DGLR / CEAS European Air and Space Conference 2007
DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007
CEAS 2007 – 290
DGLR-Fachausschuss S4.1
Survey of Agency Programmes and Budgets
Dedicated to Demonstration and Development
Available for German Space Industry
R. Pernpeintner, D. Sygulla
2
DGLR / CEAS European Air and Space Conference 2007
DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007
European Space Expenses, per Nation
France
Italy
Germany
0
100
200
300
400
500
600
700
800
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
M€
(E
.C.
20
07
)
others
3
DGLR / CEAS European Air and Space Conference 2007
DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007
Space Budgets – ESA and world
16,0
22,5
3,82,1 1,5 1,3 0,8 0,2 0,1
0,0
5,0
10,0
15,0
20,0
25,0
NA
SA
US
-DO
D
ES
A
JAX
A
CN
SA
RK
A
ISR
O
KA
RI
AE
B
Sp
ac
e A
ge
nc
y B
ud
ge
ts 2
00
6
Billion US$
4
DGLR / CEAS European Air and Space Conference 2007
DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007
European Space Expenses, per Programme
Ariane
Vega
Soyuz at CSG
FLPP
CSG
EGAS
ARTA & VERTA
(to be approved)
CSG
(to be approved)
New
Programs
(to be approved)
0
100
200
300
400
500
600
700
800
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
M€
(E
.C.
20
07
)
5
DGLR / CEAS European Air and Space Conference 2007
DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007
German Civil Space Expenses in 2005
total 890 M€
71% 17% 12%
6
DGLR / CEAS European Air and Space Conference 2007
DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007
Programme Period Budget
ACEP 2006 - 2010 3%
ARTA 2007 - 2010 9%
ARTES 2006 - 2010 11%
Aurora 2006 - 2009 2%
ELIPS 2 2006 - 2009 3%
EOEP 3 2008 - 2013 26%
Exomars 2006 - 2011 14%
FLPP 2006 - 2009 6%
GMES 1 2006 - 2008 5%
GSTP 2006 - 2008 5%
ISS expl2 2005 - 2008 10%
VERTA 2006 - 2010 5%
TOTAL 4.738 €
ACEPARTA
ARTES
Aurora
ELIPS 2
EOEP 3
Exomars
FLPP
GMES 1
GSTP
ISS expl2
VERTA
MC 2005 – Programmes Decided
7
DGLR / CEAS European Air and Space Conference 2007
DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007
Period 1
2004-2007
▪
▪
▪
Preparation of the down-selection of RLV system concepts
driving the technology developments
Preparation of experimental vehicle concepts
Assess evolutions to reduce the cost of current ELVs
Period 2 step1
2006-2009
▪
▪
▪
Provide technical elements for decisions in 2008
Preparation of NGL vehicle concepts (ELV, RLV) down selection
Perform associated technology activities focussing on
demonstrators (propulsion, cryogenic stage, re-entry, materials
and structures ...)
Period 2 step 2
and Period 3
2009-2013
▪
▪
▪
▪
To be revised as a function of the selected scenario
Finalisation of the initiated technology demonstrators
Updated mission requirements for the NGL
Final recommendation of one NGL concept
source: ESA, 7.3.06
recent progress: ELV launcher concept now in preference compared to RLV
FLPP – Periods
8
DGLR / CEAS European Air and Space Conference 2007
DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007
System Studies 6%
Cryogenic Upper Stage
Technology CUST8%
Propulsion
Expander Cycle 26%
Main Stage Prop. 21%
Solid 1,2%
Materials & Structures 6%
Opto-Pyrotechnik 1,0%
Acionics & GNC 0,4%
Other Technologies 0,6%
Re-entry Demonstrator IXV 18%
Technik-Budget 278,4 M€
ESA Administrat. Budget 11%
total 312,6 M€
source: DLR, 17.4.07
FLPP – Budget Break-down
9
DGLR / CEAS European Air and Space Conference 2007
DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007
ACEP – Ariane Consolidation and Evolution Preparation
ACEPACEP
A5 Consolidation
BME, EPC, ESC-A, ESC-ARF, JAVE, ISS, Vulcain-2, HM-7, FlightExploitation, TelemetryNetwork, ELA-3, MPS, Payload Fairing
A5 Consolidation
BME, EPC, ESC-A, ESC-ARF, JAVE, ISS, Vulcain-2, HM-7, FlightExploitation, TelemetryNetwork, ELA-3, MPS, Payload Fairing
A5 Evolution Prep.
Vulcain 2, telemetry, OBC, EPC, structures
A5 Evolution Prep.
Vulcain 2, telemetry, OBC, EPC, structures
Specific Mission
Adaptations
Herschel / Planck
Specific Mission
Adaptations
Herschel / Planck
But:Budget now partly dedicated to A5-ML acitivites���� reducing possible work content of ACEP
10
DGLR / CEAS European Air and Space Conference 2007
DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007
A5-ME – Steering Commitee Conclusion
� Candidate Priorisation
3 categories
– C1: coping with Ariane-5 Mid-life Evolution objectives
– C2: potentially contributing to Ariane-5 Mid-life Evolution objectives
– C3: not coping with A5Mid-life Evolution objectives
� Note:No specific budget, partly to be financed by ACEP
11
DGLR / CEAS European Air and Space Conference 2007
DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007
A5-ME – Steering Commitee Conclusion
� Already reference
– Improved upper stage ESC-X: expander cycle, new upper composite
� Category 1
– System: GNSS navigation, additional kick-stage– Central main stage EPC: improved front skirt– Booster: steel case, segments 2 and 3 overloaded to P 250, nozzle, aft skirt
and DIAS modification– Upper stage ESC: versatility– SEL: OBC, Li-ion battery– Ground segment: payload encapsulation, GH2 venting
� Category 2
– EPC: bulhead spinforming, Vulcain 2 evolution– SEL: opto-pyro technique, SRI, hybrid navigation– Ground segment: ZL-access, test benches, DAAR integration
� Category 3
– Booster: steel 2 segmented, CFRP 2 and 3 segmented case, adapted nozzle– Low-cost initiator, TBI barrier
12
DGLR / CEAS European Air and Space Conference 2007
DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007
Other Programmes – Clipper / ACTS / CSTS
MAKS” conceptby Molniya
capsule conceptby Krunichev
Klipper conceptby Energia
13
DGLR / CEAS European Air and Space Conference 2007
DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007
Europe’s Launcher Business Evolution
-
500
1 000
1 500
2 000
2 500
19
73
19
75
19
77
19
79
19
81
19
83
19
85
19
87
19
89
19
91
19
93
19
95
19
97
19
99
20
01
20
03
20
05
20
07
20
09
ME
UR
O
Development & ARTA
(ESA funding w/o CSG & EGAS)
Launch Service
(Arianespace turnover w/o EGAS)
CSG & EGAS
Ord
ers
Ord
ers
Arianespace
Fu
nd
ing
Agencies• ESA• CNES
ESA•Development
•ARTACSG (CNES)
EGAS