TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) LIMITED REQUEST FOR PROPOSALS (RFP) FOR THE APPOINTMENT OF RECRUITMENT AGENCIES FOR TEMPORARY STAFF PLACEMENT FOR A PERIOD OF TWO (2) YEARS FROM 1 JULY 2015 TO 30 JUNE 2017 (TENDER REF: 2201000019) 7 May 2015 (Corrigendum No. 01) This document is the property of Singapore Pools (Private) Limited and the information contained herein is confidential. This document, either in whole or in part, must not be reproduced or disclosed to others or used for purposes other than that for which it has been supplied without Singapore Pools' prior written permission, or, if any part hereof is furnished by virtue of a contract with a third party, as expressly authorized under that contract. Singapore Pools (Private) Limited 210 Middle Road #01-01 Singapore Pools Building Singapore 188994 Tel: (65) 6216 8168 URL: www.singaporepools.com.sg RCB Reg No. 196800202G

Upload: vuongphuc

Post on 28-Mar-2019

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

TENDER DOCUMENT

SINGAPORE POOLS (PRIVATE) LIMITED

REQUEST FOR PROPOSALS (RFP) FOR THE APPOINTMENT OF RECRUITMENT AGENCIES FOR

TEMPORARY STAFF PLACEMENT FOR A PERIOD OF TWO (2) YEARS FROM 1 JULY 2015 TO 30 JUNE 2017

(TENDER REF: 2201000019)

7 May 2015

(Corrigendum No. 01)

This document is the property of Singapore Pools (Private) Limited and the information contained herein is confidential. This document, either in whole or in part, must not be reproduced or disclosed to others or used for purposes other than that for which it has been supplied without Singapore Pools' prior written permission, or, if any part hereof is furnished by virtue of a contract with a third party, as expressly authorized under that contract.

Singapore Pools (Private) Limited 210 Middle Road #01-01 Singapore Pools Building Singapore 188994

Tel: (65) 6216 8168 URL: www.singaporepools.com.sg RCB Reg No. 196800202G

Page 2: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

CONTENTS Section I Invitation to Tender

Annex A Instructions to Tenderers Annex B Tenderer’s Particulars Annex C Requirements and Scope of Services Annex D Price Schedule Annex E Evaluation Criteria

Tender Ref: 2201000019 Page 2 of 26

Page 3: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

SECTION I INVITATION TO TENDER

SECTION I

INVITATION TO TENDER

Tender Ref: 2201000019 Page 3 of 26

Page 4: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

SECTION I INVITATION TO TENDER

Dear Sir/Madam, REQUEST FOR PROPOSALS (RFP) FOR THE APPOINTMENT OF RECRUITMENT AGENCIES FOR TEMPORARY STAFF PLACEMENT FOR A PERIOD OF TWO (2) YEARS FROM 1 JULY 2015 TO 30 JUNE 2017 (TENDER REF: 2201000019) 1. You are invited by Singapore Pools (Private) Limited (hereinafter called “SPPL”) to

tender for THE APPOINTMENT OF RECRUITMENT AGENCIES FOR TEMPORARY STAFF PLACEMENT FOR A PERIOD OF TWO (2) YEARS FROM 1 JULY 2015 TO 30 JUNE 2017 (TENDER REF: 2201000019) according to the requirements and scope of services in Section I Annex C and the services in Section I Annex D of this document.

2. The contract period is two (2) years commencing from 1 July 2015 to 30 June 2017

(both dates inclusive). 3. The Tender Document comprises the following (all of the following shall be referred

to as the “Tender Document”):

Section I Invitation to Tender Annex A Instructions to Tenderers Annex B Tenderer’s Particulars Annex C Requirements and Scope of Services Annex D Price Schedule Annex E Evaluation Criteria

4. Tenderers are to ensure the followings: (a) All documents must be submitted in sealed envelopes.

(b) All documents and every page, including the cover page of the documents and

all information contained within the media (e.g. in compact disc) should clearly marked “CONFIDENTIAL”.

(c) All documents must be bound into a book or binded and clearly labelled at the front, bottom-right hand corner as “ORIGINAL” or “COPY”. The duplicated copy can be printed on double-sided A4 papers.

(d) All documents must be completed in typewritten form and all pages must be

initialled or signed by the Tenderer’s authorised representative and bearing the official seal or rubber stamp of the Tenderer, and all schedules of prices type-

Tender Ref: 2201000019 Page 4 of 26

Page 5: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

SECTION I INVITATION TO TENDER

written and signed by the Tenderer’s authorised representative and bearing the official seal or rubber stamp of the Tenderer.

Information and/or Documents in sealed envelope(s)

Two (2) complete hard copy sets and one (1) softcopy required – One (1) set to be marked “Original” and one (1) set to be marked “Copy” or “Duplicate”. • Tender Proposal for THE APPOINTMENT OF RECRUITMENT AGENCIES

FOR TEMPORARY STAFF PLACEMENT FOR A PERIOD OF TWO (2) YEARS FROM 1 JULY 2015 TO 30 JUNE 2017 (TENDER REF: 2201000019) comprising the following: (a) Price Schedule in Section I Annex D; (b) Tenderer’s Particulars in Section I Annex B; (c) Any other relevant or additional information or documents which the

Tenderer feels is relevant to and should be submitted with their tender proposal.

Soft copy – In addition to the hard copy sets, one (1) soft copy (in compact disc/flash drive) of the Price Schedules must be provided in the stated Microsoft excel format as required.

NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE DOCUMENTS MUST BE SIGNED AND STAMPED.

5. Your Tender Proposal must be deposited in Tender Box C located at the Reception

Lobby of Singapore Pools (Private) Limited, 210 Middle Road #01-01, Singapore Pools Building, Singapore 188994, not later than 2:00pm sharp (Singapore Time) Tuesday, 26 May 2015.

Senior Manager (Operations Support) For and on behalf of SINGAPORE POOLS (PRIVATE) LIMITED

Tender Ref: 2201000019 Page 5 of 26

Page 6: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

SECTION I INVITATION TO TENDER ANNEX A

INSTRUCTIONS TO TENDERERS

SECTION I –

ANNEX A

INSTRUCTIONS TO TENDERERS

Tender Ref: 2201000019 Page 6 of 26

Page 7: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

SECTION I INVITATION TO TENDER ANNEX A

INSTRUCTIONS TO TENDERERS CONTENTS

1 Instructions for Tender Submission

2 Tender Proposal

3 Checklists

4 Tender Enquiries/Clarifications

5 Prices

6 GST Registration

7 Expenses

8 Alterations and Amendments

9 Omissions and Errors

10 Validity Period

11 Additional Conditions

12 Acceptance of Tender

13 Award of Tender

14 Formal Agreement

15 Security Deposit for Due Performance (Not Applicable for this tender)

16 Confidentiality

17 Non-Compliance

18 Export Approval (Not Applicable for this tender)

19 Clarifications of Tenderer’s Submission

20 Ownership of Tender Documents

21 Ownership Status of Tender

22 Re-submission of Tender

23 Currency

24 Others

Tender Ref: 2201000019 Page 7 of 26

Page 8: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

SECTION I INVITATION TO TENDER ANNEX A

INSTRUCTIONS TO TENDERERS 1. Instructions for Tender Submission 1.1 The Tenderers who wish to participate in this Tender, are to deliver to Singapore

Pools (Private) Limited (“SPPL”) the documents that are set out in the Checklists under paragraph 3 below, in accordance with their stated requirements thereto, in a sealed envelope marked with a label at the top left-hand corner. The label is to bear the following:

CONFIDENTIAL RFP FOR THE APPOINTMENT OF RECRUITMENT AGENCIES FOR TEMPORARY STAFF PLACEMENT FOR A PERIOD OF TWO (2) YEARS FROM 1 JULY 2015 TO 30 JUNE 2017 (TENDER REF: 2201000019) Closing Date: 26 MAY 2015, 2.00PM sharp Tender Box: C [Name and Address of Tenderer]

The sealed envelopes are to be addressed to:

Singapore Pools (Private) Limited 210 Middle Road, #01-01 Singapore Pools Building Singapore 188994

1.2 Tender Proposals should be less than 5cm thick and 35cm wide each so that the

proposals can be slotted into the tender box. Tenderers who wish to submit bulky supporting documents thicker than 5cm and/or 35cm wide are to pack their supporting documents into smaller parcels of size not exceeding less than 5cm thick and 35cm wide each. These parcels must be properly sealed, serial numbered into “Part 1 of ___ (total no. of parts submitted)”, “Part 2 of ___ (total no. of parts submitted)” etc, and submitted by hand into the designated Tender Box.

1.3 The sealed envelope must be deposited in Tender Box C at the Singapore Pools (Private) Limited, 210 Middle Road, #01-01, Singapore Pools Building, Singapore 188994 not later than 2.00pm sharp, 26 May 2015, Tuesday (the “Closing Date”).

1.4 SPPL shall not be responsible for placing the sealed envelope received through the post into the designated tender box and by the Closing Date. Any Tender Proposal that is not deposited in Tender Box C shall be disqualified / rejected.

1.5 Tenderers are to treat this tender as strictly confidential and not to communicate their prices to a third party nor reveal anything about it or any matter relating to the Tender to the public or press.

1.6 Incomplete tender submissions and/or tender submissions received after the Closing Date and Time shall be invalidated. Submission of Tender by electronic mail or

Tender Ref: 2201000019 Page 8 of 26

Page 9: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

SECTION I INVITATION TO TENDER ANNEX A

INSTRUCTIONS TO TENDERERS facsimile is not permitted. Failure to strictly comply with these instructions shall subject the Tenderer’s Tender Proposal to disqualification / rejection.

2. Tender Proposal

The Tenderer must prepare the Tender Proposal in accordance with the submission of proposal set forth in the Checklists under paragraph 3 below and number ALL Pages of his Tender Proposal.

3. Checklists 3.1 Tenderers are to ensure that following documents in sealed envelopes are submitted:

Information and/or Documents in sealed envelope(s)

Two (2) complete hard copy sets and one (1) softcopy required – One (1) set to be marked “Original” and one (1) set to be marked “Copy” or “Duplicate”. • Tender Proposal for THE APPOINTMENT OF RECRUITMENT AGENCIES

FOR TEMPORARY STAFF PLACEMENT FOR A PERIOD OF TWO (2) YEARS FROM 1 JULY 2015 TO 30 JUNE 2017 (TENDER REF: 2201000019) comprising the following: (a) Price Schedule in Section I Annex D; (b) Tenderer’s Particulars in Section I Annex B; (c) Any other relevant or additional information or documents which the

Tenderer feels is relevant to and should be submitted with their tender proposal.

Soft copy – In addition to the hard copy sets, one (1) soft copy (in compact disc/flash drive) of the Price Schedules must be provided in the stated Microsoft excel format as required.

3.2 Tenderers are to ensure the following: (a) All documents must be submitted in sealed envelopes.

(b) All documents and every page, including the cover page of the documents and

all information contained within the media (e.g. in compact disc) should clearly marked “CONFIDENTIAL”.

(c) All documents must be bound into a book or binded and clearly labelled at the

front, bottom-right hand corner as “ORIGINAL” or “COPY”. The duplicated copy can be printed on double-sided A4 papers.

Tender Ref: 2201000019 Page 9 of 26

Page 10: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

SECTION I INVITATION TO TENDER ANNEX A

INSTRUCTIONS TO TENDERERS (d) All documents must be completed in typewritten form and all pages must be

initialled or signed by the Tenderer’s authorised representative and bearing the official seal or rubber stamp of the Tenderer, and all schedules of prices type-written and signed by the Tenderer’s authorised representative and bearing the official seal or rubber stamp of the Tenderer.

NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE DOCUMENTS MUST BE SIGNED AND STAMPED.

4. Tender Enquiries/Clarifications 4.1 Any queries or clarifications on any aspect of the Tender Document should be

communicated in writing to the following persons:

(a) Ms Ferrine Ng at Email: [email protected] Tel (DID): (65) 6216-8815 (b) Mr James Chen at Email: [email protected] Tel (DID): (65) 6216-8238 (c) Ms Vannterline Chee at Email: [email protected] Tel (DID): (65) 6216-8883

4.2 No oral or email representations from either of the abovementioned individuals or any

other representatives from SPPL shall be construed to modify or vary any of the provisions, terms or conditions of the Tender Document.

5. Prices 5.1 The Tenderer shall quote in Singapore Dollars an itemized all-in-price, excluding the

Goods and Services Tax (GST) for the supply and delivery of the goods and the services to be performed.

5.2 SPPL shall reimburse the successful Tenderer any GST charged on the goods, services or works supplied.

5.3 The Tenderer shall be deemed to have satisfied himself before the submission of his Tender Proposal as to the correctness and sufficiency of his tender.

5.4 Unless otherwise requested or approved in writing by SPPL, all prices quoted shall not be amended by the Tenderer and must be held good throughout the Contract period. SPPL will not entertain any claims made by the Tenderer in respect of any increase in costs due to the rise in the cost of materials, labour, duties, transportation expenses or anything affecting the cost of performance of the Tenderer’s obligations

Tender Ref: 2201000019 Page 10 of 26

Page 11: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

SECTION I INVITATION TO TENDER ANNEX A

INSTRUCTIONS TO TENDERERS under the Contract. All and any such increase in costs will be wholly borne by the Tenderer.

6. GST Registration 6.1 The Tenderer shall declare his GST status in his Proposal. He shall clearly indicate

whether he is, or whether he will be a taxable person under the GST Act (Cap 117A). He shall, if available, furnish the GST registration number to SPPL.

6.2 The Tenderer will be deemed to be a taxable person if no declaration to the contrary is made in the Tender Proposal. A Tenderer who declares himself to be a non-taxable person under the GST Act but who becomes a taxable person after accepting the award shall forthwith inform SPPL of its change in GST status. He shall be entitled to reimbursement by SPPL of any GST charged on the goods, services or works he supplies after his change in GST status.

7. Expenses

Tenderers are to bear all expenses incurred in the preparation of their submission. 8. Alterations and Amendments 8.1 Any alteration or amendment made to the Tender Document by the Tenderer shall

have no effect and the original text of the Tender Document shall be adopted and adhered to unless the alterations, amendments and cancellations are specifically allowed in the Tender Document by an express provision thereto or they are expressly stated in the Letter of Acceptance/Purchase Order to form part of the agreement between the parties or otherwise authorised in writing by SPPL.

8.2 Subject to paragraph 8.1 and 11.1 of these Instructions to Tenderers, any alteration, amendment or cancellation made to the Tender Document by the Tenderer will not be accepted unless such amendments are initialled by the Tenderer.

9. Omissions and Errors The Tenderer shall be solely responsible for any omissions or errors in their Tender Proposal. A Tenderer who has submitted his Tender Proposal before the Closing Date and who wishes to amend or vary his Tender Proposal before the Closing Date may not do so once he has already made a submission unless expressly agreed to by SPPL.

Tender Ref: 2201000019 Page 11 of 26

Page 12: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

SECTION I INVITATION TO TENDER ANNEX A

INSTRUCTIONS TO TENDERERS 10. Validity Period

Every Tender Proposal submitted will remain valid for acceptance for a period of six (6) calendar months from the Closing Date and during such extension of the period as may afterwards separately be agreed in writing by the Tenderer at the request of SPPL.

11. Additional Conditions 11.1 SPPL reserves the right at any time prior to the Closing Date to vary any terms and

conditions in the Tender Document and to introduce additional terms and conditions of contract. Without prejudice to the aforesaid, any variation or new terms and conditions that are introduced after the Closing Date by SPPL are subject to the agreement of the parties.

11.2 Any additional information or clarification of the Tender Proposal or any part thereof submitted in writing by the Tenderer, in response to SPPL’s enquiry and prior to the acceptance of the tender, shall form part of the Tenderer's offer.

11.3 Prior to the acceptance of the tender, SPPL may request the Tenderer to amend the offer he has submitted and any amendments agreed upon shall be in writing and shall form part of the Tender Proposal.

12. Acceptance of Tender 12.1 SPPL shall be under no obligation to accept the lowest or any Tender Proposal nor be

required to give any reason for non-acceptance of any Tender Proposal. SPPL retains absolute discretion in accepting a Tender Proposal. SPPL may also choose to abandon this tender and in such an event SPPL shall not be liable in any whatsoever to any Tenderer arising from such abandonment and shall not be liable to any Tenderer for the costs and expense incurred by the Tenderer in preparing and submitting their Tender Proposal or relating to this tender. SPPL will not enter into correspondence with any Tenderer regarding the reasons for non-acceptance of a Tender Proposal.

12.2 SPPL shall be at liberty to accept such portion of a Tender Proposal as it deems appropriate and reject the rest of the Tender Proposal. SPPL’s acceptance and/or entering into any formal agreement with any successful Tenderer(s) shall in no way be construed as granting any exclusive rights to the successful Tenderer(s) to supply the goods, services or works specified in the Letter of Acceptance/Purchase Order or formal agreement.

