Technical Code Programme 2020 Awareness & Adoption of Technical Codes Technical Standard and Infrastructure Requirements: Radiocommunications Network Infrastructure (External) (TSIR Part 3) MTSFB 001:2009 Mr David Lim Teck Huat Expert member, Radiocommunications Network Facilities Working Group (RNF WG), MTSFB 19 Nov 2020 Let’s collaborate @ MTSFB!

Upload: others

Post on 29-Nov-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Technical Code Programme 2020Awareness & Adoption of

Technical CodesTechnical Standard and Infrastructure Requirements:

Radiocommunications Network Infrastructure (External) (TSIR Part 3)MTSFB 001:2009

Mr David Lim Teck HuatExpert member, Radiocommunications Network Facilities Working Group (RNF WG), MTSFB19 Nov 2020

Let’s collaborate @ MTSFB!

Page 2: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Technical Standard and Infrastructure Requirements: Radiocommunications Network Infrastructure (External) (TSIR Part 3)

No Title Technical Code number Registration date

1.

Technical Standard andInfrastructure Requirements:RadiocommunicationsNetwork Infrastructure(External) (TSIR Part 3)

MTSFB 001:2009 21 May 2010

Page 3: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

https://www.mtsfb.org.my

Where To Find MTSFB TC Documents….

Technical Standards and Infrastructure Requirements : Radiocommunications Network Infrastructure (External) (Part 3) Year 2009

Let’s collaborate @ MTSFB!

Page 4: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

GLOSSARY (Terms Used In Industry)

PBTS = Portable Base Transmitter Station

COW = Cellular On Wheels

VL/GBS = Vacant Land/Ground Based Structure

RT = Rooftop

IBC = In-building Coverage

LIF/LINF/MCI = Low Impact Facilities/Low Impact Network Facilities

/Minor Communications Infrastructure

LP/MP = Lamp Pole/Monopole

OSA = One Stop Agency (for permit processing)

OSC = One Stop Centre (Apprvl for road, bldgs, bldg reno, bridge, etc…)

PTG = Pejabat Tanah & Galian

LC/PBT = Local Council / Pihak Berkuasa Tempatan

KM = Kebenaran Merancang (Planning Approval)

SBC = State Backed Company (MICTH, KJS, Sacofa, Touch Matrix, etc..)

Setback = Distance of telco structure from nearest neighbor buildingLet’s collaborate @ MTSFB!

Page 5: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

AGENDA12

aTECHNICAL CODE:

External Infra Categories

OPERATIONS & CHALLENGES:3

Introduction & Objective

bc

Targeted Applications & Structure Fotos

Evolving… TSIR Part 3 (new technology addendum)

a Local Govt Application Procedures (PBT/LC Guideline, Checklist, Fees, etc)

bc

Problems of Permit Compliance

Case Against Site Build Protest(EMF/Radiation Fears….)

Let’s collaborate @ MTSFB!

Page 6: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

1 Introduction & Objective

Let’s collaborate @ MTSFB!

Page 7: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

This TC was published to provide the guideline to Public, Local Authorities, Telecom Vendors, Telco Industry licensees on the:

a) general requirements on rooftop sites, tower sites, mobile/portable BTS sites

b) Operations & Maintenance

c) Design requirements for construction, structural, mechanical& electrical (C&S and M&E) of equipment cabins, antenna mounting structures, towers and power supply

Many sample drawings and pictures are included to enhance visualization of the various infrastructures.

Objective of this Technical Code (TC)

Let’s collaborate @ MTSFB!

Page 8: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Document Sample Extract…..

Let’s collaborate @ MTSFB!

Page 9: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

2a External Infra Categories

2 TECHNICAL CODE:

Let’s collaborate @ MTSFB!

Page 10: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Overall Network Diagram (Coverage of External Technical Code – TSIR)

Let’s collaborate @ MTSFB!

Page 11: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

0

20

40

60

80

100

120

A B C D E F G

Height Range

A-Lamp Pole B-Smart Pole C-PortableBTSMobile BTS

D-MonopoleTree

E-Monopole F-Rooftop G-Tower

Heig

ht in

Met

ers

What Are The Different External Infra Type?RM40k – RM80k RM60k – RM80k RM200k – RM250k RM200k – RM400k

Let’s collaborate @ MTSFB!

