35
Sheet 1 of 35 PT. REKAYASA INDUSTRI PROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW CLIENT : PT PLN (PERSERO) JOB NO. : 07-1205 LOCATION : SURALAYA-BANTEN TECHNICAL BID TABULATION FOR WASTE WATER TREATMENT PACKAGE NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA Waste water Input / output data As per Doc. No. PLTU1-10-IS-WWTP-001 1. - U/G RECEIVING PIT (T-01) Capacity 10000 Size 100 x 50 x 2 m Material Reinforced Concrete - WASTE WATER TRANSFER PUMPS (P-01A/B) NO. REQUIRED 2 CODE AND STANDARD ANSI/ASME/ISO/DIN/Mfr Std MANUFACTURER by Vendor COUNTRY OF ORIGIN by Vendor MODEL by Vendor TYPE CENTRIFUGAL PERFORMANCE : Rated/normal capacity 200 m3/hr Total head / NPSHA by Vendor Speed by Vendor Sp. Gr. 1 BKW, Shaft Power / End Curve Power by Vendor Efficiency at rated capacity by Vendor Head characteristic Continuously rise to shut-off Minimum continuous flow by Vendor NPSHR by Vendor NPSHA-NPSHR Min 3 ft (1 m) Sound Level Max. 85 dBA @ 1 m CONSTRUCTION FEATURE: Nozzle: size / rating / face / location Suction by Vendor / 150# / RF / END Discharge by Vendor / 150# / RF / TOP No. of stages 1 Casing mounting Horizontal Impeller : by Vendor Bearing Type Radial by Vendor Thrust by Vendor Coupling : Manufacturer by Vendor Model Flexible Disc w/ Spacer Baseplate Horizontal / CS MATERIAL : Casing Stainless Steel Impeller Stainless Steel Shaft Stainless Steel Case gasket Non Asbestos SHAFT SEAL : Type Gland Packing

Upload: david-lambert

Post on 08-Dec-2015

15 views

Category:

Documents


1 download

DESCRIPTION

Technical Form for WWTP Industry

TRANSCRIPT

Page 1: Technical Form WWTP

Sheet 1 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

Waste water Input / output data As per Doc. No. PLTU1-10-IS-WWTP-001

1. - U/G RECEIVING PIT (T-01)

Capacity 10000

Size 100 x 50 x 2 m

Material Reinforced Concrete

- WASTE WATER TRANSFER PUMPS (P-01A/B)

NO. REQUIRED 2

CODE AND STANDARD ANSI/ASME/ISO/DIN/Mfr Std

MANUFACTURER by Vendor

COUNTRY OF ORIGIN by Vendor

MODEL by Vendor

TYPE CENTRIFUGAL

PERFORMANCE :

Rated/normal capacity 200 m3/hr

Total head / NPSHA by Vendor

Speed by Vendor

Sp. Gr. 1

BKW, Shaft Power / End Curve Power by Vendor

Efficiency at rated capacity by Vendor

Head characteristic Continuously rise to shut-off

Minimum continuous flow by Vendor

NPSHR by Vendor

NPSHA-NPSHR Min 3 ft (1 m)

Sound Level Max. 85 dBA @ 1 m

CONSTRUCTION FEATURE:

Nozzle: size / rating / face / location

Suction by Vendor / 150# / RF / END

Discharge by Vendor / 150# / RF / TOP

No. of stages 1

Casing mounting Horizontal

Impeller : by Vendor

Bearing Type

Radial by Vendor

Thrust by Vendor

Coupling :

Manufacturer by Vendor

Model Flexible Disc w/ Spacer

Baseplate Horizontal / CS

MATERIAL :

Casing Stainless Steel

Impeller Stainless Steel

Shaft Stainless Steel

Case gasket Non Asbestos

SHAFT SEAL :

Type Gland Packing

Page 2: Technical Form WWTP

Sheet 2 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

MOTOR :

Manufacturer by Vendor

Rated power by Vendor

Volt / Phase / Freq. 400/3/50

Enclosure TEFC, IP-55

Insulation class / temperature rise F / B

SCOPE OF WORK:

Engineering and Documentation Yes, by Vendor

Guarantee and Warranty Yes, by Vendor

Manufacturing and Assembling Yes, by Vendor

Final Machining and Mounting of Coupling Half Yes, by Vendor

Mounting of Driver Yes, by Vendor

Inspection and Test at Shop Yes, by Vendor

Wiring and Tubing Within the Skid Yes, by Vendor (if any)

Prime Coating and Finish Coating at Shop Yes, by Vendor

Finish Color for Pump Yes, by Vendor

Packing and Rust Prevention Yes, by Vendor

Shipping and Transportation Yes, by Vendor

SCOPE OF SUPPLY:

Pumps Yes, by Vendor

Coupling and Guard Yes, by Vendor

Baseplate/Soleplate Yes, by Vendor

Foundation Bolts and Nuts (plus 10% spare) Yes, by Vendor

with Liners and Shims

Driver Setting Bolts and Nuts Yes, by Vendor

Space Heater for Motor > 10 kW Yes, by Vendor (if Req'd)

Auxiliary Piping Within The Skid Yes, by Vendor

Special Tools Yes (if any)

Spare parts :

Construction and commissioning Yes, by Vendor

One-year operation Yes, by Vendor

Price List of Recommended Spare Parts Yes, by Vendor, Optional

for One-year Operation

Lifting Lugs and Earth Lugs Yes, by Vendor

Constant level oiler Yes, by Vendor

DELIVERY TIME max. 6 months

Term by Vendor

- SUBMERSIBLE SLUDGE PUMPS (PORTABLE) (P-05A/B)

NO. REQUIRED 2

CODE AND STANDARD Manufacturer Std

MANUFACTURER by Vendor

COUNTRY OF ORIGIN by Vendor

MODEL by Vendor

TYPE Centrifugal (Submersible)

PERFORMANCE :

Normal/Rated capacity 5 m3/hr

Normal head by Vendor

Speed by Vendor

Page 3: Technical Form WWTP

Sheet 3 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

BKW, Shaft Power / Peak Power by Vendor

Efficiency at rated capacity by Vendor

Sound Level Max. 85 dBA@ 1 m

CONSTRUCTION FEATURE:

Discharge Nozzle by Vendor

MATERIAL :

Casing Stainless Steel

Impeller Stainless Steel

Shaft Stainless Steel

Motor Stainless Steel

MOTOR :

Manufacturer by Vendor

Rated power by Vendor

Volt / Phase / Freq. 400/3/50

Enclosure IP-68

Insulation class F

SCOPE OF WORK:

Engineering and Documentation Yes, by Vendor

Guarantee and Warranty Yes, by Vendor

Manufacturing and Assembling Yes, by Vendor

Mounting of Driver Yes, by Vendor

Inspection and Test at Shop Yes, by Vendor

Packing and Rust Prevention Yes, by Vendor

SCOPE OF SUPPLY:

Pump Yes, by Vendor

Motor Driver Yes, by Vendor

2. - RAPID MIX TANK (T-02)

APPLICABLE CODE API 650 Latest Edition

DESIGN CONDITIONS

Capacity 120 m3

Dimension :

Shell ID by Vendor

Shell Height by Vendor

Nozzle by Vendor

Thickness :

Shell 6 mm

Bottom 9 mm

Operating / Design Pressure ATM / Full Water

Operating / Design Temperature 25 / 60

Hydrostatic Test Pressure Full Water

Radiographic examination Spot

Type of Roof OPEN ROOF

Joint efficiency 0.85

Corrosion allowance (shell, bottom) 1.7 / 1.7

Insulation None

Flange rating by Vendor

Material Data :

