the 2007-2009 re chronicle
DESCRIPTION
Data and Information for researchTRANSCRIPT
THE COVERPicture defines the conversion of ruralareas from sleeping villages to urbanizedand progressive communities through therural electrification program.
TABLE OF CONTENTS
THE COVERNEA MANDATE-VISION-MISSION-CREDO
FOREWORD
I. NATIONAL SUMMARY
LOCATION MAP / 1 STATUS OF ENERGIZATION / 2
II. LOCATION MAPS & STATISTICAL PROFILE OF ELECTRIC COOPERATIVES
REGION I – ILOCOS / 3-4
ILOCOS NORTE ELECTRIC COOPERATIVE, INC. (INEC) / 5-6 PANGASINAN I ELECTRIC COOPERATIVE, INC. (PANELCO I) / 11-12ILOCOS SUR ELECTRIC COOPERATIVE, INC. (ISECO) / 7-8 CENTRAL PANGASINAN ELECTRIC COOPERATIVE, INC. (CENPELCO) / 13-14LA UNION ELECTRIC COOPERATIVE, INC. (LUELCO) / 9-10 PANGASINAN III ELECTRIC COOPERATIVE, INC. (PANELCO III) / 15-16
REGION II – CAGAYAN VALLEY / 17-18
BATANES ELECTRIC COOPERATIVE, INC. (BATANELCO) / 19-20 ISABELA I ELECTRIC COOPERATIVE, INC. (ISELCO I) / 25-26CAGAYAN I ELECTRIC COOPERATIVE, INC. (CAGELCO I) / 21-22 ISABELA II ELECTRIC COOPERATIVE, INC. (ISELCO II) / 27-28CAGAYAN II ELECTRIC COOPERATIVE, INC. (CAGELCO II) / 23-24 NUEVA VIZCAYA ELECTRIC COOPERATIVE, INC. (NUVELCO) / 29-30
QUIRINO ELECTRIC COOPERATIVE, INC. (QUIRELCO) / 31-32
CAR – CORDILLERA ADMINISTRATIVE REGION / 33-34
ABRA ELECTRIC COOPERATIVE, INC. (ABRECO) / 35-36 IFUGAO ELECTRIC COOPERATIVE, INC. (IFELCO) / 39-40BENGUET ELECTRIC COOPERATIVE, INC. (BENECO) / 37-38 KALINGA-APAYAO ELECTRIC COOPERATIVE, INC. (KAELCO) / 41-42
MOUNTAIN PROVINCE ELECTRIC COOPERATIVE, INC. (MOPRECO) / 43-44
REGION III – CENTRAL LUZON / 45-46
AURORA ELECTRIC COOPERATIVE, INC. (AURELCO) / 47-48 PAMPANGA RURAL ELECTRIC SERVICE COOPERATIVE, INC. (PRESCO) / 61-62TARLAC I ELECTRIC COOPERATIVE, INC. (TARELCO I) / 49-50 PAMPANGA I ELECTRIC COOPERATIVE, INC. (PELCO I) / 63-64TARLAC II ELECTRIC COOPERATIVE, INC. (TARELCO II) / 51-52 PAMPANGA II ELECTRIC COOPERATIVE, INC. (PELCO II) / 65-66NUEVA ECIJA I ELECTRIC COOPERATIVE, INC. (NEECO I) / 53-54 PAMPANGA III ELECTRIC COOPERATIVE, INC. (PELCO III) / 67-68NUEVA ECIJA II ELECTRIC COOPERATIVE, INC. (NEECO II) – AREA 1 / 55-56 PENINSULA ELECTRIC COOPERATIVE, INC. (PENELCO) / 69-70NUEVA ECIJA II ELECTRIC COOPERATIVE, INC. (NEECO II) – AREA 2 / 57-58 ZAMBALES I ELECTRIC COOPERATIVE, INC. (ZAMECO I) / 71-72SAN JOSE CITY ELECTRIC COOPERATIVE, INC. (SAJELCO) / 59-60 ZAMBALES II ELECTRIC COOPERATIVE INC. (ZAMECO II) / 73-74
REGION IV-A - SOUTHERN TAGALOG (CALABARZON) / 75-76
FIRST LAGUNA ELECTRIC COOPERATIVE, INC. (FLECO) / 77-78 QUEZON I ELECTRIC COOPERATIVE, INC. (QUEZELCO I) / 83-84BATANGAS I ELECTRIC COOPERATIVE, INC. (BATELEC I) / 79-80 QUEZON II ELECTRIC COOPERATIVE INC. (QUEZELCO II) / 85-86BATANGAS II ELECTRIC COOPERATIVE, INC. (BATELEC II) / 81-82
REGION IV-B - SOUTHERN TAGALOG (MIMAROPA) / 87-88
LUBANG ELECTRIC COOPERATIVE, INC. (LUBELCO) / 89-90 TABLAS ISLAND ELECTRIC COOPERATIVE, INC. (TIELCO) / 97-98OCCIDENTAL MINDORO ELECTRIC COOPERATIVE, INC. (OMECO) / 91-92 ROMBLON ELECTRIC COOPERATIVE, INC. (ROMELCO) / 99-100 ORIENTAL MINDORO ELECTRIC COOPERATIVE, INC. (ORMECO) / 93-94 BUSUANGA ISLAND ELECTRIC COOPERATIVE, INC. (BISELCO) / 101-102MARINDUQUE ELECTRIC COOPERATIVE, INC. (MARELCO) / 95-96 PALAWAN ELECTRIC COOPERATIVE, INC. (PALECO) / 103-104
REGION V – BICOL / 105-106
CAMARINES NORTE ELECTRIC COOPERATIVE, INC. (CANORECO) / 107-108 ALBAY ELECTRIC COOPERATIVE, INC. (ALECO) / 117-118CAMARINES SUR I ELECTRIC COOPERATIVE, INC. (CASURECO I) / 109-110 SORSOGON I ELECTRIC COOPERATIVE, INC. (SORECO I) / 119-120CAMARINES SUR II ELECTRIC COOPERATIVE, INC. (CASURECO II) / 111-112 SORSOGON II ELECTRIC COOPERATIVE, INC. (SORECO II) / 121-122CAMARINES SUR III ELECTRIC COOPERATIVE, INC. (CASURECO III) / 113-114 FIRST CATANDUANES ELECTRIC COOPERATIVE, INC. (FICELCO) / 123-124CAMARINES SUR IV ELECTRIC COOPERATIVE, INC. (CASURECO IV) / 115-116 MASBATE ELECTRIC COOPERATIVE, INC. (MASELCO) / 125-126
TICAO ISLAND ELECTRIC COOPERATIVE, INC. (TISELCO) / 127-128
REGION VI – WESTERN VISAYAS / 129-130
AKLAN ELECTRIC COOPERATIVE, INC. (AKELCO) / 131-132 GUIMARAS ELECTRIC COOPERATIVE, INC. (GUIMELCO) / 143-144ANTIQUE ELECTRIC COOPERATIVE, INC. (ANTECO) / 133-134 V-M-C RURAL ELECTRIC SERVICE COOPERATIVE, INC. (VRESCO) / 145-146CAPIZ ELECTRIC COOPERATIVE, INC. (CAPELCO) / 135-136 CENTRAL NEGROS ELECTRIC COOPERATIVE, INC. (CENECO) / 147-148ILOILO I ELECTRIC COOPERATIVE, INC. (ILECO I) / 137-138 NEGROS OCCIDENTAL ELECTRIC COOPERATIVE, INC. (NOCECO) / 149-150ILOILO II ELECTRIC COOPERATIVE, INC. (ILECO II) / 139-140ILOILO III ELECTRIC COOPERATIVE, INC. (ILECO III) / 141-142
CONTENTS
REGION VII – CENTRAL VISAYAS / 151-152
NEGROS ORIENTAL I ELECTRIC COOPERATIVE, INC. (NORECO I) / 153-154 PROVINCE OF SIQUIJOR ELECTRIC COOPERATIVE, INC. (PROSIELCO) / 165-166
NEGROS ORIENTAL II ELECTRIC COOPERATIVE, INC. (NORECO II) / 155-156 CAMOTES ELECTRIC COOPERATIVE, INC. (CELCO) / 167-168BANTAYAN ISLAND ELECTRIC COOPERATIVE, INC. (BANELCO) / 157-158 BOHOL I ELECTRIC COOPERATIVE, INC. (BOHECO I) / 169-170CEBU I ELECTRIC COOPERATIVE, INC. (CEBECO I) / 159-160 BOHOL II ELECTRIC COOPERATIVE, INC. (BOHECO II) / 171-172CEBU II ELECTRIC COOPERATIVE, INC. (CEBECO II) / 161-162CEBU III ELECTRIC COOPERATIVE, INC. (CEBECO III) / 163-164
REGION VIII – EASTERN VISAYAS / 173-174
DON ORESTES ROMUALDEZ ELECTRIC COOPERATIVE, INC. (DORELCO) / 175-176 BILIRAN ELECTRIC COOPERATIVE, INC. (BILECO) / 187-188LEYTE II ELECTRIC COOPERATIVE, INC. (LEYECO II) / 177-178 NORTHERN SAMAR ELECTRIC COOPERATIVE, INC. (NORSAMELCO) / 189-190LEYTE III ELECTRIC COOPERATIVE, INC. (LEYECO III) / 179-180 SAMAR I ELECTRIC COOPERATIVE, INC. (SAMELCO I) / 191-192LEYTE IV ELECTRIC COOPERATIVE, INC. (LEYECO IV) / 181-182 SAMAR II ELECTRIC COOPERATIVE, INC. (SAMELCO II) / 193-194LEYTE V ELECTRIC COOPERATIVE, INC. (LEYECO V) / 183-184 EASTERN SAMAR ELECTRIC COOPERATIVE, INC. (ESAMELCO) / 195-196SOUTHERN LEYTE ELECTRIC COOPERATIVE, INC. (SOLECO) / 185-186
REGION IX – ZAMBOANGA PENINSULA / 197-198
ZAMBOANGA DEL NORTE ELECTRIC COOPERATIVE, INC. (ZANECO) / 199-200ZAMBOANGA DEL SUR I ELECTRIC COOPERATIVE, INC. (ZAMSURECO I) / 201-202ZAMBOANGA DEL SUR II ELECTRIC COOPERATIVE, INC. (ZAMSURECO II) / 203-204ZAMBOANGA CITY ELECTRIC COOPERATIVE, INC. (ZAMCELCO) / 205-206
REGION X - NORTHERN MINDANAO / 207-208
MISAMIS OCCIDENTAL I ELECTRIC COOPERATIVE, INC. (MOELCI I) / 209-210 FIRST BUKIDNON ELECTRIC COOPERATIVE, INC. (FIBECO) / 217-218MISAMIS OCCIDENTAL II ELECTRIC COOPERATIVE, INC. (MOELCI II) / 211-212 BUKIDNON II ELECTRIC COOPERATIVE, INC. (BUSECO) / 219-220MISAMIS ORIENTAL I ELECTRIC SERVICE COOPERATIVE, INC. (MORESCO I) / 213-214 CAMIGUIN ELECTRIC COOPERATIVE, INC. (CAMELCO) / 221-222MISAMIS ORIENTAL II ELECTRIC SERVICE COOPERATIVE, INC. (MORESCO II) / 215-216 LANAO DEL NORTE ELECTRIC COOPERATIVE, INC. (LANECO) / 223-224
REGION XI – DAVAO / 225-226
DAVAO ORIENTAL ELECTRIC COOPERATIVE, INC. (DORECO) / 227-228DAVAO DEL NORTE ELECTRIC COOPERATIVE, INC. (DANECO) / 229-230DAVAO DEL SUR ELECTRIC COOPERATIVE, INC. (DASURECO) / 231-232
REGION XII – SOCCSKSARGEN / 233-234
NORTH COTABATO ELECTRIC COOPERATIVE, INC. (COTELCO) / 235-236SOUTH COTABATO I ELECTRIC COOPERATIVE, INC. (SOCOTECO I) / 237-238SOUTH COTABATO II ELECTRIC COOPERATIVE, INC. (SOCOTECO II) / 239-240SULTAN KUDARAT ELECTRIC COOPERATIVE, INC. (SUKELCO) / 241-242
ARMM-AUTONOMOUS REGION IN MUSLIM MINDANAO / 243-244
TAWI-TAWI ELECTRIC COOPERATIVE, INC. (TAWELCO) / 245-246 BASILAN ELECTRIC COOPERATIVE, INC. (BASELCO) / 251-252SIASI ELECTRIC COOPERATIVE, INC. (SIASELCO) / 247-248 CAGAYAN DE SULU ELECTRIC COOPERATIVE, INC. (CASELCO) / 253-254SULU ELECTRIC COOPERATIVE, INC. (SULECO) / 249-250 LANAO DEL SUR ELECTRIC COOPERATIVE, INC. (LASURECO) / 255-256
MAGUINDANAO ELECTRIC COOPERATIVE, INC. (MAGELCO) / 257-258
CARAGA / 259-260
AGUSAN DEL NORTE ELECTRIC COOPERATIVE, INC. (ANECO) / 261-262 DINAGAT ISLAND ELECTRIC COOPERATIVE, INC. (DIELCO) / 269-270AGUSAN DEL SUR ELECTRIC COOPERATIVE, INC. (ASELCO) / 263-264 SURIGAO DEL SUR I ELECTRIC COOPERATIVE, INC. (SURSECO I) / 271-272SURIGAO DEL NORTE ELECTRIC COOPERATIVE, INC. (SURNECO) / 265-266 SURIGAO DEL SUR II ELECTRIC COOPERATIVE, INC. (SURSECO II) / 273-274SIARGAO ELECTRIC COOPERATIVE, INC. (SIARELCO) / 267-268
III. OTHER ELECTRIC DISTRIBUTION UTILITIES (EDUs)
SUMMARY / 275 PER EDU / 276-281
IV. ANNEXES
GRAPHS OF KEY PERFORMANCE INDICATORS
NEA ORGANIZATIONAL STRUCTURE
EDITORIAL BOX
ACKNOWLEDGMENT
NATIONAL ELECTRIFICATION ADMINISTRATION
MANDATETotal electrification on an area coverage basis and competence enhancement
of electric distribution utilities in a deregulated environment
VISIONTotal electrification on an area coverage basis by 2020
MISSIONTo pursue the mandate of rural electrification and to provide FIT assistance to
EDUs to make them highly competitive in delivering quality service
CORPORATE CREDO
Go where the darkness loomsCreate the path of lightWalk with the rural folks
Install the lines of progress
Work with the electric cooperativesSpin the engine of growth
Bring electricity to the industriesCommunities and households
Protect the consumers’ interestServe with your hearts
Share your talents And make a difference
Live honestlyWork efficiently
Promote solidarity
FOREWORD
"Let there be light". This has been the dream of the Philippine government 40 years ago. Then President Ferdinand E. Marcos articulated once ". . .bright lights symbolize . . . job opportunities . . . income . . . recreation . . . culture . . . sophistication . . ." thus Rural Electrification became a priority program of government.
On August 4, 1969, the National Electrification Administration (NEA) was created by virtue of Republic Act No. 6038 declaring as national policy objective the total electrification of the Philippines on an area coverage basis. In retrospect, through a grant from the United States amounting to $3.5 million, two pilot projects signalled the beginning of the now successful government program on Rural Electrification.
In 1997, all the municipalities and cities within the coverage areas of ECs have been energized including those in small and isolated islands nationwide. Program implementation was then shifted to electrification of the barangays.
By end of 2009, barangay electrification level was almost 100%. In the electric cooperatives' (ECs) franchise area comprising 36,030 barangays, 35,860 have already been energized, increasing the level of electrification from 97.6% in 2008 to 99.5% in 2009. This both covers grid and off-grid electrification, made possible through public-private partnership via the Expanded Rural Electrification Program of the Energy Sector under the chairmanship of the National Electrification Administration. Only the remotest, last mile barangays remained unlit and targeted to be fully energized before the end of 2010.
Consumer connection steadily increased, effecting the installation of 1,043,872 meters from 2007 to 2009. This created an impact to the lives of approximately 5.2 million "kababayans" who live in all parts of the country. This is the commitment that the Energy Sector will continue to pursue.
Year 2009 symbolizes a year of celebration for the four (4) decades of the Rural Electrification Program. The month of August was declared as a National Electrification Month through Presidential Proclamation No. 1743. A successful International Convention on Rural Electrification (ICORE) was held and participated in by local and foreign delegates. The 8th million consumer connection was highlighted as milestone during the period.
Another milestone for the year is the awarding of Diamond Awards for excellent performing ECs and General Managers (GMs). A Diamond EC is a distinct class of its own, which has an unsurpassed excellent record of high level of performance in all aspects of operation worth emulating. A Diamond GM exudes confidence in the performance of his tasks with competence and tested managerial skills, possesses leadership traits and enjoys a high degree of credibility.
For four decades, the NEA-ECs partnership has greatly contributed to the improvement of the lives of the rural folks and to the transformation of the rural areas as centers for development and progress, making them attractive for investment, enterprise, education, health, labor and employment opportunities.
This publication manifests the accomplishments of NEA and ECs throughout the years.
We present with pride . . . The Rural Electrification Chronicle 2007-2009.
ILPI
REGION XI
99 - Davao Oriental - City of Mati100 - Davao del Norte - Montevista,
Compostela Valley101 - Davao del Sur - City of Digos
01
03
04
05
06
08
09
10
12 13
14
16
18
1920 23
29
30
31
33
36
REGION IV-A
32 - First Laguna - Lumban33 - Batangas I - Calaca34 - Batangas II - Lipa City35 - Quezon I - Pitogo36 - Quezon II - Infanta
REGION IV-B37 - Lubang - Lubang38 - Occidental Mindoro - San Jose39 - Oriental Mindoro - City of Calapan40 - Marinduque - Boac41 - Tablas - Odiongan, Romblon42 - Romblon - Romblon43- Busuanga - Coron, Palawan44 - Palawan - Puerto Princesa City
REGION VIII
76 - Don Orestes Romualdez - Tolosa77 - Leyte II - Tacloban City78 - Leyte III - Tunga79 - Leyte IV - Hilongos80 - Leyte V - Ormoc City81 - Southern Leyte - City of Maasin82 - Biliran Island - Naval83 - Northern Samar - Bobon84 - Samar I - Calbayog City85 - Samar II - Paranas86 - Eastern Samar - City of Borongan
37
41 42
44
50
57
62
65
68
72
75
87 93
98
99
107
109
110
112
114
115
Lapu-Lapu
Pangataran
Almagro
55
Caluya
Semirara
Sibay
Cuyo
Magsaysay
Rapu-Rapu
Alabat
TingloyIsla Verde
Patnanungan
Jomalig
Anda
Culion I
Linapacan Is.
Araceli Is.
Dumaran Is.
Balabac
TURTLE ISLANDS
Sitangkai I BongaoTandubas I
108
Pata I.
REGION X
91 - Misamis Occidental I - Calamba92 - Misamis Occidental II - Ozamis City93 - Misamis Oriental I - Laguindingan94 - Misamis Oriental II - Medina95 - Bukidnon I - Maramag96 - Bukidnon II - Manolo Fortich97 - Camiguin - Mambajao98 - Lanao del Norte - Tubod
25
22Polillo Is.
REGION III
19 - Aurora - Baler20 - Tarlac I - Gerona21 - Tarlac II - Concepcion22 - Nueva Ecija I - San Isidro23 - Nueva Ecija II-Area 1 - Talavera Nueva Ecija II-Area 2 - San Leonardo24 - San Jose City - San Jose City25 - Pampanga Rural - Anao, Mexico26 - Pampanga I - Mexico27 - Pampanga II - Guagua28 -Pampanga III - Apalit29 - Peninsula - City of Balanga30 - Zambales I - Palauig31 - Zambales II - Castillejos
CAR
14 - Abra - Bangued15 - Benguet - La Trinidad16 - Ifugao - Lagawe17 - Kalinga- Apayao - City of Tabuk18 - Mountain Province - Bontoc
REGION II
07 - Batanes - Basco08 - Cagayan I - Solana09 - Cagayan II - Aparri10 - Isabela I - Alicia11 - Isabela II - Ilagan12 - Nueva Vizcaya - Dupax del Sur13 - Quirino - Diffun
REGION I01 - Ilocos Norte - Dingras02 - Ilocos Sur - Santiago03 - La Union - Aringay04 - Pangasinan I - Bani05 - Central Pangasinan - San Carlos City06 - Pangasinan III - City of Urdaneta
LUECO
DECORP
TEI
KALAYAANGROUP OFISLANDS
PECO
59
CEPALCO
COLIGHT
REGION XII
102 - North Cotabato - Matalam103 - South Cotabato I - City of Koronadal104 - South Cotabato II - General Santos City105 - Sultan Kudarat - City of Tacurong
Sarangani Is.
CARAGA
113 - Agusan del Norte - Butuan City114 - Agusan del Sur - San Francisco115 - Surigao del Norte - Surigao City116 - Siargao - Dapa, Surigao del Norte117 - Dinagat Island - San Jose118 - Surigao del Sur I - City of Bislig119 - Surigao del Sur II - City of Tandag
REGION IX
87 - Zamboanga del Norte - Dipolog City88 - Zamboanga del Sur I - Pagadian City89 - Zamboanga del Sur II - Ipil,
Zamboanga Sibugay90 - Zamboanga City - Zamboanga City
ARMM
106 - Tawi-Tawi - Bongao107 - Siasi - Siasi, Sulu108 - Sulu - Jolo109 - Basilan - City of Isabela110 - Cagayan de Sulu - Mapun, Tawi-Tawi111 - Lanao del Sur - Marawi City112 - Maguindanao - Datu Odin Sinsuat (Dinaig), Maguindanao
Olutanga
Tagbilaran City
104
102
103
91
90
89
101
100
96
119
118
113
95
94
111
105
92
88
67
6669 74
81
79
76
7880 77
7371
70
116117
86
8582
83
84
49 53
48
52
47
45
3546
39
38
43
63
64
58
56
60
40
02
21
24
27
26
28
PAMESAEC
SFELAPCO CELCOR
VECO
MECO
PES Bohol
REGION V
45 - Camarines Norte - Daet46 - Camarines Sur I - Libmanan47 - Camarines Sur II - Naga City48 - Camarines Sur III - Iriga City49 - Camarines Sur IV - Tigaon50 - Albay - Legazpi City51 - Sorsogon I - Irosin52 - Sorsogon II - City of Sorsogon53 - First Catanduanes - Bato54 - Masbate - Mobo55 - Ticao - San Jacinto, Masbate
REGION VI56 - Aklan - Lezo57- Antique - San Jose58 - Capiz - Panitan59 - Iloilo I - Tigbauan60 - Iloilo II - Pototan61 - Iloilo III - Sara62 - Guimaras - Jordan63 - V-M-C Rural - Manapla64 - Central Negros - Bacolod City65 - Negros Occidental. - City of Kabankalan
PUD(Olongapo City)
32
34
ELECTRIC DISTRIBUTION UTILITIESLOCATION AND JURISDICTION
Camiguin I
Calayan I
Panuitan I
Babuyan Is.
07
Itbayat
Uyugan
Sabtang
BASCO
106
17
15
11
51
54
61
97
DLPC
PIOUs / LGUsECs
Head Quarters
Legend:
BELS
MERALCO
Banton Electric System
Corcuera Electric System
Concepcion Electric System
IEES
1
REGION VII
66 - Negros Oriental I - Bindoy67 - Negros Oriental II - Dumaguete City68 - Bantayan Island - Bantayan, Cebu69 - Cebu I - Dumanjug70 - Cebu II - City of Bogo71 - Cebu III - Toledo City72 - Siquijor - Larena73 - Camotes Is. - Poro, Cebu74 - Bohol I - Tubigon75 - Bohol II - Jagna
MMPC
HFMPC
Claveria Mun.Electric System
I. STATUS OF ENERGIZATION (Cumulative):
2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %
Served by Electric Cooperatives:
1 Region I 116 116 116 116 100 3,027 3,026 3,026 3,027 100.00 844,300 704,292 726,211 750,870 89
2 Region II 96 96 96 96 100 2,369 2,269 2,282 2,368 99.96 660,700 510,652 530,141 547,856 83
3 CAR 73 73 73 73 100 1,112 1,078 1,084 1,112 100.00 315,200 231,280 239,591 248,098 79
4 Region III 100 100 100 100 100 2,236 2,230 2,231 2,234 99.91 1,128,600 946,037 986,041 1,026,706 91
5 Region IV-A 71 71 71 71 100 1,946 1,943 1,943 1,945 99.95 641,900 526,090 544,530 565,744 88
6 Region IV-B 69 69 69 69 100 1,415 1,365 1,368 1,405 99.29 546,500 322,878 341,127 360,028 66
7 Region V 112 112 112 112 100 3,410 3,217 3,359 3,407 99.91 1,006,100 684,980 709,673 740,543 74
8 Region VI 132 132 132 132 100 3,870 3,841 3,850 3,867 99.92 1,277,900 826,291 865,781 907,313 71
9 Region VII 121 121 121 121 100 2,713 2,712 2,713 2,713 100.00 951,600 610,931 646,697 682,738 72
10 Region VIII 142 142 142 142 100 4,372 4,151 4,233 4,321 98.83 789,200 515,306 545,707 570,039 72
11 Region IX 72 72 72 72 100 1,865 1,750 1,818 1,862 99.84 614,500 332,820 350,225 365,855 60
12 Region X 85 85 85 85 100 1,843 1,767 1,769 1,778 96.47 598,500 422,759 443,695 464,093 78
13 Region XI 44 44 44 44 100 894 891 891 894 100.00 527,900 291,023 303,679 314,802 60
14 Region XII 55 49 49 55 100 1,226 979 997 1,221 99.59 749,900 329,625 343,736 386,818 52
15 ARMM 114 116 117 114 100 2,422 2,178 2,303 2,398 99.01 550,300 153,514 163,891 143,298 26
16 CARAGA 73 73 73 73 100 1,310 1,285 1,291 1,308 99.85 460,400 355,829 372,862 387,804 84
Total 1,475 1,471 1,472 1,475 100 36,030 34,682 35,158 35,860 99.53 11,663,500 7,764,307 8,113,587 8,462,605 73
Notes on Barangay Energization :
A barangay is considered energized/completed through on-grid electrification when the center of the barangay has gained access to power through
the ECs' backbone lines. On the other hand, off-grid electrification entails the installation of photovoltaic solar home system (PV-SHS), battery
charging stations (BCS) or micro hydro projects. These schemes are mostly applied to far flung or remote areas where infrastructure such as road
network is not yet available, and are composed of unclustered houses with limited load.
As of yearend 2009, there are about 2,195 off-grid barangays. Continuing efforts are being made for these barangays to be electrified on-grid
through the line enhancement program.
Potential
C O N N E C T I O N S
Served
B A R A N G A Y SMUNICIPALITIES / CITIES
REGIONCoverage
EnergizedCoverage
Energized/Completed
22
Others 199,411 224,202 211,404 220,188 236,421 245,435 239,724 252,670 271,313 289,576
Public Bldg. 321,342 352,854 403,708 469,397 501,519 514,884 530,270 579,890 620,200 668,943
Industrial 1,340,888 1,422,973 1,478,426 1,609,404 1,644,799 1,728,355 1,786,017 1,846,922 1,918,956 2,098,300
Residential 3,754,448 4,048,965 4,382,196 4,938,520 5,367,672 5,406,834 5,311,960 5,526,300 5,716,024 6,245,095
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
II. ELECTRIC COOPERATIVES MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):
NATIONAL SUMMARY
Commercial 1,238,267 1,341,742 1,433,782 1,574,591 1,795,975 1,884,816 1,925,309 2,081,256 2,224,141 2,426,958
Total 6,854,356 7,390,736 7,909,516 8,812,100 9,546,386 9,780,324 9,793,280 10,287,038 10,750,634 11,728,872
LEGEND :
3
Energized Coop System
Energized Other System
Headquarters
N
PANELCO IBani, Pangasinan
INECDingras, Ilocos Norte
ISECOSantiago, Ilocos Sur
LUELCOAringay, La Union
Served byDagupan Electric Corp.
CENPELCOSan Carlos City
Served byLa Union Electric Co.
PANELCO IIICity of Urdaneta
I. STATUS OF ENERGIZATION (Cumulative):
2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %
A. Electric Cooperatives:
1 Ilocos Norte 23 23 23 23 100 557 557 557 557 100 133,000 123,522 127,286 131,302 99
2 Ilocos Sur 34 34 34 34 100 768 767 767 768 100 143,000 127,093 132,283 139,110 97
3 La Union 18 18 18 18 100 536 536 536 536 100 124,900 105,170 108,044 111,326 89
4 Pangasinan I 9 9 9 9 100 192 192 192 192 100 72,600 54,667 56,046 57,536 79
5 Central Pangasinan 15 15 15 15 100 553 553 553 553 100 210,600 168,274 172,885 178,054 85
6 Pangasinan III 17 17 17 17 100 421 421 421 421 100 160,200 125,566 129,667 133,542 83
Total 116 116 116 116 100 3,027 3,026 3,026 3,027 100 844,300 704,292 726,211 750,870 89
MUNICIPALITIES/CITIES BARANGAYS
CoverageEnergized
CoverageEnergized
REGION I
Served
CONNECTIONS
Potential
ILOCOS REGION
ELECTRIC DISTRIBUTION
UTILITIES
II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 383,043 412,984 457,396 501,646 534,777 532,807 548,211 550,420 521,460 579,785
Commercial 93,910 109,575 125,801 138,600 149,141 159,894 168,020 177,828 170,672 200,273
Industrial 33,721 34,911 38,061 42,361 44,234 45,267 49,293 52,226 49,030 60,043
Public Bldgs. 27,105 30,041 34,674 39,426 46,307 48,229 49,355 52,301 51,597 55,833
Others 14,366 15,332 16,028 18,313 18,350 15,707 13,082 13,476 13,979 15,712
Total 552,145 602,843 671,960 740,346 792,809 801,904 827,961 846,251 806,738 911,646
4
INECINEC
5
HQ Location
Municipality
5 MVA Substation
10 MVA Substation
15 MVA Substation
NPC Substation
Wind Power
Mini Hydro
3 PH Backbone Line
H Q
Energized Coop System
LEGEND :
MH
W P
PAGUDPUD
BANGUIBURGOS
PASUQUIN
BACARRA
CARASI
PINILI
DUMALNEG
MARCOS BANNA(ESPIRITU)CURRIMAO
BADOC
NUEVA ERA
DINGRAS
PIDDIG
SARRAT
VINTAR
SAN. NICOLAS
CITY ofBATAC
PAOAYSOLSONA
ADAMS
LAOAG CITY
H Q
MHN
W P
I. DATE OF INCORPORATION AND REGISTRATION : July 7, 1971
II. DATE OF FIRST ENERGIZATION : September 11, 1973
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 68.5 98.5 98.5
Subsidy 22.0 63.7 63.7
25.000
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Adams 1 1 1 1 100 0 300 165 176 191 64
2 Bacarra 43 43 43 43 100 0 7,800 7,278 7,452 7,703 99
3 Bangui 15 15 15 15 100 0 4,800 4,526 4,660 4,749 99
4 Burgos 11 11 11 11 100 0 2,500 2,343 2,393 2,440 98
5 Carasi 3 3 3 3 100 0 300 161 162 178 59
6 Dumalneg 1 1 1 1 100 0 300 280 288 296 99
7 Laoag City 80 80 80 80 100 0 28,000 26,375 27,154 27,923 99
8 Pagudpud 16 16 16 16 100 0 4,800 4,453 4,622 4,790 99
9 Pasuquin 33 33 33 33 100 0 6,500 5,906 6,190 6,423 99
10 Piddig 23 23 23 23 100 0 5,200 4,760 4,931 5,055 97
11 Sarrat 24 24 24 24 100 0 5,800 5,465 5,590 5,723 99
12 Vintar 33 33 33 33 100 0 7,500 7,048 7,302 7,469 99
Second District
13 Badoc 31 31 31 31 100 0 6,200 5,692 5,907 6,143 99
14 City of Batac 43 43 43 43 100 0 12,100 11,384 11,687 12,028 99
15 Currimao 23 23 23 23 100 0 2,400 2,165 2,245 2,330 97
16 Dingras 31 31 31 31 100 0 8,400 7,809 8,008 8,377 99
17 Banna (Espiritu) 20 20 20 20 100 0 3,900 3,684 3,765 3,823 98
18 Marcos 13 13 13 13 100 0 3,500 3,215 3,297 3,435 98
19 Nueva Era 11 11 11 11 100 0 1,400 1,297 1,310 1,348 96
20 Paoay 31 31 31 31 100 0 4,600 4,190 4,293 4,400 96
21 Pinili 25 25 25 25 100 0 3,400 2,990 3,136 3,295 97
22 San Nicolas 24 24 24 24 100 0 8,300 7,701 7,926 8,218 99
23 Solsona 22 22 22 22 100 0 5,000 4,635 4,792 4,965 99
Total 557 557 557 557 100 0 133,000 123,522 127,286 131,302 99
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 107,388 90,509 90,668 Residential 113,722 116,831 118,010
MWH Purchased 15,670 15,707 16,543 Commercial 6,750 7,109 7,588
MWH Sold 13,398 13,718 14,404 Industrial 11 12 13
Systems Loss (%) 14 12 13 Public Building 2,490 2,630 2,679
Peak Load (KW) 38,318 34,907 40,277 Others 549 704 3,012
Load Factor (%) 56 62 56 Total 123,522 127,286 131,302
Collection Efficiency (%) 100 97 95
Ave. Systems Rate (P/KWH) 8.01 6.60 6.29
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 69,224 73,144 80,237 87,221 91,061 90,113 93,515 92,890 94,565 99,465
Commercial 23,857 28,910 34,730 37,464 39,883 42,775 44,723 46,891 47,941 49,221
Industrial 5,211 5,358 4,941 5,124 5,255 4,380 3,603 4,068 4,000 4,722
Public Building 8,610 9,452 10,780 11,301 11,896 11,756 12,482 12,538 13,488 13,748
Others 3,126 3,708 4,321 4,462 4,743 4,614 4,750 4,394 4,620 5,695
Total 110,028 120,572 135,009 145,572 152,838 153,638 159,073 160,781 164,614 172,851
Wind
Pagudpud Agua Grande/INEC
Mr. Lorenzo Rey G. Ruiz
Engr. Renato A. Balintec
A+
Mr. Reynaldo M. Lazo
Engr. Renato A. Balintec
A+
Monthly Average
B A R A N G A Y S
Engr. Renato A. Balintec (OIC)
A+
Location
POWER PLANT
122,381
Bangui
Mega Large
North Wind Dev't Corp
C O N N E C T I O N S
Legislative DistrictCoverage
EnergizedUnenerg.
MUNICIPALITIES/CITYServed
Potential
ILOCOS NORTE ELECTRIC COOPERATIVE, INC. (INEC)Brgy. Suyo, Dingras, Ilocos Norte
Tel Nos. (077) 784-7126, 784-7546 to 47; Telefax Nos. (077) 771-3343, 784-7125; E-mail: [email protected]
20092007 2008
Mr. Lorenzo Rey G. Ruiz
Mega Large Mega Large
4.500Mini Hydro
125,966119,066
Project Name/Proponent Type
6
7
N
SINAIT
SANEMILIO
SUYO
SIGAY
BANAYOYO
NAGBUKEL
SANTACATALINA
BANTAY
SAN ILDEFONSO
SAN JUAN (Lapog)
SANTA
ALILEMTAGUDIN
SUGPON
SANTA CRUZ
CERVANTES
GREGORIODEL PILAR(Concepcion) QUIRINO
(Angkaki)
LIDLIDDASANTIAGO
BURGOS
SANESTEBAN
SANTA MARIA
NARVACAN
SANTO DOMINGO
MAGSINGAL
GALIMUYOD
SALCEDO (Baugen)
CITY ofCANDON
SANTALUCIA
CAOAYAN
SANVICENTE
CITY of VIGAN
H Q
P P
CABUGAO
MH
LEGEND :
HQ Location
Municipality
5 MVA Substation
10 MVA Substation
15 MVA Substation
Power Plant
Mini Hydro
3 PH Backbone Line
Energized Coop System
H Q
P PMH
I. DATE OF INCORPORATION AND REGISTRATION : January 24, 1974
II. DATE OF FIRST ENERGIZATION : December 1974
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 2.3 2.3 2.3 70.000
Subsidy 47.7 86.2 86.2 0.530
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Bantay 34 34 34 34 100 0 6,900 6,220 6,461 6,809 99
2 Cabugao 33 33 33 33 100 0 6,900 6,147 6,520 6,893 99
3 Caoayan 17 17 17 17 100 0 3,700 3,388 3,487 3,629 98
4 Magsingal 30 30 30 30 100 0 5,700 5,070 5,317 5,648 99
5 San Ildefonso 15 15 15 15 100 0 1,400 1,263 1,288 1,348 96
6 San Juan (Lapog) 32 32 32 32 100 0 5,300 4,734 4,947 5,228 99
7 San Vicente 7 7 7 7 100 0 2,600 2,318 2,404 2,521 97
8 Sinait 44 44 44 44 100 0 5,400 4,842 5,033 5,340 99
9 Santa Catalina 9 9 9 9 100 0 2,800 2,596 2,677 2,739 98
10 Santo Domingo 36 36 36 36 100 0 5,500 4,985 5,137 5,457 99
11 City of Vigan 39 39 39 39 100 0 12,000 11,269 11,545 11,924 99
Second District
12 Alilem 9 9 9 9 100 0 1,300 873 954 1,042 80
13 Banayoyo 14 14 14 14 100 0 1,800 1,555 1,623 1,708 95
14 Burgos 26 26 26 26 100 0 2,500 2,267 2,358 2,490 99
15 City of Candon 42 42 42 42 100 0 14,200 13,220 13,670 14,177 99
16 Cervantes 13 12 12 13 100 0 3,100 1,457 1,672 2,149 69
17 Gregorio del Pilar (Concepcion) 7 7 7 7 100 0 900 709 794 833 93
18 Galimuyod 24 24 24 24 100 0 2,200 1,957 2,074 2,137 97
19 Lidlidda 11 11 11 11 100 0 900 724 761 800 89
20 Nagbukel 12 12 12 12 100 0 1,300 1,120 1,167 1,225 94
21 Narvacan 34 34 34 34 100 0 9,400 8,773 9,050 9,396 99
22 Quirino (Angkaki) 9 9 9 9 100 0 1,400 911 975 1,337 96
23 Salcedo (Baugen) 21 21 21 21 100 0 2,200 1,905 1,985 2,120 96
24 San Emilio 8 8 8 8 100 0 1,400 1,046 1,147 1,238 88
25 San Esteban 10 10 10 10 100 0 2,100 1,913 1,967 2,038 97
26 Santa 26 26 26 26 100 0 3,200 2,884 2,957 3,053 95
27 Santiago 24 24 24 24 100 0 4,200 3,854 4,039 4,188 99
28 Sigay 7 7 7 7 100 0 500 393 420 423 85
29 Santa Cruz 49 49 49 49 100 0 9,300 8,492 8,849 9,013 97
30 Santa Lucia 36 36 36 36 100 0 5,400 5,106 5,213 5,341 99
31 Santa Maria 33 33 33 33 100 0 7,300 6,719 6,923 7,241 99
32 Sugpon 6 6 6 6 100 0 500 209 231 235 47
33 Suyo 8 8 8 8 100 0 1,700 1,278 1,353 1,472 87
34 Tagudin 43 43 43 43 100 0 8,000 6,896 7,285 7,918 99
Total 768 767 767 768 100 0 143,000 127,093 132,283 139,110 97
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 95,874 81,208 86,648 Residential 118,772 123,490 126,278
MWH Purchased 14,463 14,998 15,675 Commercial 5,827 6,172 6,305
MWH Sold 12,397 12,932 13,661 Industrial 43 40 44
Systems Loss (%) 14 13 13 Public Building 1,932 2,011 2,058
Peak Load (KW) 33,627 34,077 35,997 Others 519 570 4,425
Load Factor (%) 59 60 60 Total 127,093 132,283 139,110
Collection Efficiency (%) 99 101 101
Ave. Systems Rate (P/KWH) 7.73 6.28 6.34
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 67,740 71,488 79,581 88,312 92,922 95,226 97,425 99,485 102,664 108,760
Commercial 15,230 17,220 19,621 23,266 25,227 26,847 29,680 31,335 33,731 36,300
Industrial 5,810 4,447 4,665 5,709 5,283 4,796 5,166 5,192 4,874 4,608
Public Building 5,495 5,724 6,430 7,687 8,310 8,976 9,629 10,026 10,843 11,012
Others 978 964 1,265 1,642 1,635 2,027 2,100 2,722 3,069 3,254
Total 95,253 99,843 111,562 126,616 133,376 137,871 144,000 148,760 155,181 163,934
ILOCOS SUR ELECTRIC COOPERATIVE, INC. (ISECO)Bigbiga, Santiago, Ilocos Sur 2707
Telefax No. (077) 742-6175 (Main Office); Fax No. (077) 742-5036
20082007 2009
Legislative DistrictPotential
Monthly Average
141,192
MUNICIPALITIES/CITIES
135,787
CoverageEnergized
Project Name/Proponent
Unenerg.Served
Mega Large
147,435
B A R A N G A Y S C O N N E C T I O N S
Mega Large
POWER PLANT
Location
Alilem
Mr. Abelardo Z. Dugat
Mr. Cesar G. Gironella
A+A+
Mr. Tirso S. Savellano, Jr.Mr. Abelardo Z. Dugat
Mr. Cesar G. Gironella Mr. Cesar G. Gironella
A+
Suyo Dawara/ISECO Mini Hydro
Mega Large
Type
Hedcor Hydro
8
9
N
LEGEND :
HQ Location
Municipality
5 MVA Substation
10 MVA Substation
Mini Hydro
3 PH Backbone Line
Energized Coop SystemEnergized Other System
H Q
MH
Served byLa Union Electric Co.
Partly served byLa Union Electric Co.
SAN GABRIEL
BURGOS
CABA
SISON PART OF PANGASINAN
BAGULIN
SANTOTOMAS
PUGO
ROSARIO
TUBAO
SANTOL
BALAOAN
ARINGAY
AGOO
SAN JUAN
BAUANG
LUNA
BANGAR
SUDIPEN
SANFABIAN SAN
JACINTOPOZZORUBIO
CITY ofSAN FERNANDO
MH
H Q
NAGUILIAN
BACNOTAN
I. DATE OF INCORPORATION AND REGISTRATION : August 6, 1971
II. DATE OF FIRST ENERGIZATION : August 1, 1974
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 495.2 913.7 1,284.7 0.200
Subsidy 67.1 101.3 101.3
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Bacnotan 47 47 47 47 100 0 8,200 7,677 7,871 8,147 99
2 Balaoan 36 36 36 36 100 0 7,300 6,076 6,219 6,427 88
3 Bangar 33 33 33 33 100 0 6,900 5,853 6,002 6,190 90
4 Luna 40 40 40 40 100 0 7,000 6,477 6,614 6,713 96
5 San Gabriel 15 15 15 15 100 0 3,200 1,786 1,876 1,955 61
6 Santol 11 11 11 11 100 0 2,400 1,155 1,276 1,350 56
7 Sudipen 17 17 17 17 100 0 3,300 2,743 2,860 2,920 88
City of San Fernando 14 14 14 14 100 0 1,700 1,271 1,319 1,346 79
San Juan 34 34 34 34 100 0 4,700 4,431 4,517 4,645 99
Second District
8 Agoo 49 49 49 49 100 0 12,700 11,697 11,946 12,656 99
9 Aringay 24 24 24 24 100 0 9,100 8,281 8,453 8,682 95
10 Bagulin 10 10 10 10 100 0 2,100 1,002 1,060 1,109 53
11 Burgos 12 12 12 12 100 0 1,400 1,046 1,112 1,134 81
12 Caba 17 17 17 17 100 0 4,300 4,049 4,163 4,253 99
13 Naguilian 37 37 37 37 100 0 9,500 8,259 8,435 8,648 91
14 Pugo 14 14 14 14 100 0 3,100 2,828 2,946 3,040 98
15 Rosario 33 33 33 33 100 0 9,500 7,741 7,953 8,172 86
16 Santo Tomas 24 24 24 24 100 0 6,800 5,977 6,147 6,270 92
17 Tubao 18 18 18 18 100 0 5,400 4,633 4,779 4,867 90
Bauang 7 7 7 7 100 0 3,400 3,190 3,274 3,323 98
Fourth District, Pangasinan
San Fabian 8 8 8 8 100 0 2,000 1,435 1,470 1,513 76
San Jacinto 3 3 3 3 100 0 500 338 375 377 75
Fifth District, Pangasinan
18 Sison 28 28 28 28 100 0 9,200 6,405 6,533 6,730 73
Pozzorubio 5 5 5 5 100 0 1,200 820 844 859 72
Total 536 536 536 536 100 0 124,900 105,170 108,044 111,326 89
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 72,976 63,824 71,469 Residential 99,356 102,119 104,881
MWH Purchased 10,844 10,838 11,691 Commercial 3,779 3,875 4,307
MWH Sold 9,279 9,354 10,144 Industrial 132 110 109
Systems Loss (%) 14 13 13 Public Building 1,510 1,553 1,617
Peak Load (KW) 26,423 26,474 28,808 Others 393 387 412
Load Factor (%) 56 56 56 Total 105,170 108,044 111,326
Collection Efficiency (%) 100 101 104
Ave. Systems Rate (P/KWH) 7.87 6.82 7.05
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 55,098 58,541 64,841 71,236 75,258 75,148 75,318 77,356 76,301 80,310
Commercial 7,113 7,534 8,814 9,778 10,870 11,748 12,031 12,399 13,460 14,949
Industrial 9,809 9,189 10,687 13,026 11,431 11,538 11,902 11,578 12,588 16,068
Public Building 2,614 2,779 3,282 3,799 5,140 5,770 5,830 6,130 6,143 6,746
Others 3,679 3,479 4,146 4,391 4,158 3,008 3,749 3,880 3,751 3,650
Total 78,313 81,522 91,770 102,230 106,857 107,212 108,830 111,343 112,243 121,723
Mr. Sofronio D. Bambico
Mr. Ramon C. Posadas, Ph.D.
