t- 489 status report 4/5/07
DESCRIPTION
T- 489 Status Report 4/5/07. Yesterday:. 10am: access to ESA to retrieve Fe samples and place Ti-alloy samples Irradiation for 3.5hrs 2:00 pm : access to ESA to retrieve downstream Fe samples Continuous gamma spectrometry and dose - PowerPoint PPT PresentationTRANSCRIPT
1
T- 489Status Report 4/5/07
- 10am: access to ESA to retrieve Fe
samples and place Ti-alloy samples
- Irradiation for 3.5hrs
- 2:00 pm: access to ESA to retrieve downstream Fe samples
- Continuous gamma spectrometry and dose rate measurements in building 24
Yesterday:
2B24 Measurements
Dose Rate Measurements
Gamma Spectra Measurements
3
Dose rates to be measured over a period of 1000 hours (until May 15, 2007)
Short term sample activation levels at ~10 Sv/hr (1mR/hr) on contact
Samples Species:
Cu, Al, Fe, Ti, TiAlV, SS, dirt, concrete, water
B24 Measurements
4AB01 Toroids
5AB01 Toroids
Check of CID Toroid with respect to CID Faraday Cup (10% agreement)
Likely to do a post experiment calibration of AB01 Toro 4140
6
10am: take out Ti-Alloy and Steel Reference samples put in Al lateral and downstream and Steel Reference samples
- Irradiation for 4hrs
- 2pm: access to ESA to retrieve Al downstream sample
- Continuous gamma spectrometry and dose rate measurements in
building 24
Will run through weekend until 7:00 AM Monday (09-May-2007)
Schedule for today: