T2 Energy | +61 7 3713 7269 | www.t2energy.com.au 1 T2 Energy www.t2energy.com.au Electrical Infrastructure and Control Solutions

Upload: lycong

Post on 23-Apr-2018

219 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: T2 Energy in a wide range of mining, ... Primer coat Dulux Powder Coat Primer applied at 10-20 micrometres. ... Kentan UBS busbar supports (type 6,

T2 Energy | +61 7 3713 7269 | www.t2energy.com.au

1

T2 Energy

www.t2energy.com.au

Electrical Infrastructure and Control Solutions

Page 2: T2 Energy in a wide range of mining, ... Primer coat Dulux Powder Coat Primer applied at 10-20 micrometres. ... Kentan UBS busbar supports (type 6,

T2 Energy | +61 7 3713 7269 | www.t2energy.com.au

2

T2 EnergyT2 Energy is a leading provider of electrical infrastructure and control solutions, including design and manufacture of switchboards, motor control centres, control panels, transformer kiosks, transportable switchboards, and associated automation and control solutions.

T2 Energy’s clients are largely in the mining, industrial and utilities sectors. T2 is also involved in the solar power renewable energy sector, where T2 can provide solutions including E-House, transformers, PV panels and array frames, combiner boxes, cables, and accessories as well as SCADA hardware and software.

Based in Brisbane, Queensland, T2 Energy has established a reputation for quality and reliability, with experienced project management resources and processes ensuring on-time delivery so that our clients can meet their project schedules and deadlines.

The focus of our design and manufacturing team is to supply electrical equipment and systems that meet our clients’ expectations, on budget and on time. We acknowledge that space constraints and costs must be balanced with the provision of suitable spacing for switchgear, and safe termination of cable.

T2 Energy has achieved accreditation for its Quality Management System in accordance with AS/NZS ISO 9001: 2015 Standard.

ExperienceT2 Energy has supplied custom-built and containerised transportable electrical switch rooms, padmounted transformer kiosks, motor control centres, main switchboards, distribution boards, local control stations and control panels for mining, industrial, utility and solar installations. The equipment has been installed in various applications including pipelines, mineral processing, multi-stage kilns, wash plants, coal handling and preparation plants, water and sewage treatment plants, and solar farms.

Moura WTP Stainless Steel MCC

Page 3: T2 Energy in a wide range of mining, ... Primer coat Dulux Powder Coat Primer applied at 10-20 micrometres. ... Kentan UBS busbar supports (type 6,

T2 Energy | +61 7 3713 7269 | www.t2energy.com.au

3

Mt Isa DCS Cabinet

Kiln Control Panel

APA Aluminium Cathodic Protection Panels

Page 4: T2 Energy in a wide range of mining, ... Primer coat Dulux Powder Coat Primer applied at 10-20 micrometres. ... Kentan UBS busbar supports (type 6,

T2 Energy | +61 7 3713 7269 | www.t2energy.com.au

4

Custom Built Switchboard SystemsT2 Energy’s standard custom switchboard is a fully welded, powder coated free standing construction with an IP56 degree of protection, manufactured from 2mm zinc coated steel, and demountable modules. This proven type-tested design has been used in a wide range of mining, industrial, and commercial applications both as indoor and outdoor weatherproof switchboards. For motor control applications the MCC tiers are manufactured as 8 or 10 cell variants with a nominal cell width of 550mm. This standard design can be modified to suit specific customer requirements. Custom specifications can be found at the end of this document.

Key System Features

Construction

Engineering Services

• Fault rating of up to 80kA for one second • Main busbar rating up to 4000 amps• Internal arc fault containment (annex ZD)• Flexibility in design to meet customer requirements• Internal segregation from Form 1 up to Form 4b

• Robust structure suitable for arduous conditions• Available in 2mm zinc coated steel, 2mm stainless steel, or 3mm aluminium• Powder coated finish in X15 Orange, with other colours available on request• Plinth 75PFC hot dipped galvanised, and pre-drilled for floor fixing

• Electrical design and drafting services• Full technical documentation and manuals

Page 5: T2 Energy in a wide range of mining, ... Primer coat Dulux Powder Coat Primer applied at 10-20 micrometres. ... Kentan UBS busbar supports (type 6,