118,162
Mr. Roland A. Balagot
Mr. Ramon C. Posadas, Ph.D.
A+
Mega Large
Amburayan/LUELCO Mini Hydro
Type
A+
Mega Large
121,684
Ms Herminia M. Pascua
Mr. Ramon C. Posadas, Ph.D.
A+
Mega Large
LA UNION ELECTRIC COOPERATIVE, INC. (LUELCO)Sta. Rita East, Aringay, La Union 2503
Tel. Nos. (072) 714-0238, 521-3106, 714-0554; Fax No. (072) 714-0553; E-mail: [email protected]
2008 20092007
C O N N E C T I O N S
CoverageEnergized
Unenerg.Served
Potential
Monthly Average
115,099
Legislative District
MUNICIPALITIES/CITYB A R A N G A Y S
Sudipen
POWER PLANT
Location Project Name/Proponent
10
N
LEGEND :
HQ Location
Municipality
5 MVA Substation
10 MVA Substation
15 MVA Substation
3 PH Backbone Line
Energized Coop SystemH Q
PANELCO IPANELCO I
11
BANI
CITY ofALAMINOS
MABINI
DASOL
AGNO
BURGOS
INFANTA
ANDABOLINAO
H Q
I. DATE OF INCORPORATION AND REGISTRATION : September 28, 1972
II. DATE OF FIRST ENERGIZATION : December 14, 1975
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 9.0 9.0 9.0
Subsidy 54.5 54.5 69.5
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Agno 17 17 17 17 100 0 5,700 3,893 4,035 4,194 74
2 City of Alaminos 39 39 39 39 100 0 16,800 14,965 15,335 15,732 94
3 Anda 18 18 18 18 100 0 7,400 5,617 5,755 5,886 80
4 Bani 27 27 27 27 100 0 9,800 7,780 7,915 8,083 82
5 Bolinao 30 30 30 30 100 0 13,800 9,638 9,888 10,145 74
6 Burgos 14 14 14 14 100 0 4,100 2,546 2,634 2,706 66
7 Dasol 18 18 18 18 100 0 5,700 3,895 3,985 4,132 72
8 Infanta 13 13 13 13 100 0 4,600 3,282 3,359 3,422 74
9 Mabini 16 16 16 16 100 0 4,700 3,051 3,140 3,236 69
Total 192 192 192 192 100 0 72,600 54,667 56,046 57,536 79
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 39,637 37,666 37,059 Residential 51,386 52,623 54,039
MWH Purchased 5,985 5,739 5,756 Commercial 1,967 2,019 2,041
MWH Sold 4,825 4,706 4,809 Industrial 86 136 144
Systems Loss (%) 18 17 15 Public Building 1,084 1,100 1,095
Peak Load (KW) 14,117 14,416 14,185 Others 144 168 217
Load Factor (%) 58 55 56 Total 54,667 56,046 57,536
Collection Efficiency (%) 105 105 103
Ave. Systems Rate (P/KWH) 8.21 8.00 7.71
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 22,964 25,537 30,375 33,298 35,749 34,554 34,857 36,550 35,255 34,743
Commercial 3,801 4,350 4,909 5,224 5,702 8,919 9,604 9,633 7,771 5,703
Industrial 2,589 2,315 3,610 5,148 8,217 8,353 8,469 8,286 10,216 14,401
Public Building 1,193 1,423 1,786 2,081 2,416 3,256 2,783 3,011 2,887 2,207
Others 1,818 2,053 246 823 344 378 341 421 349 648
Total 32,365 35,678 40,926 46,574 52,427 55,459 56,054 57,901 56,478 57,702
Mr. Rolando O. Reinoso
-
PANGASINAN I ELECTRIC COOPERATIVE, INC. (PANELCO I)San Jose, Bani, Pangasinan
Tel. Nos. (075) 553-2200 to 03, 553-3494 to 95, 553-2198 to 99; Fax No. (075) 553-2005;E-mail:[email protected]
2007 20092008
Monthly Average
Ms. Amelia R. Olores
-
49,346
-
Legislative District
-
MUNICIPALITIES/CITY
Ms. Amelia R. Olores
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.Served
Potential
-
50,573
Ms. Amelia R. Olores
Mr. Rolando O. Reinoso Mr. Rolando O. Reinoso
-
51,957
12
13
LEGEND :
HQ Location
Municipality
Below 5 MVA Substation
5 MVA Substation
10 MVA Substation
20 MVA Substation
NPC Substation
Power Plant
3 PH Backbone Line
Energized Coop System
Energized Other System
H Q
P P
Served by Dagupan Electric Corp.
N
SAN CARLOS CITY
BUGALLON
SUAL
H Q
SANFABIAN
SANTABARBARA
DAGUPAN CITY
CALASIAO
ALCALA
MANGALDAN
MALASIQUI
BAYAMBANG
MANGATAREM
URBIZTONDO
BASISTA
AGUILAR
LABRADOR
LINGAYEN
BAUTISTA
BINMALEY
P P
SAN JACINTO
I. DATE OF INCORPORATION AND REGISTRATION : October 6, 1975
II. DATE OF FIRST ENERGIZATION : May 6, 1976
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 721.8 979.2 1,450
Subsidy 40.1 91.4 91.4
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Sual 19 19 19 19 100 0 5,900 4,080 4,304 4,492 76
Second District
2 Aguilar 16 16 16 16 100 0 7,600 4,670 4,848 5,066 67
3 Basista 13 13 13 13 100 0 6,000 5,066 5,198 5,341 89
4 Binmaley 33 33 33 33 100 0 16,500 13,133 13,437 13,732 83
5 Bugallon 24 24 24 24 100 0 13,000 9,181 9,475 9,761 75
6 Labrador 10 10 10 10 100 0 4,400 3,642 3,751 3,876 88
7 Lingayen 32 32 32 32 100 0 20,200 18,167 18,737 19,326 96
8 Mangatarem 82 82 82 82 100 0 13,800 10,385 10,757 11,211 81
9 Urbiztondo 21 21 21 21 100 0 9,000 6,482 6,656 6,856 76
Third District
10 Bayambang 77 77 77 77 100 0 21,800 15,959 16,340 16,846 77
11 Malasiqui 73 73 73 73 100 0 25,600 19,709 20,183 20,787 81
12 San Carlos City (86) 84 84 84 84 100 0 34,100 30,176 30,856 31,654 93
Fourth District
13 Mangaldan 30 30 30 30 100 0 18,600 16,689 17,103 17,549 94
Fifth District
14 Alcala 21 21 21 21 100 0 8,000 6,735 6,920 7,111 89
15 Bautista 18 18 18 18 100 0 6,100 4,200 4,320 4,446 73
Total 553 553 553 553 100 0 210,600 168,274 172,885 178,054 85
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 118,216 95,836 116,687 Residential 159,010 163,467 168,268
MWH Purchased 18,023 17,523 19,800 Commercial 6,863 6,934 7,214
MWH Sold 15,085 14,825 16,960 Industrial 117 115 114
Systems Loss (%) 15 14 13 Public Building 1,784 1,876 1,939
Peak Load (KW) 44,335 44,907 49,736 Others 500 493 519
Load Factor (%) 56 53 55 Total 168,274 172,885 178,054
Collection Efficiency (%) 97 96 96
Ave. Systems Rate (P/KWH) 7.84 6.46 6.88
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 90,695 99,898 109,077 117,906 128,063 125,217 129,012 132,678 129,119 145,878
Commercial 13,883 18,430 20,922 24,021 24,661 25,706 27,816 30,642 31,293 37,683
Industrial 4,331 4,276 4,371 4,692 4,690 4,074 3,689 4,110 3,976 4,333
Public Building 5,150 5,996 6,400 7,628 10,875 11,086 11,445 12,340 12,108 13,940
Others 997 1,009 1,631 1,186 1,359 1,426 1,168 1,253 1,399 1,688
Total 115,056 129,609 142,401 155,433 169,648 167,510 173,130 181,023 177,895 203,522
Legislative District
Monthly Average
170,047
MUNICIPALITIES/CITY
POWER PLANT
Location Project Name/Proponent Type
Coverage
2007
Unenerg.Energized
Potential
Mrs. Josefina D. Mandapat
Mega Large
A
Mega Large
Served
175,406
B A R A N G A Y S C O N N E C T I O N S
165,274
SualSual Coal-Fired Power
Plant/San Miguel Energy Corporation
CENTRAL PANGASINAN ELECTRIC COOPERATIVE, INC. (CENPELCO)Padilla Street, San Carlos City, Pangasinan
Tel. Nos. (075) 532-5142, 532-2222 loc. 213; Telefax No. (075) 532-3146; Fax No. (075) 955-5499;E-mail:[email protected]
2008 2009
Mr. Cesar T. EspinoMr. Manuel S. Morillo
Coal 1294.000
Mrs. Josefina D. Mandapat
A
Mega Large
Dr. Henry J. Fernandez
Mrs. Josefina D. Mandapat
A
14
15
LEGEND :Energized Coop System
MH
HQ Location
Municipality
5 MVA Substation
10 MVA Substation
15 MVA Substation
Power Plant
Mini Hydro
3 PH Backbone Line
Energized Other System
H Q
P P
N
BALUNGAO
LAOACMANAOAG
Served byDagupan Electric Corp.
UMINGAN
SAN MANUEL
TAYUG
SAN NICOLAS
ROSALES
BINALONAN
SANTA MARIA
SANTOTOMAS
VILLASIS
NATIVIDAD
SAN QUINTIN
POZZORUBIO
MAPANDAN
CITY ofURDANETA
ASINGAN
H Q
P P
MH
I. DATE OF INCORPORATION AND REGISTRATION : May 20, 1978
II. DATE OF FIRST ENERGIZATION : May 1979
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 376.8 376.8 376.8 345.000
Subsidy 124.4 124.4 153.8 0.750
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Third District
1 Mapandan 15 15 15 15 100 0 6,900 4,975 5,196 5,357 78
Fifth District
2 Binalonan 24 24 24 24 100 0 11,500 10,861 11,083 11,357 99
3 Laoac 22 22 22 22 100 0 6,000 4,448 4,560 4,688 78
4 Pozzorubio (34) 29 29 29 29 100 0 11,900 9,847 10,102 10,378 87
5 Santo Tomas 10 10 10 10 100 0 2,700 2,005 2,058 2,120 79
6 City of Urdaneta 34 34 34 34 100 0 25,300 22,783 23,528 24,278 96
7 Villasis 21 21 21 21 100 0 12,200 10,024 10,327 10,585 87
Sixth District
8 Asingan 21 21 21 21 100 0 11,600 8,943 9,172 9,427 81
9 Balungao 20 20 20 20 100 0 5,300 3,822 3,932 4,047 76
10 Natividad 18 18 18 18 100 0 4,500 3,233 3,386 3,489 78
11 Rosales 37 37 37 37 100 0 11,800 9,389 9,754 10,074 85
12 San Manuel 14 14 14 14 100 0 9,300 6,245 6,467 6,737 72
13 San Nicolas 33 33 33 33 100 0 7,100 3,434 3,631 3,805 54
14 San Quintin 21 21 21 21 100 0 6,400 5,267 5,431 5,557 87
15 Santa Maria 23 23 23 23 100 0 6,300 4,922 5,106 5,248 83
16 Tayug 21 21 21 21 100 0 8,200 6,400 6,620 6,808 83
17 Umingan 58 58 58 58 100 0 13,200 8,968 9,314 9,587 73
Total 421 421 421 421 100 0 160,200 125,566 129,667 133,542 83
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 119,289 104,187 112,634 Residential 115,833 119,499 123,365
MWH Purchased 19,187 19,128 21,122 Commercial 8,462 8,625 8,760
MWH Sold 15,537 15,592 17,447 Industrial 236 464 260
Systems Loss (%) 18 18 17 Public Building 872 898 1,000
Peak Load (KW) 43,851 45,189 49,668 Others 163 181 157
Load Factor (%) 60 58 58 Total 125,566 129,667 133,542
Collection Efficiency (%) 98 93 -
Ave. Systems Rate (P/KWH) 7.68 6.68 6.46
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 77,322 84,376 93,285 103,673 111,724 112,550 118,084 111,461 83,556 110,629
Commercial 30,026 33,131 36,805 38,847 42,799 43,898 44,166 46,928 36,476 56,417
Industrial 5,971 9,326 9,787 8,662 9,358 12,126 16,464 18,992 13,376 15,911
Public Building 4,043 4,667 5,996 6,930 7,670 7,386 7,186 8,256 6,128 8,180
Others 3,768 4,119 4,419 5,809 6,112 4,254 974 806 791 777
Total 121,130 135,619 150,292 163,921 177,663 180,214 186,874 186,443 140,327 191,914
2007
Engr. Solomon B. Villar Engr. Solomon B. Villar
20092008
Engr. Solomon B. Villar
Nancayasan, City of Urdaneta, Pangasinan
Tel. Nos. (075) 568-2399 to 2402, 568-2301; Telefax No. (075) 568-2413; E-mail: [email protected]; Website: www.panelco3.com
Served
C O N N E C T I O N S
Potential
-
-
125,488
Monthly Average
B A R A N G A Y S
Legislative DistrictCoverage
EnergizedUnenerg.
MUNICIPALITIES/CITY
Engr. Ferdinand M. Cerezo
Type
Ms. Neri F. Policina
Location
-
-
121,829
Engr. Ferdinand M. Cerezo
-
-
128,981
Hydro
Natividad Bachelor/PANELCO III Mini Hydro
POWER PLANT
Project Name/ProponentSan Roque Multi Purpose
Hydro/strategic Power Devt. Corp.
San Manuel
16
PANGASINAN III ELECTRIC COOPERATIVE, INC. (PANELCO III)
Energized Coop System
LEGEND :
Headquarters
N
BATANELCOBasco, Batanes
NUVELCODupax del Sur,Nueva Vizcaya
CAGELCO ISolana, Cagayan
CAGELCO IIAparri, Cagayan
ISELCO IIIlagan, Isabela
QUIRELCODiffun, Quirino
ISELCO IAlicia, Isabela
17
I. STATUS OF ENERGIZATION (Cumulative):
2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %
A. Electric Cooperatives:
1 Batanes 6 6 6 6 100 29 29 29 29 100 5,100 4,193 4,466 4,637 91
2 Cagayan I 12 12 12 12 100 376 357 368 376 100 123,200 95,159 99,822 103,440 84
3 Cagayan II 21 21 21 21 100 510 482 483 510 100 113,000 82,393 85,508 89,280 79
4 Isabela I 15 15 15 15 100 484 484 484 484 100 156,300 141,026 145,833 150,887 97
5 Isabela II 21 21 21 21 100 545 516 516 545 100 140,800 98,021 102,081 105,639 75
6 Nueva Vizcaya 15 15 15 15 100 275 251 252 274 99 83,200 59,398 60,360 60,360 73
7 Quirino 6 6 6 6 100 150 150 150 150 100 39,100 30,462 32,071 33,613 86
Total 96 96 96 96 100 2,369 2,269 2,282 2,368 99 660,700 510,652 530,141 547,856 83
REGION IICAGAYAN VALLEY REGION
ELECTRIC DISTRIBUTION
UTILITIES
MUNICIPALITIES/CITIES BARANGAYS
CoverageEnergized
CoverageEnergized
Potential
CONNECTIONS
Served
18
Total 340,296 361,603 410,405 430,688 482,315 494,288 489,192 509,673 535,817 582,090
Others 4,510 5,265 6,160 6,863 7,172 9,368 10,439 11,219 12,200 13,041
Public Bldgs. 20,318 21,465 24,768 25,998 27,311 28,010 28,728 34,260 36,983 39,643
Industrial 49,176 54,237 57,769 63,951 76,742 80,868 85,300 68,381 63,667 73,673
Commercial 60,127 62,607 72,067 72,655 79,687 82,570 82,392 109,351 124,682 135,783
Residential 206,165 218,029 249,641 261,221 291,403 293,472 282,333 286,462 298,285 319,950
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):
BATANELCO
N
HQ Location
Municipality
Wind Power
Generating Set
3 PH Backbone Line
LEGEND :
Energized Coop System
H Q
G S
ITBAYAT
BASCO
MAHATAO
IVANA UYUGAN
SABTANG
G S
H Q
G S
G S
19
W P
W P
I. DATE OF INCORPORATION AND REGISTRATION : October 16, 1981
II. DATE OF FIRST ENERGIZATION : April 24, 1989
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 6.1 6.1 6.1 2.591
Subsidy 38.9 40.3 40.3 0.180
0.163
0.326
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Lone District1 Basco 6 6 6 6 100 0 2,500 2,131 2,309 2,390 96
2 Itbayat 5 5 5 5 100 0 900 655 688 714 79
3 Ivana 4 4 4 4 100 0 400 320 335 351 88
4 Mahatao 4 4 4 4 100 0 500 413 435 450 90
5 Sabtang 6 6 6 6 100 0 400 357 374 389 97
6 Uyugan 4 4 4 4 100 0 400 317 325 343 86
Total 29 29 29 29 100 0 5,100 4,193 4,466 4,637 91
VIII. GENERAL STATISTICS
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 2,123 2,043 2,155 Residential 3,225 3,403 3,509
MWH Purchased 372 368 369 Commercial 360 394 416
MWH Sold 336 335 333 Industrial - - -
Systems Loss (%) 9 9 10 Public Building 225 268 251
Peak Load (KW) 1,062 1,102 1,298 Others 383 401 461
Load Factor (%) 48 46 39 Total 4,193 4,466 4,637
Collection Efficiency (%) 102 100 104
Ave. Systems Rate (P/KWH) 6.31 6.10 6.48
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 1,447 1,455 1,873 2,050 2,177 2,183 2,210 2,351 2,313 2,280
Commercial 234 230 345 454 463 528 573 632 675 670
Industrial - - - - - - - - - -
Public Building 299 323 488 597 609 725 698 789 787 754
Others 59 120 199 201 227 278 249 263 246 288
Total 2,039 2,128 2,905 3,302 3,475 3,713 3,730 4,035 4,021 3,992
Diesel
NPC-SPUG Diesel
Type
Diesel
Legislative District
Itbayat
NPC-SPUG
Basco Wind Turbine
Monthly Average
B A R A N G A Y S C O N N E C T I O N S
Coverage Potential
MUNICIPALITIES
IX. CONNECTION PER TYPE OF CONSUMER : (Cum)
EnergizedUnenerg.
Served
BATANES ELECTRIC COOPERATIVE, INC. (BATANELCO)Basco, Batanes
Cel. Nos. (0921)545-9972; E-mail:bataneselco2yahoo.com
2008 20092007
Location
A+
Project Name/Proponent
Basco
3,911 4,233
Sabtang NPC-SPUG
Mr. Arthur E. Faeldon
Ms. Victoria A. Mata (OIC)
Mr. Wilfredo D. Cabitac
Ms. Victoria A. Mata (OIC)
A+
SmallSmall
NPC-SPUG
Mr. Arthur E. Faeldon
Ms. Victoria A. Mata (OIC)
A
Small
4,046
POWER PLANT
20 20
N
21
LEGEND :
Municipality
5 MVA Substation
10 MVA Substation
15 MVA Substation
3 PH Backbone Line
Energized Coop System
HQ LocationH Q
BAGGAO
RIZAL
ALCALA
AMULUNG
IGUIG
PENABLANCA
ENRILE
SOLANA
PIAT
TUAO
TUGUEGARAO
CITY
SANTO NINO (Faire)
H Q
I. DATE OF INCORPORATION AND REGISTRATION : November 25, 1971II. DATE OF FIRST ENERGIZATION : December 1975
III. ELECTRIC COOPERATIVE OFFICIALS :
President :Gen. Manager :
IV. CATEGORY CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009
Residual Loan 632.5 632.5 753.1Subsidy 67.8 113.4 123.5
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %First District
1 Alcala 25 25 25 25 100 0 7,400 5,615 5,896 6,071 822 Baggao 48 47 47 48 100 0 14,500 8,674 9,428 9,801 68
Second District3 Piat 18 18 18 18 100 0 4,500 3,390 3,565 3,683 824 Rizal 29 23 23 29 100 0 3,200 1,491 1,565 1,611 505 Santo Nino (Faire) (31) 29 21 28 29 100 0 4,600 2,571 2,999 3,199 70
Third District6 Amulung 47 45 47 47 100 0 9,400 5,240 5,808 6,203 667 Enrile 22 22 22 22 100 0 6,500 6,056 6,248 6,410 998 Iguig 23 23 23 23 100 0 5,200 4,734 4,953 5,075 989 Penablanca 24 22 24 24 100 0 8,300 5,970 6,314 6,730 81
10 Solana 38 38 38 38 100 0 14,800 11,028 11,463 11,900 8011 Tuao (32) 24 24 24 24 100 0 9,500 6,828 7,176 7,480 7912 Tuguegarao City 49 49 49 49 100 0 35,300 33,562 34,407 35,277 99
Total 376 357 368 376 100 0 123,200 95,159 99,822 103,440 84
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 76,147 66,393 70,790 Residential 85,704 89,966 93,279 MWH Purchased 10,554 10,927 11,524 Commercial 6,760 6,868 7,136 MWH Sold 9,119 9,593 10,123 Industrial 3 3 5 Systems Loss (%) 13 11 11 Public Building 1,319 1,359 1,415 Peak Load (KW) 27,964 28,771 31,570 Others 1,373 1,626 1,605 Load Factor (%) 52 52 50 Total 95,159 99,822 103,440 Collection Efficiency (%) 97 97 97 Ave. Systems Rate (P/KWH) 8.35 6.92 6.99
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 37,644 40,292 45,826 50,104 54,726 56,110 55,159 55,723 58,680 62,506 Commercial 25,253 27,353 29,492 30,513 33,254 35,571 36,281 38,794 40,868 42,540 Industrial 604 562 622 460 365 438 406 503 551 553 Public Building 7,435 7,993 8,802 9,406 9,524 9,721 10,074 10,972 11,236 12,009 Others 1,999 2,400 2,575 2,475 2,902 3,097 2,945 3,431 3,781 3,869 Total 72,935 78,600 87,317 92,958 100,771 104,937 104,865 109,423 115,116 121,477
Monthly Average
88,522
B A R A N G A Y S C O N N E C T I O N S
Coverage
Mega LargeMega Large
MUNICIPALITIES/CITY
Legislative DistrictServed
A+ A
PotentialEnergized
86,392
Mr. Lorenzo L. Trinidad, Jr.Mr. Lorenzo L. Trinidad, Jr.
A+Mega Large
96,171
Unenerg.
2007Mr. Lorenzo L. Trinidad, Jr.
Engr. Tito R. Lingan
CAGAYAN I ELECTRIC COOPERATIVE, INC. (CAGELCO I)Maddarulug, Solana, Cagayan
Tel. Nos. (078) 844-1595, 824-8039, 501-0062 Telefax No.(078) 844-4528, 501-0882; E-mail:[email protected]/[email protected]
20092008
Engr. Tito R. Lingan Engr. Tito R. Lingan
22
CAGELCO IICAGELCO II
LEGEND :
HQ Location
Municipality
5 MVA Substation
10 MVA Substation
Generating Set
3 PH Backbone Line
Energized Coop System
H Q
G S
23
N
PART OF APAYAO
SANTAPRAXEDES
CLAVERIA
PUDTOL
LUNA
APARRI
BALLESTEROS
ABULUG
SANCHEZ MIRA
PAMPLONA
G S
GONZAGA
BUGUEY
ALLACAPAN
GATTARAN
LASAM
SANTA ANA
CAMALANIUGAN
LAL-LO
CAMIGUIN IS
CALAYAN IS
FLORA
SANTAMARCELA
SANTATERESITA
H Q
I. DATE OF INCORPORATION AND REGISTRATION : January 20, 1978
II. DATE OF FIRST ENERGIZATION : July 1979
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 26.1 53.2 159.3 0.426
Subsidy 48.4 92.1 96.3
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %Lone District, Apayao
1 Flora 16 11 11 16 100 0 3,300 1,626 1,695 1,776 54
2 Luna 22 20 20 22 100 0 3,100 2,102 2,165 2,222 72
3 Pudtol 22 13 13 22 100 0 2,400 1,199 1,251 1,279 53
4 Santa Marcela 13 13 13 13 100 0 2,200 1,336 1,398 1,491 68
Calanasan 1 1 1 1 100 0 200 88 97 103 52First District
5 Aparri 42 41 41 42 100 0 12,900 10,427 10,694 10,994 85
6 Buguey 30 30 30 30 100 0 5,800 4,801 4,952 5,134 89
7 Camalaniugan 28 28 28 28 100 0 4,700 3,986 4,125 4,274 91
8 Gattaran 50 49 49 50 100 0 10,500 7,538 7,863 8,132 77
9 Gonzaga 25 25 25 25 100 0 7,000 5,304 5,549 5,901 84
10 Lal-lo 35 34 35 35 100 0 8,000 6,118 6,316 6,520 82
11 Santa Ana 16 15 15 16 100 0 4,700 3,418 3,603 3,777 80
12 Santa Teresita 13 13 13 13 100 0 3,000 2,352 2,392 2,439 81Second District
13 Abulug 20 20 20 20 100 0 5,800 4,208 4,437 4,590 79
14 Allacapan 27 27 27 27 100 0 5,900 3,468 3,748 4,135 70
15 Ballesteros 19 19 19 19 100 0 6,000 4,965 5,107 5,284 88
16 Calayan 12 5 5 12 100 0 2,900 314 314 314 11
17 Claveria 41 41 41 41 100 0 6,500 5,715 5,819 6,014 93
18 Lasam 30 30 30 30 100 0 7,400 5,052 5,286 5,523 75
19 Pamplona 18 18 18 18 100 0 4,400 2,964 3,117 3,244 74
20 Sanchez-Mira 18 18 18 18 100 0 5,100 4,703 4,836 5,084 99
21 Santa Praxedes 10 9 9 10 100 0 700 533 560 604 86
Santo Nino (Faire) 2 2 2 2 100 0 500 176 184 446 89
Total 510 482 483 510 100 0 113,000 82,393 85,508 89,280 79
VIII. GENERAL STATISTICS
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 42,708 40,055 45,931 Residential 77,481 80,389 84,096
MWH Purchased 5,885 6,337 7,067 Commercial 3,004 3,118 3,169
MWH Sold 4,909 5,415 6,039 Industrial - - -
Systems Loss (%) 16 14 14 Public Building 1,601 1,646 1,741
Peak Load (KW) 17,605 18,221 21,131 Others 307 355 274
Load Factor (%) 46 48 46 Total 82,393 85,508 89,280
Collection Efficiency (%) 95 95 99
Ave. Systems Rate (P/KWH) 8.70 7.40 7.61
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 26,235 24,950 34,255 37,391 40,001 40,556 40,279 40,921 43,213 46,883
Commercial 5,920 5,372 7,259 7,928 8,369 8,789 9,413 12,682 16,098 19,310
Industrial - - - - - - - - - -
Public Building 2,671 2,461 3,421 3,893 4,170 4,435 4,795 5,018 5,453 6,048
Others 335 217 242 342 235 333 403 291 216 226
Total 35,161 33,000 45,177 49,554 52,775 54,112 54,890 58,912 64,980 72,467
Engr. Gabriel A. Tordesillas
85,500
POWER PLANT
Type
Engr. Gabriel A. Tordesillas
A+
Mega Large
A+
Extra LargeExtra Large
Mr. Benjamin AF Agatep
CAGAYAN II ELECTRIC COOPERATIVE, INC. (CAGELCO II)Maharlika Highway, Macanaya District, Aparri, Cagayan
Tel. Nos. (078) 888-2173, 888-2308, 888-2092, 822-8209; Telefax No. (078) 822-8900; E-mail: [email protected]
200920082007
Mr. Benjamin AF Agatep (Acting) Mr. Benjamin AF Agatep
Monthly Average
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.Served
IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
Legislative DistrictPotential
MUNICIPALITIES
Engr. Gabriel A. Tordesillas
88,453
A
Calayan NPC-SPUG
Location Project Name/Proponent
91,873
Diesel
24
LEGEND :
HQ Location
Municipality
5 MVA Substation
10 MVA Substation
15 MVA Substation
NPC Substation
Power Plant
Mini Hydro
3 PH Backbone Line
Energized Coop System
H Q
MHP P
25
N
SAN GUILLERMO
SANMATEO
REINAMERCEDES
CITY of SANTIAGO
RAMON
CABATUAN
CITY ofCAUAYAN
CORDON
JONES
SAN AGUSTIN
ANGADANAN
SANISIDRO
LUNA
ECHAGUE
ALICIA
MH
P P
H QMH
P P
I. DATE OF INCORPORATION AND REGISTRATION : March 24, 1972II. DATE OF FIRST ENERGIZATION : November 6, 1975III. ELECTRIC COOPERATIVE OFFICIALS :
President :Gen. Manager :
IV. CATEGORY CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009 Cap.(MW)
Residual Loan 625.9 666.9 717.4 3.000
Subsidy 34.2 83.3 83.3
2.520
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %Third District
1 Alicia 34 34 34 34 100 0 14,000 13,029 13,497 13,986 992 Angadanan 59 59 59 59 100 0 8,300 6,165 6,359 6,566 793 Cabatuan 22 22 22 22 100 0 7,500 6,997 7,226 7,405 994 City of Cauayan 65 65 65 65 100 0 25,200 23,654 24,414 25,116 995 Luna 19 19 19 19 100 0 3,500 3,223 3,314 3,425 986 Reina Mercedes 20 20 20 20 100 0 4,600 3,529 3,642 3,839 837 San Guillermo 26 26 26 26 100 0 3,000 2,374 2,484 2,575 868 San Mateo 33 33 33 33 100 0 13,700 12,707 13,187 13,668 99
Fourth District9 Cordon 26 26 26 26 100 0 7,500 6,592 6,966 7,298 97
10 Echague 64 64 64 64 100 0 13,800 12,752 13,034 13,322 9711 Jones 42 42 42 42 100 0 8,800 7,548 7,825 8,090 9212 Ramon 19 19 19 19 100 0 9,300 7,795 8,316 8,726 9413 San Agustin (23) 5 5 5 5 100 0 1,500 1,346 1,372 1,394 9314 San Isidro 13 13 13 13 100 0 4,200 4,000 4,076 4,161 9915 City of Santiago 37 37 37 37 100 0 31,400 29,315 30,121 31,316 99
Total 484 484 484 484 100 0 156,300 141,026 145,833 150,887 97
VIII. GENERAL STATISTICS2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 130,580 102,286 112,797 Residential 126,922 130,012 135,197 MWH Purchased 17,662 18,053 20,166 Commercial 6,747 7,012 7,367 MWH Sold 14,803 15,426 17,322 Industrial 954 223 240 Systems Loss (%) 16 14 14 Public Building 2,035 2,175 2,244 Peak Load (KW) 40,822 43,479 47,016 Others 4,368 6,411 5,839 Load Factor (%) 59 57 59 Total 141,026 145,833 150,887 Collection Efficiency (%) 90 90 95 Ave. Systems Rate (P/KWH) 8.82 6.63 6.51
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 67,049 70,753 77,135 76,975 89,029 90,016 85,108 86,783 89,543 99,499 Commercial 15,526 15,626 18,438 16,069 16,799 16,429 15,351 35,538 43,510 48,490 Industrial 35,297 37,904 40,638 46,007 57,621 60,881 63,764 44,898 40,115 46,564 Public Building 2,910 3,014 3,643 3,023 3,277 3,276 3,233 7,023 8,047 8,926 Others 416 703 884 580 714 2,354 3,322 3,393 3,902 4,388 Total 121,198 128,000 140,738 142,654 167,440 172,956 170,778 177,635 185,117 207,867
360.000
Echague San Antonio Natural Gas
IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
Unenerg.Served
C O N N E C T I O N S
Potential
Magat A&B/ISELCO I Mini Hydro
RamonMagat HEP/SN Aboitiz
Power Corp.Hydro
Engr. Virgilio L. MontañoMr. Quirino G. Lucas Mr. Cesar G. Guzman, Jr.Mr. Cesar G. Guzman, Jr.
Engr. Virgilio L. MontañoEngr. Virgilio L. Montaño
Mega LargeC
Mega LargeA
Mega LargeA
ISABELA I ELECTRIC COOPERATIVE, INC. (ISELCO I)Victoria, Alicia, Isabela
Tel. Nos. (078) 662-7103, 662-7917, Telefax No. (078) 662-7984
20082007 2009
Monthly Average
B A R A N G A Y S
Legislative DistrictCoverage
EnergizedMUNICIPALITIES/CITIES
155,760150,713
POWER PLANTLocation Project Name/Proponent Type
145,490
26
N
ISELCO II
27
LEGEND :
HQ Location
Municipality
5 MVA Substation
10 MVA Substation
15 MVA Substation
Generator Substation
Mini Hydro
3 PH Backbone Line
Energized Coop System
H Q
G SMH
PALANAN
SAN MARIANO
BENITO
SOLIVEN
BURGOS
QUIRINO
DIVILACAN
CABAGAN
SAN PABLO
TUMAUINI
MALLIG
ROXAS
AURORA
NAGUILIAN
SANMANUEL
QUEZON
MACONACON
SANTAMARIA
GAMU
DELFINALBANO(MAGSAYSAY)
SANTOTOMAS
ILAGAN
G S
H Q
MH
I. DATE OF INCORPORATION AND REGISTRATION : February 25, 1978
II. DATE OF FIRST ENERGIZATION : July 2, 1979
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 385.1 392.3 392.3 0.523
Subsidy 72.5 77.2 120.0 0.250
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %First District
1 Cabagan 26 26 26 26 100 0 9,300 6,623 6,813 6,813 73
2 Delfin Albano (Magsaysay) 29 29 29 29 100 0 5,300 4,073 4,246 4,356 82
3 Ilagan 91 91 91 91 100 0 27,000 22,975 24,139 25,278 94
4 Palanan 17 6 6 17 100 0 3,400 272 272 272 8
5 San Pablo 17 17 17 17 100 0 4,300 2,898 2,983 2,983 69
6 Santa Maria 20 20 20 20 100 0 4,500 2,409 2,599 2,509 56
7 Santo Tomas 27 25 25 27 100 0 4,800 2,918 3,043 3,137 65
8 Tumauini 46 46 46 46 100 0 11,300 8,410 8,870 9,386 83
9 Divilacan 12 1 1 12 100 0 700 37 37 37 5
10 Maconacon 10 7 7 10 100 0 800 83 83 83 10
Second District
11 Aurora 33 33 33 33 100 0 6,500 5,287 5,485 5,647 87
12 Benito Soliven 29 28 28 29 100 0 5,000 3,288 3,394 4,130 83
13 Burgos 14 14 14 14 100 0 4,600 2,162 2,258 2,336 51
14 Gamu 16 16 16 16 100 0 5,800 4,380 4,452 4,642 80
15 Mallig 18 18 18 18 100 0 5,800 4,322 4,467 4,467 77
16 Naguilian 25 25 25 25 100 0 5,900 4,092 4,287 4,559 77
17 Quezon (15) 13 13 13 13 100 0 4,100 2,527 2,665 2,666 65
18 Quirino 21 21 21 21 100 0 4,500 3,157 3,230 3,230 72
19 Roxas 26 26 26 26 100 0 11,800 11,083 11,432 11,432 97
20 San Manuel 19 19 19 19 100 0 6,100 4,061 4,254 4,412 72
21 San Mariano 36 35 35 36 100 0 9,300 2,964 3,072 3,264 35
Total 545 516 516 545 100 0 140,800 98,021 102,081 105,639 75
VIII. GENERAL STATISTICS
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 57,537 59,071 60,843 Residential 92,241 96,149 99,544
MWH Purchased 8,635 8,928 9,442 Commercial 3,461 3,502 3,563
MWH Sold 6,962 7,259 7,817 Industrial 526 530 539
Systems Loss (%) 19 18 17 Public Building 1,434 1,498 1,551
Peak Load (KW) 23,394 23,951 26,142 Others 359 402 442
Load Factor (%) 51 51 49 Total 98,021 102,081 105,639
Collection Efficiency (%) 94 90 -
Ave. Systems Rate (P/KWH) 8.26 8.14 7.78
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 37,655 40,419 45,876 46,611 54,065 53,805 50,773 51,234 53,216 55,840
Commercial 7,091 7,542 8,757 9,273 10,940 11,278 11,077 11,569 12,780 13,951
Industrial 5,652 7,236 7,420 7,823 9,104 9,780 11,041 12,439 11,949 14,322
Public Building 4,271 4,561 4,931 5,258 5,660 5,672 5,603 5,936 6,577 6,905
Others 1,040 1,148 1,375 2,265 1,870 1,949 1,992 2,365 2,586 2,785
Total 55,709 60,906 68,359 71,230 81,639 82,484 80,486 83,543 87,108 93,803
IX. CONNECTION PER TYPE OF CONSUMER: (Cum)Monthly Average
102,761
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized Served
Tumauini
98,514
Mini Hydro
MUNICIPALITIES/CITY
Palanan DieselNPC-SPUG
Mr. Jose Mari Martin M. Bigornia
Unenerg.Legislative District
-
-
Potential
B
Mr. Ernesto T. Cubangbang (OIC)
Project Name/Proponent
ISELCO II
Mr. Jose Mari Martin M. Bigornia
Mr. Ernesto T. Cubangbang (OIC)
-
Location
Mr. Jose Mari Martin M. Bigornia
Engr. Antonio A. Young (OIC)
107,247
Extra Large
-
Type
POWER PLANT
ISABELA II ELECTRIC COOPERATIVE, INC. (ISELCO II)Alibagu, Ilagan, Isabela
Tel. Nos. (078) 622-2742, 624-2220, 624-2237; Telefax. No. (078) 622-3798
200920082007
28
LEGEND :
HQ Location
Municipality
10 MVA Substation
NPC Substation
3 PH Backbone Line
Energized Coop SystemH Q
N
BAGABAG
KAYAPA
ARITAO
ALFONSOCASTANEDA
KASIBU
QUEZON
DUPAX DEL NORTE
DUPAXDEL SUR
BAYOMBONG
SOLANO
VILLAVERDE
AMBAGUIO
BAMBANG
DIADI
SANTA FE
H Q
29
I. DATE OF INCORPORATION AND REGISTRATION : September 26, 1972II. DATE OF FIRST ENERGIZATION : May 15, 1977III. ELECTRIC COOPERATIVE OFFICIALS :
President :Gen. Manager :
IV. CATEGORY CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009
Residual Loan 459.3 459.3 459.3
Subsidy 36.2 63.8 63.8
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %Lone District
1 Alfonso Castaneda 6 5 5 6 100 0 1,000 540 545 545 552 Ambaguio 8 8 8 8 100 0 2,200 153 153 153 73 Aritao 22 22 22 22 100 0 7,200 5,686 5,771 5,771 804 Bagabag 17 17 17 17 100 0 6,900 5,418 5,515 5,515 805 Bambang 25 25 25 25 100 0 9,700 9,205 9,391 9,391 976 Bayombong 25 25 25 25 100 0 11,400 10,415 10,501 10,501 927 Diadi 19 19 19 19 100 0 3,200 1,873 1,908 1,908 608 Dupax del Norte 15 13 13 15 100 0 5,200 3,569 3,609 3,609 699 Dupax del Sur 19 17 17 19 100 0 3,600 2,100 2,128 2,128 59
10 Kasibu 30 23 23 30 100 0 6,400 1,621 1,694 1,694 2611 Kayapa 30 19 20 30 100 0 4,300 1,036 1,055 1,055 2512 Quezon 12 12 12 12 100 0 3,600 1,948 2,017 2,017 5613 Santa Fe 16 15 15 15 94 1 2,900 1,557 1,604 1,604 5514 Solano 22 22 22 22 100 0 12,200 11,835 11,987 11,987 9815 Villaverde 9 9 9 9 100 0 3,400 2,442 2,482 2,482 73
Total 275 251 252 274 99 1 83,200 59,398 60,360 60,360 73
VIII. GENERAL STATISTICS2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 45,462 42,110 47,586 Residential 54,849 55,678 55,369 MWH Purchased 6,240 6,366 6,974 Commercial 2,078 2,103 2,309 MWH Sold 5,047 5,281 5,900 Industrial 440 452 481 Systems Loss (%) 19 17 15 Public Building 1,055 1,253 1,297 Peak Load (KW) 15,313 15,896 17,163 Others 976 874 904 Load Factor (%) 56 55 56 Total 59,398 60,360 60,360 Collection Efficiency (%) 91 93 -Ave. Systems Rate (P/KWH) 9.01 7.97 8.07
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 28,689 31,897 35,783 39,371 41,195 40,715 39,290 39,290 40,985 41,630 Commercial 4,261 4,414 5,239 5,997 7,046 7,158 6,994 7,131 7,591 7,386 Industrial 7,252 8,051 8,585 9,190 9,208 9,363 9,767 10,113 10,536 11,751 Public Building 1,525 1,730 1,981 2,275 2,384 2,452 2,602 2,673 2,888 2,736 Others 596 609 813 936 1,159 1,254 1,405 1,363 1,370 1,394 Total 42,323 46,701 52,401 57,769 60,991 60,943 60,058 60,570 63,370 64,897
Mr. Lopito Lloyd T. ValdezEngr. Narciso S. Salunat (OIC)
-
Mr. Lopito Lloyd T. ValdezEngr. Narciso S. Salunat (OIC)
--
Mr. Lopito Lloyd T. ValdezEngr. Narciso S. Salunat (OIC)
Monthly Average
63,666
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.