RM10k – RM30k

Page 12: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

2b Targeted Applications & Structure Fotos

Let’s collaborate @ MTSFB!

Page 13: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Target Applications Of Different External InfraHigh

Tower Site

HighRooftop Site

Temporary/Event

Coverage

OutdoorGround-level

Vehicle & PedestrianCoverage

Lamp Pole/Pedestrian Site

Let’s collaborate @ MTSFB!

Page 14: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Target Applications Of Different External Infra

Let’s collaborate @ MTSFB!

Kpmg Sapagaya, Lahat Datu

E-Monopole G-Tower

Pantai Dalam, KL Sin Sin Park, Kuching

A-Lamp Pole

B-Smart Pole

C-PortableBTSMobile BTS

D-MonopoleTree

F-Rooftop C-PortableBTSMobile BTS

High Rise/High Density

Low Rise/High Density

Low Rise/Low Density

Page 15: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Let’s collaborate @ MTSFB!

Bangsar South City | MSC BOUNDARY & PREMISES

Page 16: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Lamp Poles,

Smart Poles,

Zero Cabinet Lamp Poles

Let’s collaborate @ MTSFB!

Increasing Numbers….and New Structures……in use

Page 17: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Zero Cabinet DesignStandard Design (Cabinet)

Different Types of Lamp Poles

Kapal Singh Drive, Penang

Jln Bkt Bintang Jln Lombong

Let’s collaborate @ MTSFB!

City/Town Centre Tourist Area

Page 18: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Generic “Smart Pole” Physical Features

Access connectivity viaFourth Generation (4G),Third Generation (3G) andother connectivitytechnology such as LowPower Wireless AccessNetwork.

More Info in Next Session

Let’s collaborate @ MTSFB!

Page 19: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

PORTABLE BTS (Base Transceiver Station)

MOBILE BTS (Cellular On Wheels/COW)

Let’s collaborate @ MTSFB!

Page 20: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Different Types of Portable BTS…. (Mobile & non-Mobile)

Non-Mobile DesignMobile DesignMobile Design(Cellular On Wheels) Let’s collaborate @ MTSFB!

Page 21: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

ROOFTOPS, BUILDING

FAÇADE, CAMOUFLAGE

Let’s collaborate @ MTSFB!

Page 22: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Different Building Implementation

Let’s collaborate @ MTSFB!

Page 23: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Methods of Camouflaging Antennas

Let’s collaborate @ MTSFB!

Page 24: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Methods of Camouflaging Antennas

Before After

Let’s collaborate @ MTSFB!

Page 25: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

London Building Examples

Let’s collaborate @ MTSFB!

Page 26: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

2c Evolving… TSIR Part 3(new requirement & designs)

Let’s collaborate @ MTSFB!

Page 27: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Radiocommunications Network Facilities (External) (TSIR Part 3)

Towers, Rooftops, Lamp Poles, Portables, Billboards

Smart Pole Street Furniture 6G..7G…?Low Impact

Facilities (LIF)

Evolving… TSIR Part 3 (new technology addendum)

Let’s collaborate @ MTSFB!

Page 28: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

INTERNATIONAL RECOMMENDATION & PRACTICE

ITU’s Latest Recommendation For LIF Guideline

Let’s collaborate @ MTSFB!

Page 29: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Non Low-Impact Infra

Low-Impact Infra

Let’s collaborate @ MTSFB!

Page 30: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Meaning… Federal Authority

Meaning… State Authority

Let’s collaborate @ MTSFB!

Page 31: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Let’s collaborate @ MTSFB!

Repeater (LIF)Public WiFi (LIF)

LIF Structure Examples

Page 32: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

More LIF Structures Examples (Building & Rooftop)

On building, dish 75 cm diameter or smaller is

PERMIT-FREE

MICROWAVE/SATELLITE

DISH

PANEL/OMNIANTENNA

BUILDINGDiameter

75 cm or lessLength

1 meter or lessPERMIT

FREE

60cm Dish (LIF)

Let’s collaborate @ MTSFB!