T2 Energy | +61 7 3713 7269 | www.t2energy.com.au

5

To ensure trouble-free installation and commissioning on-site, all T2 Energy switchboards are put through rigorous quality control throughout the manufacturing process and before despatch. The following factory tests are carried out:• Dielectric properties test• Control functions• Protective circuits test• Clearage and creepage distances• Mechanical operation

Factory Testing

General details

Our standard switchboard design has been Fully Type Tested (TTA) in accordance with Australian Standards AS/NZS 3439.1:2002, and AS 60529–2004 as follows:

Rated voltage 415V

Rated insulation voltage 690V

Form of segregation Form 4

Verification of dielectric properties after short circuit tests 2500V RMS 1422/1 to1422/5

Verification of dielectric properties after short circuit tests 1000V RMS 1422/6

Short circuit withstand strength

Description Rating Peak Test Cert. No

Main horizontal busbars 50kA for 1 second 105kA Peak 1422/1

50kA for 3 seconds 105kA Peak 1422/1

63kA for 1 second 138kA Peak 1422/2

80kA for 1 second 176kA Peak 1422/2

Neutral busbar 48kA for 1 second 103kA Peak 1422/2

Main vertical busbars 50kA for 1 second 105kA Peak 1422/3

63kA for 1 second 138kA Peak 1422/5

80kA for 1 second 176kA Peak 1422/4

Compartments with protective devices

DOL starters 7.5kW – 75kW 63kA prospective 1422/6

Internal arc fault containment

Feeders 100A – 160A 63kA prospective 1422/7

DOL starters 30kW – 75kW 63kA prospective 1422/7

Degree of protection to AS 60529-2004

IP66 NE08/0019

Testing Specifications

Switchboard Type Testing

Page 6: T2 Energy in a wide range of mining, ... Primer coat Dulux Powder Coat Primer applied at 10-20 micrometres. ... Kentan UBS busbar supports (type 6,

T2 Energy | +61 7 3713 7269 | www.t2energy.com.au

6

ManufacturingOur manufacturing facilities have been established for over 40 years and are located on a 12 000m2 site with more than 500 employees. It houses an extensive array of state of the art sheet metal fabrication and machining equipment such as:• CNC lathes, milling machines, turret punches• Robotic welders• Laser machines

Additionally, it contains a number of in-house facilities including:• Powder coating facilities• Plating facilities• Liquid gasketing machine for dust seals• Clean room for power and control wiring• Electrical testing facilities

Personnel resources in our manufacturing facility include:• Design and drawing• Production planning and control• Manufacturing• Procurement• Stores (receipt, despatch, stock control, etc.)• Administration• Quality assurance

T2 Energy is able to provide ex-works lead times for switchboards of approximately 6-8 weeks from the approval of construction drawings, with an additional 2 weeks shipping, clearance and transport.

KHEI Manufacture Control Wiring KHEI Manufacturing Aluminium MCC

Page 7: T2 Energy in a wide range of mining, ... Primer coat Dulux Powder Coat Primer applied at 10-20 micrometres. ... Kentan UBS busbar supports (type 6,

T2 Energy | +61 7 3713 7269 | www.t2energy.com.au

7

B&R Modular Switchboard SystemsB&R’s signature SE is a type tested and fully certified modular switchboard building system suitable for commercial and industrial applications. The system has an ongoing certification program to ensure compliance to all the latest design codes.

Certification

• AS/NZS 3439. 1:2002• BS EN 60439-1:1999• IEC 60439-1:2004

• Fault rating of up to 100kA for one second and 65kA for three seconds• IP43 and IP55 protection rating• Current rating from 600-3400amps (4000 amp incomer)• Impulse voltage withstand of up to 16kV• Dielectric withstand of 3.5kV• 10 drive module sizes• Up to 12 drive modules per tier

Construction

• 2mm zinc-coated steel• Polyurethane gasket (formed in place)

Key System Features

B&R Modular Switchboards

Page 8: T2 Energy in a wide range of mining, ... Primer coat Dulux Powder Coat Primer applied at 10-20 micrometres. ... Kentan UBS busbar supports (type 6,

T2 Energy | +61 7 3713 7269 | www.t2energy.com.au

8

E-House

Solar Power Renewable Energy SystemsT2 Energy specialises in the design and manufacture of electrical and mechanical fabricated equipment for solar farms, up to approximately 50MW.