63,666
IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
MUNICIPALITIES
Legislative District
--
Potential
-
62,553
Served
NUEVA VIZCAYA ELECTRIC COOPERATIVE, INC. (NUVELCO)Gabut, Dupax del Sur, Nueva Vizcaya 3707
Tel. Nos. (078) 326-7486, 322-1090, 326-7808; Telefax. No. (078) 322-1187; E-mail: [email protected]
20092007 2008
30
QUIRELCO
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
3 PH Backbone Line
Energized Coop System
N
SAGUDAY
NAGTIPUNAN
DIFFUN
AGLIPAY
MADDELA
CABARROGUIS
H Q
31
I. DATE OF INCORPORATION AND REGISTRATION : July 7, 1977
II. DATE OF FIRST ENERGIZATION : February 1980
III. ELECTRIC COOPERATIVE OFFICIALS :
President : Mr. Flor B. Perez Mr. Flor B. Perez Mr. Flor B. Perez
Gen. Manager : Engr. Jimmy M. Tumacder Engr. Jimmy M. Tumacder Engr. Fidel V. Pascua (OIC)
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 21.5 21.5 21.5
Subsidy 34.2 44.6 44.6
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Lone District
1 Aglipay 25 25 25 25 100 0 5,200 3,789 3,980 4,190 81
2 Cabarroguis 17 17 17 17 100 0 6,300 5,383 5,662 5,926 94
3 Diffun 33 33 33 33 100 0 9,500 7,978 8,483 9,003 95
4 Maddela 32 32 32 32 100 0 7,700 6,343 6,639 6,919 90
5 Nagtipunan 16 16 16 16 100 0 4,100 1,811 1,919 1,992 49
6 Saguday 9 9 9 9 100 0 3,100 2,587 2,725 2,846 92
Fourth District, Isabela
San Agustin 18 18 18 18 100 0 3,200 2,571 2,663 2,737 86
Total 150 150 150 150 100 0 39,100 30,462 32,071 33,613 86
VIII. GENERAL STATISTICS
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 13,126 13,018 13,001 Residential 27,780 29,370 30,795
MWH Purchased 1,561 1,621 1,761 Commercial 1,864 1,849 1,920
MWH Sold 1,296 1,342 1,466 Industrial 32 27 27
Systems Loss (%) 17 17 16 Public Building 747 789 832
Peak Load (KW) 4,187 4,503 4,818 Others 39 36 39
Load Factor (%) 51 49 50 Total 30,462 32,071 33,613
Collection Efficiency (%) 84 85 -
Ave. Systems Rate (P/KWH) 10.13 9.70 8.87
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 7,446 8,263 8,893 8,719 10,209 10,087 9,514 10,160 10,335 11,312
Commercial 1,842 2,070 2,537 2,421 2,817 2,817 2,703 3,005 3,160 3,436
Industrial 371 484 504 471 444 405 322 428 516 483
Public Building 1,207 1,383 1,502 1,546 1,689 1,731 1,723 1,849 1,995 2,265
Others 65 68 72 64 66 103 123 113 99 91
Total 10,931 12,268 13,508 13,221 15,224 15,143 14,385 15,555 16,105 17,587
Monthly Average
28,850
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.
IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
30,044
Served
Legislative District
-
-
Potential
-
-
27,541
MUNICIPALITIES
-
-
QUIRINO ELECTRIC COOPERATIVE, INC. (QUIRELCO)Aurora East, Diffun, Quirino
Tel. No. (078) 694-7002; Fax No. (078) 694-7015; E-mail:[email protected]
20092007 2008
32
Energized Coop System
LEGEND :
Headquarters
N
IFELCOLagawe, Ifugao
KAELCOCity of Tabuk
ABRECOBangued, Abra
MOPRECOBontoc, Mt. Province
BENECOLa Trinidad, Benguet
APAYAO
KALINGA
Served byCAGELCO II
33
I. STATUS OF ENERGIZATION (Cumulative):
2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %
A. Electric Cooperatives:
1 Abra 27 27 27 27 100 303 303 303 303 100 47,200 38,631 39,939 41,261 87
2 Benguet 14 14 14 14 100 269 265 267 269 100 153,200 127,433 130,320 133,454 87
3 Ifugao 11 11 11 11 100 175 173 173 175 100 34,700 17,709 18,859 20,489 59
4 Kalinga Apayao 11 11 11 11 100 221 193 197 221 100 48,400 24,101 25,734 27,262 56
5 Mt. Province 10 10 10 10 100 144 144 144 144 100 31,700 23,406 24,739 25,632 81
Total 73 73 73 73 100 1,112 1,078 1,084 1,112 100 315,200 231,280 239,591 248,098 79
CAR
Potential
CORDILLERA ADMINISTRATIVE REGION
EnergizedELECTRIC
DISTRIBUTION UTILITIES
MUNICIPALITIES/CITIES
Served
BARANGAYS
CoverageEnergized
Coverage
CONNECTIONS
34
Total 197,589 219,913 242,771 271,137 304,379 307,598 307,358 320,409 338,816 354,950
Others 7,130 17,875 12,754 3,814 5,640 6,865 8,362 9,076 8,912 9,505
Public Bldgs. 13,917 14,064 21,941 32,308 35,436 36,965 35,933 38,153 39,312 39,642
Industrial 2,834 2,577 3,012 3,597 4,018 5,691 6,826 6,859 7,474 7,929
Commercial 58,458 63,572 69,438 80,271 97,728 97,355 96,279 100,141 105,843 107,109
Residential 115,250 121,825 135,626 151,147 161,558 160,723 159,958 166,180 177,275 190,765
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
N
LEGEND :
HQ Location
Municipality
5 MVA Substation
Generating Set
Mini Hydro
3 PH Backbone Line
H QEnergized Coop System
G S
TINEG
LACUBSAN JUANDANGLAS
MALIBCONG
DAGUIOMANBUCLOC
BOLINEY
TUBO
SALLAPADAN
LUBA
LICUAN-BAAY (Licuan)
DOLORESBANGUED
BUCAY
SAN ISIDRO
SAN QUINTINPENARUBBIA
PILAR
VILL
AVIC
IOSA
PIDIGAN
LAPAZ
LANGIDENTAYUM
MANABO
LAGAYAN
LAGANGILANG
MH
G S
G S
H Q
35
M H
I. DATE OF INCORPORATION AND REGISTRATION : March 28, 1972II. DATE OF FIRST ENERGIZATION : September 1973III. ELECTRIC COOPERATIVE OFFICIALS :
President :Gen. Manager :
IV. CATEGORY CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009 Cap.(MW)
Residual Loan 28.4 28.4 28.4 0.085Subsidy 40.9 51.3 51.7 0.400
0.400
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %Lone District
1 Bangued 31 31 31 31 100 0 12,000 11,210 11,583 11,923 992 Boliney 8 8 8 8 100 0 700 253 263 273 393 Bucay 21 21 21 21 100 0 3,100 2,485 2,582 2,686 874 Bucloc 4 4 4 4 100 0 400 301 316 327 825 Daguioman 4 4 4 4 100 0 300 254 272 289 966 Danglas 7 7 7 7 100 0 800 533 548 567 717 Dolores 15 15 15 15 100 0 2,100 1,861 1,944 1,990 958 La Paz 12 12 12 12 100 0 2,700 2,081 2,153 2,227 829 Lacub 6 6 6 6 100 0 500 173 191 199 40
10 Lagangilang 17 17 17 17 100 0 2,500 2,120 2,184 2,241 9011 Lagayan 5 5 5 5 100 0 800 527 542 556 7012 Langiden 6 6 6 6 100 0 600 407 420 433 7213 Licuan-Baay (Licuan) 11 11 11 11 100 0 800 411 422 439 5514 Luba 8 8 8 8 100 0 1,300 747 778 812 6215 Malibcong 12 12 12 12 100 0 800 206 207 229 2916 Manabo 11 11 11 11 100 0 2,000 1,835 1,894 1,959 9817 Peñarrubia 9 9 9 9 100 0 1,100 975 1,010 1,046 9518 Pidigan 15 15 15 15 100 0 2,300 2,061 2,122 2,202 9619 Pilar 19 19 19 19 100 0 1,800 1,458 1,517 1,593 8920 Sallapadan 9 9 9 9 100 0 1,100 823 845 871 7921 San Isidro 9 9 9 9 100 0 900 708 742 784 8722 San Juan 19 19 19 19 100 0 1,800 1,699 1,737 1,773 9923 San Quintin 6 6 6 6 100 0 1,000 911 945 992 9924 Tayum 11 11 11 11 100 0 2,800 2,562 2,631 2,693 9625 Tineg 10 10 10 10 100 0 1,000 453 453 453 4526 Tubo 10 10 10 10 100 0 1,000 775 798 821 8227 Villaviciosa 8 8 8 8 100 0 1,000 802 840 883 88
Total 303 303 303 303 100 0 47,200 38,631 39,939 41,261 87
VIII. GENERAL STATISTICS2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 19,895 18,490 21,543 Residential 36,104 37,358 38,596 MWH Purchased 2,632 2,625 2,785 Commercial 1,294 1,298 1,344 MWH Sold 2,229 2,239 2,350 Industrial 146 157 179 Systems Loss (%) 14 14 15 Public Building 792 824 851 Peak Load (KW) 6,783 6,805 7,131 Others 295 302 291 Load Factor (%) 53 53 53 Total 38,631 39,939 41,261 Collection Efficiency (%) 106 108 -Ave. Systems Rate (P/KWH) 8.93 8.26 9.17
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 13,248 13,668 15,987 17,809 17,687 18,299 18,508 18,987 17,487 18,210 Commercial 3,377 3,634 4,039 4,191 4,361 3,468 2,857 2,884 2,593 2,790 Industrial 319 332 348 303 269 1,235 1,961 2,057 2,003 2,198 Public Building 1,944 1,570 1,745 1,931 2,122 2,024 2,157 2,239 2,057 2,154 Others 347 328 460 612 674 650 768 577 488 503 Total 19,235 19,532 22,579 24,846 25,112 25,676 26,251 26,744 24,628 25,855
Boliney
43,492
- - -
EC
Project Name/Proponent Type
GenSetMalibcong
44,676- -
46,081
2009Mr. David B. Guzman, Jr. Mr. David B. Guzman, Jr.Mr. Loreto P. Seares, Jr.
2008Mr. David B. Guzman, Jr.
Mr. Loreto P. Seares, Jr.
LGU
POWER PLANTLocation
Micro-Hydro
-
IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
Unenerg.Served
B A R A N G A Y S
Monthly Average
ABRA ELECTRIC COOPERATIVE, INC. (ABRECO)Bangued, Abra
Tel. No. (074) 752-8086; Fax No. (074) 752-8628
Mr. Loreto P. Seares, Jr.
2007
Tubo EC GenSet
Legislative DistrictPotential
MUNICIPALITIESCoverage
EnergizedC O N N E C T I O N S
36
LEGEND :
Energized Coop SystemHQ Location
Municipality
Below 5 MVA Substation
5 MVA Substation
10 MVA Substation
20 MVA Substation
NPC Substation
Power Plant
Mini Hydro
3 PH Backbone Line
H Q
MH
P P
37
N
BAKUN
KIBUNGAN
BUGUIAS
ATOK
KABAYAN
MANKAYAN
TUBLAY
KAPANGAN
BOKOD
ITOGON
TUBA
SABLAN
LA TRINIDAD
BAGUIOCITY
P P
P P
P P
H Q
MH
MH
MH
MH
I. DATE OF INCORPORATION AND REGISTRATION : October 5, 1973
II. DATE OF FIRST ENERGIZATION : November 10, 1973
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 76.7 98.7 172.5 100.750
Subsidy 77.6 123.6 130.0
6.000
0.500
18.350
0.560
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %Lone District
1 Atok 8 8 8 8 100 0 3,600 2,123 2,187 2,240 62
2 Bakun 7 6 7 7 100 0 2,600 1,584 1,665 1,763 68
3 Bokod 10 10 10 10 100 0 2,500 1,603 1,658 1,729 69
4 Buguias 14 14 14 14 100 0 7,200 5,237 5,414 5,862 81
5 Itogon 9 9 9 9 100 0 10,200 7,012 7,345 7,694 75
6 Kabayan 13 12 12 13 100 0 2,700 1,175 1,301 1,361 50
7 Kapangan 15 15 15 15 100 0 3,900 2,334 2,431 2,505 64
8 Kibungan 7 5 6 7 100 0 3,300 1,507 1,554 1,602 49
9 La Trinidad 16 16 16 16 100 0 20,000 18,384 18,962 19,551 98
10 Mankayan 12 12 12 12 100 0 7,500 3,571 3,660 3,806 51
11 Sablan 8 8 8 8 100 0 2,100 1,616 1,649 1,720 82
12 Tuba 13 13 13 13 100 0 8,400 5,195 5,414 5,578 66
13 Tublay 8 8 8 8 100 0 3,000 2,157 2,222 2,370 79
Lone District, Baguio City
14 Baguio City 129 129 129 129 100 0 76,200 73,935 74,858 75,673 99
Total 269 265 267 269 100 0 153,200 127,433 130,320 133,454 87
VIII. GENERAL STATISTICS
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 165,273 142,090 129,081 Residential 115,942 118,717 121,682
MWH Purchased 24,897 26,154 27,579 Commercial 9,754 9,776 9,701
MWH Sold 21,845 23,331 24,351 Industrial 26 31 31
Systems Loss (%) 12 11 12 Public Building 1,517 1,588 1,596
Peak Load (KW) 57,473 58,159 67,438 Others 194 208 444
Load Factor (%) 59 62 56 Total 127,433 130,320 133,454
Collection Efficiency (%) 104 110 108
Ave. Systems Rate (P/KWH) 7.57 6.09 5.30
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 88,075 91,597 102,000 113,604 123,003 121,985 122,450 127,647 138,887 150,144
Commercial 52,444 56,877 62,040 72,651 89,631 89,494 89,032 92,553 98,044 98,769
Industrial 1,971 1,720 2,120 2,717 2,907 2,952 3,067 3,039 3,569 3,562
Public Building 9,750 9,916 17,150 27,091 30,026 31,589 30,347 32,210 33,194 33,085
Others 6,032 16,572 11,169 1,824 3,339 4,500 5,935 6,693 6,280 6,647
Total 158,272 176,682 194,479 217,887 248,906 250,519 250,831 262,142 279,974 292,207
Mr. Joel A. Alangsab
Mr. Gerardo P. Verzosa
A+
Mega Large
Mini Hydro
Sablan Hydro Electric Dev't. Corp. Hydro
Philex Mining Corp.Itogon
Mini Hydro
NIA Baligatan
BENGUET ELECTRIC COOPERATIVE, INC. (BENECO)Alapang, La Trinidad, Benguet
Tel. Nos. (074) 422-5671 to 73, 422-2110, 422-2000, 422-2969; Fax Nos. (074) 443-9601, 422-2848, 422-4515; E-mail: [email protected]
Mr. Gerardo P. Verzosa
2009
Atty. Victorio T. Palangdan
2008
Atty. Benny O. Bomogao
Mr. Gerardo P. Verzosa
2007
Ambuclao-Binga HEP/SN Aboitiz Power Hydro, Inc.
101,936
Mega Large
POWER PLANT
Mega Large
103,655 105,758
Location Type
AA+
BakunBakun-Benguet Hydro
Plants/Amlan Holdings Corp. Mini Hydro
Project Name/Proponent
Bokod Hydro
Legislative District
B A R A N G A Y SMUNICIPALITIES/CITY
C O N N E C T I O N S
ServedCoverage
Club John Hay
175.000
Mini Hydro
IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
EnergizedUnenerg. Potential
Monthly Average
Baguio City
38
N
LEGEND :
HQ Location
Municipality
NPC Substation
3 PH Backbone Line
Energized Coop SystemH Q
BANAUE
MAYOYAO AGUINALDO
TINOC
KIANGAN
ALFONSO LISTA (POTIA)
LAMUT
HUNGDUAN
HINGYON
LAGAWE
ASIPULO
H Q
39
I. DATE OF INCORPORATION AND REGISTRATION : May 16, 1977
II. DATE OF FIRST ENERGIZATION : August 1980
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 12.3 17.2 18.3
Subsidy 27.3 40.2 46.4
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %Lone District
1 Aguinaldo* 16 15 15 16 100 0 3,500 721 824 919 26
2 Alfonso Lista (Potia)** 20 20 20 20 100 0 4,500 2,554 2,765 2,925 65
3 Asipulo* 9 9 9 9 100 0 2,600 495 540 576 22
4 Banaue 18 18 18 18 100 0 4,400 2,044 2,143 2,221 50
5 Hingyon* 12 12 12 12 100 0 2,100 1,138 1,194 1,234 59
6 Hungduan 9 9 9 9 100 0 2,000 685 763 809 40
7 Kiangan 14 14 14 14 100 0 3,000 1,831 1,910 1,996 67
8 Lagawe 20 20 20 20 100 0 3,400 3,055 3,206 3,322 98
9 Lamut 18 18 18 18 100 0 4,200 3,771 3,921 4,161 99
10 Mayoyao 27 26 26 27 100 0 3,000 1,060 1,231 1,395 47
11 Tinoc* 12 12 12 12 100 0 2,000 355 362 931 47
Total 175 173 173 175 100 0 34,700 17,709 18,859 20,489 59
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 7,248 7,327 8,629 Residential 15,253 16,340 17,952
MWH Purchased 871 920 1,008 Commercial 1,132 1,130 1,130
MWH Sold 679 754 824 Industrial 129 122 113
Systems Loss (%) 22 18 18 Public Building 730 789 851
Peak Load (KW) 1,900 2,020 2,154 Others 465 478 443
Load Factor (%) 63 62 64 Total 17,709 18,859 20,489
Collection Efficiency (%) 93 95 97
Ave. Systems Rate (P/KWH) 10.67 9.72 10.47
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 3,163 4,169 4,725 5,437 5,285 4,933 4,556 4,651 5,166 5,633
Commercial 902 1,093 1,194 1,192 1,290 1,526 1,478 1,565 1,727 1,848
Industrial 147 191 172 161 274 573 530 445 491 558
Public Building 496 646 828 910 996 1,070 1,120 1,320 1,456 1,618
Others 76 161 236 220 240 186 159 170 203 229
Total 4,784 6,260 7,155 7,920 8,084 8,288 7,843 8,151 9,043 9,886
* Not included in the EC's Certificate of Franchise
**With Provisional Franchise, NEC Res. No. 4 s. 1976
Engr. Jaime Pe Benito, Jr.
B
Mr. Roy G. Sambrano Mr. Antonio L. Padduyao
B
Engr. Jaime Pe Benito, Jr.
Mr. Alejandro C. Cleofas
Engr. Jaime Pe Benito, Jr.
19,991
B
Medium
18,396
Large
17,514
Medium
IFUGAO ELECTRIC COOPERATIVE, INC. (IFELCO)Rizal Avenue, Poblacion, Lagawe, Ifugao
Telefax No. (074) 382-2092
200920082007
Legislative DistrictPotential
MUNICIPALITIES
Monthly Average
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.Served
40
N
HQ Location
Municipality
5 MVA Substation
Generating Set
Micro Hydro
3 PH Backbone Line
LEGEND :
H QEnergized Coop System
G S
CALANASAN (Bayag)
CONNER
BALBALAN
RIZAL(Liwan)
PASIL
TANUDAN
MT. PROVINCETIE LINE
KABUGAO
PINUKPUK
APAYAO
KALINGA
CITY ofTABUK
LUBUAGAN
TINGLAYAN
G S
G S
MH
H Q
G S
MH
41
MH
I. DATE OF INCORPORATION AND REGISTRATION : May 15, 1977
II. DATE OF FIRST ENERGIZATION : January 1979
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 69.8 96.8 127.4 0.643
Subsidy 66.3 79.9 83.6 0.025
0.025
0.550
0.025
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %Lone District, Apayao
1 Conner 21 20 20 21 100 0 4,600 1,685 1,815 1,928 42
2 Kabugao 21 11 11 21 100 0 3,100 694 726 735 24
3 Calanasan (Bayag) (18)* 17 11 11 17 100 0 2,600 111 111 111 4Lone District, Kalinga
4 Balbalan 14 12 13 14 100 0 2,400 130 151 156 7
5 Lubuagan 9 9 9 9 100 0 2,000 417 456 567 28
6 Pasil 14 12 13 14 100 0 1,900 94 94 203 11
7 Pinukpuk 23 21 22 23 100 0 5,400 1,867 2,067 2,221 41
8 Rizal (Liwan) 14 14 14 14 100 0 2,900 1,981 2,023 2,103 73
9 City of Tabuk 42 42 42 42 100 0 16,200 14,339 15,275 16,057 99
10 Tanudan 16 12 12 16 100 0 2,000 260 271 276 14
11 Tinglayan 20 19 20 20 100 0 2,800 966 1,137 1,207 43Second District, Isabela
Quezon 2 2 2 2 100 0 400 235 244 265 66
Second District, Cagayan
Rizal 50 56 57
Third District, Cagayan
Tuao 8 8 8 8 100 0 2,100 1,243 1,279 1,346 64
Lone District, Mt. Province
Paracelis 29 29 30
Total 221 193 197 221 100 0 48,400 24,101 25,734 27,262 56
VIII. GENERAL STATISTICS
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 10,582 11,061 11,596 Residential 22,520 24,382 25,757
MWH Purchased 1,361 1,414 1,517 Commercial 576 574 606
MWH Sold 1,118 1,200 1,299 Industrial 146 45 86
Systems Loss (%) 17 14 14 Public Building 782 668 745
Peak Load (KW) 3,780 3,821 4,142 Others 77 65 68
Load Factor (%) 49 51 50 Total 24,101 25,734 27,262
Collection Efficiency (%) 95 95 96
Ave. Systems Rate (P/KWH) 9.46 9.22 8.93
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 7,343 8,163 8,234 9,002 9,858 10,062 9,250 9,215 9,747 10,471
Commercial 775 892 1,055 917 991 1,257 1,222 1,347 1,536 1,675
Industrial 397 334 372 416 567 931 1,268 1,318 1,411 1,611
Public Building 1,199 1,297 1,560 1,580 1,468 1,413 1,382 1,402 1,546 1,607
Others 142 145 134 192 163 204 137 136 156 222
Total 9,856 10,831 11,355 12,107 13,048 13,866 13,259 13,418 14,396 15,586
22,200
Tinglayan NGO/BGY Micro-Hydro
Pasil DOE/BGY
Large
23,517
POWER PLANT
Location Project Name/Proponent
Large
KALINGA-APAYAO ELECTRIC COOPERATIVE, INC. (KAELCO) Purok 5, Provincial Rd.,Bulanao, City of Tabuk, Kalinga
E-mail: [email protected], [email protected]
A
Mr. Victor MC. Tanggawohn, Sr.
Ms. Corazon D. Tomas
A+
Ms. Corazon D. Tomas
Mr. Victor MC. Tanggawohn, Sr.
C
2009
Legislative District
2007
Mr. Basilio D. Baluyan
Ms. Corazon D. Tomas (OIC)
MUNICIPALITIES
CoverageEnergized
2008
Large
Monthly Average
Potential
IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
Type
GenSet
Lubuagan
Micro-HydroDOE/BGY
Diesel
Unenerg.Served
NPC-SPUG
B A R A N G A Y S C O N N E C T I O N S
Balbalan
Kabugao
NPC-SPUG Diesel
42
SADANGA
PARACELIS
NATONIN
BARLIG
TADIAN
SAGADA
BESAO
BAUKO
SABANGAN
BONTOC
H Q
N
LEGEND :
H Q HQ Location
Municipality
Below 5 MVA Substation
3 PH Backbone Line
Energized Coop System
43
I. DATE OF INCORPORATION AND REGISTRATION : May 25, 1974
II. DATE OF FIRST ENERGIZATION : January 1975
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 0.2 0.2 0.2
Subsidy 50.8 58.5 64.6
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %Lone District
1 Barlig 11 11 11 11 100 0 1,300 848 873 898 69
2 Bauko 22 22 22 22 100 0 6,000 5,149 5,396 5,603 93
3 Besao 14 14 14 14 100 0 2,100 1,358 1,431 1,476 70
4 Bontoc 16 16 16 16 100 0 6,200 5,590 5,876 6,090 99
5 Natonin 11 11 11 11 100 0 1,900 905 981 1,036 55
6 Paracelis 9 9 9 9 100 0 4,100 1,720 1,995 2,097 51
7 Sabangan 15 15 15 15 100 0 1,800 1,679 1,733 1,771 98
8 Sadanga 8 8 8 8 100 0 1,800 1,019 1,115 1,174 65
9 Sagada 19 19 19 19 100 0 2,600 2,351 2,474 2,539 98
10 Tadian 19 19 19 19 100 0 3,900 2,787 2,865 2,948 76
Total 144 144 144 144 100 0 31,700 23,406 24,739 25,632 81
VIII. GENERAL STATISTICS
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 8,163 7,956 7,959 Residential 21,318 22,472 23,332
MWH Purchased 1,001 1,063 1,127 Commercial 1,421 1,459 1,448
MWH Sold 829 898 951 Industrial - - -
Systems Loss (%) 16 15 15 Public Building 629 764 809
Peak Load (KW) - - - Others 38 44 43
Load Factor (%) - - - Total 23,406 24,739 25,632
Collection Efficiency (%) 95 102 94
Ave. Systems Rate (P/KWH) 9.84 8.86 8.37
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 3,421 4,228 4,680 5,295 5,725 5,443 5,194 5,680 5,988 6,307
Commercial 960 1,076 1,110 1,320 1,455 1,610 1,690 1,792 1,943 2,027
Industrial - - - - - - - - - -
Public Building 528 635 658 796 825 869 927 982 1,059 1,178
Others 533 669 755 966 1,224 1,326 1,363 1,500 1,785 1,904
Total 5,442 6,608 7,203 8,377 9,229 9,248 9,174 9,954 10,775 11,416
Mr. Andrew M. Magwilang
B A R A N G A Y S C O N N E C T I O N S
Engr. Jude A. Domoguen
Mr. Andrew M. Magwilang
Engr. Jude A. Domoguen
Mr. Andrew M. Magwilang
Engr. Jude A. Domoguen
B
Large
EnergizedUnenerg.
Served
A
LargeLarge
B
Legislative District
23,472
Monthly Average
23,695
Potential
24,136
MUNICIPALITIES
IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
Coverage
MOUNTAIN PROVINCE ELECTRIC COOPERATIVE, INC. (MOPRECO)Poblacion, Bontoc, Mountain Province
Telefax: (074) 602-1054; E-mail:[email protected]
2008 20092007
44
Energized Coop System
LEGEND :
Energized Other System
Headquarters
45
N
Served byCabanatuan Electric Corp.
Served byMERALCOBULACAN
SAJELCOSan Jose City
NEECO II - AREA 2San Leonardo, Nueva Ecija
PRESCOAnao, Mexico,Pampanga
PELCO IIIApalit, Pampanga
Served by PantabanganMunicipal Electric System
PELCO IMexico, Pampanga
AURELCOBaler, Aurora
Served byTarlac Electric, Inc.
Served byPublic Utilities Dept.OLONGAPO CITY
Served byAngeles Electric Corp.
NEECO II - AREA 1Talavera, Nueva Ecija
NEECO ISan Isidro, Nueva Ecija
TARELCO IIConcepcion, Tarlac
ZAMECO IPalauig, Zambales
ZAMECO IICastillejos, Zambales
PELCO IIGuagua, Pampanga
TARELCO IGerona, Tarlac
PENELCOCity of Balanga
Served bySan Fernando Electric Light& Power Co.
I. STATUS OF ENERGIZATION (Cumulative):
2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %
A. Electric Cooperatives:
1 Aurora 9 9 9 9 100 157 156 157 157 100 41,400 33,621 35,538 37,043 89
2 Tarlac I 15 15 15 15 100 421 421 421 421 100 135,500 117,813 122,118 126,819 94
3 Tarlac II 5 5 5 5 100 120 120 120 120 100 82,000 67,252 70,484 73,522 90
4 Nueva Ecija I 5 5 5 5 100 95 95 95 95 100 72,800 66,158 68,382 70,720 97
5 Nueva Ecija II-Area 1 10 10 10 10 100 291 291 291 291 100 111,000 82,484 85,409 88,714 80
6 Nueva Ecija II-Area 2 11 11 11 11 100 228 228 228 228 100 97,000 72,264 75,804 78,715 81
7 SAJELCO 1 1 1 1 100 38 38 38 38 100 27,200 25,463 26,276 27,154 99
8 PRESCO - - - - - 34 34 34 34 100 16,800 15,067 15,538 15,988 95
9 Pampanga I 6 6 6 6 100 112 112 112 112 100 84,500 75,533 78,303 81,117 96
10 Pampanga II 7 7 7 7 100 175 172 172 175 100 132,100 109,854 115,351 123,008 93
11 Pampanga III 6 6 6 6 100 95 95 95 95 100 69,700 52,365 56,101 57,580 83
12 PENELCO 12 12 12 12 100 241 241 241 241 100 140,400 126,184 131,057 136,560 97
13 Zambales I 6 6 6 6 100 118 116 116 116 98 56,400 45,031 46,645 48,382 86
14 Zambales II 7 7 7 7 100 111 111 111 111 100 61,800 56,948 59,035 61,384 99
Total 100 100 100 100 100 2,236 2,230 2,231 2,234 99 1,128,600 946,037 986,041 1,026,706 91
REGION III
CONNECTIONS
Coverage CoverageEnergized
Potential
CENTRAL LUZON REGION
ELECTRIC DISTRIBUTION
UTILITIES
MUNICIPALITIES/CITIES BARANGAYS
ServedEnergized
46
Total 946,607 1,026,070 1,133,592 1,264,021 1,374,420 1,353,758 1,362,781 1,277,535 1,451,604 1,591,251
Others 40,808 45,624 26,977 19,149 21,799 22,174 23,274 24,498 26,009 27,370
Public Bldgs. 22,863 25,901 28,357 31,686 34,283 36,728 38,649 37,263 44,255 46,865
Industrial 172,238 172,299 210,319 236,973 254,904 253,881 249,889 200,373 229,464 256,340
Commercial 105,778 120,077 134,145 144,975 157,175 157,587 164,985 161,455 200,154 218,131
Residential 604,920 662,169 733,794 831,238 906,259 883,388 885,984 853,946 951,722 1,042,545
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
Generating Set
3 PH Backbone Line
Energized Coop System
G S
47
N
DILASAG
D INGALAN
SAN LUIS
BALERMARIAAURORA
METERING POINTNEECO II - A1 /NEECO II - A2
CASIGURAN
DINALUNGAN
DIPACULAO
G S
H Q
DINAPIGUE
I. DATE OF INCORPORATION AND REGISTRATION : March 26, 1980
II. DATE OF FIRST ENERGIZATION : August 18, 1982
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 133.7 199.3 269.7 1.935
Subsidy 75.4 91.2 96.9
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %Lone District
1 Baler 13 13 13 13 100 0 8,700 8,016 8,292 8,615 99
2 Casiguran 24 24 24 24 100 0 4,600 3,345 3,554 3,753 82
3 Dilasag 11 11 11 11 100 0 3,300 1,656 1,818 1,932 59
4 Dinalungan 9 9 9 9 100 0 2,100 1,034 1,227 1,232 59
5 Dingalan 11 11 11 11 100 0 4,500 4,004 4,244 4,306 96
6 Dipaculao 25 25 25 25 100 0 5,100 4,239 4,501 4,761 93
7 Maria Aurora 40 40 40 40 100 0 7,700 7,157 7,421 7,700 100
8 San Luis 18 17 18 18 100 0 4,700 3,909 4,121 4,327 92 Fourth District, Isabela
9 Dinapigue 6 6 6 6 100 0 700 261 360 417 60
Total 157 156 157 157 100 0 41,400 33,621 35,538 37,043 89
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 12,637 12,447 13,229 Residential 31,355 33,077 34,435
MWH Purchased 1,698 1,833 2,023 Commercial 1,202 1,274 1,357
MWH Sold 1,459 1,580 1,759 Industrial 95 101 103
Systems Loss (%) 14 13 13 Public Building 895 1,005 1,060
Peak Load (KW) 3,615 3,879 3,926 Others 74 81 88
Load Factor (%) 64 65 71 Total 33,621 35,538 37,043
Collection Efficiency (%) 97 97 100
Ave. Systems Rate (P/KWH) 8.66 7.88 7.52
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 8,891 9,573 10,235 11,093 11,503 12,090 11,427 12,522 13,635 15,031
Commercial 1,129 1,277 1,362 1,463 1,506 1,606 1,718 1,961 2,123 2,454
Industrial 376 348 400 398 554 304 392 563 552 602
Public Building 1,343 1,449 1,483 1,545 1,664 1,858 1,988 2,267 2,442 2,759
Others 282 264 226 218 207 211 203 196 212 263
Total 12,021 12,911 13,706 14,717 15,433 16,069 15,728 17,509 18,964 21,109
Mr. Benjamin M. Mina
Engr. Agripino A. Teh San
Large
Mr. Rico H. Porquerino
Engr. Agripino A. Teh San
A+
Large
AURORA ELECTRIC COOPERATIVE, INC. (AURELCO)Brgy. Reserva, Baler, Aurora
Fax No. (042) 209-4000 (PT&T); E-mail:[email protected]/[email protected]
20092007 2008
Mr. Rico H. Porquerino
Engr. Agripino A. Teh San
Monthly Average
B A R A N G A Y S
CoverageEnergized
Unenerg.
34,010 35,434
A+
31,942
A+
Large
POWER PLANT
Location
Legislative District
MUNICIPALITIES
Casiguran
Potential
Project Name/Proponent Type
Served
DieselNPC-SPUG
C O N N E C T I O N S
48
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
3 PH Backbone Line
Energized Coop SystemTARELCO I
49
N
PURA
VICTORIA
SAN JOSE
SAN MANUEL
CUYAPO
MONCADA
NAMPICUAN
CAMILING
SAN
CLEM
ENTE
SANTAIGNACIAMAYANTOC
GERONA
ANAO
PANIQUI
Part of NUEVA ECIJA
RAMOS
H Q
I. DATE OF INCORPORATION AND REGISTRATION : January 24, 1975
II. DATE OF FIRST ENERGIZATION : July 16, 1975
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 69.2 75.6 91.9
Subsidy 51.5 96.4 97.6
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %First District
1 Anao 18 18 18 18 100 0 2,400 2,186 2,252 2,355 98
2 Camiling 61 61 61 61 100 0 16,800 15,671 16,177 16,704 99
3 Mayantoc 24 24 24 24 100 0 5,800 4,727 4,902 5,098 88
4 Moncada 37 37 37 37 100 0 11,700 9,783 10,121 10,508 90
5 Paniqui 35 35 35 35 100 0 19,500 18,190 18,844 19,453 99
6 Pura 16 16 16 16 100 0 4,900 4,377 4,529 4,709 96
7 Ramos 9 9 9 9 100 0 3,900 3,172 3,287 3,424 88
8 San Clemente 12 12 12 12 100 0 2,700 2,262 2,316 2,372 88
9 San Manuel 15 15 15 15 100 0 4,900 3,799 3,901 4,072 83
10 Santa Ignacia 24 24 24 24 100 0 9,000 8,197 8,534 8,938 99 Second District
11 Gerona 44 44 44 44 100 0 17,100 15,119 15,663 16,231 95
12 San Jose 13 13 13 13 100 0 6,900 3,350 3,529 3,768 55
13 Victoria 26 26 26 26 100 0 11,900 10,869 11,281 11,673 98
City of Tarlac 5 5 5 5 100 0 1,900 1,474 1,540 1,634 86 First District, Nueva Ecija
14 Cuyapo 51 51 51 51 100 0 11,900 10,898 11,289 11,718 98
15 Nampicuan 21 21 21 21 100 0 2,400 2,056 2,179 2,274 95
Guimba 10 10 10 10 100 0 1,800 1,538 1,621 1,734 96
Licab 58 66 67 Second District, Pangasinan
Mangatarem 87 87 87
Total 421 421 421 421 100 0 135,500 117,813 122,118 126,819 94
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 75,755 66,197 77,099 Residential 108,981 112,812 116,319
MWH Purchased 11,262 11,584 12,774 Commercial 3,608 3,785 4,280
MWH Sold 10,178 10,587 11,689 Industrial 245 227 294
Systems Loss (%) 9 8 8 Public Building 977 977 1,163
Peak Load (KW) 27,257 27,486 29,672 Others 4,002 4,317 4,763
Load Factor (%) 57 58 59 Total 117,813 122,118 126,819
Collection Efficiency (%) 92 90 91
Ave. Systems Rate (P/KWH) 7.44 6.25 6.60
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 53,599 60,919 66,489 77,725 81,927 81,532 82,134 83,610 86,889 94,824
Commercial 6,410 7,654 9,241 9,966 10,471 11,030 11,744 13,253 15,351 17,388
Industrial 13,593 15,690 16,813 16,493 17,181 16,842 16,926 18,041 16,572 19,148
Public Building 1,060 1,093 1,107 1,284 1,366 1,315 1,527 2,601 3,589 4,091
Others 1,802 2,217 2,385 2,805 3,706 3,947 4,425 4,626 4,646 4,816
Total 76,464 87,573 96,035 108,273 114,650 114,666 116,756 122,131 127,047 140,267
Mr. Antonio C. Perez, Jr.Mr. Jose I. Hidalgo, Sr.
Potential
MUNICIPALITIES/CITY
Coverage
Mr. Francisco A. Diza
Engr. Resurreccion R. Coronel Engr. Resurreccion R. Coronel
A+
Mega Large
TARLAC I ELECTRIC COOPERATIVE, INC. (TARELCO I)Amacalan, Gerona, Tarlac 2302
Tel. Nos. (045) 931-0971 to 75, 931-2212, 931-0973; Fax No. (045) 931-0974 loc. 120
2008 20092007
Engr. Resurreccion R. Coronel
EnergizedUnenerg.
Served
Legislative District
Monthly Average
A+
Mega Large
115,669111,635
A+
Mega Large
B A R A N G A Y S C O N N E C T I O N S
120,055
50
N
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
Power Plant
3 PH Backbone Line
Energized Coop SystemEnergized Other System
P P
51
Part of NUEVA ECIJA
CITY of TARLAC
Served byTarlac Electric, Inc.
ZARAGOZALA PAZ
CONCEPCIONCAPAS
BAMBAN
TARELCO I
P P
H Q
I. DATE OF INCORPORATION AND REGISTRATION : June 6, 1981
II. DATE OF FIRST ENERGIZATION: March 14. 1983
III. ELECTRIC COOPERATIVE OFFICIALS:
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 24.3 24.3 24.3 18.900
Subsidy 120.9 143.4 151.2
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District, Nueva Ecija1 Zaragoza (19) 18 18 18 18 100 0 8,500 5,624 5,960 6,289 74
Third District2 Bamban 15 15 15 15 100 0 11,200 10,136 10,605 11,175 99
3 Capas* 20 20 20 20 100 0 22,500 20,048 21,147 22,007 98
4 Concepcion 45 45 45 45 100 0 27,100 22,445 23,294 24,199 89
5 La Paz 21 21 21 21 100 0 12,400 8,999 9,478 9,852 78
City of Tarlac 1 1 1 1 100 0 300
Total 120 120 120 120 100 0 82,000 67,252 70,484 73,522 90
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 74,204 62,585 67,920 Residential 63,231 66,184 68,900
MWH Purchased 11,255 11,798 12,904 Commercial 3,262 3,415 3,685
MWH Sold 10,039 10,729 11,804 Industrial 71 74 76
Systems Loss (%) 11 9 9 Public Building 550 669 712
Peak Load (KW) 26,262 27,048 30,801 Others 138 142 149
Load Factor (%) 59 60 57 Total 67,252 70,484 73,522
Collection Efficiency (%) 95 97 97
Ave. Systems Rate (P/KWH) 7.39 5.83 5.75
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 40,060 44,175 49,755 56,876 61,639 60,250 60,388 63,185 67,026 74,272
Commercial 8,422 9,055 9,586 10,697 12,672 13,520 15,206 16,736 17,992 19,990
Industrial 5,735 5,390 28,123 39,821 40,246 41,985 37,913 36,982 39,831 43,051
Public Building 761 1,020 1,050 1,312 1,538 2,065 2,250 2,453 2,680 3,005
Others 27,035 30,864 10,619 1,082 1,041 1,082 1,069 1,112 1,223 1,330
Total 82,013 90,504 99,133 109,788 117,135 118,902 116,826 120,468 128,752 141,648
TARLAC II ELECTRIC COOPERATIVE, INC. (TARELCO II)San Nicolas, Concepcion, Tarlac
Tel. Nos. (045) 923-0460, 923-0449, 923-0383 to 84 ; Fax No. (045) 923-0471
2008 20092007
74,846
Extra Large
80,810
Extra Large
77,878
Extra Large
Mr. Emerson S. Gomez
Engr. Jose F. Bognot, Jr. (OIC)
A+
Mr. Orlando C. Masibay
Ms. Amelia S. Tioaquen (OIC)
Mr. Emerson S. Gomez
Engr. Jose F. Bognot, Jr. (OIC)
A+A+
Monthly Average
B A R A N G A Y S
CoverageEnergized
Unenerg.
DieselCapas
C O N N E C T I O N S
Served
Tarlac Electric, Inc.
included in La Paz
POWER PLANT
Location Project Name/Proponent Type
Legislative District
MUNICIPALITIES/CITY
Potential
52
N
HQ Location
Municipality
5 MVA Substation
10 MVA Substation
Mini Hydro
3 PH Backbone Line
LEGEND :
H Q
Energized Coop System
MH
53
CITY of GAPAN
SANANTONIO
JAEN
CABIAO SANISIDRO
MH
H Q
I. DATE OF INCORPORATION AND REGISTRATION : November 24, 1973II. DATE OF FIRST ENERGIZATION : January 1974III. ELECTRIC COOPERATIVE OFFICIALS :
President :Gen. Manager :
IV. CATEGORY CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009 Cap.(MW)
Residual Loan 81.7 82.0 116.7 0.300Subsidy 13.2 58.9 35.4
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %Fourth District
1 Cabiao 23 23 23 23 100 0 14,300 13,199 13,630 14,101 99 2 City of Gapan 23 23 23 23 100 0 21,300 19,822 20,442 21,230 99 3 Jaen (27) 24 24 24 24 100 0 12,400 11,379 11,828 12,203 98 4 San Antonio 16 16 16 16 100 0 14,800 12,323 12,773 13,201 89 5 San Isidro 9 9 9 9 100 0 10,000 9,435 9,709 9,985 99
Total 95 95 95 95 100 0 72,800 66,158 68,382 70,720 97
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 55,797 50,716 54,840 Residential 63,597 65,537 67,723 MWH Purchased 8,874 9,058 9,655 Commercial 2,349 2,626 2,775 MWH Sold 6,949 7,514 8,230 Industrial 76 75 76 Systems Loss (%) 22 17 15 Public Building 34 31 31 Peak Load (KW) 19,722 19,825 20,900 Others 102 113 115 Load Factor (%) 62 63 63 Total 66,158 68,382 70,720 Collection Efficiency (%) 93 93 94 Ave. Systems Rate (P/KWH) 8.03 6.75 6.66
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2001* 2002 2003 2004 2005 2006 2007 2008
Residential 39,228 36,046 50,491 58,294 63,305 60,785 59,357 59,816 63,574 70,447 Commercial 7,125 6,364 8,233 9,096 9,656 9,174 8,795 9,104 11,365 12,871 Industrial 5,654 4,333 5,877 6,664 7,414 8,164 13,016 13,321 13,913 14,013 Public Building 985 946 1,027 841 939 940 741 751 797 833 Others 229 208 224 255 299 362 383 396 524 597 Total 53,221 47,897 65,852 75,150 81,613 79,425 82,292 83,388 90,173 98,761
* 10 months
65,929 68,088 69,977
Mini Hydro
Legislative DistrictServed
Potential
C O N N E C T I O N S
City of Gapan
B B
Monthly Average
MUNICIPALITIES/CITYCoverage
EnergizedB A R A N G A Y S
Unenerg.
