TAP HSE good practices: Dynamic risk
Assessment
IPLOCA 2018 convention
Jose de la Torre
TAP Senior Corporate QHSE Manager
![Page 2: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/2.jpg)
Agenda
• TAP Project
• HSE Good Practices
• Dynamic Risk Assessment
2ILPOCA Annual Conference 2018
![Page 3: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/3.jpg)
About TAP
![Page 4: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/4.jpg)
Part of Southern Gas Corridor (TAP., TANAP, SCPX)
Aimed at improving the security and diversity of the EU’s energy supply.
878 km in length (Greece 550 km; Albania 215 km; Adriatic Sea 105 km; Italy 8 km). Its highest point will be approximately 2,100 m in Albania’s mountains, while its lowest will be 820 m beneath the sea.
Initial capacity10 bcm
4About TAP
![Page 5: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/5.jpg)
Head Quartered in Baar, Switzerland
Branch business offices in Athens, Rome, Lecce and Tirana. There are also project execution offices near the route of the pipeline in Thessaloniki, Tirana and in the Melendugno area.
TAP currently employs over 250 specialists from 30 countries and many thousands more personnel via our EPC Contractors
5About TAP
![Page 6: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/6.jpg)
6
Owned by:
SOCAR
(20%)
BP
(20%)
Snam
(20%)
Fluxys
(19%)
Enagás
(16%)
Axpo
(5%)
TAP’s shareholders
EPC Contractors:
![Page 7: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/7.jpg)
7IPLOCA Annual Conference
![Page 8: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/8.jpg)
HSE Best Practices
![Page 9: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/9.jpg)
9
• HSE Executive Forums with Contractors
• HSE App
• IVMS and Journey Management Plans
• Safe Start
• Communication Programme
• Health and Well being Programme
• HSE Leadership visits and BBS
• On line training platform
• Incident Review Panel
• Lessons Learned
• Incident close out validation
HSE Best Practices
• ISO 14001 / OHSAS 18001 Certification
• Dynamic Risk Assessment
![Page 10: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/10.jpg)
10HSE Communication Plan
BROWN BAG LUNCH PLAN –HEALTH AWARENESS
• CPR & AED Awareness
• Tick Season Ahead
• Sitting Kills - Exercises at your Desk
• Smoothie Making Workshop
• Cycling
• Heart Attack & Stroke Awareness
• Fitness @ Work Using Exercise Bands
• 10 Steps to Boost Your Immune System
• Serving Sizes
CELEBRATION:
H&S WORLD DAY - 28th April
ENVIRONMENT WORLD DAY 5th June
PROJECT AWARDS - Best Contractors awarded
HSE TV:
TV Screens present on eachTAP office, displaying:
HSE messages, lessonslearned, statistics, Healthcampaigns
![Page 11: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/11.jpg)
11HSE Health and Wellbeing Program
TAP RUN
To improve team building within theorganisation, reduce the stress and to gethealthy, TAP will promote and sponsor aRun.
HEALTH CAMPAIGNS
Healthy snacks will be provided during all the HSE Meetings.
NUTRITIONIST
Collaboration with a Doctor that will support personnel in a more healthy approach to their meals.
MINDFUL
Activity as yoga, anti stress session, desk exercises…
HEALTH AWARENESS
Different Campaign developedby our Occupational Doctorswill be implemented during theyear (I.e: Tobacco, BloodPressure, Diabetes, etc)
![Page 12: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/12.jpg)
12
• HSE Policies
• Emergency Numbers (different for each country)
• Contact HSE + Training Passport
• Unsafe conditions + HSE Visits Template
TAP HSE APP
• Golden Rules
• Business Travel + ISOS
• Incident & Reporting Procedure
• Duty Managers
All the important HSE info merged in only one App
![Page 13: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/13.jpg)
Safety Statistics 13
TRFR (PTD): 1.58
LTIFR (YTD): 0.58
LTIFR (PTD): 0.40
TRIFR (YTD) : 2.02
Man hours (Mill)
Km driven (Mill)
33
95
![Page 14: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/14.jpg)
Dynamic Risk Assessment
![Page 15: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/15.jpg)
Defining The Issue
• Poor quality CTR pre start briefings
• TBT content inconsistent
• Incident investigation root causes:
Workforce not being put to work with correct information
• Reliance on wordy, long, generic JSAs
• Workforce and supervision not engaged in hazard/risk identification
15
Solution
• Make supervision accountable for how teams are put to work
• Engage supervision and workforce in risk assessment process
• Ensure supervision to check on their teams
IPLOCA Annual Conference
![Page 16: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/16.jpg)
16
LoF - Machine- Exclusion zones marked out
- Flagmen in place
- Agreed communication method
between sidebooms
- Supervisor
