IN THIS SECTION

- Test & Balance

HA~RISAIRSYSTE1V1S, INC.

Heat;inB &...-Air Condit;ioninBInst;allat;ion &...-5ervice

AIR MOVING EQUIPMENT TEST SHEET

DIAMOND TEST AND BALANCE11577 So. Lampton View Drive

So. Jordan, UT 84095Ph: (801) 282-3480

Fax: (801) 282-3557

JOB NAME: SPRING HILL SUITES DATE:

PAGE:

2/22/2012

UNIT NO. MAU-1 MAU-2 FC-1

LOCATION ROOF ROOF POOL CEILING

MANUFACTURER ARES ARES JOHNSON CONTROLS

MODEL NO. SE2A BADE SE2A BADE NC090COOC6ATJ2A

SERIAL NO. A7751 A7752 N1H1273465

OPERATING CONDo SPECIFIED ACTUAL SPECIFIED ACTUAL SPECIFIED ACTUAL SPECIFIED ACTUAL

TOTAL CFM 2520 2299 3340 3075 3000 2996

RETURN CFM - - - - 1470 1501

OUTSIDE CFM 2520 2299 3340 3075 1530 1495

EXT.STATIC PRESS .50"

TOT.STATIC PRESS. 040" AD" .90"

SUCTION PRESS. .15" .10" .80"

DISCHARGE PRESS. .25" .30" .10"

FAN SHEAVE AK144 1" AK144 1" AK56 1"

MOTOR SHEAVE 1VL30 5/8" 1VM40 5/8" 1VL40 7/8"

BELTS AX66 A68 A44

MOTOR MANUFCTR. BALDOR BALDOR MARATHON

SIZE 3/4 3/4 2.0

VOLTAGE 120 121 120 121 460 208,210,208

PHASE 1 1 1 1 3 3

RATED ACTUAL RATED ACTUAL RATED ACTUAL RATED ACTUAL

RPM MOTOR 1725 1786 1725 1781 1725 1580

AMPERAGE 10.2 9.2 10.2 9.5 6.8 3.3, 3.1, 3,0

RPM FAN 304 318 902

FILTER DROP/COIL 040"

COIL DROP

HTG DISCH. TEMP.

AIR MOVING EQUIPMENT TEST SHEET

DIAMOND TEST AND BALANCE11577 So. Lampton View Drive

So. Jordan, UT 84095Ph: (801) 282·3480

Fax: (801) 282·3557

JOB NAME: SPRING HILL SUITES DATE:

PAGE:

2/22/2012

2

UNIT NO. EF-1 (2) EF-1 (04) EF-1 (06) EF-1 (08)

LOCATION ROOF ROOF ROOF ROOF

MANUFACTURER GREENHECK GREENHECK GREENHECK GREENHECK

MODEL NO. G-085-VG-4-X G-085-VG-4-X G-085-VG-4-X G-085-VG-4-X

SERIAL NO. 12534323-1108 12534314-1108 12534324-1108 12534321-1108

OPERATING CONDo SPECIFIED ACTUAL SPECIFIED ACTUAL SPECIFIED ACTUAL SPECIFIED ACTUAL

TOTAL CFM 270 345 270 345 270 383 270 330

RETURN CFM 270 345 270 345 270 383 270 330

OUTSIDE CFM - - - - - - - -

EXT.STATIC PRESS - - - -

TOT.STATIC PRESS. - - - -

SUCTION PRESS. .28" .29" .25" .27"

DISCHARGE PRESS. - - - -

FAN SHEAVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE

MOTOR SHEAVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE

BELTS DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE

MOTOR MANUFCTR. GREENHECK GREENHECK GREENHECK GREENHECK

SIZE 1/4 1/4 1/4 1/4

VOLTAGE 115 120 115 120 115 120 115 120

PHASE 1 1 1 1 1 1 1

RATED ACTUAL RATED ACTUAL RATED ACTUAL RATED ACTUAL

RPM MOTOR 1725 1708 1725 1728 1725 1714 1725 1719

AMPERAGE 3.9 .9 3.9 1.0 3.9 1.0 3.9 .9

RPM FAN 1708 1728 1714 1719

FILTER DROP/COIL

COIL DROP

SF

AIR MOVING EQUIPMENT TEST SHEET

DIAMOND TEST AND BALANCE11577 So. Lampton View Drive

So. Jordan, UT 84095Ph: (801) 282·3480

Fax: (801) 282-3557

JOB NAME: SPRING HILL SUITES DATE: 2/22/2012

PAGE: 3

UNIT NO. EF-1 (10) EF-1 (12) EF-1 (14) EF-2 (16)

LOCATION ROOF ROOF ROOF ROOF

MANUFACTURER GREENHECK GREENHECK GREENHECK GREENHECK

MODEL NO. G085-VG-4-X G085-VG-4-X G085-VG-4-X G085-VG-4-X

SERIAL NO. 12534320-1108 12534316-1108 12534309-11 08 12534319-1108

OPERATING CONDo SPECIFIED ACTUAL SPECIFIED ACTUAL SPECIFIED ACTUAL SPECIFIED ACTUAL

TOTALCFM 270 346 270 297 270 340 360 448

RETURN CFM 270 346 270 297 270 340 360 448

OUTSIDE CFM - - - - - - - -

EXT.STATIC PRESS - - - -

TOT.STATIC PRESS. - - - -SUCTION PRESS. .26" .25" .21" .20"