Peñaranda
POWER PLANTLocation Project Name/Proponent Type
NUEVA ECIJA I ELECTRIC COOPERATIVE, INC. (NEECO I)Malapit, San Isidro, Nueva Ecija 3106
Tel. No. (044) 486-0201; Telefax No. (044) 486-2026
20092007 2008Rev. Fr. Antonio A. Mangahas, Jr. (MSEC)Rev. Fr. Antonio A. Mangahas, Jr. (MEC) Rev. Fr. Antonio A. Mangahas, Jr. (MEC)
Extra Large Extra Large Extra LargeA
Mr. Rogelio B. Marzan Engr. Bonifacio A. Patiag Engr. Bonifacio A. Patiag
54
N
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
NPC Substation
3 PH Backbone Line
Energized Coop System
Energized Other System
55
CARRANGLAN
LUPAO
ALIAGA
SANTODOMINGO
GUIMBA
SCIENCECITY ofMUÑOZ
TALUGTUG
LICABQUEZON
TALAVERA
Served by PantabanganMunicipal Electric System
PANTABANGAN
H Q
I. DATE OF INCORPORATION AND REGISTRATION : September 22, 1975
II. DATE OF FIRST ENERGIZATION : September 11, 1977
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 980.9 1,110.7 1,155.0
Subsidy 27.9 33.7 57.4
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %First District
1 Aliaga 26 26 26 26 100 0 11,600 7,966 8,301 8,634 74
2 Guimba (64) 54 54 54 54 100 0 18,700 13,513 14,137 15,099 81
3 Licab 11 11 11 11 100 0 5,000 3,297 3,407 3,512 70
4 Quezon 16 16 16 16 100 0 7,300 4,783 4,971 5,163 71
5 Santo Domingo 24 24 24 24 100 0 10,600 7,607 7,827 8,068 76
6 Talavera 53 53 53 53 100 0 22,400 19,357 19,880 20,429 91 Second District
7 Carranglan 17 17 17 17 100 0 7,300 3,890 4,080 4,265 58
8 Lupao 24 24 24 24 100 0 8,100 6,365 6,585 6,786 84
9 Science City of Muñoz 37 37 37 37 100 0 15,200 12,266 12,676 13,062 86
10 Talugtug 28 28 28 28 100 0 4,300 3,092 3,188 3,331 77
Conversion, Pantabangan 1 1 1 1 100 0 500 348 357 365 73
Total 291 291 291 291 100 0 111,000 82,484 85,409 88,714 80
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 64,088 58,087 65,627 Residential 79,505 82,264 85,317
MWH Purchased 8,621 8,773 9,394 Commercial 2,008 2,099 2,229
MWH Sold 6,906 7,084 8,114 Industrial 372 382 403
Systems Loss (%) 19 18 12 Public Building 393 426 488
Peak Load (KW) 24,200 22,377 28,516 Others 206 238 277
Load Factor (%) 49 54 45 Total 82,484 85,409 88,714
Collection Efficiency (%) 95 93 94
Ave. Systems Rate (P/KWH) 9.28 8.20 8.09
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 36,997 43,526 48,010 53,548 60,231 57,844 54,569 56,372 57,439 65,420
Commercial 3,872 4,453 4,426 4,528 4,772 4,412 4,131 4,413 4,694 5,297
Industrial 11,714 14,062 13,394 13,881 16,053 16,665 18,361 19,983 20,930 24,406
Public Building 659 819 877 1,029 1,190 1,178 1,176 1,069 1,116 1,264
Others 509 556 661 867 895 1,290 827 1,033 826 982
Total 53,751 63,416 67,368 73,853 83,141 81,388 79,064 82,870 85,005 97,369
Mr. Reynaldo V. Villanueva
Ms. Eulalia M. Castro
NUEVA ECIJA II ELECTRIC COOPERATIVE, INC. (NEECO II-Area 1)Calipahan, Talavera, Nueva Ecija
Tel Nos. (044) 411-3285, 411-4289; Telefax: (044) 411-1007
2008 20092007
Mr. Reynaldo V. Villanueva
Ms. Eulalia M. Castro
Monthly Average
B
Extra Large
88,961
Extra Large
Unenerg.Legislative District
Potential
A A+
Served
Extra Large
91,645
C O N N E C T I O N S
86,498
Mr. Reynaldo V. Villanueva
Ms. Eulalia M. Castro (OIC)
MUNICIPALITIES/CITY
CoverageEnergized
B A R A N G A Y S
56
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
NPC Substation
3 PH Backbone Line
Energized Coop SystemEnergized Other System
N
57
Served by CABANATUAN ELECTRIC CORP.RIZAL
LLANERABONGABON
LAUR
GABALDON (Bitulok & Sabani)
GENERAL TINIO (Papaya)
SANTAROSA
PALAYAN CITY
SANLEONARDO
GENERAL MAMERTONATIVIDAD
PEÑARANDAH Q
CABANATUAN CITY
I. DATE OF INCORPORATION AND REGISTRATION :
II. DATE OF FIRST ENERGIZATION :
III. ELECTRIC COOPERATIVE OFFICIALS :
President:
General Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan - 309.0 309.0
Subsidy 20.5 49.4 55.4
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %First District
Zaragoza 1 1 1 1 100 0 100 67 70 71 71 Second District
1 Llanera 22 22 22 22 100 0 7,000 4,704 4,944 5,106 73
Pantabangan 4 4 4 4 100 0 1,200 874 916 942 79
2 Rizal 26 26 26 26 100 0 11,400 9,210 9,597 9,936 87 Third District
3 Bongabon 28 28 28 28 100 0 11,500 9,172 9,737 10,075 88
4 Gabaldon (Bitulok & Sabani) 16 16 16 16 100 0 6,500 3,879 4,122 4,364 67
5 General Mamerto Natividad 20 20 20 20 100 0 6,700 4,729 5,032 5,230 78
6 Laur 17 17 17 17 100 0 6,200 4,464 4,649 4,803 77
7 Palayan City 19 20 19 19 100 0 7,200 5,309 5,536 5,911 82
8 Santa Rosa 33 33 33 33 100 0 12,100 9,117 9,534 9,895 82
Cabanatuan City 1 1 1 1 100 0 300 172 178 189 63
Fourth District
9 General Tinio (Papaya) 13 12 13 13 100 0 8,200 6,281 6,649 6,838 83
10 Peñaranda 10 10 10 10 100 0 5,700 4,596 4,802 4,946 87
11 San Leonardo 15 15 15 15 100 0 11,700 9,175 9,502 9,861 84
Jaen 3 3 3 3 100 0 1,200 514 535 547 46
Lone District, Aurora
Dingalan 1 1 1
Total 228 228 228 228 100 0 97,000 72,264 75,804 78,715 81
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 62,838 58,590 62,415 Residential 69,726 72,977 75,836
MWH Purchased 8,491 8,797 9,656 Commercial 1,577 1,688 1,688
MWH Sold 7,491 7,911 8,711 Industrial 98 100 109
Systems Loss (%) 11 9 9 Public Building 656 790 792
Peak Load (KW) 21,412 21,308 22,311 Others 207 249 290
Load Factor (%) 54 57 59 Total 72,264 75,804 78,715
Collection Efficiency (%) 94 94 98
Ave. Systems Rate (P/KWH) 8.39 7.41 7.17
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 41,725 44,341 47,777 54,940 60,815 59,421 59,224 61,158 63,276 69,280
Commercial 5,889 6,448 6,802 7,092 7,737 8,066 8,569 9,163 10,123 11,351
Industrial 7,938 7,992 10,254 11,098 11,253 11,859 11,845 15,582 17,395 19,366
Public Building 809 882 1,035 1,339 1,483 1,474 1,399 1,356 1,450 1,583
Others 1,539 1,912 2,120 2,584 2,837 2,670 2,584 2,627 2,685 2,950
Total 57,900 61,575 67,988 77,053 84,125 83,491 83,621 89,886 94,929 104,530
NUEVA ECIJA II ELECTRIC COOPERATIVE, INC. (NEECO II-Area 2)Maharlika Highway (Diversion Road), San Leonardo, Nueva Ecija
2009
Tel. No. (044) 958-1051 to 52; 958-1019; Telefax: (044) 958-1053; E-mail: [email protected]
2007 2008
Mr. Reynaldo V. VillanuevaMr. Reynaldo V. VillanuevaMr. Reynaldo V. Villanueva
Engr. Ramon M. De Vera Engr. Ramon M. De Vera Engr. Ramon M. De Vera
72,682
Monthly Average
B A R A N G A Y S
CoverageEnergized
Unenerg.
MUNICIPALITIES/CITIES
Legislative District
76,222
A+ A+
Served
C O N N E C T I O N S
A+
79,134
Extra Large
Potential
Extra Large Extra Large
58
N
HQ Location
Municipality
10 MVA Substation
3 PH Backbone Line
LEGEND :
H QEnergized Coop System
59
SAN JOSE CITY
H Q
I. DATE OF INCORPORATION AND REGISTRATION : November 1967 / March 5, 1986II. DATE OF FIRST ENERGIZATION : November 1969III. ELECTRIC COOPERATIVE OFFICIALS :
President :Gen. Manager :
IV. CATEGORY CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009
Residual Loan - - -Subsidy 4.0 10.6 10.6
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %Second District, Nueva Ecija
1 San Jose City 38 38 38 38 100 0 27,200 25,463 26,276 27,154 99
Total 38 38 38 38 100 0 27,200 25,463 26,276 27,154 99
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 31,047 27,277 32,061 Residential 22,527 23,083 24,039 MWH Purchased 4,684 4,626 4,992 Commercial 951 950 977 MWH Sold 4,046 4,005 4,383 Industrial 45 46 47 Systems Loss (%) 13 13 12 Public Building 215 236 246 Peak Load (KW) 10,478 11,160 12,361 Others 1,725 1,961 1,845 Load Factor (%) 61 57 55 Total 25,463 26,276 27,154 Collection Efficiency (%) 95 95 -Ave. Systems Rate (P/KWH) 7.67 6.81 7.31
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 15,316 15,951 17,625 19,933 21,396 21,407 20,184 20,663 20,744 22,127 Commercial 6,517 6,587 7,960 8,555 9,340 8,655 8,266 8,649 8,852 9,687 Industrial 7,892 8,455 8,639 9,872 12,283 12,399 13,571 17,492 16,619 18,772 Public Building 871 943 1,096 1,133 1,214 1,232 1,304 1,359 1,419 1,604 Others 225 230 293 347 402 380 371 394 422 410 Total 30,821 32,166 35,613 39,840 44,636 44,072 43,696 48,557 48,056 52,600
Legislative District
Monthly Average
B A R A N G A Y S
CoverageEnergized
Unenerg.CITY
Served
--
23,369 24,156
C O N N E C T I O N S
Potential
-
2007
SAN JOSE CITY ELECTRIC COOPERATIVE, INC. (SAJELCO)Maharlika Hi-way, San Jose City 3121
Tel. Nos. (044) 947-2798, 511-0374 to 75; Telefax: (044) 511-1250
20092008
22,658
Engr. Andres R. GarciaMr. Celestino P. Pobre
--
Engr. Andres R. GarciaMr. Celestino P. Pobre
Engr. Andres R. GarciaMr. Melquisidec A. Lagmay
-
60
N
LEGEND :
H Q HQ Location
Municipality
10 MVA Substation
3 PH Backbone Line
Energized Coop System
61
ARAYAT
SANTA ANAMEXICO
H Q
I. DATE OF INCORPORATION AND REGISTRATION : November 2, 1968
II. DATE OF FIRST ENERGIZATION : May 1969
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 6.8 9.3 16.5
Subsidy 4.4 8.8 8.8
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First DistrictMagalang 1 1 1 1 100 0 500 368 380 387 77
Third DistrictArayat 5 5 5 5 100 0 3,400 3,137 3,217 3,301 97
Mexico 24 24 24 24 100 0 10,400 9,639 9,972 10,281 99
City of San Fernando
Santa Ana 4 4 4 4 100 0 2,500 1,923 1,969 2,019 81
Total 34 34 34 34 100 0 16,800 15,067 15,538 15,988 95
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 14,801 12,036 13,613 Residential 14,537 14,955 15,380
MWH Purchased 2,051 2,116 2,308 Commercial 300 343 361
MWH Sold 1,805 1,889 2,088 Industrial - - -
Systems Loss (%) 12 11 9 Public Building 185 183 183
Peak Load (KW) - - - Others 45 57 64
Load Factor (%) - - - Total 15,067 15,538 15,988
Collection Efficiency (%) 93 93 94
Ave. Systems Rate (P/KWH) 8.20 6.37 6.52
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 9,911 11,247 12,411 14,441 15,911 16,309 16,686 17,079 17,240 19,225
Commercial 1,035 1,923 2,099 2,489 2,898 3,292 3,867 4,120 4,903 5,228
Industrial - - - - - - - - - -
Public Building 189 198 226 263 279 309 308 314 322 392
Others 136 131 144 385 171 140 161 152 197 214
Total 11,271 13,499 14,880 17,578 19,260 20,050 21,022 21,665 22,662 25,059
PAMPANGA RURAL ELECTRIC SERVICE COOPERATIVE, INC. (PRESCO)San Ros Subd., Ninoy Aquino By-Way, Brgy. Anao, Mexico, Pampanga
Tel No. 865-1243; E-mail: [email protected]/ [email protected]/ [email protected]
20092007 2008
Legislative District
Served
A+
Medium
14,358 14,772
C O N N E C T I O N S
Potential
MUNICIPALITIES/CITY
Mr. Vicente S. Baljadia
Mr. Efren M. Tongol
A+
Medium
A+
Ms. Zenaida G. Quiambao
Mr. Efren M. Tongol
Mr. Eduardo G. David
Mr. Efren M. Tongol
Medium
13,939
Monthly Average
B A R A N G A Y S
CoverageEnergized
Unenerg.
62
N
LEGEND :
H Q
Municipality
5 MVA Substation
10 MVA Substation
3 PH Backbone Line
Energized Coop System
HQ Location
63
MAGALANG
SAN LUIS
CANDABASANTA ANA
MEXICO
ARAYAT
H Q
I. DATE OF INCORPORATION AND REGISTRATION : December 20, 1972
II. DATE OF FIRST ENERGIZATION : April 1973
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 130.3 130.3 130.3
Subsidy 66.1 85.5 85.8
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Magalang (27) 25 25 25 25 100 0 17,400 16,190 16,736 17,341 99
Third District
2 Arayat (30) 25 25 25 25 100 0 20,800 18,031 18,695 19,385 93
3 Mexico (43) 19 19 19 19 100 0 19,100 17,713 18,373 18,998 99
4 Santa Ana (14) 10 10 10 10 100 0 7,900 7,348 7,583 7,820 99
Fourth District
5 Candaba (33) 16 16 16 16 100 0 9,500 8,086 8,366 8,636 91
6 San Luis 17 17 17 17 100 0 9,800 8,165 8,550 8,937 91
Total 112 112 112 112 100 0 84,500 75,533 78,303 81,117 96
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 74,679 71,582 76,795 Residential 70,810 74,015 76,728
MWH Purchased 10,481 11,049 12,080 Commercial 3,508 3,170 3,221
MWH Sold 9,028 9,702 10,824 Industrial 27 24 23
Systems Loss (%) 13 12 10 Public Building 892 909 957
Peak Load (KW) 25,668 27,638 26,984 Others 296 185 188
Load Factor (%) 56 55 61 Total 75,533 78,303 81,117
Collection Efficiency (%) 92 93 96
Ave. Systems Rate (P/KWH) 8.27 7.38 7.10
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 47,866 54,212 60,314 69,259 77,983 77,747 78,416 81,012 83,017 91,506
Commercial 8,777 9,668 11,183 12,788 14,792 15,565 16,380 18,449 23,221 23,320
Industrial 4,095 4,150 4,151 4,645 5,218 5,384 5,154 3,648 4,626 8,966
Public Building 1,509 1,750 2,045 2,579 2,917 3,284 3,370 3,806 4,135 4,613
Others 1,206 1,529 1,506 881 1,072 1,098 1,298 1,423 1,424 1,481
Total 63,453 71,309 79,199 90,152 101,982 103,078 104,618 108,338 116,423 129,886
PAMPANGA I ELECTRIC COOPERATIVE, INC. (PELCO I)Sto. Domingo, Mexico, Pampanga
Tel. Nos. (045) 966-0604, 966-0269; Telefax No. (045) 966-0270; E-mail: [email protected]
20092007 2008
Legislative District
Served
A+
Extra Large
83,743 85,922
C O N N E C T I O N S
Potential
MUNICIPALITIES
Mr. Carlos D. De Jesus
Engr. Loliano E. Allas
A+
Extra Large
A+
Mr. Carlos D. De Jesus
Engr. Loliano E. Allas
Mr. Carlos D. De Jesus
Engr. Loliano E. Allas
Extra Large
81,179
Monthly Average
B A R A N G A Y S
CoverageEnergized
Unenerg.
64
65
HQ Location
Municipality
10 MVA Substation
15 MVA Substation
25 MVA Substation
Power Plant
3 PH Backbone Line
LEGEND :
H Q
Energized Coop SystemEnergized Other System
P P
N
Served by San FernandoElectric Light & Power Co.
ANGELES CITY
PORAC
CITY of SANFERNANDO
BACOLOR
`FLORIDABLANCA
Served byAngeles Electric Co.
MABALACAT
SASMUAN(SEXMOAN)
LUBAO
GUAGUA
SANTA RITA
H Q
P P
5 MVA Substation
I. DATE OF INCORPORATION AND REGISTRATION : April 23, 1979
II. DATE OF FIRST ENERGIZATION : November 15, 1979
III. ELECTRIC COOPERATIVE OFFICIALS :
President :Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 113.6 113.6 136.0 50.000
Subsidy 126.1 156.2 160.4
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %First District
1 Mabalacat 27 27 27 27 100 0 40,200 34,488 36,104 39,506 98
Magalang 1 1 1 1 100 0 2,600 2,424 2,476 2,536 98 Second District
2 Guagua 31 31 31 31 100 0 22,800 19,343 20,047 20,728 91
3 Lubao 44 44 44 44 100 0 29,600 22,063 23,361 24,449 83
4 Porac 29 26 26 29 100 0 19,000 14,754 15,997 17,686 93
5 Sasmuan (Sexmoan) 12 12 12 12 100 0 5,300 4,308 4,412 4,546 86
6 Santa Rita 10 10 10 10 100 0 8,800 8,202 8,442 8,767 99
Floridablanca 2,638 2,670 2,775Third District
7 Bacolor 21 21 21 21 100 0 3,800 1,634 1,842 2,015 53
Total 175 172 172 175 100 0 132,100 109,854 115,351 123,008 93
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 139,084 114,974 134,860 Residential 105,100 99,085 106,500
MWH Purchased 23,800 24,653 26,587 Commercial 3,771 3,924 4,182
MWH Sold 18,672 20,120 22,648 Industrial 98 100 119
Systems Loss (%) 21 18 14 Public Building 824 899 930
Peak Load (KW) 54,446 55,185 58,305 Others 61 11,343 11,277
Load Factor (%) 60 61 62 Total 109,854 115,351 123,008
Collection Efficiency (%) 80 80 84
Ave. Systems Rate (P/KWH) 7.45 5.71 5.95
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 104,321 114,115 125,210 141,339 154,733 142,392 164,013 163,026 172,550 193,440
Commercial 20,067 25,294 28,466 29,800 31,236 29,915 34,882 35,203 40,682 46,485
Industrial 7,193 8,235 7,782 10,715 10,963 11,153 13,243 13,323 15,489 18,623
Public Building 2,589 2,969 3,170 3,624 3,859 3,632 4,479 4,629 4,946 5,449
Others 4,205 4,223 4,608 5,571 5,842 5,420 6,557 7,877 7,771 7,776
Total 138,375 154,836 169,236 191,049 206,632 192,511 223,174 224,058 241,438 271,773
Served
C O N N E C T I O N S
Mabalacat
Potential
B A R A N G A Y S
CoverageEnergized
Unenerg.
Asia Pacific Energy, Corp. Coal
Monthly Average
Mega Large
135,914
Legislative District
MUNICIPALITIES
141,044
POWER PLANT
Location Project Name/Proponent
D
Mr. Antonio D. DecenaMr. Sulpicio C. Lagarde, Jr.
PAMPANGA II ELECTRIC COOPERATIVE, INC. (PELCO II)San Roque, Guagua, Pampanga
Tel. Nos. (045) 900-0611, 900-0689, 900-0474, 900-0408; Telefax No. (045) 900-2650; Fax Nos. (045) 901-0534, 900-0092
200920082007
Mr. Anterto P. FloresMr. Amador T. Guevarra
D
Mr. John David R. SunioMr. Amador T. Guevarra
Type
C
Mega LargeMega Large
164,045
66
N
67
LEGEND :
H Q HQ Location
Municipality
10 MVA Substation
15 MVA Substation
3 PH Backbone line
Energized Coop System
SAN SIMON SANTOTOMAS
MINALIN
MACABEBE
MASANTOL
APALIT
H Q
I. DATE OF INCORPORATION AND REGISTRATION : May 16, 1981
II. DATE OF FIRST ENERGIZATION : May 26, 1981
III. ELECTRIC COOPERATIVE OFFICIALS :
President :Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 51.9 51.9 51.9
Subsidy 17.2 30.6 30.6
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Fourth District
1 Apalit (12) 9 9 9 9 100 0 19,100 17,024 18,027 18,313 96
2 Macabebe 25 25 25 25 100 0 15,400 9,310 10,401 10,717 70
3 Masantol 26 26 26 26 100 0 10,900 5,551 6,071 6,259 57
4 Minalin 15 15 15 15 100 0 8,200 6,618 6,845 6,989 85
5 San Simon (14) 13 13 13 13 100 0 7,500 6,355 6,763 6,761 90
6 Santo Tomas 7 7 7 7 100 0 8,600 7,507 7,994 8,541 99
Total 95 95 95 95 100 0 69,700 52,365 56,101 57,580 83
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 50,831 61,324 Residential N 53,576 55,002
MWH Purchased N 12,023 11,772 Commercial 1,879 1,881
MWH Sold 8,397 9,609 Industrial D 35 35
Systems Loss (%) D 30 18 Public Building 483 504
Peak Load (KW) 27,620 27,356 Others A 128 158
Load Factor (%) A 60 59 Total - 56,101 57,580
Collection Efficiency (%) - 90
Ave. Systems Rate (P/KWH) 6.05 6.38
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 51,423 53,614 55,285 60,146 66,492 64,097 55,495 N 62,812 75,096
Commercial 9,993 11,165 14,010 15,320 16,365 15,806 14,271 17,066 18,370
Industrial 72,270 62,060 70,311 74,471 78,834 74,545 64,461 D 16,139 17,592
Public Building 1,989 2,352 2,655 2,924 3,130 3,446 3,190 3,138 2,762
Others 1,412 1,110 1,092 953 1,605 1,691 1,280 A 1,614 1,493
Total 137,087 130,301 143,353 153,814 166,425 159,585 138,697 100,769 115,313
NDA - No Data Available
Atty. Restituto C. Capulong Atty. Restituto C. Capulong Atty. Restituto C. CapulongMs. Magdalena P. Bondoc (OIC) Ms. Magdalena P. Bondoc (OIC) Ms. Magdalena P. Bondoc (OIC)
- - E
- - Extra Large
58,843 60,803 64,864
PAMPANGA III ELECTRIC COOPERATIVE, INC. (PELCO III)Quintos Bldg. Mc Arthur Highway San Vicente, Apalit, Pampanga
Tel. Nos. (045) 302-5114, 879-0563 to 64, 652-0224; Telefax No. (045) 302-5785
2007 2008 2009
Monthly Average
Legislative District
ServedPotential
MUNICIPALITIESB A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.
68
N D A - No Data Available
N
HQ Location
Municipality
5 MVA Substation
10 MVA Substation
NPC Substation
Power Plant
3 PH Backbone Line
Energized Coop System
LEGEND :
H Q
P P
69
ORANISAMAL
ABUCAYMORONG
BAGAC
PILAR
ORION
LIMAY
MARIVELES
MILITARYRESERVATION
CITY ofBALANGA
HERMOSA
DINALUPIHAN
H Q
P P
I. DATE OF INCORPORATION AND REGISTRATION : April 10, 1990
II. DATE OF FIRST ENERGIZATION : December 1, 1974
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 115.1 115.1 115.1
Subsidy 34.6 67.4 75.0
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District, Bataan
1 Abucay 9 9 9 9 100 0 8,200 7,517 7,790 8,136 99
2 Dinalupihan 46 46 46 46 100 0 20,500 18,687 19,487 20,425 99
3 Hermosa 23 23 23 23 100 0 10,700 9,415 9,829 10,324 96
4 Morong 5 5 5 5 100 0 5,100 4,152 4,393 4,650 91
5 Orani 29 29 29 29 100 0 12,700 11,987 12,284 12,651 99
6 Samal 14 14 14 14 100 0 6,900 6,433 6,639 6,833 99
Second District, Bataan
7 Bagac 14 14 14 14 100 0 5,200 4,489 4,649 4,824 93
8 City of Balanga 25 25 25 25 100 0 18,300 17,065 17,614 18,233 99
9 Limay 12 12 12 12 100 0 11,400 10,409 10,880 11,378 99
10 Mariveles 18 18 18 18 100 0 22,000 19,996 20,909 21,862 99
11 Orion 23 23 23 23 100 0 10,400 8,967 9,267 9,648 93
12 Pilar 19 19 19 19 100 0 7,700 7,067 7,316 7,596 99
Second District, Pampanga
Floridablanca 3 3 3 3 100 0 1,200
First District, Zambales
Subic 1 1 1 1 100 0 100
Total 241 241 241 241 100 0 140,400 126,184 131,057 136,560 97
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 150,785 127,960 143,920 Residential 117,017 121,605 126,652
MWH Purchased 21,197 22,115 23,760 Commercial 6,700 6,863 7,151
MWH Sold 18,824 19,714 21,432 Industrial 654 703 771
Systems Loss (%) 11 11 10 Public Building 1,444 1,508 1,571
Peak Load (KW) 48,008 49,294 52,800 Others 369 378 415
Load Factor (%) 60 61 62 Total 126,184 131,057 136,560
Collection Efficiency (%) 91 92 92
Ave. Systems Rate (P/KWH) 8.01 6.49 6.72
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 104,314 111,936 121,833 134,836 144,505 143,160 141,842 148,583 152,372 164,997
Commercial 16,729 17,498 17,880 19,111 20,018 20,173 20,170 21,981 23,241 25,123
Industrial 24,645 29,168 30,986 33,252 38,348 39,031 38,900 42,512 47,033 52,148
Public Building 6,225 6,813 7,642 8,354 8,677 9,425 9,611 9,411 10,560 11,130
Others 1,617 1,559 1,784 2,021 2,673 2,840 2,703 3,405 3,356 3,789
Total 153,530 166,974 180,125 197,574 214,222 214,629 213,226 225,892 236,562 257,187
Monthly Average
141,070
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.Served
141,523
Gas Turbine
Legislative District
A+
Mega Large
Potential
A+
Mega Large
137,478
MUNICIPALITIES/CITY
Limay
2007
Mr. Alberto A. Villaruz
Engr. Loreto C. Marcelino
PENINSULA ELECTRIC COOPERATIVE, INC. (PENELCO)Roman Super Highway, Tuyo, City of Balanga
Telefax Nos. (047) 791-5155, 791-5103; E-mail: [email protected]/[email protected]
20092008
Mr. Alberto A. Villaruz
Engr. Loreto C. Marcelino
Ms. Ma. Lilibeth R. Fuster
Engr. Loreto C. Marcelino
A+
Mega Large
620.000Limay CCPP/San Miguel
Energy Corp.
POWER PLANT
Location Project Name/Proponent Type
7070
N
ZAMECO IREGION III
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
NPC Substation
Power Plant
3 PH Backbone Line
Energized Coop System
P P
71
SANTA CRUZ
CANDELARIA
PALAUIG
MASINLOC
BOTOLAN
IBA
P P
H Q
I. DATE OF INCORPORATION AND REGISTRATION : June 30, 1972II. DATE OF FIRST ENERGIZATION : December 1974III. ELECTRIC COOPERATIVE OFFICIALS :
President :Gen. Manager :
IV. CATEGORY CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 359.7 408.4 437.9
Subsidy 44.2 59.2 60.2
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %Second District
1 Botolan 31 31 31 31 100 0 11,300 7,538 7,753 7,966 70 2 Candelaria 16 16 16 16 100 0 5,700 4,812 5,010 5,150 90 3 Iba 14 14 14 14 100 0 10,500 9,520 9,956 10,366 99 4 Masinloc 13 12 12 12 92 1 9,600 7,350 7,626 7,968 83 5 Palauig 19 18 18 18 95 1 7,300 5,777 5,971 6,215 85 6 Santa Cruz 25 25 25 25 100 0 12,000 10,034 10,329 10,717 89
Total 118 116 116 116 98 2 56,400 45,031 46,645 48,382 86
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 38,498 37,714 41,494 Residential 41,495 43,056 44,706 MWH Purchased 5,587 5,679 5,982 Commercial 2,915 2,941 3,006 MWH Sold 4,543 4,786 5,122 Industrial 107 107 103 Systems Loss (%) 18 16 14 Public Building 418 439 460 Peak Load (KW) 15,075 13,775 14,078 Others 96 102 107 Load Factor (%) 51 56 58 Total 45,031 46,645 48,382 Collection Efficiency (%) 93 91 92 Ave. Systems Rate (P/KWH) 8.47 7.88 8.10
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 23,822 26,102 28,298 33,625 36,050 35,974 32,532 34,201 35,571 37,232 Commercial 5,285 5,709 5,752 6,335 6,914 7,075 7,329 7,856 8,639 9,782 Industrial 4,530 4,837 5,990 7,108 7,768 7,586 7,586 9,403 10,224 10,782 Public Building 1,333 1,390 1,402 1,635 1,794 1,968 2,090 2,410 2,482 2,875 Others 342 341 347 460 397 380 525 643 521 790 Total 35,312 38,379 41,789 49,163 52,923 52,982 50,062 54,513 57,437 61,461
Mr. Isagani Q. Yap
ZAMBALES I ELECTRIC COOPERATIVE, INC. (ZAMECO I)San Vicente, Palauig, Zambales
Tel. No. (047) 603-0106; Fax No. (047) 0821-1029
20092008
Engr. Rene A. Divino
49,902
Mr. Richard E. ReglosEngr. Rene A. Divino
ALarge Large
B
Monthly Average
48,693
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.Served
Potential
47,427
Legislative District
2007
BLarge
MUNICIPALITIES
Mr. Isagani Q. YapEngr. Rene A. Divino
600.000MasinlocMasinloc CFTPP/ Masinloc
Power Partners Co., Ltd.Coal
POWER PLANT
Location Project Name/Proponent Type
72
LEGEND :
H Q HQ Location
Municipality
Below 5 MVA Substation
5 MVA Substation
10 MVA Substation
3 PH Backbone Line
Energized Coop SystemEnergized Other System
N
73
Served byPublic Utilities Dept.OLONGAPO CITY
OLONGAPO CITY
SUBIC
CABANGAN
SAN FELIPE
SAN NARCISO
SANANTONIO
SAN MARCELINO
CASTILLEJOS
H Q
I. DATE OF INCORPORATION AND REGISTRATION : October 14, 1984
II. DATE OF FIRST ENERGIZATION : 1984
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 0.6 10.6 10.6
Subsidy 35.9 51.2 63.9
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District1 Castillejos 14 14 14 14 100 0 10,400 9,338 9,763 10,321 99
2 San Marcelino 18 18 18 18 100 0 9,300 8,725 8,965 9,233 99
3 Subic (16) 15 15 15 15 100 0 16,900 15,268 16,022 16,840 99
Second District4 Cabangan 22 22 22 22 100 0 5,000 4,585 4,746 4,927 99
5 San Antonio 14 14 14 14 100 0 8,300 7,756 7,957 8,202 99
6 San Felipe 11 11 11 11 100 0 5,500 5,206 5,362 5,498 99
7 San Narciso 17 17 17 17 100 0 6,400 6,070 6,220 6,363 99
Total 111 111 111 111 100 0 61,800 56,948 59,035 61,384 99
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 50,236 47,135 50,301 Residential 51,055 52,909 55,221
MWH Purchased 7,606 8,022 8,538 Commercial 3,166 3,396 3,449
MWH Sold 6,522 6,949 7,429 Industrial 69 73 76
Systems Loss (%) 14 13 13 Public Building 456 462 469
Peak Load (KW) 16,880 17,623 24,937 Others 2,202 2,195 2,169
Load Factor (%) 62 62 47 Total 56,948 59,035 61,384
Collection Efficiency (%) 94 95 -
Ave. Systems Rate (P/KWH) 7.70 6.78 6.77
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 27,447 36,412 40,061 45,183 49,768 50,379 49,717 52,719 55,577 49,648
Commercial 4,528 6,982 7,145 7,735 8,801 9,297 9,657 10,567 11,902 10,785
Industrial 6,603 7,579 7,599 8,555 8,791 7,964 8,521 9,523 10,141 8,871
Public Building 2,541 3,277 3,542 3,824 4,232 4,603 5,216 4,837 5,179 4,505
Others 269 480 968 720 652 665 888 614 588 479
Total 41,388 54,730 59,315 66,017 72,243 72,909 73,999 78,260 83,387 74,288
Monthly Average
63,904
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.Legislative District
-
-
Served
66,41961,642
MUNICIPALITIES
Potential
A+
ZAMBALES II ELECTRIC COOPERATIVE, INC. (ZAMECO II)Magsaysay, Castillejos, Zambales
Tel. No. (047) 623-2401; Telefax No. (047) 623-2402
200920082007
Engr. Dominador A. Gallardo
-
Mr. Paulino T. Lopez (PS) Engr. Alvin M. Farrales (OIC)
-
Engr. Fidel S. Correa (OIC)
Extra Large -
Engr. Dominador A. Gallardo (IBP)
Engr. Alvin M. Farrales (OIC)
74
Energized Coop System
LEGEND :
Energized Other System
Headquarters
N
POLILLO IS.
Served byIbaan Electric & Engineering System
FLECOLumban, Laguna
QUEZELCO IIInfanta, Quezon
QUEZELCO IPitogo, Quezon
BATELEC ICalaca, Batangas
BATELEC IILipa City
Served byMERALCO (RIZAL) Served by
MERALCO(METRO MANILA)
Partly Served by MERALCO (LAGUNA)
Partly Served byMERALCO(QUEZON)
Served byBauan Electric Light System
MERALCO (BATANGAS)
Served byMERALCO (CAVITE)
Partly Served by
75
I. STATUS OF ENERGIZATION (Cumulative):
CONNECTIONS
2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %
A. Electric Cooperatives:
1 Laguna 11 11 11 11 100 164 164 164 164 100 64,400 49,711 51,378 53,018 82
2 Batangas I 12 12 12 12 100 366 366 366 366 100 134,500 122,764 127,400 133,847 99
3 Batangas II 17 17 17 17 100 482 482 482 482 100 227,200 209,363 216,815 224,002 99
4 Quezon I 23 23 23 23 100 805 805 805 805 100 175,100 121,205 125,080 129,697 74
5 Quezon II 8 8 8 8 100 129 126 126 128 99 40,700 23,047 23,857 25,180 62
Total 71 71 71 71 100 1,946 1,943 1,943 1,945 99 641,900 526,090 544,530 565,744 88
SOUTHERN TAGALOG REGION
Potential
REGION IV-A (CALABARZON)
ELECTRIC DISTRIBUTION UTILITIES
MUNICIPALITIES/CITIES BARANGAYS
ServedCoverage
EnergizedCoverage
Energized
76
Total 559,518 615,666 597,822 730,263 768,732 782,100 774,796 840,046 843,576 940,347
Others 28,319 31,124 27,495 35,544 37,667 39,123 39,985 43,467 43,663 46,072
Public Bldgs. 11,520 13,193 13,566 16,938 19,540 20,401 20,773 22,764 24,350 26,817
Industrial 103,117 112,989 110,607 139,021 138,565 154,916 169,399 196,113 180,835 226,985
Commercial 113,122 124,904 120,227 145,972 156,967 160,374 159,227 172,061 183,563 196,839
Residential 303,440 333,456 325,927 392,788 415,992 407,285 385,412 405,641 411,165 443,634
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):
N
77
SAN PEDRO
BIÑAN
SANTA ROSA
CABUYAO
CALAMBA
BAY CALAUAN
SAN PABLO CITY
RIZAL
NAGCARLAN
VICTORIAPILA
SANTACRUZ
LUISIANA
MAJAYJAY
LILIW
ALAMINOS
CAVINTIPAGSANJAN
LUMBAN
KALAYAAN
PAETE
PAKIL
PANGILSINILOANFAMY
MABITAC
SANTA MARIA
TALIM IS.
Served by MERALCO
MAGDALENA
LOSBAÑOS
P PH Q
Served byMERALCO
Part ofPAKIL Part of
PANGILMH
P PP P
MH
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
Power Plant
Mini Hydro
3PH Backbone Line
Energized Coop SystemEnergized Other System
P P
I. DATE OF INCORPORATION AND REGISTRATION : April 3, 1973II. DATE OF FIRST ENERGIZATION : September 1, 1973III. ELECTRIC COOPERATIVE OFFICIALS :
President :Gen. Manager :
IV. CATEGORY CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009 Cap.(MW)
Residual Loan 251.0 351.6 444.8Subsidy 34.7 48.7 48.7
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %Fourth District
1 Cavinti 19 19 19 19 100 0 5,200 4,136 4,271 4,428 85 2 Famy 20 20 20 20 100 0 2,800 1,848 1,911 2,009 72 3 Kalayaan 3 3 3 3 100 0 5,000 3,442 3,560 3,704 74 4 Lumban 16 16 16 16 100 0 7,000 5,499 5,686 5,893 84 5 Mabitac 15 15 15 15 100 0 4,000 2,836 2,954 2,987 75 6 Paete 9 9 9 9 100 0 6,400 5,264 5,414 5,562 87 7 Pagsanjan 16 16 16 16 100 0 9,000 8,423 8,643 8,864 98 8 Pakil 13 13 13 13 100 0 4,800 3,682 3,845 3,985 83 9 Pangil 8 8 8 8 100 0 5,600 3,980 4,100 4,193 75
10 Siniloan 20 20 20 20 100 0 8,000 6,491 6,703 6,887 86 11 Santa Maria 25 25 25 25 100 0 6,600 4,110 4,291 4,506 68
Total 164 164 164 164 100 0 64,400 49,711 51,378 53,018 82
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 41,060 34,300 40,237 Residential 47,384 48,739 50,277 MWH Purchased 6,199 6,244 6,417 Commercial 1,745 1,739 1,835 MWH Sold 4,756 4,747 5,335 Industrial 74 71 75 Systems Loss (%) 23 23 16 Public Building 324 603 622 Peak Load (KW) 14,798 14,192 14,829 Others 184 226 209 Load Factor (%) 57 60 59 Total 49,711 51,378 53,018 Collection Efficiency (%) 84 91 93 Ave. Systems Rate (P/KWH) 8.63 7.22 7.54
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 33,086 36,491 38,726 42,798 43,943 42,774 40,333 41,969 41,417 47,145 Commercial 5,158 5,366 5,643 7,048 8,204 8,012 7,580 7,724 7,938 8,954 Industrial 3,623 3,930 4,435 4,512 4,414 4,528 4,294 4,491 4,403 4,261 Public Building 486 558 662 916 1,507 1,669 1,781 2,001 2,139 2,546 Others 517 645 583 552 547 685 892 886 1,073 1,113 Total 42,870 46,990 50,049 55,826 58,615 57,668 54,880 57,071 56,970 64,019
0.150
Kalayaan
709.000
Botocan/Electric Power Dev't. Corp.
Hydro 23.000
San Juan River/Kalayaan Ice Plant
Mini Hydro
Monthly Average
B A R A N G A Y S
CoverageEnergized
Unenerg.Legislative District
MUNICIPALITIES
Extra Large
ServedC O N N E C T I O N S
Potential
POWER PLANT
23.500
Project Name/ProponentLocation
Kalayaan 1,2,3,4/Electric Power
Dev't. Corp.Hydro
Large
FIRST LAGUNA ELECTRIC COOPERATIVE, INC. (FLECO)Brgy. Lewin, Lumban, Laguna
Tel. Nos. (049) 808-4478, 813-0858; Telefax No. (049) 808-5008
20092007 2008
DLarge
Engr. Edgardo R. Piamonte (PS/AGM)Mr. Ricardo R Leron Mr. Felix Q. FloresMr. Ricardo R Leron
Engr. Edgardo R. Piamonte (PS/AGM)BD
Mr. Evamgelito S. Estaca (PS/AGM)
50,047 51,221 52,511
LumbanCaliraya/Electric Power
Dev't. Corp.Hydro
Type
78
N
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
Power Plant
3 PH Backbone Line
Energized Coop System
P P
79
TUY
SAN LUIS
LIAN
SANTATERESITA
TAAL
CALATAGAN
AGONCILLO
BALAYAN
CALACA
SANNICOLAS
NASUGBU
H Q
P P
LEMERY
Part ofSAN NICOLAS
I. DATE OF INCORPORATION AND REGISTRATION : June 14, 1972II. DATE OF FIRST ENERGIZATION : December 14, 1974III. ELECTRIC COOPERATIVE OFFICIALS :
President :Gen. Manager :
IV. CATEGORY CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009 Cap.(MW)
Residual Loan 83.1 84.0 100.0Subsidy 51.0 88.6 88.6
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %First District
1 Balayan 48 48 48 48 100 0 18,000 16,498 17,011 17,933 99 2 Calaca 40 40 40 40 100 0 14,800 13,420 13,900 14,748 99 3 Calatagan 25 25 25 25 100 0 10,800 10,082 10,415 10,741 99 4 Lemery 46 46 46 46 100 0 17,400 15,783 16,473 17,352 99 5 Lian 19 19 19 19 100 0 10,400 9,338 9,742 10,317 99 6 Nasugbu 42 42 42 42 100 0 23,000 20,925 21,746 22,950 99 7 Taal 42 42 42 42 100 0 10,600 9,816 10,122 10,528 99
8 Tuy 22 22 22 22 100 0 8,800 7,771 8,270 8,773 99
Second District
9 San Luis 26 26 26 26 100 0 6,600 6,111 6,315 6,556 99 Third District
10 Agoncillo 21 21 21 21 100 0 6,900 6,320 6,510 6,808 99 11 San Nicolas 18 18 18 18 100 0 3,800 3,537 3,661 3,770 99 12 Santa Teresita 17 17 17 17 100 0 3,400 3,163 3,235 3,371 99
Total 366 366 366 366 100 0 134,500 122,764 127,400 133,847 99
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 119,728 104,356 114,071 Residential 108,626 112,865 118,586MWH Purchased 18,398 19,524 20,594 Commercial 3,739 3,844 3,875 MWH Sold 15,993 16,841 17,873 Industrial 18 17 20 Systems Loss (%) 13 13 13 Public Building 1,235 1,245 1,322 Peak Load (KW) 42,089 44,024 49,710 Others 9,146 9,429 10,044 Load Factor (%) 60 61 57 Total 122,764 127,400 133,847Collection Efficiency (%) 97 97 96 Ave. Systems Rate (P/KWH) 7.49 6.20 6.38
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 75,625 82,952 86,135 97,836 102,971 101,541 99,733 104,528 105,047 111,855Commercial 30,856 35,615 36,844 40,058 48,172 49,220 51,194 54,400 61,900 66,476 Industrial 9,251 8,435 9,138 13,070 11,920 13,985 13,813 16,298 17,876 17,435 Public Building 2,843 3,288 3,437 3,999 4,278 4,388 4,950 5,240 5,424 6,125 Others 6,504 6,993 7,185 8,691 9,706 10,462 10,638 11,450 11,851 12,581 Total 125,079 137,283 142,739 163,654 177,047 179,596 180,328 191,916 202,098 214,472
Location
A+
Ms. Raquel Rowena A. RodriguezEngr. Ricardo C. Castillo, Jr. (OIC)
Mr. Rodolfo C. ReyesMr. Demetrio V. Ellao
A+Mega Large
133,491
Mr. Calixto A. BernalesMr. Demetrio V. Ellao
Type
Batangas (Calaca) CFTPP/DMCI Holdings,
Inc.Calaca Coal
A+Mega Large
138,783 141,317
Potential
POWER PLANTProject Name/Proponent
BATANGAS I ELECTRIC COOPERATIVE, INC. (BATELEC I)Calaca, Batangas 4212
Tel. Nos. (043) 424-0500, 424-0600, 223-5684, 223-5226; Fax Nos. (043) 424-0413; Cel.No. (0912) 308-3182
200920082007
Mega Large
600.000
Legislative District
Monthly Average
B A R A N G A Y S
CoverageEnergized
Unenerg.MUNICIPALITIES
ServedC O N N E C T I O N S
80
81
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
15 MVA Substation
NPC Substation
Generating Set
3 PH Backbone Line
Energized Coop SystemEnergized Other System
G S
20 MVA Substation
N
LAUREL
TINGLOY
STO TOMAS
SANPASCUAL
BATANGAS CITY
Served byBauan Electric Light System
Served by MERALCO
Served by MERALCO
IBAAN
Served by Ibaan Electric &Engineering System
ROSARIO
LIPA CITY
TAYSAN
TALISAY
CITY ofTANAUANY
MALVAR
MATAASNA KAHOY
SAN JOSE
ALITAGTAG PADRE GARCIA
SAN JUAN
LOBO
MABINI
BAUAN
CUENCA
BALETE
G S
H Q
Part ofTALISAY
Part ofBATANGAS CITY
I. DATE OF INCORPORATION AND REGISTRATION : August 12, 1977II. DATE OF FIRST ENERGIZATION : May 1978III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :IV. CATEGORY
CLASSIFICATIONV. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009 Cap.(MW)
Residual Loan 123.5 231.6 231.6 1.183Subsidy 73.0 134.9 134.9
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %Second District
1 Lobo 26 26 26 26 100 0 9,300 8,747 8,987 9,216 99 2 Mabini 34 34 34 34 100 0 9,500 9,069 9,247 9,431 99 3 Tingloy 15 15 15 15 100 0 2,900 1,922 2,017 2,108 73
Third District4 Alitagtag 19 19 19 19 100 0 4,700 4,145 4,229 4,319 92 5 Balete 13 13 13 13 100 0 3,800 3,454 3,599 3,749 99 6 Cuenca 21 21 21 21 100 0 7,200 6,757 6,937 7,098 99 7 Laurel 21 21 21 21 100 0 7,400 6,788 7,000 7,309 99 8 Malvar 15 15 15 15 100 0 8,000 7,211 7,588 7,890 99 9 MataasnaKahoy 16 16 16 16 100 0 5,700 5,400 5,545 5,657 99
10 Talisay 21 21 21 21 100 0 7,500 5,506 5,737 5,992 80
11 City of Tanauan 48 48 48 48 100 0 30,700 27,783 29,208 30,354 99
Fourth District
12 Lipa City 72 72 72 72 100 0 55,100 50,561 52,852 55,089 99 13 Padre Garcia 18 18 18 18 100 0 8,300 7,726 7,997 8,244 99 14 Rosario 48 48 48 48 100 0 23,000 21,710 22,295 22,915 99 15 San Jose 33 33 33 33 100 0 12,100 10,952 11,326 11,715 97 16 San Juan 42 42 42 42 100 0 23,600 22,684 23,091 23,566 99 17 Taysan 20 20 20 20 100 0 8,400 8,027 8,214 8,387 99
Batangas City 921 946 963Total 482 482 482 482 100 0 227,200 209,363 216,815 224,002 99
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 334,657 274,342 313,032 Residential 199,577 206,677 213,466 MWH Purchased 46,929 46,370 51,064 Commercial 6,949 7,138 7,385 MWH Sold 40,675 39,710 45,370 Industrial 45 46 46 Systems Loss (%) 13 14 11 Public Building 1,523 1,602 1,656 Peak Load (KW) 100,590 111,870 122,004 Others 1,269 1,352 1,449 Load Factor (%) 64 57 57 Total 209,363 216,815 224,002 Collection Efficiency (%) 96 96 96 Ave. Systems Rate (P/KWH) 8.23 6.91 6.90
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 134,686 148,549 131,910 175,264 189,125 186,987 178,511 188,554 191,106 204,810 Commercial 67,139 73,128 66,491 86,416 87,699 90,753 88,496 96,664 99,407 105,791 Industrial 77,589 88,951 85,267 108,860 109,168 123,066 139,106 163,858 146,787 192,288 Public Building 4,594 5,326 4,991 7,108 7,973 8,391 8,404 9,259 9,923 10,678 Others 18,110 19,977 17,790 24,477 25,835 26,532 27,094 29,764 29,300 30,877 Total 302,118 335,931 306,449 402,125 419,800 435,730 441,611 488,099 476,523 544,444
A+Mega Large
197,416
Monthly Average
B A R A N G A Y S
CoverageEnergized
Unenerg.
