Survey Planning System 10 th European Research Vessel Operators (ERVO) Meeting 2009 - 14 th – 15 st May Copenhagen , Denmark. John Breslin Research Vessel Operations Marine Institute, Ireland.

Upload: nowles

Post on 23-Jan-2016

19 views

Category:

Documents


0 download

DESCRIPTION

10 th European Research Vessel Operators (ERVO) Meeting 2009 - 14 th – 15 st May Copenhagen , Denmark. Survey Planning System. John Breslin Research Vessel Operations Marine Institute, Ireland. Survey Planning System – Why?. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Survey Planning System

Survey Planning System

10th European Research Vessel Operators (ERVO) Meeting 2009 - 14th – 15st May

Copenhagen , Denmark.

John Breslin

Research Vessel Operations

Marine Institute, Ireland.

Page 2: Survey Planning System

Survey Planning System – Why?

Capture all survey information in one central location, from application stage through to cruise reporting

Reduce amount of manual recording Improved scheduling, planning, allocation of ship-time,

updating & displaying schedules online, reporting and statistical analysis

Automatic reminders Action points highlighted inc. ownership Used by scientists for submitting ship time application and

survey details Used by vessel crew for accessing survey information Open access – available to RV Operations, POMS Shore

operations, crew and Chief Scientist

Page 3: Survey Planning System

Survey Planning System Work Flow

RV Ops open a call for ship time for the upcoming year

Applicants logon to SPS to complete the ship time application form

Page 4: Survey Planning System

SPS Logon

Page 5: Survey Planning System

Survey Planning System

Logout

Logged in as smulcahyMain menu → New ship-time application

New ship-time application

Applicant Details Cruise Information Description of Research/ Training Equipment

Application date 01-Mar-2007

Save partial form Submit complete form

Schedules Surveys Reporting Action Points LogoutAdminHelp

Application code APP-CE07001

Classification Research

Survey name Applepie Solutions Seabed Study

Chief Scientist Stephen Mulcahy

Organisation Applepie Solutions

Next page →

Page 6: Survey Planning System
Page 7: Survey Planning System

Survey Planning System Work Flow

RV Ops confirm survey dates with the Chief Scientist/applicant

The new schedules for the Research Vessels are published

Page 8: Survey Planning System
Page 9: Survey Planning System

Survey Planning System Work Flow

Scientists enter survey details via SPS

SPS facilitates Diplomatic Clearance and SAC application procedures

Page 10: Survey Planning System

Survey Planning System

Logout

Logged in as smulcahyMain menu → CE07001→ Survey Details

Survey Details for CE07001

Schedules Surveys Reporting Action Points LogoutAdminHelp

DGPS

HP DGPS

Spot positions

Positioning Signals Required

Calibrations required Details here

Planned user calibrations Details here

Other technical requirements Details here

Save partial form Submit complete form Next page →← Previous page

Will you require technical assistance?

Yes No

Do you require technical support during mobilisation? Yes No

Do you require technical support during demobilisation? Yes No

Do you require technical support during ... The entire survey A portion of the survey No part of the survey

Please provide details of the portion of the survey that technical support is required

Details.

Please provide details of thetechnical support required

Details.

Support from MI Seabed survey arranged?

Support from Oceanographic teams arranged?

Yes No

Yes No

Yes NoNetwork Access Required?

How many network ports are required? 10

Yes No

Yes No

Yes No

General Facilities & Equip Pers Mob/Demob Post-cruise meet FundingUser Equip Post-cruise actionsPre-cruise actionsTech Reqs

Page 11: Survey Planning System
Page 12: Survey Planning System

Survey Planning System Work Flow

SPS generates automatic e-mail reminders to Chief Scientists regarding survey details required e.g. Next of Kin Information

Last minute changes can be entered by RV Ops

Pre Cruise actions are recorded on SPS

Page 13: Survey Planning System

Survey Planning System

Logout

Logged in as smulcahyMain menu → CE07001→ Survey Details

Survey Details for CE07001

Schedules Surveys Reporting Action Points LogoutAdminHelp

Id Description

CE07001-011 Prepare report on xxx

Owner

Pending

CE07001-002 Fix yyy Resolved

CE07001-003 Change zzz Pending

smulcahy

smulcahy

Status Creation Date Closure Date

02-Mar-2006

02-Mar-2006 02-Jun-2006

02-Aug-2007

Right-click mouse on an action point id to edit

that action point.

