Blue River South Inflow/Infiltration Reduction Projects
Center Planning & Development Council
T U E S D A Y, M A Y 2 6 , 2 0 1 5
Kansas City’s Overflow Control Program
May 26, 2015 2
Program Overview
May 26, 2015 3
Kansas City’s Program Implementation
4May 26, 2015
Blue River South Inflow/Infiltration Reduction Projects
Inflow/Infiltration Reduction Projects
May 26, 2015 6
Pu
bli
c
Pr
iva
te
$250 Million Investment
Inflow and Infiltration (I/I) Sources
7May 26, 2015
Project Goals
• Reduce inflow/infiltration flows by 45% basin-wide.
• Increase the reliability and performance of sewer service.
• Protect public health by reducing basement backups.
• Improve water quality of area streams by reducing overflows or releases of untreated sewage into the environment.
May 26, 2015 8
Blue River South Inflow/Infiltration Reduction Projects
May 26, 2015 9
KC Water Services Contacts
Andy Shively Engineering Officer
May 26, 2015 10
Julie JensonProject Manager
John PrussOverflow Control
Program Manager
Project Boundary: Area 1 and Area 2
May 26, 2015 11
Project Team
• GBA assisted by DuBois
• Havens - Construction contractor
Anticipated Schedule
• Design July 2013 – April 2015
• Construction August 2015 – March 2017
Project Boundary: Area 3
May 26, 2015 12
Project Team
• Olsson Associates assisted by
Taliaferro and Browne and
TREKK Design Group
Anticipated Schedule
• Field investigations June 2015 – November 2015
• Design January 2015 – August 2016
• Construction December 2016 – February 2018
Project Boundary: Area 4
May 26, 2015 13
Project Team
• GBA assisted by DuBois, Schmitz
King & Associates, and TREKK
Design Group
Anticipated Schedule
• Field investigations May 2015 – January 2016
• Design February 2015 – November 2016
• Construction March 2017 – March 2019
May 26, 2015 14
Project Team
• HNTB assisted by Taliaferro
and Browne and TREKK
Design Group
Anticipated Schedule
• Field investigations June 2015 – November 2015
• Design June 2015 – December 2016
• Construction February 2017 – March 2018
Project Boundary: Area 5
Public Outreach
• Notification letters
• Area 5 Public Meeting:
• Thursday, June 25, 2015 7:00-8:30 PM St. Thomas More Parish, 11822 Holmes
• Areas 1 & 2 Public Meeting:
• Tuesday, July 14, 2015 7:00-8:30 PM Hillcrest Community Center
• Door hangers
15May 26, 2015
Manhole Inspections and Surveys
May 26, 2015 16
Sewer Cleaning and CCTV
May 26, 2015 17
Smoke Testing
May 26, 2015 18
Dyed-Water Testing
May 26, 2015 19
Construction
May 26, 2015 20
Question and Answer