technical committee on emergency communication systems 2016 second draft … · 2016-03-28 ·...
TRANSCRIPT
National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 • Fax: 617-770-7070 • www.nfpa.org
Technical Committee on Emergency Communication Systems 2016 Second Draft Meeting Minutes
San Diego, CA June 24 & 25, 2014
Wayne Moore-Chair
A. 6.24.14 TC meeting called to order by Chair Wayne Moore at 8:06 AM B. Introductions of all present, plus 6 guests C. Sign in sheets gathered by NFPA staff, see attached roster of attendees D. Agenda was reviewed and Approved, E. Meeting Minutes for First Draft were Approved F. Discussion/presentation on Process for Second Draft Actions G. Reviewed Task Group activities, noted below. H. Worked on various PC’s (Total of 35 PC’s to work) I. Lunch break at 11:50 AM to 1:00 PM J. Resumed meeting at 1:00 PM to review proposed Annex K. 1:30 PM worked on various PC’s L. 6:20 PM Closed the session for the day M. 6.25.14 Session called to order at 8:00 AM N. Al Ramirez of UL presented an update on CI Cables listings O. Next steps Ballots and CC reviews actions P. New Business: None Q. A total of 39 PC and CI were processed in this session R. Closed session 11:40 AM.
a. The meeting closed on a sobering note, this will be Wayne Moore’s last session as Chair, and Wayne took Chapter 24 from an idea to a very valuable part of NFPA 72. His leadership is respected and the committee looks forward to his continued participation within the committee.
The following task groups are for record only. Most of the tasks are closed and noted. They will be removed with when the next cycle starts.
Task Group Scope
Chair Members
Documentation Review Ch 24 documentation
requirements and recommend reduction in duplicative material and relocate
some material to appropriate locations for improved flow.
Report: Completed, 11 PI’s submitted, with renumbering of sections
CLOSED
Bruce Fraser Andrew Woodward, Rodger Reiswig, Sean Remke
Numbering of Sections Review Ch 24 numbering and
recommend ways to reduce length of section paragraph numbering and to promote major headings for improved
usability. Report: See above for comments,
CLOSED
Bruce Fraser Andrew Woodward, Rodger Reiswig, Sean Remke
Risk Analysis Where do we make this mandatory?
Is required for MNS System. Impacts on Combination Systems
where MNS is involved.
Report: John reported on actions taken, submitted various PI’s. Tried to simplify
the process, lots of discussion—will review the PI’s in detail
CLOSED
John Fuoto Sean Remke, Oded Aron, Joe Collins, Joe Ripp, Aviv
Siegel, Bruce Fraser
LOC Mounting Heights and define use by Occupant vs. Authorized user
Develop language and PI
Report: Submitted PI’s CLOSED
Scott Lacey Ray Hansen, Waymon Jackson
Req for Monitoring FA and MNS Stand Alone Systems
Develop Language and PI Report: Submitted PI’s
CLOSED
Scott Lacey Derek Matthews, Ray Hansen
Test Schedule for Elevator Define and prepare PI
Report: Submitted PI’s
CLOSED
Bruce Fraser Wayne Moore
Test Schedule Area of Refuge Communication Systems
Clean up 14.4.3.2; LSC 101 7.2.12 Develop PI
Report: TG has draft of changes, need to submit CI to ECS and Chp 14 TMS
CLOSED
Rodger Reiswig Derek Mathews, Dan Finnegan, Waymon Jackson
FPRF Research on Messaging What should we put into our code for
guidance and direction Develop PI
Report: Submitted PI’s
Worked SR’s and submitted in this session
Dan Finnegan John Fuoto, Wayne Moore
Technology for Providing
Intelligibility May need to allow non-Fire listed
products for certain applications……
Report: TG submitted PI’s
John Fuoto
Mike Pallett , Denise Pappas, Andrew Woodward, Wayne
Moore, Derek Mathews, Dan Finnegan, Joe Collins
Audio Circuit db Loss Evaluate data from chapter 23, place in
Annex Develop PI
Report: Need some outside SME on
this topic, need placeholder into document CLOSED
Charlie Hall Waymon Jackson, Joe Dafin, Jim Chambers
24.4.2.8 Review Evacuation Signals
Correlate with Chp 18, change title to just evac. Revise and create PI
Report: Formed a TG to review and develop revisions to submitted PI
CLOSED
Dan Finnegan Mike Pallett, Jim Mongeau
Prescriptive vs Performance Base for Risk Analysis
Develop PI
Report: PI’s submitted CLOSED
Sean Remke Ray Hansen, Waymon Jackson, Bruce Fraser
Area of Refuge Compare actual requirements with other
two way requirements
Report: PI’s submitted CLOSED
Mike Pallett Derek Mathews Needs to work with Rodgers
task group
LCD screens that would be primary visual notification appliances
Review and develop PI
Report: PI’s submitted CLOSED
Mike Pallett
Derek Mathews
Review of First Draft Document NEW (9.09.13)
Review FD accuracy as printed, including Correlation
CLOSED
Bruce Fraser
Bruce Fraser-Chair John Fannin Joe Collins
Review Communication Systems for Elevator and Stairs NEW (9.11.13)
Overlap of Systems-Recommendations
Bruce Fraser
Joe Ripp, Andrew Woodward Jim Mongeau, Mike Pallett,
ECS-PRO ColorationCollaboration
Define Zone/Notification To be worked next cycle
Mike Pallett-rep ECS
tbd
Submitted Daniel P Finnegan
Secretary ECS TC