The E-House acts as a control centre for all power generated from the solar farm. The major benefit of the T2 E-House is its adaptability. It can be transported and installed at any site, no matter how remote.

The components of the E-House are installed in custom-built switchrooms or containerised transportable systems. They feature the following:• 22kV/33kV main switchboard• LV main switchboard• Protection relay panels• SCADA server and communications rack• Auxiliary services transformer• Fire detection and gas suppression system• Airconditioning systems

T2 E-Houses also have remote communication capability. This means that monitoring can occur off-site.

E-House

Page 9: T2 Energy in a wide range of mining, ... Primer coat Dulux Powder Coat Primer applied at 10-20 micrometres. ... Kentan UBS busbar supports (type 6,

T2 Energy | +61 7 3713 7269 | www.t2energy.com.au

9

Transformers and Padmounted Transformer Kiosks

SCADA Software Solutions

Transformer Kiosks are sized to suit the particular requirements of the solar farm. If one part of the farm fails, T2’s ring main units allow easier maintenance without complete loss of power during repair work.

The transformers consist of the following:• 22kV/33kV ring main units• Converter transformers (2 or 3 winding)• Low voltage end or busbars suitable for connecting large solar inverter cables

SCADA Software controls the operation of the solar farm. It employs both hardware and software functions to ensure that customers have full control over their solar farms. T2 Energy provides flexibility on input and output (IO) requirements to suit our customers’ needs.

Solar Solutions

2 Energy also supply solar panels, array frames combiner boxes, cables and all solar farm accessories.

Transformer Kiosk

Page 10: T2 Energy in a wide range of mining, ... Primer coat Dulux Powder Coat Primer applied at 10-20 micrometres. ... Kentan UBS busbar supports (type 6,

T2 Energy | +61 7 3713 7269 | www.t2energy.com.au

10

General y Chrome D-handles fitted where shown on approved drawings. y Earth studs M6x20 welded to the interior of all doors, hinged escutcheons and on the

adjacent interior cubicle surface. y External hardware fitted on weatherproof cubicles to be stainless steel or chrome plated. y Exposed thread of fixings, after fitment of required materials, (e.g. washers and nuts etc)

shall be 2 clear threads (min) to 5mm (max). y Document and or schedule holders fitted as shown on approved drawings.

WIRING

y All control wiring to be PVC V90 0.6/1kV grade with tinned copper conductor. y Control and instrumentation wiring has flexible copper conductors, and colour coded as

detailed, numbered each end, and terminated by the use of appropriate pre-insulated crimp lugs etc.

y Power wiring to be a minimum 2.5sqmm stranded copper conductors, unless indicated. y Phase and control cable colour coded as required by the customer. y Low level instrumentation signals and 4-20mA signals wired in shielded pair minimum sized

to specified requirements and earthed at one end only. y Earth cables minimum 2.5sqmm flexible coloured green/yellow. y Doors and hinged escutcheons bonded with 4sqmm flexible earth strap/cable. y Wire numbering will be equal to the Brady system.

SURFACE FINISH

Surface preparation Zinc-seal AS1397–2001 G2 ZS30 has a phosphate coating and only requires degreasing before paint. Dulux Duthin 020 prep wash being manually applied solvent degreaser.

Primer coat Dulux Powder Coat Primer applied at 10-20 micrometres.

Painting Powder coatings are solid materials that are applied with a specialised electrostatic gun, and then baked in a hot oven at 200 degrees Celsius for 15 minutes.

Dry film thickness A dry film thickness of 60-80 micrometres will be applied unless otherwise stated on approved workshop drawings.

Colour selection

Colours should be selected from the standard range of powder coat finishes

Exterior cubicle surfaces (including exterior doors and covers)

Fire services, lifts, evacuation and smoke control

Interior cubicle surfaces

Interior doors and escutcheon and removable mounting panels

y Customer selection y Signal red suggested

y Same as exterior y Option: white

y White

BUSBARS

Construction details Busbars are manufactured from hard drawn high conductivity (HDHC) copper, conservatively sized to ensure temperature ratings are not excessive.

Finish 1. Natural.2. Tinned.3. Insulated.4. Painted matt black to improve heat emissivity.

Phase identification As a minimum each phase is distinguished by use of 50mm painted bands or heat-shrink sleeving spaced at not more than 500mm centres.