12.3 When accepting a Tender Proposal or part thereof, SPPL may amend any part of the Specifications including without limitation the quality, type(s) and/or quantity of goods, services or works to be supplied, subject to reasonable standard adjustment to the prices quoted in the Tender Proposal.

Tender Ref: 2201000019 Page 12 of 26

Page 13: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

SECTION I INVITATION TO TENDER ANNEX A

INSTRUCTIONS TO TENDERERS 13. Award of Tender 13.1 SPPL reserves the right to award the tender to more than one tenderer and/or the

tender in whole or in part. SPPL also reserves the right not to disclose the details of the selected Tender Proposal and Tenderer.

13.2 A Letter of Acceptance/Purchase Order will be sent via electronic mail or facsimile or delivered by post to the successful Tenderer’s address as given in his Tender Proposal and such delivery shall be deemed good service of the Letter of Acceptance/Purchase Order/Purchase Order on the Tenderer. Notification will not necessarily be sent to unsuccessful Tenderers by SPPL. Unless and until the formal agreement referred to at paragraph 14 of these Instructions to Tenderers is executed by both the said successful Tenderer and SPPL, the said Tenderer’s offer and SPPL’s acceptance by way of the Letter of Acceptance/Purchase Order thereof shall not constitute a binding contract between the successful Tenderer and SPPL.

14. Formal Agreement

The Tenderer whose Tender Proposal is accepted shall enter into a formal agreement with SPPL within fourteen (14) calendar days from the issue of the Letter of Acceptance/Purchase Order or on such other date or extended period/date mutually agreed upon by the Tenderer and SPPL.

15. Security Deposit for Due Performance (Not Applicable for this tender)

Intentionally left blank 16. Confidentiality 16.1 Tenderers are to note that the information contained in the Tender Document is

confidential. Such information and any other information disclosed to the Tenderers in the course of this tender exercise shall be used by the Tenderers for the sole purpose of preparing their tender submission.

16.2 Tenderers are not to disclose or allow to be disclosed to any person such confidential information without the prior written consent of SPPL except for disclosure to their employees on a need-to-know basis.

16.3 Tenderers must exercise utmost care and diligence in safeguarding the confidential information and shall not disclose the same to any of the abovementioned employees / authorised persons unless they have already extracted a confidentiality undertaking from such persons in terms similar to this clause.

16.4 Tenderers shall be wholly responsible for all unauthorised dissemination of the confidential information by any person to whom they have disclosed the information.

Tender Ref: 2201000019 Page 13 of 26

Page 14: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

SECTION I INVITATION TO TENDER ANNEX A

INSTRUCTIONS TO TENDERERS 17. Non-Compliance

Non-compliance with the terms and conditions stipulated in the Tender Document (including a Tenderer’s failure to submit the Tender Proposal in the manner prescribed by SPPL) will render the Tender Proposal liable to rejection. The decision of SPPL on what constitutes non-compliance is final and no further correspondence will be entered into by SPPL.

18. Export Approval (Not Applicable for this tender)

Intentionally left blank 19. Clarifications of Tenderer’s Submission

In the event that SPPL requires clarification on any aspect of the Tenderer’s submission/proposal, the Tenderer shall provide full and comprehensive response within three (3) working days of the date of such request, or such other date as agreed upon by SPPL.

20. Ownership of Documents

All documents submitted by the Tenderer shall become SPPL’s property. However, intellectual property in the information contained in the Tender Proposal submitted by the Tenderer shall remain vested with the Tenderer. Notwithstanding the aforesaid, by the Tenderer’s submission of the Tender Proposal, the Tenderer agrees that SPPL has an irrevocable and perpetual licence to reproduce and use the information in the Tender Proposal. This paragraph is without prejudice to any provisions to the contrary in any subsequent contract between the Tenderer and SPPL including the formal agreement referred to at paragraph 14 of these Instructions to Tenderers. In the event of any inconsistency between this paragraph and the formal agreement, the latter shall prevail.

21. Ownership Status The Tenderer shall provide full information on

(a) the name and address of any person, company or corporation which owns,

whether directly or indirectly, at least 50% of the total number of shares in the Tenderer; and

(b) the number, percentage and class of shares held by such person, company or

corporation.

Tender Ref: 2201000019 Page 14 of 26

Page 15: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

SECTION I INVITATION TO TENDER ANNEX A

INSTRUCTIONS TO TENDERERS 22. Re-Submission of Tender 22.1 SPPL reserves the right to shortlist Tenderers and give those so shortlisted the

opportunity to submit new or amended Tender Proposals on the basis of SPPL’s revised requirements, in accordance with a common deadline; including through the calling of a tender.

22.2 The Tender Proposals received in the final round shall be complete and comprehensive, and shall over-ride all Tender Proposals previously submitted. The final offer shall not make references to previous offers. All the Tender Proposals received in the previous rounds shall be treated as lapsed. Such final offers shall be submitted in sealed envelopes and deposited in the tender box or electronic mail or facsimile as instructed by SPPL.

23. Currency

The currency of the offer shall be Singapore Dollars (S$).

24. Others

All references in these Instructions to Tenderers to the "Tenderer" shall include individuals, bodies corporate, unincorporated associations and partnerships. Words importing the singular shall include the plural and vice versa and words denoting the masculine gender shall include the feminine and neuter genders.

Tender Ref: 2201000019 Page 15 of 26

Page 16: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

SECTION I INVITATION TO TENDER ANNEX B

TENDERER’S PARTICULARS

SECTION I -

ANNEX B

TENDERER’S PARTICULARS

Tender Ref: 2201000019 Page 16 of 26

Page 17: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

SECTION I INVITATION TO TENDER ANNEX B

TENDERER’S PARTICULARS

INFORMATION ON TENDERER

Please provide the information stated below and attached a copy of your company’s ACRA1 (for companies in Singapore) or Business Registration (for overseas companies). All spaces must be completed and “NA” should be written if not applicable.

1. Registered Name of Company

2. Registered Address, Telephone no. and Fax no.

3. Type of Registration

[ ] Sole Proprietor [ ] Private Company

[ ] Partnership [ ] Public Company

4. Date of Registration & Incorporation:

5. Business Registration No:

6. GST Registration No (if applicable):

7. Commercial Details (if applicable):

a. EPPU (Supply Head, Financial Limit & Expiry Date):

b. Others (e.g. certificates, licenses, etc.):

1 Accounting and Corporate Regulatory Authority

Tender Ref: 2201000019 Page 17 of 26

Page 18: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

SECTION I INVITATION TO TENDER ANNEX B

TENDERER’S PARTICULARS 8. Nature of Business & Products/Services Offered

9. Ownership: Singapore [ %] Foreign [ %]

10. Names & Identification Card Number (or passport number for foreigners) of all Partners/Directors/Shareholders & % of Shareholding for each (use separate sheet).

11. Principal Officers:

Managing Director

General Manager

Key Account Manager

Technical Manager

Contact Person(s) for this tender:

Name & Designation Contact No. Email Address (Office & Mobile)

12. Paid-up Capital: S$

13. Fixed Assets: S$

14. Annual Turnover: S$

Tender Ref: 2201000019 Page 18 of 26

Page 19: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

SECTION I INVITATION TO TENDER ANNEX B

TENDERER’S PARTICULARS 15. Company Bankers

16. Give details of international/technical support for local operations, if applicable. (Use separate sheet).

17. Give details of the total number of staff strength and attach a copy of the organization chart.

18. Company’s track record with other customers for products/services offered that are similar to the goods/services to be offered in this Tender (Use separate sheet)

Name of Companies2 Value of Business3 Contact Person4

19. I declare that the information provided in this form and on all accompanying documents are true and correct.

Name: Designation:

Signature: Date:

Company Stamp:

2 Insert name of companies that were your previous customers. 3 Insert the contract amounts with the clients stated under the name of companies. 4 You agree that we may contact this named contact person from your previous customer whom you previously dealt with to obtain a reference on you.

Tender Ref: 2201000019 Page 19 of 26

Page 20: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

SECTION I INVITATION TO TENDER ANNEX C

REQUIREMENTS AND SCOPE OF SERVICES

SECTION I -

ANNEX C

REQUIREMENTS AND SCOPE OF SERVICES

Tender Ref: 2201000019 Page 20 of 26

Page 21: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

SECTION I INVITATION TO TENDER ANNEX C

REQUIREMENTS AND SCOPE OF SERVICES 1. INTRODUCTION

1.1 The purpose of this tender is to seek proposals for the provision of services for

temporary staff placement for Singapore Pools (Private) Limited (“SPPL”) for a period of 2 years from 1 July 2015 to 30 June 2017.

