TEN YEAR TRANSPORTATION IMPROVEMENT PLAN
2011 - 2020
APPROVED BY THE NH LEGISLATURE
AND SIGNED INTO LAW BY THE GOVERNOR
PURSUANT TO
RSA 228:99 AND RSA 240 OF THE LAWS OF NEW HAMPSHIRE
PROJECTS LISTED ALPHABETICALLY
PREPARED BY THE NEW HAMPSHIRE
DEPARTMENT OF TRANSPORTATION
JUNE 28, 2010
Projects Only
TEN YEAR TRANSPORTATION IMPROVEMENT PLAN
2011 - 2020
APPROVED BY THE NH LEGISLATURE
AND SIGNED INTO LAW BY THE GOVERNOR
PURSUANT TO
RSA 228:99 AND RSA 240 OF THE LAWS OF NEW HAMPSHIRE
PROJECTS LISTED ALPHABETICALLY
PREPARED BY THE NEW HAMPSHIRE
DEPARTMENT OF TRANSPORTATION
JUNE 28, 2010
Projects Only
TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2011 - 2020~ Alpha Sort with Funding Category Label ~
June 28, 2010
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
ACWORTH
NH 123A Bridge repaired following flood
damage. Red List Bridge
Priority #20.
REPLACE BRIDGE OVER BOWERS BROOK - 113/064 {Red List} [Oct 2005 Flood] (Bridge Rehab
= 14540T, FY 2007)
6641FHWA
2018 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.000C 2018
1.000Total:Highway and Bridge 1.000
ALEXANDRIA
14964
WASHBURN ROAD Red List Bridge. Specific project
from Statewide program,
Municipal managed.
BRIDGE REPLACEMENT OVER PATTEN BROOK - 160/109 {Red List}
6610State Aid Bridge
2014 SAB - STATE AID BRIDGE (State FY), 20% = Town 1.015C 2014
2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .117P
2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
1.137Total:Highway and Bridge 0.540
ALTON
14239
PLACES MILL ROAD Specific project from Statewide
program, Municipal managed.
BRIDGE REPLACEMENT OVER SUNSET LAKE OUTLET - 098/178
5634 State Aid Bridge
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .275C 2011
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .055P
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.335Total:Highway and Bridge 0.335
ANDOVER
14573
MORRILL HILL ROAD Red List Bridge. Specific project
from Statewide program,
Municipal managed.
BRIDGE REPLACEMENT OVER ELBOW BROOK (AKA GREAT BROOK) - 127/106 {Red List}
6152State Aid Bridge
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .502C 2011
.502Total:Highway and Bridge 0.507
ANTRIM
14828
US 202 / NH 31 MAIN
STREET
Specific project from Statewide
program. Municipal Managed.
REHABILITATION PHASE 2: CONTINUE EXISTING PROJECT ON THE WEST SIDE TO RECONSTRUCT
SIDEWALKS, SHOULDERS AND DRAINAGE TO IMPROVE THE DOWNTOWN PEDESTRIAN
FACILITIES AND COMPLETE TRAFFIC CALMING AND PEDESTRIAN FLOW IMPROVEMENTS (TE
Program) [06-03TE]6232 FHWA
2011 L220 - STP - TRANSPORTATION ENHANCEMENT .337C TE 2006
.337Total:Bike / Pedestrian 0.341
Projects Page - 1 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
ANTRIM
14940
DEPOT STREET Red List Bridge. Specific project
from Statewide program,
Municipal managed.
BRIDGE REPLACEMENT OVER RELIEF - 181/071
6497State Aid Bridge
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .235C 2010
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .045P
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.285Total:Highway and Bridge 0.285
ANTRIM
14941
DEPOT ST Red List Bridge. Specific project
from Statewide program,
Municipal managed.
BRIDGE REPLACEMENT OVER CONTOOCOOK RIVER OVERFLOW - 183/071 {Red List}
6496State Aid Bridge
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .310C 2010
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .060P
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.375Total:Highway and Bridge 0.375
ANTRIM
14942
CRAIG ROAD Red List Bridge. Specific project
from Statewide program,
Municipal managed.
BRIDGE REPLACEMENT OVER BROOK - 117/093 {Red List}
6495State Aid Bridge
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .170C 2013
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .045P
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.220Total:Highway and Bridge 0.220
ANTRIM - BENNINGTON
15349 A
DEPOT STREET Red List Bridge. Specific project
from Statewide program,
Municipal Managed.
BRIDGE REHABILITATION - 184/071, PHASE II {Red List}
7001State Aid Bridge
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .570C New Project
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .095P
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.670Total:Highway and Bridge
AUBURN
15512
CHESTER TURNPIKE Red List Bridge. Specific project
from Statewide program,
Municipal Managed.
BRIDGE REHABILITATION OVER MURRAY BROOK - 120/149 {Red List}
6999State Aid Bridge
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .184C New Project
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .036P
.220Total:Highway and Bridge
Projects Page - 2 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
AUBURN
15657
OLD CANDIA ROAD Red List Bridge. Specific project
from Statewide program,
Municipal Managed.
BRIDGE REHABILITATION OVER MAPLE FALLS BROOK - 088/159 {Red List}
7170State Aid Bridge
2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .227C New Project
.227Total:Highway and Bridge
BARNSTEAD - ALTON
14121
NH 28 Initial intersection priorities in
2010. Pavement rehabilitation
and/or other corridor priorities.
RECONSTRUCTION FROM THE ALTON CIRCLE SOUTH APPROXIMATELY 7.0 MILES TO THE
IMPROVED SECTION IN BARNSTEAD
2738FHWA
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 4.125C 2015
2011 L200 - STP - AREAS LESS THAN 200,000 .096P
2011 L250 - STP - RURAL AREAS < 5,000k .010P
2013 L250 - STP - RURAL AREAS < 5,000k .010P
2013 L250 - STP - RURAL AREAS < 5,000k .100P
2011 L250 - STP - RURAL AREAS < 5,000k .027R
2014 L250 - STP - RURAL AREAS < 5,000k .340R
4.708Total:Highway and Bridge 6.100
BEDFORD
FEE Tpk Specific project from HB 391,
Turnpike Capital Program.
WIDENING AND RETROFIT EXISTING BEDFORD TOLL FACILITY TO IMPLEMENT HIGHWAY SPEED
(OPEN ROAD) TOLLING {Turnpike}
7394 Turnpike Expansion
2012 TPK - TURNPIKE EXPANSION (State FY) 10.435C New Project
2013 TPK - TURNPIKE EXPANSION (State FY) 9.565C
2011 TPK - TURNPIKE EXPANSION (State FY) .400R
20.400Total:Highway and Bridge
BEDFORD
13527
US 3 Turnpike Capital Program, Red
List Bridge Priority # 32
REPLACE BRIDGE OVER F.E.E.T. - 189/121 & ASSOCIATED APPROACH WORK {Turnpike} {Red
List}
3036 Turnpike Expansion
2012 TPK - TURNPIKE EXPANSION (State FY) 12.200C 2013
2011 TPK - TURNPIKE EXPANSION (State FY) .350R
12.550Total:Highway and Bridge 13.318
BEDFORD
13953
NH 101 DOT priority list, SNHPC priority
#1
WIDEN TO 5 LANES FOR APPROXIMATELY 2 MILES, FROM NH 114 TO WALLACE ROAD
1818 FHWA
2019 L050 - NATIONAL HIGHWAY SYSTEM 6.500C Previously Programmed Beyond TYP (Deferred)
2015 L050 - NATIONAL HIGHWAY SYSTEM .385P
2016 L050 - NATIONAL HIGHWAY SYSTEM .250P
2016 L050 - NATIONAL HIGHWAY SYSTEM .250R
7.385Total:Highway and Bridge
Projects Page - 3 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
BEDFORD - MANCHESTER -
LONDONDERRY -
MERRIMACK
11512 H
AIRPORT ACCESS ROAD Current construction schedule
and specific construction
contract breakout. Advanced
due to ARRA funds.
CONSTRUCT NORTH OF LITTLE COHAS BRIDGE AND FINAL PAVING TO NH 3A (Parent = Bed-
Man-Lon-Mer 11512)
5670 FHWA
2011 L050 - NATIONAL HIGHWAY SYSTEM 2.753C 2012
2011 L050 - NATIONAL HIGHWAY SYSTEM .650C 2012
2012 L050 - NATIONAL HIGHWAY SYSTEM 3.750C 2012
7.153Total:Highway and Bridge 5.000
BEDFORD - MANCHESTER -
LONDONDERRY -
MERRIMACK
11512 K
AIRPORT ACCESS ROAD Current construction schedule
and specific construction
contract breakout. Advanced
due to ARRA funds.
SELECTS, FINAL PAVING AND MISCELLANEOUS WEST OF MERRIMACK RIVER (Parent = Bed-
Man-Lon-Mer 11512)
5952 FHWA
2011 L050 - NATIONAL HIGHWAY SYSTEM 7.225C 2013
2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.088C 2013
2012 L050 - NATIONAL HIGHWAY SYSTEM 8.750C 2013
17.062Total:Highway and Bridge 14.572
BELMONT - LACONIA
NH 106 Scope to address pavement
and problem intersections only.
RECONSTRUCT FROM 0.4 MILES NORTH OF US 3 / NH 11 BYPASS SOUTHERLY INTO BELMONT
SOUTH OF OPECHEE PLAZA
2787 FHWA
2018 L050 - NATIONAL HIGHWAY SYSTEM 1.500C 2017
2011 L050 - NATIONAL HIGHWAY SYSTEM .100P
2012 L050 - NATIONAL HIGHWAY SYSTEM .100P
2014 L050 - NATIONAL HIGHWAY SYSTEM .800P
2012 L050 - NATIONAL HIGHWAY SYSTEM .100R
2015 L050 - NATIONAL HIGHWAY SYSTEM .625R
3.225Total:Highway and Bridge 3.225
BERLIN
12958 B
NH 110 Earmark funding.PHASE 2 RECONSTRUCTION FROM FIRST AVENUE TO WIGHT STREET (APPROX.0.7 MILES)
[Section 1702 - Designated Project; Demo Id NH043 & NH062]
3763 FHWA
2012 L200 - STP - AREAS LESS THAN 200,000 1.420C 2011
2012 LY20 - HIGH PRIORITY PROJ SEC 1702 .580C
2013 HPER - HIGH PRIORITY 1.793C
2013 L200 - STP - AREAS LESS THAN 200,000 .207C
2011 HY20 - HIGH PRIORITY PROJ SEC 1702 .523R
2011 LY20 - HIGH PRIORITY PROJ SEC 1702 2.477R
2012 LY20 - HIGH PRIORITY PROJ SEC 1702 .550R
7.550Total:Highway and Bridge
Projects Page - 4 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
BERLIN
15792
HILLSIDE AVENUE Specific project from Statewide
program, Municipal Managed.
BRIDGE REPLACEMENT OVER DEAD RIVER - 232/066 [SAB*4216] {State Aid Bridge Program}
7338 State Aid Bridge
2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .497C New Project
2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .065P
2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.567Total:Highway and Bridge
BERLIN
15793
12th STREET Specific project from Statewide
program, Municipal Managed.
BRIDGE REHABILITATION OVER ANDROSCOGGIN RIVER - 256/087 [SAB*4216] {State Aid Bridge
Program}
7339 State Aid Bridge
2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .776C New Project
2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .060P
.836Total:Highway and Bridge
BETHLEHEM
13087
US 302 Specific project from Statewide
Program. Municipal Managed.
CORRECTION OF TRAFFIC & PEDESTRIAN SAFETY DEFICIENCIES; INCLUDING SIDEWALKS,
CURBING, CROSSWALKS, SIGNING, & LIGHTING IN THE CENTER OF TOWN (TE Program) [98-
77TE]2331 FHWA
2011 L220 - STP - TRANSPORTATION ENHANCEMENT .035C TE 1998
.035Total:Highway and Bridge
BOW
13742 B
I-93 Breakout from Bow-Concord
13742 Turnpike Capital
Program. Red List Bridge
Priorities #22 & #23.
BRIDGE REDECKING OVER I-89 & TURKEY RIVER - 135/160 & 136/160 [Parent = Bow-Concord
13742] {Both Red List}
6816
Turnpike Expansion
2011 TPK - TURNPIKE EXPANSION (State FY) 5.000C
5.000Total:Highway and Bridge
BOW - CONCORD
I-93 Preliminary Design of corridor
improvements
WIDEN FROM I-89 TO I-393 (PE Only)
7447 FHWA
2014 L010 - INTERSTATE MAINTENANCE 1.000P Previously Programmed Beyond TYP (Deferred)
2014 TPK - TURNPIKE EXPANSION (State FY) 1.000P
2.000Total:Highway and Bridge
BOW - CONCORD
13742 A
I-93 Breakout from Bow-Concord
13742 Turnpike Capital
Program. Red List Bridge Priority
#58.
EXIT 12 (Concord), NH 3A OVER I-93 BRIDGE REDECKING - 203/087 {Red List} (Includes Pe &
Row for 'B' & 'C') [Parent = Bow-Concord 13742]
6815
Turnpike Expansion
2012 TPK - TURNPIKE EXPANSION (State FY) 3.000C Previously Programmed Beyond FY2018
2011 TPK - TURNPIKE EXPANSION (State FY) .400P
3.400Total:Highway and Bridge
Projects Page - 5 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
BRADFORD
15857
BREEZY HILL ROAD Specific project from Statewide
program, Municipal Managed.
BRIDGE REPLACEMENT OVER WARNER RIVER - 161/145 [SAB*4216] {State Aid Bridge Program}
7449 State Aid Bridge
2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .865C New Project
2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .140P
2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .015R
1.020Total:Highway and Bridge
CANAAN
14952
GOOSE POND ROAD Red List Bridge. Specific project
from Statewide program,
Municipal managed.
BRIDGE REPLACEMENT OVER GOOSE POND BROOK - 087/092 {Red List}
6599State Aid Bridge
2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .320C 2014
2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .075P
2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.400Total:Highway and Bridge 0.400
CART
TRANSIT Annual Program FundingOPERATING ASSISTANCE
7239 FTA
2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .690
2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .690
2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .690
2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .690
2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .690
2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .690
2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .690
2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .690
2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .690
2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .690
6.901Total:Transit
CART
TRANSIT Boston urbanized area FTA
funds.
PREVENTATIVE MAINTENANCE
2985 FTA
2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .085
2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .085
2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .085
2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .085
2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .085
2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .085
2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .085
2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .085
2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .085
2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .085
.850Total:Transit
Projects Page - 6 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
CHESTERFIELD
13597
NH 63 Original scope to address
pavement and guardrail.
RECONSTRUCT TO IMPROVE SAFETY ADJACENT TO SPOFFORD LAKE IN THE AREA OF THE "S-
CURVES" FROM NORTH SHORE ROAD SOUTHERLY APPROXIMATELY 0.5 MILES {STP-Safety}
2747 FHWA
2011 H210 - STP - SAFETY .440C 2011
.440Total:Highway and Bridge 0.450
CLAREMONT
CLAREMONT AIRPORT Safety Issue for future airport
upgrade.
BUILDING DEMOLITION
3400 Airport
2011 AIP - AIRPORT IMPROVEMENT PROGRAM .289
.289Total:Aeronautics
CLAREMONT
CLAREMONT
MUNICIPAL AIRPORT
Address Safety Concerns.CONSTRUCT TAXIWAY 'C' WEST
6515 Airport
2012 AIP - AIRPORT IMPROVEMENT PROGRAM .684
.684Total:Aeronautics
CLAREMONT
CLAREMONT
MUNICIPAL AIRPORT
Address Capacity ConcernsCONSTRUCTION ONLY: APRON EXPANSION
6662 Airport
2017 AIP - AIRPORT IMPROVEMENT PROGRAM .500
.500Total:Aeronautics
CLAREMONT
CLAREMONT
MUNICIPAL AIRPORT
Address Capacity Concerns.DESIGN ONLY: AIRPORT EXPANSION
6520 Airport
2016 AIP - AIRPORT IMPROVEMENT PROGRAM .158
.158Total:Aeronautics
CLAREMONT
CLAREMONT
MUNICIPAL AIRPORT
Address Capacity ConcernsDESIGN & CONSTRUCT T-HANGARS
7364 Airport
2019 AIP - AIRPORT IMPROVEMENT PROGRAM .158
2020 AIP - AIRPORT IMPROVEMENT PROGRAM .158
.316Total:Aeronautics
CLAREMONT
CLAREMONT
MUNICIPAL AIRPORT
Address Safety ConcernsOBSTRUCTION REMOVAL
6519 Airport
2015 AIP - AIRPORT IMPROVEMENT PROGRAM .116
.116Total:Aeronautics
CLAREMONT
CLAREMONT
MUNICIPAL AIRPORT
Replace Aging EquipmentPURCHASE SNOW-REMOVAL EQUIPMENT
6663 Airport
2018 AIP - AIRPORT IMPROVEMENT PROGRAM .300
.300Total:Aeronautics
Projects Page - 7 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
CLAREMONT
CLAREMONT
MUNICIPAL AIRPORT
Address Safety Concerns.REMOVE SOUTHERN END OF ABANDONED RUNWAY 5-23 PAVEMENT (REPLACE WITH LOAM
AND SEED)
6516 Airport
2015 AIP - AIRPORT IMPROVEMENT PROGRAM .132
.132Total:Aeronautics
CLAREMONT
CLAREMONT
MUNICIPAL AIRPORT
Revisit Airport Role & NeedsUPDATE AIRPORT MASTER PLAN
6517 Airport
2013 AIP - AIRPORT IMPROVEMENT PROGRAM .116
.116Total:Aeronautics
CLAREMONT
CLAREMONT
MUNICIPAL AIRPORT
Address Safety Concerns.UPGRADE RUNWAY SAFETY AREAS
6518 Airport
2014 AIP - AIRPORT IMPROVEMENT PROGRAM .447
.447Total:Aeronautics
CLAREMONT
13248 #
NH 12 Earmark funding. Municipal
Managed
NORTH STREET INTERSECTION RELOCATION [Section 1702 - Designated Project; Demo Id
NH039 & NH059] [Parent]
2802 FHWA
2012 HPER - HIGH PRIORITY .078C
2012 HPER - HIGH PRIORITY 1.295C 2012
2012 HY20 - HIGH PRIORITY PROJ SEC 1702 .650C
2012 LY10 - HIGH PRIORITY PROJ SEC 1702 .414C
2012 LY20 - HIGH PRIORITY PROJ SEC 1702 1.955C
4.392Total:Highway and Bridge 4.300
COAST
COAST ADA OPERATIONS
3070 FTA
2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .074
2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .076
2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .101
2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .104
2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .104
2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .104
2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .104
2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .104
2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .104
2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .104
.979Total:Transit
Projects Page - 8 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
COAST
COAST Annual Program FundingCAPITAL PROGRAM [ARRA]
3503 FTA
2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .536
2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .553
2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .981
2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .157
2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .157
2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .157
2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .157
2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .157
2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .157
2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .157
3.171Total:Transit
COAST
COAST Annual Program FundingGENERAL & COMPREHENSIVE PLANNING
3069 FTA
2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .109
2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .113
2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .052
2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .054
2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .054
2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .054
2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .054
2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .054
2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .054
2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .054
.652Total:Transit
COAST
COAST Annual Program FundingMISC. SUPPORT EQUIPMENT
3067 FTA
2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .034
2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .035
2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .033
2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .034
2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .034
2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .034
2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .034
2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .034
2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .034
2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .034
.340Total:Transit
Projects Page - 9 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
COAST
COAST Annual Program FundingMISC. BUS STATION EQUIPMENT [ARRA]
3068 FTA
2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .065
2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .066
2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .065
2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .067
2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .067
2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .067
2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .067
2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .067
2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .067
2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .067
.665Total:Transit
COAST
COAST Annual Program FundingOPERATING ASSISTANCE
567 FTA
2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.788
2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.844
2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.566
2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.613
2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.613
2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.613
2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.613
2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.613
2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.613
2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.613
16.489Total:Transit
COAST
COAST Annual Program FundingPREVENTIVE MAINTENANCE
2691 FTA
2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .523
2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .538
2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .380
2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .391
2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .391
2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .391
2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .391
2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .391
2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .391
2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .391
4.178Total:Transit
Projects Page - 10 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
COLEBROOK
13476
NH 26 Specific Project from Statewide
Program
BRIDGE REHABILITATION OVER MOHAWK RIVER - 147/068
571 FHWA
2017 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.000C 2016
2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .058P
2015 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .058P
2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .054R
1.169Total:Highway and Bridge 1.169
COLUMBIA
US 3 Prioity Corridor Weight
Restricted Bridge (C1)
REHABILITATE / REPLACE BRIDGE OVER CONE BROOK - 059/089
7360 FHWA
2019 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.000C New Project
2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P
2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .050R
1.150Total:Highway and Bridge
CONCORD
CONCORD AIRPORT Address Safety and Security
Concerns
CONSTRUCTION OF NEW TERMINAL BUILDING
4237 Airport
2017 AIP - AIRPORT IMPROVEMENT PROGRAM .256
2019 AIP - AIRPORT IMPROVEMENT PROGRAM 2.132
2.388Total:Aeronautics
CONCORD
CONCORD AIRPORT Safety Issue. New taxiway to
prevent taxiing on runway.
PARALLEL TAXIWAY FOR RUNWAY 12/30 - PHASE I
3403 Airport
2013 AIP - AIRPORT IMPROVEMENT PROGRAM .650
.650Total:Aeronautics
CONCORD
CONCORD AIRPORT Priority as identified by airport
sponsor. Rehabilitation of old
runway to a taxiway.
REHABILITATE TAXIWAY / OLD RUNWAY 3-21
3402Airport
2016 AIP - AIRPORT IMPROVEMENT PROGRAM 2.850
2.850Total:Aeronautics
CONCORD
CONCORD MUNICIPAL
AIRPORT
Address Safety Concerns.CONSTRUCT ONLY - TAXIWAY 'A' (SOUTH SECTION)
6530 Airport
2014 AIP - AIRPORT IMPROVEMENT PROGRAM 1.390
1.390Total:Aeronautics
CONCORD
CONCORD MUNICIPAL
AIRPORT
Address Safety Concerns.DESIGN ONLY - TAXIWAY 'A' (SOUTH SECTION)
6529 Airport
2013 AIP - AIRPORT IMPROVEMENT PROGRAM .200
.200Total:Aeronautics
Projects Page - 11 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
CONCORD
CONCORD MUNICIPAL
AIRPORT
Address Safety ConcernsDRAINAGE/EROSION REPAIRS - R/W 17 & 30 INTERSECTION
6664 Airport
2018 AIP - AIRPORT IMPROVEMENT PROGRAM 1.750
1.750Total:Aeronautics
CONCORD
CONCORD MUNICIPAL
AIRPORT
Needed to plan for future
projects.
ENVIRONMENTAL ASSESSMENT
6528 Airport
2011 AIP - AIRPORT IMPROVEMENT PROGRAM .300
.300Total:Aeronautics
CONCORD
CONCORD MUNICIPAL
AIRPORT
Address Safety Concerns.EXPAND ITINTERANT APRON
6531 Airport
2016 AIP - AIRPORT IMPROVEMENT PROGRAM 1.600
1.600Total:Aeronautics
CONCORD
CONCORD MUNICIPAL
AIRPORT
Address Safety Concerns.PROPERTY ACQUISITION RUNWAY 17 RPZ - PHASE VI
6527 Airport
2012 AIP - AIRPORT IMPROVEMENT PROGRAM .700
.700Total:Aeronautics
CONCORD
CONCORD MUNICIPAL
AIRPORT
Replace Aging EquipmentPURCHASE SNOW REMOVAL EQUIPMENT
6665 Airport
2020 AIP - AIRPORT IMPROVEMENT PROGRAM .295
.295Total:Aeronautics
CONCORD
12004
SEWALLS FALLS ROAD Earmark Funding (partial). City
pays 20% match, Municipal Red
List Bridge.
REPLACE BRIDGE OVER MERRIMACK RIVER - 070/117 [Section 1702 - Designated Project;
Demo Id NH045] {Red List}
293FHWA
2012 HPER - HIGH PRIORITY .089C 2012
2012 HY10 - HIGH PRIORITY PROJ SEC 1702 .171C 2012
2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 7.656C 2012
2012 LY10 - HIGH PRIORITY PROJ SEC 1702 .542C 2012
2012 LZ10 - EQUITY BONUS - EXEMPT LIM .299C 2012
2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .028R
8.784Total:Highway and Bridge 8.565
CONCORD
14817
STORRS STREET Specific project from Statewide
program.
PARK AND RIDE [06-02CM] (CMAQ Project)
6220 FHWA
2019 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT .900C CMAQ 2006
.900Total:Highway and Bridge 2.350
Projects Page - 12 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
CONCORD
15877
HOOKSETT TURNPIKE
(Local Rd)
Specific project from Statewide
program, Municipal Managed.
BRIDGE REPLACEMENT OVER BELA BROOK - 200/015 [SAB*4216] {State Aid Bridge Program}
7469 State Aid Bridge
2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .480C New Project
2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .125P
2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .015R
.620Total:Highway and Bridge
CONCORD
15878
BIRCHDALE ROAD Specific project from Statewide
program, Municipal Managed.
BRIDGE REPLACEMENT OVER BELA BROOK - 193/027 [SAB*4216] {State Aid Bridge Program}
7470 State Aid Bridge
2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .480C New Project
2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .125P
2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .015R
.620Total:Highway and Bridge
CONCORD - PEMBROKE
14841 A
NORTH PEMBROKE
ROAD
Specific project from Statewide
program, Municipal Managed.
BRIDGE REHABILITATION OVER SOUCOOK RIVER - 183/156
6743 State Aid Bridge
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .540C New Project
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .100P
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .010R
.650Total:Highway and Bridge
CONWAY
11339 B
US 302 / NH 16 Original overall project for PE
and ROW.
DESIGN & ROW ACQUISITIONS OF THE US 302 / NH 16 CONWAY BYPASS PHASES TO PROVIDE
CONGESTION RELIEF [PE & ROW Only; CONSTRUCTION BROKEN INTO OTHER 11339
PROJECTS] [Section 1602 - Designated Project; Demo Id NH004]176 FHWA
2011 L200 - STP - AREAS LESS THAN 200,000 .055P
2014 L050 - NATIONAL HIGHWAY SYSTEM .055P
2011 L050 - NATIONAL HIGHWAY SYSTEM .055R
.165Total:Highway and Bridge
CONWAY
11339 O
NH 16 Conway Bypass.CONWAY BYPASS - LANDSCAPE SOUTHERN SEGMENT (Parent = Conway 11339B)
1215 FHWA
2016 L050 - NATIONAL HIGHWAY SYSTEM .350C 2016
.350Total:Highway and Bridge 0.350
CONWAY
14958
NH 16 Deck plate girder bridge,
priority #77.
