Systems Engineering Management. MSE607B Chapter 5 Design Review and Evaluation. Learning Objectives. Explain the basic philosophy of design evolution Describe the evaluation methods Explain the informal and formal design reviews - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/1.jpg)
EngineeringManagement
Systems EngineeringManagement
MSE607BChapter 5
Design Review and Evaluation
![Page 2: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/2.jpg)
2
Learning Objectives
Explain the basic philosophy of design evolution Describe the evaluation methods Explain the informal and formal design reviews Explain the feedback and corrective-action loop
associated with these activities
![Page 3: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/3.jpg)
3
Design Review and Evaluation
![Page 4: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/4.jpg)
4
Design Review and Evaluation Requirements
Formal mechanism to ensure design will meet consumer need Design evolves through iterations from initial definition to firm
system configuration Requirements verification process required from the beginning
• Early detection of potential problems allows to incorporate necessary changes easily
• An ongoing design review and evaluation effort is required Overall review process through combination of several approaches:
• Informal day-to-day review and evaluation • Formal design reviews at designated stages
Serve as a vehicle for communications Serve as the formal approval of design data
![Page 5: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/5.jpg)
5
Design Review and Evaluation Procedure
![Page 6: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/6.jpg)
6
Informal Day-to-day Review and Evaluation
Performed as design decisions are made and data developed
Informal activity • Results of design reviewed and discussed on a day-by-day basis
Output leads into the formal design reviews
Ensure that the results of design:• Communicated in a clear, effective, and
timely manner to all members of the design team
• Compatible with initially defined requirements for the system
Review procedure has to be accomplished efficiently and in timely manner
![Page 7: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/7.jpg)
7
Formal Design Reviews
Conducted at designated stages in the evolution of design
Serve as a vehicle for communications and the formal approval of design data.
Purpose• Review system requirements specification document• Ensure documented design reflect current knowledge of
customer and market requirements• Identify areas where design may not be consistent with
product development constraints• Put the design document under version control to serve
as a stable baseline for continued new product development
![Page 8: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/8.jpg)
8
Formal Design Reviews (cont.)
Preliminary Design Review (PDR) • Ensure planned technical approach will meet the
requirements Critical Design Review (CDR)
• Ensure design implementation has met the requirements Test Readiness Review (TRR)
• Review preparations and readiness for testing, including test procedures
Production Readiness Review (PRR)• Ensure design completely and accurately documented• Ensure design ready for formal release to manufacturing
![Page 9: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/9.jpg)
9
Conceptual (Preliminary) Design Review
PDR• Usually scheduled toward end of program conceptual
design• Deals primarily with top system-level requirements• Results constitute basis for preliminary system design
and development activity• Participation include representation from both the
consumer and producer organizationsPurpose:
• Review and evaluate the functional baseline of the system
![Page 10: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/10.jpg)
10
Topics Covered in Conceptual Design Review
Objective• Review and evaluate functional baseline of the system
Feasibility analysis • Results of technology assessments and trade-off
studies justifying the system design approach being proposed
System operational requirements System maintenance concept
![Page 11: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/11.jpg)
11
Topics Covered in Conceptual Design Review (cont.)
Functional analysis Significant design criteria for the system Effectiveness of merit and technical performance
measures System specification Type A System engineering management plan Test and evaluation master plan System design documentation
![Page 12: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/12.jpg)
12
Systems Design Reviews
Usually scheduled during preliminary design phase• Functional requirements & allocations are defined• Preliminary design layouts & specifications are prepared• System-level trade-off studies are conducted
Oriented to the overall system configuration Ensure that requirements described in the system
specifications are maintained as design evolves Should include representation from
• Consumer• Producer• Major suppliers
![Page 13: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/13.jpg)
13
Topics Covered in Systems Design Reviews
Functional analysis and the allocations of requirements Development, process, product, and material
specifications • Type B, C, D, and E
Design data defining the overall system Analysis, reports, trade-off studies, and related design
documentation. Assessment of proposed system design configuration in
terms of technical performance measures (TPMs) Individual program/design plans
![Page 14: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/14.jpg)
14
Equipment/Software Design Reviews
Formal design reviews covering equipment, software, and other components of the system: • Scheduled during the detail design and development phase
of the life cycle• Usually oriented to a particular item• Should include representation from
• Consumer• Producer• Applicable supplier organizations
![Page 15: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/15.jpg)
15
Topics Covered in Equipment/Software Design Reviews
Process, product, and material specifications • Types C, D, and E
Design data defining major subsystems, equipment, software, and other elements of the system as applicable
Analyses, reports, predictions, trade-off studies, and other related design documentation
Assessment of the proposed system design configuration in terms of the applicable TPMs
Engineering breadboards, laboratory models, service test models, mock-ups, and prototype models
Supplier data covering specific components of the system
![Page 16: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/16.jpg)
16
Critical Design Review (CDR)
Generally scheduled after the completion of detail design, but prior to the release for production or construction • Design is essentially “frozen” at this point
Proposed configuration evaluated for adequacy and producibility
Results describe final system/product configuration baseline prior to entering into production or construction.