Page 33: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

3a Local Govt Application Procedures (PBT/LC Guideline, Checklist, Fees, etc)

3 OPERATIONS & ISSUES:

Let’s collaborate @ MTSFB!

Page 34: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Generic Approval process

JKRBOMBA

TNB

MCMC

1 – 4 WEEKS 1 – 2 WEEKS 1 – 2 WEEKS 1 – 2 WEEKS 1 – 2 WEEKS

State with OSA12 weeks

4 - 5 weeks

Let’s collaborate @ MTSFB!

Page 35: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Permit Application Submission Checklist (Generic List)

PRIVATE L. STATE/FED L.

TOWER MONOPOLE LAMP POLE LAMP POLE BILLBOARD PBTS COW ROOFTOP

TELC

OIN

TERN

AL Site Design (PE Engineer) YES YES YES YES YES YES YES YES

Surround Site Location Photo YES YES YES YES YES YES YES YESTelco NFP License Some State Some State Some State Some State Some State Some State Some State Some StateTelco Company Registration Some State Some State Some State Some State Some State Some State Some State Some State

LAN

DLO

RD

Landlord Board Resolution Letter If Company If Company If Company If Company If Company If Company If Company If CompanyLandlord IC YES YES YES YES YES YES YES YESLandlord Auth Letter To Telco Sometimes Sometimes Sometimes Sometimes Sometimes Sometimes Sometimes Sometimes

Joint Owner Consent / Auth Letter If Joint Owner

If Joint Owner

If Joint Owner

If Joint Owner

If Joint Owner

If Joint Owner

If Joint Owner

If Joint Owner

Power of Attorney Trustee Site Trustee Site Trustee Site Trustee Site Trustee Site Trustee Site Trustee Site Trustee SiteStamped TA YES YES YES YES YES YES YES YES

TELC

OEX

TERN

AL

Land Search YES YES YES YES YES YES No YESLand Office Ack Letter Sometimes Sometimes Sometimes Sometimes No No No YESLand Title YES YES YES YES YES YES No YES

LC/PTG Valuation Dept LetterState/Federa

lLand

State/Federal

Land

State/Federal

Land

State/Federal

Land

State/Federal

Land

State/Federal

LandNo

State/Federal

LandQuit Rent Receipt YES YES YES YES YES No No YESAssessment Receipt YES YES YES YES YES No No YESBOMBA, DCA, TNB, MCMC - TiadaHalangan Letter YES YES Sometimes Sometimes NO NO NO YES

MIS

CL ADUN Letter Some State Some State Some State Some State Some State No No Some State

Neighbor Lot Consent Letter Some State Some State Some State Some State Some State No No Some StateLet’s collaborate @ MTSFB!

Page 36: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Let’s collaborate @ MTSFB!

KEMENTERIAN PERUMAHAN DAN KERAJAAN TEMPATAN

PELAKSANAAN MANUAL OSC 3.0 PLUS DI SEMUA PIHAK BERKUASA TEMPATAN

SEMENANJUNG MALAYSIA

KEMENTERIAN PERUMAHAN DAN KERAJAAN TEMPATAN

MESYUARAT JAWATANKUASA PERUNDINGAN PIHAK BERKUASA TEMPATAN (JPPBT) BIL. 2/2020 ZON TIMUR

Page 37: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Let’s collaborate @ MTSFB!

1180

335

66

363

00

50100150200250300350400

MAJLIS BANDARAYA ALOR STAR

2017

2019

KM

BIL.

KM SEDERHANA

2017 2017

20192019

KM BESAR

PENCAPAIAN PELAKSANAAN OSC 3.0 PLUS PBT RINTISTEMPOH KELULUSAN KM

63 49

250

83

363

00

50

100

150

200

250

300

350

400

MAJLIS BANDARAYA IPOH

2017 2019

2017

2019

2017

2019

KM KECIL

BIL. HARI

KM KM BESAR

75%

75 0

222

112

363

00

100

200

300

400

MAJLIS PERBANDARAN SUBANG JAYA

2017 2019

2017

2019

2017

2019

KM KECIL

BIL. HARI

KM KM BESAR

49%

80%

JPPBT 2/2020

Sehingga 31 Disember 2019, 3 PBT rintis yang mempunyai transaksi yang aktif telah mempamerkanpencapaian positif dalam memendekkan tempoh kelulusan KM melalui perbandingan antara tahun 2017dengan pencapaian tahun 2019.