BRIDGE REHABILITATION OVER SACO RIVER - 170/071
5552 FHWA
2015 L050 - NATIONAL HIGHWAY SYSTEM 2.850C 2015
2011 L050 - NATIONAL HIGHWAY SYSTEM .060P
2011 L050 - NATIONAL HIGHWAY SYSTEM .010R
2.920Total:Highway and Bridge 2.850
Projects Page - 13 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
CONWAY
15300
TASKER HILL ROAD Red List Bridge. Specific project
from Statewide program,
Municipal Managed.
BRIDGE REPLACEMENT OVER PEQUAWKET POND - 182/066 {Red List}
6755State Aid Bridge
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .336C New Project
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .062P
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.403Total:Highway and Bridge
CONWAY
15864
US 302 Red List Bridge. Specific project
from Statewide program.
REPLACE BRIDGE OVER CONWAY LAKE OUTLET - 158/137 {Betterment} (Red List)
7458 Betterment
2013 BET - BETTERMENT (State FY) 2.800C New Project
2011 BET - BETTERMENT (State FY) .025P
2012 BET - BETTERMENT (State FY) .025P
2011 BET - BETTERMENT (State FY) .010R
2012 BET - BETTERMENT (State FY) .055R
2.915Total:Highway and Bridge
CONWAY
15888
NH 153 Specific project from Statewide
program.
ROADWAY AND DRAINAGE IMPROVEMENTS FROM TASKER HILL RD SOUTH 1.2 MILES IN
CONWAY [BET-RSR*6730] {Betterment}
7479 Betterment
2011 BET - BETTERMENT (State FY) .500C New Project
.500Total:Highway and Bridge
DANBURY
US 4 Bridge Prioity #63REHABILITATE BRIDGE OVER NHRR - 156/105
7347 FHWA
2019 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.500C New Project
2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .150P
2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .050R
1.700Total:Highway and Bridge
DERRY / LONDONDERRY
13065
I-93 Engineering for Final Design and
coordination with I-93
reconstruction. Partial funding
with communities.
CONSTRUCTION OF EXIT 4A - NEW INTERCHANGE BETWEEN EXISTING EXIT 4 AND EXIT 5 TO: (1)
RELIEVE TRAFFIC; (2) ALLOW ACCESS TO POTENTIAL DEVELOPMENT OF INDUSTRIAL LAND (PE
Only)1816
FHWA
2014 L010 - INTERSTATE MAINTENANCE 1.000P Previously Programmed Beyond TYP (Deferred)
1.000Total:Highway and Bridge
DOVER
15402
WHITTIER STREET Red List Bridge. Specific project
from Statewide program,
Municipal Managed.
BRIDGE REHABILITATION - 111/132 {Red List}
6902State Aid Bridge
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town 1.643C New Project
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .207P
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .050R
1.900Total:Highway and Bridge
Projects Page - 14 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
DOVER
15800
SPAULDING TURNPIKE Specific project from Statewide
program.
DOVER TOLL PLAZA SAFETY IMPROVEMENT (TRR*4042) {TRR Program}
7344 npike Renewal & Replacem
2012 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) .700C
.700Total:Highway and Bridge
DOVER - MILTON
15758
EASTERN TPK -
SPAULDING TPK
Specific project from Statewide
program.
TURNPIKE RESURFACING, FY 2011 [TRR*4042] {TRR Program}
7295 npike Renewal & Replacem
2011 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) 2.100C New Project
2.100Total:Highway and Bridge
DUBLIN
15684
CHARCOAL ROAD Red List Bridge. Specific project
from Statewide program,
Municipal Managed.
BRIDGE REPLACEMENT OVER CHARCOAL BROOK - 085/103 {Red List}
7208State Aid Bridge
2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .285C New Project
2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .075P
2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.365Total:Highway and Bridge
DUMMER
15815
OLD NH 110 Specific project from Statewide
program, Municipal managed.
Portion of ARRA-Related
Federally Funded Project.
BRIDGE REPLACEMENT - 042/043 [SAB*4216] {State Aid Bridge Program}
7397
State Aid Bridge
2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .940C
2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .130P
2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
1.075Total:Highway and Bridge
DUMMER - CAMBRIDGE -
ERROL
NH 16 DOT Priority List, NCC priority.
Scope of work and specific
limits to be determined.
WIDEN & REHABILITATE FROM ERROL SOUTHERLY 10 MILES
2766 FHWA
2019 L250 - STP - RURAL AREAS < 5,000k 4.700C New Project
2016 L250 - STP - RURAL AREAS < 5,000k .250P
2016 L250 - STP - RURAL AREAS < 5,000k .050R
5.000Total:Highway and Bridge
DURHAM
US 4 Bridge Priority #40.BRIDGE REPLACEMENT & APPROACHES OVER BUNKER CREEK - 145/116
4059 FHWA
2018 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 4.000C 2017
4.000Total:Highway and Bridge 4.000
Projects Page - 15 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
DURHAM
US 4 / NH 108 From Route 4 Safety Study.INTERCHANGE IMPROVEMENTS AND RECONFIGURATION INCLUDING THE INSTALLATION OF
TRAFFIC SIGNALS, DEDICATED TURNING LANES, SIGNAGE, ETC. - PHASE 2
3286 FHWA
2014 L050 - NATIONAL HIGHWAY SYSTEM .500C 2014
2011 L050 - NATIONAL HIGHWAY SYSTEM .020P
2013 L050 - NATIONAL HIGHWAY SYSTEM .030P
.550Total:Highway and Bridge 0.550
DURHAM - NEWMARKET
13080
NH 108 CONSTRUCT 4' BIKE SHOULDERS FROM OYSTER RIVER BRIDGE TO DAME ROAD AND SANBORN
AVE IN NEWMARKET (3.4MI) STP & [98-17TE] (TE Program)
2296 FHWA
2012 L200 - STP - AREAS LESS THAN 200,000 3.800C 2011
2012 L220 - STP - TRANSPORTATION ENHANCEMENT .215C CMAQ 1998
2012 LZ10 - EQUITY BONUS - EXEMPT LIM .165C
2011 L220 - STP - TRANSPORTATION ENHANCEMENT .030P
4.210Total:Bike / Pedestrian 4.250
ENFIELD
13592
SHAKER BOULEVARD Specific project from Statewide
program, Municipal Managed.
INSTALL TEMPORARY BRIDGE AND REPLACE BRIDGE OVER THE KNOX RIVER - 120/115
3164 State Aid Bridge
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .235C 2008
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .050P
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .015R
.300Total:Highway and Bridge 0.050
ENFIELD - LEBANON
13962
I-89 Bridge priority #43 {Red List} and
#44.
REHAB FROM EXIT 15 TO EXIT 17, INCLUDES BRIDGES 156/117 {Red List} & 155/117(4.0 MILES)
[BRPPI*6601] {4R & Statewide Federal Bridge Program}
2761 FHWA
2012 L010 - INTERSTATE MAINTENANCE 4.000C
2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 2.000C
2013 L010 - INTERSTATE MAINTENANCE 4.800C 2011
2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 2.000C
12.800Total:Highway and Bridge 8.000
EPPING
13712
NH 125 DOT priority list, RPC Inter-
Regional priority #5
RECONSTRUCTION FROM NH 27 NORTH TO NH 87
1894 FHWA
2020 L050 - NATIONAL HIGHWAY SYSTEM 4.150C Previously Programmed Beyond TYP (Deferred)
2017 L050 - NATIONAL HIGHWAY SYSTEM .063P
2017 L050 - NATIONAL HIGHWAY SYSTEM .088P
2017 L050 - NATIONAL HIGHWAY SYSTEM .200R
4.500Total:Highway and Bridge
Projects Page - 16 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
EPSOM
15766
ECHO VALLEY FARM
ROAD
Specific project from Statewide
program, Municipal Managed.
BRIDGE REPLACEMENT OVER GRIFFIN BROOK - 156/103 [SAB*4216] {State Aid Bridge Program}
7302 State Aid Bridge
2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .395C New Project
2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .040P
.435Total:Highway and Bridge
EXETER
14090 A
PARK STREET Red List bridge, Municipal
Managed, Awaiting Municipal
Action; funding 80% Federal,
10% Town, 10% State.
BRIDGE REPLACEMENT OVER B&M RAILROAD - 088/076 (Red List) [Parent = MOBRR-221]
5580
FHWA
2015 L110 - BRIDGE PROGRAM - OFF SYSTEM 2.500C 2015
2014 L110 - BRIDGE PROGRAM - OFF SYSTEM .150P
2014 L110 - BRIDGE PROGRAM - OFF SYSTEM .100P
2014 L110 - BRIDGE PROGRAM - OFF SYSTEM .050P
2014 L110 - BRIDGE PROGRAM - OFF SYSTEM .135R
2014 L110 - BRIDGE PROGRAM - OFF SYSTEM .015R
2.950Total:Highway and Bridge 2.950
EXETER
15399
STRING BRIDGE ROAD Specific project from Statewide
program, Municipal Managed.
BRIDGE REHABILITATION OVER SQUAMSCOTT RIVER - 102/074 & 103/074
6899 State Aid Bridge
2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .835C New Project
2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .204P
2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .001R
1.040Total:Highway and Bridge
FARMINGTON
NH 153 Red List Bridge Priority #36REPLACE BRIDGE OVER COCHECO RIVER - 096/140 {Red List}
6778 FHWA
2015 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.800C 2015
1.800Total:Highway and Bridge 1.800
FARMINGTON
15677
BAY ROAD Specific project from Statewide
program, Municipal Managed.
BRIDGE REPLACEMENT OVER COCHECO RIVER - 060/144
7188 State Aid Bridge
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .428C New Project
.428Total:Highway and Bridge
FITZWILLIAM
14560
NH 119 Specific Project from Statewide
Program
REALIGNMENT OF NH 119 & HOLMAN ROAD INTERSECTION, REPLACEMENT OF DRAINAGE,
ADDING A SHOULDER & INSTALLING GUARD RAIL [BET-ISU*3833] {Betterment}
6115 Betterment
2011 BET - BETTERMENT (State FY) .075C 2007
2011 BET - BETTERMENT (State FY) .005P
.080Total:Highway and Bridge
Projects Page - 17 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
FRANCESTOWN
15762
JUNIPER HILL ROAD Specific project from Statewide
program, Municipal Managed.
BRIDGE REPLACEMENT OVER BRENNAN BROOK - 093/087 [SAB*4216] {State Aid Bridge
Program}
7298 State Aid Bridge
2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .495C New Project
2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .095P
2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .010R
.600Total:Highway and Bridge
FRANCESTOWN
15763
RUSSELL STATION ROAD Specific project from Statewide
program, Municipal Managed.
BRIDGE REPLACEMENT OVER RUSSELL - 125/058 [SAB*4216] {State Aid Bridge Program}
7299 State Aid Bridge
2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .680C New Project
2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .140P
2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.825Total:Highway and Bridge
FRANCESTOWN
15764
WOODWARD HILL ROAD Specific project from Statewide
program, Municipal Managed.
BRIDGE REPLACEMENT OVER BRENNAN BROOK - 121/077 [SAB*4216] {State Aid Bridge
Program}
7300 State Aid Bridge
2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .475C New Project
2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .095P
2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.575Total:Highway and Bridge
FRANCESTOWN
15765
SOUTH NEW BOSTON
ROAD
Specific project from Statewide
program, Municipal Managed.
BRIDGE REPLACEMENT OVER PISCATAQUOG RIVER - 149/058 [SAB*4216] {State Aid Bridge
Program}
7301 State Aid Bridge
2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .855C New Project
2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .140P
2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
1.000Total:Highway and Bridge
FRANCONIA - LITTLETON
I-93 PAVEMENT REHABILITATION FROM THE FRANCONIA NOTCH TO NORTH OF EXIT 41 (9 Miles) [4R]
3255 FHWA
2019 L010 - INTERSTATE MAINTENANCE 10.000C 2017
2020 L010 - INTERSTATE MAINTENANCE 10.000C 2018
2014 L010 - INTERSTATE MAINTENANCE .222P
2016 L010 - INTERSTATE MAINTENANCE .278P
20.500Total:Highway and Bridge 20.500
FRANKLIN
13928 #
US 3 Earmarked funding.UPGRADE AT INTERSECTION OF INDUSTRIAL PARK DRIVE IN FRANKLIN [Section 1702 -
Designated Project; Demo Id NH057 (13928B) & NH037 (13928A)] [PARENT]
2732 FHWA
2011 HPER - HIGH PRIORITY .996C 2011
2011 HY20 - HIGH PRIORITY PROJ SEC 1702 .310C 2011
2011 LY20 - HIGH PRIORITY PROJ SEC 1702 1.504C 2011
2.810Total:Highway and Bridge 3.360
Projects Page - 18 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
GILFORD
LACONIA AIRPORT Protects Federal investment of
snow removal equipment
CONSTRUCT SNOW REMOVAL EQUIPMENT BUILDING
3998 Airport
2016 AIP - AIRPORT IMPROVEMENT PROGRAM .350C
.350Total:Aeronautics 0.350
GILFORD
LACONIA AIRPORT Priority as identified by airport
sponsor.
DESIGN ONLY TAXIWAY TO SERVE NW QUADRANT
3672 Airport
2012 AIP - AIRPORT IMPROVEMENT PROGRAM .520
.520Total:Aeronautics
GILFORD
LACONIA AIRPORT Equipment required for safe
winter operations.
PURCHASE SNOW REMOVAL EQUIPMENT
4001 Airport
2017 AIP - AIRPORT IMPROVEMENT PROGRAM .350
.350Total:Aeronautics
GILFORD
LACONIA AIRPORT Safety and Security issue.SECURITY/SAFETY FENCING- PHASE III
3414 Airport
2017 AIP - AIRPORT IMPROVEMENT PROGRAM .666
.666Total:Aeronautics
GILFORD
LACONIA MUNICIPAL
AIRPORT
Address Safety Concerns.CONSTRUCT ONLY TAXIWAY TO SERVE NW QUADRANT
6533 Airport
2013 AIP - AIRPORT IMPROVEMENT PROGRAM 1.705
1.705Total:Aeronautics
GILFORD
LACONIA MUNICIPAL
AIRPORT
Address Safety Concerns.CONSTRUCT EMERGENCY ACCESS ROAD
6534 Airport
2014 AIP - AIRPORT IMPROVEMENT PROGRAM .720
.720Total:Aeronautics
GILFORD
LACONIA MUNICIPAL
AIRPORT
Address Safety Concerns.DESIGN AND INSTALL PERIMETER FENCING - PHASE IV
6537 Airport
2019 AIP - AIRPORT IMPROVEMENT PROGRAM .650
.650Total:Aeronautics
GILFORD
LACONIA MUNICIPAL
AIRPORT
Required for safe winter
operations.
PURCHASE SNOW-REMOVAL EQUIPMENT
6535 Airport
2018 AIP - AIRPORT IMPROVEMENT PROGRAM .315
.315Total:Aeronautics
Projects Page - 19 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
GILFORD
LACONIA MUNICIPAL
AIRPORT
Required for safe aircraft
operations.
REHABILITATE OBSTRUCTION LIGHTS
6536 Airport
2018 AIP - AIRPORT IMPROVEMENT PROGRAM .030
.030Total:Aeronautics
GILFORD
15890
BELKNAP MOUNTAIN
ROAD
Specific project from Statewide
program, Municipal Managed.
BRIDGE REPAIR / REPLACEMENT - 184/098 [SAB*4216] {State Aid Bridge Program}
7481 State Aid Bridge
2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .165C New Project
2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .030P
2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.200Total:Highway and Bridge
GRAFTON
13373 A
MILL BROOK ROAD Specific project from Statewide
program, Municipal managed.
BRIDGE REPLACEMENT AT TOWN BRIDGE SITE #162/139 (PHASE 2)
6511 State Aid Bridge
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .250C 2011
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .045P
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.300Total:Highway and Bridge 0.360
GRAFTON
14627
DAVIS ROAD Specific project from Statewide
program, Municipal managed.
REPLACE BRIDGE OVER SMITH RIVER - 123/104
6263 State Aid Bridge
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .744C 2012
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .120P
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .010R
.874Total:Highway and Bridge 0.874
HAMPTON - NORTH
HAMPTON
15678 D
I-95 (BLUE STAR TPK) Specific project from HB 391,
Turnpike Capital Program.
IMPROVEMENT TO EXISTING HAMPTON TOLL PLAZA & FACILITY AS RESULT OF THE OPEN ROAD
TOLLING PROJECTS (PE & ROW ARE IN 15678) {Turnpike}
7279 Turnpike Expansion
2011 TPK - TURNPIKE EXPANSION (State FY) 2.000C New Project
2.000Total:Highway and Bridge
HAMPTON FALLS -
HAMPTON
13408 B
I-95 Bridge Priority #48. Previously
studied under Statewide
Culvert Repair. Turnpike Priority
Capital Program
REPLACEMENT OF THE TAYLOR RIVER BRIDGE ON THE BLUE STAR HIGHWAY AND
REPLACEMENT OR REMOVAL OF THE TAYLOR RIVER DAM IN HAMPTON AT MILE 3.6501 (Red
List) {Turnpike}
6048Turnpike Expansion
2012 TPK - TURNPIKE EXPANSION (State FY) 9.930C 2009
9.930Total:Highway and Bridge 10.155
Projects Page - 20 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
HAVERHILL - BATH
10436
US 302 Scope reduction to address
pavement and problem
intersections only. Further
addressed by private
development
RECONSTRUCTION FROM JUNCTION @ NH 10 NORTHERLY APPROXIMATELY 1.8 MILES
99
FHWA
2013 L200 - STP - AREAS LESS THAN 200,000 2.500C 2010
2011 L250 - STP - RURAL AREAS < 5,000k .141P
2012 L250 - STP - RURAL AREAS < 5,000k .020P
2011 L250 - STP - RURAL AREAS < 5,000k .061R
2011 L250 - STP - RURAL AREAS < 5,000k .020R
2012 L250 - STP - RURAL AREAS < 5,000k .060R
2012 L250 - STP - RURAL AREAS < 5,000k .010R
2.811Total:Highway and Bridge 2.781
HENNIKER
15718
WESTERN AVENUE Red List Bridge. Specific project
from Statewide program,
Municipal Managed.
REPAIR / REPLACEMENT OF BRIDGE OVER CONTOOCOOK RIVER - 095/100 {Red List}
7256State Aid Bridge
2015 SAB - STATE AID BRIDGE (State FY), 20% = Town 3.060C New Project
2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .250P
3.310Total:Highway and Bridge
HINSDALE
14920
MONUMENT ROAD Specific project from Statewide
program, Municipal managed.
BRIDGE REPLACEMENT OVER ASH BROOK - 085/064
6475 State Aid Bridge
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .334C 2013
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .050P
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .010R
.394Total:Highway and Bridge 0.394
HINSDALE, NH -
BRATTLEBORO, VT
12210 #
NH 119 Earmark funding (partial).
Bridge priority #71 and #72.
REPLACE 2 BRIDGES OVER CONNECTICUT RIVER - 041/040 & 042/044, BY CONSTRUCTING A
NEW BRIDGE 043/044 JUST DOWNSTREAM [Section 1602 - Designated Project; Demo Id
NH018 (12210) & NH021 (12210B) [PARENT]
4171 FHWA
2014 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 13.648C 2014
2014 Q920 - HIGH PRIORITY PROJ SEC 1602 1.352C 2014
2014 Q920 - HIGH PRIORITY PROJ SEC 1602 .328C 2014
2015 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 16.040C 2015
2011 Q920 - HIGH PRIORITY PROJ SEC 1602 .315P
2012 Q920 - HIGH PRIORITY PROJ SEC 1602 .200P
2012 Q920 - HIGH PRIORITY PROJ SEC 1602 .270R
32.152Total:Highway and Bridge 31.420
Projects Page - 21 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
HOOKSETT
12537 A
US 3 / NH 28 Earmark funding.WIDEN NORTH OF BENTON ROAD SOUTH 0.411 MILES TO THE INTERSECTION WITH MARTIN'S
FERRY ROAD [Section 117 - Designated Project; Demo Id NH031]
4107 FHWA
2011 H660 - GRANTS SUP PLAN HEWY STP, SECTION 117 2.526C 2009
2011 HPER - HIGH PRIORITY .064C 2009
2011 L200 - STP - AREAS LESS THAN 200,000 2.010C
4.600Total:Highway and Bridge 2.800
HOOKSETT
14950
HACKET HILL ROAD Specific project from Statewide
program, Municipal Manged.
RECONSTRUCTION AT NH 3A AND TURNPIKE RAMP
6505 State Aid Highway
2011 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town 1.000C 2011
2012 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town 1.000C 2012
2.000Total:Highway and Bridge 3.000
HOOKSETT
15463
I-93 Specific project from Statewide
program.
REPLACE CONCRETE SLAB, CANOPY RE-ROOFING AT HOOKSETT SIDE TOLL PLAZA [TRR
Program]
6980 npike Renewal & Replacem
2011 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) .900C New Project
.900Total:Highway and Bridge
HOOKSETT
15803
I-93 Specific project from HB 391,
Turnpike Capital Program.
WIDENING AND RETROFIT EXISTING HOOKSETT TOLL FACILITY TO IMPLEMENT HIGHWAY SPEED
(OPEN ROAD) TOLLING {Turnpike}
7384 Turnpike Expansion
2011 TPK - TURNPIKE EXPANSION (State FY) 5.000C New Project
2012 TPK - TURNPIKE EXPANSION (State FY) 15.000C
2011 TPK - TURNPIKE EXPANSION (State FY) .050P
20.050Total:Highway and Bridge
HOPKINTON
US 202 / NH 9 Red List Bridge Prioity #64REPLACE BRIDGE OVER HATFIELD ROAD - 056/093 (Red List)
7348 FHWA
2019 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 3.000C New Project
2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .250P
2017 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .050R
3.300Total:Highway and Bridge
HUDSON
13353
MELENDY ROAD Specific project from Statewide
program, Municipal Managed.
BRIDGE REHABILITATION OVER HADLEY BROOK - 114/083
2837 State Aid Bridge
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .100C 2011
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .015P
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.120Total:Highway and Bridge 0.120
Projects Page - 22 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
JAFFREY
US 202 New Project, SWRPC priority #2INTERSECTION IMPROVEMENTS (Roundabout) @ MAIN ST (NH 124) & RECONFIGURE US 202
'DOG-LEG'
7442 FHWA
2020 L250 - STP - RURAL AREAS < 5,000k 6.200C New Project
2014 L250 - STP - RURAL AREAS < 5,000k .250P
2015 L250 - STP - RURAL AREAS < 5,000k .250P
2018 L250 - STP - RURAL AREAS < 5,000k .250R
6.950Total:Highway and Bridge
JEFFERSON - RANDOLPH
13602 B
US 2 Scope intended to address
pavement and specific
problem areas.
RECONSTRUCTION, SAFETY IMPROVEMENTS & SHOULDER WIDENING FROM NH 115
INTERSECTION EAST APPROX. 2.3 MILES TO JEFFERSON / RANDOLPH T/L (Construction only)
{National Corridor Preservation & Border Crossing}6036FHWA
2016 L050 - NATIONAL HIGHWAY SYSTEM 3.150C 2016
3.150Total:Highway and Bridge 3.500
KEENE
10309 B
WINCHESTER STREET Formerly considered with
overall Keene-Swanzey project.
In lieu of Keene 12230 West
Street project. Municipal
Managed and 20% match.
RECONSTRUCTION FROM NH 101 ROUNDABOUT NORTH TO PEARL STREET / ISLAND STREET
INCLUDING INTERSECTION AT KEY ROAD
1828
FHWA
2014 L200 - STP - AREAS LESS THAN 200,000 1.800C 2014
2015 L200 - STP - AREAS LESS THAN 200,000 2.200C 2015
2013 L200 - STP - AREAS LESS THAN 200,000 .238P
2014 L200 - STP - AREAS LESS THAN 200,000 .335R
4.573Total:Highway and Bridge 4.238
KEENE
14383
HARRISON STREET Red List Bridge. Specific project
from Statewide program,
Municipal managed.
BRIDGE REPLACEMENT OVER BEAVER BROOK - 141/074 {Red List}
5852State Aid Bridge
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .245C 2010
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .065P
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .010R
.320Total:Highway and Bridge 0.320
KEENE
15345
CHURCH STREET Specific project from Statewide
program, Municipal Managed.
BRIDGE REPLACEMENT OVER BEAVER BROOK - 140/075
6818 State Aid Bridge
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .365C New Project
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .075P
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .010R
.450Total:Highway and Bridge
Projects Page - 23 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
KEENE
15852
EAST SURRY ROAD Specific project from Statewide
program, Municipal Managed.
BRIDGE REPLACEMENT OVER STURTEVANT BROOK - 111/138 [SAB*4216] {State Aid Bridge
Program}
7427 State Aid Bridge
2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .240C New Project
2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .055P
2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.300Total:Highway and Bridge
KEENE
15854
ROXBURY STREET Specific project from Statewide
program, Municipal Managed.
BRIDGE REPLACEMENT OVER BEAVER BROOK - 140/077 [SAB*4216] {State Aid Bridge Program}
7429 State Aid Bridge
2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .510C New Project
2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .105P
2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .010R
.625Total:Highway and Bridge
KEENE - SWANZEY
NH 12 / 101 DOT priority list, SWRPC priority
#6
INTERIM INTERSECTION IMPROVEMENTS @ NH 12 (MAIN STREET) (Parent = Keene-Swanzey
10309)
7443 FHWA
2020 L200 - STP - AREAS LESS THAN 200,000 2.500C Previously Programmed Beyond TYP (Deferred)
2016 L200 - STP - AREAS LESS THAN 200,000 .200P
2016 L200 - STP - AREAS LESS THAN 200,000 .050R
2.750Total:Highway and Bridge
KEENE - SWANZEY
10309 J
NH 9 / NH 10 / NH 12 /
NH 101
Incremental/interim
improvement.
INTERIM INTERSECTION IMPROVEMENTS AT 'T' INTERSECTION (Parent = Keene-Swanzey 10309)
5705 FHWA
2017 L050 - NATIONAL HIGHWAY SYSTEM 2.200C 2017
2.200Total:Highway and Bridge 3.000
KEENE - SWANZEY
10309 L
NH 12 / 101 Incremental/interim
improvement.
CONSTRUCTION OF INTERIM WIDENING WITH REPLACEMENT OF THE ASHUELOT RIVER BRIDGE
(Parent = Keene-Swanzey 10309)
5707 FHWA
2015 L050 - NATIONAL HIGHWAY SYSTEM 2.947C 2015
2015 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 2.310C 2015
5.256Total:Highway and Bridge 4.100
KEENE - SWANZEY
10309 P
NH 9/10/12/101 Incremental/interim
improvement.
CONSTRUCTION OF MULTI-USE TRAIL BRIDGE OVER NH 12/101, AND MITIGATION SITE (Parent
= Keene-Swanzey 10309)
6189 FHWA
2013 L050 - NATIONAL HIGHWAY SYSTEM 3.135C 2010
3.135Total:Highway and Bridge 1.750
Projects Page - 24 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
KINGSTON
14973
NEW BOSTON RD Red List Bridge. Specific project
from Statewide program.
