May 9-11, 2006 Technology Evaluation Cycles and Maturity Assessment INFOLOGIC, INC. 1048 Irvine Avenue #624 Newport Beach, CA 92660 www.infologic.com Multi-Dimensional Assessment of Technology Maturity Workshop Organized by AFRL, Wright Patterson AFB, OH I N F O L O G I C The logical approach to harness innovation though emerging information technologies Presented by: Has Patel Infologic, Inc. [email protected] (888) 325 0500 Ext. 100

Upload: hatu

Post on 06-Feb-2018

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

May 9-11, 2006

Technology Evaluation Cycles and Maturity Assessment

INFOLOGIC, INC.1048 Irvine Avenue #624Newport Beach, CA 92660www.infologic.com

Multi-Dimensional Assessment ofTechnology Maturity Workshop

Organized by AFRL, Wright Patterson AFB, OH

I N F O L O G I CThe logical approach to harness innovation though emerging information technologies

Presented by:Has Patel

Infologic, [email protected](888) 325 0500 Ext. 100

Page 2: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

Report Documentation Page Form ApprovedOMB No. 0704-0188

Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering andmaintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, ArlingtonVA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if itdoes not display a currently valid OMB control number.

1. REPORT DATE MAY 2006 2. REPORT TYPE

3. DATES COVERED 00-00-2006 to 00-00-2006

4. TITLE AND SUBTITLE Technology Evaluation Cycles and Maturity Assessment

5a. CONTRACT NUMBER

5b. GRANT NUMBER

5c. PROGRAM ELEMENT NUMBER

6. AUTHOR(S) 5d. PROJECT NUMBER

5e. TASK NUMBER

5f. WORK UNIT NUMBER

7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Infologic, Inc,1048 Irvine Avenue #624,Newport Beach,CA,92660

8. PERFORMING ORGANIZATIONREPORT NUMBER

9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S)

11. SPONSOR/MONITOR’S REPORT NUMBER(S)

12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited

13. SUPPLEMENTARY NOTES See also ADM002184. Presented at the Air Force Research Laboratory Seminar/Workshop onMulti-Dimensional Assessment of Technology Maturity in Fairborn, OH on 9-11 May 2006.

14. ABSTRACT

15. SUBJECT TERMS

16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT Same as

Report (SAR)

18. NUMBEROF PAGES

24

19a. NAME OFRESPONSIBLE PERSON

a. REPORT unclassified

b. ABSTRACT unclassified

c. THIS PAGE unclassified

Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18

Page 3: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

1

Copyright © 2006 INFOLOGIC Inc. All rights reserved.

Agenda

- tManager (Technology Manager)- iManager (Insertion and Integration Manager)- pManager (Plan Manager)

II. Introduce a methodology, called TechIP (Technology Insertion Plan) which can be used through the complete life cycle of a System or Project to identify, select, insert, integrate and manage technologies.

I. Role of Technology Cycles (Hype Cycle and Adoption Cycles ) in identifying technologies for a System or Project

Page 4: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

2

Copyright © 2006 INFOLOGIC Inc. All rights reserved.

Strategic Issues: Policy Guidelines

Technology Identification, Due Diligence, Risk Management, Insertion, Integration, Collaboration and Planning processes are on-going, andcover complete life cycle of a System-of-Systems (SoS) or System.

DoDI 5000.2 states that ….“ …. The purpose is …. to reduce technology risk

and to determine appropriate set of technologies to be integrated into a full system. Technology Development is a continuous technology discovery and development process reflecting close collaboration between the S&T community, the user, and the system developer. It is an iterative process designed to assess the viability of technologies while simultaneously refining user requirements”. In addition, it states that ….

“…. Technologists and industry shall identify and protect promising technologies in laboratories and research centers, academia, and foreign and domestic sources; reduce the risks of introducing these technologies into the acquisition process; and promote coordination, cooperation and mutual understanding of technology issues….”

Page 5: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

3

Copyright © 2006 INFOLOGIC Inc. All rights reserved.

