TECHNICAL SP!ClflC.\TlON
!2! 1URNliHlNC1 INSTALLING 1 AND OPU.ATINc: AN
I:QUIPMI:NT DECONTAMINATION PACU.lTY
PlCILLO FARM liTE
)(!NT COUNTY, RHODE ULAND
"'a-n = = = .' l
..
aL~· &/ts/18-i-U?t--.J "2.>~. 't
Iaauad for conatruction AII4 l{ .!*' M. Revhad a nd rei..uad for bid lfA- :i( I -::It' IIi>*
luued for bid /Ad ,., IW/1 lrl6
8
I Uti iOIIII .•• ,...... su• w ..
19161-100
Furniahing, Inatelling, and' Specit ication j_• &v 101 1110
1
Operating and Equipment - 02-CSP-01 Decontamination Facility .. •IMU 't 1
6
-
r
1.0
2.0
3.0
4 . 0
s.o
6 . 0
7.0
TECHNICAL IP!ClFlCATJON lQ!
m.!I.~HJNCi tiSTALLlW"-L__ANp OPEJATl~ PMENT E 0 AM NAT ION fA
lliLL!.Q...!!II'U.lll ltENT CQUNIY.
GENERAL
AB BREVIATIONS
QUALITY STANDARDS
SUBM ITTALS
MATERIALS
FIELD OP!ItATlONS
INSPECTION AND TESTING
RHODE ISLAND
.,-n = = cc
241!1lY 04/l0 /88
-
TECHNICAL SPECIFICATION ro•
FURNI S HING , lNSTALLlNC AND OPERATING AN
EQUIPMENT DEC .lffA.M INATION FACILITY
1 . 0 G!NUAL
Thh Uchnictl tpec ificttion defi ne• the uchnictl requi remen tl and eatablhhel the qutllty a nd woriulltnlhip required for the con1truct1on , o pera tion, tnd llalntentnce of tn equipment decontaminttton hcility.
2 . 0 ABBREVIAIJONS
The tbbrevhtionl lhtld below, where u1ed in thia Technictl
Specificttion, shtll htve the followi ng metninqs :
ANSI Anler ictn lltt iontl Sttnduda Institute
ASTM Americtn Society fo r Tea ting 1nd MaUriall .,., O.grees Fthrenheit GPM Gtllons Per Mi nute n NEMA Mationtl Electrical Mtnuflcturen Asaoc i tt ion = PSI Pounds Per Squue Inch ca = llOOT lhocSe Iahnd Depart111ent of Tnnsportttion
1 . 0 QUALITY STANDARDS
The Contnctor 1hlll control the quality of item• tnd aervices
to ••t the requirement• of this Technical Speclfi c ttion ,
appli cable codes tnd lttnchrds , and other Contract Docume nt•.
Unlen otherwhe 1pecified or 1hown on the de1ign drtwin91 , the
following code• and sttndtrdl of the latest inue at the t ime
of Contuct bid thtll tpply to the extent indictted herein :
AIISI/MEMA OS - 1 Sheet-Steel Outlet Boaes, Device Boxes,
Coven tnd Box Suppor ts, tnd Cut Aluminum
Cover•
ASTil A 36 Standud Speclficttion for Structural Steel
ASTM A 121 Stlndud Specifiettion for Zinc (Hot
Gtlvanhed Cottings) on Produc t s
Ftbrictted from Rolled , Pressed, tnd
Forged Steel Shapes, Phtes, Bus, tnd
Strip
HllY 04 120/U
-
ASTM A 107 lhndud Sipeclfic:ation for Cubon Staal Eatarnally Threaded Studud Futanau
AITJII D 7Sl lhndud thods of Tasting Coated fabrics
11001' Jtandud Specifications for load and I ridge Conat ruction
4 .0~
4 . 1 CEN!IAL
lntinaartng docuMntltlon nquiraNnta ua surm~uhad on ror• ltlU Dl, and ue augMnted by datfi led raqui ramenta in thh apacificstion. lechtel lnvironMntsl, Inc . (BEl) will detu11ina if docu~~~entltion h comphh u submitted by the Contractor, and r..ervaa the right to diupprove any lllterilla, schedules, •thoda, equipment , plans, dnwinqs , or other submitUh t ha t do not meet the Contract raq ui rernenta.
4 . 2 MATERI AL
Unlaaa noted otherwise, eaterh l, equ ipment, and drawing aubmitUls shill be 1111de to BEl for review I t lent two weeks prior to u.. or i111plement1tion .
5 . 0 MATERI ALS
5 , 1 ASPHALT PAD
The Contr1ctor ah1ll make use of, renov1ta , aap•nd , 1nd mllintli n an allhting uphill p1d located on alta. The uphllt u..d shall be Dense Tnture 1-2 or Sidewllk in accord1nce with IIDOT IUndud SpecitiCitiona for Ro1d 1nd Bridge Construction Section M. O. l (lituminoua PIVements, Penetration Mlcadam 1nd Phnt Mia Ma c adam) . The Contuctor ah1ll submit a certificate of complilnce p rior to purchne.