Page 4: Technical Form WWTP

Sheet 4 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

Shell & Bottom A 283 C

Internals (Vortex Breaker) A 106 B

Nozzle necks A 106 B

Flange A 105

Bolts & nuts A 193 B7 / A 194 2H

Gasket Non asbestos sheet gasket

Foundation bolts/nuts A 307 B / A 563 A

Stiffener A 36

Painting (internal) Coal Tar Epoxy

Painting (external) as per painting spec

Unit weight estimate (erection) 40.743

SCOPE OF WORKS

Design and Engineering Yes

Warranty and Guarantee Yes, Mechanical Guarantee

Supply of Material Yes

Fabrication at Field Yes

Inspection and Testing Yes

Packing Yes

Documentation Yes

SCOPE OF SUPPLY

Body (shell, bottom, roof, etc) Yes

Ladders and Handrail Yes

Manhole c/w cover, davit/hinge (include bolt, nut, and gasket) Yes

Anchor bolts and nuts Yes

Nameplate Yes

Lifting lug Yes

Earth lug Yes

Bird screen Yes, if required

Moisture trap Yes, if required

Vortex breaker Yes, if required

Roof reinforcement Yes, if required

External pipe support Yes, if required

Internal Piping Yes, if required

Internal Ladder Yes, if required

Internal and External Coating Yes, if required

Spare parts

for Commissioning Yes

for One-year operation Yes

INSPECTION AND TESTING

Hydrotest Yes

NDE Yes

Visual and dimension check Yes

- AGITATOR AND MOTOR (A-01)

SERVICE RAPID TANK MIXER

MANUFACTURER BY VENDOR

MODEL BY VENDOR

CODE AND STANDARD BY VENDOR

Page 5: Technical Form WWTP

Sheet 5 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

OPERATING CONDITION

Liquid WATER

Service temperature AMBIENT

Sp. Gr. at service temp BY VENDOR

Viscosity at service temp 1-3

Corr/Err caused by H2S, CO2, S COMPOUND

Capacity: Normal BY VENDOR

Rated BY VENDOR

Process ( chemical/physical) MIXING / HOMOGENIZE

Baffles 3 at 120

Working Volume BY VENDOR

Agitator location RAPID MIX TANK

Type of Tank ( clilindrical )

CONSTRUCTION

Shaft Diameter at propoller BY VENDOR

Shaft diameter at coupling BY VENDOR

Shaft Length BY VENDOR

Mounting VERTICAL CENTERED ON TOP

Mechanical Seal YES

Seal Type LIP SEAL

Seal liquid reservoir/tank and accessories BY VENDOR

Distance Propoller to bottom BY VENDOR

Ring size BY VENDOR

Blades size BY VENDOR

Blade Type BY VENDOR

Driver Support BY VENDOR

Agitator Support BY VENDOR

Coupling BY VENDOR

Fastening Flanges BY VENDOR

Erection weight BY VENDOR

Total weight BY VENDOR

Agitator weight BY VENDOR

Coupling weight BY VENDOR

Motor/Gear weight BY VENDOR

Local instruments BY VENDOR (if any)

Miscellaneous

Name plate BY VENDOR

Stainless steel shim plates BY VENDOR

Setbolts for mounting driver BY VENDOR

Sparepart for for construction, Pe-commissioning, & Commissioning BY VENDOR

Sparepart for 1 (one) year operation Separate Quotation

Special tools BY VENDOR (if any)

Shop inspection and testing REQUIRED; WITNESSED

Painting (as per REK's spec) BY VENDOR

Painting material for field touch up BY VENDOR; 5% of Painting Material

Packing & rust prevention BY VENDOR; 6 month storage

Vendor Documents Required (as per Requisition) BY VENDOR

Page 6: Technical Form WWTP

Sheet 6 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

PERFORMANCE

Performance curve BY VENDOR

Min Continuity, Capacity BY VENDOR

Power Design BY VENDOR

Rotating Facing Coupling end BY VENDOR

Submergence Required BY VENDOR

Maximum Thrust Up/down BY VENDOR

Rated Speed 60-70

Start Torque BY VENDOR

Normal Torque BY VENDOR

Driving System ELECTRICAL MOTOR

Duty CONTINUOUS 24 HR

Max allowable sound level/Expected max 85 dBA

MATERIAL

Casing SS 304

Inner case parts BY VENDOR

propeller SS 304

Mounting Plate BY VENDOR

Shaft SS 304

Shaft sleeve SS 304

Mounting Bolt & Nut SS

BEARING AND LUBRICATION

Lubrication BY VENDOR

DRIVER :

INDUCTION MOTOR

Code and Standard IEC

Manufacturer BY VENDOR

IP Protection IP 55 (minimum)

Rated power BY VENDOR

Volt / Phase / Freq. 380 / 3 / 50

Enclosure TEFC

Insulation class / temperature rise F / B

INSPECTION AND TEST

Performance WITNESSED

Mechanical running WITNESSED

All other inspection & test per req./spec. NON WITNESSED

EXPERIENCES Similar project

DELIVERY TIME BY VENDOR

- FeSO4 DOSING UNIT (D-01)

Dosing Pump

Manufacturer By Vendor

Quantity 2

Motor Power kW By Vendor

Page 7: Technical Form WWTP

Sheet 7 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

Capacity liter/hr By Vendor

Enclosure IP 65

Material Stainless steel / plastic

Mixing Tank

Quantity 1

Type By Vendor

Capacity liter By Vendor

Material FRP/Stainless Steel

Size (diameter x height) mm by Vendor

Agitator

Material Stainless steel

Motor Power for Agitator kW by Vendor

Motor Enclosure IP 55

Piping, Valve, Line Specification, & Accessories as per P&ID

- Ca(OH)2 DOSING UNIT (D-02)

Dosing Pump

Manufacturer By Vendor

Quantity 2

Motor Power kW By Vendor

Capacity liter/hr By Vendor

Enclosure IP 65

Material Stainless steel / plastic

Mixing Tank

Quantity 1

Type By Vendor

Capacity liter By Vendor

Material FRP/Stainless Steel

Size (diameter x height) mm by Vendor

Agitator

Material Stainless steel

Motor Power for Agitator kW by Vendor

Motor Enclosure IP 55

Piping, Valve, Line Specification, & Accessories as per P&ID

3. - REACTOR TANK (T-03)

APPLICABLE CODE API 650 Latest Edition

DESIGN CONDITIONS

Capacity 197 m3

Dimension :

Shell ID by Vendor

Shell Height by Vendor

Nozzle by Vendor

Thickness :

Shell 6 mm

Bottom 9 mm

Operating / Design Pressure ATM / Full Water

Operating / Design Temperature 25 / 60

Hydrostatic Test Pressure Full Water

Page 8: Technical Form WWTP

Sheet 8 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

Radiographic examination Spot

Type of Roof OPEN ROOF

Joint efficiency 0.85

Corrosion allowance (shell, bottom) 1.7 / 1.7

Insulation None

Flange rating by Vendor

Material Data :

