TASK AND OUT-TURN OF WORKS

TASK AND OUT-TURN OF WORKSSUBMITTED BY:MARIA SEBASTIANMANALI JAMGAONKARLINDA ELSA BABYMAITREYI MURALIANALYSIS AND RATESThe capacity of doing work by an artisan or skilled labour in the form of quantity of work per day is known as the task work or out turn of the labour.

The out-turn of work per artisan varies to some extent according to the nature, size, height, situation, location, etc., In bigger cities where specialized and experienced labour is available the out-turn is greater than small towns and country sides. In well organized work less labour is required.

In order to determine the rate of a particular item, the factors affecting the rate of that item are studied carefully and then finally a rate is decided for that item. The process of determining the rates of that item is termed as analysis of rates or rate analysis.The rate of a particular item or work depends on the following-

Specifications of works Quantity of materials and their costsCost of labour and their wagesLocation of site of work and the distances from source and conveyance chargesOverhead and establishment chargesProfit

The following may be taken as the approximate quantity of work or out turn or task for an average artisan per day.

LABOUR REQUIRED FOR DIFFERENT WORKSExtracts from the report on productivity projects in building industries issued by National Building Organisation are given below:

Load for a two-bullocks cart

Load for trucks

MATERIALS FOR DIFFERENT ITEMS OF WORK