Update: April 2018 This project, part of the high speed railway line Paris-Madrid (Atlantic branch of Priority Project 3), was focused on the station between Bergara and Hernani located in the Basque province of Guipúzcoano which is close to the French border. It supported the design studies and the construction of the new high speed railway line of approximately 66 km, subdivided into the following 3 sections: west section (Bergara-Ezkio/Itsaso) - 14 km central section (Ezkio/Itsaso-Tolosa) - 20 km east section (Tolosa-Hernani) - 32 km Due to the mountainous landscape, the works included the construction of a series of viaducts, tunnels, embankments and ditches. The project contributed to improving the rail transport services between Madrid and Bordeaux. The Action is closed. TEN-T Multi-Annual Programme Member States involved: Spain Implementation schedule Start date: January 2007 End date: December 2015 EU contribution: €9,115,315 Additional information: Coordinator’s Report of the Priority Project: http://ec.europa.eu/transport/themes /infrastructure/ten-t-policy/priority- projects/european- coordinators_en.htm European Commission, DG MOVE http://ec.europa.eu/transport Innovation and Networks Executive Agency (INEA) https://ec.europa.eu/inea Beneficiary: Gobierno Vasco, Departamento de Transportes y Obras Públicas www.garraioak.ejgv.euskadi.net Implementing body: Euskal Trebide Sarea www.ets-rfv.euskadi.eus/portada-ets- es/ High Speed Railway Line Paris-Madrid: New Railway Network Guipúzcoano 2007-ES-03050-P Part of Priority Project 3

Upload: others

Post on 02-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • Update: April 2018

    This project, part of the high speed railway line Paris-Madrid (Atlantic branch of Priority Project 3), was focused on the station between Bergara and Hernani located in the Basque province of Guipúzcoano which is close to the French border. It supported the design studies and the construction of the new high speed railway line of approximately 66 km, subdivided into the following 3 sections:

    • west section (Bergara-Ezkio/Itsaso) - 14 km • central section (Ezkio/Itsaso-Tolosa) - 20 km • east section (Tolosa-Hernani) - 32 km

    Due to the mountainous landscape, the works included the construction of a series of viaducts, tunnels, embankments and ditches. The project contributed to improving the rail transport services between Madrid and Bordeaux. The Action is closed.

    TEN-T Multi-Annual Programme

    Member States involved: Spain Implementation schedule Start date: January 2007 End date: December 2015

    EU contribution: €9,115,315

    Additional information:

    Coordinator’s Report of the Priority Project: http://ec.europa.eu/transport/themes/infrastructure/ten-t-policy/priority-projects/european-coordinators_en.htm European Commission, DG MOVE http://ec.europa.eu/transport Innovation and Networks Executive Agency (INEA) https://ec.europa.eu/inea Beneficiary: Gobierno Vasco, Departamento de Transportes y Obras Públicas www.garraioak.ejgv.euskadi.net Implementing body: Euskal Trebide Sarea www.ets-rfv.euskadi.eus/portada-ets-es/