Shell & Bottom A 283 C

Internals (Vortex Breaker) A 106 B

Nozzle necks A 106 B

Flange A 105

Bolts & nuts A 193 B7 / A 194 2H

Gasket Non asbestos sheet gasket

Foundation bolts/nuts A 307 B / A 563 A

Stiffener A 36

Painting (internal) Coal Tar Epoxy

Painting (external) as per painting spec

Unit weight estimate (erection) 40.743

SCOPE OF WORKS

Design and Engineering Yes

Warranty and Guarantee Yes, Mechanical Guarantee

Supply of Material Yes

Fabrication at Field Yes

Inspection and Testing Yes

Packing Yes

Documentation Yes

SCOPE OF SUPPLY

Body (shell, bottom, roof, etc) Yes

Ladders and Handrail Yes

Manhole c/w cover, davit/hinge (include bolt, nut, and gasket) Yes

Anchor bolts and nuts Yes

Nameplate Yes

Lifting lug Yes

Earth lug Yes

Bird screen Yes, if required

Moisture trap Yes, if required

Vortex breaker Yes, if required

Roof reinforcement Yes, if required

External pipe support Yes, if required

Internal Piping Yes, if required

Internal Ladder Yes, if required

Internal and External Coating Yes, if required

Spare parts

for Commissioning Yes

for One-year operation Yes

INSPECTION AND TESTING

Hydrotest Yes

NDE Yes

Visual and dimension check Yes

Page 9: Technical Form WWTP

Sheet 9 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

- AGITATOR AND MOTOR (A-02)

SERVICE REACTOR TANK MIXER

MANUFACTURER BY VENDOR

MODEL BY VENDOR

CODE AND STANDARD BY VENDOR

OPERATING CONDITION

Liquid WATER

Service temperature AMBIENT

Sp. Gr. at service temp BY VENDOR

Viscosity at service temp 1-3

Corr/Err caused by H2S, CO2, S COMPOUND

Capacity: Normal BY VENDOR

Rated BY VENDOR

Process ( chemical/physical) MIXING / HOMOGENIZE

Baffles 3 at 120

Working Volume BY VENDOR

Agitator location REACTOR TANK

Type of Tank ( clilindrical )

CONSTRUCTION

Shaft Diameter at propoller BY VENDOR

Shaft diameter at coupling BY VENDOR

Shaft Length BY VENDOR

Mounting VERTICAL CENTERED ON TOP

Mechanical Seal YES

Seal Type LIP SEAL

Seal liquid reservoir/tank and accessories BY VENDOR

Distance Propoller to bottom BY VENDOR

Ring size BY VENDOR

Blades size BY VENDOR

Blade Type BY VENDOR

Driver Support BY VENDOR

Agitator Support BY VENDOR

Coupling BY VENDOR

Fastening Flanges BY VENDOR

Erection weight BY VENDOR

Total weight BY VENDOR

Agitator weight BY VENDOR

Coupling weight BY VENDOR

Motor/Gear weight BY VENDOR

Local instruments BY VENDOR (if any)

Miscellaneous

Name plate BY VENDOR

Stainless steel shim plates BY VENDOR

Setbolts for mounting driver BY VENDOR

Sparepart for for construction, Pe-commissioning, & Commissioning BY VENDOR

Sparepart for 1 (one) year operation Separate Quotation

Page 10: Technical Form WWTP

Sheet 10 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

Special tools BY VENDOR (if any)

Shop inspection and testing REQUIRED; WITNESSED

Painting (as per REK's spec) BY VENDOR

Painting material for field touch up BY VENDOR; 5% of Painting Material

Packing & rust prevention BY VENDOR; 6 month storage

Vendor Documents Required (as per Requisition) BY VENDOR

PERFORMANCE

Performance curve BY VENDOR

Min Continuity, Capacity BY VENDOR

Power Design BY VENDOR

Rotating Facing Coupling end BY VENDOR

Submergence Required BY VENDOR

Maximum Thrust Up/down BY VENDOR

Rated Speed 60-70

Start Torque BY VENDOR

Normal Torque BY VENDOR

Driving System ELECTRICAL MOTOR

Duty CONTINUOUS 24 HR

Max allowable sound level/Expected max 85 dBA

MATERIAL

Casing SS 304

Inner case parts BY VENDOR

propeller SS 304

Mounting Plate BY VENDOR

Shaft SS 304

Shaft sleeve SS 304

Mounting Bolt & Nut SS

BEARING AND LUBRICATION

Lubrication BY VENDOR

DRIVER :

INDUCTION MOTOR

Code and Standard IEC

Manufacturer BY VENDOR

IP Protection IP 55 (minimum)

Rated power BY VENDOR

Volt / Phase / Freq. 380 / 3 / 50

Enclosure TEFC

Insulation class / temperature rise F / B

INSPECTION AND TEST

Performance WITNESSED

Mechanical running WITNESSED

All other inspection & test per req./spec. NON WITNESSED

EXPERIENCES Similar project

Page 11: Technical Form WWTP

Sheet 11 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

DELIVERY TIME BY VENDOR

- BLOWER AND MOTOR

Number 2

Blower Power kW by vendor

Air Flow m3/hr by vendor

Fan Speed rpm by vendor

Manufacturer by vendor

Motor

- Rated kW kW by vendor

- Area Classification non hazardous

- Manufacturer by vendor

- Full Load Speed rpm by vendor

- Ph / Freq / Voltage 3/50/400

- Enclosure IP 55

Painting as per Spec

4. - SOLID CONTACT TANK/CLARIFIER (T-04)

APPLICABLE CODE API 650 Latest Edition

DESIGN CONDITIONS

Capacity 690 m3

Dimension :

Shell ID by Vendor

Shell Height by Vendor

Nozzle by Vendor

Thickness :

Shell 6 mm

Bottom 9 mm

Operating / Design Pressure ATM / Full Water

Operating / Design Temperature 25 / 60

Hydrostatic Test Pressure Full Water

Radiographic examination Spot

Type of Roof OPEN ROOF

Joint efficiency 0.85

Corrosion allowance (shell, bottom) 1.7 / 1.7

Insulation None

Flange rating by Vendor

Material Data :

Shell & Bottom A 283 C

Internals (Vortex Breaker) A 106 B

Nozzle necks A 106 B

Flange A 105

Bolts & nuts A 193 B7 / A 194 2H

Gasket Non asbestos sheet gasket

Foundation bolts/nuts A 307 B / A 563 A

Stiffener A 36

Painting (internal) Coal Tar Epoxy

Painting (external) as per painting spec

Unit weight estimate (erection) 40.743

Page 12: Technical Form WWTP

Sheet 12 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

SCOPE OF WORKS

Design and Engineering Yes

Warranty and Guarantee Yes, Mechanical Guarantee

Supply of Material Yes

Fabrication at Field Yes

Inspection and Testing Yes

Packing Yes

Documentation Yes

SCOPE OF SUPPLY

Body (shell, bottom, roof, etc) Yes

Ladders and Handrail Yes

Manhole c/w cover, davit/hinge (include bolt, nut, and gasket) Yes

Anchor bolts and nuts Yes

Nameplate Yes

Lifting lug Yes

Earth lug Yes

Bird screen Yes, if required

Moisture trap Yes, if required

Vortex breaker Yes, if required

Roof reinforcement Yes, if required

External pipe support Yes, if required

Internal Piping Yes, if required

Internal Ladder Yes, if required

Internal and External Coating Yes, if required

Spare parts

for Commissioning Yes

for One-year operation Yes

INSPECTION AND TESTING

Hydrotest Yes

NDE Yes

Visual and dimension check Yes

- AGITATOR AND MOTOR (A-03)

SERVICE SOLID CONTACT TANK MIXER

MANUFACTURER BY VENDOR

MODEL BY VENDOR

CODE AND STANDARD BY VENDOR

OPERATING CONDITION

Liquid WATER

Service temperature AMBIENT

Sp. Gr. at service temp BY VENDOR

Viscosity at service temp 1-3

Corr/Err caused by H2S, CO2, S COMPOUND

Capacity: Normal BY VENDOR

Rated BY VENDOR

Process ( chemical/physical) MIXING / HOMOGENIZE

Baffles 3 at 120

Working Volume BY VENDOR

Page 13: Technical Form WWTP

Sheet 13 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

Agitator location SOLID CONTACT TANK

Type of Tank ( clilindrical )