Municipal Managed.
Advanced Constructed in SFY
2008.
BRIDGE REPLACEMENT OVER POWWOW RIVER - 116/113 {Red List}
6688
State Aid Bridge
2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .328C 2014
2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.333Total:Highway and Bridge 0.625
LACONIA
14826
Specific project from Statewide
program. Municipal managed.
PHASE 2, WINNIPESAUKEE OPECHEE WINNISQUAM (WOW) TRAIL: CONSTRUCT 1.0 MILES OF
SHARED USE PATH IN THE RAILROAD CORRIDOR FROM MAIN STREET IN DOWNTOWN LACONIA
TO THE BELMONT TOWN LINE (TE Program) [06-22TE]6237 FHWA
2011 L220 - STP - TRANSPORTATION ENHANCEMENT .090C TE 2006
2011 NON - OTHER NON PARTICIPATING .300C
.390Total:Bike / Pedestrian 0.391
LACONIA
15303
MAIN STREET Specific project from Statewide
program, Municipal Managed.
BRIDGE REHABILITATION OVER WINNIPESAUKEE RIVER - 121/047
6757 State Aid Bridge
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town 1.050C New Project
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .090P
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .010R
1.150Total:Highway and Bridge
LANCASTER, NH -
GUILDHALL, VT
US 2 Bridge Priority #93.BRIDGE REHABILITAION AND PAINTING OVER CONNECTICUT RIVER - 111/129 (ROGER'S
RANGER'S BRIDGE #26)
3524 FHWA
2017 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.910C 2017
1.910Total:Highway and Bridge 1.910
LEBANON
I-89 Bridge priority #45, #46, #75
{Red List}, & #76.
1" OVERLAY FROM EXIT 17 TO JUST SOUTH OF EXIT 20 (5.5 MILES) INCLUDES SLIP LINING TWIN
66" PIPES NORTH OF EXIT 17 AND BRIDGE JOINT REHAB [4R]; BRIDGES 158/114, 159/114,
093/109 {Red List}, & 094/1081900 FHWA
2013 L010 - INTERSTATE MAINTENANCE 7.100C 2012
2014 L010 - INTERSTATE MAINTENANCE 7.100C 2012
2011 L010 - INTERSTATE MAINTENANCE .050P
14.250Total:Highway and Bridge 14.000
LEBANON
LEBANON AIRPORT Needed to Plan for Future
Projects
AIRPORT SAFETY ENHANCEMENT DESIGN & PERMITTING
7365 Airport
2011 AIP - AIRPORT IMPROVEMENT PROGRAM 2.000
2.000Total:Aeronautics
Projects Page - 25 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
LEBANON
LEBANON AIRPORT Priority as identified by project
sponsor.
DESIGN & CONSTRUCT TAXIWAY 'C'
2914 Airport
2017 AIP - AIRPORT IMPROVEMENT PROGRAM .625
.625Total:Aeronautics
LEBANON
LEBANON AIRPORT Priority as established by project
sponsor.
DESIGN & CONSTRUCT MID FIELD APRON
2915 Airport
2017 AIP - AIRPORT IMPROVEMENT PROGRAM .540
.540Total:Aeronautics
LEBANON
LEBANON AIRPORT Priority as established by airport
sponsor.
EXPAND 'SRE' BUILDING WITH 'ARFF'
2913 Airport
2015 AIP - AIRPORT IMPROVEMENT PROGRAM .950
.950Total:Aeronautics
LEBANON
LEBANON AIRPORT Equipment purchase;
95% Federal funds, 2.5% Sponsor
match
PURCHASE SNOW REMOVAL EQUIPMENT
3421Airport
2015 AIP - AIRPORT IMPROVEMENT PROGRAM .950
2017 AIP - AIRPORT IMPROVEMENT PROGRAM .500
1.450Total:Aeronautics
LEBANON
LEBANON AIRPORT Priority as established by airport
sponsor.
RECONSTRUCT EMERGENCY ACCESS ROAD
2668 Airport
2017 AIP - AIRPORT IMPROVEMENT PROGRAM .200
.200Total:Aeronautics
LEBANON
LEBANON AIRPORT Safety issue. Required by
Federal regulations.
REHABILITATE OBSTRUCTION POLES & LIGHTS, REMOVE OBSTRUCTIONS
2912 Airport
2011 AIP - AIRPORT IMPROVEMENT PROGRAM .600
.600Total:Aeronautics
LEBANON
LEBANON AIRPORT Priority as established by airport
sponsor.
RECONSTRUCT TAXIWAY 'B' EAST
2916 Airport
2016 AIP - AIRPORT IMPROVEMENT PROGRAM 1.650
1.650Total:Aeronautics
Projects Page - 26 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
LEBANON
LEBANON MUNICIPAL
AIRPORT
Mitigate for environmental
impacts.
AIRPORT SAFETY ENHANCEMENT, MITIGATION
6541 Airport
2011 AIP - AIRPORT IMPROVEMENT PROGRAM 1.700
2012 AIP - AIRPORT IMPROVEMENT PROGRAM 1.700
2013 AIP - AIRPORT IMPROVEMENT PROGRAM 1.700
5.100Total:Aeronautics
LEBANON
LEBANON MUNICIPAL
AIRPORT
Needed to Plan for Future
Projects
AIRPORT MASTER PLAN UPDATE
6668 Airport
2020 AIP - AIRPORT IMPROVEMENT PROGRAM .400
.400Total:Aeronautics
LEBANON
LEBANON MUNICIPAL
AIRPORT
Address Safety and
environmental concerns.
CONSTRUCT AIRPORT SAFETY ENHANCEMENTS
6542 Airport
2012 AIP - AIRPORT IMPROVEMENT PROGRAM 13.380
2013 AIP - AIRPORT IMPROVEMENT PROGRAM 6.689
2014 AIP - AIRPORT IMPROVEMENT PROGRAM 6.689
26.758Total:Aeronautics
LEBANON
LEBANON MUNICIPAL
AIRPORT
Address Safety Concerns.DESIGN AND CONSTRUCT APRON (17 AIRPARK ROAD)
6545 Airport
2019 AIP - AIRPORT IMPROVEMENT PROGRAM .250
.250Total:Aeronautics
LEBANON
LEBANON MUNICIPAL
AIRPORT
Address Capacity Concerns.DESIGN & CONSTRUCT TERMINAL BUILDING IMPROVEMENTS
6546 Airport
2019 AIP - AIRPORT IMPROVEMENT PROGRAM 1.000
1.000Total:Aeronautics
LEBANON
LEBANON MUNICIPAL
AIRPORT
Needed to meet Federal
requirements.
PURCHASE AIRCRAFT RESCUE AND FIRE FIGHTING VEHICLE (INDEX B)
6543 Airport
2014 AIP - AIRPORT IMPROVEMENT PROGRAM .662
.662Total:Aeronautics
LEBANON
LEBANON MUNICIPAL
AIRPORT
Address Safety Concerns.REHABILITATE RUNWAY 7-25
6544 Airport
2018 AIP - AIRPORT IMPROVEMENT PROGRAM 1.200
1.200Total:Aeronautics
Projects Page - 27 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
LEBANON
10034 A
US 4 (MECHANIC STREET) MUNICIPAL MANAGED, 20%
City matched project.
Coordinated with Municipal
water/sewer project.
RECONSTRUCTION FROM HIGH STREET TO I-89 RAMPS INCLUDING REMOVAL OF CONCRETE
UNDERBASE, INSTALLATION OF SIDEWALKS, AND UPGRADE OF STORM DRAINAGE SYSTEM
1890
FHWA
2013 L200 - STP - AREAS LESS THAN 200,000 2.120C 2016
2012 L200 - STP - AREAS LESS THAN 200,000 .200P
2012 L200 - STP - AREAS LESS THAN 200,000 .500R
2.820Total:Highway and Bridge 3.020
LEBANON
13558 A
NH 12A Municipal Managed.BRIDGE REPLACEMENT OVER B&M RAILROAD - 062/117 [MOBRR-221] {Municipal Bridge
Program}
5583 FHWA
2011 L110 - BRIDGE PROGRAM - OFF SYSTEM 3.200C 2011
3.200Total:Highway and Bridge 3.300
LEBANON
13951
US 4 Red List bridge, priority #17.BRIDGE REPLACEMENT OVER MASCOMA RIVER - 188/126 NEAR INTERSECTION OF US 4 AND
NH 4A {Red List}
1875 FHWA
2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 5.000C 2011
2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 5.050C 2011
2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .050P
10.100Total:Highway and Bridge 8.575
LEBANON
14552
US 4 & NH 10 Specific project from Statewide
program, Municipal managed.
BRIDGE REHABILITATION OVER MASCOMA RIVER - 120/115
6101 State Aid Bridge
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .540C 2012
.540Total:Highway and Bridge 0.540
LEBANON, NH -
HARTFORD, VT
I-89 Bridge priorities #59 and #60.REHABILITATION OF BRIDGES OVER CONNECTICUT RIVER - 044/103 & 044/104
2771 FHWA
2017 L010 - INTERSTATE MAINTENANCE 5.000C 2017
2018 L010 - INTERSTATE MAINTENANCE 5.000C 2017
2011 L010 - INTERSTATE MAINTENANCE .111P
2012 L010 - INTERSTATE MAINTENANCE .556P
2014 L010 - INTERSTATE MAINTENANCE .050R
10.717Total:Highway and Bridge 11.272
Projects Page - 28 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
LEBANON, NH -
HARTFORD, VT
14957
US 4 Red List bridge, priority #5.REPLACE BRIDGE OVER CONNECTICUT RIVER - 058/127 {Red List}
2753 FHWA
2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 4.740C 2010
2011 VT - VERMONT'S CONTRIBUTION .760C
2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 3.650C
2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .350C
9.500Total:Highway and Bridge 4.250
LINCOLN
15754
I-93 Specific Project from 4R
Program.
COLD PLANE AND OVERLAY WITH FABRIC & 2" PAVEMENT FROM US 3 BRIDGE TO WHITEHOUSE
BRIDGE (4.2 MILES) (4R)
7291 FHWA
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 5.000C New Project
2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .050P
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .075P
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .005R
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .005R
5.235Total:Highway and Bridge
LITTLETON
15406
HIGHLAND AVENUE Red List Bridge. Specific project
from Statewide program,
Municipal Managed.
BRIDGE REPLACEMENT OVER BROOK - 227/048 {Red List}
6915State Aid Bridge
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .450C New Project
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .080P
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.535Total:Highway and Bridge
LITTLETON, NH -
WATERFORD, VT
I-93 Bridge priority #56 {Red List} and
#57.
PAVEMENT REHABILITATION (9 MILES) & BRIDGE REHABILITATION (18 BRIDGES) FROM NORTH
OF EXIT 41 TO VERMONT S/L - 105/135 {Red List}, 104/136 [4R]
2785 FHWA
2017 L010 - INTERSTATE MAINTENANCE 12.000C 2017
2018 L010 - INTERSTATE MAINTENANCE 12.000C 2018
2014 L010 - INTERSTATE MAINTENANCE .500P
24.500Total:Highway and Bridge 24.500
Projects Page - 29 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
LONDONDERRY - SALEM
TRANSIT Boston Urbanized Area FundingCAPITAL
2903 FTA
2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .219
2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .219
2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .219
2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .219
2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .219
2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .219
2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .219
2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .219
2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .219
2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .219
2.190Total:Transit
LONDONDERRY - SALEM
TRANSIT Boston Urbanized Area FundingCOMMUTER BUS PREVENTATIVE MAINTENANCE
6292 FTA
2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .281
2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .281
2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .281
2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .281
2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .281
2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .281
2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .281
2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .281
2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .281
2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .281
2.813Total:Transit
LYME, NH - THETFORD, VT
14460
EAST THETFORD ROAD Bridge priority #94.BRIDGE REHABILITATION OVER THE CONNECTICUT RIVER - 053/112
3269 FHWA
2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 3.350C 2016
2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P
2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P
2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P
2014 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .150P
2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .005R
2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .010R
2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .015R
2014 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .020R
3.850Total:Highway and Bridge 3.850
Projects Page - 30 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
MADISON - CONWAY
11339 J
NH 16 Southern segment of overall
Conway Bypass.
CONWAY BYPASS SOUTHERN SEGMENT, EARTHWORK PROJECT (Parent = Conway 11339B)
[ARRA]
1210 FHWA
2015 L050 - NATIONAL HIGHWAY SYSTEM 11.337C 2015
2016 L050 - NATIONAL HIGHWAY SYSTEM 11.337C 2016
22.673Total:Highway and Bridge 18.753
MADISON - CONWAY
11339 T
CONWAY BYPASS Southern segment of overall
Conway Bypass.
CONSTRUCT BRIDGES OVER PEQUAWKET BROOK, NH 113, PUDDING POND & WOODLAND
ROAD (Parent = Conway 11339B) [ARRA]
3659 FHWA
2016 L050 - NATIONAL HIGHWAY SYSTEM 7.000C 2016
2017 L050 - NATIONAL HIGHWAY SYSTEM 7.529C 2016
14.529Total:Highway and Bridge 10.000
MADISON - CONWAY
11339 U
CONWAY BYPASS- NH 16 Southern segment of overall
Conway Bypass.
SOUTHERN SEGMENT FINAL CONSTRUCTION, CONWAY BYPASS STA. 100+300-STA. 188+00
(Parent = Conway 11339B) [ARRA]
3660 FHWA
2018 L050 - NATIONAL HIGHWAY SYSTEM 13.994C 2018
2019 L050 - NATIONAL HIGHWAY SYSTEM 13.994C 2017
27.987Total:Highway and Bridge 25.503
MANCHESTER
FEE TPK Previous Id# 2745 for New/Full
interchange at Exit 7. Study to
include Exit 6 as well and
interrelated operations.
PLANNING AND ENGINEERING STUDY FOR RECONSTRUCTION OF EXITS 6 & 7
7473
Turnpike Expansion
2013 TPK - TURNPIKE EXPANSION (State FY) 2.000P Previously Programmed Beyond TYP (Deferred)
2.000Total:Highway and Bridge
MANCHESTER
TRANSIT AUTHORITY Annual Program FundingMISCELLANEOUS CAPITAL
6923 FTA
2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .094
2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .099
2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .104
2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .109
2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .114
2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .120
2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .126
2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .132
2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .132
2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .132
1.162Total:Transit
Projects Page - 31 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
MANCHESTER
TRANSIT AUTHORITY Annual Program FundingOPERATING ASSISTANCE FOR FIXED ROUTE SERVICE
602 FTA
2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 2.700
2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 2.812
2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 2.925
2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 3.042
2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 3.163
2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 3.290
2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 3.421
2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 3.558
2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 3.558
2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 3.558
32.028Total:Transit
MANCHESTER
TRANSIT AUTHORITY Annual Program FundingOPERATING ASSISTANCE FOR CAPITAL MAINTENANCE OF MTA FLEET
2496 FTA
2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .414
2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .434
2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .451
2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .469
2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .488
2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .508
2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .528
2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .549
2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .549
2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .549
4.940Total:Transit
MANCHESTER
TRANSIT AUTHORITY Annual Program FundingOPERATING ASSISTANCE FOR ADA PARATRANSIT SERVICE
5916 FTA
2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .265
2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .275
2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .286
2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .297
2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .309
2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .322
2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .335
2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .348
2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .201
2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .209
2.847Total:Transit
Projects Page - 32 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
MANCHESTER
TRANSIT AUTHORITY Annual Program FundingREPLACEMENT BUSES
3062 FTA
2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .408
2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.560
1.968Total:Transit
MANCHESTER
TRANSIT AUTHORITY Annual Program FundingREPLACEMENT OF ADA PARATRANSIT VANS
5917 FTA
2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .134
2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .070
2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .162
2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .170
2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .085
.621Total:Transit
MANCHESTER
TRANSIT AUTHORITY REPLACEMENT OF TRANSIT SERVICE VEHICLES
5919 FTA
2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .025
2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .136
.161Total:Transit
MANCHESTER
13512
Specific project from Statewide
program. Municipal lead.
Supports Capital Corridor.
Nashua-Manchester-Concord
CONSTRUCT 600 SPACE PARK'N RIDE STRUCTURE (CMAQ Program) [00-13CM]
2968
FHWA
2016 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 8.500C CMAQ 2000
2012 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT .009P
2013 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT .490P
2013 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT .010R
2014 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT .140R
2014 NON - OTHER NON PARTICIPATING .250R
9.399Total:Highway and Bridge 9.399
MANCHESTER
14025 B
GRANITE STREET Breakout project from Granite
Street bridge project (City) and
Statewide program.
RECONSTRUCT CROSSINGS, ROADWAY APPROACHES AND SIGNALS WITH ASSOCIATED WORK
OF SPRING ST (845-631L0, KIDDER ST (845-630E), COMMERCIAL ST (854-629K) AND B&M
RAILROAD [Parent = Manch 14025 & Statewide Railroad-RCS]5595FHWA
2011 H210 - STP - SAFETY .418C
2011 H210 - STP - SAFETY .418C
2011 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .050C 2009
2011 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .050C
.935Total:Rail 1.235
Projects Page - 33 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
MANCHESTER
14048
CENTRAL TPK Tpk Capital Program. Bridge
Priority #103 & #104.
REHABILITATE TURNPIKE BRIDGE OVER BLACK BROOK BETWEEN EXITS 6 & 7 - 099/066 &
099/067 {Turnpike}
3553 Turnpike Expansion
2011 TPK - TURNPIKE EXPANSION (State FY) .250C 2010
2012 TPK - TURNPIKE EXPANSION (State FY) 2.200C 2010
2013 TPK - TURNPIKE EXPANSION (State FY) 1.200C 2010
3.650Total:Highway and Bridge 3.500
MANCHESTER
14966
I-293 / FEE TPK Turnpike Capital Program,
funding primarily for bridge
repair. Four Red List bridges,
priority #51, #52, #53, and #54.
EXIT 4, BRIDGE REHABILITATIONS OR REPLACEMENTS: 144/066, 146/064, 146/065, 149/063 {All
Red List} {Turnpike}
3294
Turnpike Expansion
2012 TPK - TURNPIKE EXPANSION (State FY) 2.627C 2012
2013 TPK - TURNPIKE EXPANSION (State FY) 13.880C 2013
2014 TPK - TURNPIKE EXPANSION (State FY) 13.880C 2014
2011 TPK - TURNPIKE EXPANSION (State FY) 1.688P
2011 TPK - TURNPIKE EXPANSION (State FY) 1.251R
33.326Total:Highway and Bridge 38.547
MANCHESTER
14966 A
FE EVERETT TURNPIKE (I-
293)
Specific project from Statewide
program. Red List Bridge Priority
#50.
EXIT 4 NB OFF- RAMP BRIDGE REPLACEMENT - 153/061 {Red List} {Turnpike}
7173Turnpike Expansion
2011 TPK - TURNPIKE EXPANSION (State FY) .703C New Project
2012 TPK - TURNPIKE EXPANSION (State FY) 1.797C
2.500Total:Highway and Bridge
MANCHESTER
15401
GOFFS FALLS ROAD Specific project from Statewide
program, Municipal Managed.
BRIDGE REHABILITATION OVER B&M RR - 188/092
6901 State Aid Bridge
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .570C New Project
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .100P
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.675Total:Highway and Bridge
MANCHESTER
15837
US 3 (ELM STREET) Specific project from Statewide
program, Municipal Managed.
BRIDGE REHABILITATION OVER B&MRR - 144/075 [SAB*4216] {State Aid Bridge Program}
7415 State Aid Bridge
2017 SAB - STATE AID BRIDGE (State FY), 20% = Town 2.650C New Project
2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .325P
2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .025R
3.000Total:Highway and Bridge
Projects Page - 34 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
MANCHESTER - HOOKSETT
14604
I-93 Red List Bridges, priority #12 and
#13.
MERRIMACK RIVER BRIDGES IN MANCHESTER NORTH 1 MI TO I-293 IN HOOKSETT; 4R WORK
INCLUDING BRIDGE REHABILITATION @ MERRIMACK RIVER AND NH3A - 059/087 & 060/086
{Both Red List} {Statewide Federal Bridge Program}6196 FHWA
2011 L010 - INTERSTATE MAINTENANCE 5.000C 2010
2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 6.000C
11.000Total:Highway and Bridge 5.675
MANCHESTER - HOOKSETT
15849
I-293 Specific project from Statewide
program.
REPLACE MEDIAN BOX BEAM BARRIER WITH CONCRETE BARRIER FROM MILE MARKER 8.5 TO
10.8 [TRR*4042] {TRR Program}
7425 npike Renewal & Replacem
2011 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) 2.500C New Project
2011 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) .015P
2.515Total:Highway and Bridge
MANCHESTER -
LONDONDERRY
MANCHESTER - BOSTON
REGIONAL AIRPORT
Address Safety Concerns as
established by Manchester
Airport.
AIRPORT ACCESS ROAD INTERSECTION ENHANCEMENTS
7370 Airport
2014 AIP - AIRPORT IMPROVEMENT PROGRAM 10.000
10.000Total:Aeronautics
MANCHESTER -
LONDONDERRY
MANCHESTER - BOSTON
REGIONAL AIRPORT
Address Safety Concerns as
established by Manchester
Airport.
ACQUIRE SNOW-REMOVAL EQUIPMENT
7371 Airport
2016 AIP - AIRPORT IMPROVEMENT PROGRAM .550
2017 AIP - AIRPORT IMPROVEMENT PROGRAM 2.292
2.842Total:Aeronautics
MANCHESTER -
LONDONDERRY
MANCHESTER - BOSTON
REGIONAL AIRPORT
Address Safety Concerns as
established by Manchester
Airport.
CONSTRUCTION ONLY: RELOCATE ROADWAYS AND REPLACE PARKING
7368 Airport
2013 AIP - AIRPORT IMPROVEMENT PROGRAM 5.017
5.017Total:Aeronautics
MANCHESTER -
LONDONDERRY
MANCHESTER - BOSTON
REGIONAL AIRPORT
Address Safety Concerns as
established by Manchester
Airport.
DESIGN ONLY: RELOCATE ROADWAYS AND REPLACE PARKING
7367 Airport
2012 AIP - AIRPORT IMPROVEMENT PROGRAM .253
.253Total:Aeronautics
Projects Page - 35 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
MANCHESTER -
LONDONDERRY
MANCHESTER - BOSTON
REGIONAL AIRPORT
Address Safety & Environmental
Concerns as established by
Manchester Airport.
GLYCOL MAMAGEMENT PROGRAM - PHASE II & III
7366 Airport
2011 AIP - AIRPORT IMPROVEMENT PROGRAM 2.333
2012 AIP - AIRPORT IMPROVEMENT PROGRAM 2.100
4.433Total:Aeronautics
MANCHESTER -
LONDONDERRY
MANCHESTER - BOSTON
REGIONAL AIRPORT
Address Safety Concerns as
established by Manchester
Airport.
IMPROVEMENT RUNWAY 6-24 INSTRUMENT APPROACHES
6552 Airport
2017 AIP - AIRPORT IMPROVEMENT PROGRAM 2.373
2.373Total:Aeronautics
MANCHESTER -
LONDONDERRY
MANCHESTER - BOSTON
REGIONAL AIRPORT
Priority as established by
Manchester Airport.
NORTH TERMINAL APRON / TAXIWAY EXTENSION
4247 Airport
2014 AIP - AIRPORT IMPROVEMENT PROGRAM 1.000
2015 AIP - AIRPORT IMPROVEMENT PROGRAM 19.000
20.000Total:Aeronautics
MANCHESTER -
LONDONDERRY
MANCHESTER - BOSTON
REGIONAL AIRPORT
Address Safety ConcernsPROPERTY ACQUISITION
7369 Airport
2013 AIP - AIRPORT IMPROVEMENT PROGRAM 6.000
6.000Total:Aeronautics
MANCHESTER -
LONDONDERRY
MANCHESTER - BOSTON
REGIONAL AIRPORT
Address Safety ConcernsRECONSTRUCT EAST AIRCRAFT PARKING APRON
7372 Airport
2016 AIP - AIRPORT IMPROVEMENT PROGRAM 2.930
2.930Total:Aeronautics
MANCHESTER -
LONDONDERRY
MANCHESTER - BOSTON
REGIONAL AIRPORT
Address Safety Concerns.VARIOUS PRIORITIZED CAPITAL IMPROVEMENT PROJECTS
6553 Airport
2018 AIP - AIRPORT IMPROVEMENT PROGRAM 4.000
2019 AIP - AIRPORT IMPROVEMENT PROGRAM 4.000
2020 AIP - AIRPORT IMPROVEMENT PROGRAM 4.000
12.000Total:Aeronautics
Projects Page - 36 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
MEREDITH
10430 #
US 3 / NH 25 Earmark funding (partial).
Scope & priorities being
developed with community.
ROADWAY AND INTERSECTION IMPROVEMENTS @ NH 104, NORTH TO NH 25, AND NH 25
FROM US 3, EAST TO THE MEREDITH / CENTER HARBOR T/L [Section 1702 - Designated Project;
Demo Id NH041 (10430), NH060 (10430A), & NH071 (10430B)] [PARENT]6869FHWA
2011 HY10 - HIGH PRIORITY PROJ SEC 1702 .029C 2011
2011 L250 - STP - RURAL AREAS < 5,000k 4.119C 2011
2011 LY10 - HIGH PRIORITY PROJ SEC 1702 .060C 2011
2011 LY60 - HIGH PRIORITY PROJ SEC 112 .792C 2011
5.000Total:Highway and Bridge 6.275
MERRIMACK
13923
MCGAW BRIDGE RD Red List Bridge. Specific project
from Statewide program.
Municipal Managed.
BRIDGE REPLACEMENT OVER BABOOSIC BROOK - 116/137 {Red List}
3804State Aid Bridge
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .395C 2012
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .060P
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.460Total:Highway and Bridge 0.460
MERRIMACK
15839
WIRE ROAD Specific project from Statewide
program, Municipal Managed.
BRIDGE REPLACEMENT OVER BABOOSIC BROOK - 098/174 [SAB*4216] {State Aid Bridge
Program}
7417 State Aid Bridge
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .570C New Project
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .100P
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.675Total:Highway and Bridge
MERRIMACK
15841
BEDFORD ROAD Specific project from Statewide
program, Municipal Managed.
BRIDGE REPAIR/REPLACEMENT OVER BABOOSIC BROOK - 113/159 [SAB*4216 State Aid
Bridge]
7418 State Aid Bridge
2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .720C New Project
2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .120P
2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .010R
.850Total:Highway and Bridge
Projects Page - 37 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
METRO PLANNING
085-MP-1
PLANNING & RESEARCH Annual required program.
Reflects anticipated federal
revenues.
