    1D-EBC MTG Online Inspctn,EGMTG01

    1.Take and record generator operation readings (from moni

    2.Monitor cooling air temperature at generator stator

    3.Perform physical inspection and check any abnormalities.

  • 7/27/2019 Task List for MTG

    2/40

    oring panel): Power,Voltage,Current,Power Factor,Frequency,Windi

    . Record: Alarm and Sign of Overheated [at panel],Abnormal Sound

  • 7/27/2019 Task List for MTG

    3/40

    ng & Bearing Temperature,Vibration Reading - for those with indic

    / Noise/ Hunting Noise [at GTG site]

  • 7/27/2019 Task List for MTG

    4/40

    ator

  • 7/27/2019 Task List for MTG

    5/40

    1M-EBC MTG Online Inspctn,EGMTG02

    1. Perform Daily Maintenance Tasks

    2. Perform alternator vibration reading

    3. Check bearing condition using bearing analyzer [online

    4. Perform visual inspection on Earthing System conection5. Check condition of alternator ventilation system fan

  • 7/27/2019 Task List for MTG

    6/40

    ] and leaking bearing lubrication

  • 7/27/2019 Task List for MTG

    7/40

  • 7/27/2019 Task List for MTG

    8/40

    4) To ensure operators are well trained and competent for

    5) To establish procedures for conductiong winding IR te

    6) To produce procedures for generator rotor pull out and

    7) Check and review spare part inventories: excitation co

  • 7/27/2019 Task List for MTG

    9/40

    and perform cleaning

    heck & tighten holding bolt and screw. Check air gap and clean d

    Resistance,Ohmic,and Polarization index

    Index,Perform Ohmic Resistance Test and Inspect space heater f

    sistance,Check for signs of overheated,and tighten bolt and

    tion on sign of overheating and cleanliness

    ernator cooling system [Cleanliness,Blocked etc]

    lubrication for bearing

    synchronization capability with other generator and Test synch

    tightness,signs of overheating,insulation for cracking,physical

    ing is correct/calibrated and functional,Perform functional chec

    t operation

    NER and Measure NER value

    or loose parts and Clean & repaint as necessary

    aker as per HV Switchgear checklist

    ating limit

    rained for the generator operation.

    procedures

  • 7/27/2019 Task List for MTG

    10/40

    the control and parallel operation of generators

    st,etc,to avoid loss of magnetism

    generator rotor cool down as recommended by manufacturer to a

    ntrol card,rotating diodes,

  • 7/27/2019 Task List for MTG

    11/40

    rt accumulation in the air gap

    nctional (Ohmic value,IR)

    onizing protective relay (if required)

    damage and moisture,Measure IR and Polarization index for power

    on the control and interlocking circuit,Perform fucntional che

  • 7/27/2019 Task List for MTG

    12/40

    oid rotor unbalance and rotor saging.

  • 7/27/2019 Task List for MTG

    13/40

    Cable and Tighten bolt

    ck on the alarm and instrumentation circuit,After maintenance t

  • 7/27/2019 Task List for MTG

    14/40

  • 7/27/2019 Task List for MTG

    15/40

    perform normal generator output Load test ,After maintenance

  • 7/27/2019 Task List for MTG

    16/40

  • 7/27/2019 Task List for MTG

    17/40

    to perform Load Acceptance Test and With clean dry compressed a

  • 7/27/2019 Task List for MTG

    18/40

  • 7/27/2019 Task List for MTG

    19/40

    r clean up heat exchanger tubes and enclosure as required

  • 7/27/2019 Task List for MTG

    20/40

    32K-PM Shutdown Maintenance,EGMTG04

    SHUTDOWN INSPECTION

    Permanent Magnet Generator (PMG) - Check and clean PMG as

    Rotor excitation coils - Measure winding resistance and PLube oil cooler pump Motor: Perform visual

