July 2013 marks the 35th anniversary of TEAM GROUP. Since the commencement ofits operations, TEAM GROUP has committed and dedicated to garnering areputation as a professional integrated consulting firm and related businesssolutions. TEAM GROUP has been entrusted with involvement in more than 2,000important projects by both public and private agencies, in Thailand and beyond. Inthis issue of TEAM GROUP Newsletter, we have compiled a list of outstandinglysuccessful projects which cover eight areas of expertise: transportation andlogistics; water resources; environmental management; environmental engineering;building and infrastructure; energy; management and training; communications andpublic participation.
Study and Detailed Designof High Speed Train fromBangkok - Chiang MaiProject (Phase 1: Bangkok- Phitsanulok)
Feasibility Study, Detailed Design, EIA,PR and PP activities for the Mass RapidTransit System for Bangkok Metropolis
(Green Line Extension)- Mo Chit - Saphan Mai - Lam Lukka- Bearing - Samut Prakan - Bang Pu
Detailed Design and ConstructionSupervision of Red Line Commuter TrainProject (Bang Sue – Taling Chan)
Feasibility Study and Detailed Design of Laem Chabang Port, Phase 3
12/24/13 TEAM Newsletter
teamgroup.co.th/newsletter/1303/EN/ourteam.html 2/8
Detailed Design of Inter-city Motorway(Bang Pa In – Nakhon Ratchasima)
Traffic Management Consulting Services(Fashion Island, Future Park (Rangsit),
Terminal 21, Asiatique, Gateway Ekamai)
IEE and EIA for the Hongsa Power Plant,Mining Development and Transmission
Line, Lao PDR
Master Plan Study of Integrated WaterResources Development and Management
and Irrigation Improvement for the 9th
National Economic and Social DevelopmentPlan
Construction Supervision of Drainage Tunnel(Saen Saep and Lat Phrao Canals - ChaoPhraya River)
Feasibility Study and EIA of Pasak JolasidDam, Lop Buri
12/24/13 TEAM Newsletter
teamgroup.co.th/newsletter/1303/EN/ourteam.html 3/8
Study, Design and Construction Supervisionof Flood Protection and Drainage System
for Industrial Estates and Private Sector
Engineering Design, EMP, RAP,Independent Engineer and ConstructionSupervision of Nam Ngum 2 HydroelectricPower Project, Lao PDR
IEE and EIA for the Hongsa Power Plant,Mining Development and Transmission
Line, Lao PDR
EIA for the Regional Gas Pipeline toNakhon Sawan
EHIA for the Mae Moh Lignite Mine Project,Lampang
12/24/13 TEAM Newsletter
teamgroup.co.th/newsletter/1303/EN/ourteam.html 4/8
EHIA for the Replacement of Units 4 – 7 atMae Moh Power Plant, Lampang
IIEE and Environmental Studies for Dawei Sea Port and Industrial Estate
Development
Construction Supervision and Contract Management for Turnkey
Construction of the Bangkok WastewaterTreatment Project
Improvement of Wastewater TreatmentPlant of Klaeng Aquatic Processing FoodPlant in Klaeng District, Rayong
Master Plan and Feasibility Studyfor Water Supply System Improvement
in Surat Thani
Detailed Design and ConstructionSupervision of Metropolitan WaterTreatment Plants
Feasibility Study and Detailed Designof Solid Waste Disposal Center,
Khon Kaen Municipality
12/24/13 TEAM Newsletter
teamgroup.co.th/newsletter/1303/EN/ourteam.html 5/8
Architectural, Engineering and LandscapeDesign, and Renovation Design of the
NIMT’s Chemical Metrology Laboratory,Pathum Thani
Design of the Renaissance Boutique HotelPhnom-Penh, Cambodia
Turnkey Service of a New PharmaceuticalPlant of Atlantic Laboratories Corporationi
Architectural and Engineering Design, andConstruction Supervision of the Vandapac’sProduction Facility
Detailed Design, Project Managementand Construction Supervision ofBen Tre Fish Meal Factory and Hue Shrimp Factory in Vietnam
Engineering Design and ConstructionManagement and Supervision of Cargill
Integrated Poultry Processing Complex inNakhon Ratchasima
Owner Engineer and Lender Engineerfor the 400,000 LPD Ethanol Plant Project,
Ubon Ratchathani
12/24/13 TEAM Newsletter
teamgroup.co.th/newsletter/1303/EN/ourteam.html 6/8
Project Management and ConstructionSupervision of the 110 MW NavanakornPower Plant, Pathum Thani
Construction Supervision of PTTARLaboratory Building, Rayongi
Technical Due Diligence of the PhetchaburiOil Termina
Engineering Services forMagotteaux Facility in
Nong Khae District,Sara Buri
Project Management and ConstructionSupervision of the Second Royal Thai Mint
in Khlong Luang District, Pathum Thani
Study, Planning, and Project Managementfor the New Tobacco Factory Project, Phra
12/24/13 TEAM Newsletter
teamgroup.co.th/newsletter/1303/EN/ourteam.html 7/8
for the New Tobacco Factory Project, PhraNakhon Si Ayutthaya
Project Management and ConstructionSupervision of the 13th Asian GamesSportsComplex at Thammasat University Rangsit
Campus, Pathum Thanii
Project Management and ConstructionSupervision of Suvarnabhumi Airport
Project Management and ConstructionSupervision of the Government ComplexCommemorating His Majesty the King’s
80th BirthdayAnniversary, 5th December,B.E. 2550 (2007)
Exquisite Publications
Market Sounding Session for High SpeedRail Projects for Thailand
12/24/13 TEAM Newsletter
teamgroup.co.th/newsletter/1303/EN/ourteam.html 8/8
Accomplished Public Relations Action PlanTargeting Local Residents around
Suvarnabhumi Airport
Exhibitions at Sanam Luang in Celebrationof Its Major Renovation