LocationTingloy
Legislative District
MUNICIPALITIES/CITIESServed
A+Mega Large
204,370 211,032
C O N N E C T I O N S
Potential
POWER PLANT
Mr. Ruperto H. Manalo
Ms. Marilyn M. Caguimbal
BATANGAS II ELECTRIC COOPERATIVE, INC. (BATELEC II)Antipolo del Norte, Lipa City 4217
Telefax Nos. (043) 756-1021, 756-1424, 756-6337, 981-1865, 757-0951; E-mail: [email protected]
20092007 2008
Ms. Marilyn M. CaguimbalMr. Evangelito S. Estaca (PS)
NPC-SPUG Diesel
Mr. Michael Angelo C. Rivera
A+Mega Large
Mr. Michael Angelo C. Rivera
Ms. Marilyn M. Caguimbal
Project Name/Proponent Type
82
QUEZELCO I
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
3 PH Backbone Line
Energized Coop System
Energized Other System
Served by MERALCO
83
N
MAUBAN
SAMPALOC
TAYABAS
SANANTONIO
PAGBILAO
TIAONG
DOLORES
CALAUAG
CATANAUAN
SANFRANCISCO (AURORA)
SANANDRES
PITOGO
TAGKAWAYAN
DEL GALLEGO,CAMARINES SUR
QUEZON
PEREZ
ATIMONAN
PADRE BURGOS
GENERALLUNAMACALELON
MULANAY
ALABAT
ALABAT IS.
SUBMARINE CABLE ( 1.2 kms )
SANNARCISO
LOPEZ
GUMACA
PLARIDEL
LUCENACITYSARIAYA
AGDANGAN
LUCBAN
H Q
UNISAN
BUENAVISTA
STA. ELENA,CAMARINESNORTE
I. DATE OF INCORPORATION AND REGISTRATION : April 24, 1972II. DATE OF FIRST ENERGIZATION : March 1976III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009
Residual Loan 168.9 318.9 413.9Subsidy 107.2 183.0 187.4
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %Third District
1 Agdangan 12 12 12 12 100 0 2,600 2,373 2,431 2,508 96 2 Buenavista 37 37 37 37 100 0 5,200 2,082 2,169 2,236 43 3 Catanauan 46 46 46 46 100 0 13,200 7,892 8,221 8,575 65 4 General Luna 27 27 27 27 100 0 4,800 3,333 3,419 3,560 74 5 Macalelon 30 30 30 30 100 0 5,200 3,975 4,117 4,315 83 6 Mulanay 28 28 28 28 100 0 10,500 5,256 5,378 5,532 53 7 Padre Burgos 22 22 22 22 100 0 4,300 3,457 3,565 3,722 87 8 Pitogo 39 39 39 39 100 0 4,800 4,278 4,409 4,578 95 9 San Andres 7 7 7 7 100 0 6,200 1,701 1,728 1,851 30
10 San Francisco (Aurora) 16 16 16 16 100 0 11,000 3,809 3,904 4,231 38 11 San Narciso 24 24 24 24 100 0 8,800 4,027 4,194 4,385 50 12 Unisan 36 36 36 36 100 0 4,800 4,403 4,468 4,554 95
Fourth District13 Alabat 19 19 19 19 100 0 3,400 3,113 3,233 3,278 96 14 Atimonan 42 42 42 42 100 0 13,000 11,107 11,369 11,558 89 15 Calauag 81 81 81 81 100 0 15,100 12,752 13,388 13,928 92 16 Guinayangan 54 54 54 54 100 0 8,500 5,974 6,193 6,447 76 17 Gumaca 59 59 59 59 100 0 13,900 12,499 12,791 13,135 94 18 Lopez 95 95 95 95 100 0 18,000 12,362 12,643 13,115 73 19 Perez 14 14 14 14 100 0 2,300 1,742 1,827 1,888 82 20 Plaridel 9 9 9 9 100 0 2,100 1,860 1,898 1,945 93 21 Quezon 24 24 24 24 100 0 3,300 2,634 2,742 2,843 86
22 Tagkawayan 45 45 45 45 100 0 10,100 7,662 7,986 8,401 83
First District, Camarines Sur23 Del Gallego (32) 30 30 30 30 100 0 4,000 2,914 3,007 3,112 78
Lone District, Camarines NorteSta. Elena 9 9 9 9 100 0Total 805 805 805 805 100 0 175,100 121,205 125,080 129,697 74
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 59,929 54,536 59,689 Residential 115,230 118,940 123,298 MWH Purchased 8,908 9,321 9,899 Commercial 3,055 3,091 3,244 MWH Sold 7,160 7,471 8,146 Industrial 61 60 60 Systems Loss (%) 19 20 17 Public Building 2,224 2,337 2,444 Peak Load (KW) 24,127 23,864 25,616 Others 635 652 651 Load Factor (%) 51 54 53 Total 121,205 125,080 129,697 Collection Efficiency (%) 95 95 95 Ave. Systems Rate (P/KWH) 8.37 7.30 7.33
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 51,511 55,463 58,670 65,020 68,120 64,935 55,759 58,691 60,884 66,336 Commercial 7,870 8,485 8,977 9,945 10,446 10,196 9,342 10,287 11,048 11,987 Industrial 12,004 11,175 11,285 12,369 12,980 13,249 11,426 10,527 10,826 12,110 Public Building 3,486 3,868 4,335 4,594 5,248 5,347 4,990 5,496 6,038 6,511 Others 2,961 3,252 1,667 1,405 1,176 1,086 907 917 855 813 Total 77,832 82,243 84,934 93,333 97,970 94,813 82,424 85,918 89,651 97,757
B
125,401
BBExtra Large
Monthly Average
CoverageEnergized
Mega Large116,148
Mega Large120,161
Legislative District
C O N N E C T I O N SB A R A N G A Y SServed
MUNICIPALITIESPotentialUnenerg.
QUEZON I ELECTRIC COOPERATIVE, INC. (QUEZELCO I)Brgy. Poctol, Pitogo, Quezon 4308
Tel. Nos. (042) 318-8156; Fax No. (042) 421-1122
200920082007
Engr. Carlito M. Rufo, Jr. Engr. Carlito M. Rufo, Jr.
Dr. Agripino P. Tullas
Engr. Carlito M. Rufo, Jr.
Dr. Agripino P. Tullas Dr. Agripino P. Tullas
84
N
LEGEND :
Energized Coop System
H Q HQ Location
Municipality
5 MVA Substation
Generating Set
3 PH Backbone Line
G S
85
JOMALIG
PATNANUNGAN
PANUKULAN
INFANTAGENERAL NAKAR
REAL
BURDEOS
POLILLO
G S
G S
G SH Q
I. DATE OF INCORPORATION AND REGISTRATION : August 11, 1978
II. DATE OF FIRST ENERGIZATION : January 1983
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 32.6 53.4 53.4 3.180
Subsidy 40.0 47.2 47.2 0.326
0.317
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Burdeos 14 14 14 14 100 0 4,500 940 1,026 1,159 26
2 General Nakar 19 17 17 19 100 0 5,400 1,852 1,965 2,084 39
3 Infanta 36 36 36 36 100 0 12,000 10,478 10,814 11,225 94
4 Jomalig* 5 5 5 5 100 0 1,300 290 298 354 27
5 Panukulan 12 12 12 12 100 0 2,500 883 907 999 40
6 Patnanungan* 6 6 6 6 100 0 2,500 657 685 715 29
7 Polillo 20 20 20 20 100 0 5,500 3,430 3,494 3,560 65
8 Real 17 16 16 16 94 1 7,000 4,517 4,668 5,084 73
Total 129 126 126 128 99 1 40,700 23,047 23,857 25,180 62
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 12,029 11,093 13,065 Residential 21,344 21,068 21,802
MWH Purchased 1,678 1,799 1,907 Commercial 1,130 1,144 1,184
MWH Sold 1,420 1,528 1,638 Industrial 79 31 167
Systems Loss (%) 15 15 14 Public Building 304 350 371
Peak Load (KW) 3,588 3,584 3,801 Others 190 1,264 1,656
Load Factor (%) 64 69 69 Total 23,047 23,857 25,180
Collection Efficiency (%) 96 92 99
Ave. Systems Rate (P/KWH) 8.47 7.26 7.98
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 8,532 10,001 10,486 11,870 11,832 11,048 11,076 11,899 12,711 13,488
Commercial 2,099 2,310 2,272 2,505 2,447 2,192 2,615 2,986 3,270 3,631
Industrial 650 498 482 210 83 88 760 939 943 891
Public Building 111 153 141 321 535 608 648 768 826 957
Others 227 257 270 419 403 357 454 450 584 688
Total 11,619 13,219 13,651 15,325 15,299 14,293 15,553 17,042 18,334 19,655
* With Provisional Franchise, NEC Res. No. 4 s. 1976
B
Large
20,909
Monthly Average
B A R A N G A Y S
CoverageEnergized
Unenerg.
Location
Polillo
Legislative District
MUNICIPALITIESServed
C
Large
21,551 22,733
C O N N E C T I O N S
Potential
POWER PLANT
Mr. Antonio L. Astejada
Engr. Victor R. Cada
QUEZON II ELECTRIC COOPERATIVE, INC. (QUEZELCO II)Brgy. Gumian, Infanta, Quezon
Tel. Nos. (042) 535-2265, 535-2105, 535-3406, 535-4302; Telefax No. (042) 535-3151; (042) 536-3406
20092007 2008
NPC-SPUG Diesel
Mr. Adelo S. Leynes
Engr. Victor R. Cada
A
Large
Mr. Adelo S. Leynes
Engr. Victor R. Cada
Project Name/Proponent Type
Patnanungan NPC-SPUG Diesel
Jomalig NPC-SPUG Diesel
86
Energized Coop System
LEGEND :
Energized Other SystemHeadquarters
N
BISELCOCoron, Palawan
PALECOPuerto Princesa City
87
LUBELCOTilik, Lubang, Occ. Mindoro
ORMECOCity of Calapan
OMECOSan Jose, Occ. Mindoro
ROMELCORomblon, Romblon
TIELCOOdiongan, Romblon
MARELCOBoac, Marinduque
Served byBanton MunicipalElectric System
Served byCorcuera MunicipalElectric System
Served byConcepcion MunicipalElectric System
I. STATUS OF ENERGIZATION (Cumulative):
CONNECTIONS
2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %
A. Electric Cooperatives :
1 Lubang 2 2 2 2 100 25 25 25 25 100 7,600 5,931 6,171 6,364 84
2 Mindoro Occ. 9 9 9 9 100 137 136 136 137 100 81,300 50,151 53,085 55,911 69
3 Mindoro Or. 15 15 15 15 100 426 422 425 426 100 163,300 108,291 115,145 123,043 75
4 Marinduque 6 6 6 6 100 218 218 218 218 100 48,900 38,825 40,203 41,600 85
5 Tablas 10 10 10 10 100 112 112 112 112 100 34,200 22,173 23,283 24,583 72
6 Romblon 4 4 4 4 100 66 66 66 66 100 19,900 10,438 11,039 11,709 59
7 Busuanga 4 4 4 4 100 61 58 58 61 100 17,900 6,269 6,962 7,473 42
8 Palawan 19 19 19 19 100 370 328 328 360 97 173,400 80,800 85,239 89,345 52
Total 69 69 69 69 100 1,415 1,365 1,368 1,405 99 546,500 322,878 341,127 360,028 66
EnergizedPotential
Served
REGION IV-B (MIMAROPA)SOUTHERN TAGALOG REGION
ELECTRIC DISTRIBUTION
UTILITIES
MUNICIPALITIES/CITIES BARANGAYS
CoverageEnergized
Coverage
88
Total 206,532 225,052 239,206 260,012 282,735 302,048 290,970 309,463 325,326 354,578
Others 3,943 4,064 4,737 5,353 6,453 7,228 6,654 6,920 7,200 7,908
Public Bldgs. 17,477 19,013 20,721 23,764 25,028 26,071 26,821 29,486 32,195 35,840
Industrial 15,547 17,828 18,872 19,166 23,590 26,830 27,577 28,575 29,552 34,688
Commercial 48,575 50,205 54,078 57,957 64,208 69,724 70,305 76,802 82,040 86,503
Residential 120,990 133,942 140,798 153,772 163,457 172,194 159,613 167,680 174,339 189,639
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):
N
LUBELCO
LEGEND :
H Q HQ Location
Municipality
Below 5 MVA Substation
Generating Set
3 PH Backbone Line
Energized Coop System
G S
LOOC
LUBANG
TABAOTAMBO
AMBIL IS.
CABRA IS.
GOLO IS.
TALAOTAO
G S
H Q
89
I. DATE OF INCORPORATION AND REGISTRATION : February 20, 1975
II. DATE OF FIRST ENERGIZATION : December 2, 1978
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 0.8 0.8 5.8 1.704
Subsidy 11.8 13.9 13.9
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Lone District, Occidental Mindoro
1 Looc 9 9 9 9 100 0 2,100 1,264 1,302 1,340 64
2 Lubang 16 16 16 16 100 0 5,500 4,667 4,869 5,024 91
Total 25 25 25 25 100 0 7,600 5,931 6,171 6,364 84
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 969 1,409 1,644 Residential 5,658 5,881 6,056
MWH Purchased 127 196 228 Commercial 116 120 131
MWH Sold 103 162 192 Industrial 28 28 27
Systems Loss (%) 19 17 15 Public Building 95 103 110
Peak Load (KW) 713 565 643 Others 34 39 40
Load Factor (%) 24 47 49 Total 5,931 6,171 6,364
Collection Efficiency (%) 92 100 97
Ave. Systems Rate (P/KWH) 9.44 8.73 8.56
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 916 1,102 1,190 1,207 1,110 1,224 1,088 924 1,394 1,617
Commercial 153 184 185 191 155 198 228 166 324 402
Industrial 12 12 32 30 41 45 40 23 42 60
Public Building 79 92 88 82 82 121 75 65 106 141
Others 22 24 34 43 43 53 46 54 72 84
Total 1,182 1,414 1,529 1,553 1,430 1,641 1,477 1,232 1,938 2,304
Legislative District
Lubang (Cabra Is.)
Potential
MUNICIPALITIESB A R A N G A Y S C O N N E C T I O N S
Served
POWER PLANT
Small
6,376 6,591 6,756
Monthly Average
CoverageEnergized
Unenerg.
Ms. Prescila T. Balibay (OIC)
AD D
SmallSmall
NPC-SPUG
Project Name/Proponent
Diesel
Location Type
- - Mr. Romeo C. Puli
Engr. Alex C. Labrador (Deputized GM) Engr. Alex C. Labrador (Deputized GM)
LUBANG ELECTRIC COOPERATIVE, INC. (LUBELCO)Tilik, Lubang, Occidental Mindoro
Cel. Nos. (0918) 306-8970, 302-3446, 306-8970; (0919) 254-6984
2007 2008 2009
90
N
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
Generator Substation
3 PH Backbone Line
Energized Coop System
G S
PALUAN
SAN JOSE
ILIN ISLAND
GARZA IS.
DONGON IS.
PANDANISLAND
AMBULONG IS.
ABRA DE ILOG
MAMBURAO
SANTA CRUZ
SABLAYAN
CALINTAAN
MAGSAYSAY
RIZAL
G S
G S
H Q
GS
91
I. DATE OF INCORPORATION AND REGISTRATION: March 25, 1974
II. DATE OF FIRST ENERGIZATION: May 1974
III. ELECTRIC COOPERATIVE OFFICIALS:
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 48.6 48.6 246.6 0.800
Subsidy 52.0 79.4 85.0 14.000
5.750
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Lone District
1 Abra de Ilog 9 9 9 9 100 0 5,200 2,471 2,635 2,778 53
2 Calintaan 7 7 7 7 100 0 5,500 2,655 2,802 2,915 53
3 Magsaysay 12 12 12 12 100 0 6,700 2,997 3,172 3,386 51
4 Mamburao 15 15 15 15 100 0 7,300 5,897 6,238 6,498 89
5 Paluan* 12 11 11 12 100 0 2,800 770 770 770 28
6 Rizal 11 11 11 11 100 0 6,900 3,347 3,671 3,899 57
7 Sablayan 22 22 22 22 100 0 14,600 8,690 9,460 10,179 70
8 San Jose 38 38 38 38 100 0 26,000 20,368 21,118 22,018 85
9 Santa Cruz 11 11 11 11 100 0 6,300 2,956 3,219 3,468 55
Total 137 136 136 137 100 0 81,300 50,151 53,085 55,911 69
*Operated by the Municipality
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 32,002 34,214 38,045 Residential 46,273 48,932 51,623
MWH Purchased 4,343 4,585 5,022 Commercial 2,777 2,971 3,008
MWH Sold 3,563 3,812 4,185 Industrial 62 65 69
Systems Loss (%) 17 16 16 Public Building 940 1,006 1,074
Peak Load (KW) 15,386 11,628 13,307 Others 99 111 137
Load Factor (%) 39 54 52 Total 50,151 53,085 55,911
Collection Efficiency (%) 100 100 101
Ave. Systems Rate (P/KWH) 8.98 8.97 9.09
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 16,500 17,871 18,301 18,904 21,084 22,198 22,220 22,969 24,684 26,765
Commercial 5,170 5,462 5,462 5,577 6,246 6,660 7,110 7,915 8,733 9,669
Industrial 4,584 5,443 5,513 4,992 6,315 6,925 7,680 8,839 8,921 10,010
Public Building 1,356 1,469 1,616 1,676 1,866 2,167 2,444 2,745 3,105 3,446
Others 249 230 297 258 425 354 261 286 306 332
Total 27,859 30,475 31,189 31,407 35,936 38,303 39,715 42,754 45,749 50,222
Legislative District
Monthly Average
CoverageEnergized
B A R A N G A Y S
NPC-SPUG
MUNICIPALITIES
Project Name/Proponent
ServedUnenerg. Potential
C O N N E C T I O N S
DieselMamburao NPC-SPUG
San Jose
Diesel
Large
OCCIDENTAL MINDORO ELECTRIC COOPERATIVE, INC. (OMECO)M.H. Del Pilar St. cor. Quirino St., San Jose, Occidental Mindoro
Tel. Nos. (043) 491-1021, 491-1981; Telefax No. (043) 491-1364
2007 2008 2009
POWER PLANT
Location
DieselPB 106/Genset
Type
Extra Large
C
45,286
Extra Large
50,55047,382
Paluan LGU
C C
Mr. Leonardo S. Dela Fuente Mr. Jerry R. Villanada
Engr. Alex C. Labrador
Mr. Samuel A. Villar
Engr. Alex C. Labrador Engr. Alfred A. Dantis (OIC)
92
LEGEND :
HQ Location
Municipality
Below 5 MVA Substation
5 MVA Substation
NPC Substation
Power Plant
Generator Substation
Mini Hydro
3 PH Backbone Line
H Q
Energized Coop System
MH
G S
P P
93
N PUERTOGALERA
VICTORIA
SOCORRO
BONGABONG
ROXAS
MANSALAY
BULALACAO(San Pedro)
BACO
POLA
PINAMALAYAN
BANSUD
GLORIA
NAUJAN
CITY ofCALAPAN
SANTEODORO G S
MH
P P
P P
H Q
I. DATE OF INCORPORATION AND REGISTRATION : ORMECO I - Feb. 16, 1973 ; ORMECO II - Aug. 15, 1977 ; Merged - May 20, 1988
II. DATE OF FIRST ENERGIZATION : June 1, 1974
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 62.1 88.4 134.5 26.000
Subsidy 78.6 140.7 142.8 22.500
7.500
1.600
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Baco 27 27 27 27 100 0 6,500 4,421 4,609 4,930 76
2 City of Calapan 62 62 62 62 100 0 31,500 28,039 29,596 31,403 99
3 Naujan 70 68 69 70 100 0 19,100 13,527 14,595 15,377 81
4 Pola 23 23 23 23 100 0 7,200 3,667 3,833 4,014 56
5 Puerto Galera 13 13 13 13 100 0 6,400 5,556 5,944 6,385 99
6 San Teodoro 8 8 8 8 100 0 3,100 2,136 2,229 2,424 78
7 Socorro 26 26 26 26 100 0 8,400 4,957 5,217 5,447 65
8 Victoria 32 32 32 32 100 0 9,700 7,714 8,124 8,513 88
Second District
9 Bansud 13 13 13 13 100 0 7,900 4,113 4,427 4,787 61
10 Bongabong 36 35 36 36 100 0 13,500 6,957 7,461 8,235 61
11 Bulalacao (San Pedro) 15 14 15 15 100 0 6,300 1,214 1,501 1,774 28
12 Gloria 27 27 27 27 100 0 8,800 4,862 5,172 5,609 64
13 Mansalay 17 17 17 17 100 0 8,900 2,884 3,100 3,438 39
14 Pinamalayan 37 37 37 37 100 0 16,600 12,307 12,897 13,729 83
15 Roxas 20 20 20 20 100 0 9,400 5,937 6,440 6,978 74
Total 426 422 425 426 100 0 163,300 108,291 115,145 123,043 75
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 84,065 91,391 92,381 Residential 96,514 103,976 111,254
MWH Purchased 10,437 10,692 11,548 Commercial 8,040 8,295 8,669
MWH Sold 9,072 9,402 10,194 Industrial 74 84 109
Systems Loss (%) 12 11 11 Public Building 2,308 2,519 2,692
Peak Load (KW) 25,050 24,530 28,320 Others 1,355 271 319
Load Factor (%) 57 60 56 Total 108,291 115,145 123,043
Collection Efficiency (%) 99 101 100
Ave. Systems Rate (P/KWH) 9.27 9.72 9.06
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 42,301 48,109 52,080 57,075 59,976 65,065 56,474 61,435 62,840 68,694
Commercial 14,785 16,538 18,954 21,744 23,405 26,169 25,389 29,093 30,681 29,847
Industrial 3,042 4,108 4,076 4,268 6,083 7,242 7,277 8,184 8,393 11,325
Public Building 4,254 5,090 5,706 6,555 7,164 8,032 8,008 9,042 9,764 11,155
Others 754 888 1,024 1,101 1,211 1,250 1,108 1,110 1,145 1,303
Total 65,136 74,733 81,840 90,743 97,838 107,758 98,256 108,864 112,823 122,324
Project Name/Proponent Type
Diesel
Puerto Galera Minolo Power Barge
Calapan NPC-SPUG Diesel/Modular GenSet
CoverageEnergized
B A R A N G A Y S
Pinamalayan Mirant
95,161 100,782 107,643
POWER PLANT
Location
C O N N E C T I O N S
Dulangan/ORMECO
Monthly Average
Mega Large
Unenerg. Potential
MUNICIPALITIES/CITY
Baco
Served
Legislative District
Mega Large Mega Large
ORIENTAL MINDORO ELECTRIC COOPERATIVE, INC. (ORMECO)Simaron, Sta. Isabel, City of Calapan, Oriental Mindoro
Tel. No. (043) 288-2349; Telefax Nos. (043) 286-9424, 286-9375; E-mail: ormeco-coop@com
2007 2008 2009
Mr. Platanos T. Suarez Mr. Platanos T. Suarez Mr. Platanos T. Suarez
Mini Hydro
Mr. Romeo N. Cuasay Mr. Romeo N. Cuasay Mr. Romeo N. Cuasay
A+A+ A+
94
N
MARELCO
LEGEND :
HQ Location
Municipality
Below 5 MVA Substation
NPC Substation
Generating Set
3 PH Backbone Line
H QEnergized Coop System
G S
95
MOGPOG
SANTA CRUZ
TORRIJOSGASAN
BUENAVISTA
BOAC
GASPAR IS.
MELCHOR IS.
BALTAZAR IS.
ELEPHANT IS.
SALAMAGUEIS.
MANIWAYA IS.
MOMPONG IS.
POLO IS.SANAHO IS.
HATANGKO IS.
G S
G S
G S
G S
G S
H Q
G S
I. DATE OF INCORPORATION AND REGISTRATION : March 27, 1973
II. DATE OF FIRST ENERGIZATION : December 9, 1973
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 37.6 55.4 59.2 5.650
Subsidy 65.7 93.1 95.7 7.200
0.500
0.45
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Lone District
1 Boac 61 61 61 61 100 0 11,000 9,863 10,148 10,478 95
2 Buenavista 15 15 15 15 100 0 4,300 2,709 2,889 3,032 71
3 Gasan 25 25 25 25 100 0 6,700 5,464 5,607 5,747 86
4 Mogpog 37 37 37 37 100 0 7,200 6,261 6,480 6,683 93
5 Santa Cruz 55 55 55 55 100 0 13,500 10,044 10,427 10,852 80
6 Torrijos 25 25 25 25 100 0 6,200 4,484 4,652 4,808 78
Total 218 218 218 218 100 0 48,900 38,825 40,203 41,600 85
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 17,478 17,845 18,926 Residential 35,383 36,713 38,078
MWH Purchased 2,401 2,415 2,597 Commercial 2,184 2,184 2,172
MWH Sold 1,975 1,950 2,103 Industrial 160 167 173
Systems Loss (%) 17 18 18 Public Building 888 925 950
Peak Load (KW) 6,970 7,334 7,660 Others 210 214 227
Load Factor (%) 47 45 46 Total 38,825 40,203 41,600
Collection Efficiency (%) 98 97 97
Ave. Systems Rate (P/KWH) 8.85 9.15 9.00
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 13,097 14,485 15,188 16,140 16,691 16,996 15,055 15,926 15,244 15,953
Commercial 3,192 3,265 3,293 3,391 3,341 3,287 3,087 3,413 3,305 3,381
Industrial 344 482 387 448 679 857 952 988 1,220 2,144
Public Building 1,756 1,825 2,027 2,311 2,293 2,348 2,340 2,451 2,632 2,775
Others 421 492 606 728 947 973 856 919 997 979
Total 18,810 20,549 21,501 23,018 23,951 24,460 22,290 23,697 23,398 25,232
CoverageEnergized
Type
Diesel/Genset
Power Barge
Torrijos NPC-SPUG
Sta. Cruz NPC-SPUG Diesel
Legislative District
Monthly Average
40,695 41,725
Unenerg. Potential
Boac NPC-SPUG
Mogpog
42,878
MUNICIPALITIES
POWER PLANT
Location Project Name/Proponent
Served
NPC-SPUG
Diesel
B A R A N G A Y S C O N N E C T I O N S
Mr. Joel R. Palatino
Mr. Eduardo Q. Bueno Mr. Eduardo Q. Bueno Mr. Eduardo Q. Bueno
Mr. Augusto Leo M. Livelo Mr. Augusto Leo M. Livelo
B B B
Large LargeLarge
MARINDUQUE ELECTRIC COOPERATIVE, INC. (MARELCO)Brgy. Ihatub, Boac, Marinduque
Tel. Nos. (042) 332-1043 to 44; Fax No. (042) 332-1837; E-mail: [email protected]/marelco.pldtdsl.net
2007 2008 2009
96
N
TIELCO
LEGEND :
H Q HQ Location
Municipality
Generating Set
3 PH Backbone Line
Energized Coop System
G S
97
SIBUYAN ISLAND
ALCANTARA
SANTA FE
SANJOSE
FERROL
ODIONGAN
LOOC
SANTA MARIA(IMELDA)
SANANDRES
SANAGUSTIN
CALATRAVA
H Q
G S
G S
G S
Part of LOOC
I. DATE OF INCORPORATION AND REGISTRATION : February 6, 1978
II. DATE OF FIRST ENERGIZATION : September 3, 1983
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 14.6 17.6 17.6 6.870
Subsidy 19.4 28.8 34.3 0.576
1.740
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Lone District, Romblon
1 Alcantara 12 12 12 12 100 0 3,100 2,015 2,098 2,181 70
2 Calatrava 7 7 7 7 100 0 1,900 1,159 1,265 1,357 71
3 Ferrol 6 6 6 6 100 0 1,300 820 859 889 68
4 Looc 12 12 12 12 100 0 4,500 3,090 3,241 3,385 75
5 Odiongan 25 25 25 25 100 0 9,100 7,681 8,020 8,395 92
6 San Agustin 15 15 15 15 100 0 4,800 2,495 2,599 2,732 57
7 San Andres 13 13 13 13 100 0 3,000 1,869 1,952 2,031 68
8 San Jose 5 5 5 5 100 0 1,800 631 712 832 46
9 Santa Fe 11 11 11 11 100 0 3,100 1,635 1,704 1,876 61
10 Santa Maria (Imelda) 6 6 6 6 100 0 1,600 778 833 905 57
Total 112 112 112 112 100 0 34,200 22,173 23,283 24,583 72
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 9,450 9,466 10,774 Residential 20,588 21,681 22,889
MWH Purchased 1,352 1,390 1,536 Commercial 833 841 879
MWH Sold 1,215 1,250 1,382 Industrial 89 92 94
Systems Loss (%) 10 10 10 Public Building 556 563 582
Peak Load (KW) 4,284 3,923 4,100 Others 107 106 139
Load Factor (%) 43 49 51 Total 22,173 23,283 24,583
Collection Efficiency (%) 99 95 99
Ave. Systems Rate (P/KWH) 7.77 7.57 7.80
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 7,416 7,920 8,100 9,550 10,181 10,551 10,033 10,421 10,454 11,454
Commercial 1,325 1,464 1,496 1,608 1,722 1,911 2,114 2,206 2,327 2,617
Industrial 288 311 314 309 301 249 231 226 227 230
Public Building 807 856 868 1,170 1,323 1,369 1,382 1,513 1,754 1,968
Others 231 265 284 320 275 309 267 219 238 312
Total 10,067 10,816 11,062 12,957 13,803 14,389 14,027 14,585 15,000 16,581
24,693
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Diesel
Type
Diesel
San Agustin NPC-SPUG
A+
Large
Legislative District
Monthly Average
22,531 23,485
Unenerg. Potential
San Jose NPC-SPUG
MUNICIPALITIES
POWER PLANT
Location Project Name/Proponent
Served
Odiongan NPC-SPUG
PB 109
Large Large
Mr. Marcelino R. Tanguilig, Jr. Mr. Ulysses P. Ancheta Mr. Martin F. Lasaga III
Engr. Orville F. Ferranco (OIC) Engr. Orville F. Ferranco Engr. Orville F. Ferranco
A+ A+
TABLAS ISLAND ELECTRIC COOPERATIVE, INC. (TIELCO)Tielco Road, Torrel, Odiongan, Romblon 5505
Tel Nos. (042) 567-5170, 567-5172; Telefax No. (042) 567-5171
2007 2008 2009
98
N
LEGEND :
H Q HQ Location
Municipality
Generating Set
3 PH Backbone Line
Energized Coop System
Energized Other System
G S
99
ALAD ISLAND
ROMBLON ISLAND
SIBUYAN ISLAND
ROMBLON
SAN FERNANDO
MAGDIWANG
COBRADOR ISLAND
G S G S
G S
G S
H Q
BANTON IS.
CORCUERA IS.
SIMARA IS.CONCEPCION IS.
Served by ConcepcionMunicipal Electric System
Served by BantonMunicipal Electric System
Served by CorcueraMunicipal Electric System
CAJIDIOCAN
I. DATE OF INCORPORATION AND REGISTRATION : June 14, 1989
II. DATE OF FIRST ENERGIZATION : January 1990
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 0.9 12.9 37.3 3.020
Subsidy 53.4 59.0 61.0 3.006
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Lone District
1 Cajidiocan 14 14 14 14 100 0 4,300 1,838 1,964 2,153 50
2 Magdiwang 9 9 9 9 100 0 2,600 1,177 1,274 1,428 55
3 Romblon 31 31 31 31 100 0 8,300 5,288 5,579 5,827 70
4 San Fernando 12 12 12 12 100 0 4,700 2,135 2,222 2,301 49
Total 66 66 66 66 100 0 19,900 10,438 11,039 11,709 59
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 5,780 6,362 6,321 Residential 9,199 9,801 10,418
MWH Purchased 795 823 891 Commercial 716 704 698
MWH Sold 683 707 769 Industrial 6 6 6
Systems Loss (%) 14 14 13 Public Building 324 340 369
Peak Load (KW) 2,060 2,204 2,275 Others 193 188 218
Load Factor (%) 53 51 54 Total 10,438 11,039 11,709
Collection Efficiency (%) 95 99 96
Ave. Systems Rate (P/KWH) 8.46 9.00 8.22
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 3,226 3,793 3,878 4,479 4,469 4,602 4,528 5,149 5,237 5,678
Commercial 1,084 1,132 1,073 1,137 1,064 1,462 1,358 1,491 1,553 1,711
Industrial 172 140 92 171 193 293 260 257 192 204
Public Building 422 528 669 739 683 737 774 948 1,050 1,183
Others 301 243 295 326 338 329 291 355 452 453
Total 5,205 5,836 6,007 6,852 6,747 7,424 7,211 8,200 8,484 9,229
Diesel/Power Barge
Diesel
Legislative District
Monthly Average
10,437 11,269
Unenerg. Potential
Romblon NPC-SPUG
San Fernando
11,921
MUNICIPALITIES
POWER PLANT
Location Project Name/Proponent
Served
NPC-SPUG
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Type
Mr. Cyril A. Tansiongco
Engr. Rene M. Fajilagutan Engr. Rene M. Fajilagutan Engr. Rene M. Fajilagutan
Engr. Anthony G. Rugas Engr. Anthony G. Rugas
A A A
Medium MediumMedium
ROMBLON ELECTRIC COOPERATIVE, INC. (ROMELCO)Capaclan, Romblon, Romblon
Tel./ Fax No. (02) 412-2864 loc. 2613
2007 2008 2009
100
LEGEND :
H Q HQ Location
Municipality
Below 5 MVA Substation
Generating Set
3 PH Backbone Line
Energized Coop System
G S
CALIBANGBANGAN
101
BARONGONAN
CORON
CULION
CALAWIT
LINAPACAN
CHEEY CARAGA IS.
BUSUANGA
SN ISIDRO
PANATAN
MAGLALANBAY
TARA IS.
MALAUIG
DINARAG IS.
LATALA
LUAC
BURABON
HASLEY
BULALACAO
DIPALIJAN
CABUNLAWAN
NANGALAOCALALAYAN
PICAL
SAN NICOLAS
DICABAITOT
CORON IS.
GALUC
G S
G S
G S
H Q
N
I. DATE OF INCORPORATION AND REGISTRATION : June 27, 1979
II. DATE OF FIRST ENERGIZATION : May 18, 1983
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 3.7 6.7 13.6 1.680
Subsidy 14.7 16.7 16.7 0.423
0.108
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District, Palawan
1 Busuanga 16 16 16 16 100 0 4,000 872 1,098 1,180 30
2 Coron 23 23 23 23 100 0 8,200 3,992 4,398 4,736 58
3 Culion 12 10 10 12 100 0 3,500 1,172 1,214 1,273 36
4 Linapacan* 10 9 9 10 100 0 2,200 233 252 284 13
Total 61 58 58 61 100 0 17,900 6,269 6,962 7,473 42
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 2,962 3,193 3,977 Residential 5,075 5,800 6,148
MWH Purchased 485 543 675 Commercial 749 797 927
MWH Sold 419 472 591 Industrial 2 2 3
Systems Loss (%) 13 12 12 Public Building 181 209 216
Peak Load (KW) 1,464 1,773 - Others 262 154 179
Load Factor (%) 45 42 - Total 6,269 6,962 7,473
Collection Efficiency (%) 90 83 87
Ave. Systems Rate (P/KWH) 7.06 6.76 6.73
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 1,758 1,819 1,932 2,204 2,450 2,395 2,391 2,575 2,791 3,347
Commercial 886 882 1,033 1,186 1,379 1,478 1,609 1,814 2,147 2,869
Industrial 110 174 263 105 17 23 21 14 10 61
Public Building 204 226 251 317 356 365 431 587 666 747
Others 30 37 51 57 96 82 70 43 54 63
Total 2,988 3,138 3,530 3,869 4,298 4,342 4,522 5,033 5,668 7,087
* With Provisional Franchise, NEC Res. No. 4 s. 1976
CoverageEnergized
Type
Diesel
Diesel
Linapacan NPC-SPUG
Legislative District
Monthly Average
5,761 6,442
Unenerg. Potential
Busuanga NPC-SPUG
Culion
6,893
MUNICIPALITIES
POWER PLANT
Location Project Name/Proponent
Served
NPC-SPUG
Diesel
B A R A N G A Y S C O N N E C T I O N S
Mr. Virgilio P. Daculla
Ms. Ruth L. Galang (OIC) Ms. Ruth L. Galang (OIC) Ms. Ruth L. Galang (OIC)
Mr. Adolfo Y. Arceo Mr. Adolfo Y. Arceo
A A A
Small SmallSmall
BUSUANGA ISLAND ELECTRIC COOPERATIVE, INC. (BISELCO)Brgy. I, Poblacion, Coron, Palawan
Tel. No. (048) 723-0326; Cell. No. (0919) 668-4132
2007 2008 2009
102
CUYO
LEGEND :
H Q HQ Location
Municipality
NPC Substation
Generator Substation
3 PH Backbone Line
Energized Coop System
G S
103
PALECO
KALAYAAN GROUP
TAYTAY
SAN VICENTE
ROXAS
ARACELI
DUMARAN
PUERTO PRINCESA CITY
ABORLAN
BATARAZA
RIZAL(Marcos)
BALABAC
EL NIDO(Bacuit)
AGUTAYA
MAGSAYSAY
SOFRONIO ESPAÑOLA
NARRAQUEZON
CAGAYANCILLO
G S
G SG S
G S
G S
G S
G S
G S G S
G S
G S
G S
G S
G S
G S
G S
G S
CUYO
H Q
G S
G S
G S
BROOKE'S POINT
N
I. DATE OF INCORPORATION AND REGISTRATION : January 25, 1974
II. DATE OF FIRST ENERGIZATION : January 11, 1975
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 2.6 2.6 2.6 1.850
Subsidy 69.9 69.9 90.1 0.830
0.923
1.403
3.948
0.217
0.326
0.217
26.800
0.356
0.326
5.000
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Agutaya 10 6 6 10 100 0 2,500 242 257 261 10
2 Araceli 13 13 13 13 100 0 2,600 455 455 520 20
3 Cagayancillo 12 8 8 12 100 0 1,500 232 268 280 19
4 Cuyo 17 17 17 17 100 0 4,500 3,464 3,555 3,640 81
5 Dumaran 16 16 16 16 100 0 4,100 208 246 246 6
6 El Nido (Bacuit) 18 17 17 18 100 0 6,700 855 922 1,047 16
7 Magsaysay 11 8 8 11 100 0 2,700 1,669 1,711 1,765 65
8 Roxas 31 22 22 31 100 0 11,700 3,170 3,321 3,555 30
9 San Vicente 10 7 7 10 100 0 5,300 1,240 1,371 1,511 29
10 Taytay 31 27 27 31 100 0 13,200 1,370 1,421 1,504 11
Second District
11 Aborlan 19 19 19 19 100 0 6,300 3,522 3,695 3,839 61
12 Balabac 20 7 7 10 50 10 6,200 333 364 383 6
13 Bataraza 22 22 22 22 100 0 10,200 1,321 1,499 1,602 16
14 Brooke's Point 18 18 18 18 100 0 12,100 5,587 5,952 6,281 52
15 Narra 22 22 22 22 100 0 14,100 10,008 10,322 10,575 75
16 Puerto Princesa City 66 66 66 66 100 0 45,000 40,791 42,894 44,982 99
17 Quezon 14 14 14 14 100 0 10,300 3,650 3,885 4,054 39
18 Rizal (Marcos) 11 10 10 11 100 0 7,800 475 744 851 11
19 Sofronio Española 9 9 9 9 100 0 6,600 2,208 2,357 2,449 37
Total 370 328 328 360 97 10 173,400 80,800 85,239 89,345 52
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 73,384 77,052 83,549 Residential 65,285 69,297 72,856
MWH Purchased 9,927 10,582 11,451 Commercial 5,002 5,239 5,606
MWH Sold 8,758 9,356 10,133 Industrial 104 118 128
Systems Loss (%) 11 11 11 Public Building 1,537 1,606 1,675
Peak Load (KW) 21,500 21,500 21,500 Others 8,872 8,979 9,080
Load Factor (%) 63 67 73 Total 80,800 85,239 89,345
Collection Efficiency (%) 88 92 91
Ave. Systems Rate (P/KWH) 8.38 8.24 8.25
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 35,776 38,843 40,129 44,213 47,495 49,163 47,824 48,281 51,695 56,131
Commercial 21,980 21,278 22,582 23,123 26,896 28,561 29,410 30,704 32,970 36,007
Industrial 6,995 7,158 8,195 8,843 9,962 11,197 11,116 10,044 10,547 10,654
Public Building 8,599 8,927 9,496 10,914 11,261 10,933 11,367 12,135 13,118 14,425
Others 1,935 1,885 2,146 2,520 3,118 3,879 3,755 3,934 3,936 4,382
Total 75,285 78,091 82,548 89,613 98,732 103,732 103,472 105,098 112,266 121,599
Diesel
NPC-SPUG
LGU
MUNICIPALITIES/CITY
Diesel
Diesel
Diesel
Diesel
San Vicente NPC-SPUG
Legislative District
Cuyo
Agutaya
Rizal
Narra
Coverage
Balabac
Araceli
Monthly Average
Unenerg. Potential
Puerto Princesa
Served
C O N N E C T I O N S
NPC-SPUG/PPC
NPC-SPUG
Energized
B A R A N G A Y S
Roxas
NPC-SPUG
NPC-SPUG
NPC-SPUG
NPC-SPUG
NPC-SPUG
Cagayancillo
NPC-SPUG Diesel
Taytay
- -
85,59178,450 82,208
-
POWER PLANT
Location Project Name/Proponent Type
NPC-SPUG
- - -
Diesel
El Nido
Mr. Jose P. Tan-Paredes, Jr. Mr. Jose P. Tan-Paredes, Jr. Mr. Jose P. Tan-Paredes, Jr.
