survey of agency programmes and budgets dedicated to ... · capsule concept by krunichev klipper...

13
1 DGLR / CEAS European Air and Space Conference 2007 DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007 CEAS 2007 – 290 DGLR-Fachausschuss S4.1 Survey of Agency Programmes and Budgets Dedicated to Demonstration and Development Available for German Space Industry R. Pernpeintner, D. Sygulla

Upload: vuongnhi

Post on 01-May-2019

213 views

Category:

Documents


0 download

TRANSCRIPT

1

DGLR / CEAS European Air and Space Conference 2007

DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007

CEAS 2007 – 290

DGLR-Fachausschuss S4.1

Survey of Agency Programmes and Budgets

Dedicated to Demonstration and Development

Available for German Space Industry

R. Pernpeintner, D. Sygulla

2

DGLR / CEAS European Air and Space Conference 2007

DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007

European Space Expenses, per Nation

France

Italy

Germany

0

100

200

300

400

500

600

700

800

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

M€

(E

.C.

20

07

)

others

3

DGLR / CEAS European Air and Space Conference 2007

DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007

Space Budgets – ESA and world

16,0

22,5

3,82,1 1,5 1,3 0,8 0,2 0,1

0,0

5,0

10,0

15,0

20,0

25,0

NA

SA

US

-DO

D

ES

A

JAX

A

CN

SA

RK

A

ISR

O

KA

RI

AE

B

Sp

ac

e A

ge

nc

y B

ud

ge

ts 2

00

6

Billion US$

4

DGLR / CEAS European Air and Space Conference 2007

DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007

European Space Expenses, per Programme

Ariane

Vega

Soyuz at CSG

FLPP

CSG

EGAS

ARTA & VERTA

(to be approved)

CSG

(to be approved)

New

Programs

(to be approved)

0

100

200

300

400

500

600

700

800

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

M€

(E

.C.

20

07

)

5

DGLR / CEAS European Air and Space Conference 2007

DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007

German Civil Space Expenses in 2005

total 890 M€

71% 17% 12%

6

DGLR / CEAS European Air and Space Conference 2007

DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007

Programme Period Budget

ACEP 2006 - 2010 3%

ARTA 2007 - 2010 9%

ARTES 2006 - 2010 11%

Aurora 2006 - 2009 2%

ELIPS 2 2006 - 2009 3%

EOEP 3 2008 - 2013 26%

Exomars 2006 - 2011 14%

FLPP 2006 - 2009 6%

GMES 1 2006 - 2008 5%

GSTP 2006 - 2008 5%

ISS expl2 2005 - 2008 10%

VERTA 2006 - 2010 5%

TOTAL 4.738 €

ACEPARTA

ARTES

Aurora

ELIPS 2

EOEP 3

Exomars

FLPP

GMES 1

GSTP

ISS expl2

VERTA

MC 2005 – Programmes Decided

7

DGLR / CEAS European Air and Space Conference 2007

DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007

Period 1

2004-2007

Preparation of the down-selection of RLV system concepts

driving the technology developments

Preparation of experimental vehicle concepts

Assess evolutions to reduce the cost of current ELVs

Period 2 step1

2006-2009

Provide technical elements for decisions in 2008

Preparation of NGL vehicle concepts (ELV, RLV) down selection

Perform associated technology activities focussing on

demonstrators (propulsion, cryogenic stage, re-entry, materials

and structures ...)

Period 2 step 2

and Period 3

2009-2013

To be revised as a function of the selected scenario

Finalisation of the initiated technology demonstrators

Updated mission requirements for the NGL

Final recommendation of one NGL concept

source: ESA, 7.3.06

recent progress: ELV launcher concept now in preference compared to RLV

FLPP – Periods

8

DGLR / CEAS European Air and Space Conference 2007

DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007

System Studies 6%

Cryogenic Upper Stage

Technology CUST8%

Propulsion

Expander Cycle 26%

Main Stage Prop. 21%

Solid 1,2%

Materials & Structures 6%

Opto-Pyrotechnik 1,0%

Acionics & GNC 0,4%

Other Technologies 0,6%

Re-entry Demonstrator IXV 18%

Technik-Budget 278,4 M€

ESA Administrat. Budget 11%

total 312,6 M€

source: DLR, 17.4.07

FLPP – Budget Break-down

9

DGLR / CEAS European Air and Space Conference 2007

DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007

ACEP – Ariane Consolidation and Evolution Preparation

ACEPACEP

A5 Consolidation

BME, EPC, ESC-A, ESC-ARF, JAVE, ISS, Vulcain-2, HM-7, FlightExploitation, TelemetryNetwork, ELA-3, MPS, Payload Fairing

A5 Consolidation

BME, EPC, ESC-A, ESC-ARF, JAVE, ISS, Vulcain-2, HM-7, FlightExploitation, TelemetryNetwork, ELA-3, MPS, Payload Fairing

A5 Evolution Prep.

Vulcain 2, telemetry, OBC, EPC, structures

A5 Evolution Prep.

Vulcain 2, telemetry, OBC, EPC, structures

Specific Mission

Adaptations

Herschel / Planck

Specific Mission

Adaptations

Herschel / Planck

But:Budget now partly dedicated to A5-ML acitivites���� reducing possible work content of ACEP

10

DGLR / CEAS European Air and Space Conference 2007

DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007

A5-ME – Steering Commitee Conclusion

� Candidate Priorisation

3 categories

– C1: coping with Ariane-5 Mid-life Evolution objectives

– C2: potentially contributing to Ariane-5 Mid-life Evolution objectives

– C3: not coping with A5Mid-life Evolution objectives

� Note:No specific budget, partly to be financed by ACEP

11

DGLR / CEAS European Air and Space Conference 2007

DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007

A5-ME – Steering Commitee Conclusion

� Already reference

– Improved upper stage ESC-X: expander cycle, new upper composite

� Category 1

– System: GNSS navigation, additional kick-stage– Central main stage EPC: improved front skirt– Booster: steel case, segments 2 and 3 overloaded to P 250, nozzle, aft skirt

and DIAS modification– Upper stage ESC: versatility– SEL: OBC, Li-ion battery– Ground segment: payload encapsulation, GH2 venting

� Category 2

– EPC: bulhead spinforming, Vulcain 2 evolution– SEL: opto-pyro technique, SRI, hybrid navigation– Ground segment: ZL-access, test benches, DAAR integration

� Category 3

– Booster: steel 2 segmented, CFRP 2 and 3 segmented case, adapted nozzle– Low-cost initiator, TBI barrier

12

DGLR / CEAS European Air and Space Conference 2007

DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007

Other Programmes – Clipper / ACTS / CSTS

MAKS” conceptby Molniya

capsule conceptby Krunichev

Klipper conceptby Energia

13

DGLR / CEAS European Air and Space Conference 2007

DGLR Fachausschuss Raumtransportsysteme S4.1 / Survey of Agency Programmes and Budgets / June 2007

Europe’s Launcher Business Evolution

-

500

1 000

1 500

2 000

2 500

19

73

19

75

19

77

19

79

19

81

19

83

19

85

19

87

19

89

19

91

19

93

19

95

19

97

19

99

20

01

20

03

20

05

20

07

20

09

ME

UR

O

Development & ARTA

(ESA funding w/o CSG & EGAS)

Launch Service

(Arianespace turnover w/o EGAS)

CSG & EGAS

Ord

ers

Ord

ers

Arianespace

Fu

nd

ing

Agencies• ESA• CNES

ESA•Development

•ARTACSG (CNES)

EGAS