TELECENTER FOR POST-TSUNAMI RECONSTRUCTION. Program of APEC Telecenter Training Camp Taipei, Taiwan January 25 th , 2005 Boni Pudjianto Muslimin Kulle Ministry of Communication and Information The Republic of Indonesia. Tsunami in Aceh and North Sumatera. Area of Disaster - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: TELECENTER  FOR POST-TSUNAMI RECONSTRUCTION

TELECENTER FOR POST-TSUNAMIRECONSTRUCTION

Program of APEC Telecenter Training CampTaipei, Taiwan

January 25th, 2005

Boni PudjiantoMuslimin Kulle

Ministry of Communication and InformationThe Republic of Indonesia

Page 2: TELECENTER  FOR POST-TSUNAMI RECONSTRUCTION

Tsunami in Aceh and North Sumatera

Area of Disaster

Aceh and North Sumatera

Page 3: TELECENTER  FOR POST-TSUNAMI RECONSTRUCTION

Earthquake and Tsunami patternAnimation

Page 4: TELECENTER  FOR POST-TSUNAMI RECONSTRUCTION

Before and After

Banda Aceh Harbour

I've never seen anything like this. "I have been in war and I have been through a number of hurricanes, tornados and other relief operations, but I have never seen anything like this,". Collin Powell

Page 5: TELECENTER  FOR POST-TSUNAMI RECONSTRUCTION

Condition

Page 6: TELECENTER  FOR POST-TSUNAMI RECONSTRUCTION
Page 7: TELECENTER  FOR POST-TSUNAMI RECONSTRUCTION

BACKGROUND

• Aceh has suffered the most human fatalities, infrastructures and other properties in the catastrophic Tsunami disaster of December 26th ,2004

• Since its widespread deconstruction, the tsunami has paralyzed the local activity, including government, education programs, human resource developments and other critical activities.

Page 8: TELECENTER  FOR POST-TSUNAMI RECONSTRUCTION

The Damages

• The victims in Indonesia more than 90.000 people are dead, and more than 132.000 still missing, 340.000 are becoming refugee

• The damages and loses > 4,4Billion U$

• Infrastructure 16%, social 34%, environment 11%, production 37%, others 2%

Restoring People’s Lives and Livelihoods Restoring the Economy Restoring Infrastructure Restoring Local Government

The Reconstruction Strategy :

Page 9: TELECENTER  FOR POST-TSUNAMI RECONSTRUCTION

OBJECTIVES

• To support and network development of Aceh reconstruction post-disaster

• Dissemination of knowledge (ICT, multimedia technologies, social sciences, etc) from Government and Universities for Aceh Development

• Conducting action-oriented research between government and universities

Page 10: TELECENTER  FOR POST-TSUNAMI RECONSTRUCTION

How Can ICT help ?

• Technology access and ICT skills could have played a major role

• ICT can immediate responded to the imminent crisis at a time (when no other local or national warning system was in place)

• ICT can be crucial and save a lot of lives

• Helping people to search their family

Page 11: TELECENTER  FOR POST-TSUNAMI RECONSTRUCTION

The Need of Telecenter

• It’s about connecting government officials with all the people to coordinate, support and network development of Aceh reconstruction post-disaster

• Finally, reduction of information and education divide should be a right of all people and the responsibility of all governments

Page 12: TELECENTER  FOR POST-TSUNAMI RECONSTRUCTION

What Have We Done So Far• Kominfo and Universities set up a team of experts to

study and develop Information System for Supporting Aceh and North Sumatera Disaster Recovery Management for Banda aceh and Meulaboh, Nangroe Aceh Darussalam– Volunteers information management– Donation information management– Aceh information management– other knowledge managements

• As a fundamental Infrastructure for information dissemination and coordination between Banda Aceh, Meulaboh and Jakarta & Bandung West Java

Page 13: TELECENTER  FOR POST-TSUNAMI RECONSTRUCTION

Infrastructure for Disaster Monitoring

Jakarta : Control & MonitoringCenter; ASProvider

BandaAceh : Data collecting

Earthquale and Tsunami area

Internet

Internet

Meulaboh

Page 14: TELECENTER  FOR POST-TSUNAMI RECONSTRUCTION

Initial Networking Infrastructure

ITB MAN

Satellite

VSAT Terminal+Modem10/100 Mbps

Internet

Workstation

Workstation

Workstation

PC router

JAKARTA &BandungWest java

Banda Aceh &Meulaboh, NAD

Page 15: TELECENTER  FOR POST-TSUNAMI RECONSTRUCTION

Data Input Mechanism

(Computer Terminal)

InternetTelephone/Mobile/SMS Radio/HT

ASPInternet Data Center (IDC)

Jakarta

Control center

Banda Aceh“Webbased Application”

Data input From Aceh and North Sumatera can be submitted throughInternet, HP, Tlp, SMS, Radio HT, etc via BandaAceh or directly

etc

Page 16: TELECENTER  FOR POST-TSUNAMI RECONSTRUCTION

Integrated Portal Development Schedule

Preparation stage

Operational stage

JanJan PebPeb MarMar AprApr MaiMai JunJun JulJul AugAug SepSep OktOkt NopNop DesDes

20052005

JanJan

20062006 dst.

Page 17: TELECENTER  FOR POST-TSUNAMI RECONSTRUCTION

Problems

• Lack of personnel, resources, funds, etc

• Need more solution about how, government, universities and business entities to perform the tasks outlined above more effectively

Page 18: TELECENTER  FOR POST-TSUNAMI RECONSTRUCTION

Boni Pudjianto : [email protected] Kulle : [email protected]