Mr. Ponciano D. Payuyo Mr. Ponciano D. Payuyo Mr. Ponciano D. Payuyo
PALAWAN ELECTRIC COOPERATIVE, INC. (PALECO)National Highway, Brgy. Tiniguiban, Puerto Princesa City 5300
Tel. Nos. (048) 433-2001; 433-2544; 433-5646; Telefax: (048) 433-5645, 433-9144; E-mail: [email protected]
2007 2008 2009
Diesel
Diesel
Diesel
Diesel
Diesel
104104
Energized Coop System
LEGEND :
Headquarters
N
CASURECO IINaga City
CASURECO IVTigaon, Camarines Sur
CANORECODaet, Camarines Norte
CASURECO ILibmanan, Camarines Sur
CASURECO IIIIriga City
ALECOLegazpi City
MASELCOMobo, Masbate
TISELCOSan Jacinto, Masbate
SORECO IIrosin, Sorsogon
FICELCOBato, Catanduanes
SORECO IICity of Sorsogon
105
I. STATUS OF ENERGIZATION (Cumulative):
2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %
A. Electric Cooperatives:
1 Camarines Norte 12 12 12 12 100 273 273 273 273 100 100,600 76,434 79,916 83,280 83
2 Camarines Sur I 11 11 11 11 100 309 295 296 309 100 81,800 51,108 52,521 54,798 67
3 Camarines Sur II 10 10 10 10 100 259 259 259 259 100 105,800 81,794 86,710 89,645 85
4 Camarines Sur III 7 7 7 7 100 229 229 229 229 100 81,700 56,305 57,820 59,561 73
5 Camarines Sur IV 9 9 9 9 100 258 258 258 258 100 62,800 40,728 42,361 44,190 70
6 Albay 18 18 18 18 100 720 718 718 718 99 243,400 184,814 186,745 194,464 80
7 Sorsogon I 8 8 8 8 100 253 253 253 253 100 61,200 45,757 47,252 48,757 80
8 Sorsogon II 7 7 7 7 100 288 288 288 288 100 85,100 71,712 74,050 77,051 91
9 Catanduanes 11 11 11 11 100 315 315 315 315 100 47,500 39,539 41,126 42,557 90
10 Masbate 15 15 15 15 100 434 283 411 433 99 119,900 32,226 36,258 40,898 34
11 Ticao Island 4 4 4 4 100 72 46 59 72 100 16,300 4,563 4,914 5,342 33
Total 112 112 112 112 100 3,410 3,217 3,359 3,407 99 1,006,100 684,980 709,673 740,543 74
EnergizedCoverage
EnergizedPotential
Served
BICOL REGIONREGION V
ELECTRIC DISTRIBUTION UTILITIES
MUNICIPALITIES/CITIES BARANGAYS CONNECTIONS
Coverage
106
Total 500,153 549,889 592,304 657,023 686,279 697,371 610,784 649,361 698,605 740,508
Others 17,985 15,180 18,889 17,845 14,613 14,825 13,430 12,100 12,858 16,118
Public Bldgs. 36,179 39,718 42,902 49,766 50,960 50,462 46,016 50,087 57,648 56,394
Industrial 57,401 68,888 71,277 70,602 63,495 63,360 59,640 62,306 53,966 53,993
Commercial 101,929 111,825 117,779 128,577 145,780 158,281 146,235 158,280 178,241 197,987
Residential 286,659 314,278 341,457 390,233 411,432 410,444 345,463 366,588 395,892 416,016
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):
CANORECO
LEGEND :
H Q HQ Location
Municipality
10 MVA Substation
NPC Substation
3 PH Backbone Line
Energized Coop System
107
N
PARACALE
BASUD
CAPALONGA
JOSEPANGANIBAN
LABO
SANLORENZO RUIZ (Imelda)
VINZONS
MERCEDES
SANTAELENA
DAET
Part ofMERCEDES
H Q
TALISAY
SANVICENTE
I. DATE OF INCORPORATION AND REGISTRATION : October 23, 1975
II. DATE OF FIRST ENERGIZATION : August 4, 1976
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 51.0 72.9 87.9
Subsidy 42.3 70.5 74.4
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %Lone District
1 Basud 29 29 29 29 100 0 6,900 4,893 5,129 5,361 78
2 Capalonga 22 22 22 22 100 0 5,400 3,334 3,563 3,683 68
3 Daet 25 25 25 25 100 0 23,000 21,541 22,244 22,962 99
4 Jose Panganiban 27 27 27 27 100 0 9,500 7,309 7,653 8,111 85
5 Labo 52 52 52 52 100 0 16,800 11,567 12,203 12,703 76
6 Mercedes 26 26 26 26 100 0 8,600 5,917 6,183 6,481 75
7 Paracale 27 27 27 27 100 0 8,700 6,718 7,100 7,485 86
8 San Lorenzo Ruiz (Imelda) 12 12 12 12 100 0 2,400 1,528 1,608 1,677 70
9 San Vicente 9 9 9 9 100 0 1,800 1,353 1,429 1,500 83
10 Santa Elena (19) 10 10 10 10 100 0 5,300 3,763 3,939 4,091 77
11 Talisay 15 15 15 15 100 0 4,400 3,703 3,847 3,986 91
12 Vinzons 19 19 19 19 100 0 7,800 4,808 5,018 5,240 67
Total 273 273 273 273 100 0 100,600 76,434 79,916 83,280 83
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 56,485 49,320 53,475 Residential 71,712 75,007 78,220
MWH Purchased 7,682 7,198 7,508 Commercial 3,326 3,389 3,467
MWH Sold 6,739 6,316 6,691 Industrial 40 37 34
Systems Loss (%) 12 12 10 Public Building 1,103 1,175 1,192
Peak Load (KW) 18,914 18,968 18,055 Others 253 308 367
Load Factor (%) 56 52 57 Total 76,434 79,916 83,280
Collection Efficiency (%) 91 92 92
Ave. Systems Rate (P/KWH) 8.38 7.81 7.99
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 31,886 34,233 36,813 42,913 44,725 44,252 43,383 44,943 47,134 50,621
Commercial 10,525 11,804 13,169 14,584 14,744 14,356 15,043 15,648 16,693 17,907
Industrial 2,130 4,214 7,314 2,903 2,314 2,269 8,913 13,324 4,829 4,199
Public Building 1,847 2,471 3,239 4,042 4,285 4,536 4,542 4,890 5,033 5,206
Others 537 1,104 1,505 2,000 1,918 2,382 2,675 2,058 2,108 2,355
Total 46,925 53,826 62,040 66,442 67,986 67,795 74,556 80,863 75,797 80,288
A
Legislative District
Engr. Lorenzo S. Canlas, Jr. Engr. Lorenzo S. Canlas, Jr.
Served
Mega Large
Mr. Amilo A. BarramedaMr. Jesus T. Fernandez, Jr.
Potential
MUNICIPALITIES
Unenerg.
76,201
Engr. Lorenzo S. Canlas, Jr.
Mega Large
Energized
CAMARINES NORTE ELECTRIC COOPERATIVE, INC. (CANORECO)Jose P.Rizal St., Daet, Camarines Norte
Tel. Nos. (054) 721-1483, 721-4295, 440-0071, 571-2228
2008 20092007
Atty. Godfrey Parale
Monthly Average
79,321 82,368
A A+
Mega Large
B A R A N G A Y S C O N N E C T I O N S
Coverage
108108
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
Generating Set
3 PH Backbone Line
Energized Coop System
G S
CASURECO I
109
CLAVERIA
Served byCLAVERIA MUNICIPAL SYSTEM
N
BURIAS IS. SANPASCUAL
G S
RAGAY
SIPOCOT
CABUSAO
LIBMANAN
LUPI
CAMALIGAN
PASACAO
SANFERNANDO
GAINZAPAMPLONA
H Q
I. DATE OF INCORPORATION AND REGISTRATION : November 27, 1972
II. DATE OF FIRST ENERGIZATION : December 15, 1973
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 12.8 16.7 16.7 0.163
Subsidy 151.5 210.8 236.7
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %First District
1 Cabusao 9 9 9 9 100 0 3,500 2,960 3,077 3,205 92
2 Libmanan 75 75 75 75 100 0 18,000 13,812 14,184 14,786 82
3 Lupi 38 38 38 38 100 0 5,300 2,750 2,854 2,955 56
4 Pamplona 17 17 17 17 100 0 6,000 4,237 4,344 4,586 76
5 Pasacao 19 19 19 19 100 0 7,900 4,965 5,061 5,258 67
6 Ragay 38 38 38 38 100 0 9,800 5,877 6,104 6,469 66
7 San Fernando 22 22 22 22 100 0 5,600 3,679 3,767 3,951 71
8 Sipocot 46 46 46 46 100 0 11,600 8,102 8,303 8,574 74
Del Gallego 2 2 2 2 100 0 100 63 0Second District
9 Camaligan 13 13 13 13 100 0 3,900 3,089 3,162 3,279 84
10 Gainza 8 8 8 8 100 0 1,900 1,574 1,601 1,671 88First District, Masbate
11 San Pascual 22 8 9 22 100 0 8,200 64 64 1
Total 309 295 296 309 100 0 81,800 51,108 52,521 54,798 67
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 24,517 23,785 26,835 Residential 45,314 46,230 48,448
MWH Purchased 3,354 3,622 3,825 Commercial 2,493 2,427 2,343
MWH Sold 2,475 2,795 2,991 Industrial 57 53 53
Systems Loss (%) 26 22 21 Public Building 712 753 783
Peak Load (KW) 9,587 10,317 10,012 Others 2,532 3,058 3,171
Load Factor (%) 48 48 52 Total 51,108 52,521 54,798
Collection Efficiency (%) 92 94 94
Ave. Systems Rate (P/KWH) 9.91 8.51 8.97
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 17,009 18,030 20,313 22,088 20,275 21,175 18,536 17,737 20,482 23,218
Commercial 3,442 4,431 4,745 6,119 8,234 7,933 6,463 7,586 8,354 7,845
Industrial 4,006 2,774 3,578 3,653 3,059 2,707 2,044 1,899 1,915 1,817
Public Building 1,369 1,423 1,542 1,799 1,800 1,881 1,690 1,826 2,147 2,341
Others 1,657 1,276 1,533 1,858 870 848 754 650 646 668
Total 27,483 27,934 31,711 35,517 34,238 34,544 29,487 29,698 33,544 35,889
Location Project Name/Proponent Type
San Pascual LGU GenSet
Extra Large
52,991
Extra LargeExtra Large
2007
Mr. Miguel B. Cada
Engr. Josephus Paulo C. Motos (OIC)
E
Mr. Edgar A. Cancaida
Legislative DistrictPotential
MUNICIPALITIESB A R A N G A Y S C O N N E C T I O N S
CoverageServed
POWER PLANT
E E
Mr. Juan U. Rubio
Engr. Josephus Paulo C. Motos (OIC) Mr. Charito C. Mabitazan (PS/AGM)
Mr. Charito C. Mabitazan (PS/AGM)
Monthly Average
CAMARINES SUR I ELECTRIC COOPERATIVE, INC. (CASURECO I)Puro-Batia, Libmanan, Camarines Sur
Tel. Nos. (054) 451-2147, 451-2104, 451-2162; Fax No. (054) 451-2148
2008 2009
54,870 57,268
EnergizedUnenerg.
110
CASURECO II
111
N
SIRUMA
CALABANGA
TINAMBAC
BOMBON
CANAMAN
PILI
MILAOR
MINALABAC
H QMAGARAO
NAGACITY
MH
MH
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
20 MVA Substation
Mini Hydro
3 PH Backbone Line
Energized Coop System
MH
I. DATE OF INCORPORATION AND REGISTRATION : August 10, 1975II. DATE OF FIRST ENERGIZATION : December 27, 1977III. ELECTRIC COOPERATIVE OFFICIALS :
President :Gen. Manager :
IV. CATEGORY CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009 Cap.(MW)
Residual Loan 51.3 51.7 51.3Subsidy 128.8 171.3 175.5
0.200
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Minalabac 25 25 25 25 100 0 8,600 4,038 6,445 6,629 77
Second District
2 Bombon 8 8 8 8 100 0 2,600 2,306 2,390 2,475 95 3 Calabanga 48 48 48 48 100 0 13,800 9,681 10,040 10,455 76 4 Canaman 24 24 24 24 100 0 5,800 5,054 5,179 5,322 92 5 Magarao 15 15 15 15 100 0 4,300 3,393 3,495 3,677 86 6 Milaor 20 20 20 20 100 0 4,600 3,863 3,992 4,138 90 7 Naga City 27 27 27 27 100 0 37,700 35,476 36,556 37,578 99 8 Pili 26 26 26 26 100 0 13,700 12,302 12,696 13,278 97
Third District9 Siruma 22 22 22 22 100 0 3,300 886 909 932 28
10 Tinambac 44 44 44 44 100 0 11,400 4,795 5,008 5,161 45 Total 259 259 259 259 100 0 105,800 81,794 86,710 89,645 85
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 119,782 106,326 114,139 Residential 75,520 80,234 83,198 MWH Purchased 16,784 17,496 18,863 Commercial 5,044 5,175 5,114 MWH Sold 13,190 14,044 15,932 Industrial 109 108 106 Systems Loss (%) 21 19 15 Public Building 883 927 956 Peak Load (KW) 36,370 38,120 40,934 Others 238 266 271 Load Factor (%) 63 63 63 Total 81,794 86,710 89,645 Collection Efficiency (%) 93 94 91 Ave. Systems Rate (P/KWH) 9.08 7.57 7.16
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 54,695 61,038 65,411 74,174 74,995 76,012 67,527 69,599 71,954 80,119 Commercial 39,705 43,922 45,400 49,295 51,347 52,701 54,342 55,912 63,340 78,699 Industrial 11,749 13,937 13,297 12,446 12,888 16,042 15,386 15,242 14,017 12,159 Public Building 10,173 10,515 11,275 12,636 12,041 11,869 11,766 12,876 14,446 13,244 Others 3,133 3,988 4,577 4,600 4,906 5,195 4,951 4,648 4,777 6,967 Total 119,455 133,400 139,960 153,151 156,177 161,820 153,972 158,277 168,534 191,188
Legislative DistrictPotential
MUNICIPALITIES/CITYUnenerg.
Pili Yabo/PROSAMAPI Coop.
CoverageEnergized
Mr. Rodelio A. Pasumbal (OIC)B A
Ms. Jane T. Barrameda (OIC) Ms. Jane T. Barrameda (OIC)C
CAMARINES SUR II ELECTRIC COOPERATIVE, INC. (CASURECO II)Brgy. Del Rosario, Naga City 4400
Tel Nos. (054) 473-0204 to 09, 473-0112; Fax No. (054) 473-0201
2008 2009Atty. Perfecto Nixon C. TaboraMr. Hilario D. Basmayor
2007Mr. Hilario D. Basmayor
Mega Large
B A R A N G A Y S C O N N E C T I O N S
POWER PLANTLocation Project Name/Proponent
71,660
Type
Mega Large Mega Large
Monthly Average
74,428 76,741
0.960
Mihi Hydro
Naga CityInarihan/Bicol Hydropower
Corp.Mini Hydro
Served
112
N
CASURECO III
113
BULA
BAAO
IRIGACITY
BUHI
NABUA
BALATAN BATO
H QMH
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
Mini Hydro
3 PH Backbone Line
Energized Coop System
MH
I. DATE OF INCORPORATION AND REGISTRATION : December 2, 1975
II. DATE OF FIRST ENERGIZATION : October 23, 1977
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 32.5 34.1 34.1
Subsidy 74.6 87.5 117.3
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %Fourth District
1 Baao 30 30 30 30 100 0 9,600 6,625 6,769 6,953 72
2 Balatan 17 17 17 17 100 0 4,600 2,331 2,475 2,726 59
3 Bato 33 33 33 33 100 0 8,800 5,286 5,458 5,641 64
4 Buhi 38 38 38 38 100 0 13,900 8,059 8,242 8,508 61
5 Bula 33 33 33 33 100 0 11,800 6,535 6,742 6,929 59
6 Iriga City 36 36 36 36 100 0 18,200 16,314 16,778 17,259 95
7 Nabua 42 42 42 42 100 0 14,800 11,155 11,356 11,545 78
Total 229 229 229 229 100 0 81,700 56,305 57,820 59,561 73
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 36,359 31,328 36,360 Residential 52,677 54,140 55,383
MWH Purchased 5,336 5,530 6,022 Commercial 2,431 2,421 2,824
MWH Sold 3,812 4,173 4,502 Industrial 165 164 156
Systems Loss (%) 28 24 25 Public Building 872 924 933
Peak Load (KW) 13,860 13,941 15,747 Others 160 171 265
Load Factor (%) 53 54 52 Total 56,305 57,820 59,561
Collection Efficiency (%) 70 65 75
Ave. Systems Rate (P/KWH) 9.54 7.51 8.08
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 25,101 27,984 30,521 32,329 35,810 34,249 30,842 29,990 32,861 35,089
Commercial 5,069 5,555 5,711 5,817 6,553 6,728 7,342 7,220 8,847 10,261
Industrial 2,850 3,326 3,523 3,496 3,650 4,254 3,521 3,946 3,430 3,228
Public Building 1,542 1,792 1,883 2,168 2,768 3,241 3,304 3,365 3,861 4,201
Others 1,242 1,485 2,625 1,697 1,727 1,735 1,359 1,221 1,081 1,243
Total 35,804 40,142 44,263 45,507 50,507 50,206 46,368 45,742 50,080 54,022
Served
Extra Large
Legislative DistrictPotential
MUNICIPALITIES/CITYB A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.
62,266
E
Mr. Fabio F. Dinero, Jr.
Engr. Pedro M. Prestado, Jr.
E
Mr. Ronaldo Felix V. Alfelor
Mr. Joel I. Sergio (OIC) Mr. Claro M. Turiano (OIC)
Mr. Ronaldo Felix V. Alfelor
Extra Large Extra Large
56,074 58,728
CAMARINES SUR III ELECTRIC COOPERATIVE, INC. (CASURECO III)San Isidro, Iriga City 4431
Tel. Nos. (054) 299-2287, 299-1879, 299-5707; Telefax No. (054) 299-2382; E-mail: [email protected]; Website: www.casureco3.com
2008 20092007
E
Monthly Average
POWER PLANT
Location Project Name/Proponent Type
BuhiBarit HEP/Atty. Ramon I
Constancio Hydro 1.800
114
N
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
Generating Set
Mini Hydro
3 PH Backbone Line
Energized Coop System
G S
MH
115
GARCHITORENALAGONOY
GOA
CARAMOAN
PRESENTACION (Parubcan)
SANJOSE
TIGAON
OCAMPO
SAGÑAY
AGUIRAGA IS.
MH
MH
G S
H Q
MH
Part ofSAN JOSE
I. DATE OF INCORPORATION AND REGISTRATION : February 18, 1977
II. DATE OF FIRST ENERGIZATION : July 9, 1977
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative) POWER PLANT
2007 2008 2009 Cap.(MW)
Residual Loan 114.5 114.6 129.5 0.600
Subsidy 113.8 172.7 190.5 3.100
0.100
0.350
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Second District
1 Ocampo 25 25 25 25 100 0 7,400 4,785 5,000 5,202 70
Third District
2 Caramoan 49 49 49 49 100 0 8,100 4,158 4,341 4,787 59
3 Garchitorena 23 23 23 23 100 0 4,700 1,237 1,299 1,408 30
4 Goa 34 34 34 34 100 0 9,900 7,327 7,597 7,792 79
5 Lagonoy 38 38 38 38 100 0 8,700 6,041 6,265 6,525 75
6 Presentacion (Parubcan) 18 18 18 18 100 0 3,300 1,921 2,054 2,091 63
7 Sagñay 19 19 19 19 100 0 5,400 2,906 3,044 3,194 59
8 San Jose 29 29 29 29 100 0 6,900 5,739 5,907 6,075 88
9 Tigaon 23 23 23 23 100 0 8,400 6,352 6,586 6,825 81
Outside Coverage Area 262 268 291
Total 258 258 258 258 100 0 62,800 40,728 42,361 44,190 70
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 17,059 16,696 18,624 Residential 38,421 39,922 40,784
MWH Purchased 2,259 2,528 2,777 Commercial 1,493 1,580 2,507
MWH Sold 1,801 2,046 2,286 Industrial 36 35 37
Systems Loss (%) 20 19 17 Public Building 632 656 691
Peak Load (KW) 6,757 6,668 7,021 Others 146 168 171
Load Factor (%) 46 52 54 Total 40,728 42,361 44,190
Collection Efficiency (%) 95 97 96
Ave. Systems Rate (P/KWH) 9.47 8.16 8.15
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 11,065 12,409 13,954 16,183 16,754 16,512 13,591 14,494 16,176 18,085
Commercial 2,464 2,830 3,041 3,396 3,428 3,547 3,103 3,394 4,103 4,784
Industrial 699 598 796 737 1,098 1,416 1,336 1,787 1,850 2,036
Public Building 998 1,180 1,375 1,609 1,694 1,740 1,558 1,688 2,060 2,278
Others 250 266 459 441 555 414 296 252 358 248
Total 15,476 17,283 19,625 22,366 23,529 23,629 19,884 21,615 24,547 27,431
Dendro Thermal
Served
Sagñay Coyaoyao
Presentacion EC
Legislative DistrictPotential
MUNICIPALITIES
Unenerg.
Large Large
Caramoan
EC
40,102
EC
Dr. Arnel P. Armea
Atty. Veronica T. Briones (Managing Consultant) Atty. Veronica T. Briones (Managing Consultant)
Dr. Arnel P. Armea
Mini-Hydro
CAMARINES SUR IV ELECTRIC COOPERATIVE, INC. (CASURECO IV)Talojongon, Tigaon, Camarines Sur
Tel. Nos. (054) 452-3083, 452-3715, 453-0191, 452-3899; 452-3441 to 42; Telefax No. (054) 452-3085
2008 20092007
Dr. Arnel P. Armea
Atty. Veronica T. Briones (Managing Consultant)
B
Mini Hydro
Location Project Name/Proponent Type
Lagonoy
Mini-Hydro
Monthly Average
41,986 43,815
B B
Large
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
116116
N
ALECO
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
20 MVA Substation
Power Plant
Generating Set
3 PH Backbone Line
Energized Coop System
G S
P P
117
JOVELLAR
OAS
LIBON
POLANGUI
TIWI
MAL
ILIP
OT
SANTO DOMINGO (Libog)
CAMALIG
MANITO
RAPU-RAPU
DARAGA (Locsin)CITY of
LIGAO
PIODURAN
SAN MIGUEL IS.
GUINANAYAN IS.
BATAN IS.
CAGRARAY IS.
GUINOBATAN
CITY ofTABACO
MALINAO
LEGAZPICITY
G S
P P
P P
H Q
BACACAY
I. DATE OF INCORPORATION AND REGISTRATION : August 9, 1972/May 13, 1991II. DATE OF FIRST ENERGIZATION : March 30, 1973
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2005 2009 Cap.(MW)
Residual Loan 86.6 96.3 95.8 275.690Subsidy 362.2 403.5 494.0 1.500
1.535
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %First District
1 Bacacay 56 56 56 56 100 0 12,400 9,283 9,354 9,739 79 2 Malilipot 18 18 18 18 100 0 6,200 5,524 5,332 5,540 89 3 Malinao 29 29 29 29 100 0 7,700 6,339 6,165 6,537 85 4 Santo Domingo (Libog) 23 23 23 23 100 0 5,800 5,252 5,280 5,483 95 5 City of Tabaco 47 47 47 47 100 0 22,700 19,712 20,651 21,797 96 6 Tiwi 25 25 25 25 100 0 9,700 9,246 9,319 9,624 99
Second District
7 Camalig 50 49 49 49 98 1 12,300 9,376 8,711 9,235 75 8 Daraga (Locsin) 54 53 53 53 98 1 23,200 22,207 20,756 21,795 94 9 Legazpi City 70 70 70 70 100 0 44,000 40,290 29,572 30,747 70
10 Manito 15 15 15 15 100 0 4,300 3,312 3,201 3,418 79 11 Rapu-Rapu 34 34 34 34 100 0 6,200 2,303 2,905 3,383 55
Third District
12 Guinobatan 44 44 44 44 100 0 15,000 10,938 12,335 12,875 86 13 Jovellar 23 23 23 23 100 0 3,600 1,142 1,877 1,892 53 14 Libon 47 47 47 47 100 0 14,000 5,766 8,240 8,414 60 15 City of Ligao 55 55 55 55 100 0 19,000 12,282 15,736 16,216 85 16 Oas 53 53 53 53 100 0 13,000 6,588 8,962 9,266 71 17 Pio Duran 33 33 33 33 100 0 9,400 3,645 3,927 4,034 43 18 Polangui 44 44 44 44 100 0 14,900 11,609 14,422 14,469 97
Total 720 718 718 718 99 2 243,400 184,814 186,745 194,464 80
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 116,519 110,027 122,201 Residential 172,701 175,493 183,612 MWH Purchased 20,345 22,752 24,761 Commercial 7,300 7,865 7,861 MWH Sold 15,322 16,989 18,657 Industrial 417 441 387 Systems Loss (%) 25 25 24 Public Building 1,600 1,718 1,699 Peak Load (KW) 50,484 51,208 56,393 Others 2,796 1,228 905 Load Factor (%) 55 61 60 Total 184,814 186,745 194,464 Collection Efficiency (%) 78 76 77 Ave. Systems Rate (P/KWH) 7.60 6.48 6.55
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 84,913 93,605 101,756 118,799 129,299 128,288 94,703 105,247 116,825 125,875 Commercial 23,455 25,244 26,656 28,409 38,956 49,048 38,207 43,876 49,062 54,736 Industrial 31,553 39,619 38,348 42,249 34,489 29,218 21,692 18,756 19,541 23,293 Public Building 13,720 14,903 15,322 17,200 17,016 16,482 12,714 13,697 16,359 16,878 Others 4,310 4,102 5,648 3,928 2,852 2,433 1,870 2,286 2,087 3,108 Total 157,951 177,473 187,730 210,585 222,613 225,470 169,186 183,862 203,874 223,890
Atty. Rodolfo B. Bonafe, Jr.
-Mr. Jose A. Zamora (PS)
Atty. Rodolfo B. Bonafe, Jr.Atty. Rodolfo B. Bonafe, Jr.
-181,914
Engr. Lorenzo S. Marcelo, Jr. (Head, NPC Mgmt. Engr. Lorenzo S. Marcelo, Jr. (Head, NPC Mgmt.
Mega Large Mega Large190,330 197,205
E E
Legislative DistrictPotential
MUNICIPALITIES/CITIESB A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.Served
Manito GeothermalTiwi
Monthly Average
NPC-SPUG DieselRapu-rapuManito
Tiwi/AP Renewables Geothermal
POWER PLANTLocation Project Name/Proponent Type
ALBAY ELECTRIC COOPERATIVE, INC. (ALECO)W. Vinzons St., Albay District, Legazpi City
Tel. Nos. (052) 481-5555, 481-5021; Fax No. (052) 820-2668
2008 20092007
118
Engr. Alex M. Realosa (OIC) Engr. German P . Silva ( O & M Manager) Engr. German P. Silva ( O & M Manager)
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
NPC Substation
3 PH Backbone Line
Energized Coop System
N
MATNOG
BULUSAN
MAGALLANESJUBAN
SORECO II
IROSINBULAN
SANTAMAGDALENA
CASIGURAN
H Q
119
I. DATE OF INCORPORATION AND REGISTRATION : January 17, 1973II. DATE OF FIRST ENERGIZATION : August 1, 1975
III. ELECTRIC COOPERATIVE OFFICIALS :
President :Gen. Manager :
IV. CATEGORY CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009
Residual Loan 33.2 33.6 43.6Subsidy 51.4 72.6 79.0
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %First District
1 Casiguran 25 25 25 25 100 0 6,000 4,425 4,563 4,703 78 2 Magallanes 34 34 34 34 100 0 6,800 4,327 4,490 4,667 69
Second District3 Bulan 63 63 63 63 100 0 17,900 13,799 14,230 14,668 82 4 Bulusan 24 24 24 24 100 0 4,500 3,657 3,766 3,861 86 5 Irosin 28 28 28 28 100 0 10,000 8,661 8,857 9,094 91 6 Juban 25 25 25 25 100 0 5,800 4,024 4,181 4,324 75 7 Matnog 40 40 40 40 100 0 7,000 4,225 4,459 4,681 67 8 Santa Magdalena 14 14 14 14 100 0 3,200 2,639 2,706 2,759 86
Total 253 253 253 253 100 0 61,200 45,757 47,252 48,757 80
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 19,860 19,549 19,717 Residential 43,397 44,850 46,271 MWH Purchased 2,595 2,709 2,811 Commercial 1,266 1,274 1,306 MWH Sold 2,052 2,288 2,434 Industrial 61 63 63 Systems Loss (%) 21 15 13 Public Building 720 772 833 Peak Load (KW) 6,824 9,824 7,183 Others 313 293 284 Load Factor (%) 52 38 54 Total 45,757 47,252 48,757 Collection Efficiency (%) 89 90 95 Ave. Systems Rate (P/KWH) 9.68 8.55 8.10
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 13,704 14,769 15,644 18,045 19,655 19,943 16,488 17,373 18,806 20,334 Commercial 2,344 2,421 2,540 2,846 3,253 3,333 2,991 3,300 3,587 3,934 Industrial 1,243 1,407 1,409 2,092 2,378 2,559 2,303 2,278 3,054 2,796 Public Building 992 1,047 1,157 1,326 1,367 1,410 1,218 1,354 1,573 1,764 Others 5,455 1,397 579 556 472 479 417 323 432 382 Total 23,738 21,041 21,329 24,865 27,125 27,724 23,417 24,628 27,452 29,210
Mr. Rogelio C. Lee
43,20341,887
Mr. Roberto F. Fortes (OIC)E
Large
SORSOGON I ELECTRIC COOPERATIVE, INC. (SORECO I)Gulang-Gulang, Irosin, Sorsogon 4707
Tel. No. (056) 557-3279; Telefax No. (056) 557-3162; Fax. No. (056) 557-3289
2008 20092007Mr. Rogelio C. Lee
Mr. Roberto F. Fortes (OIC) Mr. Roberto F. Fortes Mr. Rogelio C. Lee
C BLarge
44,531Large
Monthly Average
Legislative District
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.Served
PotentialMUNICIPALITIES
120120
121
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
Power Plant
Mini Hydro
3 PH Backbone Line
Energized Coop System
P PMH
N
GUBAT
BARCELONA
CITY ofSORSOGON
CASTILLA
PRIETODIAZBACON
PILAR
DONSOL
P P
H QMH
I. DATE OF INCORPORATION AND REGISTRATION : April 14, 1977
II. DATE OF FIRST ENERGIZATION : June 1977
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 9.4 9.4 9.4 0.400
Subsidy 79.0 85.4 109.9 150.000
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %First District
1 Castilla 34 34 34 34 100 0 9,700 6,547 6,865 7,242 75
2 Donsol 51 51 51 51 100 0 8,600 5,973 6,224 6,586 77
3 Pilar 49 49 49 49 100 0 12,400 8,322 8,735 9,184 74
4 City of Sorsogon 64 64 64 64 100 0 34,700 32,905 33,759 34,695 99 Second District
5 Barcelona 25 25 25 25 100 0 3,900 3,490 3,596 3,791 97
6 Gubat 42 42 42 42 100 0 11,500 10,693 10,967 11,347 99
7 Prieto Diaz 23 23 23 23 100 0 4,300 3,782 3,904 4,206 98
Total 288 288 288 288 100 0 85,100 71,712 74,050 77,051 91
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 33,249 32,201 35,016 Residential 68,224 70,482 73,455
MWH Purchased 4,675 5,095 5,274 Commercial 1,993 2,005 1,994
MWH Sold 3,678 4,014 4,289 Industrial 9 10 11
Systems Loss (%) 21 21 18 Public Building 1,262 1,303 1,349
Peak Load (KW) 11,403 12,742 12,406 Others 224 250 242
Load Factor (%) 56 55 58 Total 71,712 74,050 77,051
Collection Efficiency (%) 86 86 -
Ave. Systems Rate (P/KWH) 9.04 8.02 8.16
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 20,853 22,973 25,876 29,737 32,493 31,948 25,903 28,203 29,408 18,563
Commercial 7,151 7,703 8,517 9,323 9,586 9,554 8,292 9,807 11,670 7,098
Industrial 820 736 786 896 871 986 927 1,043 1,126 580
Public Building 2,413 2,738 3,201 4,077 4,323 4,416 3,901 4,547 5,318 3,364
Others 598 700 648 1,614 983 881 632 530 645 421
Total 31,835 34,850 39,028 45,647 48,257 47,784 39,655 44,130 48,167 30,026
Mr. Fernando O. Duran, Jr.
Mr. Jaime M. Marchan (OIC)
- --
Mr. Edwin B. Destajo
Atty. Owen B. Amor Engr. Romeo F. Cedino, Jr. (OIC)
Mr. Fernando O. Duran, Jr.
Legislative District
MUNICIPALITIES/CITY
-
B A R A N G A Y S
EnergizedUnenerg.
-
Coverage
City of Sorsogon
-
61,610
POWER PLANT
Location Project Name/Proponent Type
65,07963,369
SORSOGON II ELECTRIC COOPERATIVE, INC. (SORECO II)Buhatan, City of Sorsogon 4700
Tel. Nos. (056) 211-1331, 211-1434, 421-5244, 421-5165; Telefax No. (056) 421-5245 ; E-mail: [email protected]
2008 20092007
Monthly Average
Hydro
Potential
City of Sorsogon Cawayan HEP/SORECO II
C O N N E C T I O N S
BacMan Geothermal Power Plants/BacMan Geothermal
Inc.Geothermal
Served
122
HQ Location
Municipality
Generating Set
Mini Hydro
3 PH Backbone Line
LEGEND :
H QEnergized Coop System
MH
G S
123
N
SAN ANDRES (Calolbon) VIRAC
SAN MIGUEL
BARAS
BATO
PANGANIBAN (Payo)
VIGA
BAGAMANOC
GIGMOTOCARAMORAN
PANDAN
G S
G S
G S
G S
MHH Q
I. DATE OF INCORPORATION AND REGISTRATION : October 28, 1971II. DATE OF FIRST ENERGIZATION : April 1972
III. ELECTRIC COOPERATIVE OFFICIALS :
President :Gen. Manager :
IV. CATEGORY CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009 Cap.(MW)
Residual Loan 31.3 31.5 45.7 2.240Subsidy 127.6 139.9 156.8 8.064
1.800
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %Lone District
1 Bagamanoc 18 18 18 18 100 0 1,900 1,453 1,508 1,586 83 2 Baras 29 29 29 29 100 0 2,400 2,132 2,222 2,317 97 3 Bato 27 27 27 27 100 0 4,100 3,774 3,898 4,023 99 4 Caramoran 27 27 27 27 100 0 4,900 2,935 3,085 3,214 66 5 Gigmoto 9 9 9 9 100 0 1,400 1,208 1,268 1,330 95 6 Pandan 26 26 26 26 100 0 3,600 2,189 2,295 2,394 67 7 Panganiban (Payo) 23 23 23 23 100 0 1,800 1,508 1,568 1,611 90 8 San Andres (Calolbon) 38 38 38 38 100 0 6,400 5,538 5,750 5,919 92 9 San Miguel 24 24 24 24 100 0 2,500 2,153 2,280 2,351 94
10 Viga 31 31 31 31 100 0 3,700 2,814 2,927 3,036 82 11 Virac 63 63 63 63 100 0 14,800 13,835 14,325 14,776 99
Total 315 315 315 315 100 0 47,500 39,539 41,126 42,557 90
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 16,434 20,014 21,085 Residential 36,500 37,792 39,289 MWH Purchased 2,243 2,470 2,619 Commercial 1,800 1,943 1,895 MWH Sold 1,913 2,103 2,203 Industrial - - -Systems Loss (%) 14 14 14 Public Building 884 971 1,011 Peak Load (KW) - - - Others 355 420 362 Load Factor (%) - - - Total 39,539 41,126 42,557 Collection Efficiency (%) 95 98 98 Ave. Systems Rate (P/KWH) 8.59 9.52 9.57
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 11,267 12,623 12,741 15,270 14,858 15,969 14,545 15,347 16,641 17,503 Commercial 3,163 3,256 3,086 3,635 3,855 4,751 4,424 4,622 4,994 5,235 Industrial - - - - - - - - - -Public Building 1,951 2,253 2,239 2,835 2,697 2,588 2,551 2,612 3,095 3,176 Others 293 258 685 325 301 614 582 374 501 519 Total 16,674 18,390 18,751 22,065 21,711 23,921 22,102 22,955 25,231 26,433
Engr. Rodolfo F. Mendoza (OIC)Engr. Rodolfo F. Mendoza (OIC)A+
Large Large
FIRST CATANDUANES ELECTRIC COOPERATIVE, INC. (FICELCO)Marinawa, Bato, Catanduanes
Tel No. (052) 811-1324; 811-3166: 811-3164;Telefax No. (052) 811-0584; Fax No. (052) 811-1351
2008 2009
Mini Hydro
NPC-SPUG
2007Mr. Fidelito T. Soledad Mr. Rodolfo B. Vargas, Sr.Mr. Fidelito T. Soledad
Engr. Carlos T. Gianan III A+ A+
Large37,070
Location
38,252 39,334
Project Name/ProponentPOWER PLANT
Type
Legislative DistrictPotential
MUNICIPALITIESCoverage
EnergizedUnenerg.
C O N N E C T I O N SB A R A N G A Y SServed
Monthly Average
DieselNPC-SPUG Diesel/PB-110
Bato
Viga
Balongbong
124
MASELCO
LEGEND :
H Q HQ Location
Municipality
Generating Set
3 PH Backbone Line
Energized Coop System
G S
125
N
AROROY
PLACER
ESPERANZA
CATAINGAN
MILAGROS
MANDAON
PIO V. CORPUZ
(Limbuhan(
MOBO
MASBATECITY
DIMAS
ALAN
G
USON
BALUD
BALENO
NARO IS.
LO-OC
G S
PALANAS
CAWAYAN
H Q
G SG S
G S
G S
G S
G S
G S
G S
I. DATE OF INCORPORATION AND REGISTRATION : November 23, 1977II. DATE OF FIRST ENERGIZATION : May 12, 1979
III. ELECTRIC COOPERATIVE OFFICIALS :
President :Gen. Manager :
IV. CATEGORY CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)2007 2008 2009 Cap.(MW)
Residual Loan 18.1 18.1 18.1 11.500Subsidy 180.3 275.8 296.6 0.060
0.215
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %Second District
1 Aroroy 41 9 37 41 100 0 12,700 1,475 1,710 2,467 19 2 Baleno 24 17 24 24 100 0 4,300 1,164 1,431 1,553 36 3 Balud 32 24 30 32 100 0 6,500 1,000 1,156 1,278 20 4 Mandaon 26 11 24 26 100 0 6,800 919 1,031 1,581 23 5 Masbate City 30 21 28 30 100 0 15,600 11,099 11,939 12,523 80 6 Milagros 27 13 24 27 100 0 9,600 1,718 1,956 2,248 23 7 Mobo 29 17 27 29 100 0 6,000 2,671 2,847 3,064 51
Third District
8 Cataingan 36 25 36 36 100 0 10,000 1,872 2,368 3,042 30 9 Cawayan 37 30 37 37 100 0 11,300 1,211 1,530 1,702 15
10 Dimasalang 20 14 20 20 100 0 4,600 1,539 1,671 1,786 39 11 Esperanza 20 12 20 20 100 0 3,500 336 510 698 20 12 Palanas 24 24 24 24 100 0 5,300 1,344 1,448 1,520 29 13 Pio V. Corpuz (Limbuhan) 18 18 18 18 100 0 4,600 1,196 1,385 1,533 33 14 Placer 35 24 33 34 97 1 9,600 1,645 1,906 2,100 22 15 Uson 35 24 29 35 100 0 9,500 3,037 3,370 3,803 40
Total 434 283 411 433 99 1 119,900 32,226 36,258 40,898 34
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 22,441 24,411 23,320 Residential 30,178 34,137 38,664 MWH Purchased 3,730 3,979 4,373 Commercial 1,357 1,345 1,368 MWH Sold 2,877 3,169 3,203 Industrial 99 94 101 Systems Loss (%) 23 21 27 Public Building 538 627 711 Peak Load (KW) 8,760 9,440 10,180 Others 54 55 54 Load Factor (%) 58 58 59 Total 32,226 36,258 40,898 Collection Efficiency (%) 88 83 91 Ave. Systems Rate (P/KWH) 7.80 7.70 7.28
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 15,242 15,579 17,176 19,352 21,188 20,469 17,989 21,250 23,006 23,703 Commercial 4,368 4,420 4,618 4,895 5,605 6,070 5,679 6,463 7,063 6,934 Industrial 2,351 2,277 2,226 2,130 2,748 3,909 3,518 4,031 4,204 3,885 Public Building 1,132 1,348 1,611 2,019 2,904 2,226 2,673 3,116 3,610 3,767 Others 467 562 575 766 (34) (216) (176) (335) 142 143 Total 23,560 24,186 26,206 29,162 32,411 32,459 29,683 34,525 38,025 38,432
Cawayan NPC-SPUG Diesel
Mobo NPC-SPUG/PB 105 DieselPlacer NPC-SPUG Diesel
POWER PLANTLocation Project Name/Proponent Type
Dr. Elpidio C. LimMr. Eduardo N. Margallo
E D DLarge Large36,142 39,030
Large33,009
Dr. Elpidio C. LimMr. Eduardo N. Margallo Mr. Eduardo N. Margallo
Dr. Elpidio C. Lim
MASBATE ELECTRIC COOPERATIVE, INC. (MASELCO)Pinamarbuhan, Mobo, Masbate
Service Center (056) 333-2105, 333-8013; Telefax No. (056) 333-2360; 333-6006
2008 20092007
Legislative DistrictPotential
MUNICIPALITIES/CITY
Monthly Average
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.Served
126
LEGEND :
H Q HQ Location
Municipality
Generating Set
3 PH Backbone Line
Energized Coop System
G S
N
SAN JACINTO
MONREAL
BATUAN
SAN FERNANDO
G S
H Q
127
I. DATE OF INCORPORATION AND REGISTRATION : March 18, 1985
II. DATE OF FIRST ENERGIZATION : November 10, 1991
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 0.60 0.60 0.60 1.960
Subsidy 30.0 34.8 36.6
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %First District, Masbate
1 Batuan 14 8 14 14 100 0 2,600 396 597 641 25
2 Monreal 11 8 8 11 100 0 4,300 768 846 952 22
3 San Fernando 26 17 18 26 100 0 4,100 1,106 1,351 1,434 35
4 San Jacinto 21 13 19 21 100 0 5,300 2,293 2,120 2,315 44
Total 72 46 59 72 100 0 16,300 4,563 4,914 5,342 33
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 2,017 2,117 2,131 Residential 4,198 4,536 4,955
MWH Purchased 341 369 388 Commercial 283 285 285
MWH Sold 256 280 308 Industrial - - -
Systems Loss (%) 25 24 20 Public Building 56 67 76
Peak Load (KW) - - - Others 26 26 26
Load Factor (%) - - - Total 4,563 4,914 5,342
Collection Efficiency (%) 74 76 80
Ave. Systems Rate (P/KWH) 7.89 7.57 6.91
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 924 1,035 1,252 1,343 1,379 1,627 1,956 2,405 2,599 2,906
Commercial 243 239 296 258 219 260 349 452 528 554
Industrial - - - - - - - - - -
Public Building 42 48 58 55 64 73 99 116 146 175
Others 43 42 55 60 63 61 70 93 81 64
Total 1,252 1,364 1,661 1,716 1,725 2,021 2,474 3,066 3,354 3,699
Legislative DistrictPotential
MUNICIPALITIES
San Jacinto
Location
Coverage
B A R A N G A Y S
Energized
C O N N E C T I O N S
Diesel
Type
- Small
TICAO ISLAND ELECTRIC COOPERATIVE, INC. (TISELCO)Almonte St., San Jacinto, Masbate 5417
2008 2009
-
Small
E
2007
Mr. Rene C. Altarejos
Mr. Edgar G. Barrun (OIC)
Mr. Rene C. Altarejos
Mr. Edgar G. Barrun (OIC)
Mr. Rene C. Altarejos
Ms. Ma. Judee D. Almocera (OIC)
NPC-SPUG
POWER PLANT
D
4,563
Monthly Average
4,901
Unenerg.Served
Project Name/Proponent
4,624
128
Energized Coop System
LEGEND :
Energized Other System
Headquarters
N
129
VRESCOManapla, NegrosOccidental
CAPELCOPanitan, Capiz
ILECO IIISara, Iloilo
ILECO IIPototan, Iloilo
CENECOBacolod City
NOCECOCity of Kabankalan
AKELCOLezo, Aklan
ANTECOSan Jose, Antique
Served byPanay Electric Co.
