text alignment right move date to here rather than above and in format e.g. july 19, 2010 insert...

5
Text alig righ to r and e.g. 010 Insert today’s date Pleas pick field BE wi ‘*’ Insert logo for copyright steel business briefing Inser

Upload: andrea-hood

Post on 16-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Text alignment right Move date to here rather than above and in format e.g. July 19, 2010 Insert today’s date Please pick up field on BE with 1 ‘*’ Insert

Text alignment right

Move date to here rather than above and in format e.g. July 19, 2010

Insert today’s date

Please pick up field on BE with 1 ‘*’

Insert logo for copyright steel business briefing Insert sbb logo

Page 2: Text alignment right Move date to here rather than above and in format e.g. July 19, 2010 Insert today’s date Please pick up field on BE with 1 ‘*’ Insert

Figures incorrect – check formula used

Increase 1st column width so 2nd row ‘W.Australia (Capesize)’ is all on 1 line so that bottom of table and chart (left) line up

Date range should be last 12 months

Should be populated with average MTD price

Should be populated with average QTD price

This column to show latest complete month

Page 3: Text alignment right Move date to here rather than above and in format e.g. July 19, 2010 Insert today’s date Please pick up field on BE with 1 ‘*’ Insert

Date range should be last 12 months

Chart to be populated from:Data entry/China Port Vessel Wait. Please pick up data labelled ‘(Capesize)’ and ‘(All Vessel Classes)’. Needs to be latest data entered

Chart to be populated from:Data entry/China Port Vessel Wait. Please pick up data labelled ‘Tianjin’, ‘Caofeidian’, ‘Qingdao’, ‘Rizhao’. Needs to be latest data entered

Chart to be populated from:Data entry/Australia Port Vessel Wait. Please pick up data labelled ‘Iron Ore’, ‘Coal’ and ‘Combined’. Needs to be latest data entered

Page 4: Text alignment right Move date to here rather than above and in format e.g. July 19, 2010 Insert today’s date Please pick up field on BE with 1 ‘*’ Insert

Chart to be populated with SBB BE – to be discussed

Page 5: Text alignment right Move date to here rather than above and in format e.g. July 19, 2010 Insert today’s date Please pick up field on BE with 1 ‘*’ Insert

Number to be populated from BE/Data Entry/Iron Ore Normalisation Data/62% Fe Fines Coefficient (Latest data entered

Number to be populated from BE/Data Entry/Iron Ore Normalisation Data/58% Fe Fines Coefficient (Latest data entered