CONSTRUCTION

Shaft Diameter at propoller BY VENDOR

Shaft diameter at coupling BY VENDOR

Shaft Length BY VENDOR

Mounting VERTICAL CENTERED ON TOP

Mechanical Seal YES

Seal Type LIP SEAL

Seal liquid reservoir/tank and accessories BY VENDOR

Distance Propoller to bottom BY VENDOR

Ring size BY VENDOR

Blades size BY VENDOR

Blade Type BY VENDOR

Driver Support BY VENDOR

Agitator Support BY VENDOR

Coupling BY VENDOR

Fastening Flanges BY VENDOR

Erection weight BY VENDOR

Total weight BY VENDOR

Agitator weight BY VENDOR

Coupling weight BY VENDOR

Motor/Gear weight BY VENDOR

Local instruments BY VENDOR (if any)

Miscellaneous

Name plate BY VENDOR

Stainless steel shim plates BY VENDOR

Setbolts for mounting driver BY VENDOR

Sparepart for for construction, Pe-commissioning, & Commissioning BY VENDOR

Sparepart for 1 (one) year operation Separate Quotation

Special tools BY VENDOR (if any)

Shop inspection and testing REQUIRED; WITNESSED

Painting (as per REK's spec) BY VENDOR

Painting material for field touch up BY VENDOR; 5% of Painting Material

Packing & rust prevention BY VENDOR; 6 month storage

Vendor Documents Required (as per Requisition) BY VENDOR

PERFORMANCE

Performance curve BY VENDOR

Min Continuity, Capacity BY VENDOR

Power Design BY VENDOR

Rotating Facing Coupling end BY VENDOR

Submergence Required BY VENDOR

Maximum Thrust Up/down BY VENDOR

Rated Speed 60-70

Start Torque BY VENDOR

Normal Torque BY VENDOR

Driving System ELECTRICAL MOTOR

Page 14: Technical Form WWTP

Sheet 14 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

Duty CONTINUOUS 24 HR

Max allowable sound level/Expected max 85 dBA

MATERIAL

Casing SS 304

Inner case parts BY VENDOR

propeller SS 304

Mounting Plate BY VENDOR

Shaft SS 304

Shaft sleeve SS 304

Mounting Bolt & Nut SS

BEARING AND LUBRICATION

Lubrication BY VENDOR

DRIVER :

INDUCTION MOTOR

Code and Standard IEC

Manufacturer BY VENDOR

IP Protection IP 55 (minimum)

Rated power BY VENDOR

Volt / Phase / Freq. 380 / 3 / 50

Enclosure TEFC

Insulation class / temperature rise F / B

INSPECTION AND TEST

Performance WITNESSED

Mechanical running WITNESSED

All other inspection & test per req./spec. NON WITNESSED

EXPERIENCES Similar project

DELIVERY TIME BY VENDOR

- RAKE AND MOTOR (R-01)

SERVICE SOLID CONTACT TANK RAKE

MANUFACTURER BY VENDOR

MODEL BY VENDOR

CODE AND STANDARD BY VENDOR

OPERATING CONDITION

Liquid WATER+SLUDGE

Service temperature AMBIENT

Sp. Gr. at service temp BY VENDOR

Viscosity at service temp 1-3

Corr/Err caused by H2S, CO2, S COMPOUND

Capacity: Normal BY VENDOR

Rated BY VENDOR

Working Volume BY VENDOR

Page 15: Technical Form WWTP

Sheet 15 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

CONSTRUCTION

Shaft Diameter at propoller BY VENDOR

Shaft diameter at coupling BY VENDOR

Shaft Length BY VENDOR

Mounting VERTICAL CENTERED ON TOP

Mechanical Seal YES

Seal Type LIP SEAL

Seal liquid reservoir/tank and accessories BY VENDOR

Distance Propoller to bottom BY VENDOR

Ring size BY VENDOR

Blades size BY VENDOR

Blade Type BY VENDOR

Driver Support BY VENDOR

Rake Support BY VENDOR

Coupling BY VENDOR

Fastening Flanges BY VENDOR

Erection weight BY VENDOR

Total weight BY VENDOR

Rake weight BY VENDOR

Coupling weight BY VENDOR

Motor/Gear weight BY VENDOR

Local instruments BY VENDOR (if any)

Miscellaneous

Name plate BY VENDOR

Stainless steel shim plates BY VENDOR

Setbolts for mounting driver BY VENDOR

Sparepart for for construction, Pe-commissioning, & Commissioning BY VENDOR

Sparepart for 1 (one) year operation Separate Quotation

Special tools BY VENDOR (if any)

Shop inspection and testing REQUIRED; WITNESSED

Painting (as per REK's spec) BY VENDOR

Painting material for field touch up BY VENDOR; 5% of Painting Material

Packing & rust prevention BY VENDOR; 6 month storage

Vendor Documents Required (as per Requisition) BY VENDOR

PERFORMANCE

Performance curve BY VENDOR

Min Continuity, Capacity BY VENDOR

Power Design BY VENDOR

Rotating Facing Coupling end BY VENDOR

Submergence Required BY VENDOR

Maximum Thrust Up/down BY VENDOR

Rated Speed 60-70

Start Torque BY VENDOR

Normal Torque BY VENDOR

Driving System ELECTRICAL MOTOR

Duty CONTINUOUS 24 HR

Max allowable sound level/Expected max 85 dBA

Page 16: Technical Form WWTP

Sheet 16 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

MATERIAL

Casing SS 304

Inner case parts BY VENDOR

propeller SS 304

Mounting Plate BY VENDOR

Shaft SS 304

Shaft sleeve SS 304

Mounting Bolt & Nut SS

BEARING AND LUBRICATION

Lubrication BY VENDOR

DRIVER :

INDUCTION MOTOR

Code and Standard IEC

Manufacturer BY VENDOR

IP Protection IP 55 (minimum)

Rated power BY VENDOR

Volt / Phase / Freq. 380 / 3 / 50

Enclosure TEFC

Insulation class / temperature rise F / B

INSPECTION AND TEST

Performance WITNESSED

Mechanical running WITNESSED

All other inspection & test per req./spec. NON WITNESSED

EXPERIENCES Similar project

DELIVERY TIME BY VENDOR

- SODIUM SULPHITE DOSING UNIT (D-03)

Dosing Pump

Manufacturer By Vendor

Quantity 2

Motor Power kW By Vendor

Capacity liter/hr By Vendor

Enclosure IP 65

Material Stainless steel / plastic

Mixing Tank

Quantity 1

Type By Vendor

Capacity liter By Vendor

Material FRP/Stainless Steel

Size (diameter x height) mm by Vendor

Agitator

Material Stainless steel

Motor Power for Agitator kW by Vendor

Motor Enclosure IP 55

Piping, Valve, Line Specification, & Accessories as per P&ID

Page 17: Technical Form WWTP

Sheet 17 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

- ALUM DOSING UNIT (D-04)

Dosing Pump

Manufacturer By Vendor

Quantity 2

Motor Power kW By Vendor

Capacity liter/hr By Vendor

Enclosure IP 65

Material Stainless steel / plastic

Mixing Tank

Quantity 1

Type By Vendor

Capacity liter By Vendor

Material FRP/Stainless Steel

Size (diameter x height) mm by Vendor

Agitator

Material Stainless steel

Motor Power for Agitator kW by Vendor

Motor Enclosure IP 55

Piping, Valve, Line Specification, & Accessories as per P&ID

- ANION POLYMER DOSING UNIT (D-05)