Strategic Issues: The Pitfalls

Current practices (e.g.: TRA/TRLs) lack:

Do not address complete life cycle. Single Dimension (subject of this workshop) Lack of a collaboration platform that can be used by the executive management through technology developers, systems designers and the end users to evaluate, select and implement technologies. Does not provide links to related methodologies, such as the SEI Capability Maturity Model (CMM), and the DoDI 5000.2 references to the Evolutionary Acquisition (EA), and Spiral Development (SD) requirements. Addresses only “system” technologies (hardware, software, etc.), and does not address “process”technologies (algorithms, formulas, models, methodologies, work flow, etc.) TRA/TRLs are based on the government experiences and do not consider industry “best practices”, such as the Gartner Group’s “Technology Hype Cycle”, and the Forrester Group’s “Innovation Network”.

TRL 1

TRL 2

TRL 3

TRL 4

TRL 5

TRL 6

TRL 7

TRL 8

TRL 9

Matu

rity

Technology Readiness Levels (TRLs)

Page 6: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

4

Copyright © 2006 INFOLOGIC Inc. All rights reserved.

Strategic Issues: A Solution

TechIP Methodology consists of two models, tManager & iManager, and associated tools, called pManager

To implement a comprehensive technology insertion and risk management solution which addresses the DoDI 5000.2 requirements and the TRA/TRL shortcomings, what is neededis ……

A methodology and associated tools that can be used to identify technologies, perform technology due diligence, risk assessment, technology insertion and integration activities for the full life cycle of a SoS or System.

TechIP (Technology Insertion Plan)

tManager

(Technology Manager)

iManager

(Technology Insertion and Integration Manager)

pManager

(Technology Profile and Plan Manager)

Page 7: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

5

Copyright © 2006 INFOLOGIC Inc. All rights reserved.

TechIP Methodology

The TechIP methodology provides a framework for the management of technology through SoS Life Cycle.

tManager

(Technology Manager)

iManager

(Technology Insertion and Integration Manager)

pManager

(Technology Profile and Plan Manager)

Page 8: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

6

Copyright © 2006 INFOLOGIC Inc. All rights reserved.

tManager: DoD Framework and Deliverables

Technology Identification, Due Diligence, Risk Management, Insertion, Integration, Collaboration and Planning processes cover completeSystem-of-Systems (SoS) Life Cycle.

ICD

AoAPlan

TDS

TRL=>6

TRA

TRL=>7

TRA

AoADeliverables

TMP

Page 9: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

7

Copyright © 2006 INFOLOGIC Inc. All rights reserved.

tManager: Technology Selection

Requirements View

Concept Refinement View

Maturity View

User

Needs

eBusiness ServicesRisk Analysis

Custom

erD

eveloperProgram

matic

Technology

Risk

Tech.

Opportunitie

s

ICD

AoA

Tech. Hype Cycle

Tech. Adoption Cycle

Technology selection comprises of reviewing user needs and technology opportunities (Requirements View), identifying Critical Technology Elements (Concept

Refinement View) and conducting maturity analysis (Maturity View).

TDS

Page 10: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

8

Copyright © 2006 INFOLOGIC Inc. All rights reserved.

Maturity Classification: Current TRLs

NASA developed matrix to classify technology maturity

TRL 1 - Scientific research begins to be translated into applied R&D

TRL 2: Technology concept and/or application formed

TRL 3: Analytical and experimental critical function and/or characteristics proof of concept

TRL 4: Component and/or breadboard validity in laboratory environment

TRL 5: Component and/or breadboard validation in relevant environment

TRL 6: System/subsystem model or prototype demonstration in a relevant environment

TRL 7: System prototype demonstration in an operational environment

TRL 8: Actual system completed and qualified through test and demonstration

TRL 9: Actual system proven through successful mission operations

Matu

rity

Technology Readiness Levels

Technology Readiness Levels (TRLs)

Page 11: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

9

Copyright © 2006 INFOLOGIC Inc. All rights reserved.