1. Phases - Red, White, Blue.2. Neutral - Black.3. Earth - Green/Yellow.

Surface preparation 1. De-burr holes.2. Clean surfaces.

Cleats y Main busbar cleats manufactured from glass fiber reinforced composite, or 25mm thick densified wood (Permali).

y Main busbar support centres to suit fault current rating. y Dropper cleats – Kentan UBS busbar supports (type 6, 30% glass filled nylon).

Hardware options Bolts Tensioning

Hexagon headed bolts or set screws, flat washers and:

1. Plated mild steel bolts.2. Plated high tensile bolts (grade 8.8).3. Stainless steel bolts (grade 304).4. Stainless steel bolts (grade 316).

y Flat washers and a choice of:1. Spring washers.2. Bellville washers.3. Lock nuts.

y All bolts/nuts marked for visible evidence of correct tensioning.

y Neutral bar numbers stamped and positioned clear of all cable lugs.

y Busbars can be pre-drilled for extension.

Custom Switchboard Specifications

Page 11: T2 Energy in a wide range of mining, ... Primer coat Dulux Powder Coat Primer applied at 10-20 micrometres. ... Kentan UBS busbar supports (type 6,

T2 Energy | +61 7 3713 7269 | www.t2energy.com.au

11

CUBICLE

Construction details y The cubicle is folded and welded to form a free standing Form 4a (AS/NZS 3439.1:2002) construction with an IP rating <IP66 (AS 60529–2004).

y The motor control centre has interchangeable unit cells with power connection in the starter cell and control terminals located in either the cable zone or starter cell.

Material Standard: 2mm zinc coated steel folded and welded with all visible seams and joints fully welded and ground smooth where necessary. All edges and corners burr free and made safe.Options:

1. 1.6mm zinc coated steel (for smaller switchboards in protected areas).2. 1.6mm 304 or 316 stainless steel.3. 2mm 304 or 316 stainless steel.4. 3mm aluminum (special manufacture).

GLAND PLATES

Materials Standard: 3mm aluminium.Options:

1. 6mm aluminum.2. 3mm brass.3. 5mm brass.4. 6-8mm bakelite.5. 6-10mm PVC.

General y Gland plate material fitted with 25mm closed cell neoprene seal. y Sealing material suitably fixed to gland plate. y An earth stud M8x35mm welded adjacent to each gland plate. y Gland plate openings reinforced (as required) with 25x6 flat, root nuts or nut-serts.

PLINTH

Construction details y The switchboard plinth is manufactured from rolled channel and welded to form a secure base.

y The cubicle is attached to plinth/base with suitably spaced M10 (min) bolts, nuts, flat and spring washers (approximate spacing between cubicle/base fixings is 400mm).

y Plinth drilled for floor fixing.

Material Standard: 75PFC pre-drilled for floor fixing.Options:

1. 100PFC.2. Special (customer specified).3. Floor fixing clamp to hold down plinth.

Finish Standard: Hot dipped galvanised.Options: Painted (recommended for computer rooms).

ESCUTCHEONS, DOORS & COVERS

Escutcheons y Sealing rubber. y Pintle hinges: 50mm and 80mm. y Fitted with slotted square key ¼ turn latch and 26mm pawl. y Star washers fitted under all hinge and handle mounting screws.

Options:1. Winged ¼ turn handle.2. Key lockable.

Doors y Sealing rubber. y Cut-outs on exterior of cubicle fitted with cover/gland plate and neoprene seal. Cable

straps fitted adjacent door mounted equipment as shown on approved drawings. y Fitted with slotted square key ¼ turn latch and 26mm pawl. y Star washers fitted under all hinge and handle mounting screws.

Options:1. Small T-handle with key and pawl.

Covers y Sealing rubber. y Chrome D-handles fitted where shown on approved drawings. y Covers fixed with M8 studs and acorn nuts.

Page 12: T2 Energy in a wide range of mining, ... Primer coat Dulux Powder Coat Primer applied at 10-20 micrometres. ... Kentan UBS busbar supports (type 6,

T2 Energy | +61 7 3713 7269 | www.t2energy.com.au

12

Unit B3, 2688 Ipswich Road,

Darra, QUEENSLAND 4076

Email: [email protected]

Phone: +61 7 33713 7269

Fax: +61 7 3713 7279

T2 Energy

www.t2energy.com.au

Electrical Infrastructure and Control Solutions