- Supervisor
- Spread BossLoF - Body
Excavations
Overhead Lines
Lifting
Electricity
- Goalposts
- Bunting
- Flagman for crossings
- Permit needed for entry
- Exclusion zone in place for
personnel
- Pre use visual checks
- Equipment inspection
- Correct colour code
- SWL adhered to
- Supervisor
- Work team
- ROW Team
- Supervisor
- Sideboom Operator
- Sideboom Operator
IPLOCA Annual Conference
![Page 17: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/17.jpg)
Step 1
17
KP 210
07/09/17 08:00am
Lowering and laying pipe along the ROW near high voltage overhead line
J. Smith
TAP
IPLOCA Annual Conference
![Page 18: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/18.jpg)
Step 2 – Line of Fire Hazards
18
Line Of Fire - Hand
• Using line-up clamps
• Lining up pipe
• Manual handling
Line Of Fire - Machine
• Lowering and laying
• Welding activities
• Multiple activities in same location
Line Of Fire - Head
• Lining up pipe
• Autowelding activities
Line Of Fire - Body
• Stringing of pipe
• Lining up pipe
IPLOCA Annual Conference
![Page 19: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/19.jpg)
Step 2 – Hazard Identification
19
Excavations
• Working near
• Working inside
• Creating excavations
Steep Slopes
• Working on steep slopes
• Travelling on steep slopes
• Transporting on steep slopes
Pressure
• Buried services (gas, water)
• Hydraulics
Working at Height
• Machine maintenance
• Scaffolding
IPLOCA Annual Conference
Confined Space
• Working inside trenches
• Working inside pipes
• Auger boring
Overhead Lines
Dropped Objects
Flammable
• Working near overhead lines
• Working next to overhead lines
• Travelling between overhead lines
• Hand Tools
• Equipment
• Welding
• Chemical Use
• Trench Breaker creation
![Page 20: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/20.jpg)
Step 2 – Hazard Identification
20
Lifting
• Cranes
• Sidebooms with pipe
• Valve installation
Created Openings
• Holes in scaffolding
• Trenches
Electricity
• Hand Tools
• Equipment
• Welding
Hot/Cold
• Welding
• Chemical Use
• Trench Breaker creation
IPLOCA Annual Conference
Slips, Trips & Falls
• Uneven ground
• Rocky/stony ground
• Equipment wires
Sharp Edges
• Handling pipe edges
• Handling metal sheets
Multiple Activities
• Congested work areas
• Large numbers of people is same area
• More than one work activity in same area
![Page 21: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/21.jpg)
Step 3-6 – Hazard Assessment
21
Reference number of
method statement &
JSA and/or lifting plan
Any other document
references (steep
slopes checklist etc)
List the top 5 hazards
identified (more can be
added if necessary)
List the main controls to
minimise each of the
hazards
Assign a person
responsible for putting
in place each of the
controls
When the control
is in place and
working confirm
in this section
IPLOCA Annual Conference
![Page 22: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/22.jpg)
22
LoF - Machine- Exclusion zones marked out
- Flagmen in place
- Agreed communication method
between sidebooms
- Supervisor
- Supervisor
- Spread BossLoF - Body
Excavations
Overhead Lines
Lifting
Electricity
- Goalposts
- Bunting
- Flagman for crossings
- Permit needed for entry
- Exclusion zone in place for
personnel
- Pre use visual checks
- Equipment inspection
- Correct colour code
- SWL adhered to
- Supervisor
- Work team
- ROW Team
- Supervisor
- Sideboom Operator
- Sideboom Operator
IPLOCA Annual Conference
![Page 23: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/23.jpg)
Step 7 – Work Party Declaration
23
Understand what you
are agreeing to when
you sign this paper
Work party sign here
Any new team members
who join after the initial
assessment read and
sign
IPLOCA Annual Conference
![Page 24: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/24.jpg)
Step 8 – Supervisor & Safety Supervisor Challenge
24
• Initially the supervisor must ensure the individual/team have;
Completed the Operatives Pre – job Hazard
Checklist Reviewed and signed onto the work pack
Familiar with their activities
Are clear of their roles and responsibilities
• The supervisor should then challenge the team on their general surroundings and if this could effect their safety.
• The supervisor should then challenge the team whether the risk assessment/method statement adequately covers the task and whether the control measures are suitable.
IPLOCA Annual Conference
![Page 25: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/25.jpg)
TAP HSE Performance 2017. Video25
![Page 26: TAP HSE good practices: Dynamic risk Assessment](https://reader031.vdocument.in/reader031/viewer/2022021522/620a5e90472ae04183624dc8/html5/thumbnails/26.jpg)
26
Questions?
IPLOCA Annual Conference