technical task force meeting 2 (march 19, 2015) meeting ... · based on current ground leases...

41
Technical Task Force Meeting 2 (March 19, 2015) Meeting Materials Introduction In Meeting 2, we will continue the conversation about the zoning envelope and building form. The meeting will focus three main topics: key corridors, building height, and upper story mass. Please review the attached information before the meeting. Packet Materials Item Page(s) Notes Introduction 1 Draft agenda 2 Meeting 2 background info 3-37 These pages provide background on some of the key topics that will be covered in Meeting 2. Staff will present more information at the meeting for task force discussion. Excerpt from memo prepared by KHO Consulting for the Arapahoe Square component of the NE Downtown Neighborhoods Plan in 2011 38-39 This memo (prepared as part of the plan in 2011) provides an economic analysis of parking lot revenue and its impact on the land value of parking lots. Note the last paragraph, which explains why a “downzoning” may not have the intended effect of encouraging the redevelopment of parking lots. Example floor plans of parking garages with column spacing around 15 ft 40-41 These are floor plans from actual projects that have been constructed in Denver that illustrate how a 15 ft column spacing can work with a typical parking garage layout. Meeting 2 Packet - Page 1

Upload: others

Post on 14-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Technical Task Force Meeting 2 (March 19, 2015) – Meeting Materials

Introduction In Meeting 2, we will continue the conversation about the zoning envelope and building form. The meeting will focus three main topics: key corridors, building height, and upper story mass. Please review the attached information before the meeting. Packet Materials Item Page(s) Notes Introduction 1 Draft agenda 2 Meeting 2 background info 3-37 These pages provide background on some of the key

topics that will be covered in Meeting 2. Staff will present more information at the meeting for task force discussion.

Excerpt from memo prepared by KHO Consulting for the Arapahoe Square component of the NE Downtown Neighborhoods Plan in 2011

38-39 This memo (prepared as part of the plan in 2011) provides an economic analysis of parking lot revenue and its impact on the land value of parking lots. Note the last paragraph, which explains why a “downzoning” may not have the intended effect of encouraging the redevelopment of parking lots.

Example floor plans of parking garages with column spacing around 15 ft

40-41 These are floor plans from actual projects that have been constructed in Denver that illustrate how a 15 ft column spacing can work with a typical parking garage layout.

Meeting 2 Packet - Page 1

Page 2: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Agenda: Meeting 2 of Phase 2 March 19, 2015 3-6pm

3:00 – Opening/Welcome

3:15 – Recap of Meeting 1 and Goals for Meeting 2

3:20 – Presentation Key Corridors Max Building Height Datum/Upper Story Mass

4:10 – Break

4:20 – Task Force Discussion and Feedback

5:55 – Wrap-Up and Next Steps: Meeting 3 on April 30 (3-6pm) at Stout Street Health Center - 2130 Stout Street - Education Room

Find meeting materials and information at www.denvergov.org/arapahoesquare

Meeting 2 Packet - Page 2

Page 3: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Meeting 1 Recap andMeeting 2 Goals

Meeting 2 Packet - Page 3

Page 4: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Feedback from Mtg 1

• More flexibility in datum approach• More flexibility in datum approach• Consider lower height for base – only reachmax plan heights with incentives and pointtowersto e s

• Explore upper story mass reduction, especiallyfor buildings with longer street frontage andtaller height

• Building form should respond to key corridors

Meeting 2 Packet - Page 4

Page 5: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Meeting 2 Goals

• Task force to provide guidance on three• Task force to provide guidance on threeinterrelated topics:–Approach for building form on key corridors–Approach for maximum building height–Approach for maximum building height–Approach for accomplishing datum/upperstory mass reduction

Meeting 2 Packet - Page 5

Page 6: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Key CorridorsKey CorridorsSummary of characteristics and case studies for the key corridors inArapahoe Square. Includes initial thoughts about what might be the

appropriate building form approach for these corridors. The focus is onheight/mass. Other items that we might want to tailor for certainstreets, such as build to, can be discussed in future meetings.