Tempoh kelulusan KM KategoriSederhana bagi MB Alor Star telahberjaya dipercepatkan sehingga 80% iaitudari purata 335 hari pada tahun 2017kepada 66 hari pada tahun 2019.

MP Subang Jaya mencatatkan49% dengan mengurangkantempoh kelulusan dari purata222 hari kepada 112 hari.

MB Ipoh pula berjaya mencapaisehingga 75% iaitu memendekkantempoh masa dari purata 250 harikepada 83 hari.

Page 38: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Let’s collaborate @ MTSFB!

http://www.epbt.gov.my/osc/JMohon_index2.cfm

Comment: Possible addition of Telco structure permitting into OSC 3.0 Plus Online.It’s just a simple programming addition

OSC 3.0 PLUS ONLINE PORTAL

Page 39: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

3b Problems of Permit Compliance

Let’s collaborate @ MTSFB!

Page 40: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

1. Tower was built years earlier, later residential houses constructed closer than the Setback guideline distance

2. Documentation signing problem of property with multiple owners, some may have passed away…

3. Telco has tenancy agreement with Billboard owner, but OSA insists land owner to also give site use approval triggering land owner to demand percentage of telco rental on Billboard

4. Difficulty of getting neighbor’s approval for site build….”since” neighbor does not get part of the site rental income

5. State impose more strict Setback (further) compared to KPKT recommendation

6. Resident’s objection to site build due to radiation fears(Residents assumes Telco site is guilty of radiation danger until proven innocent…)

Some Problem Commonly Faced By Industry

Let’s collaborate @ MTSFB!

Page 41: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

3c Case Against Site Build Protest(EMF/Radiation Fears)

Let’s collaborate @ MTSFB!

Page 42: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

CopyrightDavid Lim

Our Government & Authorities Knows Public Has Radiation Safety ConcernBut people who claim to be afraid of radiation sickness never take such actions below…..

Let’s collaborate @ MTSFB!

Page 43: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

CopyrightDavid Lim

Microwave Oven Safety StandardThrough its Center for Devices and Radiological Health (CDRH), the FDA sets and enforcesstandards of performance for electronic products to assure that radiation emissions do notpose a hazard to public health.A Federal standard (21 CFR 1030.10) limits the amount of microwaves that can leak froman oven throughout its lifetime to 5 milliwatts (mW) of microwave radiation per squarecentimeter at approximately 2 inches from the oven surface.

https://www.fda.gov/radiation-emitting-products/resources-you-radiation-emitting-products/microwave-oven-radiation#Microwave_Oven_Safety_Standard

Microwave Oven Has Proper Safety Regulation

Let’s collaborate @ MTSFB!

Page 44: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

MCMC Has Papers On Radiation Study and Safety

Let’s collaborate @ MTSFB!

Page 45: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Electromagnetic fields and public health: mobile phones

https://www.who.int/news-room/fact-sheets/detail/electromagnetic-fields-and-public-health-mobile-phones

Exposure levelsMobile phones are low-powered radiofrequency transmitters, operating at frequencies between 450 and 2700 MHz with peak powers in the range of 0.1 to 2 watts.

Long-term effectsEpidemiological research examining potential long-term risks from radiofrequency exposure has mostly looked for an association between brain tumours and mobile phone use.

The international pooled analysis of data gathered from 13 participating countries found no increased risk of glioma or meningioma with mobile phone use of more than 10 years.

World Health Organization Research Long Term Mobile Use

Let’s collaborate @ MTSFB!

Page 46: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Let’s collaborate @ MTSFB!

https://www.penang.gov.my/index.php/en/260-menu-utama/kerajaan/360458-dasar-pekeliling#garis-panduan

SOP Bantahan Penduduk Terhadap Struktur Pemancar Telekomunikasi di Negeri Pulau Pinang

Page 47: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan
Page 48: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

48Let’s collaborate @ MTSFB!