MANCHESTER METROPOLITAN PLANNING ORGANIZATION, ANTICIPATED FUNDS FOR UNIFIED
PLANNING WORK PROGRAMS
667FHWA
2011 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .625P
2012 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .625P
2013 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .625P
2014 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .625P
2015 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .625P
2016 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .625P
2017 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .625P
2018 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .625P
2019 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .625P
2020 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .625P
6.250Total:Highway and Bridge
METRO PLANNING
085-MP-2
PLANNING & RESEARCH Annual required program.
Reflects anticipated federal
revenues.
NASHUA METROPOLITAN PLANNING ORGANIZATION, ANTICIPATED FUNDS FOR UNIFIED
PLANNING WORK PROGRAMS
809FHWA
2011 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .500P
2012 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .500P
2013 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .500P
2014 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .500P
2015 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .500P
2016 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .500P
2017 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .500P
2018 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .500P
2019 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .500P
2020 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .500P
4.996Total:Highway and Bridge
METRO PLANNING
085-MP-3
PLANNING & RESEARCH Annual required program.
Reflects anticipated federal
revenues.
STRAFFORD METROPOLITAN PLANNING ORGANIZATION, ANTICIPATED FUNDS FOR UNIFIED
PLANNING WORK PROGRAMS
811FHWA
2011 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .317P
2012 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .317P
2013 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .317P
2014 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .317P
2015 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .317P
2016 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .317P
2017 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .317P
2018 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .317P
2019 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .317P
2020 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .317P
3.173Total:Highway and Bridge
Projects Page - 38 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
METRO PLANNING
085-MP-4
PLANNING & RESEARCH Annual required program.
Reflects anticipated federal
revenues.
ROCKINGHAM METROPOLITAN PLANNING ORGANIZATION, ANTICIPATED FUNDS FOR UNIFIED
PLANNING WORK PROGRAMS
810FHWA
2011 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .458P
2012 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .458P
2013 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .458P
2014 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .458P
2015 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .458P
2016 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .458P
2017 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .458P
2018 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .458P
2019 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .458P
2020 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .458P
4.578Total:Highway and Bridge
MILAN
BERLIN REGIONAL
AIRPORT
Address Capacity Concerns.
Priority as identified by project
sponsor.
AIRCRAFT APRON EXPANSION
3432Airport
2012 AIP - AIRPORT IMPROVEMENT PROGRAM .158
2013 AIP - AIRPORT IMPROVEMENT PROGRAM 1.053
1.211Total:Aeronautics
MILAN
BERLIN REGIONAL
AIRPORT
Address Capacity Concerns.
Priority as identified by project
sponsor.
DESIGN AND INSTALL PERIMETER FENCING
6555Airport
2014 AIP - AIRPORT IMPROVEMENT PROGRAM .150
.150Total:Aeronautics
MILAN
BERLIN REGIONAL
AIRPORT
Address Safety Concerns.
Priority as identified by project
sponsor.
PARALLEL TAXIWAY
3434Airport
2015 AIP - AIRPORT IMPROVEMENT PROGRAM 1.800
1.800Total:Aeronautics
Projects Page - 39 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
MILAN
BERLIN REGIONAL
AIRPORT
TO BE DETERMINED; 95% Federal
funds, 2.5% Sponsor match. FAA
five year Capital Improvement
Program for projects yet to be
identified by FAA and airport
sponsors.
VARIOUS PRIORITIZED CAPITAL IMPROVEMENT PROJECTS
3439
Airport
2017 AIP - AIRPORT IMPROVEMENT PROGRAM .300
2018 AIP - AIRPORT IMPROVEMENT PROGRAM .300
2019 AIP - AIRPORT IMPROVEMENT PROGRAM .158
2020 AIP - AIRPORT IMPROVEMENT PROGRAM .158
.916Total:Aeronautics
MILFORD
14492 #
NH 101A & NH 13 Earmark funding. Municipal
Managed.
IMPROVEMENTS IN THE AREA KNOWN AS THE "OVAL" TO IMPROVE TRAFFIC FLOW BASED ON
RESULTS OF ONGOING TRAFFIC STUDIES WITHIN THE TOWN [Section 1702 - Designated
Project; Demo Id NH038 (14492) & NH058 (14492A)] [PARENT]4065 FHWA
2011 HPER - HIGH PRIORITY .060C 2011
2011 HPER - HIGH PRIORITY .996C 2011
2011 HPER - HIGH PRIORITY .029C 2011
2011 LY10 - HIGH PRIORITY PROJ SEC 1702 .332C 2011
2011 LY20 - HIGH PRIORITY PROJ SEC 1702 1.306C 2011
2.723Total:Highway and Bridge 4.857
MILFORD TO NASHUA
10136
NH 101A Specific Safety & Capacity
improvements at 3 intersections
as determined by corridor
study..
INTERSECTION IMPROVEMENTS AT SEVERAL LOCATIONS BETWEEN NH 101 TO FEE TPK (7.5
MILES); AS DETERMINED BY CORRIDOR STUDY
730
FHWA
2012 L050 - NATIONAL HIGHWAY SYSTEM 3.000C 2011
2013 L050 - NATIONAL HIGHWAY SYSTEM 3.000C 2013
2011 L050 - NATIONAL HIGHWAY SYSTEM .250P
2011 L050 - NATIONAL HIGHWAY SYSTEM .125R
6.375Total:Highway and Bridge 6.625
NASHUA
BOIRE FIELD Address Safety ConcernsACQUIRE SNOW REMOVAL EQUIPMENT
3447 Airport
2013 AIP - AIRPORT IMPROVEMENT PROGRAM .610
2020 AIP - AIRPORT IMPROVEMENT PROGRAM .300
.910Total:Aeronautics
NASHUA
BOIRE FIELD Needed to Plan for Future
Projects
AIRPORT MASTER PLAN UPDATE
6671 Airport
2019 AIP - AIRPORT IMPROVEMENT PROGRAM .300
.300Total:Aeronautics
Projects Page - 40 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
NASHUA
BOIRE FIELD Address Safety Concerns.
Priority as identified by project
sponsor.
CONSTRUCT ONLY - PARALLEL TAXIWAY RELOCATION
6560Airport
2016 AIP - AIRPORT IMPROVEMENT PROGRAM 5.980
5.980Total:Aeronautics
NASHUA
BOIRE FIELD Address Safety Concerns.
Priority as identified by project
sponsor.
DESIGN ONLY - PARALLEL TAXIWAY RELOCATION
6559Airport
2015 AIP - AIRPORT IMPROVEMENT PROGRAM .600
.600Total:Aeronautics
NASHUA
BOIRE FIELD Address Safety Concerns.
Priority as identified by project
sponsor.
RUNWAY RECONSTRUCTION & RELOCATION
3442Airport
2011 AIP - AIRPORT IMPROVEMENT PROGRAM 8.049
2012 AIP - AIRPORT IMPROVEMENT PROGRAM 6.749
14.798Total:Aeronautics
NASHUA
BOIRE FIELD Address Safety Concerns.
Priority as identified by project
sponsor.
RECONSTRUCT GRASS APRON TO PAVEMENT
3444Airport
2014 AIP - AIRPORT IMPROVEMENT PROGRAM 2.732
2.732Total:Aeronautics
NASHUA
BOIRE FIELD Address Safety Concerns.
Priority as identified by project
sponsor.
REPLACE CONTROL TOWER
6561Airport
2017 AIP - AIRPORT IMPROVEMENT PROGRAM .350
2018 AIP - AIRPORT IMPROVEMENT PROGRAM 5.000
5.350Total:Aeronautics
NASHUA
EAST HOLLIS STREET MUNICIPAL MANAGED, 20% City
Match. City Urban Compact
project.
RECONSTRUCTION OF EAST HOLLIS STREET FROM MAIN STREET TO HUDSON TOWN LINE TO
IMPROVE CAPACITY
3536FHWA
2017 L200 - STP - AREAS LESS THAN 200,000 2.120C 2016
2015 L200 - STP - AREAS LESS THAN 200,000 .040P
2015 L200 - STP - AREAS LESS THAN 200,000 .040P
2015 L200 - STP - AREAS LESS THAN 200,000 .040P
2015 L200 - STP - AREAS LESS THAN 200,000 .040P
2015 L200 - STP - AREAS LESS THAN 200,000 .040R
2.320Total:Highway and Bridge 2.280
Projects Page - 41 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
NASHUA
MAIN STREET MUNICIPAL MANAGED, 20% City
Match. Urban Compact
project.
RECONSTRUCTION FROM HOLLIS STREET TO ORCHARD AVENUE (1.09 Miles)
4049FHWA
2018 L200 - STP - AREAS LESS THAN 200,000 2.200C 2017
2.200Total:Highway and Bridge 2.200
NASHUA
NASHUA TRANSIT SYSTEM Annual Program FundingCAPITAL PLANNING PROGRAM
608 FTA
2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .160
2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .160
2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .160
2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .160
2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .160
2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .160
2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .160
2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .160
2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .160
2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .160
1.600Total:Transit
NASHUA
NASHUA TRANSIT SYSTEM Annual Program FundingCAPITAL EQUIPMENT [ARRA]
3797 FTA
2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .065
2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .067
2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .069
2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .072
.274Total:Transit
NASHUA
NASHUA TRANSIT SYSTEM Annual Program FundingOPERATING ASSISTANCE
609 FTA
2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.455
2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.455
2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.455
2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.455
2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.455
2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.455
2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.455
2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.455
2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.455
2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.455
14.551Total:Transit
Projects Page - 42 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
NASHUA
NASHUA TRANSIT SYSTEM Annual Program FundingPREVENTIVE MAINTENANCE
3799 FTA
2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .420
2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .433
2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .446
2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .459
2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .459
2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .459
2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .459
2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .459
2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .459
2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .459
4.514Total:Transit
NASHUA
10040 G
BALDWIN STREET Earmark funding (partial),
project being re-scoped by
City. Municipal Managed, Red
List bridge priority #89.
RECONSTRUCTION AND EXTENSION FROM AMHERST ST, OVER B&M RAILROAD - 115/120 {Red
List} & FUTURE BROAD ST PARKWAY TO FAIRMOUNT ST, WITH CONNECTOR TO FUTURE
PARKWAY {Red List} [Section 1602 - Designated Project; Demo Id NH003] [Sister Demo
Projects: 10040A, G, H, J, S, T] (Parent = Nashua 10040A)2641
FHWA
2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 4.653C 2011
2011 Q920 - HIGH PRIORITY PROJ SEC 1602 .032C 2011
4.685Total:Highway and Bridge 4.685
NASHUA
10040 H
BROAD STREET PARKWAY Earmark funding (partial),
project being re-initiated by
City. Municipal Managed.
CONSTRUCTION FROM NASHUA RIVER WESTERLY TO BROAD STREET (TO SUBGRADE ONLY)
[Section 1602 - Designated Project; Demo Id NH003] [Sister Demo Projects: 10040A, G, H, J, S,
T] (Parent = Nashua 10040A)2642FHWA
2012 Q920 - HIGH PRIORITY PROJ SEC 1602 5.611C 2012
5.611Total:Highway and Bridge 5.487
NASHUA
10040 I
BROAD STREET PARKWAY Earmark funding (partial),
project being re-initiated by
City. Municipal Managed.
Bridge Priority #90.
CONSTRUCTION OF BRIDGE OVER NASHUA RIVER; FAIRMOUNT STREET BRIDGE OVER
PARKWAY - 118/118 (Parent = Nashua 10040A)
2643
FHWA
2012 3610 - CONGESTION RELIEF PROJECTS 1.463C 2012
2012 L200 - STP - AREAS LESS THAN 200,000 9.137C 2012
10.600Total:Highway and Bridge 10.600
NASHUA
10040 J
BROAD STREET PARKWAY Earmark funding (partial),
project being re-initiated by
City. Municipal Managed.
CONSTRUCTION FROM WEST HOLLIS STREET TO PINE STREET EXTENSION INCLUDING BRIDGE
OVER CANAL [Section 1602 - Designated Project; Demo Id NH003] [Sister Demo Projects:
10040A, G, H, J, S, T] (Parent = Nashua 10040A)2647FHWA
2011 Q920 - HIGH PRIORITY PROJ SEC 1602 5.100C 2011
5.100Total:Highway and Bridge 5.100
Projects Page - 43 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
NASHUA
10040 K
BROAD STREET PARKWAY Earmark funding (partial),
project being re-initiated by
City. Municipal Managed.
BASE COURSES, WEARING COURSES, SIGNING, MARKINGS, RR CROSSING, AND SIGNALS
(Parent = Nashua 10040A)
2648FHWA
2014 L200 - STP - AREAS LESS THAN 200,000 1.200C 2014
1.200Total:Highway and Bridge 1.200
NASHUA
10040 L
BROAD STREET PARKWAY Earmark funding (partial),
project being re-initiated by
City. Municipal Managed.
PROJECT WIDE LANDSCAPING (Parent = Nashua 10040A)
2649FHWA
2016 L200 - STP - AREAS LESS THAN 200,000 .300C 2016
.300Total:Highway and Bridge 0.300
NASHUA
10040 S
BROAD STREET PARKWAY R-O-W Demolition. Earmark
funding appropriated in 1998.
DEMOLITION OF "NIMCO" BUILDING [Section 1602 - Designated Project; Demo Id NH003]
[Sister Demo Projects: 10040A, G, H, J, S, T] (Parent = Nashua 10040A)
3752 FHWA
2011 Q920 - HIGH PRIORITY PROJ SEC 1602 .125R
2011 Q920 - HIGH PRIORITY PROJ SEC 1602 .125R 2007
.250Total:Highway and Bridge
NASHUA
10040 T
BROAD STREET PARKWAY R-O-W Demolition. Earmark
funding appropriated in 1998.
MILLYARD UTILITY RELOCATION [Section 1602 - Designated Project; Demo Id NH003] [Sister
Demo Projects: 10040A, G, H, J, S, T] (Parent = Nashua 10040A)
3753 FHWA
2011 Q920 - HIGH PRIORITY PROJ SEC 1602 .600R 2008
.600Total:Highway and Bridge
NASHUA
10136 A
NH 101A Municipal Managed with State
Match.
WIDENING BETWEEN CELINA AVENUE INTERSECTION TO AMHERST STREET MALL INTERSECTION
(1.5 MILES) TO EXPAND FROM EXISTING FIVE LANES TO SEVEN LANES AS RECOMMENDED BY
CORRIDOR STUDY (Milford to Nashua 10136)3593 FHWA
2012 L200 - STP - AREAS LESS THAN 200,000 3.114C 2012
2012 NON - OTHER NON PARTICIPATING 5.287C
2011 L050 - NATIONAL HIGHWAY SYSTEM .464P
2011 L050 - NATIONAL HIGHWAY SYSTEM 2.250R
11.114Total:Highway and Bridge 6.125
NASHUA
13117
FEE TPK / CAPITAL
CORRIDOR
Specific project from Statewide
program. ROW funds
programmed previously.
Municipal Managed.
CONSTRUCT 1000 SPACE PARK'N'RIDE NEAR B&M RR WITH RAIL PLATFORM; FACILITY WILL BE
USED FOR CAR POOL, VANPOOL, & PASSENGER RAIL MODES (CMAQ Program) [98-13CM]
2344
FHWA
2011 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 2.450C CMAQ 1998
2.450Total:Highway and Bridge 6.500
Projects Page - 44 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
NASHUA
13931
NH 130 Municipal Managed and 20%
match.
BROAD STREET RECONSTRUCTION FROM COBURN AVE TO COLISEUM AVE, INCLUDING
DUBLIN AVE, TO PROVIDE SHOULDERS / SAFETY IMPROVEMENTS
3277 FHWA
2016 L200 - STP - AREAS LESS THAN 200,000 4.200C 2016
2014 L200 - STP - AREAS LESS THAN 200,000 .020P 2006
2014 L200 - STP - AREAS LESS THAN 200,000 .020P
2014 L200 - STP - AREAS LESS THAN 200,000 .010P
2015 L200 - STP - AREAS LESS THAN 200,000 .180R
4.430Total:Highway and Bridge 4.390
NASHUA - MANCHESTER -
CONCORD
CAPITAL CORRIDOR Municipal responsibility.
Funding anticipated to be a
mix of Municipal, CMAQ, TIF,
Airport, and other funds. (Also
Manchester 13512)
STATION FACILITIES ALONG CORRIDOR
7200
Rail
2013 FRA - Federal Railroad Grant / Other Funds 7.700C New Project
2014 FRA - Federal Railroad Grant / Other Funds 7.700C
15.400Total:Rail
NASHUA - MANCHESTER -
CONCORD
CAPITAL CORRIDOR Overall Capital Corridor Rail
Service, specific projects and
particular phasing to be
determined dependent on
funding availability and
continued coordination with
NHRTA.
TRACK INFRASTRUCTURE, EQUIPMENT, GRADE CROSSINGS, ENVIRONMENTAL & ENGINEERING
FOR ESTABLISHING RAIL SERVICE
7201
Rail
2011 FRA - Federal Railroad Grant / Other Funds 51.000C New Project
2012 FRA - Federal Railroad Grant / Other Funds 51.000C
2013 FRA - Federal Railroad Grant / Other Funds 51.000C
2014 FRA - Federal Railroad Grant / Other Funds 51.000C
204.000Total:Rail
NASHUA - MANCHESTER -
CONCORD
13514
CAPITAL CORRIDOR Specific project from Statewide
program, Municipal Managed.
PURCHASE PASSENGER RAIL EQUIPMENT (CMAQ Program) [00-12CM]
2959 FHWA
2011 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 5.003C
2012 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 5.000C
2013 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 5.000C CMAQ 2000
15.003Total:Rail 15.003
Projects Page - 45 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
NASHUA - MANCHESTER -
CONCORD
13875
CAPITAL CORRIDOR Specific project from Statewide
program, Municipal managed.
PROVIDE 3 YEARS OPERATING SUPPORT FOR PASSENGER RAIL STARTUP (CMAQ Program) [02-
22CM]
3698 FHWA
2011 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 1.750P CMAQ 2002
2012 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 1.750P
2013 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 1.750P
5.250Total:Rail
NEW BOSTON
14771
GREGG MILL ROAD Specific project from Statewide
program, Municipal managed.
BRIDGE REPLACEMENT OVER SOUTH BRANCH PISCATAQUOG RIVER - 132/138
6343 State Aid Bridge
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .920C 2012
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .110P
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
1.035Total:Highway and Bridge 1.035
NEW BOSTON
15505
TUCKER MILL ROAD Specific project from Statewide
program, Municipal Managed.
BRIDGE REPLACEMENT OVER MID BRANCH PISCATAQUOG RIVER - 087/150
6988 State Aid Bridge
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .490C New Project
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .080P
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.575Total:Highway and Bridge
NEW CASTLE - RYE
NH 1B Bridge Priority #41{Red List}.REHABILITATE SINGLE LEAF BASCULE MOVEABLE BRIDGE OVER LITTLE HARBOR - 066/071 {Red
List}
5558 FHWA
2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 4.750C 2013
4.750Total:Highway and Bridge 4.750
NEW DURHAM
15398
DAVIS CROSSING Specific project from Statewide
program, Municipal Managed.
BRIDGE REPLACEMENT OVER ELA RIVER - 228/091 (NEW)
6898 State Aid Bridge
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .295C New Project
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .065P
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.365Total:Highway and Bridge
NEW IPSWICH
14465
NH 123 / 124 Bridge Priority #18 {Red List}.REPLACE BRIDGE OVER SOUHEGAN RIVER - 157/093 {Red List}
2757 FHWA
2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 2.750C 2012
2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .110P
2.860Total:Highway and Bridge 2.650
Projects Page - 46 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
NEW LONDON
NH 114 (Main St) DOT priority list, UVLSRPC priorityRECONSTRUCTION, NH 11 (CROCKETT'S CORNER) NORTHERLY TO NEWPORT ROAD (HOMAN'S
CORNER)
3526 FHWA
2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 1.775C Previously Programmed Beyond TYP (Deferred)
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .050P
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P
2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .025R
2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .050R
2.000Total:Highway and Bridge
NEWINGTON
11238 M
NH 16 / US 4 / SPLDG TPK Specific Project Breakout from
Newington-Dover 11238
EXIT 3 INTERCHANGE CONSTRUCTION [PARENT = N-D 11238]
7075 Turnpike Expansion
2011 TPK - TURNPIKE EXPANSION (State FY) 8.834C New Project
2012 TPK - TURNPIKE EXPANSION (State FY) 15.143C
2013 TPK - TURNPIKE EXPANSION (State FY) 15.143C
2014 TPK - TURNPIKE EXPANSION (State FY) 2.524C
41.644Total:Highway and Bridge
NEWINGTON
11238 N
NH 16 / US 4 / SPLDG TPK Specific Project Breakout from
Newington-Dover 11238
EXIT 4 RAMPS AND MAINLINE TURNPIKE CONSTRUCTION [PARENT = N-D 11238]
7076 Turnpike Expansion
2012 TPK - TURNPIKE EXPANSION (State FY) 6.196C New Project
2013 TPK - TURNPIKE EXPANSION (State FY) 7.436C
2014 TPK - TURNPIKE EXPANSION (State FY) 2.479C
16.111Total:Highway and Bridge
NEWINGTON - DOVER
11238
NH 16 / US 4 / SPLDG TPK Turnpike Capital Program -
overall project for Little Bay
bridge and Newington
interchange construction, pe, &
row. Specific Construction
projects broken out separately
and include earmark federal
funding.
WIDEN TURNPIKE INCLUDING LITTLE BAY BRIDGES FROM GOSLING ROAD TO DOVER TOLL
1191
Turnpike Expansion
2011 TPK - TURNPIKE EXPANSION (State FY) 3.713C 2010
2011 TPK - TURNPIKE EXPANSION (State FY) 3.400P
2012 TPK - TURNPIKE EXPANSION (State FY) 3.400P
2013 TPK - TURNPIKE EXPANSION (State FY) 3.200P
2011 TPK - TURNPIKE EXPANSION (State FY) 2.200R
2012 TPK - TURNPIKE EXPANSION (State FY) 1.443R
17.356Total:Highway and Bridge
Projects Page - 47 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
NEWINGTON - DOVER
11238 O
NH 16 / US 4 / SPLDG TPK Specific Project Breakout from
Newington-Dover 11238
REHABILITATION OF EXISTING LITTLE BAY BRIDGE & BRIDGE APPROACH CONSTRUCTION
[PARENT N-D 11238]
7077 Turnpike Expansion
2014 TPK - TURNPIKE EXPANSION (State FY) 9.751C New Project
2015 TPK - TURNPIKE EXPANSION (State FY) 16.717C
2016 TPK - TURNPIKE EXPANSION (State FY) 6.965C
33.433Total:Highway and Bridge
NEWINGTON - DOVER
11238 P
SPLDG TPK / LITTLE BAY
BRIDGES
Specific project from HB 391,
Turnpike Capital Program.
SOUNDWALL CONSTRUCTION NORTH OF EXIT 6
7227 Turnpike Expansion
2013 TPK - TURNPIKE EXPANSION (State FY) 1.140C New Project
2014 TPK - TURNPIKE EXPANSION (State FY) 1.425C
2.565Total:Highway and Bridge
NEWINGTON - DOVER
11238 Q
SPLDG TPK / LITTLE BAY
BRIDGES
Specific project from HB 391,
Turnpike Capital Program.
EXIT 6 INTERCHANGE RECONSTRUCTION
7228 Turnpike Expansion
2014 TPK - TURNPIKE EXPANSION (State FY) 13.220C New Project
2015 TPK - TURNPIKE EXPANSION (State FY) 15.864C
2016 TPK - TURNPIKE EXPANSION (State FY) 5.288C
34.372Total:Highway and Bridge
NEWINGTON - DOVER
11238 R
SPAULDING TURNPIKE /
LITTLE BAY BRIDGES
Specific project from HB 391,
Turnpike Capital Program.
TURNPIKE MAINLINE RECONSTRUCTION FROM LBB TO TOLL PLAZA
7229 Turnpike Expansion
2015 TPK - TURNPIKE EXPANSION (State FY) 5.635C
2016 TPK - TURNPIKE EXPANSION (State FY) 6.761C New Project
2017 TPK - TURNPIKE EXPANSION (State FY) 2.254C
14.650Total:Highway and Bridge
NEWINGTON - DOVER
11238 S
SPAULDING TURNPIKE /
LITTLE BAY BRIDGES
Specific project from HB 391,
Turnpike Capital Program.
GENERAL SULLIVAN BRIDGE REHABILITATION
7233 Turnpike Expansion
2015 TPK - TURNPIKE EXPANSION (State FY) 9.327C New Project
2016 TPK - TURNPIKE EXPANSION (State FY) 15.988C
2017 TPK - TURNPIKE EXPANSION (State FY) 6.662C
31.977Total:Highway and Bridge
NEWPORT
14969
PARADISE ROAD Specific project from Statewide
program. Municipal Managed.
BRIDGE REPLACEMENT OVER SUGAR RIVER - 177/117
6683 State Aid Bridge
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .560C 2014
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .100P
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.665Total:Highway and Bridge 0.525
Projects Page - 48 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
NEWPORT
15597
REED'S FARM ROAD Red List Bridge. Specific project
from Statewide program,
Municipal Managed.
BRIDGE REPLACEMENT OVER BROOK - 167/148 {Red List}
7096State Aid Bridge
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .080C New Project
.080Total:Highway and Bridge
NORTH HAMPTON
15848
NH 111 Specific project from Statewide
program.
BRIDGE REHABILITATION OVER I-95 - 081/093 [TRR*4042] {TRR Program}
7424 npike Renewal & Replacem
2012 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) 1.400C New Project
2011 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) .100P
1.500Total:Highway and Bridge
NORTHFIELD
I-93 Red List Bridge Prioity #61 & 62REHABILITATE BRIDGES OVER WINNISPESAUKEE RIVER - 117/157 & 118/158 (Red List)
7357 FHWA
2020 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 3.000C New Project
2017 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .250P
2018 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .050R
3.300Total:Highway and Bridge
NOTTINGHAM
15720
DEERFIELD ROAD Specific project from Statewide
program, Municipal Managed.
Advanced Constructed in SFY
2009.
BRIDGE REPLACEMENT OVER BACK CREEK - 102/085 (NEW)
7258
State Aid Bridge
2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .349C New Project
.349Total:Highway and Bridge
OSSIPEE
10431
NH 16 Scope intent, address
pavement condition and
problem intersections only.
PAVEMENT REHABILITATION & INTERSECTION IMPROVEMENTS FROM NH 28 NORTH 3.36 MILES
95FHWA
2015 L050 - NATIONAL HIGHWAY SYSTEM 3.000C 2015
2011 L050 - NATIONAL HIGHWAY SYSTEM .125P
2013 L050 - NATIONAL HIGHWAY SYSTEM .188P
2013 L050 - NATIONAL HIGHWAY SYSTEM .250R
3.563Total:Highway and Bridge 3.563
Projects Page - 49 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
OSSIPEE
13910
NH 16, NH 25, NH 41 Scope reduction. Immediate
Intersection needs.
INTERSECTION IMPROVEMENTS IN WEST OSSIPEE AT THE INTERSECTION OF NH 16 AND NH 25
1888 FHWA
2015 L050 - NATIONAL HIGHWAY SYSTEM 1.060C 2015
2015 L050 - NATIONAL HIGHWAY SYSTEM .530C 2015
2011 L050 - NATIONAL HIGHWAY SYSTEM .065P
2012 L050 - NATIONAL HIGHWAY SYSTEM .150P
2011 L050 - NATIONAL HIGHWAY SYSTEM .030R
2012 L050 - NATIONAL HIGHWAY SYSTEM .250R
2.085Total:Highway and Bridge 2.085
OSSIPEE
14749
NH 16 / NH 25 Scope intent to address bridges
and pavement condition only.
Red List Bridge priorities #37,
#38, and #39
ROADWAY RESURFACING AND REHABILITATE 4 BRIDGES, BEGINNING AT THE LOVELL RIVER
BRIDGE, RUNNING NORTH 3.22 MILES TO THE CHOCORUA RIVER - 137/299, 137/297, 152/268,
123/324 (All Red List)2762
FHWA
2016 L200 - STP - AREAS LESS THAN 200,000 5.000C 2016
2017 L200 - STP - AREAS LESS THAN 200,000 4.000C
2012 L110 - BRIDGE PROGRAM - OFF SYSTEM .110P
2014 L050 - NATIONAL HIGHWAY SYSTEM .094P
2014 L110 - BRIDGE PROGRAM - OFF SYSTEM .156P
2013 L110 - BRIDGE PROGRAM - OFF SYSTEM .080R
2015 L110 - BRIDGE PROGRAM - OFF SYSTEM .188R
9.628Total:Highway and Bridge 5.643
PELHAM
MAIN STREET Red List Bridge Priority # 42REHABILITATE BRIDGE OVER BEAVER BROOK - 110/090 (Red List)
7436 FHWA
2020 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.500C New Project
2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .150P
2017 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .040R
1.690Total:Highway and Bridge
PELHAM
14491 #
NH 111A Earmark fundingIMPROVEMENTS TO TWO INTERSECTIONS: MAIN STREET / NASHUA ROAD AND OLD BRIDGE
STREET / COMMON STREET [Section 1702 - Designated Project; Demo Id NH055 (14491) &
Demo Id NH072 (14491A)] [PARENT]6859 FHWA
2011 HPER - HIGH PRIORITY .996C 2010
2011 HPER - HIGH PRIORITY .008C 2010
2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .188C 2010
2011 LY20 - HIGH PRIORITY PROJ SEC 1702 1.016C 2010
2011 LY60 - HIGH PRIORITY PROJ SEC 112 .743C 2010
2.950Total:Highway and Bridge 3.588
Projects Page - 50 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
PEMBROKE
14477 A#
US 3 / PEMBROKE HILL
RD
Earmark fundingINTERSECTION IMPROVEMENT PROJECT [Section 1702 - Designated Project; Demo Id NH042
(14477A) & NH061 (14477B] [PARENT]
3782 FHWA
2011 HPER - HIGH PRIORITY .020C 2010
2011 HPER - HIGH PRIORITY .042C 2010
2011 HPER - HIGH PRIORITY .697C 2010
2011 HY20 - HIGH PRIORITY PROJ SEC 1702 .350C 2010
2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .059C 2010
2011 LY10 - HIGH PRIORITY PROJ SEC 1702 .104C 2010
2011 LY20 - HIGH PRIORITY PROJ SEC 1702 1.053C 2010
2011 LY10 - HIGH PRIORITY PROJ SEC 1702 .100R
2.425Total:Highway and Bridge 2.135
PETERBOROUGH
14935
UNION STREET Red List Bridge. Specific project
from Statewide program,
Municipal managed.
REPLACE BRIDGE OVER NUBANUSIT RIVER - 057/108 {Red List}
6489State Aid Bridge
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town 1.150C 2013
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .150P
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .015R
1.315Total:Highway and Bridge 1.315
PETERBOROUGH
15879
US 202 / NH 101 Bridge Priority #67 {Red List}REHABILITATE BRIDGE INCLUDING REPLACE DECK AND PAINT GIRDERS OVER CONTOOCOOK
RIVER - 087/077 {Red List}
6779 FHWA
2018 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .945C 2018
.945Total:Highway and Bridge 1.000
PINKHAMS GRANT
NH 16 Prioity Corridor Weight
Restricted Bridge (E1)
REHABILITATE / REPLACE BRIDGE OVER NEW RIVER - 058/048
7359 FHWA
2019 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.000C New Project
2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P
2017 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .040R
1.140Total:Highway and Bridge
PITTSFIELD
14972
SHAW RD Specific project from statewide
program, Municipal Managed.
BRIDGE REPLACEMENT OVER KELLY BROOK - 089/135
6685 State Aid Bridge
2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .260C 2014
2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .060P
2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.325Total:Highway and Bridge 0.325
Projects Page - 51 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
PLAISTOW
10044 G
NH 125 Specific project breakout
project from Plaistow-Kingston
project.
RECONSTRUCT EAST RD TO OLD RD (Parent = Plaistow-Kingston 10044B)
6371FHWA
2013 L050 - NATIONAL HIGHWAY SYSTEM 5.975C 2013
5.975Total:Highway and Bridge 3.900
PLAISTOW - KINGSTON
10044 B
NH 125 Original overall project,
construction now programmed
in specific projects.
RECONSTRUCTION FROM EAST ROAD IN PLAISTOW NORTHERLY APPROX. 6.0 +/- MILE TO NH
125 & MAIN STREET INTERSECTION IN KINGSTON
24FHWA
2011 L230 - STP - URBANIZED AREAS OVER 200,000 .820R
.820Total:Highway and Bridge
PLAISTOW - KINGSTON
10044 E
NH 125 Specific project breakout
project from Plaistow-Kingston
project.
RECONSTRUCT FROM 1/4 MI SOUTH OF PLAISTOW / KINGSTON T/L NORTHERLY APPROX 1.2 MI
INCLUDING EXTENSION OF KINGSTON RD. (PE & ROW FUNDING INCLUDED UNDER PLAISTOW-
KINGSTON 10044B) (PARENT=KINGSTON 10044B)3898FHWA
2018 L050 - NATIONAL HIGHWAY SYSTEM 7.500C 2017
2019 L050 - NATIONAL HIGHWAY SYSTEM 7.680C 2017
15.180Total:Highway and Bridge 8.200
PLYMOUTH
15882
NH 25 / NH 3A Bridge Priority #34 {Red List}REHABILITATE BRIDGE OVER BAKER RIVER - 117/143 (Red List)
6780 FHWA
2015 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.945C 2015
1.945Total:Highway and Bridge 2.000
PORTSMOUTH
13455 A
US 1 BYPASS Red List Bridge Priority #25.
Breakout from 13455
REMOVE US 1 SOUTH BOUND BRIDGE OVER US 1 BYPASS -173/071 (Red List) (Pe & Row in
Parent 13455)
7431 FHWA
2011 L200 - STP - AREAS LESS THAN 200,000 3.200C 2011
3.200Total:Highway and Bridge
PORTSMOUTH
13455 B
US 1 BYPASS Red List Bridge Priority #27 & 28.
Breakout from 13455
REPLACE BRIDGES {Red List} (183/087) MIDDLE ROAD AND (188/097) ISLINGTON STREET OVER
US 1 BYPASS (Pe & Row in Parent 13455)
7432 FHWA
2012 L200 - STP - AREAS LESS THAN 200,000 4.900C 2011
4.900Total:Highway and Bridge
PORTSMOUTH
13455 C
US 1 BYPASS Red List Bridge Priority #26.
Breakout from 13455
REPLACE MAPLEWOOD AVENUE BRIDGE OVER US 1 BYPASS - 227/112 {Red List} (Pe & Row in
Parent 13455)
7433 FHWA
2013 L200 - STP - AREAS LESS THAN 200,000 4.500C 2013
4.500Total:Highway and Bridge
Projects Page - 52 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
PORTSMOUTH
14193
OCEAN ROAD Specific project from Statewide
program, Municipal Manged.
RECONSTRUCT & RECLASSIFY AS A CITY STREET. (SAH Funding Capped Per Year; Excess Of
Grand Total [$1,200,000] Will Be 50/50 Match)
5576 State Aid Highway
2011 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town .150C 2011
.150Total:Highway and Bridge 1.050
PORTSMOUTH
14493
NH 1A Specific project from Statewide
program. Municipal Managed.
BRIDGE REHABILITATION OVER SAGAMORE CREEK - 198/034 [MOBRR-221] {Municipal Bridge
Program}
6053 FHWA
2011 L110 - BRIDGE PROGRAM - OFF SYSTEM 3.000C 2011
3.000Total:Highway and Bridge 3.125
PORTSMOUTH
15760
I-95 Specific project from HB 391,
Turnpike Capital Program
INSTALL SOUND WALL ALONG SB SIDE OF I-95 IN PORTSMOUTH ADJACENT TO ATLANTIC
HEIGHTS NEIGHBORHOOD (APPROX 2,000 LF) {Turnpike}
7297 Turnpike Expansion
2011 TPK - TURNPIKE EXPANSION (State FY) 1.500C New Project
2012 TPK - TURNPIKE EXPANSION (State FY) .500C
2011 TPK - TURNPIKE EXPANSION (State FY) .020P
2011 TPK - TURNPIKE EXPANSION (State FY) .005R
2.025Total:Highway and Bridge
PORTSMOUTH - KITTERY
13678 D
US 1 Breakout from overall
Portsmouth-Kittery 13678
QUALITY ASSURANCE SHOP INSPECTION CONTRACT FOR THE MEMORIAL BRIDGE PROJECT (PE
charged to Parent 13678)
6948 FHWA
2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .050C
2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .450C New Project
2011 ME - MAINE'S CONTRIBUTION .450C
.950Total:Highway and Bridge
PORTSMOUTH -
NEWINGTON
PORTSMOUTH
INTERNATIONAL
AIRPORT AT PEASE
Address Safety Concerns.
Priority as identified by project
sponsor.
DESIGN AND CONSTRUCT RUNWAY 34 END REHABILITATION & TAXIWAY 'A2' REHABILITATION
6571 Airport
2013 AIP - AIRPORT IMPROVEMENT PROGRAM 7.789
7.789Total:Aeronautics
PORTSMOUTH -
NEWINGTON
PORTSMOUTH
INTERNATIONAL
AIRPORT AT PEASE
Address Safety Concerns.
Priority as identified by project
sponsor.
DESIGN AND CONSTRUCT RUNWAY 16 END REHABILITATION
6572 Airport
2014 AIP - AIRPORT IMPROVEMENT PROGRAM 3.000
3.000Total:Aeronautics
PORTSMOUTH -
NEWINGTON
PORTSMOUTH
INTERNATIONAL
AIRPORT AT PEASE
Address Safety Concerns.
Priority as identified by project
sponsor.
DESIGN AND CONSTRUCT APRON - AREA 5 (ASR REPLACEMENT)
6672 Airport
2017 AIP - AIRPORT IMPROVEMENT PROGRAM 4.210
4.210Total:Aeronautics
Projects Page - 53 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
PORTSMOUTH -
NEWINGTON
PORTSMOUTH
INTERNATIONAL
AIRPORT AT PEASE
Address Safety Concerns.
Priority as identified by project
sponsor.
DESIGN AND CONSTRUCT APRON - AREA 7 (ASR REPLACEMENT)
6674 Airport
2020 AIP - AIRPORT IMPROVEMENT PROGRAM 11.500
11.500Total:Aeronautics
PORTSMOUTH -
NEWINGTON
PORTSMOUTH
INTERNATIONAL
AIRPORT AT PEASE
Address Safety Concerns.
Priority as identified by project
sponsor.
DESIGN ONLY: NORTH APRON REHABILITATION
7377 Airport
2019 AIP - AIRPORT IMPROVEMENT PROGRAM 2.500
2.500Total:Aeronautics
PORTSMOUTH -
NEWINGTON
PORTSMOUTH
INTERNATIONAL
AIRPORT AT PEASE
Planning ProjectENVIRONMENTAL ASSESSMENT
7373 Airport
2011 AIP - AIRPORT IMPROVEMENT PROGRAM 1.052
1.052Total:Aeronautics
PORTSMOUTH -
NEWINGTON
PORTSMOUTH
INTERNATIONAL
AIRPORT AT PEASE
Planning ProjectFAR PART 150 AIRCRAFT NOISE STUDY
7375 Airport
2015 AIP - AIRPORT IMPROVEMENT PROGRAM .316
.316Total:Aeronautics
PORTSMOUTH -
NEWINGTON
PORTSMOUTH
INTERNATIONAL
AIRPORT AT PEASE
Provide equipment for winter
operations.
PURCHASE SNOW-REMOVAL EQUIPMENT
6568 Airport
2012 AIP - AIRPORT IMPROVEMENT PROGRAM 1.530
2016 AIP - AIRPORT IMPROVEMENT PROGRAM .737
2018 AIP - AIRPORT IMPROVEMENT PROGRAM .295
2019 AIP - AIRPORT IMPROVEMENT PROGRAM 1.000
3.562Total:Aeronautics
PORTSMOUTH -
NEWINGTON
PORTSMOUTH
INTERNATIONAL
AIRPORT AT PEASE
Required to Meet Federal
Requirements
RESIDENTIAL SOUND INSTALLATION PROGRAM - GROUP V
3983 Airport
2018 AIP - AIRPORT IMPROVEMENT PROGRAM .526
.526Total:Aeronautics
Projects Page - 54 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
PORTSMOUTH -
NEWINGTON
PORTSMOUTH
INTERNATIONAL
AIRPORT AT PEASE
Address Safety ConcernsREHABILITATE RUNWAY 16-34 - CENTER
7374 Airport
2015 AIP - AIRPORT IMPROVEMENT PROGRAM 8.632
8.632Total:Aeronautics
PORTSMOUTH -
NEWINGTON
PORTSMOUTH
INTERNATIONAL
AIRPORT AT PEASE
Address Safety ConcernsSOUTH DEICING EFFLUENT DISPOSAL SYSTEM
7378 Airport
2019 AIP - AIRPORT IMPROVEMENT PROGRAM 5.750C
5.750Total:Aeronautics
PORTSMOUTH -
NEWINGTON
PORTSMOUTH
INTERNATIONAL
AIRPORT AT PEASE
Address Safety ConcernsTAXIWAY 'N' & SOUTH DEICING EFFLUENT DISPOSAL SYSTEM
7376 Airport
2018 AIP - AIRPORT IMPROVEMENT PROGRAM 11.500
11.500Total:Aeronautics
PORTSMOUTH -
NEWINGTON
PORTSMOUTH
INTERNATIONAL
AIRPORT AT PEASE
Address aircraft noise
complaints.
UPDATE AIRCRAFT NOISE EXPOSURE MAP
6570 Airport
2011 AIP - AIRPORT IMPROVEMENT PROGRAM .105
.105Total:Aeronautics
PORTSMOUTH, NH -
KITTERY, ME
13678 F
US 1 Bridge Priority #1 {Red List},
contingent on Maine funding
availability. Discretionary Grant
funding being pursued.
MEMORIAL BRIDGE OVER PISCATAQUA RIVER - 247/084 {Red List} , BASED ON CONNECTION
STUDY. REPLACEMENT OF SCOTT AVENUE BRIDGE AND REHABILITATION OF THE KITTERY
APPROACH SPANS
7262FHWA
2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 2.000C 2010
2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.000C 2009
2011 ME - MAINE'S CONTRIBUTION 1.000C 2010
2011 ME - MAINE'S CONTRIBUTION 2.000C 2010
2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 4.000C 2009
2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 14.000C 2009
2012 ME - MAINE'S CONTRIBUTION 14.000C 2010
2012 ME - MAINE'S CONTRIBUTION 1.000C 2010
2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 14.000C
2013 ME - MAINE'S CONTRIBUTION 14.000C
2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.750P
2011 ME - MAINE'S CONTRIBUTION 1.750P
2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .005R
2011 ME - MAINE'S CONTRIBUTION .005R
70.510Total:Highway and Bridge 39.727
Projects Page - 55 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
PORTSMOUTH, NH -
KITTERY, ME
15731
US 1 BYPASS Red List bridge, priority #4,
contingent on Maine funding
availability.
REHABILITATE & PAINT BRIDGE OVER PISCATAQUA RIVER - 251/108 (Sarah Mildred Long
Bridge) (Red List)
5559 FHWA
2015 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 10.000C 2012
2015 ME - MAINE'S CONTRIBUTION 10.000C 2012
2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 10.000C 2013
2016 ME - MAINE'S CONTRIBUTION 10.000C 2013
2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .075P
2012 ME - MAINE'S CONTRIBUTION .075P
2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.000P
2013 ME - MAINE'S CONTRIBUTION 1.000P
2014 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.000P
2014 ME - MAINE'S CONTRIBUTION 1.000P
2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .005R
2013 ME - MAINE'S CONTRIBUTION .005R
44.160Total:Highway and Bridge 15.000
ROCHESTER
SKYHAVEN AIRPORT Address Capacity Concerns.CONSTRUCTION ONLY - SOUTH APRON WITH TIEDOWNS
6578 Airport
2016 AIP - AIRPORT IMPROVEMENT PROGRAM 1.000
1.000Total:Aeronautics
ROCHESTER
SKYHAVEN AIRPORT Address Safety ConcernsCONSTRUCT ONLY - 500-FT. EXTENSION TO RUNWAY 33 AND RSA EXTENSION
6675 Airport
2018 AIP - AIRPORT IMPROVEMENT PROGRAM 2.200
2.200Total:Aeronautics
ROCHESTER
SKYHAVEN AIRPORT Address Safety ConcernsCONSTRUCTION ONLY - 500-FT. EXTENSION TO RUNWAY 15 AND RSA EXTENSION
7379 Airport
2020 AIP - AIRPORT IMPROVEMENT PROGRAM 1.550
1.550Total:Aeronautics
ROCHESTER
SKYHAVEN AIRPORT 95% Federal funds, 5% State
match. FAA requirement.
Runway rehabilitation.
DESIGN & RECONSTRUCTION OF RUNWAY 15/33
3462Airport
2013 AIP - AIRPORT IMPROVEMENT PROGRAM 1.263
1.263Total:Aeronautics
ROCHESTER
SKYHAVEN AIRPORT Address Capacity Concerns.DESIGN ONLY - SOUTH APRON WITH TIEDOWNS
6577 Airport
2015 AIP - AIRPORT IMPROVEMENT PROGRAM .250
.250Total:Aeronautics
Projects Page - 56 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
ROCHESTER
SKYHAVEN AIRPORT Address Safety Concerns.DESIGN ONLY - 500-FT. EXTENSION TO RUNWAY 33 AND RSA EXTENSION
6582 Airport
2017 AIP - AIRPORT IMPROVEMENT PROGRAM .600
.600Total:Aeronautics
ROCHESTER
SKYHAVEN AIRPORT Address Safety ConcernsDESIGN ONLY - 500-FT. EXTENSION TO RUNWAY 15 AND RSA EXTENSION
6676 Airport
2019 AIP - AIRPORT IMPROVEMENT PROGRAM .400
.400Total:Aeronautics
ROCHESTER
SKYHAVEN AIRPORT Address Safety ConcernsINSTALL PERIMETER FENCING
3466 Airport
2019 AIP - AIRPORT IMPROVEMENT PROGRAM .316
.316Total:Aeronautics
ROCHESTER
SKYHAVEN AIRPORT 95% Federal funds, 5% State
match. FAA requirement.
Safety issue.
REHABILITATE EXISTING TIEDOWN APRON
4111Airport
2014 AIP - AIRPORT IMPROVEMENT PROGRAM 1.263
1.263Total:Aeronautics
ROCHESTER
SKYHAVEN AIRPORT Address Safety Concerns.SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT
6581 Airport
2012 AIP - AIRPORT IMPROVEMENT PROGRAM .158
.158Total:Aeronautics
ROCHESTER
10620 J
SPAULDING TPK Turnpike Priority Capital ProgramCONSTRUCTION OF 2nd BARREL THROUGH EXIT 16 (Chestnut Hill Connector) - PHASE 4
{Turnpike}
2105 Turnpike Expansion
2011 TPK - TURNPIKE EXPANSION (State FY) 3.800C 2011
2012 TPK - TURNPIKE EXPANSION (State FY) 13.684C 2012
17.484Total:Highway and Bridge 17.484
ROCHESTER
10620 L
SPAULDING TPK Turnpike Priority Capital
Program. Bridge Priority #55
{Red List}.
SPAULDING TURNPIKE EXPANSION FROM EXIT 14, INCLUDING BRIDGE 117/088, TO EXIT 15,
INCLUDING TEN ROD ROAD, FARMINGTON ROAD AND PHASE 2 MITIGATION (Red List)
{Turnpike}3973Turnpike Expansion
2011 TPK - TURNPIKE EXPANSION (State FY) 12.600C 2011
2012 TPK - TURNPIKE EXPANSION (State FY) 14.400C 2011
27.000Total:Highway and Bridge 35.988
Projects Page - 57 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
ROCHESTER
14350
NH 202A (WALNUT
STREET)
Municipal Managed, 20% city
match.
INTERSECTION IMPROVEMENTS TO IMPROVE SAFETY THROUGH STRAFFORD SQUARE, NORTH
MAIN, & WASHINGTON STREETS
2750 FHWA
2015 H280 - STP - HAZARD ELIMINATION PROGRAM .700C 2015
2012 H280 - STP - HAZARD ELIMINATION PROGRAM .525R
1.225Total:Highway and Bridge 1.725
ROCHESTER
15863
PICKERING ROAD Specific project from Statewide
program.
RECLAIM, EXCAVATE AND REPLACE CRUSHED GRAVEL AND PAVEMENT [BET-RSR*6730]
{Betterment}
7456 Betterment
2011 BET - BETTERMENT (State FY) .433C New Project
.433Total:Highway and Bridge
ROXBURY - SULLIVAN
10439
NH 9 Scope intent to address
pavement and safety
improvement on existing
alignment. Bridge Priority #73
{Red List}.
RECONSTRUCT SHOULDERS & WIDEN FROM EAST SULLIVAN, SOUTH 2.04 MI; 093/061 (Red List)
102
FHWA
2017 L050 - NATIONAL HIGHWAY SYSTEM 4.250C 2017
2011 L050 - NATIONAL HIGHWAY SYSTEM .025P
2012 L050 - NATIONAL HIGHWAY SYSTEM .019P
2012 L050 - NATIONAL HIGHWAY SYSTEM .100P
2013 L050 - NATIONAL HIGHWAY SYSTEM .025P
2014 L050 - NATIONAL HIGHWAY SYSTEM .025P
2011 L050 - NATIONAL HIGHWAY SYSTEM .025R
2012 L050 - NATIONAL HIGHWAY SYSTEM .300R
2013 L050 - NATIONAL HIGHWAY SYSTEM .025R
2014 L050 - NATIONAL HIGHWAY SYSTEM .300R
5.094Total:Highway and Bridge 4.994
RUMNEY
14472
NH 25 Specific project from Statewide
program.
STABILIZE ROADWAY EMBANKMENT ALONG APPROX 720 FT. OF THE BAKER RIVER LOCATED
APPROX 1500 FT NORTH OF THE POLAR CAVES [BET-HIRI*3639] {Betterment}
5975 Betterment
2013 BET - BETTERMENT (State FY) .500C 2013
.500Total:Highway and Bridge 0.500
Projects Page - 58 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
SALEM
12334
NH 28 Municipal jurisdiction at 20%
match.
RECONSTRUCT INTERSECTION, MAIN STREET @ DEPOT STREET, INCLUDING SIGNALS, LEFT TURN
LANES & APPROACHES
630 FHWA
2016 L230 - STP - URBANIZED AREAS OVER 200,000 2.500C 2015
2013 L230 - STP - URBANIZED AREAS OVER 200,000 .100P
2014 L230 - STP - URBANIZED AREAS OVER 200,000 .150P
2014 L230 - STP - URBANIZED AREAS OVER 200,000 .010P
2015 L230 - STP - URBANIZED AREAS OVER 200,000 .010P
2013 L230 - STP - URBANIZED AREAS OVER 200,000 .150R
2014 L230 - STP - URBANIZED AREAS OVER 200,000 .350R
2015 L230 - STP - URBANIZED AREAS OVER 200,000 .250R
3.520Total:Highway and Bridge 3.520
SALEM
14881
EMERSON WAY Red List Bridge. Specific project
from Statewide program,
Municipal managed.
BRIDGE REPLACEMENT OVER WIDOW HARRIS BROOK - 114/108 {Red List}
6416State Aid Bridge
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .733C 2009
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .126P
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .025R
.884Total:Highway and Bridge 0.884
SALEM
15592
CLUFFS CROSSING Red List Bridge. Specific project
from Statewide program,
Municipal Managed.
Advanced Constructed in SFY
2009.
REPAIR / REPLACEMENT OF BRIDGE OVER POLICY BROOK - 094/060 {Red List}
7089
State Aid Bridge
2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .706C New Project
2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .010R
.716Total:Highway and Bridge
SALEM
15596
PELHAM ROAD Specific project from Statewide
program, Municipal Managed.
BRIDGE REPLACEMENT OVER PORCUPINE BROOK - 058/074 (NEW)
7095 State Aid Bridge
2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .468C New Project
2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .066P
.534Total:Highway and Bridge
SALEM
15772
NORTH MAIN STREET Specific project from Statewide
program, Municipal Managed.
BRIDGE REPLACEMENT OVER WIDOW HARRIS BROOK - 115/115 [SAB*4216] {State Aid Bridge
Program}
7308 State Aid Bridge
2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .549C
2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .095P
2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .010R
.654Total:Highway and Bridge
Projects Page - 59 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
SALEM TO MANCHESTER
10418 C
I-93 Overall, corridor project overall
for PE & ROW, construction
broken out to individual
projects.
RECONSTRUCT & WIDEN MAINLINE, ENVIRONMENTAL IMPACT STUDY AND FINAL DESIGN
FROM MASS S/L IN SALEM TO I-293 IN MANCHESTER (PE & ROW Only) [Section 1602 -
Designated Project; Demo Id NH014]69
FHWA
2011 L010 - INTERSTATE MAINTENANCE 4.783P
2011 L010 - INTERSTATE MAINTENANCE 7.397P
2011 L010 - INTERSTATE MAINTENANCE 4.000R
2011 L010 - INTERSTATE MAINTENANCE 5.570R
2011 L010 - INTERSTATE MAINTENANCE 1.100R
22.850Total:Highway and Bridge
SALEM TO MANCHESTER
10418 C #
I-93 See Section 5 of HB 2010. While
Priority improvements are
funded, facilitated by GARVEE
bonds, these further capacity
improvements, totaling
approximately $250M, are not
fully funded due to financial
constraint.