Constitute the last in series of progressive evaluation efforts• Reflecting design and development from a historical perspective• Showing growth and maturity in design as the engineering project
evolved
![Page 17: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/17.jpg)
17
The Design Change and System Modification Process
Important that any changes to the baseline be tightly controlled
All changes carefully recorded and documented • Configuration identification• Controlling the changes• Maintaining the integrity and continuity of design• Configuration management
![Page 18: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/18.jpg)
18
The Design Change and System Modification Process (cont.)
Configuration Management (CM)• Identifies the functional and physical characteristics of
an item• Controls changes to characteristics• Records and reports change processing and implementation
status
• Proposed design changes initiated during any phase in the life cycle
• Prepared in the form of an Engineering Change Proposal (ECP)
![Page 19: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/19.jpg)
19
Engineering Change Proposal (ECP)
Each ECP should include:• Statement of the problem and description of proposed
change• Description of alternatives considered in responding to
the need• Analysis how change will impact system performance• Analysis to ensure proposed solution will not cause a
new problem • Preliminary plan for incorporating the change
![Page 20: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/20.jpg)
20
Engineering Change Proposal (ECP) (cont.)
• Description of the resources required to implement the change
• Estimate of the costs associated with implementing the change
• Impact on the system if the proposed change is NOT implemented
Classified• Class 1 changes
• Design changes that will affect fit, form or function
• Class 2 changes • Design changes that are relatively minor in nature• Will not affect system specification requirements
• May be classified as “emergency”, “urgent,” or “routine”
![Page 21: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/21.jpg)
21
Summary
Addressed the basic review, evaluation, and feedback process of system design
The process is critical in regard to the objectives of system engineering
Must be tailored to the specific system development effort and must be properly controlled
An ongoing measurement and evaluation activity is essential and must be initiated from the beginning
Without proper controls, the incorporation of design changes ay be costly in terms of possible modifications and system support
![Page 22: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/22.jpg)
22
Interactive Workshop
Preliminary Design Review (PDR):
a)Ensures design implementation has met the requirements
b)Ensures that the planned technical approach will meet the requirements
c) Review preparations and readiness for testing, including test procedures
d)Ensures design is ready for formal release to manufacturing
![Page 23: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/23.jpg)
23
System design reviews ensure that:
a) Requirements described in the system specifications are maintained as design evolves
b) Proposed design changes initiated during any phase in the life cycle are documented
c) Proposed design changes initiated during any phase in the life cycle are documented
d) Results constitute basis for preliminary system design and development activity
e) None of the above
Interactive Workshop
![Page 24: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/24.jpg)
24
Configuration Management (CM) is the process that:
a) Identifies the functional and physical characteristics of an item
b) Controls changes to functional and physical design characteristics
c) Records and reports change processing and implementation status
d) All of the above
Interactive Workshop
![Page 25: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/25.jpg)
25
The Critical Design Review, also known as CDR, is generally scheduled:
a) After the completion of detail design, but prior to the release of firm design data for production
b) After the completion of detail design and during the release of firm design data for production
c) During the detail design and development phase of the life cycle
d) During the requirements definition phase of the life cycle
Interactive Workshop
![Page 26: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/26.jpg)
26
The purpose of conceptual design review is to:
a) Experiment with different packaging during formal design
b) Convey final design approach during design review
c) Review and evaluate the reliability baseline of the system
d) Review and evaluate the functional baseline of the system
Interactive Workshop
![Page 27: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/27.jpg)
27
Homework Assignment
Chapter 5 – Textbook page 246 • Answer questions 1, 4, 7, 11 and 13
Read Chapter 6 - Engineering Program Planning
• Pages 247-333
![Page 28: Systems Engineering Management](https://reader035.vdocument.in/reader035/viewer/2022062323/568158b1550346895dc5ffd6/html5/thumbnails/28.jpg)