Dosing Pump

Manufacturer By Vendor

Quantity 2

Motor Power kW By Vendor

Capacity liter/hr By Vendor

Enclosure IP 65

Material Stainless steel / plastic

Mixing Tank

Quantity 1

Type By Vendor

Capacity liter By Vendor

Material FRP/Stainless Steel

Size (diameter x height) mm by Vendor

Agitator

Material Stainless steel

Motor Power for Agitator kW by Vendor

Motor Enclosure IP 55

Piping, Valve, Line Specification, & Accessories as per P&ID

5. - SOLID CONTACT PIT (T-06)

Capacity BY VENDOR

Size BY VENDOR

Material Reinforced Concrete

- SOLID CONTACT SLUDGE PUMPS (P-03A/B)

NO. REQUIRED 2

CODE AND STANDARD ANSI/ASME/ISO/DIN/Mfr Std

Page 18: Technical Form WWTP

Sheet 18 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

MANUFACTURER by Vendor

COUNTRY OF ORIGIN by Vendor

MODEL by Vendor

TYPE CENTRIFUGAL

PERFORMANCE :

Rated/normal capacity by Vendor

Total head / NPSHA by Vendor

Speed by Vendor

Sp. Gr. 1

BKW, Shaft Power / End Curve Power by Vendor

Efficiency at rated capacity by Vendor

Head characteristic Continuously rise to shut-off

Minimum continuous flow by Vendor

NPSHR by Vendor

NPSHA-NPSHR Min 3 ft (1 m)

Sound Level Max. 85 dBA @ 1 m

CONSTRUCTION FEATURE:

Nozzle: size / rating / face / location

Suction by Vendor / 150# / RF / END

Discharge by Vendor / 150# / RF / TOP

No. of stages 1

Casing mounting Horizontal

Impeller : by Vendor

Bearing Type

Radial by Vendor

Thrust by Vendor

Coupling :

Manufacturer by Vendor

Model Flexible Disc w/ Spacer

Baseplate Horizontal / CS

MATERIAL :

Casing Stainless Steel

Impeller Stainless Steel

Shaft Stainless Steel

Case gasket Non Asbestos

SHAFT SEAL :

Type Gland Packing

MOTOR :

Manufacturer by Vendor

Rated power by Vendor

Volt / Phase / Freq. 400/3/50

Enclosure TEFC, IP-55

Insulation class / temperature rise F / B

SCOPE OF WORK:

Engineering and Documentation Yes, by Vendor

Guarantee and Warranty Yes, by Vendor

Manufacturing and Assembling Yes, by Vendor

Final Machining and Mounting of Coupling Half Yes, by Vendor

Page 19: Technical Form WWTP

Sheet 19 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

Mounting of Driver Yes, by Vendor

Inspection and Test at Shop Yes, by Vendor

Wiring and Tubing Within the Skid Yes, by Vendor (if any)

Prime Coating and Finish Coating at Shop Yes, by Vendor

Finish Color for Pump Yes, by Vendor

Packing and Rust Prevention Yes, by Vendor

Shipping and Transportation Yes, by Vendor

SCOPE OF SUPPLY:

Pumps Yes, by Vendor

Coupling and Guard Yes, by Vendor

Baseplate/Soleplate Yes, by Vendor

Foundation Bolts and Nuts (plus 10% spare) Yes, by Vendor

with Liners and Shims

Driver Setting Bolts and Nuts Yes, by Vendor

Space Heater for Motor > 10 kW Yes, by Vendor (if Req'd)

Auxiliary Piping Within The Skid Yes, by Vendor

Special Tools Yes (if any)

Spare parts :

Construction and commissioning Yes, by Vendor

One-year operation Yes, by Vendor

Price List of Recommended Spare Parts Yes, by Vendor, Optional

for One-year Operation

Lifting Lugs and Earth Lugs Yes, by Vendor

Constant level oiler Yes, by Vendor

DELIVERY TIME max. 6 months

Term by Vendor

6. - SLUDGE THICKENER (T-08)

APPLICABLE CODE API 650 Latest Edition

DESIGN CONDITIONS

Capacity 150 m3

Dimension :

Shell ID by Vendor

Shell Height by Vendor

Nozzle by Vendor

Thickness :

Shell 6 mm

Bottom 9 mm

Operating / Design Pressure ATM / Full Water

Operating / Design Temperature 25 / 60

Hydrostatic Test Pressure Full Water

Radiographic examination Spot

Type of Roof OPEN ROOF

Joint efficiency 0.85

Corrosion allowance (shell, bottom) 1.7 / 1.7

Insulation None

Flange rating by Vendor

Material Data :

Shell & Bottom A 283 C

Page 20: Technical Form WWTP

Sheet 20 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

Internals (Vortex Breaker) A 106 B

Nozzle necks A 106 B

Flange A 105

Bolts & nuts A 193 B7 / A 194 2H

Gasket Non asbestos sheet gasket

Foundation bolts/nuts A 307 B / A 563 A

Stiffener A 36

Painting (internal) Coal Tar Epoxy

Painting (external) as per painting spec

Unit weight estimate (erection) by vendor

SCOPE OF WORKS

Design and Engineering Yes

Warranty and Guarantee Yes, Mechanical Guarantee

Supply of Material Yes

Page 21: Technical Form WWTP

Sheet 21 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

Fabrication at Field Yes

Inspection and Testing Yes

Packing Yes

Documentation Yes

SCOPE OF SUPPLY

Body (shell, bottom, roof, etc) Yes

Ladders and Handrail Yes

Manhole c/w cover, davit/hinge (include bolt, nut, and gasket) Yes

Anchor bolts and nuts Yes

Nameplate Yes

Lifting lug Yes

Earth lug Yes

Bird screen Yes, if required

Moisture trap Yes, if required

Vortex breaker Yes, if required

Roof reinforcement Yes, if required

External pipe support Yes, if required

Internal Piping Yes, if required

Internal Ladder Yes, if required

Internal and External Coating Yes, if required

Spare parts

for Commissioning Yes

for One-year operation Yes

INSPECTION AND TESTING

Hydrotest Yes

NDE Yes

Visual and dimension check Yes

- AGITATOR AND MOTOR (A-04)

SERVICE SLUDGE THICKENER

MANUFACTURER BY VENDOR

MODEL BY VENDOR

CODE AND STANDARD BY VENDOR

OPERATING CONDITION

Liquid WATER

Service temperature AMBIENT

Sp. Gr. at service temp BY VENDOR

Viscosity at service temp 1-3

Corr/Err caused by H2S, CO2, S COMPOUND

Capacity: Normal BY VENDOR

Rated BY VENDOR

Process ( chemical/physical) MIXING / HOMOGENIZE

Baffles 3 at 120

Working Volume BY VENDOR

Agitator location SOLID CONTACT TANK

Type of Tank ( clilindrical )

CONSTRUCTION

Page 22: Technical Form WWTP

Sheet 22 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

Shaft Diameter at propoller BY VENDOR

Shaft diameter at coupling BY VENDOR

Shaft Length BY VENDOR

Mounting VERTICAL CENTERED ON TOP

Mechanical Seal YES

Seal Type LIP SEAL

Seal liquid reservoir/tank and accessories BY VENDOR

Distance Propoller to bottom BY VENDOR

Ring size BY VENDOR

Blades size BY VENDOR

Blade Type BY VENDOR

Driver Support BY VENDOR

Agitator Support BY VENDOR

Coupling BY VENDOR

Fastening Flanges BY VENDOR

Erection weight BY VENDOR

Total weight BY VENDOR

Agitator weight BY VENDOR

Coupling weight BY VENDOR

Motor/Gear weight BY VENDOR

Local instruments BY VENDOR (if any)