1.2 There is no exclusivity in this contract as SPPL may appoint more than one recruitment agency (“Agency”).

2. REQUIREMENTS AND SCOPE OF SERVICES

2.1 The Agency must be registered and licensed by the Ministry of Manpower in

Singapore.

2.2 The Agency is required to undertake and assume legal employer responsibilities for all temporary staff deployed to work for SPPL, including the following: a) professional advice on the appropriate temporary placement.

b) negotiate placements that fit SPPL requirement.

c) administration of payroll, statutory contributions, incentives, claims and/or

insurance etc. d) There shall be no partial or upfront payment to the Agency. The Agency shall

invoice SPPL on a 30-day credit term. 2.3 There will be no contractual volume or value tied to this term contract.

2.4 Specifications and extent of services may vary from this tender document to the actual

services required. Where the services required by SPPL differs from the services set out in Section I Annex D, the Agency shall provide to SPPL a written/email quotation setting out its fees for the provision of such services for the consideration and acceptance of SPPL.

2.5 Evaluation of Services From time to time, SPPL will evaluate the Agency’s services in terms of reliability, timely delivery, client servicing, responsiveness, resources and meeting of deadlines.

2.6 Termination of Contract

2.6.1 In the event where SPPL wishes to terminate the contract prematurely, SPPL

shall give the Agency one (1) month’s written notice.

Tender Ref: 2201000019 Page 21 of 26

Page 22: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

SECTION I INVITATION TO TENDER ANNEX C

REQUIREMENTS AND SCOPE OF SERVICES

2.6.2 In the event where the Agency wishes to terminate its services before the end of the contract, the Agency shall serve one (1) month’s written notice to SPPL provided there is no outstanding projects. Outstanding projects are to be closed or completed as mutually agreed upon before termination.

3. SUBMISSION OF PROPOSAL 3.1 The Agency shall submit the following (but not limited to) for evaluation:

a) Price Schedule for the scope of services as set out in Section I Annex D. All

prices shall be quoted in Singapore Dollars, excluding GST.

b) Tenderer’s Particulars as set out in Section I Annex B. c) A copy of your company’s terms and conditions or service agreement (if any)

for reference.

3.2 Agencies are to bear all expenses incurred in the preparation of their proposals and submission of the same.

Tender Ref: 2201000019 Page 22 of 26

Page 23: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

SECTION I INVITATION TO TENDER ANNEX D

PRICE SCHEDULE

SECTION I –

ANNEX D

PRICE SCHEDULE

Tender Ref: 2201000019 Page 23 of 26

Page 24: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

SECTION I INVITATION TO TENDER ANNEX D

PRICE SCHEDULE

Please refer to separate attachment for SECTION I ANNEX D: PRICE SCHEDULE – Corrigendum No. 01 dated 7 May 2015

Tender Ref: 2201000019 Page 24 of 26

Page 25: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

SECTION I INVITATION TO TENDER ANNEX E

EVALUATION CRITERIA

SECTION I -

ANNEX E

EVALUATION CRITERIA

Tender Ref: 2201000019 Page 25 of 26

Page 26: TENDER DOCUMENT SINGAPORE POOLS (PRIVATE) … · format as required. NOTE: ALL ERASURES AND AMENDMENTS TO ANY OF THE ABOVE ... SPPL will not entertain any claims made by the Tenderer

SECTION I INVITATION TO TENDER ANNEX E

EVALUATION CRITERIA 1. The Tenderer shall comply with the Invitation to Tender including the followings: Annex A Instructions to Tenderers

Annex B Tenderer’s Particulars Annex C Requirements and Scope of Services Annex D Price Schedule Annex E Evaluation Criteria

2. The Tenderer will be evaluated based on the following criteria: 2.1 Should have good proven track record (i.e. list of clientele using similar scope

of services);

2.2 Should have good business support;

2.3 Ability to meet the requirements and scope of services specified in this Tender Document;

2.4 Ability to provide most of the items specified in this Tender Document; 2.5 Price tendered/quoted should be the most competitive price. SPPL does not

bind itself to accept the lowest quoted price. SPPL reserves the right to award the tender in whole or in part to one or more successful Tenderers.

Tender Ref: 2201000019 Page 26 of 26