New Action Point

Brings user to “new action point” screen

General Facilities & Equip Tech Reqs Pers Mob/ Demob Post-cruise meet FundingUser Equip Post-cruise actions

Save partial form Submit complete form Next page →← Previous page

Pre-cruise actions

Pre-cruise actions

Last Minute Changes

Enter TextEnter More Text

15-Sep-2007 0900 Modified the mob and demob ports. Added some additional scientists and changed some scientists personal details.

16-Sep-2007 1000 Added additional items of user equipment. Modified the list of selected RV equipment to include a large crane. Added some additional chemicals required.

Add Last Minute Change

Control allowing last minute notes and changes to be

added to the survey details. Changes are stored as read-

only notes, no further modifications can be made to

these once added.

Each time an entry is made, email is sent to RVOps, the CS and P&O with details of

the note.

Page 14: Survey Planning System

Survey Planning System Work Flow

Post cruise actions are recorded on SPS

SPS facilitates post cruise reports and post cruise assessments

Page 15: Survey Planning System

Survey Planning System

Logged in as smulcahyMain menu → Action Points

List Post-cruise Action Points

Status

Id Survey No. Description

CE07001-011 Prepare report on xxx

Pending

Resolved

Start date 10 Aug 2006Celtic Explorer

Celtic Voyager

CE07001

Owner

Pending

CE07002-002 Fix yyyCE07002 Resolved

CE07002-003 Change zzzCE07002 Pending

smulcahy

smulcahy

Status Creation Date Closure Date

02-Mar-2006

02-Mar-2006 02-Jun-2006

02-Aug-2007

Schedules Surveys Reporting Action Points LogoutAdmin

Vessel All

End date 10 Aug 2006

Owner

Right-click mouse on an action point id to edit

that action point.

Help

The date range should default to the current

survey

Desc. Find

Input free text and click find to list only action points matching that

description

Pre-cruise action points

Post-cruise action points

Post-cruise action points

Page 16: Survey Planning System

Survey Planning System

Logout

Logged in as smulcahyMain menu → CE07001→ Post-cruise Assessment

Research Vessel Celtic Explorer

Survey Code CE07001

Location 1 (xxx, yyy)Location 2 (xxx, yyy)Location 3 (xxx, yyy)Location 4 (xxx, yyy)

Schedules Surveys Reporting Action Points LogoutAdminHelp

Start date 01-Mar-2007

End date 10-Mar-2007

Chief Scientist Stephen Mulcahy

Organisation Applepie Solutions

Area of operation

Master J ohn Smith

Pre-cruise planning Excellent Good Average Poor Unacceptable

Comments

Mobilisation support Excellent Good Average Poor Unacceptable

Comments

Onboard marine support / crew assistance during survey Excellent Good Average Poor Unacceptable

Comments

Onboard technical support Excellent Good Average Poor Unacceptable

Comments

Ship/technical/scientific staff interface Excellent Good Average Poor Unacceptable

Comments

Demobilisation support Excellent Good Average Poor Unacceptable

Comments

Suitability of RV equipment Excellent Good Average Poor Unacceptable

Comments

Facilities in laboratories Excellent Good Average Poor Unacceptable

Comments

Fixed scientific facilities Excellent Good Average Poor Unacceptable

Comments

Save partial form Submit complete form Next page →

Post-cruise Assessment for CE07001Onboard facilities FeedbackScientific & Technical

Post Cruise Assessment

Form

Page 17: Survey Planning System

Survey Planning System Work Flow

SPS provides survey reporting and statistical analysis

Page 18: Survey Planning System

Survey Planning System

Logged in as smulcahyMain menu → Reporting → Standard Reports

Research Vessel

Start date

Start date

Both vessels

Display report

Schedules Surveys Reporting Action Points LogoutAdmin

Standard reports

Adhoc report

Saved adhoc reports

Help

Summary of days by category

Details of days by category

Breakdown of days by category

Overall Vessel Statistics

Funding report

Post-cruise actions

End date

10 Aug 2006

10 Aug 2006

Print report Export to Excel

Page 19: Survey Planning System

Code can be made available to other vessel operators

For a small fee!!