Hype Cycle: Introduction

Source: Gartner, Hype Cycle for Emerging Technologies 2005

A Hype Cycle provides a snapshot of technologies, identifying which technologies are hyped, suffering disillusionment, and stable enough to study deployment.

Maturity

Visibility

Page 12: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

10

Copyright © 2006 INFOLOGIC Inc. All rights reserved.

Hype Cycle: Gartner’s Emerging Technology Elements

Source: Gartner, Hype Cycle for Emerging Technologies 2005

Hype Cycles are developed for different domains (e.g: governmenttechnology, emerging technology, security assurance technology)

Page 13: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

11

Copyright © 2006 INFOLOGIC Inc. All rights reserved.

Hype Cycle: How to Use

Early Identification of Emerging Technology: Cuts through hypes and buzzwords

• Develop:

• Generic hype cycles for Government-wide (DoD/FFRDC) and Commercial (Contractor, OEMs) Academic (University, Independent research) Technology Elements

• Develop SoS Specific or System Specific Technology Elements Hype Cycle

• Analyze:

• What are the core technologies? What innovative technologies are available? What are the migration (existing to proposed technology) strategies?

• Don’t get caught up in Hype / Don’t ignore unfashionable technology

• Develop technology road map

• Select:

• Use the analysis as an input to TDS

Page 14: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

12

Copyright © 2006 INFOLOGIC Inc. All rights reserved.

Technology fight for survival, evolve, and undergo their own characteristic life cycle.

Technology Adoption Life Cycle

Source: Norman (1998: The Invisible Computer)

Page 15: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

13

Copyright © 2006 INFOLOGIC Inc. All rights reserved.

Adoption Cycle: How to Use

• Develop:

• Link Technology Maturity to different User types.

• Early stages – Technology dominates

• Later stages – Usability, convenience and value

• Technology insertion/integration strategies for different technology maturity levels

• Analyze:

• Understand Different User Needs and Position Technology selection and budget to meet their requirements and perceptions.

• Difficulties in adopting disruptive technology

• Link demonstrations and implementations to appropriate User types.

• Innovation in Processes to support selected Technology

• Select:

• Use the analysis as an input to TDS

Why good technology fail; inferior technology succeed

Page 16: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

14

Copyright © 2006 INFOLOGIC Inc. All rights reserved.

PRE TRL TRL 1 TRL 2 TRL 3 TRL 4 TRL 5 TRL 6 TRL 7 TRL 8 TRL 9

Technology Readiness Levels (TRLs)

Maturity Levels should be linked to related technology evaluation cycles

tManager: Technology Manager

POST TRL

HYPE CYCLE

ADOPTION CYCLE

MATURITY LEVEL

Page 17: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

15

Copyright © 2006 INFOLOGIC Inc. All rights reserved.

tManager: How to Use

• Develop:

• Pre-TRL activities

• Post-TRL activities

• Analyze:

• Technology Cycle results

• Contractor incentives (and associated performance requirements) to maintain and implement “Live TDS”through complete SoS/System life cycle

• Select:

• Incorporate in to TDS

Page 18: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

16

Copyright © 2006 INFOLOGIC Inc. All rights reserved.

TechIP Methodology

The TechIP methodology provides a framework for the management of technology through its lifecycle. TechIP consists of three components which are tManager, iManager & pManager

tManager

(Technology Manager)

iManager

(Technology Insertion and Integration Manager)

pManager

(Technology Profile and Plan Manager)

Page 19: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

17

Copyright © 2006 INFOLOGIC Inc. All rights reserved.

tManager: Technology Selection

Requirements View

Concept Refinement View

Maturity View

User

Needs

eBusiness ServicesRisk Analysis

Custom

erD

eveloperProgram

matic

Technology

Risk

Tech.

Opportunitie

s

ICD

AoA

Tech. Hype Cycle

Tech. Adoption Cycle

Technology selection comprises of reviewing user needs and technology opportunities (Requirements View), identifying Critical Technology Elements (Concept

Refinement View) and conducting maturity analysis (Maturity View).