GUIMELCOJordan, Guimaras
ILECO ITigbauan, Iloilo
I. STATUS OF ENERGIZATION (Cumulative):
CONNECTIONS
2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %
A. Electric Cooperatives :
1 Aklan 19 19 19 19 100 380 375 375 377 99 114,700 89,363 91,932 94,001 82
2 Antique 16 16 16 16 100 537 528 534 537 100 96,500 58,036 62,291 67,245 70
3 Capiz 17 17 17 17 100 473 473 473 473 100 143,900 103,398 107,645 113,252 79
4 Iloilo I 15 15 15 15 100 794 794 794 794 100 125,100 99,585 104,855 109,351 87
5 Iloilo II 15 15 15 15 100 587 578 578 587 100 127,700 75,244 79,309 83,284 65
6 Iloilo III 13 13 13 13 100 340 340 340 340 100 88,400 43,041 45,522 48,208 55
7 Guimaras 5 5 5 5 100 98 95 95 98 100 32,000 18,664 19,708 20,776 65
8 VRESCO 9 9 9 9 100 195 195 195 195 100 163,800 86,963 93,038 100,396 61
9 Central Negros 6 6 6 6 100 158 155 158 158 100 181,400 134,354 138,544 142,622 79
10 Negros Occidental 17 17 17 17 100 308 308 308 308 100 204,400 117,643 122,937 128,178 63
Total 132 132 132 132 100 3,870 3,841 3,850 3,867 99 1,277,900 826,291 865,781 907,313 71
REGION VIWESTERN VISAYAS REGION
ELECTRIC DISTRIBUTION UTILITIES
MUNICIPALITIES/CITIES BARANGAYS
CoverageEnergized
CoverageEnergized Served
Potential
130
Total 812,826 850,866 895,566 1,001,479 1,079,667 1,134,527 1,181,673 1,297,533 1,339,061 1,418,990
Others 16,395 17,041 18,330 19,364 19,489 20,891 21,470 21,122 30,352 21,005
Public Bldgs. 35,424 38,328 42,278 49,305 42,048 43,199 46,353 52,121 55,443 60,710
Industrial 170,689 177,446 179,653 198,673 150,082 159,053 173,199 204,701 219,001 235,073
Commercial 132,085 137,200 141,545 156,494 240,123 255,722 271,996 301,031 312,760 337,508
Residential 458,233 480,851 513,760 577,643 627,924 655,663 668,655 718,558 721,505 764,694
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):
PANDANMAKATO
NUMANCIA
IBAJAY
NABAS
MALAY
BURUANGA
LIBERTAD
MALINAO
BALETE
NEW WASHINGTON
MADALAG
BATAN
LIBACAO
PART OF ANTIQUE
BORACAYISLAND
TANGALAN
BANGA
ALTAVAS
LEZOKALIBO
P P
P P
H Q
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
Power Plant
3 PH Backbone Line
Energized Coop System
P P
N
131
P P
I. DATE OF INCORPORATION AND REGISTRATION : April 25, 1972
II. DATE OF FIRST ENERGIZATION : April 16, 1974
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 456.2 530.6 638.6
Subsidy 67.8 109.7 113.2
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %Lone District
1 Altavas 14 14 14 14 100 0 4,900 3,952 4,087 4,217 86
2 Balete 10 9 9 10 100 0 5,200 3,288 3,385 3,310 64
3 Banga 30 30 30 30 100 0 7,000 6,700 6,789 6,975 99
4 Batan 20 20 20 20 100 0 6,000 4,111 4,355 4,416 74
5 Buruanga 15 15 15 15 100 0 3,300 2,041 2,184 2,162 66
6 Ibajay 35 34 34 34 97 1 8,700 7,330 7,480 7,564 87
7 Kalibo 16 16 16 16 100 0 16,200 15,677 15,690 16,121 99
8 Lezo 12 12 12 12 100 0 2,700 2,328 2,361 2,405 89
9 Libacao 24 24 24 24 100 0 5,700 1,876 1,945 1,927 34
10 Madalag 25 25 25 25 100 0 3,800 1,338 1,394 1,462 38
11 Makato 18 17 17 17 94 1 5,000 4,232 4,386 4,457 89
12 Malay 17 17 17 17 100 0 9,200 7,534 8,167 8,532 93
13 Malinao 23 22 22 22 96 1 5,200 3,562 3,685 3,698 71
14 Nabas 20 19 19 20 100 0 5,400 3,883 4,030 4,087 76
15 New Washington 16 16 16 16 100 0 8,100 7,650 7,785 8,063 99
16 Numancia 17 17 17 17 100 0 5,700 5,395 5,338 5,505 97
17 Tangalan 15 15 15 15 100 0 3,800 2,653 2,773 2,849 75 Lone District, Antique
18 Libertad 19 19 19 19 100 0 2,800 1,827 1,929 1,983 71
19 Pandan 34 34 34 34 100 0 6,000 3,986 4,169 4,268 71
2nd District, Capiz
Sapian
Total 380 375 375 377 99 3 114,700 89,363 91,932 94,001 82
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 68,770 72,670 94,519 Residential 81,974 84,460 86,187
MWH Purchased 11,883 11,937 13,784 Commercial 5,382 5,439 5,748
MWH Sold 10,247 10,394 12,224 Industrial 24 32 32
Systems Loss (%) 13 12 10 Public Building 1,603 1,649 1,680
Peak Load (KW) 28,826 31,087 33,479 Others 380 352 354
Load Factor (%) 56 53 56 Total 89,363 91,932 94,001
Collection Efficiency (%) 101 98 98
Ave. Systems Rate (P/KWH) 6.71 6.99 7.73
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2001* 2004 2005 2006 2007 2008 2009
Residential 33,736 30,456 37,081 44,742 49,613 52,642 54,285 56,551 55,286 60,204
Commercial 18,726 16,595 20,637 29,260 35,621 44,411 50,245 57,760 60,451 76,051
Industrial 791 786 1,017 1,216 940 592 471 805 926 1,139
Public Building 2,741 2,734 3,391 4,290 4,693 5,150 5,711 7,149 7,482 8,652
Others 776 476 502 1,117 1,113 876 868 700 589 641
Total 56,770 51,047 62,628 80,625 91,981 103,670 111,580 122,965 124,734 146,687 * 10 months
Type
MUNICIPALITIES
Monthly Average
B A R A N G A Y S
Legislative DistrictCoverage
EnergizedUnenerg.
Location
Mr. Wilfredo A. Ortiz (OIC)
Mega Large
96,943
Mr. Jose Carl C. Quimpo
Mr. Chito R. Peralta
101,948
A
Mega Large
A
Mr. Paterno I. Ibarreta
AKLAN ELECTRIC COOPERATIVE, INC. (AKELCO)Lezo, Aklan
Telefax No. (036) 265-8327; Fax Nos. (036) 265-7302, 268-4009
2008 20092007
105,995
Atty. Immanuel I. Sodusta
Mr. Chito R. Peralta
Potential
Mega Large
C O N N E C T I O N S
Served
A+
POWER PLANT
Project Name/Proponent
5.000
New Washington15MW Bunker Fuel/PPC Global
Business Power Corp. Diesel 12.600
New Washington5MW Bunker Fuel/PPC Global
Business Power Corp. Diesel
132
P P
HQ Location
Municipality
5 MVA Substation
10 MVA Substation
Power Plant
Generating Set
3 PH Backbone Line
Energized Coop System
LEGEND :
H Q
G S
133
N CALUYA IS.SEMIRARA
G SP P
SIBALOM
SAN REMIGIO
SIBAY
VALDERRAMA
HAMTIC
ANINI-Y
SAN JOSE
BELISON
PATNONGON
BUGASONG
BARBAZA
LAUA-AN
TIBIAO
CULASI
SEBASTE
H Q
TOBIASFORNIER(DAO)
I. DATE OF INCORPORATION AND REGISTRATION : December 10, 1972
II. DATE OF FIRST ENERGIZATION : January 1977
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 9.4 9.4 27.0 0.590
Subsidy 70.3 103.8 106.3
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Lone District
1 Anini-y 23 23 23 23 100 0 4,200 2,679 2,827 3,077 73
2 Barbaza 39 38 39 39 100 0 3,900 2,158 2,243 2,367 61
3 Belison 11 11 11 11 100 0 2,600 2,320 2,409 2,506 96
4 Bugasong 27 26 26 27 100 0 6,200 2,952 3,141 3,370 54
5 Caluya Island 18 16 17 18 100 0 4,400 1,752 2,261 2,616 59
6 Culasi 44 43 43 44 100 0 7,200 5,011 5,301 5,622 78
7 Hamtic 47 47 47 47 100 0 8,400 5,513 5,947 6,431 77
8 Laua-an 40 37 40 40 100 0 5,100 2,227 2,349 2,543 50
9 Patnongon 36 36 36 36 100 0 6,900 3,637 3,876 4,312 62
10 San Jose 28 28 28 28 100 0 13,000 11,123 12,008 12,953 99
11 San Remigio 45 45 45 45 100 0 5,600 1,811 1,941 2,120 38
12 Sebaste 10 10 10 10 100 0 3,300 2,110 2,199 2,314 70
13 Sibalom 76 76 76 76 100 0 11,000 7,686 8,284 8,833 80
14 Tibiao 21 21 21 21 100 0 4,800 2,592 2,698 2,847 59
15 Tobias Fornier (Dao) 50 50 50 50 100 0 6,000 3,196 3,444 3,761 63
16 Valderrama 22 21 22 22 100 0 3,900 1,269 1,363 1,573 40
Total 537 528 534 537 100 0 96,500 58,036 62,291 67,245 70
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 25,929 29,264 36,725 Residential 54,917 58,937 63,778
MWH Purchased 4,736 4,763 5,399 Commercial 1,627 1,733 1,770
MWH Sold 4,186 4,205 4,773 Industrial 153 132 128
Systems Loss (%) 11 11 11 Public Building 1,256 1,394 1,455
Peak Load (KW) 12,080 12,741 13,916 Others 83 95 114
Load Factor (%) 54 51 53 Total 58,036 62,291 67,245
Collection Efficiency (%) 97 98 98
Ave. Systems Rate (P/KWH) 6.19 6.96 7.69
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 21,558 22,957 24,963 28,690 31,037 32,003 32,472 34,256 33,381 36,562
Commercial 4,088 4,322 4,773 5,209 5,856 7,073 7,522 8,199 8,329 11,092
Industrial 749 753 1,001 907 1,124 1,594 2,218 2,154 2,170 2,176
Public Building 2,528 2,683 2,857 3,678 4,307 4,267 4,843 5,454 6,411 7,218
Others 225 137 165 132 143 149 154 165 170 228
Total 29,148 30,852 33,759 38,616 42,466 45,085 47,209 50,228 50,461 57,276
66,189
Mr. Efren G. Esclavilla
Unenerg.Served
Extra LargeExtra Large
Engr. Ludovico D. Lim
Legislative DistrictPotential
ANTIQUE ELECTRIC COOPERATIVE, INC. (ANTECO)Brgy. Funda, San Jose, Antique
Tel Nos. (036) 540-8436, 540-9684, 540-9981; Fax No. (036) 540-9786
2008 20092007
MUNICIPALITIES
Monthly Average
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Mr. Vicente M. Painaga, Jr.
Engr. Ludovico D. Lim
A+
Extra Large
Type
Engr. Ludovico D. Lim
69,505 73,543
A+ A+
Mr. Efren G. Esclavilla
Caluya NPC-SPUG Diesel
POWER PLANT
Location Project Name/Proponent
134
N
135
HQ Location
Municipality
10 MVA Substation
Power Plant
3 PH Backbone Line
Energized Coop System
LEGEND :
H Q
P P
5 MVA Substation
TAPAZ
JAMINDAN
PILAR
IVISAN
PANITAN
DUMARAO
CUARTERO
MA-AYON
SIGMA
SAPI-AN
PANAY
DUMALAG
PONTEVEDRA
DAO
PRESIDENTROXAS
MAMBUSAO
ROXAS CITY
P P H Q
I. DATE OF INCORPORATION AND REGISTRATION : June 16, 1971
II. DATE OF FIRST ENERGIZATION : August 1973
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 866.1 1058.8 1,058.8 11.000
Subsidy 93.0 156.3 162.8
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Ma-ayon 32 32 32 32 100 0 6,800 3,849 4,074 4,241 62
2 Panay 42 42 42 42 100 0 8,400 6,089 6,259 6,465 77
3 Panitan 26 26 26 26 100 0 7,800 6,351 6,608 6,934 89
4 Pilar 24 24 24 24 100 0 8,100 4,431 4,561 4,751 59
5 Pontevedra 26 26 26 26 100 0 8,300 6,526 6,749 7,022 85
6 President Roxas 22 22 22 22 100 0 5,500 3,731 3,832 3,971 72
7 Roxas City 47 47 47 47 100 0 34,700 32,431 33,421 34,658 99
Second District
8 Cuartero 22 22 22 22 100 0 5,000 2,822 2,942 3,110 62
9 Dao 20 20 20 20 100 0 6,300 4,060 4,236 4,517 72
10 Dumalag 19 19 19 19 100 0 5,400 4,838 5,057 5,327 99
11 Dumarao 33 33 33 33 100 0 8,400 3,967 4,302 4,649 55
12 Ivisan 15 15 15 15 100 0 5,000 4,096 4,260 4,569 91
13 Jamindan 30 30 30 30 100 0 7,000 3,617 3,847 4,186 60
14 Mambusao 26 26 26 26 100 0 7,600 6,075 6,402 6,788 89
15 Sapi-an 10 10 10 10 100 0 4,700 2,751 2,888 3,097 66
16 Sigma 21 21 21 21 100 0 5,700 4,153 4,417 4,774 84
17 Tapaz 58 58 58 58 100 0 9,200 3,611 3,790 4,193 46
Total 473 473 473 473 100 0 143,900 103,398 107,645 113,252 79
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 60,910 61,620 89,085 Residential 97,070 101,681 107,223
MWH Purchased 11,534 11,503 11,887 Commercial 4,144 4,138 4,079
MWH Sold 9,882 10,014 10,248 Industrial 78 92 75
Systems Loss (%) 14 12 13 Public Building 1,516 1,401 1,368
Peak Load (KW) 29,986 34,727 32,837 Others 590 333 507
Load Factor (%) 53 45 50 Total 103,398 107,645 113,252
Collection Efficiency (%) 99 97 96
Ave. Systems Rate (P/KWH) 6.16 6.15 8.69
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 47,640 50,400 53,048 58,942 61,823 61,865 62,482 67,721 67,467 70,389
Commercial 23,497 25,484 24,900 26,858 27,303 22,271 24,809 31,770 32,790 32,391
Industrial 7,718 6,935 4,871 4,885 7,725 15,505 16,045 11,015 12,430 11,492
Public Building 3,273 3,280 3,722 4,381 5,385 5,911 6,121 6,428 6,513 7,531
Others 931 959 1,063 2,517 1,607 1,419 1,166 1,652 962 1,175
Total 83,059 87,058 87,604 97,583 103,843 106,971 110,623 118,586 120,162 122,978
Artech Phils.
A+
Diesel
Coverage
Location
Legislative District
MUNICIPALITIES/CITYB A R A N G A Y S C O N N E C T I O N S
Panitan
A+
110,625
Mega Large
Mr. Oscar AV. Acolentaba
114,988
Engr. Edgar D. Diaz
Mr. Oscar AV. Acolentaba
Engr. Edgar D. Diaz
Mega LargeMega Large
106,113
A+
CAPIZ ELECTRIC COOPERATIVE, INC. (CAPELCO)Brgy. Timpas, Panitan, Capiz 5815
Tel. Nos. (036) 634-0330, 634-0487, 634-0283 to 84;Telefax Nos. (036) 634-0282, 634-0264
2008 20092007
Monthly Average
Unenerg.Served
PotentialEnergized
Mr. Oscar AV. Acolentaba
Engr. Edgar D. Diaz
Project Name/Proponent
POWER PLANT
Type
136
N
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
20 MVA Substation
3 PH Backbone Line
Energized Coop SystemEnergized Other System
137
Served by Panay Electric Co.
MAASIN
LEGANES
OTON
TUBUNGAN
IGBARAS
GUIMBAL
LEON
ALIMODIAN
SAN JOAQUIN
MIAGAO
TIGBAUAN
CABATUAN
H Q
SANTA. BARBARA
ILOILO CITY
PAVIA
SANMIGUEL
I. DATE OF INCORPORATION AND REGISTRATION : June 10, 1971
II. DATE OF FIRST ENERGIZATION : November 26, 1974
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 28.3 28.3 28.3
Subsidy 67.5 99.7 107.1
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Guimbal 33 33 33 33 100 0 6,000 5,328 5,472 5,705 95
2 Igbaras 46 46 46 46 100 0 6,000 4,075 4,251 4,425 74
3 Miagao 119 119 119 119 100 0 12,500 10,486 10,867 11,280 90
4 Oton 37 37 37 37 100 0 14,400 12,743 13,428 13,951 97
5 San Joaquin 85 85 85 85 100 0 10,400 6,361 6,704 7,011 67
6 Tigbauan 52 52 52 52 100 0 11,000 9,528 9,983 10,304 94
7 Tubungan 48 48 48 48 100 0 4,000 2,779 2,910 3,008 75
Second District
8 Alimodian 51 51 51 51 100 0 6,900 4,824 5,310 5,595 81
9 Leganes 18 18 18 18 100 0 5,100 4,241 4,475 4,684 92
10 Leon 85 85 85 85 100 0 9,500 6,614 6,973 7,291 77
11 Pavia 18 18 18 18 100 0 8,100 7,079 7,555 7,982 99
12 San Miguel 24 24 24 24 100 0 4,500 3,796 3,927 4,069 90
13 Santa Barbara 60 60 60 60 100 0 10,000 9,014 9,482 9,925 99
Third District
14 Cabatuan 68 68 68 68 100 0 10,000 8,631 9,107 9,495 95
15 Maasin 50 50 50 50 100 0 6,700 4,086 4,411 4,626 69
Total 794 794 794 794 100 0 125,100 99,585 104,855 109,351 87
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 68,043 67,523 90,666 Residential 96,470 101,568 106,241
MWH Purchased 11,917 12,010 13,237 Commercial 1,466 1,603 1,680
MWH Sold 10,518 10,658 11,885 Industrial 178 187 199
Systems Loss (%) 11 11 10 Public Building 766 784 800
Peak Load (KW) 30,129 30,010 31,095 Others 705 713 431
Load Factor (%) 54 55 58 Total 99,585 104,855 109,351
Collection Efficiency (%) 100 99 100
Ave. Systems Rate (P/KWH) 6.47 6.34 7.63
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 49,564 54,435 60,221 67,264 73,562 78,368 78,793 84,695 83,859 91,236
Commercial 5,132 5,430 5,394 5,202 5,580 6,710 7,442 10,281 12,219 13,746
Industrial 18,935 20,721 21,176 21,621 23,114 23,436 25,792 26,471 26,836 32,018
Public Building 3,484 3,103 3,190 3,294 3,288 3,445 3,526 3,585 3,768 4,318
Others 783 824 1,015 1,068 1,090 1,159 1,128 1,190 1,212 1,308
Total 77,898 84,513 90,996 98,449 106,635 113,118 116,681 126,222 127,894 142,626
MUNICIPALITIES
Monthly Average
B A R A N G A Y S
Legislative DistrictCoverage
EnergizedUnenerg.
Engr. Wilfred L. Billena
Mega Large
107,639
Atty. Salvador P. Cabaluna III
Engr. Wilfred L. Billena
114,478
A+
Mega Large
A+
Atty. Salvador P. Cabaluna III
ILOILO I ELECTRIC COOPERATIVE, INC. (ILECO I)Brgy. Namucon, Tigbauan, Iloilo 5021
Tel. Nos. (033) 511-7822 to 25; Fax Nos. (033) 511-8852, 511-7824
2008 20092007
118,880
Atty. Salvador P. Cabaluna III
Engr. Wilfred L. Billena
Potential
Mega Large
C O N N E C T I O N S
Served
A+
138
ILECO II
ILECO II
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
Power Plant
3 PH Backbone Line
Energized Coop System
P P
139
N
DUMANGASZARRAGA
JANIUAY
LAMBUNAO
DUENAS
CALINOGCITY of PASSI
MINA
BINGAWAN
SAN ENRIQUE
NEW LUCENA
POTOTANBAROTAC NUEVO
DINGLE
BADIANGAN
P P
H Q
I. DATE OF INCORPORATION AND REGISTRATION : October 18, 1975
II. DATE OF FIRST ENERGIZATION : September 12, 1977
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 12.1 35.1 35.1.
Subsidy 71.0 100.7 107.0
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Second District
1 New Lucena 21 21 21 21 100 0 4,300 3,305 3,461 3,608 84
2 Zarraga 24 24 24 24 100 0 4,100 3,371 3,745 3,982 97
Third District
3 Badiangan 31 31 31 31 100 0 4,800 3,059 3,208 3,318 69
4 Bingawan 14 14 14 14 100 0 2,600 1,182 1,281 1,373 53
5 Calinog 59 52 52 59 100 0 10,600 4,891 5,243 5,542 52
6 Janiuay 60 59 59 60 100 0 11,800 6,001 6,324 6,602 56
7 Lambunao 73 72 72 73 100 0 13,400 5,941 6,382 6,818 51
8 Mina 22 22 22 22 100 0 3,900 2,785 2,930 3,065 79
9 Pototan 50 50 50 50 100 0 13,600 10,086 10,543 11,005 81
Fourth District
10 Barotac Nuevo 29 29 29 29 100 0 10,000 6,833 7,113 7,398 74
11 Dingle 33 33 33 33 100 0 8,400 5,224 5,452 5,780 69
12 Dueñas 47 47 47 47 100 0 6,700 3,814 4,029 4,236 63
13 Dumangas 45 45 45 45 100 0 12,300 8,896 9,200 9,565 78
14 City of Passi 51 51 51 51 100 0 15,000 7,069 7,460 7,842 52
15 San Enrique 28 28 28 28 100 0 6,200 2,787 2,938 3,150 51
Total 587 578 578 587 100 0 127,700 75,244 79,309 83,284 65
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 43,486 43,593 51,365 Residential 71,944 75,920 79,765
MWH Purchased 7,894 8,041 8,613 Commercial 2,388 2,408 2,483
MWH Sold 6,822 6,969 7,512 Industrial 46 55 60
Systems Loss (%) 13 13 13 Public Building 661 712 749
Peak Load (KW) 20,491 22,806 21,644 Others 205 214 227
Load Factor (%) 53 48 55 Total 75,244 79,309 83,284
Collection Efficiency (%) 95 94 96
Ave. Systems Rate (P/KWH) 6.37 6.26 6.84
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 31,922 35,282 39,532 43,205 49,333 53,518 55,439 60,102 60,516 64,969
Commercial 7,098 7,201 7,116 7,323 8,601 7,919 8,406 9,399 9,639 10,567
Industrial 4,823 5,057 4,275 4,698 4,103 3,563 4,097 4,491 5,281 5,668
Public Building 3,176 3,548 3,913 4,750 5,645 6,009 6,512 7,238 7,525 8,208
Others 2,054 2,254 2,415 858 878 743 679 630 665 735
Total 49,073 53,342 57,251 60,834 68,561 71,752 75,133 81,860 83,626 90,147
Mr. Rene C. Parco Mr. Rogelio P. Solania
Ms. Maesit Q. Gallo (OIC) Engr. Jose Redmond Eric S. Roquios (OIC)
ILOILO II ELECTRIC COOPERATIVE, INC. (ILECO II)Brgy. Cau-ayan, Pototan, Iloilo
Tel. Nos. (033) 529-8668, 529-8063, 357-1168; Fax Nos. 529-8064, 529-8981; E-mail: [email protected]
2008 20092007
Project Name/Proponent Type
Extra Large
Dingle
MUNICIPALITIES/CITY
Atty. Dennis T. Ventilacion
Mr. Ramon P. Apura, Sr.
A+ A+A+
Extra Large
Served
146.700DieselPanay DPP/SPC Power
Corporation
Extra Large
B A R A N G A Y S C O N N E C T I O N S
POWER PLANT
Location
Monthly Average
81,793 86,694
Potential
77,879
CoverageEnergized
Unenerg.Legislative District
140
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
Power Plant
Generating Set
3 PH Backbone Line
Energized Coop System
G S
P P
141
N
ANILAO
BAROTAC VIEJO
SAN RAFAEL
SANDIONISIO
CONCEPCION
AJUY
BANATE
ESTANCIA
BATAD
SARA
NORTH GIGANTI
SOUTH GIGANTI
CALAGNAAN
SICOGON
PAN DE AZUCAR
MATANGABAN
IGBON
TAGUBANHAN
LEMERY
BALASAN
CARLES
P P
H Q
G S
I. DATE OF INCORPORATION AND REGISTRATION : June 30, 1986
II. DATE OF FIRST ENERGIZATION : September 1986
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 23.9 29.9 56.6 32.000
Subsidy 50.6 65.3 71.4 0.326
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Fourth District
1 Anilao 21 21 21 21 100 0 4,800 2,273 2,389 2,513 52
2 Banate 18 18 18 18 100 0 5,900 3,804 3,979 4,120 70
Fifth District
3 Ajuy 34 34 34 34 100 0 9,900 4,524 4,854 5,159 52
4 Balasan 23 23 23 23 100 0 5,600 3,429 3,592 3,839 69
5 Barotac Viejo 26 26 26 26 100 0 7,900 3,551 3,821 4,059 51
6 Batad 24 24 24 24 100 0 3,700 2,084 2,208 2,348 63
7 Carles 33 33 33 33 100 0 11,700 3,164 3,387 3,633 31
8 Concepcion 25 25 25 25 100 0 7,500 2,472 2,596 2,821 38
9 Estancia 25 25 25 25 100 0 8,100 5,575 5,876 6,129 76
10 Lemery 31 31 31 31 100 0 5,100 2,315 2,464 2,638 52
11 San Dionisio 29 29 29 29 100 0 6,200 3,192 3,337 3,519 57
12 San Rafael 9 9 9 9 100 0 2,800 1,409 1,482 1,560 56
13 Sara 42 42 42 42 100 0 9,200 5,249 5,537 5,870 64
Total 340 340 340 340 100 0 88,400 43,041 45,522 48,208 55
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 23,843 25,065 29,854 Residential 41,271 43,678 46,317
MWH Purchased 4,289 4,405 4,621 Commercial 1,182 1,200 1,224
MWH Sold 3,769 3,848 4,051 Industrial 28 29 30
Systems Loss (%) 12 12 12 Public Building 477 526 547
Peak Load (KW) 11,355 11,827 11,631 Others 83 89 90
Load Factor (%) 52 51 54 Total 43,041 45,522 48,208
Collection Efficiency (%) 91 93 94
Ave. Systems Rate (P/KWH) 6.33 6.51 7.37
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 17,126 18,210 19,618 22,778 26,101 26,647 27,168 29,920 29,744 31,323
Commercial 3,246 3,510 3,662 3,866 3,930 3,820 3,857 4,135 4,313 5,011
Industrial 2,908 2,932 2,108 2,206 2,656 4,512 7,104 7,805 8,829 8,600
Public Building 1,516 1,614 1,791 1,947 2,171 2,419 2,712 3,037 2,904 3,314
Others 729 716 806 277 592 365 304 334 381 369
Total 25,525 26,982 27,985 31,074 35,450 37,764 41,145 45,231 46,171 48,617
NPC-SPUG Diesel
Type
Estancia PB 103/NPC Diesel
ILOILO III ELECTRIC COOPERATIVE, INC. (ILECO III)Brgy. Preciosa, Sara, Iloilo
Tel. Nos. (033) 392-0104, 392-0211, 329-0388; Telefax No. (033) 392-0202
2008 20092007
A
Large
Atty. Mateo B. Baldoza, Jr. Atty. Mateo B. Baldoza, Jr.
- Mr. Ed Adlao (PS) / Engr. Antonio P. Lazarraga (CMTL)
Mr. Azur D. Salcedo
Mr. Gil A. Altamira
A+ A+
Unenerg.Served
Large Large
B A R A N G A Y S C O N N E C T I O N S
POWER PLANT
Location Project Name/Proponent
Carles
Legislative District
Monthly Average
47,730 50,210
Potential
45,070
MUNICIPALITIES
CoverageEnergized
142
N
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
Power Plant
3 PH Backbone Line
Energized Coop System
P P
PANODOLAN
NUEVAVALENCIA
NAMPOLOGAN
SIBUNAG
ILOILO
INGORE, LAPAZILOILO CITY
BUENAVISTA
JORDAN
SAN LORENZO
P PH Q
143
I. DATE OF INCORPORATION AND REGISTRATION : June 29, 1979
II. DATE OF FIRST ENERGIZATION : April 1983
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 5.2 10.2 10.2
Subsidy 36.3 43.2 43.2
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Lone District
1 Buenavista 36 36 36 36 100 0 9,500 6,621 6,923 7,267 76
2 Jordan 14 14 14 14 100 0 6,500 4,294 4,493 4,747 73
3 Nueva Valencia 22 20 20 22 100 0 7,000 4,029 4,237 4,443 63
4 San Lorenzo 12 12 12 12 100 0 4,500 2,116 2,314 2,439 54
5 Sibunag 14 13 13 14 100 0 4,500 1,604 1,741 1,880 42
Total 98 95 95 98 100 0 32,000 18,664 19,708 20,776 65
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 9,870 12,121 11,997 Residential 17,450 18,479 19,519
MWH Purchased 1,464 1,445 1,560 Commercial 725 732 752
MWH Sold 1,208 1,208 1,315 Industrial 22 22 22
Systems Loss (%) 17 16 15 Public Building 326 332 338
Peak Load (KW) - - - Others 141 143 145
Load Factor (%) - - - Total 18,664 19,708 20,776
Collection Efficiency (%) 98 95 97
Ave. Systems Rate (P/KWH) 8.17 10.03 9.12
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 6,323 6,465 7,487 8,969 9,701 9,848 9,309 10,260 10,023 10,792
Commercial 1,058 1,053 1,143 1,202 1,429 1,479 1,383 1,480 1,631 1,839
Industrial 881 822 907 960 1,153 1,254 899 887 920 1,001
Public Building 630 690 790 984 1,145 1,205 846 1,801 1,856 2,071
Others 44 35 39 149 99 107 798 74 68 74
Total 8,936 9,065 10,366 12,264 13,527 13,893 13,235 14,502 14,498 15,777
3.400
A
Large Large
Guimaras Power Project/Trans-Asia
Diesel
POWER PLANT
Location
GUIMARAS ELECTRIC COOPERATIVE, INC. (GUIMELCO)San Miguel, Jordan, Guimaras
Tel. No. (033) 237-1682; Cel. No. (0917) 302-7866; (0916) 366-7298: Telefax Nos. (033) 581-3157, 237-1139; E-mail: [email protected]
2008 20092007
Served
B A R A N G A Y S C O N N E C T I O N S
Project Name/Proponent Type
Mr. Desiderio T. Gange
18,407
Mr. Alex S. Garganera
Ms. Remedios A. Garcia
Mr. Jereme G. Ronzales
Monthly Average
Ms. Remedios A. Garcia (OIC)
18,407
B
Potential
18,407
CoverageEnergized
Unenerg.
Ms. Remedios A. Garcia (OIC)
MUNICIPALITIES
Jordan
A
Large
Legislative District
144
N
145
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
20 MVA Substation
3 PH Backbone Line
Energized Coop System
CENTRAL NEGROS
SAN JUAN
DAKU
TOBOSO
CALATRAVA
SAGAY CITY
CITY ofESCALANTE
CADIZ CITY
MOLOCABOC
DIUTAY
SAN CARLOS CITY
MANAPLA
ERMITA
ENRIQUE B.MAGALONA(Saravia)
CITY of VICTORIAS
H Q
I. DATE OF INCORPORATION AND REGISTRATION : February 1, 1971
II. DATE OF FIRST ENERGIZATION : September 1966
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 743.0 1077.9 1,472.9
Subsidy 55.8 55.8 83.8
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District, Negros Occidental1 Calatrava 40 40 40 40 100 0 15,900 3,682 4,043 5,131 32
2 City of Escalante 21 21 21 21 100 0 16,800 8,485 8,986 9,792 58
3 San Carlos City 18 18 18 18 100 0 25,000 11,788 12,744 13,658 55
4 Toboso 9 9 9 9 100 0 8,600 2,801 3,033 3,232 38
Second District, Negros Occidental5 Cadiz City 22 22 22 22 100 0 30,000 17,975 19,387 20,655 69
6 Manapla 12 12 12 12 100 0 10,500 6,335 6,835 7,432 71
7 Sagay City 24 24 24 24 100 0 27,600 11,160 11,796 12,807 46
Third District, Negros Occidental8 Enrique B. Magalona (Saravia) 23 23 23 23 100 0 11,800 9,959 10,813 11,543 98
9 City of Victorias 26 26 26 26 100 0 17,600 14,778 15,401 16,146 92
Total 195 195 195 195 100 0 163,800 86,963 93,038 100,396 61
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 57,155 60,374 73,062 Residential 81,449 87,560 94,805
MWH Purchased 11,420 11,920 12,708 Commercial 3,284 3,246 3,307
MWH Sold 9,731 10,222 11,060 Industrial 81 89 91
Systems Loss (%) 14 14 13 Public Building 461 483 501
Peak Load (KW) 27,062 28,924 31,557 Others 1,688 1,660 1,692
Load Factor (%) 58 56 55 Total 86,963 93,038 100,396
Collection Efficiency (%) 95 95 95
Ave. Systems Rate (P/KWH) 5.87 5.91 6.61
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 40,492 42,236 44,429 49,574 54,179 56,817 57,335 61,364 62,738 66,822
Commercial 13,272 13,872 14,277 16,574 17,875 18,701 19,205 20,113 20,981 22,245
Industrial 18,434 15,037 16,648 16,435 19,965 17,353 18,075 24,577 27,709 31,957
Public Building 2,769 4,007 4,028 4,949 5,724 5,799 6,034 6,231 6,579 6,623
Others 3,585 3,683 4,053 4,237 4,900 4,352 4,290 4,483 4,661 5,070
Total 78,552 78,835 83,435 91,769 102,643 103,021 104,939 116,768 122,668 132,717
Mr. Armando Federico L. Valmayor
V-M-C RURAL ELECTRIC SERVICE COOPERATIVE, INC. (VRESCO)Crossing Tortosa, Manapla, Negros Occidental
Tel. Nos. (034) 717-0921, 718-2002, 717-0200; Cel. No. (0912) 885-0511; Telefax No. (034) 717-0511
2008 20092007
Engr. Eduardo B. Parrocho
101,436
A+
Mega LargeMega Large
90,944
A+
Mega Large
Unenerg.Served
Legislative District
MUNICIPALITIES/CITIESB A R A N G A Y S C O N N E C T I O N S
Monthly Average
Mr. Armando Federico L. Valmayor
Engr. Eduardo B. Parrocho
96,539
A+
Potential
Mr. Armando Federico L. Valmayor
Engr. Eduardo B. Parrocho
CoverageEnergized
146
N
147
HQ Location
Municipality
5 MVA Substation
10 MVA Substation
20 MVA Substation
30 MVA Substation
Power Plant
3 PH Backbone Line
LEGEND :
Energized Coop System
H Q
P P
SILAY CITY
BAGO CITY
CITY of TALISAY
MURCIA
SALVADOR BENEDICTO
BACOLOD CITYH Q
P P
I. DATE OF INCORPORATION AND REGISTRATION : February 24, 1975
II. DATE OF FIRST ENERGIZATION : December 16, 1975
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 271.2 655.0 1,015.0
Subsidy 80.2 109.3 111.8
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Lone District, Bacolod City
1 Bacolod City 61 61 61 61 100 0 95,500 90,939 93,205 94,752 99
First District, Negros Occidental
2 Salvador Benedicto* 7 4 7 7 100 0 3,600 241 479 786 22
Third District, Negros Occidental
3 Murcia 23 23 23 23 100 0 12,600 6,131 6,328 6,728 53
4 Silay City 16 16 16 16 100 0 22,900 13,618 13,983 14,439 63
5 City of Talisay 27 27 27 27 100 0 16,800 11,590 12,182 12,700 76 Fourth District, Negros Occidental
6 Bago City 24 24 24 24 100 0 30,000 11,835 12,367 13,217 44
Total 158 155 158 158 100 0 181,400 134,354 138,544 142,622 79
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 208,855 204,625 247,869 Residential 124,409 128,386 132,329
MWH Purchased 46,148 47,558 49,147 Commercial 9,367 9,534 9,686
MWH Sold 40,647 42,090 43,534 Industrial 79 113 93
Systems Loss (%) 12 11 11 Public Building - - -
Peak Load (KW) 107,063 110,310 110,356 Others 499 511 514
Load Factor (%) 59 59 61 Total 134,354 138,544 142,622
Collection Efficiency (%) 94 94 96
Ave. Systems Rate (P/KWH) 5.14 4.86 5.69
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 154,644 162,491 167,884 186,572 201,260 210,873 216,483 233,867 239,020 249,210
Commercial 43,942 46,804 46,102 46,184 118,176 126,431 130,601 138,465 141,668 142,181
Industrial 102,748 110,459 114,640 118,601 73,011 76,805 83,081 108,343 117,286 124,129
Public Building 11,286 11,757 12,417 13,591 1,109 - - - - -
Others 4,295 4,997 5,032 5,182 5,292 6,860 6,970 7,092 7,105 6,891
Total 316,915 336,508 346,075 370,130 398,848 420,968 437,135 487,767 505,079 522,411
* With Provisional Franchise, NEC Res. No. 4 s. 1976
MUNICIPALITIES/CITIES
Monthly Average
B A R A N G A Y S
Legislative DistrictCoverage
EnergizedUnenerg.
CENTRAL NEGROS ELECTRIC COOPERATIVE, INC. (CENECO)Cor. Gonzaga & Mabini Sts., Bacolod City
Tel. Nos. (034) 435-3640 to 50; Fax No. (034) 435-4079, 433-2533
2008 20092007
Potential
Mega Large
C O N N E C T I O N S
Served
POWER PLANT
Location Project Name/Proponent Type
Bago CityNorthern Negros
GPP/PNOC
122,922
Mr. Erlo S. Sajo (CMT)
133,681
Atty. Edward M. Gasambelo
Mr. Sulpicio C. Lagarde, Jr.
A+
Geothermal 49.000
Mr. Roberto L. Montelibano
128,092
A+
Mega Large
A+
Atty. Vicente D. Sabornay
Engr. Edwin M. Montemayor (OIC) Mr. Eddie A. Adlao (PS)
Mega Large
148
HQ Location
Municipality
5 MVA Substation
10 MVA Substation
3 PH Backbone Line
LEGEND :
H QEnergized Coop System
149
N
PULUPANDAN
VALLADOLID
SAN ENRIQUE LA CARLOTA CITY
LA CASTELLANA
HINIGARAN MOISESPADILLA(Magallon)
ISABELABINALBAGAN
CITY ofHIMAMAYLAN
CITY ofKABANKALAN
ILOG
CAUAYAN
CANDONI
CITY of SIPALAY
HINOBA-AN (Asia)
PONTEVEDRA
H Q
I. DATE OF INCORPORATION AND REGISTRATION : February 25, 1978
II. DATE OF FIRST ENERGIZATION : January 1979
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 9.3 9.3 9.3
Subsidy 56.4 56.4 101.5
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Fourth District, Negros Occidental
1 La Carlota City 14 14 14 14 100 0 12,000 9,695 10,094 10,446 87
2 Pontevedra 20 20 20 20 100 0 8,900 6,501 6,823 7,106 80
3 Pulupandan 20 20 20 20 100 0 5,500 4,760 5,000 5,099 93
4 San Enrique 10 10 10 10 100 0 4,800 3,832 3,993 4,097 85
5 Valladolid 16 16 16 16 100 0 7,000 5,784 6,043 6,245 89
Fifth District, Negros Occidental
6 Binalbagan 16 16 16 16 100 0 12,400 8,436 8,690 8,960 72
7 City of Himamaylan 19 19 19 19 100 0 18,800 10,747 11,127 11,567 62
8 Hinigaran 24 24 24 24 100 0 16,000 11,057 11,487 11,887 74
9 Isabela 30 30 30 30 100 0 10,300 5,560 5,757 5,978 58
10 La Castellana 13 13 13 13 100 0 12,600 5,007 5,313 5,567 44
11 Moises Padilla (Magallon) 15 15 15 15 100 0 7,300 2,029 2,090 2,182 30
Sixth District, Negros Occidental
12 Candoni 9 9 9 9 100 0 4,200 1,598 1,692 1,787 43
13 Cauayan 25 25 25 25 100 0 18,900 7,383 7,728 8,226 44
14 Hinoba-an (Asia) 13 13 13 13 100 0 10,700 5,006 5,372 5,660 53
15 Ilog 15 15 15 15 100 0 9,900 5,959 6,162 6,402 65
16 City of Kabankalan 32 32 32 32 100 0 31,900 17,848 18,760 19,747 62
17 City of Sipalay 17 17 17 17 100 0 13,200 6,441 6,806 7,222 55
Total 308 308 308 308 100 0 204,400 117,643 122,937 128,178 63
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 65,132 71,709 79,409 Residential 112,139 117,095 122,016
MWH Purchased 12,500 13,430 13,161 Commercial 3,576 3,800 3,898
MWH Sold 11,117 11,981 11,646 Industrial 23 16 16
Systems Loss (%) 11 11 11 Public Building 1,619 1,719 1,800
Peak Load (KW) 31,210 34,220 32,571 Others 286 307 448
Load Factor (%) 55 54 55 Total 117,643 122,937 128,178
Collection Efficiency (%) 104 103 101
Ave. Systems Rate (P/KWH) 5.86 5.99 6.82
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 55,228 57,919 59,497 66,907 71,316 73,083 74,889 79,822 79,471 83,187
Commercial 12,026 12,929 13,541 14,816 15,751 16,907 18,526 19,429 20,739 22,385
Industrial 12,702 13,944 13,010 27,144 16,290 14,439 15,417 18,153 16,614 16,893
Public Building 4,021 4,912 6,179 7,441 8,581 8,994 10,048 11,198 12,405 12,775
Others 2,973 2,960 3,240 3,827 3,775 4,862 5,113 4,802 14,539 4,514
Total 86,950 92,664 95,467 120,135 115,714 118,285 123,993 133,404 143,768 139,754
NEGROS OCCIDENTAL ELECTRIC COOPERATIVE, INC. (NOCECO)Naga, City of Kabankalan, Negros Occidental
Tel Nos. (034) 746-9117, 471-2229, 471-2339, 471-2746, 746-9255; Fax No. (034) 471-2829; E-mail: [email protected]
2008 20092007
Unenerg.Served
MUNICIPALITIES/CITIES
Legislative DistrictPotential
C O N N E C T I O N S
139,213
- -
- -
Mr. John Peter Z. Millan
Engr. Lamberto M. Canlas
Mr. John Peter Z. Millan
Engr. Lamberto M. Canlas
Mr. John Peter Z. Millan
Engr. Lamberto M. Canlas
-
Monthly Average
134,341
-
123,590
B A R A N G A Y S
CoverageEnergized
150
Energized Coop System
LEGEND :
Energized Other System
Headquarters
151
BANELCOBantayan, Cebu
PROSIELCOLarena, Siquijor
Served byVisayan Electric Co., Inc.
