1A
VISIT THE WEBSITE
FloorplansCommunities
Chat with an Online Sales Consultant
1B
VISIT A COMMUNITY
Model HomesSales O�ceAmenities
1C
TAKE A VIRTUAL TOUR OF THE DESIGN STUDIO
Take a virtual tour through our state-of-the-art Studio browse finish options on the online Design Studio
Catalog.
2A
COMMUNITY &HOMESITE
2C
PREPARE A CONTRACTYour Sales Consultant will write a Purchase and Sale Agreement. An earnest money deposit will
be required at this time.
2D
ACCEPTED & RATIFIEDOnce your contract is accepted and
ratified and your site plan is drafted, your Hello to Home
Orientation will be scheduled.
2B
FLOORPLAN & STRUCTURAL OPTIONS
CollectionFloorplanElevation
Structural Options
2E
HELLO TO HOME PORTALAfter ratification, you will receive an email giving you access to your personal online
portal showing you the steps you’ve completed and what’s next in the
process. You can also access photos and your documents.
mycolemanhome.comColeman Homes, A Toll Brothers Company reserves the right to change price, specifications and details at anytime. Represented by Toll Brothers Real Estate, Inc.
RCE43104
THE HOMEBUYER JOURNEYHELLO TO HOME
4A
GROUND BREAKINGThis is the day we break ground and start construction. You will be notified of the o�cial date,
which is dependent on seasonal conditions.
4B
QUALITY ASSURANCEYour Construction Manager
and a Quality Assurance Representative have four scheduled Quality Check
(QC) points throughout the schedule.
4C
CONSTRUCTION ORIENTATIONA Community Representative will reach out to schedule this one-hour meeting
with you and your Construction Manager to review your selections and estimated
build schedule.
4D
FOOTINGS & FOUNDATION WALLS
QC POINT #1Footings are poured, forms
are put in place, then foundation walls are
poured.
4E
UTILITIES, BACKFILL & FLATWORK PREP
Utilities are run from the street to your homesite. Dirt is backfilled to the foundation and smoothed o�.
Areas are prepped for flatwork.
4F
FLATWORKFlatwork is poured.
It is the concrete that makes up your
garage floor, driveway, patio and
walkways.
HOME BUYER STEPS
COLEMAN HOMES STEPS
3D
COLORS & FINISHES APPOINTMENT
Select the colors and finishes that reflect your personality and style. During this Appointment, you will
choose selections such as countertops, cabinets and flooring. Personalize your home with your
exclusive Design Consultant.
3F
FUNCTION & COMFORT APPOINTMENT
This Appointment covers the function and comfort selections such as electrical, low voltage,
landscaping and lighting options.
3C
HELLO TO HOME ORIENTATION
Review and approve your site plan and get a
synopsis of what to expect during the build
process.
3G
AUTHORIZATIONTo move forward with your home, we
require your authorization on your selections.
3CC
BUILDING PERMIT PACKET PREPAREDTo build your home, the respective
municipality requires a building permit packet. It includes your site plan, extensive
drawings and specifications. Some communities require ACC or HOA review and
approval as well. It takes a few weeks to prepare all the documents.
3DD
BUILDING PERMIT SUBMITTED
The permit packet is submitted to the city and
usually takes a few weeks to approve. There are extensive
fees and costs involved in submitting for permit.
3FF
BUILDING PERMIT APPROVED
Once the city grants approval an you have authorized your
Design Appointment selections, we are able to pick up your permit and schedule
your ground breaking.
3BB
SITE PLAN APPROVEDYou’ll receive a copy of your site plan for approval at the Hello to Home Orientation.
Once approved, it is included with the building
permit packet submitted to the city.
3A
SCHEDULE YOUR DESIGN
APPOINTMENTSA Design Studio
Representative will reach out to schedule your Design
Appointments.
3B
DO YOUR HOMEWORKBrowse the Online Catalog
of Design options and record your favories on your
Wish Lists. Learn more about the Design process at
your Orientation and Browsing Session.
3AA
SITE PLAN DRAWN
This is the footprint of your home on your
homesite and is required for building
permit packets.
3GG
SCHEDULE GROUND BREAKING
After we pick up your permit, your home is put in the ground breaking
queue. Please keep in mind that other homes are in the queue as well. Rest assured, you’ll get scheduled in
the soonest available opening.
4I
STRUCTURAL ORIENTATIONQC POINT #3
Before insulation is installed, a Community Representative will schedule this one-hour meeting with you and your Construction
Manager to review your electrical and low voltage selections.
4J
INSULATIONInterior batting insulation is
installed. An inspector will inspect the insulation and give approval to
start hanging drywall.
4H
PLUMBING, HVAC & ELECTRICAL ROUGH-INSYour internal HVAC units and vents, water lines, electrical lines and outlet boxes are
roughed-in.
4G
FRAMINGQC POINT #2
Framing takes two to five weeks, depending on the size
of home and complexity of the floorplan. Once framing is complete, roof paper and windows will be installed.
4L
PRIME, DOORS & MILLWORK
Hand-texturing is complete and interior walls are sanded
and primed. Windows are wood-wrapped, then,
baseboards and door casings are installed.
4K
HANG DRYWALL, MUD, TAPE & TEXTURE
The drywall is hung, then, joints are mudded and taped. After that, walls are hand-textured
and sanded. This process takes a few weeks.
4O
COUNTERTOPS INSTALLED
Cabinets are measured and a template is created
for your countertops. Countertops are installed approximately one week
after cabinets are measured.
4P
PLUMBING, HVAC, ELECTRICAL FINISHES
Faucets, shower heads, toilets and bathroom accessories are installed. Final
outlet connections are made and lighting fixtures and switches are
installed. A city inspector will inspect these components and sign-o� on them. This can take several days.
4N
VINYL & TILE FLOORING, CABINETS & TILE SHOWER
TRIM #1Vinyl flooring, tile flooring and tile shower is installed (if purchased).
Cabinets are installed and a Community Representative
reaches out to schedule your New Home Orientation (NHO).
INTERIOR PAINTDoors and millwork are
caulked and the first coat of interior paint goes on. Your
Construction Manager locks in dates for the remainder of
your build schedule.
4M 4R
PAINT & DRYWALL TOUCH-UPSQC POINT #4
Touch-up items are completed. Your Construction Manager
does a quality check and creates a list of items that need attention before the NHO and
has the items addressed.
4Q
FLOORING INSTALL COMPLETETRIM #2 & 3
The remainder of the flooring is installed and
the first construction cleaning is done.
5D
MOVE-INYou may pick up your keys
once your loan has o�cially funded and title has recorded
in your name.
5C
SIGN LENDING & TITLE DOCUMENTS
After you’ve completed your Final Walk, you’ll sign closing documents at the title
company. Funds must transfer to the appropriate parties and title must be
recorded in your name.
5A
NEW HOME ORIENTATIONYou’ll meet with your Customer Care Representative and learn about the function of your new home (at least 8 calendar days
prior to close).
5E
12-MONTH WARRANTYThirty-days after moving in, a Warranty
Walk-thru will be scheduled. As issues arise over the next year, make sure to submit
requests on the website. At the eleven-month mark, another Warranty
Walk-thru will be conducted.
5B
FINAL WALKYour Final Walk occurs one day before
closing escrow and is held by your Customer Care Representative. At this
meeting, you’ll finalize items noted from the NHO and learn about the Warranty process.