Meeting 2 Packet - Page 6

Page 7: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Broadway

Meeting 2 Packet - Page 7

Page 8: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Broadway Characteristics

• Regional connector• Regional connector• Gateway to downtown• Strong diagonal axis –connection to Stateconnection to StateCapitol

• Plan Vision: GrandBoulevard

Meeting 2 Packet - Page 8

Page 9: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Broad St Philadelphia

Meeting 2 Packet - Page 9

Page 10: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Broadway – Form Approach

• No requirement for• No requirement forupper story stepback ormass reduction

Meeting 2 Packet - Page 10

Page 11: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

21st Street

Meeting 2 Packet - Page 11

Page 12: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

21st Street Characteristics

• Plan vision: festival• Plan vision: festivalstreet

• Heart of neighborhood• Intimate pedestrian• Intimate, pedestrianfriendly

• View corridor to Coorsfield

Meeting 2 Packet - Page 12

Page 13: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Festival Street Example

Meeting 2 Packet - Page 13

Page 14: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Pecan Street Austin

Meeting 2 Packet - Page 14

Page 15: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

21st Street – Form Approach

• Strong datum line• Strong datum linethrough required upperstory mass reduction at2 5 stories for 100% ofstreet frontage

• Frame view of ball field• Ball field entry featureat 21st street is 5 storiestall

Meeting 2 Packet - Page 15

Page 16: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Welton Street

Meeting 2 Packet - Page 16

Page 17: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Welton Street Characteristics

• Major transit corridor• Major transit corridor• Transit orienteddevelopment

• Key connection to• Key connection toDowntown

• Transition betweenArapahoe Square andp qneighborhoods to theeast

Meeting 2 Packet - Page 17

Page 18: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Pearl District Portland

Meeting 2 Packet - Page 18

Page 19: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

South Lake Union Seattle

Meeting 2 Packet - Page 19

Page 20: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Welton Street – Form Approach

• Consider tailored build• Consider tailored buildto approach (futuremeeting)

• Maybe reducedaybe educedrequirement for upperstory mass reduction?

Meeting 2 Packet - Page 20

Page 21: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

20th Street

Meeting 2 Packet - Page 21

Page 22: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

20th Street Characteristics

• Downtown edge• Downtown edge• Directly abuts D Czoning with 400’ maxheighte g t

Meeting 2 Packet - Page 22

Page 23: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

20th Street – Form Approach

• No requirement for• No requirement forupper story stepbackor mass reduction

State Street in Chicago

Meeting 2 Packet - Page 23

Page 24: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Datum and Upper Story MassDatum and Upper Story MassThis section includes several case studies related to upper story

stepbacks/mass reduction. The example buildings may be helpful tokeep in mind when discussing a more flexible approach to

accomplishing the plan’s datum recommendation.Meeting 2 will include much more content and information about how

we might want to develop an approach for Arapahoe Square.

Meeting 2 Packet - Page 24

Page 25: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Plan Guidance• Datum line: require• Datum line: requirebuildings to step backfrom street atmaximum of 5 stories(stepback may occur(stepback may occuranywhere from 2 5stories)

• Purpose: create apedestrian scaledbase for buildingstaller than 5 stories

Meeting 2 Packet - Page 25

Page 26: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Datum Approach• Goals• Goals

– Accomplish plan guidancefor a strong pedestrian base

– Allow for flexibility andivariety

– Consider what is buildableand the possibility that thefirst 1 5 stories could

Above: graphic from NEDowntown Neighborhoodsl llcontain parking

– Unique approach for keycorridors

Plan illustrating datumconcept for Arapahoe Square

Meeting 2 Packet - Page 26

Page 27: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Sugar Cube – 9 stories100% offrontage on 16thSt steps back by20’ at 6 stories

80% offrontage onBlake St stepspback by 20’ at4 stories

Meeting 2 Packet - Page 27

Page 28: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Palace Lofts – 10 stories45% of frontage on Blake St 60% of frontage on 15th Stgsteps back by 15’ at 4stories

60% of frontage on 15th Ststeps back by 15’ at 4 stories

Meeting 2 Packet - Page 28

Page 29: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

University Building 12 stories130’80’No upper story 80No upper story

stepbacks or massreduction

Meeting 2 Packet - Page 29

Page 30: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Cadence – 13 stories75% of façade length

hon 17th St steps back7’ at 2 stories

Meeting 2 Packet - Page 30

Page 31: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Cadence – 13 stories50% of façade length50% of façade lengthon Wewatta stepsback 7’ at 2 stories

Meeting 2 Packet - Page 31

Page 32: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Park Place Portland – 13 stories

