![Page 1: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/1.jpg)
1
Sustainable Energy Project Development Workshop for
Public Institutions May 22, 2008
Oakland UniversityJim Leidel
Energy Manager
Thank you to our sponsors:Oakland University Facilities ManagementSE Michigan Resource Development CouncilEntegrity Wind SystemsState of Michigan Energy OfficeChevron Energy SolutionsThermo Energy Systems
![Page 2: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/2.jpg)
2
Introduction to Renewable Energy Resources
SolarWindBiomassOthers
Brief Review of Oakland University Feasibility Studies
(Terawatts)
0.2%
0.02%
![Page 3: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/3.jpg)
3
Energy and the Environment
Alternative Energy Resources
Solar
![Page 4: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/4.jpg)
4
cosmic rays
![Page 5: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/5.jpg)
5
100% Solar
Electric Power ?
![Page 6: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/6.jpg)
6
Link to Spreadsheet
Calculation of Solar Panle Area Required to Meet 2002 US Electrical Energy Consumption
Annual electrical energy required = 1.25E+19 Joules / yr= 3.47E+12 kW hr / yr
Average POWER of full sun at solar panel = 1,000 W / m2
= 1.0 kW / m2
Average capacity factor 20%Hours per year 8,760 hours / yr
Average solar ENERGY available to solar panel = 1752 kW hr / m2 / yr= 4.8 kW hr / m2 / day
Estimated average PV total system efficiency = 10%Estimated average system losses = 15%Estimated electrical energy output = 148.92 kW hr / m2 / yr
= 0.408 kW hr / m2 / dayArea required 2.33E+10 m2
Area required 2.51E+11 ft2
Area required 5,761,310 acresArea required 9,002 miles2
~ Vermont
![Page 7: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/7.jpg)
7
Nellis Air Force Range & the Nevada Test Site
= 16,000 square miles
![Page 8: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/8.jpg)
8
Photosynthesis: Nature’s way to convert sunlight, CO2, water and nutrients into chemical energy
BioMass
Photosynthesis:CO2 + H2O + solar energy O2 + glucose
Reverse of photosynthesis:
CO2 + H2O + heat energy O2 + glucose
… also called combustion, oxidation, biodegradation…chemical bonds in glucose are broken
… nature’s battery stores solar energy in chemical bonds of glucose.
![Page 9: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/9.jpg)
9
Prospecting forBiomass ?
2005
![Page 10: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/10.jpg)
10
![Page 11: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/11.jpg)
11
![Page 12: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/12.jpg)
12
BIOMASS CROPS
![Page 13: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/13.jpg)
13
![Page 14: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/14.jpg)
14
Switchgrass
![Page 15: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/15.jpg)
15
![Page 16: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/16.jpg)
16
The Wind
![Page 17: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/17.jpg)
17
WindSpeed @50mHeight
![Page 18: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/18.jpg)
18
WindSpeed @70mHeight
WindSpeed @100mHeight
![Page 19: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/19.jpg)
19
Other Sources:Hydro Power
Geothermal Energy
Ocean Thermal
Ocean Currents
Tidal Energy
Wave Energy
Next,
A Brief Review of Oakland University Feasibility Studies
![Page 20: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/20.jpg)
20
Wind Power Option
for Oakland University
• Wind Speed Study Results•Wind speed was recorded for two years at a 50 meter tall “met tower” located on the south side of the main campus•Data collected for 2006 & 2007
• Feasibility Study Results•This data was then used in a full engineering and cost analysis for one or more wind turbines for the Oakland campus
There were two parts of the study
![Page 21: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/21.jpg)
21
