Page 1: Temporary works

AHEMEDABAD INSTITUTE OF TECHNOLOGY

SEMINAR

TEMPORARY WORKS

Page 2: Temporary works

CIVIL ENGINEERING (3rd sem)B.ESUBJECT: BUILDING CONSTRUCTION

Submitted by:

Patel Bhavik (D2D)

Patel Parth (D2D)

Bhavsar Zalak(D2D)

Dodia Margi

Limbhachya setu(D2D)

Page 3: Temporary works

What are temporary works?

O Temporary works (TW) are the parts of a

construction project that are needed to

enable the permanent works to be

built. Usually the TW are removed after

use.

O EX- Scaffolding

Timbering in trenches

Shoring

Underpinning

Page 4: Temporary works

Timbering in trenches

Various Method of Timbering

Stay bracing

Box sheeting

Vertical sheeting

Runners

Sheet piling

Page 5: Temporary works

Stay Bracing

O Used method –Firm

ground & depth

of excavation

does not exceed 2 m.

Page 6: Temporary works

Box Sheeting

Page 7: Temporary works

O Used method- loose soil & depth of

excavation does not exceed 4 m.

O A box like structure is formed by

providing polling board, wales & struts.

Page 8: Temporary works

Vertical Sheeting

O This method is adopted

for deep trenches

(up to 10 m depth)

in soft ground.

O The method is similar

to box sheeting except

that the excavation is

carried out in stages

and at the end of

each stage an offset

is provided.

Page 9: Temporary works

Runners

O In case of soft ground

runner system is

provided.

O The system is similar

to vertical sheeting.

Page 10: Temporary works

Sheet piling

This method is used

I. Soil to be excavated is loose or

soft.

II. Width of trench is large.

III. Depth of excavation is large.

IV. Sub soil water is present.

Page 11: Temporary works

What is Scaffolding?

Scaffolding, also called staging, is a

temporary structure used to support

people and material in the construction or

repair of buildings and other structures.

Page 12: Temporary works

OTypes of scaffolding

I. Single scaffolding

II. Double scaffolding

III. Needle scaffolding

IV. Trestle scaffolding

V. Suspended scaffolding

VI. Steel scaffolding

VII. Patented scaffolding

Page 13: Temporary works

Single scaffolding

Page 14: Temporary works

This is the most common type of

scaffolding and is widely use in the

construction of brickwork..

It consist of a single row of standards

placed at a distance of about 1.20m from

the wall.

Standard are placed at 2 to 2.5 m interval.

Page 15: Temporary works

Double Scaffolding

Page 16: Temporary works

This scaffolding is stronger than the single

scaffolding.

It is used in the construction of stonework.

Page 17: Temporary works

Needle ScaffoldingO Used:

Ground is week to support

the standards.

Construction of upper part

of the wall is to be carried out.

It is required to keep the

ground near wall , free

for traffic etc.

Page 18: Temporary works

Trestle Scaffolding In this type of scaffolding,

the working platform is

supported on movable

contrivances movable on

wheels.

Use: painting , repair work

Page 19: Temporary works

What is Shoring? Shoring is the construction of a temporary

structure to support temporarily an unsafe

structure.

Types of Shoring

Raking Shores

Flying Shores

Dead Shores

Page 20: Temporary works

Raking Shores

Page 21: Temporary works

This is a system of giving temporary

support to an unsafe wall.

The construction of raking shore, varies

with the condition at site.

In this method In this method inclined

members called rakers are used to give

lateral support to the wall.

Page 22: Temporary works

Flying shores

Page 23: Temporary works
Page 24: Temporary works

In this type of shoring horizontal supports

are provided for supporting temporarily

the parallel walls of the two adjacent

buildings which may tend to collapse or

damage.

If the walls are quite near to each other

(up to 9m) single flying shore can be

constructed.

When the distance between two parallel

walls is more than 9m a double shore can

be constructed.

Page 25: Temporary works

Dead shores

Page 26: Temporary works

Such type of shoring is provided for the

following purposes:

Rebuild the defective lower part of the

wall.

Rebuild the existing foundation.

To make large opening in the existing wall.

Page 27: Temporary works