ApproxApprox.190’ lengthwith nostepback

Meeting 2 Packet - Page 32

Page 33: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

1900 16th St – 17 stories

100% f f d l th100% of façade lengthon 16th steps back 120 feet at 5 stories(210’ total length)

Meeting 2 Packet - Page 33

Page 34: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

1900 16th St – 17 stories

100’ l th ith100’ length with nostepback

Meeting 2 Packet - Page 34

Page 35: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

The Platform – 21 stories200’ façade length200 façade lengthwith no stepback on17th St

Meeting 2 Packet - Page 35

Page 36: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

The Platform – 21 stories47% of frontage on47% of frontage onWewatta steps backby 45’ at 4 stories

Meeting 2 Packet - Page 36

Page 37: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

Considerations

• The appropriate amount of upper story• The appropriate amount of upper storystepback/mass reduction is related to:–Building height–The quality of the design of the façadefacing the street

–Length of the building on the street

Meeting 2 Packet - Page 37

Page 38: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

1

Excerpt from: Memorandum on Arapahoe Square by KHO Consulting, LLC Prepared on March 11, 2011 PARKING LOTS There are a large number of parking lots and vacant parcels in Arapahoe Square particularly around the perimeter of the area. Many of these vacant parcels are currently used as parking lots. Parking lots in Arapahoe Square have a blighting influence to the neighborhood because they are often unattractive, poorly maintained, and provide additional space for indigent individuals to congregate. While they provide an affordable parking reservoir to downtown employees and provide parking for thousands of fans going to watch home games at nearby Coors Field, they also represent a significant barrier to redevelopment. Parking Lot Income Distorts Land Pricing In Arapahoe Square, there is a disconnect between land prices and what the real estate market will bear. While there have been land transactions in the area over the past several years, few new developments have come out of the ground. This disconnect is at least partially driven by potential alternative revenue streams (i.e., parking and billboard revenue) available to land owners. There is a perception that parking lot owners are obstructing redevelopment because they are asking for above market pricing for their land. Parking lot economics suggest that what others consider unrealistic pricing is related to the income generated by the “interim” parking lot use. The land value of these parking lots is not necessarily based on the fundamentals of the real estate market; rather it is based on the revenue land owners can receive from parking management companies. Currently, parking lot managers provide a multi-year ground lease to parking lot owners. These ground leases typically include all maintenance and operational expenses on the lot including snow removal, landscaping, enforcement, operating the payment machine, resurfacing and restriping. In calculating the appropriate ground lease rate, the parking lot managers assume they can charge between $2 and $6 per day on normal weekdays and can charge between $6 and $30 per day when the Rockies have a home game (82 home games per year). Parking managers anticipate occupancy rates of 95% and above based on current rates and also generate revenue through citations and evening and weekend rates (especially for the lots near Lower Downtown). The parking fees are largely insensitive to macroeconomic conditions (in fact the recent recession may have made Arapahoe Square a more attractive parking destination given the high fees charged for structured parking downtown). Based on current ground leases provided by parking management companies, and current property taxes, each parking space in Arapahoe Square is worth between $750 and $1,750 annually to its owner net of property taxes. These ground leases are generally multi-year and are largely insensitive to the overall health of the macro real estate market. Assuming a standard parking space of 320 square feet (most in Arapahoe Square are smaller), that puts the annual net operating income from a parking space of between $2.35 and $5.50 per square foot. Assuming a 5% capitalization rate, the income stream can be valued between $50 and $110 per land square foot based on today’s revenue projections. This is consistent with both the appraised value of the land in Arapahoe Square and could be the basis for pricing expectations for land owners. One thing to note with this analysis is that any public policy that reduces the allowable development density of the parcel may reduce the property taxes owed on the land. Given the current ground lease structure, reducing property taxes would increase the net income for the land owner all other things being equal. In addition, if a developer needs to expend more time and money to rezone the property in order to execute their development, that will reduce the amount that developer would be willing to

Meeting 2 Packet - Page 38

Page 39: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

2

pay for the parcel. By increasing the income from the property and decreasing the proceeds from a sale of the property, an unintended consequence of a "downzoning" may be that land owners continue parking uses rather than sell at a discounted price.

Meeting 2 Packet - Page 39

Page 40: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

15’-3”

Meeting 2 Packet - Page 40

Page 41: Technical Task Force Meeting 2 (March 19, 2015) Meeting ... · Based on current ground leases provided by parking management companies, and current property taxes, each parking space

15’

Meeting 2 Packet - Page 41