Height Wind Speed Method 30 m 3.0 m/s measured40 m 3.6 m/s measured50 m 4.1 m/s measured
75 m 5.2 m/s calculated 80 m 5.4 m/s calculated100 m 6.2 m/s calculated
Average Wind Data Results
Meters per second
Wind Speed Frequency Distribution at 50 Meters (percent time for each wind speed)
Here is a small samplingof the type of data gained
in the wind study
![Page 22: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/22.jpg)
22
Annual Average Wind Power DensityWind Rose at 50 Meter Height
(shows magnitude and direction of annual wind power potential)
50 W/m2
100 W/m2
150 W/m2
0
5
10
15
20
25
0 5 10 15 20
Wind Speed (meters / second)
Freq
uenc
y at
Giv
en W
ind
Spee
d (%
)
30 meter
Frequency of Wind Speed as Height Increases
![Page 23: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/23.jpg)
23
0
5
10
15
20
25
0 5 10 15 20
Wind Speed (meters / second)
Freq
uenc
y at
Giv
en W
ind
Spee
d(%
)
30 meter
40 meter
Frequency of Wind Speed as Height Increases
0
5
10
15
20
25
0 5 10 15 20
Wind Speed (meters / second)
Freq
uenc
y at
Giv
en W
ind
Spee
d (%
)
30 meter
40 meter
50 meter
Frequency of Wind Speed as Height Increases
![Page 24: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/24.jpg)
24
0
5
10
15
20
25
0 5 10 15 20
Wind Speed (meters / second)
Freq
uenc
y at
Giv
en W
ind
Spee
d (%
)
0
200
400
600
800
1000
1200
1400
1600
Win
d Tu
rbin
e O
ut p
ut (k
W)
30 meter
40 meter
50 meter
Turbine Power
Frequency of Wind Speed as Height Increases1,500 kW Turbine
0
5
10
15
20
25
0 5 10 15 20
Wind Speed (meters / second)
Freq
uenc
y at
Giv
en W
ind
Spee
d (%
)
0
200
400
600
800
1000
1200
1400
1600W
ind
Turb
ine
Out
put
(kW
)
30 meter
40 meter
50 meter
60 meter
Turbine Power
Frequency of Wind Speed as Height Increases
![Page 25: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/25.jpg)
25
0
5
10
15
20
25
0 5 10 15 20
Wind Speed (meters / second)
Freq
uenc
y at
Giv
en W
ind
Spee
d (%
)
0
200
400
600
800
1000
1200
1400
1600
Win
d Tu
rbin
e O
ut p
ut (k
W)
30 meter
40 meter
50 meter
60 meter
70 meter
Turbine Power
Frequency of Wind Speed as Height Increases
0
5
10
15
20
25
0 5 10 15 20
Wind Speed (meters / second)
Freq
uenc
y at
Giv
en W
ind
Spee
d (%
)
0
200
400
600
800
1000
1200
1400
1600W
ind
Turb
ine
Out
put
(kW
)
30 meter
40 meter
50 meter
60 meter
70 meter
80 meter
Turbine Power
Frequency of Wind Speed as Height Increases
![Page 26: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/26.jpg)
26
0
5
10
15
20
25
0 5 10 15 20
Wind Speed (meters / second)
Freq
uenc
y at
Giv
en W
ind
Spee
d (%
)
0
200
400
600
800
1000
1200
1400
1600
Win
d Tu
rbin
e O
ut p
ut (k
W)
30 meter
40 meter
50 meter
60 meter
70 meter
80 meter
90 meter
Turbine Power
Frequency of Wind Speed as Height Increases
Frequency of Wind Speed as Height Increases
0
5
10
15
20
25
0 5 10 15 20
Wind Speed (meters / second)
Freq
uenc
y at
Giv
en W
ind
Spee
d (%
)
0
200
400
600
800
1000
1200
1400
1600W
ind
Turb
ine
Out
put
(kW
)
30 meter40 meter50 meter60 meter70 meter80 meter90 meter100 meterTurbine Power
![Page 27: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/27.jpg)
27
Energy Production (kWhr) as Height Increases
0
100,000
200,000
300,000
400,000
500,000
600,000
0 2 4 6 8 10 12 14 16 18 20
Wind Speed (meters / second)
Win
d Tu
rbin
e Pr
oduc
tion
(kW
hr) p30m
p40mp50mp80mp100m
1
2 3
4
Potential Installation
Sites
![Page 28: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/28.jpg)
28
( image courtesy of Khales Dahr & Jim Leidel )
Artist’s Rendering of Oakland Wind Turbine
Here is a typical wind turbine under consideration 1,500 kW each
77 meter bladediameter
100 meter tower
![Page 29: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/29.jpg)
29
Illustration of turbine components
Projected Cost per kW-hr Electricity Over 25 Year Project
![Page 30: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/30.jpg)
30
$(500,000)
$-
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
$3,000,000
2,010
2,012
2,014
2,016
2,018
2,020
2,022
2,024
2,026
2,028
2,030
2,032
2,034
Net Annual Cash Flow