Miscellaneous

Name plate BY VENDOR

Stainless steel shim plates BY VENDOR

Setbolts for mounting driver BY VENDOR

Sparepart for for construction, Pe-commissioning, & Commissioning BY VENDOR

Sparepart for 1 (one) year operation Separate Quotation

Special tools BY VENDOR (if any)

Shop inspection and testing REQUIRED; WITNESSED

Painting (as per REK's spec) BY VENDOR

Painting material for field touch up BY VENDOR; 5% of Painting Material

Packing & rust prevention BY VENDOR; 6 month storage

Vendor Documents Required (as per Requisition) BY VENDOR

PERFORMANCE

Performance curve BY VENDOR

Min Continuity, Capacity BY VENDOR

Power Design BY VENDOR

Rotating Facing Coupling end BY VENDOR

Submergence Required BY VENDOR

Maximum Thrust Up/down BY VENDOR

Rated Speed 60-70

Start Torque BY VENDOR

Normal Torque BY VENDOR

Driving System ELECTRICAL MOTOR

Duty CONTINUOUS 24 HR

Max allowable sound level/Expected max 85 dBA

MATERIAL

Page 23: Technical Form WWTP

Sheet 23 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

Casing SS 304

Inner case parts BY VENDOR

propeller SS 304

Mounting Plate BY VENDOR

Shaft SS 304

Shaft sleeve SS 304

Mounting Bolt & Nut SS

BEARING AND LUBRICATION

Lubrication BY VENDOR

DRIVER :

INDUCTION MOTOR

Code and Standard IEC

Manufacturer BY VENDOR

IP Protection IP 55 (minimum)

Rated power BY VENDOR

Volt / Phase / Freq. 380 / 3 / 50

Enclosure TEFC

Insulation class / temperature rise F / B

INSPECTION AND TEST

Performance WITNESSED

Mechanical running WITNESSED

All other inspection & test per req./spec. NON WITNESSED

EXPERIENCES Similar project

DELIVERY TIME BY VENDOR

- SLUDGE THICKENER SLUDGE PUMPS (P-04A/B)

NO. REQUIRED 2

CODE AND STANDARD ANSI/ASME/ISO/DIN/Mfr Std

MANUFACTURER by Vendor

COUNTRY OF ORIGIN by Vendor

MODEL by Vendor

TYPE SCREW

PERFORMANCE :

Rated/normal capacity by Vendor

Total head / NPSHA by Vendor

Speed by Vendor

Sp. Gr. by Vendor

BKW, Shaft Power / End Curve Power by Vendor

Efficiency at rated capacity by Vendor

Head characteristic Continuously rise to shut-off

Minimum continuous flow by Vendor

NPSHR by Vendor

NPSHA-NPSHR Min 3 ft (1 m)

Sound Level Max. 85 dBA @ 1 m

Page 24: Technical Form WWTP

Sheet 24 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

CONSTRUCTION FEATURE:

Nozzle: size / rating / face / location

Suction by Vendor / 150# / RF / END

Discharge by Vendor / 150# / RF / TOP

No. of stages 1

Casing mounting Horizontal

Impeller : by Vendor

Bearing Type

Radial by Vendor

Thrust by Vendor

Coupling :

Manufacturer by Vendor

Model Flexible Disc w/ Spacer

Baseplate Horizontal / CS

MATERIAL :

Casing Stainless Steel

Impeller Stainless Steel

Shaft Stainless Steel

Case gasket Non Asbestos

SHAFT SEAL :

Type Gland Packing

MOTOR :

Manufacturer by Vendor

Rated power by Vendor

Volt / Phase / Freq. 400/3/50

Enclosure TEFC, IP-55

Insulation class / temperature rise F / B

SCOPE OF WORK:

Engineering and Documentation Yes, by Vendor

Guarantee and Warranty Yes, by Vendor

Manufacturing and Assembling Yes, by Vendor

Final Machining and Mounting of Coupling Half Yes, by Vendor

Mounting of Driver Yes, by Vendor

Inspection and Test at Shop Yes, by Vendor

Wiring and Tubing Within the Skid Yes, by Vendor (if any)

Prime Coating and Finish Coating at Shop Yes, by Vendor

Finish Color for Pump Yes, by Vendor

Packing and Rust Prevention Yes, by Vendor

Shipping and Transportation Yes, by Vendor

SCOPE OF SUPPLY:

Pumps Yes, by Vendor

Coupling and Guard Yes, by Vendor

Baseplate/Soleplate Yes, by Vendor

Foundation Bolts and Nuts (plus 10% spare) Yes, by Vendor

with Liners and Shims

Driver Setting Bolts and Nuts Yes, by Vendor

Space Heater for Motor > 10 kW Yes, by Vendor (if Req'd)

Auxiliary Piping Within The Skid Yes, by Vendor

Special Tools Yes (if any)

Page 25: Technical Form WWTP

Sheet 25 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

Spare parts :

Construction and commissioning Yes, by Vendor

One-year operation Yes, by Vendor

Price List of Recommended Spare Parts Yes, by Vendor, Optional

for One-year Operation

Lifting Lugs and Earth Lugs Yes, by Vendor

Constant level oiler Yes, by Vendor

DELIVERY TIME max. 6 months

Term by Vendor

7. - FLUSH WATER TANK (T-05)

APPLICABLE CODE API 650 Latest Edition

DESIGN CONDITIONS

Capacity 23 m3

Dimension :

Shell ID by Vendor

Shell Height by Vendor

Nozzle by Vendor

Thickness :

Shell 6 mm

Bottom 9 mm

Operating / Design Pressure ATM / Full Water

Operating / Design Temperature 25 / 60

Hydrostatic Test Pressure Full Water

Radiographic examination Spot

Type of Roof OPEN ROOF

Joint efficiency 0.85

Corrosion allowance (shell, bottom) 1.7 / 1.7

Insulation None

Flange rating by Vendor

Material Data :

Shell & Bottom A 283 C

Internals (Vortex Breaker) A 106 B

Nozzle necks A 106 B

Flange A 105

Bolts & nuts A 193 B7 / A 194 2H

Gasket Non asbestos sheet gasket

Foundation bolts/nuts A 307 B / A 563 A

Stiffener A 36

Painting (internal) Coal Tar Epoxy

Painting (external) as per painting spec

Unit weight estimate (erection) by vendor

SCOPE OF WORKS

Design and Engineering Yes

Warranty and Guarantee Yes, Mechanical Guarantee

Supply of Material Yes

Fabrication at Field Yes

Inspection and Testing Yes

Packing Yes

Page 26: Technical Form WWTP

Sheet 26 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

Documentation Yes

SCOPE OF SUPPLY

Body (shell, bottom, roof, etc) Yes

Ladders and Handrail Yes

Manhole c/w cover, davit/hinge (include bolt, nut, and gasket) Yes

Anchor bolts and nuts Yes

Nameplate Yes

Lifting lug Yes

Earth lug Yes

Bird screen Yes, if required

Moisture trap Yes, if required

Vortex breaker Yes, if required

Roof reinforcement Yes, if required

External pipe support Yes, if required

Internal Piping Yes, if required

Internal Ladder Yes, if required

Internal and External Coating Yes, if required

Spare parts

for Commissioning Yes

for One-year operation Yes

INSPECTION AND TESTING

Hydrotest Yes

NDE Yes

Visual and dimension check Yes

- FLUSH WATER PUMPS (P-02A/B)

NO. REQUIRED 2

CODE AND STANDARD ANSI/ASME/ISO/DIN/Mfr Std

MANUFACTURER by Vendor

COUNTRY OF ORIGIN by Vendor

MODEL by Vendor

TYPE CENTRIFUGAL

PERFORMANCE :