    Cooling System [Filter,Fan,Tubing ] - Check generator alt

    Generator bearing - Measure vibration level and Perform

    Generator speed sensor - Check magnetic pickup signal

    Synchronizing & Control panel - After maintenance : Verif

    Electronic Governor System - Governor system (visual ins

    Battery - Impedance test,Measure Voltage reading (Individ

    Terminal Box and Electrical Connection Joints - Check cl

    Gauges/Indicator - Check indicators and gauges for correc

    Neutral Gounding - Check neutral grounding connection to

    Casing/Frame - Check for crack in base/support for broken

    NOTES : OPERATING PROCEDURE REVIEW

    1) To establish clear operating procedure with clear oper

    2) To ensure the panel operators are competent and well t

    4) To ensure operators are well trained and competent for

    5) To establish procedures for conductiong winding IR te

    6) To produce procedures for generator rotor pull out and

    7) Check and review spare part inventories: excitation co

  • 7/27/2019 Task List for MTG

    21/40

    sembly

    erform cleaning

    ernator cooling system [Cleanliness,Blocked etc]

    lubrication for bearing

    synchronization capability with other generator and Test synch

    pection),Check and test governor system,clean magnetic speed se

    ual & total),Physical condition (Water level,Deformation etc)

    eanliness & Water ingress/Moisture and Retighten bolts[Generato

    t operation

    NER and Measure NER value

    or loose parts or corrosion and Clean & repaint as necessary

    ating limit

    rained for the generator operation. procedures

    the control and parallel operation of generators

    st,etc,to avoid loss of magnetism

    generator rotor cool down as recommended by manufacturer to a

    ntrol card,rotating diodes,

  • 7/27/2019 Task List for MTG

    22/40

    onizing protective relay (if required)

    sor,check the setting,etc and Perform calibration for the Elect

    terminal and Control terminal] correct/calibrated and function

    oid rotor unbalance and rotor saging.

  • 7/27/2019 Task List for MTG

    23/40

    ronic Governor

    al. Perform functional check on the control and interlocking ci

  • 7/27/2019 Task List for MTG

    24/40

    cuit,Perform functional check on the alarm and instrumentation

  • 7/27/2019 Task List for MTG

    25/40

    circuit,After maintenance to perform normal generator output Lo

  • 7/27/2019 Task List for MTG

    26/40

    d test and After maintenance to perform Load Acceptance Test

  • 7/27/2019 Task List for MTG

    27/40

    120M-PM Shutdown Maintenance,EGMTG05

    Permanent Magnet Generator (PMG)[If applicable] -Check an

    Rotor excitation coils - Measure winding resistance and P

    Generator rotor - Check rotor air fan for fatigue/crack,C

    Stator Exciter Winding - Check :[IR,Ohmic and PI],Check RStator main winding - Perform Megger Test,Measure Polariz

    Rotating diodes & Surge suppressor - Change rotating diod

    Automatic Voltage Regulator (AVR) - AVR Panel (sign of ov

    Lube oil filter - Filter Replacement / Cleaning

    Lube oil cooler pump motor - Bearing (visual inspection)

    Cooling System [Filter,Fan,Tubing ] - Check generator alt

    Generator radial and roller bearing - NDE and DE :Measure

    Generator speed sensor - Check magnetic pickup signal

    Synchronizing & Control panel - After maintenance : Verif

    Electronic Governor System - Governor system (visual insBattery - Impedance test,Measure Voltage reading (Individ

    Terminal Box and Electrical Connection Joints - Check cle

    Miscellaneous - Ensure the winding temperature alarm sett

    Gauges/Indicator - Check indicators and gauges for correc

    Neutral Gounding - Check neutral grounding connection to

    Casing/Frame - Check for crack in base/support for broken

    1) To establish clear operating procedure with clear oper

    2) To ensure the panel operators are competent and well t

    3) Establish synchronising,load control and load sharing

    4) To ensure operators are well trained and competent for5) To establish procedures for conductiong winding IR te