PHASE II CAPACITY IMPROVEMENTS, RECONSTRUCTION AND WIDENING FROM NORTH OF EXIT
3 TO I-293 (Excluding Exit 5)
7560
FHWA
2014 L010 - INTERSTATE MAINTENANCE .000C
.000Total:Highway and Bridge
SALEM TO MANCHESTER
10418 H
I-93 Reflects current construction
sequencing and costs. GARVEE
bonding to facilitate
construction program.
PARK & RIDE @ EXIT 3 (Windham) (CMAQ Program) [Part of 04-33CM]
3138
FHWA
2014 L010 - INTERSTATE MAINTENANCE 1.053C
2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 4.099C CMAQ 2004
2014 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT .364C
5.516Total:Highway and Bridge 8.330
SALEM TO MANCHESTER
10418 T
I-93 Service to help manage
incidents and reduce delay.
CORRIDOR SERVICE PATROL (Salem to Manchester)
7112 FHWA
2011 L010 - INTERSTATE MAINTENANCE .075P
.075Total:Highway and Bridge
Projects Page - 60 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
SALEM TO MANCHESTER
10418 W
I-93 Earmark funds to help address
salt issues.
WATER QUALITY STUDY [Section 1702 - Designated Project; Demo Id NH054]
6052 FHWA
2011 LY20 - HIGH PRIORITY PROJ SEC 1702 .743P
2012 LY20 - HIGH PRIORITY PROJ SEC 1702 .774P
2013 LY20 - HIGH PRIORITY PROJ SEC 1702 .778P
2014 LY20 - HIGH PRIORITY PROJ SEC 1702 .703P
2015 LY20 - HIGH PRIORITY PROJ SEC 1702 .361P
2016 LY20 - HIGH PRIORITY PROJ SEC 1702 .313P
3.670Total:Highway and Bridge
SALEM TO MANCHESTER
13933 D
I-93 Reflects current construction
sequencing and costs. GARVEE
bonding to facilitate
construction program. Red list
bridges priorities #2 and #3
MAINLINE, EXIT 1 TO STA. 1130 & NH38 (Salem), INCLUDES BRIDGES 073/063 & 077/063 {Both
Red List} [Partial Garvee Bonded Project] (Parent = Salem to Manchester 13933*)
3818
FHWA
2011 L050 - NATIONAL HIGHWAY SYSTEM 3.353C 2010
2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 10.022C
2012 L050 - NATIONAL HIGHWAY SYSTEM 16.050C 2010
2012 L050 - NATIONAL HIGHWAY SYSTEM 1.605C 2010
2013 L050 - NATIONAL HIGHWAY SYSTEM 4.494C 2010
35.524Total:Highway and Bridge 22.800
SALEM TO MANCHESTER
13933 E
I-93 Reflects current construction
sequencing and costs. GARVEE
bonding to facilitate
construction program. Red list
bridges priorities #10 and #11.
EXIT 2 INTERCHANGE RECONSTRUCTION, INCLUDING I-93 MAINLINE & NH97, INCLUDES
BRIDGES 068/078 & 070/079 {Both Red List} (Salem) (Parent = Salem to Manchester)
3819
FHWA
2012 L050 - NATIONAL HIGHWAY SYSTEM 7.593C 2011
2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 9.325C 2011
2013 L010 - INTERSTATE MAINTENANCE 11.175C 2011
2013 L050 - NATIONAL HIGHWAY SYSTEM 12.000C 2011
2014 L010 - INTERSTATE MAINTENANCE 3.404C
2014 L050 - NATIONAL HIGHWAY SYSTEM 3.404C
46.900Total:Highway and Bridge 41.800
SALEM TO MANCHESTER
13933 F
I-93 Reflects current construction
sequencing and costs. GARVEE
bonding to facilitate
construction program. Red List
Bridge Priority #102.
BROOKDALE ROAD, BRIDGE REPLACEMENT - 058/089 & APPROACHES (Salem) {Red List}
5728
FHWA
2011 L050 - NATIONAL HIGHWAY SYSTEM 5.619C From Previous Plan Prior To 2009
2011 L110 - BRIDGE PROGRAM - OFF SYSTEM .899C
6.518Total:Highway and Bridge
Projects Page - 61 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
SALEM TO MANCHESTER
13933 I
I-93 Reflects current construction
sequencing and costs. GARVEE
bonding to facilitate
construction program.
EXIT 3 AREA, RECONSTRUCT SOUTHBOUND BARREL FROM BROOKDALE ROAD TO NORTH OF
NH111, INCLUDING THE SOUTHBOUND ON RAMP AND THE NORTH BOUND ON RAMP
(WINDHAM) [Parent = Sal-Man 13933*]3820
FHWA
2013 L050 - NATIONAL HIGHWAY SYSTEM 7.758C Previously Programmed Beyond FY2018
2014 L050 - NATIONAL HIGHWAY SYSTEM 23.219C Previously Programmed Beyond FY2018
2015 L050 - NATIONAL HIGHWAY SYSTEM 23.219C Previously Programmed Beyond FY2018
2016 L050 - NATIONAL HIGHWAY SYSTEM 23.219C Previously Programmed Beyond FY2018
2017 L050 - NATIONAL HIGHWAY SYSTEM 15.676C Previously Programmed Beyond FY2018
93.090Total:Highway and Bridge
SALEM TO MANCHESTER
14633 F
I-93 Reflects current construction
sequencing and costs. GARVEE
bonding to facilitate
construction program. 4 Red list
bridges priorities #6, #7, #8,
and #9.
EXIT 5 AREA, RECONSTRUCT INTERCHANGE INCLUDING NORTH BOUND AND SOUTH BOUND
MAINLINE AND NORTH BOUND OFF-RAMP, INCLUDES BRIDGES 096/163, 097/163, 099/160, &
100/160 {All Red List} (Londonderry) (Garvee Bonded) (Parent = Salem to Manchester 13933*)6338
FHWA
2011 L050 - NATIONAL HIGHWAY SYSTEM .072C 2009
2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 16.869C 2009
2012 L050 - NATIONAL HIGHWAY SYSTEM 18.060C 2009
2013 L050 - NATIONAL HIGHWAY SYSTEM 18.060C Additional Funds
53.062Total:Highway and Bridge 43.300
SALEM TO MANCHESTER
14800 *
I-93 GARVEE Bond debt service,
approximately $24 million
annually through 2026.
"DEBT SERVICE PROJECT" FOR: RECONSTRUCTION & WIDENING FROM S/L TO MANCHESTER
[Garvee Bonded Projects - 2005 NH Legislature Approved]
4110FHWA
2012 L050 - NATIONAL HIGHWAY SYSTEM 2.029C
2013 L050 - NATIONAL HIGHWAY SYSTEM 6.674C 2013
2014 L050 - NATIONAL HIGHWAY SYSTEM 11.891C 2014
2015 L050 - NATIONAL HIGHWAY SYSTEM 14.911C 2015
2016 L050 - NATIONAL HIGHWAY SYSTEM 17.894C 2016
2017 L050 - NATIONAL HIGHWAY SYSTEM 21.250C 2017
2018 L050 - NATIONAL HIGHWAY SYSTEM 24.000C 2018
2019 L050 - NATIONAL HIGHWAY SYSTEM 24.000C Previously Programmed Beyond FY2018
2020 L050 - NATIONAL HIGHWAY SYSTEM 24.000C Previously Programmed Beyond FY2018
146.649Total:Highway and Bridge 144.000
SEABROOK
15769
NH 107 Specific project from HB 391,
Turnpike Capital Program.
Supplemental to developer
improvements.
BRIDGE WIDENING OVER I-95 {Turnpike}
7305
Turnpike Expansion
2013 TPK - TURNPIKE EXPANSION (State FY) 2.000C
2.000Total:Highway and Bridge
Projects Page - 62 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
SHARON
15513
CROSS ROAD Specific project from Statewide
program, Municipal Managed.
BRIDGE REPLACEMENT OVER TOWN LINE BROOK - 071/099
7000 State Aid Bridge
2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .365C New Project
2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .080P
2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.450Total:Highway and Bridge
SOMERSWORTH, NH -
BERWICK, ME
12228
NH 9 Municipal Managed.REHAB BRIDGE OVER SALMON FALLS RIVER - 101/114
417 FHWA
2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .368C 2010
2011 ME - MAINE'S CONTRIBUTION .368C 2010
.735Total:Highway and Bridge 0.735
SPR #1
Planning & Research Federal specified funding for
data gathering, long range
planning, special studies. Cost
reflects anticipated federal
funding.
STATE PLANNING & RESEARCH - PART #1 "PLANNING"
665
FHWA
2011 L550 - "SAFTEA-LU"-STATE PLAN'N & RSRCH-PART 1 "PLAN'N"2% 2.864P
2012 L550 - "SAFTEA-LU"-STATE PLAN'N & RSRCH-PART 1 "PLAN'N"2% 2.864P
2013 L550 - "SAFTEA-LU"-STATE PLAN'N & RSRCH-PART 1 "PLAN'N"2% 2.864P
2014 L550 - "SAFTEA-LU"-STATE PLAN'N & RSRCH-PART 1 "PLAN'N"2% 2.864P
2015 L550 - "SAFTEA-LU"-STATE PLAN'N & RSRCH-PART 1 "PLAN'N"2% 2.864P
2016 L550 - "SAFTEA-LU"-STATE PLAN'N & RSRCH-PART 1 "PLAN'N"2% 2.864P
2017 L550 - "SAFTEA-LU"-STATE PLAN'N & RSRCH-PART 1 "PLAN'N"2% 2.864P
2018 L550 - "SAFTEA-LU"-STATE PLAN'N & RSRCH-PART 1 "PLAN'N"2% 2.864P
2019 L550 - "SAFTEA-LU"-STATE PLAN'N & RSRCH-PART 1 "PLAN'N"2% 2.864P
2020 L550 - "SAFTEA-LU"-STATE PLAN'N & RSRCH-PART 1 "PLAN'N"2% 2.864P
28.645Total:Highway and Bridge
Projects Page - 63 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
SPR #2
Planning & Research Federal specified funding for
research activities involving
construction materials and
processes.
STATE PLANNING & RESEARCH - PART #2 "RESEARCH"
666
FHWA
2011 L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY .612P
2012 L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY .612P
2013 L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY .612P
2014 L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY .612P
2015 L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY .612P
2016 L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY .612P
2017 L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY .612P
2018 L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY .612P
2019 L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY .612P
2020 L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY .612P
6.122Total:Highway and Bridge
STATEWIDE
12563 *
ADMINISTRATION Program Funding for
Departmental Training.
ANNUAL TRAINING PROGRAM (Annual Project)
451 FHWA
2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .200P
2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .200P
2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .200P
2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .200P
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .200P
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .200P
2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .200P
2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .200P
2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .200P
2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .200P
2.000Total:Highway and Bridge
STATEWIDE SPECIAL
10336 *
ADMINISTRATION Federal specified funding for
disadvantaged business
enterprises.
IN HOUSE ADMINISTRATION OF THE FHWA SUPPORTIVE SERVICES PROGRAM: "DBE"
COMPLIANCE MONITORING (Annual Program)
45FHWA
2011 H480 - DBE - SUPPORTIVE SERVICES .090P
2012 H480 - DBE - SUPPORTIVE SERVICES .090P
2013 H480 - DBE - SUPPORTIVE SERVICES .090P
2014 H480 - DBE - SUPPORTIVE SERVICES .090P
2015 H480 - DBE - SUPPORTIVE SERVICES .090P
2016 H480 - DBE - SUPPORTIVE SERVICES .090P
2017 H480 - DBE - SUPPORTIVE SERVICES .090P
2018 H480 - DBE - SUPPORTIVE SERVICES .090P
2019 H480 - DBE - SUPPORTIVE SERVICES .090P
2020 H480 - DBE - SUPPORTIVE SERVICES .090P
.900Total:Highway and Bridge
Projects Page - 64 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE-TRAC
13668
ADMINISTRATION Program Funding for 'Education
Outreach' Working with Local
High Schools.
IMPLEMENT AND PARTICIPATE IN AASHTO TRAC PROGRAM IN LOCAL HIGH SCHOOLS TO
ENCOURAGE STUDENTS TO EXPLORE OPPORTUNITIES IN TRANSPORTATION CAREERS (Annual
Program)3512FHWA
2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .021P
2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .021P
2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .021P
2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .021P
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .021P
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .021P
2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .021P
2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .021P
2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .021P
2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .021P
.208Total:Highway and Bridge
STATEWIDE
AIRPORTS Address Safety Concerns.INSTALL INSTRUMENT LANDING SYSTEM IN THE NORTH COUNTRY
6584 Airport
2011 AIP - AIRPORT IMPROVEMENT PROGRAM 4.210
4.210Total:Aeronautics
STATEWIDE
AIRPORTS Performed in accordance with
Pavement Management
System.
PAVEMENT MAINTENANCE
3472Airport
2011 AIP - AIRPORT IMPROVEMENT PROGRAM .100
2012 AIP - AIRPORT IMPROVEMENT PROGRAM .100
2013 AIP - AIRPORT IMPROVEMENT PROGRAM .100
2014 AIP - AIRPORT IMPROVEMENT PROGRAM .100
2015 AIP - AIRPORT IMPROVEMENT PROGRAM .100
2016 AIP - AIRPORT IMPROVEMENT PROGRAM .100
2017 AIP - AIRPORT IMPROVEMENT PROGRAM .100
2018 AIP - AIRPORT IMPROVEMENT PROGRAM .100
2019 AIP - AIRPORT IMPROVEMENT PROGRAM .100
2020 AIP - AIRPORT IMPROVEMENT PROGRAM .100
1.000Total:Aeronautics
Projects Page - 65 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE
AIRPORTS Planning document; 5% State
match. Allows for updated
management of the dynamic
system of NH Open to the
Public Airports.
STATE AIRPORT SYSTEM PLANNING
3473
Airport
2011 AIP - AIRPORT IMPROVEMENT PROGRAM .150
2012 AIP - AIRPORT IMPROVEMENT PROGRAM .150
2013 AIP - AIRPORT IMPROVEMENT PROGRAM .150
2014 AIP - AIRPORT IMPROVEMENT PROGRAM .150
2015 AIP - AIRPORT IMPROVEMENT PROGRAM .150
2016 AIP - AIRPORT IMPROVEMENT PROGRAM .150
2017 AIP - AIRPORT IMPROVEMENT PROGRAM .150
2018 AIP - AIRPORT IMPROVEMENT PROGRAM .150
2019 AIP - AIRPORT IMPROVEMENT PROGRAM .150
2020 AIP - AIRPORT IMPROVEMENT PROGRAM .150
1.500Total:Aeronautics
STATEWIDE DISTRICTS
BET-BRPI *
BETTERMENT Small State System Projects.BRIDGE REHABILITATION, PRESERVATION & IMPROVEMENT PROJECTS
4212 Betterment
2011 BET - BETTERMENT (State FY) .600C
2012 BET - BETTERMENT (State FY) .600C
2013 BET - BETTERMENT (State FY) .600C
2014 BET - BETTERMENT (State FY) .600C
2015 BET - BETTERMENT (State FY) .600C
2016 BET - BETTERMENT (State FY) .600C
2017 BET - BETTERMENT (State FY) .600C
2018 BET - BETTERMENT (State FY) .600C
2019 BET - BETTERMENT (State FY) .600C
2020 BET - BETTERMENT (State FY) .600C
6.000Total:Highway and Bridge
STATEWIDE DISTRICTS
BET-FA *
BETTERMENT Force Account Through District
Staff
DISTRICTS FORCE ACCOUNT WORK @ VARIOUS LOCATIONS [Parent] (Annual Project)
789 Betterment
2011 BET - BETTERMENT (State FY) 1.800C
2012 BET - BETTERMENT (State FY) 1.800C
2013 BET - BETTERMENT (State FY) 1.800C
2014 BET - BETTERMENT (State FY) 1.800C
2015 BET - BETTERMENT (State FY) 1.800C
2016 BET - BETTERMENT (State FY) 1.800C
2017 BET - BETTERMENT (State FY) 1.800C
2018 BET - BETTERMENT (State FY) 1.800C
2019 BET - BETTERMENT (State FY) 1.800C
2020 BET - BETTERMENT (State FY) 1.800C
18.000Total:Highway and Bridge
Projects Page - 66 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE DISTRICTS
BET-HIRI *
BETTERMENT Small State System Projects.HAZARDOUS INTERSECTION AND ROADWAY IMPROVEMENTS (Annual Project)
3639 Betterment
2011 BET - BETTERMENT (State FY) 1.200C
2012 BET - BETTERMENT (State FY) 1.200C
2013 BET - BETTERMENT (State FY) .700C
2014 BET - BETTERMENT (State FY) 1.200C
2015 BET - BETTERMENT (State FY) 1.200C
2016 BET - BETTERMENT (State FY) 1.200C
2017 BET - BETTERMENT (State FY) 1.200C
2018 BET - BETTERMENT (State FY) 1.200C
2019 BET - BETTERMENT (State FY) 1.200C
2020 BET - BETTERMENT (State FY) 1.200C
11.500Total:Highway and Bridge
STATEWIDE
15263 A
ENG & ROW Consultant Services to Provide
Periodic Specialized Inspection
Needs.
COMPLEX BRIDGE INSPECTION (PARENT=CBI*7237)
3570FHWA
2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .750P
.750Total:Highway and Bridge
STATEWIDE
CS-LRTP *
ENG & ROW Implement strategic inter-
regional corridor studies.
CORRIDOR STUDIES [Parent] {Long Range Transportation Plan}
6781 FHWA
2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.000P
2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 1.500P
2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 1.500P
2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 1.500P
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 1.500P
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 1.500P
2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 1.500P
2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 1.500P
2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 1.500P
2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 1.500P
15.500Total:Highway and Bridge
Projects Page - 67 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE M & R
ACTIVITIES
13921 *
ENG & ROW Means of Servicing
Sophisticated Electronic Lab &
Materials Equipment used on
Federal Aid Highway & Bridge
Projects
EQUIPMENT SERVICE & CALIBRATION AGREEMENTS AND PROJECT RELATED CONSUMABLES
(Annual Project)
3801
FHWA
2011 L200 - STP - AREAS LESS THAN 200,000 .050C
2012 L200 - STP - AREAS LESS THAN 200,000 .050C
2013 L200 - STP - AREAS LESS THAN 200,000 .050C
2014 L200 - STP - AREAS LESS THAN 200,000 .050C
2015 L200 - STP - AREAS LESS THAN 200,000 .050C
2016 L200 - STP - AREAS LESS THAN 200,000 .050C
2017 L200 - STP - AREAS LESS THAN 200,000 .050C
2018 L200 - STP - AREAS LESS THAN 200,000 .050C
2019 L200 - STP - AREAS LESS THAN 200,000 .050C
2020 L200 - STP - AREAS LESS THAN 200,000 .050C
2011 L200 - STP - AREAS LESS THAN 200,000 .045P
2012 L200 - STP - AREAS LESS THAN 200,000 .045P
2013 L200 - STP - AREAS LESS THAN 200,000 .045P
2014 L200 - STP - AREAS LESS THAN 200,000 .045P
2015 L200 - STP - AREAS LESS THAN 200,000 .045P
2016 L200 - STP - AREAS LESS THAN 200,000 .045P
2017 L200 - STP - AREAS LESS THAN 200,000 .045P
2018 L200 - STP - AREAS LESS THAN 200,000 .045P
2019 L200 - STP - AREAS LESS THAN 200,000 .045P
2020 L200 - STP - AREAS LESS THAN 200,000 .045P
.950Total:Highway and Bridge
STATEWIDE SPECIAL
10909 *
ENG & ROW For Funding Shared (MA & NH)
USGS Geodectic Survey Advisor
Position & Coordination
GEODETIC ADVISOR, COOPERATIVE AGREEMENT BETWEEN US DEPT of COMMERCE NATIONAL
OCEAN SERVICES & NHDOT (Annual Project)
2683FHWA
2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .047P
2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .049P
2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .051P
2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .054P
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .057P
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .060P
2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .062P
2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .066P
2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .069P
2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .072P
.586Total:Highway and Bridge
Projects Page - 68 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE P.E.
ENG & ROW Available PE funding as
required for specific projects for
which the scope of work (and
the depth of engineering) is yet
to be defined.
PRELIMINARY ENGINEERING (Annual Funding)
3531
FHWA
2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 5.000P
2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 5.250P
2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 8.375P
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 7.750P
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 7.750P
2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.500P
2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.500P
2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.500P
2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.500P
44.125Total:Highway and Bridge
STATEWIDE R.O.W.
ENG & ROW Available ROW funding as
required for specific projects for
which the scope of work (and
the amount of ROW) is yet to be
defined.
RIGHT OF WAY ACQUISITIONS (Annual Funding)
3532
FHWA
2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 7.500R
2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 10.500R
2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 9.750R
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 10.500R
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 12.500R
2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 7.500R
2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 7.500R
2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 7.500R
2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 7.500R
80.750Total:Highway and Bridge
Projects Page - 69 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE
UBI *
ENG & ROW Consultant services for
underwater bridge inspections.
UNDERWATER BRIDGE INSPECTION (Annual Project)
186 FHWA
2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .030P
2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .030P
2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .030P
2014 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .030P
2015 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .030P
2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .030P
2017 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .030P
2018 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .030P
2019 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .030P
2020 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .030P
.300Total:Highway and Bridge
STATEWIDE
15469
I-93, I-95, F.E. EVERETT
TPK
Specific project from Statewide
program.
REPLACE TOLL PLAZA GENERATOR, TRANSFER SWITCH AND CANOPY LIGHTS
6986 npike Renewal & Replacem
2011 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) .350C New Project
2011 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) .020P
.370Total:Highway and Bridge
Projects Page - 70 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE
P8903 *
LOW VOLUME
CORRIDORS
Specified Funding for
Recreational Trail Program
Administered by DRED.
RECREATIONAL TRAILS FUND ACT- PROJECTS SELECTED ANNUALLY
2570FHWA
2011 L940 - RECREATIONAL TRAILS .775C
2012 L940 - RECREATIONAL TRAILS .775C
2013 L940 - RECREATIONAL TRAILS .775C
2014 L940 - RECREATIONAL TRAILS .775C
2015 L940 - RECREATIONAL TRAILS .775C
2016 L940 - RECREATIONAL TRAILS .775C
2017 L940 - RECREATIONAL TRAILS .775C
2018 L940 - RECREATIONAL TRAILS .775C
2019 L940 - RECREATIONAL TRAILS .775C
2020 L940 - RECREATIONAL TRAILS .775C
2011 L940 - RECREATIONAL TRAILS .005P
2012 L940 - RECREATIONAL TRAILS .005P
2013 L940 - RECREATIONAL TRAILS .005P
2014 L940 - RECREATIONAL TRAILS .005P
2015 L940 - RECREATIONAL TRAILS .005P
2016 L940 - RECREATIONAL TRAILS .005P
2017 L940 - RECREATIONAL TRAILS .005P
2018 L940 - RECREATIONAL TRAILS .005P
2019 L940 - RECREATIONAL TRAILS .005P
2020 L940 - RECREATIONAL TRAILS .005P
2011 L940 - RECREATIONAL TRAILS .001R
2012 L940 - RECREATIONAL TRAILS .001R
2013 L940 - RECREATIONAL TRAILS .001R
2014 L940 - RECREATIONAL TRAILS .001R
2015 L940 - RECREATIONAL TRAILS .001R
2016 L940 - RECREATIONAL TRAILS .001R
2017 L940 - RECREATIONAL TRAILS .001R
2018 L940 - RECREATIONAL TRAILS .001R
2019 L940 - RECREATIONAL TRAILS .001R
2020 L940 - RECREATIONAL TRAILS .001R
7.810Total:Bike / Pedestrian
Projects Page - 71 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE
SBCM *
LOW VOLUME
CORRIDORS
Federal specified funding for
Highways designated as scenic
byways.
SCENIC BYWAYS CORRIDOR MANAGEMENT, PLANNING, AND DEVELOPMENT OF FACILITIES,
TO ENHANCE SCENIC QUALITIES OF NEW HAMPSHIRE (Annual Project)
1155FHWA
2011 L970 - SCENIC BYWAYS PROGRAM .100C
2012 L970 - SCENIC BYWAYS PROGRAM .100C
2013 L970 - SCENIC BYWAYS PROGRAM .100C
2014 L970 - SCENIC BYWAYS PROGRAM .100C
2015 L970 - SCENIC BYWAYS PROGRAM .100C
2016 L970 - SCENIC BYWAYS PROGRAM .100C
2017 L970 - SCENIC BYWAYS PROGRAM .100C
2018 L970 - SCENIC BYWAYS PROGRAM .100C
2019 L970 - SCENIC BYWAYS PROGRAM .100C
2020 L970 - SCENIC BYWAYS PROGRAM .100C
2011 L970 - SCENIC BYWAYS PROGRAM .100P
2012 L970 - SCENIC BYWAYS PROGRAM .100P
2013 L970 - SCENIC BYWAYS PROGRAM .100P
2014 L970 - SCENIC BYWAYS PROGRAM .100P
2015 L970 - SCENIC BYWAYS PROGRAM .100P
2016 L970 - SCENIC BYWAYS PROGRAM .100P
2017 L970 - SCENIC BYWAYS PROGRAM .100P
2018 L970 - SCENIC BYWAYS PROGRAM .100P
2019 L970 - SCENIC BYWAYS PROGRAM .100P
2020 L970 - SCENIC BYWAYS PROGRAM .100P
2011 L970 - SCENIC BYWAYS PROGRAM .100R
2012 L970 - SCENIC BYWAYS PROGRAM .100R
2013 L970 - SCENIC BYWAYS PROGRAM .100R
2014 L970 - SCENIC BYWAYS PROGRAM .100R
2015 L970 - SCENIC BYWAYS PROGRAM .100R
2016 L970 - SCENIC BYWAYS PROGRAM .100R
2017 L970 - SCENIC BYWAYS PROGRAM .100R
2018 L970 - SCENIC BYWAYS PROGRAM .100R
2019 L970 - SCENIC BYWAYS PROGRAM .100R
2020 L970 - SCENIC BYWAYS PROGRAM .100R
3.000Total:Highway and Bridge
Projects Page - 72 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE
EFH *
LOW VOLUME
CORRIDORS
TO ENHANCE NATIONAL BENEFITS BY PROVIDING CONSTRUCTION & MAINTENANCE OF
FOREST HIGHWAYS (Annual Project)
444 FHWA
2011 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .675C
2012 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .675C
2013 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .675C
2014 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .675C
2015 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .675C
2016 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .675C
2017 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .675C
2018 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .675C
2019 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .675C
2020 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .675C
2011 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .050P
2012 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .050P
2013 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .050P
2014 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .050P
2015 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .050P
2016 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .050P
2017 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .050P
2018 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .050P
2019 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .050P
2020 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .050P
2011 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .005R
2012 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .005R
2013 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .005R
2014 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .005R
2015 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .005R
2016 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .005R
2017 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .005R
2018 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .005R
2019 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .005R
2020 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .005R
7.300Total:Highway and Bridge
Projects Page - 73 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE
13763 *
MISCELLANEOUS Annual Statewide Wild Flower
Program
ANNUAL STATEWIDE PROGRAM FOR THE EXPANDED WILD FLOWER ESTABLISHMENT PROGRAM
FOR USE IN PLANTING NATIVE WILD FLOWERS (License Plate Program)
4229 Other
2011 NON - OTHER NON PARTICIPATING .037C
2012 NON - OTHER NON PARTICIPATING .037C
2013 NON - OTHER NON PARTICIPATING .037C
2014 NON - OTHER NON PARTICIPATING .037C
2015 NON - OTHER NON PARTICIPATING .037C
2016 NON - OTHER NON PARTICIPATING .037C
2017 NON - OTHER NON PARTICIPATING .037C
2018 NON - OTHER NON PARTICIPATING .037C
2019 NON - OTHER NON PARTICIPATING .037C
2020 NON - OTHER NON PARTICIPATING .037C
2011 NON - OTHER NON PARTICIPATING .003P
2012 NON - OTHER NON PARTICIPATING .003P
2013 NON - OTHER NON PARTICIPATING .003P
2014 NON - OTHER NON PARTICIPATING .003P
2015 NON - OTHER NON PARTICIPATING .003P
2016 NON - OTHER NON PARTICIPATING .003P
2017 NON - OTHER NON PARTICIPATING .003P
2018 NON - OTHER NON PARTICIPATING .003P
2019 NON - OTHER NON PARTICIPATING .003P
2020 NON - OTHER NON PARTICIPATING .003P
.400Total:Highway and Bridge
Projects Page - 74 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE
14899
MISCELLANEOUS $0.15 million annual program.MAINTENANCE AND UPGRADES FOR REST AREAS
6127 FHWA
2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .135C
2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .135C
2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .135C
2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .135C
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .135C
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .135C
2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .135C
2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .135C
2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .135C
2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .135C
2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .015P
2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .015P
2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .015P
2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .015P
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .015P
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .015P
2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .015P
2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .015P
2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .015P
2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .015P
1.500Total:Highway and Bridge
STATEWIDE
CMNA *
MUNICIPAL Specific CMAQ Projects
Occupy the Vacant FY's &
Below Normal FY Funding
CMAQ PROJECTS MUST BE IN NON-ATTAIN AREAS (Annual Project)
446FHWA
2015 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 6.852C
2016 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 8.352C
2017 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 10.000C
2018 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 10.000C
2019 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 10.000C
2020 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 10.000C
55.203Total:Highway and Bridge
Projects Page - 75 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE
MOBRR *
MUNICIPAL Special Municipal Projects
Occupy the Vacant FYs &
Below Normal FY Funding.