DISCHARGE PRESS. - - - -

FAN SHEAVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE

MOTOR SHEAVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE

BELTS DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE

MOTOR MANUFCTR. GREENHECK GREENHECK GREENHECK GREENHECK

SIZE 1/4 1/4 1/4 1/4

VOLTAGE 115 120 115 120 115 120 115 120

PHASE 1 1 1 1 1 1 1 1

RATED ACTUAL RATED ACTUAL RATED ACTUAL RATED ACTUAL

RPM MOTOR 1725 1728 1725 1728 1725 1701 1725 1691

AMPERAGE 3.9 1.0 3.9 1.0 3.9 .9 3.9 .9

RPM FAN 1728 1728 1701 1691

FILTER DROP/COIL

COIL DROP

---~-- ---

AIR MOVING EQUIPMENT TEST SHEET

DIAMOND TEST AND BALANCE11577 So. Lampton View Drive

So. Jordan, UT 84095Ph: (801) 282-3480

Fax: (801) 282-3557

JOB NAME: SPRING HILL SUITES DATE:

PAGE:

2/22/2012

4

UNIT NO. EF-2 (18) EF-2 (20) EF-2 (22) EF-2 (24)

LOCATION ROOF ROOF ROOF ROOF

MANUFACTURER GREENHECK GREENHECK GREENHECK GREENHECK

MODEL NO. G-095-VG-4-X G-095-VG-4-X G-095-VG-4-X G-095-VG-4-X

SERIAL NO. 12534338-11108 12534326-1108 12534328-1108 12534331-1108

OPERATING CONDo SPECIFIED ACTUAL SPECIFIED ACTUAL SPECIFIED ACTUAL SPECIFIED ACTUAL

TOTALCFM 360 465 360 481 360 502 360 469

RETURN CFM 360 465 360 481 360 502 360 469

OUTSIDE CFM - - - - - - - .

EXT.STATIC PRESS - - - -

TOT.STATIC PRESS. - - - -

SUCTION PRESS. .25" .24" .21" .18"

DISCHARGE PRESS. - - - -

FAN SHEAVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE

MOTOR SHEAVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE

BELTS DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE

MOTOR MANUFCTR. GREENHECK GREENHECK GREENHECK GREENHECK

SIZE 1/4 1/4 1/4 1/4

VOLTAGE 115 120 115 120 115 120 115 120

PHASE 1 1 1 1 1 1 1 1

RATED ACTUAL RATED ACTUAL RATED ACTUAL RATED ACTUAL

RPM MOTOR 1725 1723 1726 1721 1725 1718 1725 1717

AMPERAGE 3.9 1.5 3.9 1.4 3.9 1.6 3.9 1.4

RPM FAN 1723 1721 1718 1717

FILTER DROP

COIL DROP

AIR WASH

--------------------- ----------_ .._----

AIR MOVING EQUIPMENT TEST SHEET

DIAMOND TEST AND BALANCE11677 So. Lampton View Drive

So. Jordan, UT 84096Ph: (801) 282-3480

Fax: (801) 282-3557

JOB NAME: SPRING HILL SUITES DATE: 2/22/2012

PAGE: 5

UNIT NO. EF-2 (26) EF-2 (28) EF-2 (80) EF-2 (32)

LOCATION ROOF ROOF ROOF ROOF

MANUFACTURER GREENHECK GREENHECK GREENHECK GREENHECK

MODEL NO. G-095-VG-4-X G-095-VG-4-X G-095-VG·4-X G-095-VG-4-X

SERIAL NO. 12534329-1108 12534342-1108 12534343-1108 12534336-1108

OPERATING CONDo SPECIFIED ACTUAL SPECIFIED ACTUAL SPECIFIED ACTUAL SPECIFIED ACTUAL

TOTAL CFM 360 524 360 426 360 405 360 442

RETURN CFM 360 524 360 426 360 405 360 442

OUTSIDECFM - - - - - - - .

EXT.STATIC PRESS - - - -

TOT.STATIC PRESS. - - - -SUCTION PRESS. .16" .21" .20" .17"

DISCHARGE PRESS. - - - -

FAN SHEAVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE

MOTOR SHEAVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE

BELTS DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE

MOTOR MANUFCTR. GREENHECK GREENHECK GREENHECK GREENHECK

SIZE 3/4 3/4 3/4 3/4

VOLTAGE 115 120 115 120 115 120 115 120

PHASE 1 1 1 1 1 1 1 1

RATED ACTUAL RATED ACTUAL RATED ACTUAL RATED ACTUAL

RPM MOTOR 1725 1715 1725 1722 1725 1708 1725 1694

AMPERAGE 3.9 1.3 3.9 1.4 3.9 1.5 3.9 1.5

RPM FAN 1715 1722 1708 1694

FILTER DROP

COIL DROP

AIR WASH

AIR MOVING EQUIPMENT TEST SHEET

DIAMOND TEST AND BALANCE11577 So. Lampton View Drive

So. Jordan, UT 84095Ph: (801) 282·3480

Fax: (801) 282·3557

JOB NAME: SPRING HILL SUITES DATE:

PAGE:

2/22/2012

6

UNIT NO. EF-2 (35) EF-2 (33) EF-2 )31) EF-2 (29)

LOCATION ROOF ROOF ROOF ROOF

MANUFACTURER GREENHECK GREENHECK GREENHECK GREENHECK

MODEL NO. G-095-VG-4-X G-095-VG-4-X G-095-VG-4-X G-095-VG-4-X

SERIAL NO. 12534334-1108 12534339-1108 12534345-1108 12534341-1108

OPERATING CONDo SPECIFIED ACTUAL SPECIFIED ACTUAL SPECIFIED ACTUAL SPECIFIED ACTUAL

TOTAL CFM 360 507 360 443 360 464 360 503

RETURN CFM 360 507 360 443 360 464 360 503

OUTSIDE CFM - - - - - - - -

EXT.STATIC PRESS - - - -

TOT.STATIC PRESS. - - - -SUCTION PRESS. .22" .21" .19" .20"