TDS

Page 20: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

18

Copyright © 2006 INFOLOGIC Inc. All rights reserved.

NETWRK

NM

MANAGER

MEDIA

MM

MANAGER

UMUSER MANAGER

PMPROCESS MANAGER

KMKERNEL

MANAGER

MULTIMEDIA PROCESSORSCOMPUTERS, VOICE/VIDEO

PROCESSORS

DATAVOICEVIDEO

MULTIMEDIAWORKBENCH

EXTRANET

INTRANET

RM

iManager : Overview

Generic Model (IT System) to map Critical Technology Elements (CTEs) derived TDS into SoS

Page 21: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

19

Copyright © 2006 INFOLOGIC Inc. All rights reserved.

TechnologyIntegration( PUSH )

System 1

System 2

Repeat…..

Deployment

iManager: Technology Insertion & Integration Activities

System

Of

Systems

Logicalto

PhysicalMapping

TechnologyInsertion( PULL )

Create a Technology specific iManager model by PULLing CTEs from tManager; create iManager models for each system component of SoS, and integrate these CTEs in to SoS by PUSHing into individual systems.

Page 22: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

20

Copyright © 2006 INFOLOGIC Inc. All rights reserved.

Technology Profile

• Metadata (definitions) of CTEs, systems, subsystems, etc.

• Live Technology life cycles

Management &

Collaboration

• Forrester Value Network

• Collaboration Platform

• EA/SD Procedures

• CMMI

Tools

• AFRL/Bill Nolte’s TRL Calculator

• SEI (IDEAL – based New technology Rollout)

• Technology Portal

• Modeling and Simulation

TechnologyPlans

• Live TDS

• Technology Roadmaps

• Technology Migration Plans

• Technology Maturation Plans

pManager : Overview

The objective of pManager (which is a set of processes and software tools) is to manage the technologies identified by the tManager and iManager components of TechIP.

Page 23: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

21

Copyright © 2006 INFOLOGIC Inc. All rights reserved.

INFOLOGICThe logical approach to harness innovationthrough emerging information technologies

Mission – Infologic provides products and services that assist scientists, engineers and system designers to harness innovation through emerging information technologies.

Customer Focus - Government & Prime Contractors

Certification/Membership: AFCEA,NDIA, CompTIA, SBA Certified 8(a)/SDB

Profile

Has Patel

• Founded Infologic, Inc.• Previous experience:

• Bell Labs• Software Company• Various Industries

• Research Interests:• System Architecture• Technology Insertion• Emerging Technologies

• Education: MS/BS

Has Patel

• Founded Infologic, Inc.• Previous experience:

• Bell Labs• Software Company• Various Industries

• Research Interests:• System Architecture• Technology Insertion• Emerging Technologies

• Education: MS/BS

Page 24: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

22

Copyright © 2006 INFOLOGIC Inc. All rights reserved.

Conclusions

- tManager (Technology Manager)- iManager (Insertion and Integration Manager)- pManager (Plan Manager)

II. Introduce a methodology, called TechIP (Technology Insertion Plan) which can be sued for through the complete life cycle of a System or Project to identify, select, insert, integrate and manage technologies.

I. Role of Technology Cycles (Hype Cycle and Adoption Cycles ) in identifying technologies for a System or Project

Page 25: Technology Evaluation Cycles and Maturity · PDF fileTechnology Evaluation Cycles and Maturity Assessment INFOLOGIC, ... Report Documentation Page ... create iManager models for each

??? !!! ???

Technology Evaluation Cycles and Maturity Assessment

INFOLOGIC, INC.1048 Irvine Avenue #624Newport Beach, CA 92660www.infologic.com

Any Questions, Comments,Disagreements and Constructive Suggestions

I N F O L O G I CThe logical approach to harness innovation though emerging information technologies

Has PatelInfologic, Inc.

[email protected](888) 325 0500 Ext. 100