MUNICIPAL OWNED BRIDGE REHABILITATION & REPLACEMENT PROJECTS (Federal, State,
Local Funds) (Annual Project)
221FHWA
2015 L110 - BRIDGE PROGRAM - OFF SYSTEM 1.750C
2016 L110 - BRIDGE PROGRAM - OFF SYSTEM 3.770C
2017 L110 - BRIDGE PROGRAM - OFF SYSTEM 3.770C
2018 L110 - BRIDGE PROGRAM - OFF SYSTEM 3.770C
2019 L110 - BRIDGE PROGRAM - OFF SYSTEM 3.770C
2020 L110 - BRIDGE PROGRAM - OFF SYSTEM 3.770C
2015 L110 - BRIDGE PROGRAM - OFF SYSTEM .320P
2016 L110 - BRIDGE PROGRAM - OFF SYSTEM .320P
2017 L110 - BRIDGE PROGRAM - OFF SYSTEM .320P
2018 L110 - BRIDGE PROGRAM - OFF SYSTEM .320P
2019 L110 - BRIDGE PROGRAM - OFF SYSTEM .320P
2020 L110 - BRIDGE PROGRAM - OFF SYSTEM .320P
2015 L110 - BRIDGE PROGRAM - OFF SYSTEM .160R
2016 L110 - BRIDGE PROGRAM - OFF SYSTEM .160R
2017 L110 - BRIDGE PROGRAM - OFF SYSTEM .160R
2018 L110 - BRIDGE PROGRAM - OFF SYSTEM .160R
2019 L110 - BRIDGE PROGRAM - OFF SYSTEM .160R
2020 L110 - BRIDGE PROGRAM - OFF SYSTEM .160R
23.480Total:Highway and Bridge
STATEWIDE
MUPCA
MUNICIPAL Specific Projects occupy
vacant FY's & below normal FY
funding.
MUNICIPAL URBAN PROJECTS - COMPACT AREAS [Annual Project]
450FHWA
2011 L230 - STP - URBANIZED AREAS OVER 200,000 5.720C
2012 L230 - STP - URBANIZED AREAS OVER 200,000 6.600C
2013 L230 - STP - URBANIZED AREAS OVER 200,000 6.350C
2014 L230 - STP - URBANIZED AREAS OVER 200,000 6.040C
2015 L230 - STP - URBANIZED AREAS OVER 200,000 3.460C
2017 L230 - STP - URBANIZED AREAS OVER 200,000 4.400C
2018 L230 - STP - URBANIZED AREAS OVER 200,000 6.600C
2019 L230 - STP - URBANIZED AREAS OVER 200,000 6.600C
2020 L230 - STP - URBANIZED AREAS OVER 200,000 6.600C
52.370Total:Highway and Bridge
Projects Page - 76 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE
SABP
MUNICIPAL Specific Projects Occupy the
Vacant FY's & Below Normal FY
Funding. State program
mandated by RSA 234 to assist
municipalities with bridge
needs. Uses 20% local match /
80% state funds.
STATE AID BRIDGE PROJECTS
4216
State Aid Bridge
2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .738C
2018 SAB - STATE AID BRIDGE (State FY), 20% = Town 5.120C
2019 SAB - STATE AID BRIDGE (State FY), 20% = Town 8.000C
2020 SAB - STATE AID BRIDGE (State FY), 20% = Town 8.000C
21.858Total:Highway and Bridge
STATEWIDE
SAHP
MUNICIPAL Specific Projects Occupy the
Vacant FY's & Below Normal FY
Funding. State program
mandated by RSA 235: 10-:21
for constructing or
reconstructing Class I, II, III
highways when requested by
municipalities. Uses 1/3 local
match / 2/3 state funds.
STATE AID HIGHWAY PROJECTS
4217
State Aid Highway
2011 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town 2.299C
2012 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town 1.510C
2013 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town 2.537C
2014 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town 2.537C
2015 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town 2.537C
2016 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town 2.537C
2017 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town 2.537C
2018 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town 2.537C
2019 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town 2.537C
2020 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town 2.537C
24.108Total:Highway and Bridge
Projects Page - 77 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE SPECIAL
10344 *
MUNICIPAL Federal specified funding for
providing technical assistance
on transportation issues to
municipalities.
TECHNICAL ASSISTANCE PROGRAM TO RURAL COMMUNITIES AND ORGANIZATIONS
THROUGH-OUT THE STATE - (LTAP) (Annual Project)
58
FHWA
2011 L890 - TRANSPORTATION AST. 50% .300P
2012 L890 - TRANSPORTATION AST. 50% .300P
2013 L890 - TRANSPORTATION AST. 50% .300P
2014 L890 - TRANSPORTATION AST. 50% .300P
2015 L890 - TRANSPORTATION AST. 50% .300P
2016 L890 - TRANSPORTATION AST. 50% .300P
2017 L890 - TRANSPORTATION AST. 50% .300P
2018 L890 - TRANSPORTATION AST. 50% .300P
2019 L890 - TRANSPORTATION AST. 50% .300P
2020 L890 - TRANSPORTATION AST. 50% .300P
3.000Total:Highway and Bridge
STATEWIDE
TE *
MUNICIPAL TE program, $4 million annually.TRANSPORTATION ENHANCEMENT PROJECTS (Annual Project)
3747 FHWA
2012 L220 - STP - TRANSPORTATION ENHANCEMENT 2.249C
2013 L220 - STP - TRANSPORTATION ENHANCEMENT 4.000C
2014 L220 - STP - TRANSPORTATION ENHANCEMENT 4.000C
2015 L220 - STP - TRANSPORTATION ENHANCEMENT 4.000C
2016 L220 - STP - TRANSPORTATION ENHANCEMENT 4.000C
2017 L220 - STP - TRANSPORTATION ENHANCEMENT 4.000C
2018 L220 - STP - TRANSPORTATION ENHANCEMENT 4.000C
2019 L220 - STP - TRANSPORTATION ENHANCEMENT 4.000C
2020 L220 - STP - TRANSPORTATION ENHANCEMENT 4.000C
34.249Total:Highway and Bridge
Projects Page - 78 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE
IPPP *
PAVEMENT Interstate paving program,
average of $6 million annually
for preservation needs.
INTERSTATE MAINTENANCE & INTERSTATE PAVEMENT PRESERVATION PROGRAM (Annual
Program)
3927FHWA
2011 L010 - INTERSTATE MAINTENANCE 5.920C
2012 L010 - INTERSTATE MAINTENANCE 5.920C
2013 L010 - INTERSTATE MAINTENANCE 5.920C
2014 L010 - INTERSTATE MAINTENANCE 5.920C
2015 L010 - INTERSTATE MAINTENANCE 5.920C
2016 L010 - INTERSTATE MAINTENANCE 5.920C
2017 L010 - INTERSTATE MAINTENANCE 5.920C
2018 L010 - INTERSTATE MAINTENANCE 5.920C
2019 L010 - INTERSTATE MAINTENANCE 5.920C
2020 L010 - INTERSTATE MAINTENANCE 5.920C
2011 L010 - INTERSTATE MAINTENANCE .100P
2012 L010 - INTERSTATE MAINTENANCE .100P
2013 L010 - INTERSTATE MAINTENANCE .100P
2014 L010 - INTERSTATE MAINTENANCE .100P
2015 L010 - INTERSTATE MAINTENANCE .100P
2016 L010 - INTERSTATE MAINTENANCE .100P
2017 L010 - INTERSTATE MAINTENANCE .100P
2018 L010 - INTERSTATE MAINTENANCE .100P
2019 L010 - INTERSTATE MAINTENANCE .100P
2020 L010 - INTERSTATE MAINTENANCE .100P
60.200Total:Highway and Bridge
Projects Page - 79 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE
PRRCS *
PAVEMENT Federal Resurfacing program.
$16 million annually for
preservation needs.
PAVEMENT RESURFACING, REHABILITATION & CRACKSEAL PROGRAM & RELATED WORK
(Annual Federal Resurfacing Program)
452FHWA
2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 15.775C
2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 15.775C
2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 15.775C
2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 15.775C
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 15.775C
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 15.775C
2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 15.775C
2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 15.775C
2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 15.775C
2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 15.775C
2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .375P
2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .375P
2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .375P
2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .375P
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .375P
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .375P
2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .375P
2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .375P
2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .375P
2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .375P
2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .025R
2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .025R
2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .025R
2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .025R
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .025R
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .025R
2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .025R
2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .025R
2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .025R
2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .025R
161.750Total:Highway and Bridge
Projects Page - 80 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE DISTRICTS
BET-RES *
PAVEMENT Yearly paving by contract from
Statewide Betterment
Resurfacing Program.
RESURFACE @ VARIOUS LOCATIONS (Annual Advertised Projects)
581Betterment
2011 BET - BETTERMENT (State FY) 18.000C
2012 BET - BETTERMENT (State FY) 18.000C
2013 BET - BETTERMENT (State FY) 18.000C
2014 BET - BETTERMENT (State FY) 18.000C
2015 BET - BETTERMENT (State FY) 18.000C
2016 BET - BETTERMENT (State FY) 18.000C
2017 BET - BETTERMENT (State FY) 18.000C
2018 BET - BETTERMENT (State FY) 18.000C
2019 BET - BETTERMENT (State FY) 18.000C
2020 BET - BETTERMENT (State FY) 18.000C
180.000Total:Highway and Bridge
STATEWIDE DISTRICTS
BET-RL *
PAVEMENT Force Account Through District
Staff. Yearly pavement leveling.
ROADWAY LEVELING @ VARIOUS LOCATIONS FOR NEXT FISCAL YEAR RESURFACING (Annual
Project)
792 Betterment
2011 BET - BETTERMENT (State FY) 4.200C
2012 BET - BETTERMENT (State FY) 4.200C
2013 BET - BETTERMENT (State FY) 4.200C
2014 BET - BETTERMENT (State FY) 4.200C
2015 BET - BETTERMENT (State FY) 4.200C
2016 BET - BETTERMENT (State FY) 4.200C
2017 BET - BETTERMENT (State FY) 4.200C
2018 BET - BETTERMENT (State FY) 4.200C
2019 BET - BETTERMENT (State FY) 4.200C
2020 BET - BETTERMENT (State FY) 4.200C
42.000Total:Highway and Bridge
STATEWIDE HWY
REHABILITATION
BET-RSR
PAVEMENT Specific Project from Statewide
Program
REHABILITATION OF SECONDARY ROUTES & OTHER RELATED WORK, TREATMENT TO VARY
[Parent] {Betterment}
6730 Betterment
2011 BET - BETTERMENT (State FY) 6.000C
2012 BET - BETTERMENT (State FY) 6.000C
2013 BET - BETTERMENT (State FY) 6.000C
2014 BET - BETTERMENT (State FY) 6.000C
2015 BET - BETTERMENT (State FY) 6.000C
2016 BET - BETTERMENT (State FY) 6.000C
2017 BET - BETTERMENT (State FY) 6.000C
2018 BET - BETTERMENT (State FY) 6.000C
2019 BET - BETTERMENT (State FY) 6.000C
2020 BET - BETTERMENT (State FY) 6.000C
60.000Total:Highway and Bridge
Projects Page - 81 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE
SSRR *
PAVEMENT Secondary road rehabilitation
program, $3 million annually for
preservation needs.
SECONDARY SYSTEM RECLAMATION / REHAB WITH VARIOUS PAVEMENT TREATMENTS [Parent]
4148FHWA
2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.895C
2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.895C
2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.895C
2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.895C
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.895C
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.895C
2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.895C
2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.895C
2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.895C
2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.895C
2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P
2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P
2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P
2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P
2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P
2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P
2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P
2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P
2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .005R
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .005R
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .005R
2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .005R
2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .005R
2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .005R
2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .005R
29.985Total:Highway and Bridge
STATEWIDE
14936
PE & ROW Specific Project from Statewide
Program
PROJECT PROVIDES PAINT INSPECTION AND CONSULTING SERVICES AS NEEDED FOR ALL
BRIDGE RELATED CONTRACTS ON A STATEWIDE BASIS [HBRRP, BETTERMENT & TURNPIKE]
6490 Betterment
2011 BET - BETTERMENT (State FY) .005P
2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .005P
2011 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) .005P
.015Total:Highway and Bridge
Projects Page - 82 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE DISTRICTS
BET-BPAINT *
PRESERVATION BRIDGE PAINTING AT VARIOUS LOCATIONS [Parent] (Annual Project)
2092 Betterment
2011 BET - BETTERMENT (State FY) 1.800C
2012 BET - BETTERMENT (State FY) 1.800C
2013 BET - BETTERMENT (State FY) 1.800C
2014 BET - BETTERMENT (State FY) 1.800C
2015 BET - BETTERMENT (State FY) 1.800C
2016 BET - BETTERMENT (State FY) 1.800C
2017 BET - BETTERMENT (State FY) 1.800C
2018 BET - BETTERMENT (State FY) 1.800C
2019 BET - BETTERMENT (State FY) 1.800C
2020 BET - BETTERMENT (State FY) 1.800C
18.000Total:Highway and Bridge
Projects Page - 83 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE
BRPPI *
PRESERVATION Bridge preservation program $8
million annually for preservation
needs.
BRIDGE REHABILITATION, PAINTING, PRESERVATION & IMPROVEMENT PROJECTS (Federal
Program)
6601FHWA
2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 7.880C
2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 5.880C
2014 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 7.880C
2015 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 7.880C
2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 7.880C
2017 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 7.880C
2018 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 7.880C
2019 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 7.880C
2020 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 6.380C
2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P
2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P
2014 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P
2015 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P
2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P
2017 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P
2018 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P
2019 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P
2020 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P
2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .020R
2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .020R
2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .020R
2014 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .020R
2015 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .020R
2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .020R
2017 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .020R
2018 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .020R
2019 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .020R
2020 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .020R
68.520Total:Highway and Bridge
Projects Page - 84 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE
CRDR *
PRESERVATION Culvert replacement program
$1 million annually for
preservation needs.
CULVERT REPLACEMENT/REHABILITATION & DRAINAGE REPAIRS (Annual Project)
4157FHWA
2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .870C
2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .870C
2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .870C
2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .870C
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .870C
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .870C
2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .870C
2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .870C
2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .870C
2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .870C
2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P
2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P
2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P
2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P
2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P
2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P
2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P
2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P
2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .030R
2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .030R
2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .030R
2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .030R
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .030R
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .030R
2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .030R
2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .030R
2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .030R
2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .030R
10.000Total:Highway and Bridge
Projects Page - 85 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE
GRR *
PRESERVATION Guardrail Replacement
program, $2 million annually for
preservation needs.
GUARDRAIL REPLACEMENT [Federal Aid Guardrail Improvement Program] (Annual Project)
785FHWA
2011 H280 - STP - HAZARD ELIMINATION PROGRAM 1.880C
2012 H280 - STP - HAZARD ELIMINATION PROGRAM 1.880C
2013 H280 - STP - HAZARD ELIMINATION PROGRAM 1.880C
2014 H280 - STP - HAZARD ELIMINATION PROGRAM 1.880C
2015 H280 - STP - HAZARD ELIMINATION PROGRAM 1.880C
2016 H280 - STP - HAZARD ELIMINATION PROGRAM 1.880C
2017 H280 - STP - HAZARD ELIMINATION PROGRAM 1.880C
2018 H280 - STP - HAZARD ELIMINATION PROGRAM 1.880C
2019 H280 - STP - HAZARD ELIMINATION PROGRAM 1.880C
2020 H280 - STP - HAZARD ELIMINATION PROGRAM 1.880C
2011 H280 - STP - HAZARD ELIMINATION PROGRAM .150P
2012 H280 - STP - HAZARD ELIMINATION PROGRAM .150P
2013 H280 - STP - HAZARD ELIMINATION PROGRAM .150P
2014 H280 - STP - HAZARD ELIMINATION PROGRAM .150P
2015 H280 - STP - HAZARD ELIMINATION PROGRAM .150P
2016 H280 - STP - HAZARD ELIMINATION PROGRAM .150P
2017 H280 - STP - HAZARD ELIMINATION PROGRAM .150P
2018 H280 - STP - HAZARD ELIMINATION PROGRAM .150P
2019 H280 - STP - HAZARD ELIMINATION PROGRAM .150P
2020 H280 - STP - HAZARD ELIMINATION PROGRAM .150P
2011 H280 - STP - HAZARD ELIMINATION PROGRAM .005R
2012 H280 - STP - HAZARD ELIMINATION PROGRAM .005R
2013 H280 - STP - HAZARD ELIMINATION PROGRAM .005R
2014 H280 - STP - HAZARD ELIMINATION PROGRAM .005R
2015 H280 - STP - HAZARD ELIMINATION PROGRAM .005R
2016 H280 - STP - HAZARD ELIMINATION PROGRAM .005R
2017 H280 - STP - HAZARD ELIMINATION PROGRAM .005R
2018 H280 - STP - HAZARD ELIMINATION PROGRAM .005R
2019 H280 - STP - HAZARD ELIMINATION PROGRAM .005R
2020 H280 - STP - HAZARD ELIMINATION PROGRAM .005R
20.350Total:Highway and Bridge
Projects Page - 86 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE DISTRICTS
BET-GRL *
PRESERVATION GUARDRAIL REPLACEMENT @ VARIOUS LOCATIONS [Parent] {Annual Betterment}
2365 Betterment
2011 BET - BETTERMENT (State FY) 1.200C
2012 BET - BETTERMENT (State FY) 1.200C
2013 BET - BETTERMENT (State FY) 1.200C
2014 BET - BETTERMENT (State FY) 1.200C
2015 BET - BETTERMENT (State FY) 1.200C
2016 BET - BETTERMENT (State FY) 1.200C
2017 BET - BETTERMENT (State FY) 1.200C
2018 BET - BETTERMENT (State FY) 1.200C
2019 BET - BETTERMENT (State FY) 1.200C
2020 BET - BETTERMENT (State FY) 1.200C
12.000Total:Highway and Bridge
Projects Page - 87 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE
HSIP *
PRESERVATION Federal specified funding for
safety projects in accordance
with the Highway Safety
Improvement Program.
HIGHWAY SAFTEY IMPROVEMENT PROGRAM (HSIP) [PARENT]
6767
FHWA
2011 LS30 - HWY SAFETY PROG 5.500C
2012 LS30 - HWY SAFETY PROG 6.000C
2013 LS30 - HWY SAFETY PROG 5.500C
2014 LS30 - HWY SAFETY PROG 5.500C
2015 LS30 - HWY SAFETY PROG 5.500C
2016 LS30 - HWY SAFETY PROG 5.500C
2017 LS30 - HWY SAFETY PROG 5.500C
2018 LS30 - HWY SAFETY PROG 5.500C
2019 LS30 - HWY SAFETY PROG 5.500C
2020 LS30 - HWY SAFETY PROG 5.500C
2011 LS30 - HWY SAFETY PROG .600P
2012 LS30 - HWY SAFETY PROG .600P
2013 LS30 - HWY SAFETY PROG .600P
2014 LS30 - HWY SAFETY PROG .600P
2015 LS30 - HWY SAFETY PROG .600P
2016 LS30 - HWY SAFETY PROG .600P
2017 LS30 - HWY SAFETY PROG .600P
2018 LS30 - HWY SAFETY PROG .600P
2019 LS30 - HWY SAFETY PROG .600P
2020 LS30 - HWY SAFETY PROG .600P
2011 LS30 - HWY SAFETY PROG .050R
2012 LS30 - HWY SAFETY PROG .050R
2013 LS30 - HWY SAFETY PROG .050R
2014 LS30 - HWY SAFETY PROG .050R
2015 LS30 - HWY SAFETY PROG .050R
2016 LS30 - HWY SAFETY PROG .050R
2017 LS30 - HWY SAFETY PROG .050R
2018 LS30 - HWY SAFETY PROG .050R
2019 LS30 - HWY SAFETY PROG .050R
2020 LS30 - HWY SAFETY PROG .050R
62.000Total:Highway and Bridge
Projects Page - 88 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE
RR-REPD *
RAIL Force Account with Railroad.
To improve safety of railroad
crossings.
REMOVE EXISTING PROTECTIVE DEVICES & RELOCATE @ CROSSINGS (Annual Project)
637FHWA
2011 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .150C
2012 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .150C
2013 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .150C
2014 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .150C
2015 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .150C
2016 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .150C
2017 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .150C
2018 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .150C
2019 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .150C
2020 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .150C
2011 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .020P
2012 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .020P
2013 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .020P
2014 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .020P
2015 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .020P
2016 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .020P
2017 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .020P
2018 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .020P
2019 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .020P
2020 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .020P
2011 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .010R
2012 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .010R
2013 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .010R
2014 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .010R
2015 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .010R
2016 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .010R
2017 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .010R
2018 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .010R
2019 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .010R
2020 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .010R
1.800Total:Rail
Projects Page - 89 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE
RR-RCS *
RAIL Force Account with Railroad to
improve safety of railroad
crossings.
RECONSTRUCTION OF CROSSINGS, SIGNALS, & RELATED WORK (Annual Project)
1147FHWA
2011 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .400C
2011 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .400C
2012 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .400C
2012 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .400C
2013 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .400C
2013 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .400C
2014 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .400C
2014 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .400C
2015 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .400C
2015 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .400C
2016 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .400C
2016 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .400C
2017 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .400C
2017 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .400C
2018 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .400C
2018 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .400C
2019 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .400C
2019 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .400C
2020 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .400C
2020 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .400C
2011 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .030P
2012 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .030P
2013 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .030P
2014 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .030P
2015 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .030P
2016 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .030P
2017 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .030P
2018 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .030P
2019 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .030P
2020 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .030P
2011 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .010R
2012 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .010R
2013 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .010R
2014 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .010R
2015 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .010R
2016 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .010R
2017 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .010R
2018 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .010R
2019 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .010R
2020 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .010R
8.400Total:Rail
Projects Page - 90 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE
RAIL Proceeds from repayment of
outstanding loans to eligible
railroads. Discrete
improvements in infrastructure
or equipment. Self funded
through repayment of loans.
REVOLVING LOAN FUND FOR SHORTLINE RAILROADS
3493
Rail
2011 RAIL - RAILROAD .400R
2013 RAIL - RAILROAD .400R
2015 RAIL - RAILROAD .400R
1.200Total:Rail
STATEWIDE
RAIL Maintenance on State-Owned
Railroads. Fund to repair State-
owned Railroad lines. Funded
by Railroad operators.
SPECIAL RAILROAD FUND
3494
Rail
2011 RAIL - RAILROAD .400C
2012 RAIL - RAILROAD .400C
2013 RAIL - RAILROAD .400C
2014 RAIL - RAILROAD .400C
2015 RAIL - RAILROAD .400C
2016 RAIL - RAILROAD .400C
2017 RAIL - RAILROAD .400C
2018 RAIL - RAILROAD .400C
2019 RAIL - RAILROAD .400C
2020 RAIL - RAILROAD .400C
4.000Total:Rail
STATEWIDE CONSULTANT
TRAFFIC Sign frame structures require in
depth inspection every 5 years
to assure structural capacity for
safety purposes.
INSPECTION OF SIGN STRUCTURES ON ALL STATE MAINTAINED HIGHWAYS
2681
FHWA
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .200P
.200Total:Highway and Bridge
Projects Page - 91 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE
12223 *
TRAFFIC Annual pavement striping
program funding.
PAVEMENT MARKING (Annual Project)
1146 FHWA
2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 3.100C
2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 3.100C
2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 3.100C
2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 3.100C
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 3.100C
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 3.100C
2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 3.100C
2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 3.100C
2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 3.100C
2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 3.100C
31.000Total:Highway and Bridge
STATEWIDE DISTRICTS
BET-ISU
TRAFFIC Small State System Signal
Improvement Project.
SIGNAL EQUIPMENT UPGRADES @ VARIOUS LOCATIONS (Bureau of Traffic)
3833 Betterment
2011 BET - BETTERMENT (State FY) .120C
2012 BET - BETTERMENT (State FY) .120C
2013 BET - BETTERMENT (State FY) .120C
2014 BET - BETTERMENT (State FY) .120C
2015 BET - BETTERMENT (State FY) .120C
2016 BET - BETTERMENT (State FY) .120C
2017 BET - BETTERMENT (State FY) .120C
2018 BET - BETTERMENT (State FY) .120C
2019 BET - BETTERMENT (State FY) .120C
2020 BET - BETTERMENT (State FY) .120C
1.200Total:Highway and Bridge
STATEWIDE
TMC *
TRAFFIC Programmatic operational
funding support for TMC.