5 .2 SPLASH CURTAIN
The spluh curtain sh1ll be nylon-reinforced plut ic fabr ic such 11 Griffo ltn Type 65 manufactured by Ree f Indust r ies (8001131- 6074) or approved equal. Contractor shall submit a cateloljl cut to lEI for review prior t o purchne if 1n 11ternate •aterhl h proposed .
5, l STEAM CL!AMER-PRESSUR! MASHER UNIT
The Contr1ctor shill provide a wheeled steam cla•n•r-pressure Wisher unit , The unit shill be 1 model S-1000-C-OEP 11 m11nufllctured by the Jenny Division of
2483Y 04/20/U
.,-n = = ca
-
HoMatead Jndultdea , Inc. (U7/429·S4U) , or an approved equal. Prier to purchue, the Contuctor 1h1ll aubllit 1 cat1lot cut for the ate1111 cleaner- preuure wuher unit and acceaaoriea to I I for review if .tter111te 1111tariah are propo..d .
The un it ahall provide at..lll at 2.1 CPM and 450 PSI; hot v1Ur preuuu wuh at 4 . 0 GPM , 1100 PSI ud 20o•r ; and cold waur pnaaure wuh It 4 . 0 GPM and 1100 Pit . The unit ahall be prov ided with two SO - foot leiHJthl of 112 inch dhfMter , wire-reinforced vapor hose, with qulck- dlaconnect couplings , a apuy luce with on/off control, and various noulea (includint 1 1t11111 cleaninq noa&le and o•, u•, and Js• preaaur• wuh tips) with qui c k diaconnecta for fut and efficient u.. of the ••chine . The at11111 cleuer ahall h1ve an atUchment allowing it to produce low preuure water for lioht duty cleaning, i.e. boots , etc . The Contuctor shall provide all power required to opeute the steam cleaner - preuure wuher .
! . 4 DECONTAMINATION FACILITY WATER SYSTEM
Wate r shall be supplied to the steam cleaner-preuure wuher unit from 1 clean water supply. Valves and pumps shall be operated manually. Thi s water supply shall be ""C' continuous, such that the system wi ll not run out o f water durin9 equ ipment decont1111inatic;>n . n -'- = 6 . 0 FIELD OPERATIONS
6 . 1 The equipment decontami nation fac ility shall be ca= constructed as shown on the deli9n dnwi n91. The Contractor shall renOYite and ezpand the eaisting uphalt pad which shall be used for cletnino all contaminated equi~NMnt. The facility shall be enclosed by 1 sphah curtain to contain splnhln9 durin9 eleanin9 operations .
6.2 The facility ahall control and collect all water generated dur i n9 equipment decontamination . The 91nention of water ahtll be kept to a mini111.1m . Collected w1Ur shtll be dhpoaed of with the conttminated 1oil.
6 . 3 Sedimentation berrien as identified in the technicll specifications shall be utilized t o minirni&e erosion fr om the run - off of unconttminated wtter .
6 . 4 The Contractor shall provide penonnel to opeute the equipment decontamination facility . The facility shall be operated a s necessary so u not to dehy trucks from lening the site.
\,_..... 2411JY 04120118
http:mini111.1m
-
6 . S AI directed by lEI, the Contuctor shall cleu up the
on-site sa111ple trailer and all other contafliuted
equip~Mnt, uli"" the atea• cleaner-preuure wuher unit,
prior to their rn10v.t h011 the aile .
'-' The Contractor shall furnhh the ...ceuuy penoftnel to
phce an" remove truck dupe curtains on trucks durin~
load inv operations: hy out, Maintain, and 1110ve truck
tround coven; re11110ve conhMinated soil froM tround covefl
to prevent truck contan~iution between loads ; and spot
trucka when positiontnv for loadinv .
6 . 7 Truck• and equipment to be decontuinated shall have heny
hyeu of mud and other •ateriala adherinv to the• removed
before entetift9 the equt~nt decontaMination facility .
6.1 Any contaminated 111aterial removed either before enterlnq
or while in the decontamination facility shall be removed
and d isposed of in the aaM tllanner as all contaminated
aolld wute .
6 . 9 The Contractor shall be naponai b le for all dama ve to
equ i pment occurrinv durin9 the decontamination process . .,6 . 10 All equipment shall be decontami nated to the nthhction
of the contract equipment operator and BEl. -
6 . 11 The Contractor shall maintain the decontami nat ion facili ty
for the duration of on-site wo rk . At the completion of I n = the work, the decontami nation facility shall be left in ._ place . ca=
7. 0 INS p[CTION AND TESTING
The equipment decontamination facility, auochted equipment , and all other iteftl8 of thh Technical Specification will be inlpected 1nd/or tested by lEI . It••• not in confor•ance with this Specification and the Duivn Dr~winv a, as dete'rmi ned by lEI , shall be immediately corrected to the nt h fa ction of BEl at no additional coat .
248lY 04120 / 18
barcode: *575279*barcodetext: SDMS Doc ID 575279