No.

Name and organisation Question Answer Remarks

1. Azmie Abu Bakar(Majlis Bandaraya

Melaka Bersejarah)

Utk pembinaan tiangmenara jenis monopole,bagaimana garis panduanpemasangannya?

Ketinggian monopole mungkin 24m - 34m.Ketinggian monopole kebiasaannya lebihtinggi daripada lamp pole. Boleh rujuk garispanduan menara.

Kerana tiang Monopole biasa lebih tinggi daritiang lampu biasa, i.e. 24m ke 34m, keperluankeselamatan adalah lebih ketat terutamanya“set-back”. Iaitu keperluan jarak jauhorangramai atau rumah kediaman bolehberdekatan dengan sesuatu tapak monopole.

2. Sekiranya adapermohonan permit di pbtperlu mendapatkansokongan dari jabatan atauagensi utk keselamatanyang terlibat ke?

Kebenaran agensi selain PBT adalah JKR,Bomba, TNB dan MCMC.

Betul

3. (UPEN Melaka) Bagaimana dengankawasan lapangan terbangyang ditetapkan ada hadmaksimum untukpemasangan Pole. Adakahcadangan alternative lainuntuk isu ini?

Boleh meletakkan pole yang tinggi samatinggi dengan lamp pole sedia ada. Untukmonopole yang tidak dibenarkan oleh DCA,boleh menggunakan saiz ketinggian bagilamp pole di kawasan Airport.

(Comment: In most instance, airport does not have any pre-planned infra for outdoor cellular implementation. Airport planners in general do not incorporate such public needs and it is left for airport Authorities to plan the addition of cellular infrastructure only after an airport is built)

4. Ong Chong Kim 1 monopole or lamp polehow far is the coverage?

Tertakluk kepada frekuensi yang ditetapkandan digunakan. Cthnya 2G and 3G bolehmeliputi kawasan sejauh beberapa Kilometertetapi 5G kurang daripada 1 km. Pole yangrendah boleh meliputi kawasan yang kecilsahaja manakala pole yang tinggi bolehmeliputi kawasan yang lebih besar.

Betul

Page 49: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

49

MTSFBmtsfb_cyberjaya

Let’s Collaborate

Let’s collaborate @ MTSFB!

Page 50: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

BACKUP – SLIDESInternational Cities RT Sites

Snap-Shot

Let’s collaborate @ MTSFB!

Page 51: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Wittenoom Street, PerthLat: -31.953048° Lon: 115.868483°

Let’s collaborate @ MTSFB!

Page 52: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Hyehwa Street, Seoul, South KoreaLat: 37.589286° Lon:126.999223°

Let’s collaborate @ MTSFB!

Page 53: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Sinjang-dong, Hanam-si, South KoreaLat: 37.539435° Lon: 127.211584°

Let’s collaborate @ MTSFB!

Page 54: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Wood Lane ,LondonLat: 51.511358° Lon: -0.223440°

Let’s collaborate @ MTSFB!

Page 55: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Park View Road,LondonLat: 51.460332° Lon: 0.118710°No available tall buildings nearby

Let’s collaborate @ MTSFB!

Page 56: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

Western Road, Brighton, UKLat: 50.824400° Lon: -0.1491214°

Let’s collaborate @ MTSFB!

Page 57: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

TWO STOREYHOTEL SITE

Non-CamouflageMobile Station

CITY CENTRE – TWO STOREY HOTEL (Village Hotel Bugis, Victoria Street)

Lat: 1.302068° Lon: 103.857855°

Let’s collaborate @ MTSFB!

Page 58: Technical Code Programme 2020 Awareness & Adoption of ......dari purata 335 hari pada tahun 2017 kepada 66 hari pada tahun 2019. MP Subang Jaya mencatatkan 49% dengan mengurangkan

SINGAPORE CITY CENTRE - FU LU SHOU COMPLEXLat: 1.300970° Lon: 103.854609°

Let’s collaborate @ MTSFB!