DISCHARGE PRESS. - - - -

FAN SHEAVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE

MOTOR SHEAVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE

BELTS DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE

MOTOR MANUFCTR. GREENHECK GREENHECK GREENHECK GREENHECK

SIZE 1/4 1/4 1/4 1/4

VOLTAGE 115 120 115 120 11 5 120 115 120

PHASE 1 1 1 1 1 1 1 1

RATED ACTUAL RATED ACTUAL RATED ACTUAL RATED ACTUAL

RPM MOTOR 1725 1730 1725 1721 1725 1714 1725 1711

AMPERAGE 3.9 1.5 3.9 1.5 3.9 1.4 3.9 1.2

RPM FAN 1730 1721 1714 1711

FILTER DROP

COIL DROP

AIR MOVING EQUIPMENT TEST SHEET

DIAMOND TEST AND BALANCE11577 So. Lampton View Drive

So. Jordan, UT 84095Ph: (801) 282·3480

Fax: (801) 282·3557

JOB NAME: SPRING HILL SUITES DATE:

PAGE:

2/22/2012

7

UNIT NO. EF-2 (27) EF-2 (25) EF-2 (23) EF-2 (21)

LOCATION ROOF ROOF ROOF ROOF

MANUFACTURER GREENHECK GREENHECK GREENHECK GREENHECK

MODEL NO. G-095-VG-4-X G-095-VG-4-X G-095-VG-4-X G-095-VG-4-X

SERIAL NO. 12534335-1108 12534333-1108 12534344-1108 12534330-1108

OPERATING CONDo SPECIFIED ACTUAL SPECIFIED ACTUAL SPECIFIED ACTUAL SPECIFIED ACTUAL

TOTAL CFM 360 540 360 541 360 551 360 526

RETURN CFM 360 540 360 541 360 551 360 526

OUTSIDE CFM - - - - - - - -

EXT.STATIC PRESS - - . -

TOT.STATIC PRESS. - - - .

SUCTION PRESS. .17" .20" .16" .18"

DISCHARGE PRESS. - - - -

FAN SHEAVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE

MOTOR SHEAVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE

BELTS DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE

MOTOR MANUFCTR. GREENHECK GREENHECK GREENHECK GREENHECK

SIZE 1/4 1/4 1/4 1/4

VOLTAGE 115 120 115 120 115 120 115 120

PHASE 1 1 1 1 1 1 1 1

RATED ACTUAL RATED ACTUAL RATED ACTUAL RATED ACTUAL

RPM MOTOR 1725 1708 1725 1694 1725 1708 1725 1702

AMPERAGE 3.9 1.5 3.9 1.4 3.9 1.5 3.9 1.2

RPM FAN 1708 1694 1708 1702

FILTER DROP/COIL

COIL DROP

HTG DISCH. TEMP.

AIR MOVING EQUIPMENT TEST SHEET

DIAMOND TEST AND BALANCE11577 So. Lampton View Drive

So. Jordan, UT 84095Ph: (801) 282·3480

Fax: (801) 282-3557

JOB NAME: SPRING HILL SUITES DATE: 2/22/2012

PAGE: 8

UNIT NO. EF-2 (19) EF-1 (17) EF-1 (15) EF-4

LOCATION ROOF ROOF ROOF ROOF

MANUFACTURER GREENHECK GREENHECK GREENHECK GREENHECK

MODEL NO. G-095-VG-4-X G-095-VG-4-X G-095-VG-4-X S-CUBE-240-10-F

SERIAL NO. 12534325-1108 12534340-1108 12534337-1108 12514322-1107

OPERATING CONDo SPECIFIED ACTUAL SPECIFIED ACTUAL SPECIFIED ACTUAL SPECIFIED ACTUAL

TOTALCFM 360 551 270 329 270 389 6270 4460

RETURN CFM 360 551 270 329 270 389 6270 4460

OUTSIDECFM - - - - - - - -

EXT.STATIC PRESS - - - -

TOT.STATIC PRESS. - - - -

SUCTION PRESS. .17" ,29: ,19" -

DISCHARGE PRESS. - - - -

FAN SHEAVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE 1" 2AK74DIRECT

MOTOR SHEAVE DIRECT DRIVE DIRECT DRIVE DRIVE 5/8" 2VP36

BELTS DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE 2@ AP30

MOTOR MANUFCTR. GREENHECK GREENHECK GREENHECK WEG

SIZE 1/4 1/4 1/4 1

VOLTAGE 115 120 115 120 115 120 115 120

PHASE 1 1 1 1 1 1 1 1

RATED ACTUAL RATED ACTUAL RATED ACTUAL RATED ACTUAL

RPM MOTOR 1725 1730 1725 1706 1725 1704 1740

AMPERAGE 3.9 1.2 3.9 1.4 3.9 1.4 14.0

RPM FAN 1730 1706 1704

FILTER DROP/COIL

COIL DROP

SF

AIR MOVING EQUIPMENT TEST SHEET

DIAMOND TEST AND BALANCE11577 So. Lampton View Drive

So. Jordan, UT 84095Ph: (801) 282-3480

Fax: (801) 282-3557

JOB NAME: SPRING HILL SUITES DATE:

PAGE:

2/22/2012

9

UNIT NO. EF-3 EF-1 (11) EF-1 (09) EF- (07)