TRANSPORTATION SYSTEMS MANAGEMENT & OPERATIONS (ITS, CARS-511)
4227 FHWA
2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .250P
2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .250P
2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .250P
2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .250P
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .250P
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .250P
2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .250P
2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .250P
2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .250P
2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .250P
2.500Total:Highway and Bridge
Projects Page - 92 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE
USSS *
TRAFFIC Signing Replacement /
Upgrade Program. $0.5M
annually for preservation needs.
UPDATE SIGNING ON STATE SYSTEM (Annual Project)
2735FHWA
2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .500C
2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .500C
2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .500C
2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .500C
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .500C
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .500C
2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .500C
2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .500C
2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .500C
2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .500C
2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .010P
2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .010P
2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .010P
2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .010P
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .010P
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .010P
2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .010P
2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .010P
2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .010P
2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .010P
5.100Total:Highway and Bridge
STATEWIDE
TRANSIT CAPITAL EQUIPMENT FOR I-93 AND I-95
6926 FTA
2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .535
2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .575
1.110Total:Transit
Projects Page - 93 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE
TRANSIT Replaces deficient vehicles
serving elderly and disabled
people. Uses local match.
Cost decrease reflects
anticipated federal revenue.
ELDERLY AND PERSONS WITH DISABILITIES TRANSPORTATION PROGRAM
3505
FTA
2011 FT14 - FTA SECTION 5310 DISABILITIES PROGRAM .866
2012 FT14 - FTA SECTION 5310 DISABILITIES PROGRAM .931
2013 FT14 - FTA SECTION 5310 DISABILITIES PROGRAM .931
2014 FT14 - FTA SECTION 5310 DISABILITIES PROGRAM .931
2015 FT14 - FTA SECTION 5310 DISABILITIES PROGRAM .931
2016 FT14 - FTA SECTION 5310 DISABILITIES PROGRAM .931
2017 FT14 - FTA SECTION 5310 DISABILITIES PROGRAM .931
2018 FT14 - FTA SECTION 5310 DISABILITIES PROGRAM .931
2019 FT14 - FTA SECTION 5310 DISABILITIES PROGRAM .931
2020 FT14 - FTA SECTION 5310 DISABILITIES PROGRAM .931
9.245Total:Transit
STATEWIDE
TRANSIT Supports transportation services
providing access to
employment.
JOB ACCESS & REVERSE COMMUTE
6290FTA
2011 FT21 - FTA SECTION 5316 - JARC PROGRAM .700
2012 FT21 - FTA SECTION 5316 - JARC PROGRAM .700
2013 FT21 - FTA SECTION 5316 - JARC PROGRAM .700
2014 FT21 - FTA SECTION 5316 - JARC PROGRAM .700
2015 FT21 - FTA SECTION 5316 - JARC PROGRAM .700
2016 FT21 - FTA SECTION 5316 - JARC PROGRAM .700
2017 FT21 - FTA SECTION 5316 - JARC PROGRAM .700
2018 FT21 - FTA SECTION 5316 - JARC PROGRAM .700
2019 FT21 - FTA SECTION 5316 - JARC PROGRAM .700
2020 FT21 - FTA SECTION 5316 - JARC PROGRAM .700
7.000Total:Transit
Projects Page - 94 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE
TRANSIT Supports transportation services
for persons with disabilities.
NEW FREEDOMS INITIATIVE
6291 FTA
2011 FT22 - FTA SECTION 5317 - NEW FREEDOM PROGRAM .680
2012 FT22 - FTA SECTION 5317 - NEW FREEDOM PROGRAM .680
2013 FT22 - FTA SECTION 5317 - NEW FREEDOM PROGRAM .680
2014 FT22 - FTA SECTION 5317 - NEW FREEDOM PROGRAM .680
2015 FT22 - FTA SECTION 5317 - NEW FREEDOM PROGRAM .680
2016 FT22 - FTA SECTION 5317 - NEW FREEDOM PROGRAM .680
2017 FT22 - FTA SECTION 5317 - NEW FREEDOM PROGRAM .680
2018 FT22 - FTA SECTION 5317 - NEW FREEDOM PROGRAM .680
2019 FT22 - FTA SECTION 5317 - NEW FREEDOM PROGRAM .680
2020 FT22 - FTA SECTION 5317 - NEW FREEDOM PROGRAM .680
6.800Total:Transit
STATEWIDE
TRANSIT Continues transit service in
communities outside urbanized
areas. Uses local match.
RURAL PUBLIC TRANSIT
3506FTA
2011 FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING 5.613
2012 FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING 7.000
2013 FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING 7.000
2014 FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING 7.000
2015 FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING 7.000
2016 FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING 7.000
2017 FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING 7.000
2018 FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING 7.000
2019 FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING 7.000
2020 FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING 7.000
68.613Total:Transit
STATEWIDE
15729
TURNPIKE SYSTEM Specific project from Statewide
program.
STATEWIDE TOLL COLLECT. CONSULT FOR T&R,EZPASS RECON.,TOLL SYSTEM INTERGRATION
SUPPORT, SYSTEM TRAFFIC ANALYSIS, EQUITY STUDIES & BOND SALES
7259 Turnpike Expansion
2011 TPK - TURNPIKE EXPANSION (State FY) .167P
2012 TPK - TURNPIKE EXPANSION (State FY) .167P
.333Total:Highway and Bridge
STATEWIDE
15730
TURNPIKE SYSTEM Specific project from Statewide
program.
TOLL COLLECT, CONSULT. FOR T&R, EZPASS RECON., TOLL SYSTEM INTERGRATION SUPPORT,
SYSTEM TRAFFIC ANAYLSIS EQUITY STUDIES & BOND SALES
7260 Turnpike Expansion
2011 TPK - TURNPIKE EXPANSION (State FY) .350P
2012 TPK - TURNPIKE EXPANSION (State FY) .300P
.650Total:Highway and Bridge
Projects Page - 95 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STATEWIDE
TRR *
TURNPIKES Turnpike funding for routine
preservation work on Turnpike
System as required by bond
covenants.
PROJECTS TO BE DETERMINED ON TURNPIKE SYSTEM (Annual Project)
4042
npike Renewal & Replacem
2012 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) 8.000C
2013 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) 9.800C
2014 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) 10.500C
2015 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) 10.800C
2016 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) 11.600C
2017 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) 11.500C
2018 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) 11.850C
2019 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) 12.000C
2020 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) 12.000C
98.050Total:Highway and Bridge
STATEWIDE
14932 *
VARIOUS Federal program under SAFETEA-
LU.
SAFE ROUTES TO SCHOOL PROGRAM [Parent] [SRTS 14932*] {Safe Routes To School Program}
3965 FHWA
2011 LU20 - SAFE ROUTES TO SCHOOL PROG INFR .825C
2011 LU30 - SAFE ROUTES TO SCHOOL PROG EITHER .075C
2012 LU20 - SAFE ROUTES TO SCHOOL PROG INFR .825C
2012 LU30 - SAFE ROUTES TO SCHOOL PROG EITHER .075C
2011 LU10 - SAFE ROUTES TO SCHOOL PROG .045P
2011 LU30 - SAFE ROUTES TO SCHOOL PROG EITHER .175P
2012 LU10 - SAFE ROUTES TO SCHOOL PROG .045P
2012 LU30 - SAFE ROUTES TO SCHOOL PROG EITHER .175P
2011 LU20 - SAFE ROUTES TO SCHOOL PROG INFR .050R
2012 LU20 - SAFE ROUTES TO SCHOOL PROG INFR .050R
2.340Total:Highway and Bridge
STEWARTSTOWN
NH 145 Bridge Priority #19 {Red List}REPLACE BRIDGE OVER BISHOP BROOK - 121/114 (Red List)
6782 FHWA
2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.800C 2016
1.800Total:Highway and Bridge 1.800
Projects Page - 96 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
STEWARTSTOWN, NH -
CANAAN, VT
15838
BRIDGE STREET Red List Bridge Priority #15.BRIDGE REHABILITATION OVER CONNECTICUT RIVER - 054/163 {Red List}
7416 FHWA
2015 L110 - BRIDGE PROGRAM - OFF SYSTEM 5.000C New Project
2016 L110 - BRIDGE PROGRAM - OFF SYSTEM 1.000C
2011 L110 - BRIDGE PROGRAM - OFF SYSTEM .075P
2012 L110 - BRIDGE PROGRAM - OFF SYSTEM .050P
2013 L110 - BRIDGE PROGRAM - OFF SYSTEM .025P
2014 L110 - BRIDGE PROGRAM - OFF SYSTEM .025P
2011 L110 - BRIDGE PROGRAM - OFF SYSTEM .025R
2012 L110 - BRIDGE PROGRAM - OFF SYSTEM .020R
2013 L110 - BRIDGE PROGRAM - OFF SYSTEM .010R
2014 L110 - BRIDGE PROGRAM - OFF SYSTEM .010R
6.240Total:Highway and Bridge
STODDARD - ANTRIM -
HILLSBOROUGH
NH 9 ROW for corridor protection /
control of access per original
intent.
CAPACITY, SAFETY IMPROVEMENTS, & ACQUIRE CONTROLLED ACCESS R.O.W. FROM JUST
EAST OF NH 123 TO WESTERLY END OF HILLSBOROUGH BYPASS TO IMPROVE ROADWAY
GEOMETRICS AND ALIGNMENT (APPROX. 10 MILES)
3272 FHWA
2012 L050 - NATIONAL HIGHWAY SYSTEM .250P
2015 L050 - NATIONAL HIGHWAY SYSTEM 1.000R
2017 L050 - NATIONAL HIGHWAY SYSTEM 1.000R
2.250Total:Highway and Bridge
STRAFFORD
14790
HUCKINS ROAD Specific project from Statewide
program, Municipal managed.
BRIDGE REPLACEMENT - 125/090
6360 State Aid Bridge
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .364C 2012
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .055P
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.424Total:Highway and Bridge 0.424
Projects Page - 97 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
SUMMER YOUTH
LANDSCAPE PROGRAM
12500 *
ADMINISTRATION Program Funding for Summer
Landscaping Youth Program.
ESTABLISHMENT OF SUMMER LANDSCAPING YOUTH PROGRAM TO PERFORM MAINTENANCE &
OTHER RELATED WORK STATEWIDE [Annual Project]
1766 FHWA
2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .057C
2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .057C
2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .057C
2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .057C
2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .057C
2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .057C
2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .057C
2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .057C
2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .057C
2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .057C
.570Total:Highway and Bridge
SUNAPEE
15836
LOWER MAIN STREET Specific project from Statewide
program, Municipal Managed.
REPAIR / REPLACE BRIDGE OVER SUGAR RIVER - 094/100 [SAB*4216] {State Aid Bridge
Program}
7414 State Aid Bridge
2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .387C
2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .060P
.447Total:Highway and Bridge
SUTTON
15346
MORSE LOOP ROAD Red List Bridge. Specific project
from Statewide program,
Municipal Managed.
BRIDGE REPLACEMENT OVER BROOK - 170/024 {Red List}
6821State Aid Bridge
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .572C New Project
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .085P
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.662Total:Highway and Bridge
SUTTON - NEW LONDON
15748
I-89 PAVEMENT REHABILITATION FROM EXIT 10 TO EXIT 11 (4 MILES) [4R]
3256 FHWA
2015 L010 - INTERSTATE MAINTENANCE 6.000C 2015
2016 L010 - INTERSTATE MAINTENANCE 5.340C
2011 L010 - INTERSTATE MAINTENANCE .118P
11.458Total:Highway and Bridge 11.673
SWANZEY
DILLANT-HOPKINS
AIRPORT
Planning document.AIRPORT MASTER PLAN UPDATE
6590 Airport
2015 AIP - AIRPORT IMPROVEMENT PROGRAM .110
.110Total:Aeronautics
Projects Page - 98 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
SWANZEY
DILLANT-HOPKINS
AIRPORT
Address Safety Concerns.CONSTRUCTION ONLY - RECONSTRUCTION OF RUNWAY 2-20
6589 Airport
2016 AIP - AIRPORT IMPROVEMENT PROGRAM 3.800
3.800Total:Aeronautics
SWANZEY
DILLANT-HOPKINS
AIRPORT
Address Safety Concerns.DESIGN ONLY - RECONSTRUCTION OF RUNWAY 2-20
6587 Airport
2014 AIP - AIRPORT IMPROVEMENT PROGRAM .350
.350Total:Aeronautics
SWANZEY
DILLANT-HOPKINS
AIRPORT
Safety and Security issue.INSTALL PERIMETER FENCING
3480 Airport
2020 AIP - AIRPORT IMPROVEMENT PROGRAM .250
.250Total:Aeronautics
SWANZEY
DILLANT-HOPKINS
AIRPORT
Address Safety Concerns.NEW PARALLEL TAXIWAY 'B' TO RUNWAY 2-20
6593 Airport
2019 AIP - AIRPORT IMPROVEMENT PROGRAM 1.400
1.400Total:Aeronautics
SWANZEY
DILLANT-HOPKINS
AIRPORT
Address Safety ConcernsOBSTRUCTION REMOVAL
7380 Airport
2011 AIP - AIRPORT IMPROVEMENT PROGRAM .150
.150Total:Aeronautics
SWANZEY
DILLANT-HOPKINS
AIRPORT
Provide equipment for winter
operations.
PURCHASE SNOW-REMOVAL EQUIPMENT
6591 Airport
2019 AIP - AIRPORT IMPROVEMENT PROGRAM .350
.350Total:Aeronautics
SWANZEY
DILLANT-HOPKINS
AIRPORT
Safety Issue. Planned
rehabilitation based on
Pavement Management
System.
RUNWAY 14/32 RECONSTRUCTION
3479
Airport
2013 AIP - AIRPORT IMPROVEMENT PROGRAM 1.829C
2012 AIP - AIRPORT IMPROVEMENT PROGRAM .421P
2.250Total:Aeronautics 1.650
Projects Page - 99 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
SWANZEY
DILLANT-HOPKINS
AIRPORT
Address Safety Concerns.REHABILITATE HAZARD BEACONS
6588 Airport
2019 AIP - AIRPORT IMPROVEMENT PROGRAM .120
.120Total:Aeronautics
SWANZEY
DILLANT-HOPKINS
AIRPORT
Priority as identified by airport
sponsor.
TERMINAL APRON EXPANSION
3482 Airport
2015 AIP - AIRPORT IMPROVEMENT PROGRAM 1.300
1.300Total:Aeronautics
SWANZEY
DILLANT-HOPKINS
AIRPORT
Address Safety ConcernsTAXIWAY 'A' EXTENSION & TAXIWAY 'T' RELOCATION
7381 Airport
2017 AIP - AIRPORT IMPROVEMENT PROGRAM 1.800
1.800Total:Aeronautics
SWANZEY
14918
COBBLE HILL ROAD Red List Bridge. Specific project
from Statewide program,
Municipal managed.
BRIDGE REPLACEMENT OVER CALIFORNIA BROOK - 082/115 {Red List}
6474State Aid Bridge
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .320C 2013
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .050P
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.375Total:Highway and Bridge 0.503
SWANZEY
15348
WARMAC ROAD Red List Bridge. Specific project
from Statewide program,
Municipal Managed.
BRIDGE REPLACEMENT OVER PERRY ROAD - 135/068 {Red List}
6823State Aid Bridge
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .290C New Project
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .065P
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.360Total:Highway and Bridge
TAMWORTH
15831
VARIOUS ROUTES Earmark funding. Municipal
Managed.
SAFETY IMPROVEMENTS (Demo Ids NH077 & NH081)
7410 FHWA
2011 56A0 - SURFACE TRANSPORTATION PRIORITIES .475C New Project
2011 LY90 - HIGH PRIORITY SURFACE TRANSPORTATION S129 .400C
.875Total:Highway and Bridge
Projects Page - 100 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
TEMPLE
14937
PUTNAM ROAD Red List Bridge. Specific project
from Statewide program,
Municipal managed.
BRIDGE REPLACEMENTS - 116/139 & 117/138 {Red List}
6491State Aid Bridge
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .245C 2013
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .050P
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.300Total:Highway and Bridge 0.300
TILTON - NORTHFIELD
14839
Specific project from Statewide
program. Municipal managed.
MODIFICATIONS TO THE WINNIPESAUKEE RIVER TRAIL PHASE 2: CONSTRUCT A STEEL ARCH
BRIDGE OVER THE WINNIPESAUKEE RIVER SUITABLE FOR PEDESTRIANS AND BICYCLES WHICH IS
ADA COMPLIANT. THE NEW BRIDGE WOULD BE BUILT UPSTREAM (TE Program) [06-55TE]6249 FHWA
2011 L220 - STP - TRANSPORTATION ENHANCEMENT .240C TE 2006
.240Total:Bike / Pedestrian 0.240
TILTON - SANBORNTON
15887
NH 132 Specific project from Statewide
program.
ROADWAY AND DRAINAGE IMPROVEMENTS ALONG NH 132 FROM BUSINESS PARK DRIVE IN
TILTON TO POUND ROAD IN SANBORNTON [BET-RSR*6730] {Betterment}
7478 Betterment
2011 BET - BETTERMENT (State FY) .210C New Project
.210Total:Highway and Bridge
WAKEFIELD
14088
NH 16 Specific Project from Statewide
Program
EXTEND SHOULDER TO 12 FOOT ACCELERATION & DECELERATION LANES FOR THE NH 16 SB
TRAFFIC AT THE JUNCTION OF WILSON ROAD [BET-FA*789] {Betterment}
3917 Betterment
2011 BET - BETTERMENT (State FY) .062C 2008
2011 BET - BETTERMENT (State FY) .030P
2011 BET - BETTERMENT (State FY) .010R
.102Total:Highway and Bridge
WALPOLE - CHARLESTOWN
14747
NH 12 Formerly Charlestown in
previous TYP's construction
programmed per comment
Advisory Task Force
coordination.
RECONSTRUCTION FROM MAIN STREET IN WALPOLE TO NH 12A IN CHARLESTOWN, REMOVE
CONCRETE BASE, ADD SHOULDERS AND IMPROVE DRAINAGE
1891
FHWA
2012 L250 - STP - RURAL AREAS < 5,000k 4.000C 2010
2013 L250 - STP - RURAL AREAS < 5,000k 4.000C 2013
2015 L250 - STP - RURAL AREAS < 5,000k 5.000C
2012 L250 - STP - RURAL AREAS < 5,000k .275P
2011 L250 - STP - RURAL AREAS < 5,000k .264R
13.539Total:Highway and Bridge 9.468
Projects Page - 101 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
WALPOLE, NH -
ROCKINGHAM, VT
12905
BRIDGE STREET Bridge Priority #16 {Red List}VILAS BRIDGE REHABILITATION OVER CONNECTICUT RIVER - 062/052 {Red List}
1877 FHWA
2015 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 2.092C 2015
2015 LZ20 - EQUITY BONUS EX LIMITATION 1.208C 2015
2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .055P
2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .055P
2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .061P
2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .006R
3.476Total:Highway and Bridge 2.775
WARNER
I-89 1" OVERLAY FROM EXIT 8 TO EXIT 9 (4 MILES) [4R]
3258 FHWA
2014 L010 - INTERSTATE MAINTENANCE 8.000C 2014
2011 L010 - INTERSTATE MAINTENANCE .100P
2012 L010 - INTERSTATE MAINTENANCE .050P
8.150Total:Highway and Bridge 8.250
WARNER - SUTTON
15747
I-89 PAVEMENT REHABILITATION FROM EXIT 9 TO EXIT 10 (7 MILES) [4R]
3253 FHWA
2013 L010 - INTERSTATE MAINTENANCE 5.000C 2013
2016 L010 - INTERSTATE MAINTENANCE 5.500C 2016
2017 L010 - INTERSTATE MAINTENANCE 5.500C 2016
16.000Total:Highway and Bridge 16.200
WENTWORTH
14516
EVANS ROAD Red List Bridge. Specific project
from Statewide program,
Municipal managed.
REPLACE BRIDGE OVER SOUTH BRANCH BAKER RIVER - 136/053 {Red List}
6252State Aid Bridge
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .700C 2011
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .080P
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.785Total:Highway and Bridge 0.785
WENTWORTH
14518
DUFOUR ROAD Red List Bridge. Specific project
from Statewide program,
Municipal managed.
REHAB BRIDGE OVER SOUTH BRANCH BAKER RIVER - 162/072 {Red List}
6254State Aid Bridge
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .370C 2013
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .060P
2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.435Total:Highway and Bridge 0.435
Projects Page - 102 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
WHITEFIELD
MT. WASHINGTON
AIRPORT
Replace Aging EquipmentACQUIRE SNOW-REMOVAL EQUIPMENT
7382 Airport
2012 AIP - AIRPORT IMPROVEMENT PROGRAM .525
.525Total:Aeronautics
WHITEFIELD
MT. WASHINGTON
AIRPORT
Planning document; 95%
Federal funds, 2.5% Sponsor
match. Necessary Federal
Environmental Requirements for
development PLANNING
DOCUMENT.
ENVIRONMENTAL ASSESSMENT
3487
Airport
2013 AIP - AIRPORT IMPROVEMENT PROGRAM .200
.200Total:Aeronautics
WHITEFIELD
MT. WASHINGTON
AIRPORT
Address Capacity ConcernsEXPAND AIRCRAFT PARKING APRON
7383 Airport
2017 AIP - AIRPORT IMPROVEMENT PROGRAM .500C
.500Total:Aeronautics
WHITEFIELD
MT. WASHINGTON
REGIONAL AIRPORT
Address Safety Concerns.EXTEND RUNWAY 28 BY 500 FEET AND EXTEND PARALLEL TAXIWAY
6596 Airport
2013 AIP - AIRPORT IMPROVEMENT PROGRAM 2.250
2019 AIP - AIRPORT IMPROVEMENT PROGRAM .400
2.650Total:Aeronautics
WHITEFIELD
MT. WASHINGTON
REGIONAL AIRPORT
Address Safety ConcernsEXTEND PARTIAL PARALLEL TAXIWAY TO RUNWAY 28
6680 Airport
2018 AIP - AIRPORT IMPROVEMENT PROGRAM 2.925
2.925Total:Aeronautics
WHITEFIELD
MT. WASHINGTON
REGIONAL AIRPORT
Address Capacity Concerns.T-HANGARS
6595 Airport
2014 AIP - AIRPORT IMPROVEMENT PROGRAM .158
2015 AIP - AIRPORT IMPROVEMENT PROGRAM .158
2016 AIP - AIRPORT IMPROVEMENT PROGRAM .158
.474Total:Aeronautics
Projects Page - 103 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
WHITEFIELD
15732
WATER STREET Red List Bridge. Specific project
from Statewide program,
Municipal Managed.
REPAIR / REPLACEMENT OF BRIDGE - 106/106 [PARENT #4216] {Red List}
7261State Aid Bridge
2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .435C New Project
2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .080P
2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .010R
.525Total:Highway and Bridge
WILTON
NH 31 Red List Bridge Prioity #47REHABILITATE BRIDGE OVER SOUHEGAN RIVER - 129/126 (Red List)
7346 FHWA
2019 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 2.500C New Project
2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .200P
2017 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .050R
2.750Total:Highway and Bridge
WILTON
15767
KING BROOK ROAD Specific project from Statewide
program, Municipal Managed.
BRIDGE REHABILITATION, BR 074/060 OVER KING BROOK [SAB*4216] {State Aid Bridge
Program}
7303 State Aid Bridge
2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .245C New Project
2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .050P
2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.300Total:Highway and Bridge
WILTON
15768
OLD COUNTY FARM
ROAD
Specific project from Statewide
program, Municipal Managed.
BRIDGE REPLACEMENT OVER BLOOD BROOK - 060/118 [SAB*4216] {State Aid Bridge Program}
7304 State Aid Bridge
2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .170C New Project
2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .045P
2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.220Total:Highway and Bridge
WILTON - MILFORD -
AMHERST - BEDFORD
13692
NH 101 Interim safety improvementsSAFETY IMPROVEMENTS @ VARIOUS LOCATIONS FROM WILTON TO WALLACE RD IN BEDFORD
AS DETERMINED BY CORRIDOR STUDY
2739 FHWA
2013 L050 - NATIONAL HIGHWAY SYSTEM 3.000C 2013
2020 L050 - NATIONAL HIGHWAY SYSTEM 7.000C 2018
2011 L050 - NATIONAL HIGHWAY SYSTEM .236P
2012 L050 - NATIONAL HIGHWAY SYSTEM .080R
10.316Total:Highway and Bridge 10.426
Projects Page - 104 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
WINCHESTER
12906
NH 10 Bridge Priority #24 {Red List}BRIDGE REPLACEMENT OVER ASHUELOT RIVER - 152/181 [Designated Demo Id NH007] {Red
List}
1873 FHWA
2011 3650 - RURAL ACCESS PROJECTS .493C 2011
2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 3.588C 2011
4.081Total:Highway and Bridge 3.850
WINCHESTER
15316
BROAD BROOK ROAD Red List Bridge. Specific project
from Statewide program,
Municipal Managed.
BRIDGE REPLACEMENT OVER BROAD BROOK - 070/106 {Red List}
6769State Aid Bridge
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .305C New Project
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .065P
2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.375Total:Highway and Bridge
WINCHESTER
15317
OLD WESTPORT ROAD Red List Bridge. Specific project
from Statewide program,
Municipal Managed.
BRIDGE REPLACEMENT OVER WHEELOCK BROOK - 133/163 {Red List}
6770State Aid Bridge
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .846C New Project
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .075P
2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R
.926Total:Highway and Bridge
WINCHESTER
15881
NH 119 Bridge Priority #49 {Red List}BRIDGE REPLACEMENT OVER ASHUELOT RIVER - 113/077 {Red List}
6783 FHWA
2015 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 2.445C 2015
2.445Total:Highway and Bridge 2.500
WINDHAM - SALEM
10075
NH 111 BYPASS (HB 1092 - '88 ACT);
CONSTRUCTION PROJECTS
IDENTIFIED IN 10075A - 10075G
CONSTRUCT BYPASS AROUND SHADOW LAKE. NH 28 FROM LAKE STREET TO JONES ROAD [Pe
& Row Only]
34FHWA
2012 LZ10 - EQUITY BONUS - EXEMPT LIM .094P
.094Total:Highway and Bridge
WOODSTOCK - LINCOLN
15755
I-93 Previous Lincoln id 3254RECLAIM AND OVERLAY FROM EXIT 32 TO EXIT 33 (2 MILES) [4R]
7292 FHWA
2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 5.833C
2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 6.667C
2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .050P
2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P
2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .075P
2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .005R
2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .005R
12.735Total:Highway and Bridge
Projects Page - 105 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section
Previous
Prog. Yr
Project Name/#
Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous
Total$
3619.810 TYP Grand Total:
Projects Page - 106 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way
2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section