Rated/normal capacity by Vendor

Total head / NPSHA by Vendor

Speed by Vendor

Sp. Gr. 1

BKW, Shaft Power / End Curve Power by Vendor

Efficiency at rated capacity by Vendor

Head characteristic Continuously rise to shut-off

Minimum continuous flow by Vendor

NPSHR by Vendor

NPSHA-NPSHR Min 3 ft (1 m)

Sound Level Max. 85 dBA @ 1 m

CONSTRUCTION FEATURE:

Nozzle: size / rating / face / location

Suction by Vendor / 150# / RF / END

Discharge by Vendor / 150# / RF / TOP

Page 27: Technical Form WWTP

Sheet 27 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

No. of stages 1

Casing mounting Horizontal

Impeller : by Vendor

Bearing Type

Radial by Vendor

Thrust by Vendor

Coupling :

Manufacturer by Vendor

Model Flexible Disc w/ Spacer

Baseplate Horizontal / CS

MATERIAL :

Casing Stainless Steel

Impeller Stainless Steel

Shaft Stainless Steel

Case gasket Non Asbestos

SHAFT SEAL :

Type Gland Packing

MOTOR :

Manufacturer by Vendor

Rated power by Vendor

Volt / Phase / Freq. 400/3/50

Enclosure TEFC, IP-55

Insulation class / temperature rise F / B

SCOPE OF WORK:

Engineering and Documentation Yes, by Vendor

Guarantee and Warranty Yes, by Vendor

Manufacturing and Assembling Yes, by Vendor

Final Machining and Mounting of Coupling Half Yes, by Vendor

Mounting of Driver Yes, by Vendor

Inspection and Test at Shop Yes, by Vendor

Wiring and Tubing Within the Skid Yes, by Vendor (if any)

Prime Coating and Finish Coating at Shop Yes, by Vendor

Finish Color for Pump Yes, by Vendor

Packing and Rust Prevention Yes, by Vendor

Shipping and Transportation Yes, by Vendor

SCOPE OF SUPPLY:

Pumps Yes, by Vendor

Coupling and Guard Yes, by Vendor

Baseplate/Soleplate Yes, by Vendor

Foundation Bolts and Nuts (plus 10% spare) Yes, by Vendor

with Liners and Shims

Driver Setting Bolts and Nuts Yes, by Vendor

Space Heater for Motor > 10 kW Yes, by Vendor (if Req'd)

Auxiliary Piping Within The Skid Yes, by Vendor

Special Tools Yes (if any)

Spare parts :

Construction and commissioning Yes, by Vendor

One-year operation Yes, by Vendor

Price List of Recommended Spare Parts Yes, by Vendor, Optional

Page 28: Technical Form WWTP

Sheet 28 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

for One-year Operation

Lifting Lugs and Earth Lugs Yes, by Vendor

Constant level oiler Yes, by Vendor

DELIVERY TIME max. 6 months

Term by Vendor

8. - FILTER PRESS(F-01A/B)

Quantity 2

Capacity by Vendor

Plate Dimension by Vendor

NumbeShell ID by Vendor

MateriShell Height by Vendor

OveraNozzle by Vendor

Operating Time by Vendor

Pressing Time by Vendor

Washing Time by Vendor

Number of Cycle by Vendor

Unit weight estimate (erection) by vendor

SCOPE OF WORK:

Engineering and Documentation Yes, by Vendor

Guarantee and Warranty Yes, by Vendor

Manufacturing and Assembling Yes, by Vendor

Final Machining Yes, by Vendor

Inspection and Test at Shop Yes, by Vendor

Wiring and Tubing Within the Skid Yes, by Vendor (if any)

Prime Coating and Finish Coating at Shop Yes, by Vendor

Finish Color for Pump Yes, by Vendor

Packing and Rust Prevention Yes, by Vendor

Shipping and Transportation Yes, by Vendor

SCOPE OF SUPPLY:

Filter Press Yes, by Vendor

Skid Yes, by Vendor

Auxiliary Piping Within The Skid Yes, by Vendor

Accecories:

- Cake Discharge Chute Yes, by Vendor

- Drip Tray Yes, by Vendor

- Cake Conveyor Yes, by Vendor

Special Tools Yes (if any)

Spare parts :

Construction and commissioning Yes, by Vendor

One-year operation Yes, by Vendor

Price List of Recommended Spare Parts Yes, by Vendor, Optional

for One-year Operation

Lifting Lugs and Earth Lugs Yes, by Vendor

DELIVERY TIME max. 6 months

Term by Vendor

- CATION POLYMER DOSING UNIT (D-06)

Dosing Pump

Manufacturer By Vendor

Page 29: Technical Form WWTP

Sheet 29 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

Quantity 2

Motor Power kW By Vendor

Capacity liter/hr By Vendor

Enclosure IP 65

Material Stainless steel / plastic

Mixing Tank

Quantity 1

Type By Vendor

Capacity liter By Vendor

Material FRP/Stainless Steel

Size (diameter x height) mm by Vendor

Agitator

Material Stainless steel

Motor Power for Agitator kW by Vendor

Motor Enclosure IP 55

Piping, Valve, Line Specification, & Accessories as per P&ID

9. - AIR COMPRESSOR

No. required 1 + 1

Manufacturer by Vendor

Model by Vendor

Type Screw or Reciprocating

Oil Lubricated

Max. Discharge pressure 10 barg

Gas Flow rate dry (Nominal) 80 (at 1 atm & 20°C)

MOTOR :

Page 30: Technical Form WWTP

Sheet 30 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

No. required 2

Manufacturer by Vendor

Rated power by Vendor

Volt / Phase / Freq. 400 / 3 / 50

Enclosure TEFC / IP 54

Insulation class / temperature rise Class F / Class B

- AIR DRYER:

No. required 1

Manufacturer by Vendor

Model by Vendor

Type Heatless,Desiccant, Automatic

Dew point at maximum pressure -20

Capacity by Vendor

Desiccant type by Vendor

- PRE FILTER

No. required 2

Manufacturer by Vendor

Model by Vendor

Maximum oil content 0.01

Efficiency 99

Filter size 0.1 micron filtration

- AFTER FILTER

No. required 2

Manufacturer by Vendor

Model by Vendor

Efficiency 99

Maximum particle size 0.01

SCOPE OF WORK:

Engineering and Documentation Yes

Process Guarantee and Unit Warranty Yes

Manufacturing and Assembling Yes

Final Machining and Mounting of Coupling Half Yes

Mounting of Driver Yes

Inspection and Test at Shop Yes

Wiring and Tubing Within the Skid Yes

Prime Coating and Finish Coating at Shop Yes

Shipping and Transportation Yes

SCOPE OF SUPPLY:

Compressor, including motor driver and control panel Yes

H2S Filter Yes

Intake air with H2S Trap Yes

Ducting (Aluminium/SS) Yes

Flexible Connection Yes

Page 31: Technical Form WWTP

Sheet 31 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

After coolers (air cooled type) made from stainless steel or aluminum Included

Motor starter DOL

Structural skid and baseplate Yes

Local control panel items:

IP 55 Electrical Enclosure Yes

Local manual starting system Yes

Local manual shutdown system Yes

Automatic start-up system Yes

Automatic system of compression & decompression Yes

Automatic mode for loading Yes

Terminal box inside panel Yes

Air dryer, incl. control panel (NEMA 4/IP 56) Yes

Dual type pre filter Yes

Dual type after filter Yes

Automatic drain solenoid valves Yes

Instrumentation and control Yes

Internal piping, tubing, fittings, and valves Yes

Space Heater for Motor > 10 kW Yes

Internal cabling, junction boxes, electrical items Yes

Special Tools Yes (if any)