LOCATION ROOF ROOF ROOF ROOF

MANUFACTURER GREENHECK GREENHECK GREENHECK GREENHECK

MODEL NO. S-CUBE-200-7-F G-085-VG-4-X G-085-VG-4-X G-085-VG-4-X

SERIAL NO. 12514321-1107 12534312-1108 12534315-1108 12534313-1108

OPERATING CONDo SPECIFIED ACTUAL SPECIFIED ACTUAL SPECIFIED ACTUAL SPECIFIED ACTUAL

TOTAL CFM 4435 4255 270 335 270 345 270 324

RETURN CFM 4435 4255 270 335 270 345 270 324

OUTSIDE CFM - - - - - - - -

EXT.STATIC PRESS - - - -

TOT.STATIC PRESS. - - - -

SUCTION PRESS. .19" .20" .16"

DISCHARGE PRESS. - - -

FAN SHEAVE 3/4" 2AK64 DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE

MOTOR SHEAVE 5/8" 2VP36 DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE

BELTS 2@ AP26 DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE

MOTOR MANUFCTR. WEG GREENHECK GREENHECK GREENHECK

SIZE 3/4 1/4 1/4 1/4

VOLTAGE 115 120 115 120 115 120 115 120

PHASE 1 1 1 1 1 1 1 1

RATED ACTUAL RATED ACTUAL RATED ACTUAL RATED ACTUAL

RPM MOTOR 1745 1725 1716 1725 1707 1725 1711

AMPERAGE 10.8 3.9 .9 3.9 .9 3.9 .9

RPM FAN 1716 1707 1711

FILTER DROP/COIL

COIL DROP

AIR MOVING EQUIPMENT TEST SHEET

DIAMOND TEST AND BALANCE11577 So. Lampton View Drive

So. Jordan, UT 84095Ph: (801) 282-3480

Fax: (801) 282-3557

JOB NAME: SPRING HILL SUITES DATE: 2/22/2012

PAGE: 10

UNIT NO. EF-1 (05) EF-1 (03) EF-1 (01) EF-6

LOCATION ROOF ROOF ROOF CEILING

MANUFACTURER GREENHECK GREENHECK GREENHECK GREENHECK

MODEL NO. G-085-VG-4-X G-085-VG-4-X G-085-VG-4-X SQ-120-VG-5-X

SERIAL NO. 12534317-1108 12534318-1108 12534311-1108 12514098-1107

OPERATING CONDo SPECIFIED ACTUAL SPECIFIED ACTUAL SPECIFIED ACTUAL SPECIFIED ACTUAL

TOTAL CFM 270 335 270 308 270 335 1465 1406

RETURNCFM 270 335 270 308 270 335 1465 1406

OUTSIDE CFM - - - - - - - -

EXT.STATIC PRESS - - - -

TOT.STATIC PRESS. - - - .80"

SUCTION PRESS. .16" .22" .20" .30"

DISCHARGE PRESS. - - - .50"

FAN SHEAVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE

MOTOR SHEAVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE

BELTS DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE DIRECT DRIVE

MOTOR MANUFCTR. GREENHECK GREENHECK GREENHECK NIA

SIZE 1/4 1/4 1/4 NIA

VOLTAGE 115 121 115 121 115 121 115 121

PHASE 1 1 1 1 1 1 1 1

RATED ACTUAL RATED ACTUAL RATED ACTUAL RATED ACTUAL

RPM MOTOR 1725 1726 1725 1714 1725 1719 NIA 1733

AMPERAGE 3.9 1.0 3.9 .9 3.9 1.1 NIA 4.3

RPM FAN 1726 1714 1719 1733

FILTER DROP

COIL DROP

AIR WASH

DIFFUSER & GRILL TEST SHEET

DIAMOND TEST AND BALANCE11577 So. Lampton View Drive

So. Jordan, UT 84095Ph: (801) 282·3480Fax: (801) 282-3557

JOB NAME: SPRING HILL SUITESDATE:PAGE:

2/22/201212

REQUIRED FLOW TEST RESULTS

ROOM NO. OUTLET NO. CODE SIZE CORRECTION FPM CFM FPM CFM FINAL FINAL

FACTOR VEL VEL FPM CFM

EF-1

401 1 EG 6" 1.08 83 90 125 135 125 135

301 2 EG 6" 1.08 83 90 100 108 100 108

201 3 EG 6" 1.08 83 90 85 92 85 92

- - -

270 1.24 335 1.24 335

EF-1

402 1 EG 6" 1.08 83 90 115 124 115 124

302 2 EG 6" 1.08 83 90 100 108 100 108

202 3 EG 6" 1.08 83 90 105 113 105 113

- - -270 1.28 345 1.28 345

EF-1

403 1 EG 6" 1.08 83 90 90 97 90 97

303 2 EG 6" 1.08 83 90 95 103 95 103

203 3 EG 6" 1.08 83 90 100 108 100 108

-

270 1.14 308 1.14 308

EF-1

404 1 EG 6" 1.08 83 90 115 124 115 124

304 2 EG 6" 1.08 83 90 105 113 105 113

204 3 EG 6" 1.08 83 90 100 108 100 108

-270 1.28 345 1.28 345

EF-1

405 1 EG 6" 1.08 83 90 110 119 110 119

305 2 EG 6" 1.08 83 90 100 108 100 108

205 3 EG 6" 1.08 83 90 100 108 100 108

- - -

270 1.24 335 1.24 335

JOB NAME: SPRING HILL SUITES

DIFFUSER & GRILL TEST SHEET

DATE:PAGE:

DIAMOND TEST AND BALANCE11577 So. Lampton View Drive

So. Jordan, UT 84095Ph: (801) 282·3480Fax: (801) 282-3557

212212012

13

REQUIRED FLOW TEST RESULTS

ROOM NO. OUTLET NO. CODE SIZE CORRECTION FPM CFM FPM CFM FINAL FINAL

FACTOR VEL VEL FPM CFM

EF-1

406 1 EG 6" 1.08 83 90 130 140 130 140

306 2 EG 6" 1.08 83 90 110 119 110 119

206 3 EG 6" 1.08 83 90 115 124 115 124

- - -

270 1.42 383 1.42 383

EF-1

407 1 EG 6" 1.08 83 90 100 108 100 108

307 2 EG 6" 1.08 83 90 105 113 105 113

207 3 EG 6" 1.08 83 90 100 108 100 108

- - -270 1.20 324 1.20 324

EF-1

408 1 EG 6" 1.08 83 90 110 119 110 119

308 2 EG 6" 1.08 83 90 95 103 95 103

208 3 EG 6" 1.08 83 90 100 108 100 108

- . -

270 1.00 270 1.22 330

EF-l

409 1 EG 6" 1.08 83 90 105 113 105 113

309 2 EG 6" 1.08 83 90 110 119 110 119

209 3 EG 6" 1.08 83 90 105 113 105 113

- . -270 1.28 345 1.28 345

EF-1

410 1 EG 6" 1.08 83 90 110 119 110 119

310 2 EG 6" 1.08 83 90 100 108 100 108

210 3 EG 6" 1.08 83 90 110 119 110 119

- - -

270 1.28 346 1.28 346

JOB NAME: SPRING HILL SUITES

DIFFUSER & GRILL TEST SHEET

DATE:PAGE:

DIAMOND TEST AND BALANCE11577 So. Lampton View Drive

So. Jordan, UT 84095Ph: (801) 282-3480Fax: (801) 282·3557

2/22/201211

REQUIRED FLOW TEST RESULTS

ROOM NO OUTLET NO. CODE SIZE CORRECTION FPM CFM FPM CFM FINAL FINAL

FACTOR VEL VEL FPM CFM

MUA-1

4TH CORR. 1 SWS 8" X 22" 1.10 764 840 260 286 570 627

3RD CaRR. 2 SWS 8" X 22" 1.10 764 840 1700 1870 930 1023

2ND CaRR. 3 SWS 8" X 22" 1.10 764 840 610 671 590 649

- -2520 1.12 2827 91 2299

MUA-2

4TH CaRR. 1 SWS 8" X 22" 1.10 759 835 1000 1100 720 792

3RD CaRR. 2 SWS 8" X 22" 110 759 835 920 1012 715 787

2ND CaRR. 3 SWS 8" X 22" 1.10 759 835 1120 1232 700 770

1ST CaRR. 4 SWS 8" X 22" 1.10 759 835 760 863 660 726

- - -

3340 1.25 4180 .92 3075

FC-1

111 1 LD-1 10" 1.08 306 330 405 437 340 367

111 2 LD-1 10" 1.08 306 330 455 491 305 329

111 3 LD-1 10" 1.08 306 330 440 475 330 356

111 4 LD-1 10" 1.08 306 330 300 324 330 356

111 5 LD-1 10" 1.08 306 330 320 346 320 346

111 6 LD-1 10" 1.08 306 330 455 491 330 356

111 7 LD-1 10" 108 306 330 460 497 320 346

HOT TUB 8 LD-1 10" 1.08 319 345 160 173 250 270

HOT TUB 9 LD-1 10" 1.08 319 345 320 346 250 270

- - -

3000 1.19 3580 1.00 2996

DATE:PAGE:JOB NAME: SPRING HILL SUITES

DIFFUSER & GRILL TEST SHEET

DIAMOND TEST AND BALANCE11577 So. Lampton View Drive

So. Jordan, UT 84095Ph: (801) 282-3480Fax: (801) 282-3557

2/22/201214

REQUIRED FLOW TEST RESULTS

ROOM NO. OUTLET NO. CODE SIZE CORRECTION FPM CFM FPM CFM FINAL FINAL

FACTOR VEL VEL FPM CFM

EF-1

411 1 EG 6" 1.08 83 90 100 108 100 108

311 2 EG 6" 1.08 83 90 100 108 100 108

211 3 EG 6" 1.08 83 90 110 119 110 119

- - -270 1.24 335 1.24 335

EF-1

412 1 EG 6" 1.08 83 90 100 108 100 108

312 2 EG 6" 1.08 83 90 90 97 90 97

212 3 EG 6" 1.08 83 90 85 92 85 92

- - -

270 1.10" 297 1.10" 297

EF-1

414 1 EG 6" 1.08 83 90 100 108 100 108

314 2 EG 6" 1.08 83 90 105 113 105 113

214 3 EG 6" 1.08 83 90 110 119 110 119

- - -270 1.26 340 1.26 340

EF-1

415 1 EG 6" 1.08 83 90 125 135 125 135

315 2 EG 6" 1.08 83 90 115 124 115 124

215 3 EG 6" 1.08 83 90 120 130 120 130

- - -

270 1.44 389 1.44 389

EF-1

416 1 EG 6" 1.08 83 90 95 103 95 103

316 2 EG 6" 1.08 83 90 110 119 110 119

216 3 EG 6" 1.08 83 90 105 113 105 113

116 4 EG 6" 1.08 83 90 105 113 105 113

- - -

360 1.24 448 1.24 448

JOB NAME: SPRING HILL SUITES

DIFFUSER & GRILL TEST SHEET

DATE:

PAGE:

DIAMOND TEST AND BALANCE11577 So. Lampton View Drive

So. Jordan, UT 84095Ph: (801) 282·3480Fax: (801) 282·3557

212212012

15

REQUIRED FLOW TEST RESULTS

ROOM NO. OUTLET NO. CODE SIZE CORRECTION FPM CFM FPM CFM FINAL FINAL

FACTOR VEL VEL FPM CFM

EF-2

417 1 EG 6" 1.08 83 90 115 124 115 124

317 2 EG 6" 1.08 83 90 100 108 100 108

217 3 EG 6" 1.08 83 90 90 97 90 97

- - -

360 1.22 329 1.22 329

EF-2

418 1 EG 6" 1.08 83 90 120 130 120 130

318 2 EG 6" 1.08 83 90 100 108 100 108

218 3 EG 6" 1.08 83 90 95 103 95 103

118 4 EG 6" 1.08 83 90 115 124 115 124

- - -

360 1.29 465 1.29 465

EF-2

419 1 EG 6" 1.08 83 90 140 151 140 151

319 2 EG 6" 1.08 83 90 120 130 120 130

219 3 EG 6" 1.08 83 90 115 124 115 124

119 4 EG 6" 1.08 83 90 135 146 135 146

- - -

360 1.53 551 1.53 551

EF-2

420 1 EG 6" 1.08 83 90 120 130 120 130

320 2 EG 6" 1.08 83 90 110 119 110 119

220 3 EG 6" 1.08 83 90 100 108 100 108

120 4 EG 6" 1.08 83 90 115 124 115 124

- - -360 1.34 481 1.34 481

DIFFUSER & GRILL TEST SHEET

DIAMOND TEST AND BALANCE11577 So. Lampton View Drive

So. Jordan, UT 84095Ph: (801) 282-3480Fax: (801) 282-3557

JOB NAME: SPRING HILL SUITESDATE:PAGE:

2/22/201216

REQUIRED FLOW TEST RESULTS

ROOM NO. OUTLET NO. CODE SIZE CORRECTION FPM CFM FPM CFM FINAL FINAL

FACTOR VEL VEL FPM CFM

EF-2

421 1 EG 6" 1.08 83 90 130 140 130 140

321 2 EG 6" 1.08 83 90 120 132 120 132

221 3 EG 6" 1.08 83 90 115 124 115 124

121 4 EG 6" 1.08 83 90 120 130 120 130

- - -

360 1.46 526 1.46 526

EF-2

422 1 EG 6" 1.08 83 90 125 135 125 135

322 2 EG 6" 1.08 83 90 110 119 110 119

222 3 EG 6" 1.08 83 90 115 124 115 124

122 4 EG 6" 1.08 83 90 115 124 115 124

- - -

360 1.39 502 1.39 502

EF-2

423 1 EG 6" 1.08 83 90 150 162 150 162

323 2 EG 6" 1.08 83 90 130 140 130 140

223 3 EG 6" 1.08 83 90 110 119 110 119

123 4 EG 6" 1.08 83 90 120 130 120 130

- - -

360 1.53 551 1.53 551

EF-2

424 1 EG 6" 1.08 83 90 115 124 115 124

324 2 EG 6" 1.08 83 90 105 113 105 113

224 3 EG 6" 1.08 83 90 105 113 105 113

124 4 EG 6" 1.08 83 90 110 119 110 119

- - -

360 1.30 469 1.30 469

JOB NAME: SPRING HILL SUITES

DIFFUSER & GRILL TEST SHEET

DATE:

PAGE:

DIAMOND TEST AND BALANCE11577 So. Lampton View Drive

So. Jordan, UT 84095Ph: (801) 282·3480Fax: (801) 282·3557

212212012

17

REQUIRED FLOW TEST RESULTS

ROOM NO. OUTLET NO. CODE SIZE CORRECTION FPM CFM FPM CFM FINAL FINAL

FACTOR VEL VEL FPM CFM

EF-2

425 1 EG 6" 1.08 83 90 145 157 145 157

325 2 EG 6" 1.08 83 90 135 146 135 146

225 3 EG 6" 1.08 83 90 100 108 100 108

125 4 EG 6" 1.08 83 90 120 130 120 130

- - -

360 1.50 541 1.50 541

EF-2

426 1 EG 6" 1.08 83 90 135 146 135 146

326 2 EG 6" 1.08 83 90 135 146 135 146

226 3 EG 6" 1.08 83 90 110 119 110 119

126 4 EG 6" 1.08 83 90 105 113 105 113

- - -

360 1.46 524 1.46 524

EF-2

427 1 EG 6" 1.08 83 90 155 167 155 167

327 2 EG 6" 1.08 83 90 140 151 140 151

227 3 EG 6" 1.08 83 90 95 103 95 103

127 4 EG 6" 1.08 83 90 110 119 110 119

- - -360 1.50 540 1.50 540

EF-2

428 1 EG 6" 1.08 83 90 110 119 110 119

328 2 EG 6" 1.08 83 90 105 113 105 113

228 3 EG 6" 1.08 83 90 90 97 90 97

128 4 EG 6" 1.08 83 90 90 97 90 97

- - -

360 1.18 426 1.18 426

JOB NAME: SPRING HILL SUITES

DIFFUSER & GRILL TEST SHEET

DATE:PAGE:

DIAMOND TEST AND BALANCE11577 So. Lampton View Drive

So. Jordan, UT 84095Ph: (801) 282-3480Fax: (801) 282-3557

2/22/201220

REQUIRED FLOW TEST RESULTS

ROOM NO. OUTLET NO. CODE SIZE CORRECTION FPM CFM FPM CFM FINAL FINAL

FACTOR VEL VEL FPM CFM

EF-2

435 1 EG 6" 108 83 90 135 146 135 146

335 2 EG 6" 1.08 83 90 125 135 125 135

235 3 EG 6" 1.08 83 90 105 113 105 113

135 4 EG 6" 1.08 83 90 105 113 105 113

-

360 1.41 507 1.41 507

EF-2

436 1 EG 6" 1.08 83 90 130 140 130 140

336 2 EG 6" 1.08 83 90 125 135 125 135

236 3 EG 6" 108 83 90 100 108 100 108

- -

360 1.42 383 1.42 383

EF-3

113 1 EG 4.5' x 2' 1.34 3310 4435 3175 4255 3175 4255

- -

4435 .96 4255 .96 4255

EF-4

213 1 EG 34" x 16" 1.18 1771 2090 605 714 NOT OPERATING

313 2 EG 34" x 16" 1.18 1771 2090 1080 1274

413 3 EG 34" x 16" 1.18 1771 2090 2095 2472

-6270 .71 4460

EF-6

111 1 EG-2 18"x18" 1.09 670 730 620 676 620 676

111 2 EG-2 18" x 18" 1.09 674 735 670 730 670 730

- -

1465 .96 1406 96 1406

DIFFUSER & GRILL TEST SHEET

DIAMOND TEST AND BALANCE11577 So. Lampton View Drive

So. Jordan, UT 84095Ph: (801) 282-3480Fax: (801) 282-3557

JOB NAME: SPRING HILL SUITESDATE:PAGE:

2/22/201218

REQUIRED FLOW TEST RESULTS

ROOM NO. OUTLET NO. CODE SIZE CORRECTION FPM CFM FPM CFM FINAL FINAL

FACTOR VEL VEL FPM CFM

EF-2

429 1 EG 6" 1.08 83 90 135 146 135 146

329 2 EG 6" 1.08 83 90 120 130 120 130

229 3 EG 6" 1.08 83 90 95 103 95 103

129 4 EG 6" 1.08 83 90 115 124 115 124

- - -

360 1.40 503 1.40 503

EF-2

430 1 EG 6" 1.08 83 90 100 108 100 108

330 2 EG 6" 1.08 83 90 115 124 115 124

230 3 EG 6" 1.08 83 90 60 65 60 65

130 4 EG 6" 1.08 83 90 100 108 100 108

- - -

360 1.13 405 1.13 405

EF-2

431 1 EG 6" 1.08 83 90 125 135 125 135

331 2 EG 6" 1.08 83 90 120 130 120 130

231 3 EG 6" 1.08 83 90 80 86 80 86

131 4 EG 6" 1.08 83 90 105 113 105 113

- - -

360 1.29 464 1.29 464

EF-2

432 1 EG 6" 1.08 83 90 110 119 110 119

332 2 EG 6" 1.08 83 90 105 113 105 113

232 3 EG 6" 1.08 83 90 65 70 65 70

132 4 EG 6" 1.08 83 90 130 140 130 140

- - -

360 1.23 442 1.23 442

JOB NAME: SPRING HILL SUITES

DIFFUSER & GRILL TEST SHEET

DATE:

PAGE:

DIAMOND TEST AND BALANCE11577 So. Lampton View Drive

So. Jordan, UT 84095Ph: (801) 282-3480Fax: (801) 282-3557

2/22/2012

19

REQUIRED FLOW TEST RESULTS

ROOM NO. OUTLET NO. CODE SIZE CORRECTION FPM CFM FPM CFM FINAL FINAL

FACTOR VEL VEL FPM CFM

EF-2

433 1 EG 6" 1.08 83 90 125 135 125 135

333 2 EG 6" 1.08 83 90 110 119 110 119

233 3 EG 6" 1.08 83 90 80 86 80 86

133 4 EG 6" 1.08 83 90 95 103 95 103

- - -

360 1.23 443 1.23 443

EF-2

434 1 EG 6" 1.08 83 90 150 162 150 162

334 2 EG 6" 1.08 83 90 135 146 135 146

234 3 EG 6" 1.08 83 90 115 124 115 124

134 4 EG 6" 1.08 83 90 110 119 110 119

- - -

360 1.53 551 1.53 551

EF-2

435 1 EG 6" 1.08 83 90 135 146 135 146

335 2 EG 6" 1.08 83 90 125 135 125 135

235 3 EG 6" 1.08 83 90 105 113 105 113

135 4 EG 6" 1.08 83 90 105 113 1105 113

- - -360 1.41 507 1.41 507

EF-2

436 1 EG 6" 1.08 83 90 130 140 130 140

336 2 EG 6" 1.08 83 90 125 135 125 135

236 3 EG 6" 1.08 83 90 100 108 100 108

- - -

360 1.42 383 1.42 383

DIFFUSER & GRILL TEST SHEET

DIAMOND TEST AND BALANCE11577 So. Lampton View Drive

So. Jordan, UT 84095Ph: (801) 282-3480Fax: (801) 282-3557

JOB NAME: SPRING HILL SUITESDATE:PAGE:

2/22/201221

REQUIRED FLOW TEST RESULTS

ROOM NO. OUTLET NO. CODE SIZE CORRECTION FPM CFM FPM CFM FINAL FINAL

FACTOR VEL VEL FPM CFM

EF-7

109B 1 EG-1 10" x4" 1.08 69 75 50 54 65 71

109B 2 EG-1 10" x 4" 1.08 69 75 45 48 65 71

109B 3 EG-1 10" x 4" 1.08 69 75 175 189 75 81

109B 4 EG-1 10" x 4" 1.08 88 95 45 48 80 86

109A 5 EG-1 10" x 4" 1.08 88 95 150 162 100 108

109A 6 EG-1 10" x 4" 1.08 69 75 45 49 60 65

109A 7 EG-1 10" x 4" 1.08 69 75 115 124 80 86

- - -

565 1.19 674 1.01 568

EF-8

110 1 EG-1 10" 1.08 310 335 90 97 315 340

- -

335 .29 97 1.01 340

EF-10

213B 1 EG 6" 1.08 83 90 105 113 105 113

-

90 1.26 113 1.26 113

EF-10

2000 1 EG 6" 1.08 83 90 110 119 110 119

- - -

90 1.32 119 1.32 119

EF-10

313B 1 EG 6" 1.08 83 90 95 103 95 103

- - -

90 1.04 103 1.04 103

EF-10

413B 1 EG 6" 1.08 83 90 100 108 100 108

- - -

90 1.20 108 1.20 108

JOB NAME: SPRING HILL SUITES

DIFFUSER & GRILL TEST SHEET

DATE:

PAGE:

DIAMOND TEST AND BALANCE11577 So. Lampton View Drive

So. Jordan, UT 84095Ph: (801) 282-3480Fax: (801) 282-3557

2/22/2012

22

REQUIRED FLOW TEST RESULTS

ROOM NO. OUTLET NO. CODE SIZE CORRECTION FPM CFM FPM CFM FINAL FINAL

FACTOR VEL VEL FPM CFM

EF-12

115A 1 EG 6" 1.08 83 90 100 108 100 108

- - -90 1.2 108 1.2 108

EF-12

136B 1 EG 6" 1.08 46 50 45 49 45 49

- - -50 .98 49 .98 49

EF-12

200B 1 EG 6" 1.08 46 50 80 86 80 86

- - -50 1.72 86 1.72 86

EF-12

237A 1 EG 6" 1.08 46 50 90 97 90 97

- - -

50 1.94 97 1.94 97

EF-12

300B 1 EG 6" 1.08 46 50 105 113 105 113

- - -

50 2.26 113 2.26 113

EF-12

337 1 EG 6" 1.08 46 50 95 103 95 103

- - -

50 2.06 103 2.06 103

EF-12

400B 1 EG 6" 1.08 46 50 95 103 95 103

- - -

50 2.06 103 2.06 103

JOB NAME SPRING HILL SUITES

DIFFUSER & GRILL TEST SHEET

DATE:PAGE'

DIAMOND TEST AND BALANCE11577 So. Lampton View Drive

So. Jordan, UT 84095Ph: (801) 282·3480Fax: (801) 282·3557

2/22/2012

23

REQUIRED FLOW TEST RESULTS

ROOM NO. OUTLET NO. CODE SIZE CORRECTION FPM CFM FPM CFM FINAL FINAL

FACTOR VEL VEL FPM CFM

EF-12

437A 1 EG 6" 1.08 47 50 100 108 100 108

· ·

50 2.16 108 2.16 108

EF-13

117 1 EG 6" 108 185 200 60 65 190 205

· -200 .33 65 1.03 205

EF-13

111C 1 EG 6" 1.08 185 200 195 211 195 211

· · ·

200 1.06 211 1.06 211

AH-1

107 1 LD 24" X 24" 1.09 523 565 470 512 470 512

· · ·

565 .91 512 .91 512

AH-2

107 1 LD 24" X 24" 109 523 565 460 501 460 501

·

565 .89 501 89 501

AH-3

107 1 LD 24" X 24" 1.09 523 565 450 491 450 491

- ·

565 .87 491 .87 491

AH-4

107 1 LD 24" X 24" 1.09 523 565 455 496 455 496

· · ·

565 .88 496 .88 496

DATE:PAGE:JOB NAME: SPRING HILL SUITES

DIFFUSER & GRILL TEST SHEET

DIAMOND TEST AND BALANCE11577 So. Lampton View Drive

So. Jordan, UT 84095Ph: (801) 282-3480Fax: (801) 282-3557

21221201224

REQUIRED FLOW TEST RESULTS

ROOM NO. OUTLET NO. CODE SIZE CORRECTION FPM CFM FPM CFM FINAL FINAL

FACTOR VEL VEL FPM CFM

AH-5

103 1 LD 24" x 24" 1.09 583 635 450 491 450 491

- - -

635 .77. 491 .77 491

AH-6

1 LD 24" x 24" 1.08 417 450 350 378 350 378

- - -

450 .84 378 .84 378

AH-9

101B 1 LD 24" x 24" 1.09 583 635 550 600 550 600

- - -635 .94 600 .94 600

AH-10

101A 1 LD 24" x 24" 1.09 583 635 590 643 590 643

- - -

635 1.01 643 1.01 643

AH-11

106 1 LD 24" x 24" 1.08 417 450 520 562 520 562

- - -450 1.25 562 1.25 562

AH-12

101A 1 LD 24" x 24" 1.09 583 635 540 589 540 589

- - -635 .93 . 589 .93 589

AH-13

1018 1 LD 24" x 24" 1.09 583 635 560 610 560 610

- - -

635 .96 610 .96 610

AH-14

110 1 LD 24" x 24" 1.09 583 635 590 643 590 643

- - -

635 1.01 643 1.01 643

--------------------------------- -

DIFFUSER & GRILL TEST SHEET

JOB NAME: SPRING HILL SUITES

DATE:

PAGE:

DIAMOND TEST AND BALANCE11577 So. Lampton View Drive

So. Jordan, UT 84095Ph: (801) 282-3480Fax: (801) 282-3557

2/22/201225

REQUIRED FLOW TEST RESULTS

ROOM NO. OUTLET NO. CODE SIZE CORRECTION FPM CFM FPM CFM FINAL FINAL

FACTOR VEL VEL FPM CFM

AH-16

106A 1 LD 24" X 24" 1.08 417 450 460 497 460 497

- - -

450 1.10 497 1.10 497

AH-17

115 1 LD 24" X 24" 1.08 417 450 460 497 460 497

- - -

450 1.10 497 1.10 497

AH-18

113 1 LD 24" X 24" 1.08 417 450 510 551 510 551

- - -

450 1.22 551 1.22 551

AH-19

105 1 LD 24" X 24" 1.08 417 450 460 497 460 497

- - -450 1.10 497 1.10 497

AH-20

117 1 LD 24" X 24" 1.09 583 635 480 523 480 523

- - .

635 .82 523 .82 523