    6) To produce procedures for generator rotor pull out and

    7) Check and review spare part inventories: excitation co

    card,rotating diodes,

  • 7/27/2019 Task List for MTG

    28/40

    d clean PMG assembly

    erform cleaning / Refurbish winding

    heck & tighten holding bolt and screw,Check clearance between ro

    C circuit blocks and Overvoltage Protection and Check characteation Ratio Index Perform Ohmic Resistance Test,Inspect space he

    e

    erheating,visual check,etc ),Perform calibration inspection and

    ,Lubrication system (leak check,visual inspection,cleaning) and

    ernator cooling system [Cleanliness,Blocked etc] and Perform IR

    vibration level,Change roller bearing lubrication /greasing for

    synchronization capability with other generator and Test synch

    pection),Check and test governor system,clean magnetic speed seual & total) and Physical condition (Water level,Deformation etc)

    anliness & Water ingress/Moisture and Retighten bolts[Generator

    ing is correct/calibrated and functional,Perform functional chec

    t operation

    NER and Measure NER value

    or loose parts or corrosion and Clean & repaint as necessary

    ating limit

    rained for the generator operation.

    procedures

    the control and parallel operation of generatorsst,etc,to avoid loss of magnetism

    generator rotor cool down as recommended by manufacturer to a

    ntrol

  • 7/27/2019 Task List for MTG

    29/40

    or & stator ,To check wedge,To check retainer rings for loosenes

    istic of the Diodester [RTD] functional (Ohmic value,IR),Perform cleaning of the wi

    ontrol card inspection for loose connection,abnormalities etc

    Perform IR and PI test for motor [Refer Appendix 12 PTS 63100811

    nd PI test for motor

    bearing - For non self lubricate,Perform Insulation Resistance,P

    onizing protective relay (if required)

    sor,check the setting,etc and Perform calibration for the Elect

    erminal and Control terminal]

    on the control and interlocking circuit,Perform functional chec

    oid rotor unbalance and rotor saging.

  • 7/27/2019 Task List for MTG

    30/40

    s,Cleaning with Dry Ice/CO2 or Compressed air & Electrical Solve

    nding [e. g. recommended using CO2] ,Partial Discharge,To check

    ]

    erform clearance check between housing and bearing and Check con

    ronic Governor

    k on the alarm and instrumentation circuit,After maintenance to

  • 7/27/2019 Task List for MTG

    31/40

    t,Rotor insulation resistance,Voltage drop test to ensure rotor

    edge,Check stator core for loosenes/ blocked cooling channel,Che

    ition for white metal [sleeve bearing] and change if necessary

    erform normal generator output Load test and After maintenance t

  • 7/27/2019 Task List for MTG

    32/40

    coil turns are balanced ,Rotor Earthing Connection & EF Detectio

    ck stator winding for debris,hot spot,deformation,looseness of s

    o perform Load Acceptance Test

  • 7/27/2019 Task List for MTG

    33/40

    : Carbon brush inspection method etc. Partial Discharge check at

    acers between coil and support ring,HIPOT test for all the windi

  • 7/27/2019 Task List for MTG

    34/40

    winding : for signs of PD if was not rewounded. Check winding H

    gs [with reduced voltage to 1. 5 times] and Tangen Delta measur

  • 7/27/2019 Task List for MTG

    35/40

    tSpot especially at end winding (visual signs),Rotor Dynamic Bal

    ment [to check each winding phase health]

  • 7/27/2019 Task List for MTG

    36/40

    ancing Test ,Tangen Delta measurement and Inspection of End Windi

  • 7/27/2019 Task List for MTG

    37/40

    ng and Spacer

  • 7/27/2019 Task List for MTG

    38/40

    18M-PM Replace Air Filter,EGMTG06

    replace air filters, fuel injectors & combustion liner

  • 7/27/2019 Task List for MTG

    39/40

    24M-PM Replace Injector,EGMTG07

    replace injectors, thermocouple and main battery pack

  • 7/27/2019 Task List for MTG

    40/40

    5Y-PM Engine Change Out,EGMT08

    Engine change out