Spare parts :

Construction and commissioning Yes

1-year operation Yes

Price List of Recommended Spare Parts Yes

for 1-year Operation

Delivery time 5 months

- AIR RECEIVER

Dimension :

Shell ID BY VENDOR

Length TL to TL BY VENDOR

Head type 2 : 1 Ellipsoidal

Nozzle BY VENDOR

Thickness :

Shell BY VENDOR

Head (min after forming) BY VENDOR

Operating / Design Pressure BY VENDOR

Operating / Design Temperature BY VENDOR

Test Pressure Hydrostatic

Radiographic examination

Shell Spot

Head Full

PWHT as per code

Joint efficiency

Shell 0.85

Head 1

Corrosion allowance (shell, roof, bottom) 3 / 3 / 3 mm

Insulation None

Flange rating BY VENDOR

Material Data :

Page 32: Technical Form WWTP

Sheet 32 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

Shell, Head, & Reinforcing Pad A 516 70

Nozzle flanges A 105

Nozzle neck pipe A 106 B

Manhole neck A 516 70

Stud bolts & nuts A 193 B7 & A 194 2H

Lifting lug & Tailing lug A 283 C

Nameplate & Earth lug SS 304

Vessel support A 283 C

Base Plate A 36 / SS 400

Foundation bolts/nuts A 307 B & A 563 A

Gasket non-asbestos

Painting/coating (internal) none

Painting/coating (external) BY VENDOR

Unit weight estimate (erection) BY VENDOR

SCOPE OF WORKS

Design and Engineering Yes

Warranty and Guarantee Yes, Mechanical Guarantee

Supply of Material Yes

Fabrication at Shop Yes

Inspection and Testing Yes

Packing Yes

Documentation Yes

SCOPE OF SUPPLY

Body (shell, head, etc) Yes

Manhole c/w cover, davit/hinge (include bolt, nut, and gasket) Yes

Stud bolts and nuts Yes

Nameplate Yes

Lifting lug Yes

Earth lug Yes

Tailing lug Yes

External Support Yes

Internal Support No

Internal Part No

Internal and External Coating Yes

Spare parts

for Commissioning Yes

for One-year operation Yes

INSPECTION AND TESTING

Hydrotest Yes

NDE Yes

Visual and dimension check Yes

10. - WASH WATER RECOVERY PIT (T-07)

Capacity 10000

Size 100 x 50 x 2 m

Material Reinforced Concrete

- WASTE WATER RECOVERY PUMPS (P-04A/B)

NO. REQUIRED 2

Page 33: Technical Form WWTP

Sheet 33 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

CODE AND STANDARD ANSI/ASME/ISO/DIN/Mfr Std

MANUFACTURER by Vendor

COUNTRY OF ORIGIN by Vendor

MODEL by Vendor

TYPE CENTRIFUGAL

PERFORMANCE :

Rated/normal capacity by Vendor

Total head / NPSHA by Vendor

Speed by Vendor

Sp. Gr. 1

BKW, Shaft Power / End Curve Power by Vendor

Efficiency at rated capacity by Vendor

Head characteristic Continuously rise to shut-off

Minimum continuous flow by Vendor

NPSHR by Vendor

NPSHA-NPSHR Min 3 ft (1 m)

Sound Level Max. 85 dBA @ 1 m

CONSTRUCTION FEATURE:

Nozzle: size / rating / face / location

Suction by Vendor / 150# / RF / END

Discharge by Vendor / 150# / RF / TOP

No. of stages 1

Casing mounting Horizontal

Impeller : by Vendor

Bearing Type

Radial by Vendor

Thrust by Vendor

Coupling :

Manufacturer by Vendor

Model Flexible Disc w/ Spacer

Baseplate Horizontal / CS

MATERIAL :

Casing Stainless Steel

Impeller Stainless Steel

Shaft Stainless Steel

Case gasket Non Asbestos

SHAFT SEAL :

Type Gland Packing

MOTOR :

Manufacturer by Vendor

Rated power by Vendor

Volt / Phase / Freq. 400/3/50

Enclosure TEFC, IP-55

Insulation class / temperature rise F / B

SCOPE OF WORK:

Engineering and Documentation Yes, by Vendor

Guarantee and Warranty Yes, by Vendor

Manufacturing and Assembling Yes, by Vendor

Page 34: Technical Form WWTP

Sheet 34 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

Final Machining and Mounting of Coupling Half Yes, by Vendor

Mounting of Driver Yes, by Vendor

Inspection and Test at Shop Yes, by Vendor

Wiring and Tubing Within the Skid Yes, by Vendor (if any)

Prime Coating and Finish Coating at Shop Yes, by Vendor

Finish Color for Pump Yes, by Vendor

Packing and Rust Prevention Yes, by Vendor

Shipping and Transportation Yes, by Vendor

SCOPE OF SUPPLY:

Pumps Yes, by Vendor

Coupling and Guard Yes, by Vendor

Baseplate/Soleplate Yes, by Vendor

Foundation Bolts and Nuts (plus 10% spare) Yes, by Vendor

with Liners and Shims

Driver Setting Bolts and Nuts Yes, by Vendor

Space Heater for Motor > 10 kW Yes, by Vendor (if Req'd)

Auxiliary Piping Within The Skid Yes, by Vendor

Special Tools Yes (if any)

Spare parts :

Construction and commissioning Yes, by Vendor

One-year operation Yes, by Vendor

Price List of Recommended Spare Parts Yes, by Vendor, Optional

for One-year Operation

Lifting Lugs and Earth Lugs Yes, by Vendor

Constant level oiler Yes, by Vendor

DELIVERY TIME max. 6 months

Term by Vendor

11. - INCINERATOR (I-01)

Incinerator Type

Burner Capacity LPH by Vendor

Overall Dimension mm by Vendor

Material Of Chamber by Vendor

Volume of Chamber m3 by Vendor

Termperature of Chamber deg C by Vendor

Insulation by Vendor

Operation Time hour/day by Vendor

Retention Time second by Vendor

12. OTHERS

MCC PANEL Yes, by Vendor

MCC Panel Yes, by Vendor

PLC/DCS and Control Panel Yes, by Vendor

Stair and Walkway Platform Yes, by Vendor

Piping Yes, by Vendor

Instrumentation Yes, by Vendor

Process Building Yes, by Vendor

Chemical Storage Building Yes, by Vendor

Safety Shower Yes, by Vendor

Page 35: Technical Form WWTP

Sheet 35 of 35

PT. REKAYASA INDUSTRIPROJECT : PLTU1 UNIT 8 BANTEN COAL FIRED STEAM POWER PLANT 1 x (600-700) MW

CLIENT : PT PLN (PERSERO)

JOB NO. : 07-1205

LOCATION : SURALAYA-BANTEN

TECHNICAL BID TABULATIONFOR WASTE WATER TREATMENT PACKAGE

NO. DESCRIPTION REK'S REQUIREMENT PT. BANGUN TIRTA NUSANTARA

Painting Yes, by Vendor

Special Tools Yes, by Vendor

Export Packing Yes, by Vendor

Inland Transportation Yes, by Vendor

Yes, by Vendor

Site Training for owner’s personnel Yes, by Vendor

Guarantee

Performance Guarantee required

Warranty Periode required for 1 year operation

Delivery Time

Duration / Condition max. 4 month

ABBREVIATION: ACCEPTABILITY

ü Comply With Requirement A : Acceptable

DA Deviation Accepted B : Acceptable With Note

X Deviation Not Accepted C : Not Acceptable

? To Be Clarifeid

Service for construction, pre-commissioning, commissioning, start-up and performance test