Cumulative Cash Flow
15 year CREB @ 0% 20 year financing on remainder @ 4.5% 3% utility cost escalation 3% O&M cost escalation 1.5 cent / kWhr REC's
Net Annual and Cumulative Cash Flow Over 25 Year Project(construction in 2009, beginning operation in 2010)
Biomass Power Option
for Oakland University
![Page 31: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/31.jpg)
31
• Wood supply• Campus growth &
future needs• Wood boilers• Proposed sites• Costs & savings
We looked at 14 counties in SE Michigan & found 1.7 million tons of urban waste wood per year
![Page 32: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/32.jpg)
32
Existing biomass power plants
Nearby wood recyclers could easily serve the new system
![Page 33: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/33.jpg)
33
![Page 34: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/34.jpg)
34
![Page 35: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/35.jpg)
35
Central Michigan University
Northern Michigan University is developing a plant
Other campuses heat with wood
![Page 36: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/36.jpg)
36
(note: only water vapor is coming from stack) photo - Jim Leidel 2005
CMU Wood Boiler Plant(heats most of campus)
Next we look at the future needs for campus:
1. Replace aging boilers2. More capacity for future growth
![Page 37: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/37.jpg)
37
265Total51 / marginal195732B-4
49 / fair195934B-339 / good1969100B-239 / good1969100B-1
Age in years / Condition
Year Installed
Capacity (MMBTU/hr)
Unit
Existing Central Heating Plant
14,37916,059
18,082
25,000
0
5,000
10,000
15,000
20,000
25,000
1997 2002 2007 2020
Undergraduate Graduate
Oakland University Ten Year Fall Enrollment Growth with 2020 Vision
![Page 38: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/38.jpg)
38
$2.0M
$3.4M
$5.3M
$8.4M
$0
$2
$4
$6
$8
1997 2002 2007 2020
Electric cost Natural gas cost
Millions
Oakland University Ten Year Energy Growth with 2020 Vision2020 Projection based on $0.085/kWhr electricity and $11/MMBTU gas
We then looked at various wood boiler systems
![Page 39: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/39.jpg)
39
Vynke Stoker(Steam & HW)
Typical VynkePlant Layout
![Page 40: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/40.jpg)
40
ThreeProposed Site Locations
Artist’s Renderings
![Page 41: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/41.jpg)
41
A new wood storage building (in Kingsville, Ontario) 80 MMBTU/hr
![Page 42: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/42.jpg)
42
Annual operating savings are in the range of $1.5 million
Operating Cost Estimates
![Page 43: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/43.jpg)
43
Overview of an Integrated, Renewable Energy Supply Infrastructure
Overview of an Integrated, Renewable Energy Supply Infrastructure
![Page 44: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/44.jpg)
44
Overview of an Integrated, Renewable Energy Supply Infrastructure
Overview of an Integrated, Renewable Energy Supply Infrastructure
![Page 45: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/45.jpg)
45
Overview of an Integrated, Renewable Energy Supply Infrastructure
100%100%100%100%Totals
20%Wind Power
50%80%Biomass Boiler Plant
10%5%Diesel Generators
20%95%Detroit Edison
20%100%Central Heating Plant (natural gas)
ElectricalThermal(Heating)
ElectricalThermal(Heating)
Proposed Renewable Energy
Existing Fossil Fuel Mix
Overview of an Integrated Renewable Energy Supply Infrastructure
![Page 46: Sustainable Energy Project Development Workshop for … · Sustainable Energy Project Development Workshop for Public Institutions ... = 3.47E+12 kW hr / yr ... Meters per second](https://reader031.vdocument.in/reader031/viewer/2022020316/5b599ce57f8b9ad0048d320a/html5/thumbnails/46.jpg)
46
Biomass & WindPower
Sustainable Energy Options for the Future of Oakland University
For more info visit www.oakland.edu/energy