Served byMactan Electric Co., Inc.
Served byBohol Light Co., Inc.
BOHECO IIJagna, Bohol
BOHECO ITubigon, Bohol
NORECO IIDumaguete City
CEBECO IDumanjug, Cebu
NORECO IBindoy, Negros Oriental
CEBECO IIIToledo City
CELCOPoro, Cebu
CEBECO IICity of BogoN
I. STATUS OF ENERGIZATION (Cumulative):
2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %
A. Electric Cooperatives:
1 Negros Oriental I 11 11 11 11 100 285 285 285 285 100 115,100 43,415 45,779 49,104 43
2 Negros Oriental II 14 14 14 14 100 272 271 272 272 100 152,500 98,352 102,689 106,879 70
3 Bantayan 3 3 3 3 100 49 49 49 49 100 30,200 17,498 18,072 18,694 62
4 Cebu I 18 18 18 18 100 366 366 366 366 100 139,400 79,224 85,445 91,282 65
5 Cebu II 13 13 13 13 100 323 323 323 323 100 141,900 100,555 105,674 111,189 78
6 Cebu III 5 5 5 5 100 134 134 134 134 100 82,100 57,776 60,890 64,062 78
7 Siquijor 6 6 6 6 100 134 134 134 134 100 19,800 15,286 16,093 17,080 86
8 Camotes 4 4 4 4 100 56 56 56 56 100 21,400 11,484 12,044 12,615 59
9 Bohol I 26 26 26 26 100 603 603 603 603 100 124,700 106,079 113,858 121,717 98
10 Bohol II 21 21 21 21 100 491 491 491 491 100 124,500 81,262 86,153 90,116 72
Total 121 121 121 121 100 2,713 2,712 2,713 2,713 100 951,600 610,931 646,697 682,738 72
REGION VII
ServedPotential
CENTRAL VISAYAS REGION
ELECTRIC DISTRIBUTION
UTILITIES
MUNICIPALITIES/CITIES BARANGAYS
CoverageEnergized
CONNECTIONS
CoverageEnergized
152
Total 421,594 447,329 467,398 528,427 571,425 636,000 668,578 728,768 786,105 816,489
Others 13,893 14,495 15,789 17,836 26,977 31,421 31,867 37,141 39,130 42,469
Public Bldgs. 19,680 22,105 24,292 29,143 32,513 34,596 37,277 41,255 44,604 49,381
Industrial 98,387 99,459 91,965 100,012 98,105 127,550 143,232 157,456 184,945 168,443
Commercial 87,062 93,719 100,391 111,628 122,509 139,447 146,819 158,448 168,651 179,815
Residential 202,572 217,551 234,961 269,808 291,321 302,986 309,383 334,468 348,775 376,381
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
3 PH Backbone Line
Energized Coop System
153
N
BAIS CITY
MANJUYOD
AYUNGON
CITY of GUIHULNGAN
LA LIBERTAD
JIMALALUD
TAYASAN
VALLEHERMOSO
MABINAY
CANLAON CITY
H Q
BINDOY(Payabon)
I. DATE OF INCORPORATION AND REGISTRATION : June 14, 1972
II. DATE OF FIRST ENERGIZATION : April 10, 1978
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 15.6 20.8 49.4
Subsidy 55.7 81.7 88.0
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Ayungon 24 24 24 24 100 0 9,200 3,530 3,715 3,877 42
2 Bindoy (Payabon) 22 22 22 22 100 0 8,100 4,223 4,419 4,547 56
3 Canlaon City 12 12 12 12 100 0 10,600 3,767 3,975 4,309 41
4 City of Guihulngan 33 33 33 33 100 0 19,000 5,998 6,297 6,694 35
5 Jimalalud 28 28 28 28 100 0 6,000 1,625 1,723 1,883 31
6 La Libertad 29 29 29 29 100 0 8,000 2,227 2,437 2,616 33
7 Manjuyod 27 27 27 27 100 0 8,600 4,310 4,591 4,930 57
8 Tayasan 28 28 28 28 100 0 7,000 2,370 2,485 2,749 39
9 Vallehermoso 15 15 15 15 100 0 7,700 2,295 2,399 2,517 33
Second District
10 Bais City 35 35 35 35 100 0 15,700 8,065 8,447 9,252 59
11 Mabinay 32 32 32 32 100 0 15,200 5,005 5,291 5,730 38
Total 285 285 285 285 100 0 115,100 43,415 45,779 49,104 43
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 16,940 20,433 23,117 Residential 40,961 43,260 46,499
MWH Purchased 3,305 3,421 3,596 Commercial 1,178 1,195 1,267
MWH Sold 2,825 2,957 3,128 Industrial 298 304 282
Systems Loss (%) 14 13 13 Public Building 772 817 849
Peak Load (KW) 9,020 9,923 9,975 Others 206 203 207
Load Factor (%) 50 47 49 Total 43,415 45,779 49,104
Collection Efficiency (%) 96 95 96
Ave. Systems Rate (P/KWH) 6.00 6.91 7.39
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 12,836 13,979 14,322 16,647 18,448 18,622 18,281 20,108 20,623 21,356
Commercial 2,292 2,640 2,414 2,883 3,445 3,616 4,133 4,578 4,928 5,286
Industrial 2,678 2,829 2,830 3,302 3,604 4,206 3,442 3,934 4,058 4,562
Public Building 2,682 3,141 3,362 3,562 3,723 3,591 3,590 3,837 4,216 4,572
Others 1,074 1,244 1,340 1,560 1,847 1,877 1,422 1,438 1,661 1,765
Total 21,562 23,833 24,268 27,954 31,067 31,912 30,868 33,895 35,486 37,541
Monthly Average
43,551
Mr. Angelito A. Carriaga
A+
Extra Large
41,516
MUNICIPALITIES/CITIES
Legislative District
45,898
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.Served
Potential
A+
Extra Large Extra Large
Engr. Anito A. Mercado Engr. Anito A. Mercado
Mr. Edmund G. Nochefranca (OIC)Mr. Angelito A. Carriaga
A+
Engr. Anito A. Mercado
NEGROS ORIENTAL I ELECTRIC COOPERATIVE, INC. (NORECO I)Tinaogan, Bindoy, Negros Oriental 6209
Tel Nos. (035) 405-3055; Telefax No. (035) 405-3001; Cell. No. 0912-515-0291
2008 20092007
154
N
LEGEND :
HQ Location
Municipality
Below 5 MVA Substation
5 MVA Substation
10 MVA Substation
20 MVA Substation
Power Plant
3 PH Backbone Line
Energized Coop SystemH Q
P P
155
SANTA CATALINA
BASAY
APO ISLAND
CITY ofBAYAWAN(Tulong)
SIATON
DUMAGUETE CITY
AMLAN(Ayuquitan)
ZAMBOANGUITA
BACONG
SIBULAN
SAN JOSE
VALENCIA(Luzurriaga)
DAUIN
PAMPLONA
CITY of TANJAY
P P
P P H Q
I. DATE OF INCORPORATION AND REGISTRATION : April 2, 1977
II. DATE OF FIRST ENERGIZATION : December 1977
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 0.1 0.1 0.1
Subsidy 42.5 42.5 42.5
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Second District
1 Amlan (Ayuquitan) 8 8 8 8 100 0 4,200 2,955 3,099 3,222 77
2 Dumaguete City 30 30 30 30 100 0 30,900 28,802 29,773 30,858 99
3 Pamplona 16 15 16 16 100 0 7,400 2,817 3,024 3,173 43
4 San Jose 14 14 14 14 100 0 3,500 2,954 3,067 3,160 90
6 City of Tanjay 24 24 24 24 100 0 16,000 11,051 11,336 11,649 73
Third District
7 Bacong 22 22 22 22 100 0 5,900 5,484 5,683 5,880 99
8 Basay 10 10 10 10 100 0 4,800 1,555 1,704 1,840 38
9 City of Bayawan (Tulong) 28 28 28 28 100 0 23,000 6,923 7,425 7,901 34
10 Dauin 23 23 23 23 100 0 4,800 4,317 4,566 4,759 99
11 Siaton 26 26 26 26 100 0 14,600 7,536 7,809 8,028 55
12 Santa Catalina 22 22 22 22 100 0 15,300 5,382 5,621 5,792 38
13 Valencia (Luzurriaga) 24 24 24 24 100 0 6,900 6,200 6,477 6,816 99
14 Zamboanguita 10 10 10 10 100 0 5,200 3,461 3,660 3,821 73
Total 272 271 272 272 100 0 152,500 98,352 102,689 106,879 70
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 77,542 80,153 99,977 Residential 89,478 93,526 97,447
MWH Purchased 15,884 16,775 17,488 Commercial 7,461 7,672 7,876
MWH Sold 13,906 14,536 15,532 Industrial 95 100 96
Systems Loss (%) 12 13 11 Public Building 873 933 985
Peak Load (KW) 38,190 40,733 40,652 Others 445 458 475
Load Factor (%) 57 56 59 Total 98,352 102,689 106,879
Collection Efficiency (%) 91 91 91
Ave. Systems Rate (P/KWH) 5.58 5.51 6.44
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 48,699 51,236 53,758 62,077 67,643 72,262 76,514 82,106 84,892 90,021
Commercial 30,945 32,073 32,636 36,921 36,683 37,703 40,640 43,339 46,311 48,412
Industrial 8,228 9,687 10,251 10,248 6,077 3,870 4,074 4,522 4,977 5,993
Public Building 5,593 6,281 6,713 7,614 7,519 7,992 8,806 9,743 9,978 10,960
Others 4,753 4,793 5,237 6,199 13,973 21,463 22,246 27,158 28,271 31,003
Total 98,218 104,070 108,595 123,059 131,895 143,290 152,280 166,868 174,429 186,389
-
NEGROS ORIENTAL II ELECTRIC COOPERATIVE, INC. (NORECO II)Real St., Dumaguete City
Tel. Nos. (035) 422-7469, 225-8275, 225-1648, 225-4514, 225-0721; Telefax No. (035) 225-4783; Fax No. (035) 4229982; E-mail: [email protected]
2008 20092007
MUNICIPALITIES/CITIES
Coverage
Mr. Felix G. Gaudiel, Jr.
Engr. Ephraim T. Taclob
- -
Mr. Felix G. Gaudiel, Jr. Mr. Felix G. Gaudiel, Jr.
Engr. Ephraim T. Taclob Engr. Ephraim T. Taclob
PotentialUnenerg.
0.800
-
B A R A N G A Y S C O N N E C T I O N S
--
Valencia Geothermal
Type
AmlanAmlan HEP/ICS Renewables Inc.
Hydro
192.500
Palinpinon-Tongonan Geothermal Power
Plant/Green Core Geothermal Inc.
Project Name/Proponent
Monthly Average
85,325 88,52582,360
Energized
POWER PLANT
Location
Legislative District
Served
156
5 Sibulan 15 15 15 15 100 0 10,000 8,915 9,445 9,980 99
LEGEND :
H Q HQ Location
Municipality
Generating Set
3 PH Backbone Lines
Energized Coop System
G S
N
BANTAYAN
SANTA FE
MADRIDEJOS
G S
G S
G S
G S
G S
G S
KINATARKAN ISLET
GILANTAGAAN ISLET
BOTIGUES ISLET
DOONG ISLET
LIPAYRAN ISLET
HILOTONGAN ISLET
G S
H Q
157
I. DATE OF INCORPORATION AND REGISTRATION : September 29, 1978
II. DATE OF FIRST ENERGIZATION : December 1983
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 16.1 31.1 31.1 4.326
Subsidy 9.6 15.6 18.9 0.263
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Fourth District, Cebu1 Bantayan 25 25 25 25 100 0 17,100 10,101 10,404 10,736 63
2 Madridejos 14 14 14 14 100 0 7,300 4,270 4,399 4,543 62
3 Santa Fe 10 10 10 10 100 0 5,800 3,127 3,269 3,415 59
Total 49 49 49 49 100 0 30,200 17,498 18,072 18,694 62
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 9,383 9,703 10,426 Residential 15,364 16,186 16,782
MWH Purchased 1,279 1,301 1,437 Commercial 1,486 1,503 1,515
MWH Sold 1,125 1,175 1,294 Industrial 25 26 27
Systems Loss (%) 12 9 10 Public Building 317 318 328
Peak Load (KW) 3,400 3,791 3,260 Others 306 39 42
Load Factor (%) 52 47 60 Total 17,498 18,072 18,694
Collection Efficiency (%) 101 101 101
Ave. Systems Rate (P/KWH) 8.34 8.26 8.06
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 6,481 6,715 6,507 6,538 6,446 6,738 6,695 7,094 7,284 8,215
Commercial 1,701 1,788 1,800 2,390 3,570 3,843 3,819 4,262 4,519 4,811
Industrial 701 496 350 422 661 930 1,311 1,472 1,580 1,780
Public Building 260 302 298 354 450 472 465 504 547 561
Others 298 258 277 232 169 169 164 169 166 163
Total 9,441 9,559 9,232 9,936 11,297 12,152 12,454 13,501 14,096 15,530
Ms. Maria Neriza S. Gigante
Mr. Oscar T. Seares Mr. Oscar T. Seares
BANTAYAN ISLAND ELECTRIC COOPERATIVE, INC. (BANELCO)Balintawak, Bantigue, Bantayan, Cebu
Tel. No. (032) 352-5205; Fax No. (SOTELCO) (032) 460-9112; 460-9281
2008 20092007
Legislative DistrictPotential
MUNICIPALITIES
Medium
Coverage
Atty. Samson Troy K. Layese
Mr. Oscar T. Seares
A+
Atty. Samson Troy K. Layese
Medium
A+
Medium
B A R A N G A Y S C O N N E C T I O N S
A+
Santa Fe
Served
POWER PLANT
Location Project Name/Proponent Type
NPC-SPUG Diesel
Monthly Average
18,520 19,14217,946
Bantayan NPC-SPUG Diesel
EnergizedUnenerg.
158
HQ Location
Municipality
Below 5 MVA Substation
5 MVA Substation
10 MVA Substation
Mini Hydro
3PH Backbone Line
LEGEND :
H QEnergized Coop System
MH
N
159
SANTANDER
SAMBOAN
ALEGRIA
MALABUYOC
GINATILAN
DUMANJUGRONDA
BARILI
ALCANTARA
SIBONGA
ARGAO
DALAGUETE
ALCOY
BOLJOON
OSLOB
CITY ofCARCAR
BADIAN
MOALBOAL
ZARAGOZA
MHMH
MH
H Q
I. DATE OF INCORPORATION AND REGISTRATION : April 22, 1972
II. DATE OF FIRST ENERGIZATION : July 1976
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M): (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 15.3 15.3 15.3 0.500
Subsidy 68.8 93.6 117.6 0.500
0.720
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 City of Carcar 15 15 15 15 100 0 22,500 15,604 16,437 17,217 77
2 Sibonga 25 25 25 25 100 0 9,600 5,351 5,640 6,004 63
Second District
3 Alcantara 9 9 9 9 100 0 2,900 1,455 1,637 1,755 61
4 Alcoy 8 8 8 8 100 0 3,400 1,540 1,651 1,740 51
5 Alegria 9 9 9 9 100 0 5,200 1,957 2,123 2,275 44
6 Argao 45 45 45 45 100 0 15,200 9,487 9,943 10,401 68
7 Badian 29 29 29 29 100 0 7,600 3,349 3,761 4,206 55
8 Boljoon 11 11 11 11 100 0 3,300 1,788 1,859 2,007 61
9 Dalaguete 33 33 33 33 100 0 14,000 7,150 8,575 9,105 65
10 Dumanjug 37 37 37 37 100 0 10,000 5,204 5,700 6,244 62
11 Ginatilan 14 14 14 14 100 0 3,500 1,781 1,892 2,007 57
12 Malabuyoc 14 14 14 14 100 0 4,300 1,905 2,031 2,139 50
13 Moalboal 15 15 15 15 100 0 5,900 3,966 4,286 4,640 79
14 Oslob 21 21 21 21 100 0 5,600 3,427 3,612 4,243 76
15 Ronda 14 14 14 14 100 0 4,200 2,388 2,491 2,603 62
16 Samboan 15 15 15 15 100 0 4,200 2,632 2,813 2,958 70
17 Santander 10 10 10 10 100 0 3,500 2,519 2,715 2,950 84
Third District
18 Barili 42 42 42 42 100 0 14,500 7,721 8,279 8,788 61
Total 366 366 366 366 100 0 139,400 79,224 85,445 91,282 65
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 44,625 44,763 54,860 Residential 68,035 74,181 80,558
MWH Purchased 8,968 9,099 9,529 Commercial 8,857 8,808 8,093
MWH Sold 8,088 8,215 8,606 Industrial 11 15 26
Systems Loss (%) 9 9 9 Public Building 2,079 2,188 2,327
Peak Load (KW) 21,967 23,515 25,924 Others 242 253 278
Load Factor (%) 56 53 50 Total 79,224 85,445 91,282
Collection Efficiency (%) 101 106 105
Ave. Systems Rate (P/KWH) 5.52 5.45 6.37
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 29,684 32,215 35,122 40,184 43,642 45,253 46,608 50,174 51,616 55,754
Commercial 15,050 16,657 18,750 19,436 20,563 23,126 24,725 25,976 25,927 26,388
Industrial 10,769 9,611 9,041 9,641 10,005 11,912 12,544 12,542 11,740 10,965
Public Building 1,970 2,198 2,659 3,563 5,058 5,701 6,130 6,979 7,673 8,535
Others 884 941 989 1,059 1,120 1,169 1,219 1,387 1,622 1,632
Total 58,357 61,622 66,561 73,883 80,388 87,161 91,226 97,058 98,578 103,274
Badian
Mantayupan/CEBECO I Mini Hydro
Basak/CEBECO I Mini Hydro
Barili
Ms. Marlou M. Rendon Ms. Marlou M. Rendon
CEBU I ELECTRIC COOPERATIVE, INC. (CEBECO I)Bito-on, Dumanjug, Cebu
Tel. No. (032) 471-9297; Telefax Nos. (032) 471-9002; 471-9313
2008 20092007
A+
Extra Large
Engr. Mariano Y. Blanco, Jr.
Ms. Marlou M. Rendon
Extra Large Extra Large
A+ A+
Engr. Mariano Y. Blanco, Jr. Engr. Mariano Y. Blanco, Jr.
POWER PLANT
Location Project Name/Proponent Type
Served
Legislative DistrictPotential
MUNICIPALITIES
Matutinao/CEBECO I Mini Hydro
Monthly Average
77,060 81,08970,480
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.
160
LEGEND :
HQ Location
Municipality
Below 5MVA Substation
10 MVA Substation
20 MVA Substation
NPC Substation
3 PH Backbone Line
Energized Coop System
H Q
161
N
DAANBANTAYAN
MEDELLIN
SAN REMIGIO
TABOGON
CITY ofBOGO
BORBON
TABUELAN
SOGOD
CATMONTUBURAN
COMPOSTELA
DANAO CITY
CARMEN
H Q
I. DATE OF INCORPORATION AND REGISTRATION : December 28, 1977
II. DATE OF FIRST ENERGIZATION : May 1980
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 21.1 31.1 31.1
Subsidy 38.4 71.8 79.1
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Third District
1 Tuburan 54 54 54 54 100 0 13,000 8,012 8,405 8,809 68
Fourth District
2 City of Bogo 29 29 29 29 100 0 16,100 13,534 14,278 14,936 93
3 Daanbantayan 20 20 20 20 100 0 17,000 9,934 10,406 10,859 64
4 Medellin 19 19 19 19 100 0 10,900 6,566 6,811 7,116 65
5 San Remigio 27 27 27 27 100 0 11,000 7,791 8,245 8,716 79
6 Tabogon 25 25 25 25 100 0 7,000 4,727 5,013 5,326 76
7 Tabuelan 12 12 12 12 100 0 4,900 3,063 3,258 3,506 72
Fifth District
8 Borbon 19 19 19 19 100 0 7,200 4,369 4,639 4,833 67
9 Carmen 21 21 21 21 100 0 9,400 6,654 6,887 7,414 79
10 Catmon 20 20 20 20 100 0 6,300 4,437 4,744 5,042 80
11 Compostela 17 17 17 17 100 0 8,100 7,298 7,602 8,017 99
12 Danao City 42 42 42 42 100 0 24,100 20,292 21,218 22,212 92
13 Sogod 18 18 18 18 100 0 6,900 3,878 4,168 4,403 64
Total 323 323 323 323 100 0 141,900 100,555 105,674 111,189 78
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 64,579 73,290 92,496 Residential 90,802 95,713 101,115
MWH Purchased 13,777 15,777 17,002 Commercial 7,245 7,296 7,306
MWH Sold 12,417 14,356 15,573 Industrial 50 49 49
Systems Loss (%) 10 9 8 Public Building 1,875 1,995 2,058
Peak Load (KW) 36,709 37,335 41,556 Others 583 621 661
Load Factor (%) 51 58 56 Total 100,555 105,674 111,189
Collection Efficiency (%) 98 98 98
Ave. Systems Rate (P/KWH) 5.20 5.11 5.94
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 39,038 41,646 45,530 52,514 54,779 54,823 55,285 59,563 61,587 64,886
Commercial 16,337 18,052 20,783 23,254 25,807 29,941 30,886 33,152 34,743 37,751
Industrial 39,083 34,865 25,892 32,932 30,888 40,956 46,776 49,638 68,443 75,997
Public Building 2,280 2,483 2,794 3,257 3,646 4,007 4,204 4,777 5,430 6,091
Others 1,591 1,509 1,673 1,824 3,304 1,950 1,885 1,875 2,003 2,150
Total 98,329 98,555 96,672 113,781 118,424 131,678 139,036 149,005 172,206 186,875
CEBU II ELECTRIC COOPERATIVE, INC. (CEBECO II)Malingin, City of Bogo, Cebu
Tel. Nos. (032) 521-2154, 434-8555; Telefax No. (032) 251-2154
2008 20092007
Mrs. Armida J. Caguitla
Engr. Peter Allan B. Seneres
A+ A+
Mrs. Armida J. Caguitla Mrs. Armida J. Caguitla
Engr. Peter Allan B. Señeres Engr. Peter Allan B. Señeres
Mega Large Mega Large
A+
Mega Large
Served
Legislative DistrictPotential
MUNICIPALITIES/CITY
Monthly Average
103,159 107,87598,830
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.
162
LEGEND :
H Q HQ Location
Municipality
10 MVA Substation
15 MVA Substation
Power Plant
3 PH Backbone Line
Energized Other SystemEnergized Coop System
P P
163
N
Served by Mactan Electric Co., Inc.
CEBU CITY
LILOAN
CONSOLACION
MANDAUE CITY
MINGLANILLA
TALISAYCITY
CITY ofNAGA
SANFERNANDO LAPU-LAPU CITY
CORDOVAServed by Visayan Electric Co., Inc.
ASTURIAS
PINAMUNGAHAN
TOLEDO CITY
BALAMBAN
P P
P P
ALOGUINSAN
H Q
OLANGO ISLAND
I. DATE OF INCORPORATION AND REGISTRATION : September 27, 1979
II. DATE OF FIRST ENERGIZATION : December 1980
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 207.9 248.7 248.7 88.800
Subsidy 38.4 58.0 63.0 45.800
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Third District1 Aloguinsan 15 15 15 15 100 0 6,000 3,364 3,507 3,661 61
2 Asturias 27 27 27 27 100 0 10,000 5,965 6,275 6,597 66
3 Balamban 28 28 28 28 100 0 15,000 10,964 11,782 12,551 84
4 Pinamungahan 26 26 26 26 100 0 13,000 8,008 8,359 8,677 67
5 Toledo City 38 38 38 38 100 0
Cebu City (4) 38,100 29,475 30,967 32,576 86
Talisay City (1)
Minglanilla (2)
Total 134 134 134 134 100 0 82,100 57,776 60,890 64,062 78
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 42,141 43,037 45,928 Residential 53,064 56,028 59,227
MWH Purchased 10,711 11,765 9,844 Commercial 3,963 4,063 3,956
MWH Sold 10,007 11,138 9,421 Industrial 20 21 21
Systems Loss (%) 6 5 4 Public Building 589 630 693
Peak Load (KW) 27,064 32,381 36,816 Others 140 148 165
Load Factor (%) 54 50 37 Total 57,776 60,890 64,062
Collection Efficiency (%) 102 101 103
Ave. Systems Rate (P/KWH) 4.21 3.86 4.88
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 19,466 21,388 23,093 26,443 28,296 29,939 29,619 32,364 35,315 39,585
Commercial 7,707 8,471 8,887 9,585 9,921 10,425 10,251 11,229 12,764 14,051
Industrial 26,408 31,423 31,957 29,219 32,350 54,054 60,855 69,669 78,224 51,216
Public Building 2,761 3,066 3,194 3,599 4,146 4,367 4,705 4,903 5,353 6,003
Others 1,515 1,736 1,736 1,775 1,868 1,840 1,821 1,923 2,004 2,196
Total 57,857 66,084 68,867 70,621 76,582 100,626 107,251 120,088 133,660 113,051
CEBU III ELECTRIC COOPERATIVE, INC. (CEBECO III)Luray II, Toledo City, Cebu
Tel. Nos. (032) 322-5754, 367-9111, 467-8298; Fax. No. (032) 467-9682
2008 20092007
Mr. Tereso B. Lebumfacil
Engr. Jevy Q. Buenasilda
A+ A+
Mr. Tereso B. Lebumfacil Mr. Tereso B. Lebumfacil
Engr. Jevy Q. Buenasilda Engr. Jevy Q. Buenasilda
Legislative DistrictPotential
MUNICIPALITIES/CITIES
A+
Extra Large
Toledo CityToledo Power Corp/Atlas
Consolidated Mining & Dev't Corp.
Unenerg.Served
Coal
Extra Large Extra Large
POWER PLANT
Location Project Name/Proponent Type
Monthly Average
55,439 57,68253,289
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Diesel
164
N
HQ Location
Municipality
Generating Set
3 PH Backbone Line
LEGEND :
H QEnergized Coop System
G S
PROSIELCO
165
ENRIQUEVILLANUEVA
LARENA
MARIA
SAN JUAN
SIQUIJOR
LAZI
G S G S
H Q
I. DATE OF INCORPORATION AND REGISTRATION : December 29, 1977
II. DATE OF FIRST ENERGIZATION : October 1983
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 4.9 5.6 5.6 6.920
Subsidy 10.9 16.4 16.4
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Lone District1 Enrique Villanueva 14 14 14 14 100 0 1,300 1,082 1,145 1,261 97
2 Larena 23 23 23 23 100 0 3,200 2,878 3,011 3,151 98
3 Lazi 18 18 18 18 100 0 4,400 2,621 2,774 2,979 68
4 Maria 22 22 22 22 100 0 2,900 2,122 2,257 2,398 83
5 San Juan 15 15 15 15 100 0 2,900 2,074 2,189 2,327 80
6 Siquijor 42 42 42 42 100 0 5,100 4,509 4,717 4,964 97
Total 134 134 134 134 100 0 19,800 15,286 16,093 17,080 86
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 8,243 8,509 9,084 Residential 12,893 13,652 14,596
MWH Purchased 969 988 1,036 Commercial 1,473 1,474 1,459
MWH Sold 870 888 949 Industrial 121 134 143
Systems Loss (%) 10 10 8 Public Building 519 544 579
Peak Load (KW) 2,835 2,970 3,130 Others 280 289 303
Load Factor (%) 47 46 45 Total 15,286 16,093 17,080
Collection Efficiency (%) 101 100 100
Ave. Systems Rate (P/KWH) 9.48 9.58 9.57
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 3,598 3,842 3,979 4,142 4,644 4,958 4,832 5,424 5,397 5,863
Commercial 1,250 1,419 1,438 1,389 1,289 1,485 1,487 1,662 1,711 1,805
Industrial 335 308 310 237 221 243 240 262 287 330
Public Building 669 742 846 956 1,031 1,136 1,325 1,500 1,603 1,666
Others 328 379 454 604 1,091 1,225 1,412 1,588 1,657 1,727
Total 6,180 6,690 7,027 7,328 8,276 9,048 9,296 10,436 10,655 11,391
PROVINCE OF SIQUIJOR ELECTRIC COOPERATIVE, INC. (PROSIELCO)Nonoc, Larena, Siquijor Island
Tel No. (035) 484-1137; Telefax No. (035) 377-2065
2008 20092007
Atty. Ray Rene T. Buac
Ms. Laureen B. Malolot
A+ A+
Mr. Patrocino C. Vega Mr. Gerald A. Dominguez
Ms. Laureen B. Malolot Ms. Laureen B. Malolot
A+
Medium
B A R A N G A Y S C O N N E C T I O N S
Medium
Siquijor
Medium
NPC-SPUG Diesel/PB-113/PB-116
MUNICIPALITIES
Coverage Unenerg.
Project Name/Proponent
Served
Type
Monthly Average
14,693 15,72814,026
Energized
POWER PLANT
Location
Legislative DistrictPotential
166
N
LEGEND :
H Q HQ Location
Municipality
Generating Set
3 PH Backbone Line
Energized Coop System
G S
PILAR
TUDELA
SAN FRANCISCO
PORO
G S
G S
H Q
167
I. DATE OF INCORPORATION AND REGISTRATION : November 8, 1978
II. DATE OF FIRST ENERGIZATION : January 1984
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 7.2 7.2 10.9 2.748
Subsidy 11.0 15.5 15.5 0.576
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Fifth District, Cebu1 Poro 17 17 17 17 100 0 5,400 3,327 3,461 3,597 67
2 San Francisco 15 15 15 15 100 0 10,400 4,728 4,969 5,219 50
3 Tudela 11 11 11 11 100 0 2,700 1,643 1,713 1,798 67
4 Pilar 13 13 13 13 100 0 2,900 1,786 1,901 2,001 69
Total 56 56 56 56 100 0 21,400 11,484 12,044 12,615 59
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 4,388 4,529 4,973 Residential 10,250 10,739 11,254
MWH Purchased 520 535 585 Commercial 817 860 895
MWH Sold 474 488 536 Industrial 25 23 16
Systems Loss (%) 8 8 8 Public Building 362 390 411
Peak Load (KW) 1,675 1,905 1,880 Others 30 32 39
Load Factor (%) 42 38 43 Total 11,484 12,044 12,615
Collection Efficiency (%) 102 100 100
Ave. Systems Rate (P/KWH) 9.25 9.27 9.28
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 2,053 2,366 2,403 2,727 3,049 2,999 3,028 3,469 3,467 3,786
Commercial 589 640 676 749 930 1,292 1,260 1,408 1,538 1,815
Industrial 123 151 141 138 167 193 179 213 208 126
Public Building 196 236 237 304 364 402 466 539 586 631
Others 114 126 134 130 130 121 87 64 63 72
Total 3,075 3,519 3,591 4,048 4,640 5,007 5,020 5,693 5,862 6,430
Diesel
Monthly Average
ServedPotentialUnenerg.
C O N N E C T I O N S
Pilar NPC-SPUG
Mr. Eulalio B. Luchavez
Mr. Rolando B. Camaso
11,694
A+
Medium
Legislative District
MUNICIPALITIES
CoverageEnergized
B A R A N G A Y S
Poro NPC-SPUG Diesel
POWER PLANT
A+
Type
12,58011,961
Location Project Name/Proponent
A+
Medium Medium
Mr. Christopher G. Pleños
Mr. Rolando B. Camaso Mr. Rolando B. Camaso
Mr. Eulalio B. Luchavez
CAMOTES ELECTRIC COOPERATIVE, INC. (CELCO)Western Poblacion, Poro, Camotes Island, Cebu
Tel. No. (032) 497-0273; Telefax No. (032) 497-0272
2008 20092007
168
HQ Location
Municipality
5 MVA Substation
10 MVA Substation
Power Plant
Generating Set
Mini Hydro
3 PH Backbone Line
LEGEND :
H Q
Energized Coop SystemEnergized Other System
MH
P P
G S
169
LOON
TUBIGON
INABANGA
CALAPE
SAN ISIDRO
CATIGBIAN
CLARIN
MARIBOJOC
CARMEN
BALILIHANCORTES
BATUAN
CORELLA
BACLAYON
BILAR
SIKATUNA
LOBOCDIMIAO
LOAY
ALBURQUERQUE
TAGBILARAN CITY
DAUIS
PANGLAO
CABILAO IS.
Served by Bohol Light Co., Inc.
SAGBAYAN (Borja)
LILA
ANTEQUERA
SEVILLA
HAMBUNGAN IS.CUAMING IS.
BATASAN IS.
UBAY IS.
PANGAPASAN IS.
MOCABOC IS.
BAGONGBANWA IS.
BILANGBILANGAN IS.
MANTATAO IS.
PANGANGANIS.
BALICASAG IS.PAMICALAN IS.
P P
P P
P P
P P
P PP P
P P
P PP P P P
P PP P
G S
G S
G S
G S
G S
P P
P P
MH
H Q
N
MH
G S
I. DATE OF INCORPORATION AND REGISTRATION : August 11, 1971
II. DATE OF FIRST ENERGIZATION : December 30, 1974
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative) POWER PLANT
2007 2008 2009 Cap.(MW)
Residual Loan 30.4 30.4 50.4
Subsidy 19.4 62.6 68.0
5.000
0.106
0.038
0.056
0.291
0.120
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Alburquerque 11 11 11 11 100 0 2,200 1,872 1,946 2,140 97
2 Antequera 21 21 21 21 100 0 3,400 2,983 3,221 3,390 99
3 Baclayon 17 17 17 17 100 0 4,000 3,328 3,507 3,946 99
4 Balilihan 31 31 31 31 100 0 3,800 2,793 3,020 3,408 90
5 Calape 33 33 33 33 100 0 8,000 6,628 7,422 7,920 99
6 Catigbian 22 22 22 22 100 0 4,500 3,897 4,083 4,328 96
7 Corella 8 8 8 8 100 0 1,900 1,586 1,739 1,891 99
8 Cortes 14 14 14 14 100 0 3,600 3,134 3,307 3,573 99
9 Dauis 12 12 12 12 100 0 8,500 7,058 7,769 8,352 98
10 Loon 67 67 67 67 100 0 9,800 8,673 9,076 9,549 97
11 Maribojoc 22 22 22 22 100 0 4,700 4,183 4,390 4,689 99
12 Panglao 10 10 10 10 100 0 6,500 5,231 5,907 6,343 98
13 Sikatuna 10 10 10 10 100 0 1,400 1,129 1,244 1,346 96
14 Tubigon 34 34 34 34 100 0 11,100 10,102 10,565 11,028 99
Second District
15 Clarin 24 24 24 24 100 0 4,800 4,232 4,433 4,761 99
16 Inabanga 50 50 50 50 100 0 8,700 7,902 8,170 8,427 97
17 Sagbayan (Borja) 24 24 24 24 100 0 4,900 4,039 4,283 4,848 99
18 San Isidro 12 12 12 12 100 0 2,100 1,795 1,899 2,024 96
Third District
19 Batuan 15 15 15 15 100 0 2,600 2,022 2,336 2,488 96
20 Bilar 19 19 19 19 100 0 3,600 3,093 3,288 3,485 97
21 Carmen 29 29 29 29 100 0 9,500 7,651 8,706 9,191 97
22 Dimiao 35 35 35 35 100 0 3,000 2,576 2,752 2,949 98
23 Loay 24 24 24 24 100 0 4,100 3,586 3,770 4,083 99
24 Lila 18 18 18 18 100 0 2,500 2,218 2,348 2,481 99
25 Loboc 28 28 28 28 100 0 3,500 2,931 3,121 3,416 98
26 Sevilla 13 13 13 13 100 0 2,000 1,437 1,556 1,661 83
Total 603 603 603 603 100 0 124,700 106,079 113,858 121,717 98
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 43,415 43,260 54,033 Residential 98,117 99,396 106,881
MWH Purchased 7,521 8,051 8,965 Commercial 5,510 5,450 5,385
MWH Sold 6,988 7,475 8,295 Industrial 31 29 27
Systems Loss (%) 7 7 7 Public Building 2,055 2,246 2,399
Peak Load (KW) 20,392 21,988 23,696 Others 366 6,737 7,025
Load Factor (%) 51 50 52 Total 106,079 113,858 121,717
Collection Efficiency (%) 101 101 102
Ave. Systems Rate (P/KWH) 6.21 5.79 6.51
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 24,044 26,086 29,417 33,353 37,332 39,508 40,134 43,896 46,297 51,056
Commercial 7,538 7,828 8,391 8,946 12,538 19,279 20,593 23,986 27,468 30,065
Industrial 7,117 7,019 7,798 10,151 9,635 7,259 9,930 11,036 10,366 12,131
Public Building 1,459 1,674 1,948 2,510 2,853 3,135 3,492 3,958 4,565 5,231
Others 2,855 3,069 3,428 3,886 2,814 979 976 979 1,010 1,052
Total 43,013 45,676 50,982 58,846 65,173 70,161 75,125 83,855 89,706 99,535
1.200
Balilihan Janopol Mini Hydro
Loboc HEP/Sta. Clara Int'l Mini HydroBalilihan
Monthly Average
116,223
Engr. Carlos B. Itable
A+
Mega Large
109,087
MUNICIPALITIES
Legislative District
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.Served
Potential
A+
Project Name/Proponent
Mega Large Mega Large
Engr. Jeremias A. Boligao Engr. Jeremias A. Boligao
Engr. Carlos B. ItableEngr. Carlos B. Itable
A+
121,328
Engr. Jeremias A. Boligao
BOHOL I ELECTRIC COOPERATIVE, INC. (BOHECO I)Cabulijan, Tubigon, Bohol
Tel. Nos. (038) 508-8115 to 16, 508-0084 to 85, 237-2205, 508-8096; Telefax No. (038) 508-8095
2008 20092007
Type
GenSet
BOHECO I
GenSet
BOHECO I GenSet
GenSet
GenSet
BOHECO I
Loon BOHECO I
Baclayon BOHECO I
Tubigon
Location
Loboc
Inabanga
Panglao
170
N
LEGEND :
H Q HQ Location
Municipality
Below 5 MVA Substation
5 MVA Substation
10 MVA Substation
NPC Substation
3 PH Backbone Line
Energized Coop System
171
BUENAVISTA
TALIBONBIEN UNIDO
DANAO
DAGOHOYALICIA
PILAR
MABINI
CANDIJAY
ANDA
DUERO
VALENCIA
PRES. CARLOS P.GARCIA (PITOGO)
TRINIDAD
UBAY
SAN MIGUEL
GUINDULMAN
JAGNA
SIERRABULLONES
GARCIA HERNANDEZ
JETAFE
H Q
I. DATE OF INCORPORATION AND REGISTRATION : May 13, 1978
II. DATE OF FIRST ENERGIZATION : March 1980
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 14.3 47.6 78.2
Subsidy 44.5 79.2 81.2
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Second District
1 Bien Unido 15 15 15 15 100 0 4,800 1,561 1,637 1,706 36
2 Buenavista 35 35 35 35 100 0 5,700 2,317 2,473 2,597 46
3 Dagohoy 15 15 15 15 100 0 3,700 2,498 2,681 2,803 76
4 Danao 17 17 17 17 100 0 3,700 1,534 1,623 1,804 49
5 Jetafe 24 24 24 24 100 0 5,800 1,728 1,876 1,975 34
6 San Miguel 18 18 18 18 100 0 4,500 2,883 3,218 3,447 77
7 Talibon 25 25 25 25 100 0 11,800 7,118 7,498 7,846 66
8 Trinidad 20 20 20 20 100 0 5,600 3,583 3,888 4,134 74
9 Ubay 44 44 44 44 100 0 13,100 8,569 9,296 9,925 76
10 Pres. Carlos P. Garcia 23 23 23 23 100 0 4,500 1,758 1,829 1,898 42
(Pitogo)
Third District
11 Alicia 15 15 15 15 100 0 4,700 3,240 3,478 3,660 78
12 Anda 16 16 16 16 100 0 3,900 2,776 2,888 2,989 77
13 Candijay 21 21 21 21 100 0 6,600 5,039 5,253 5,440 82
14 Duero 21 21 21 21 100 0 3,800 3,314 3,519 3,622 95
15 Garcia Hernandez 30 30 30 30 100 0 5,200 4,679 4,900 5,039 97
16 Guindulman 19 19 19 19 100 0 6,600 5,993 6,300 6,533 99
17 Jagna 33 33 33 33 100 0 8,400 7,739 8,039 8,266 98
18 Mabini 22 22 22 22 100 0 5,800 3,713 3,921 4,116 71
19 Pilar 21 21 21 21 100 0 5,500 3,045 3,237 3,394 62
20 Sierra Bullones 22 22 22 22 100 0 5,500 3,885 4,115 4,285 78
21 Valencia 35 35 35 35 100 0 5,300 4,290 4,484 4,637 87
Total 491 491 491 491 100 0 124,500 81,262 86,153 90,116 72
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 26,593 27,742 33,135 Residential 72,599 77,486 81,326
MWH Purchased 4,579 4,820 5,275 Commercial 3,953 3,853 3,896
MWH Sold 4,031 4,286 4,706 Industrial 207 218 233
Systems Loss (%) 12 11 11 Public Building 1,736 1,806 1,861
Peak Load (KW) 13,158 14,192 14,633 Others 2,767 2,790 2,800
Load Factor (%) 48 47 49 Total 81,262 86,153 90,116
Collection Efficiency (%) 100 99 96
Ave. Systems Rate (P/KWH) 6.60 6.47 7.04
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 16,673 18,078 20,830 25,183 27,040 27,885 28,387 30,270 32,297 35,859
Commercial 3,653 4,151 4,616 6,075 7,765 8,735 9,025 8,856 8,742 9,431
Industrial 2,945 3,070 3,395 3,722 4,497 3,926 3,881 4,168 5,062 5,343
Public Building 1,810 1,982 2,241 3,424 3,723 3,791 4,094 4,515 4,653 5,131
Others 481 440 521 567 660 627 635 560 673 709
Total 25,562 27,721 31,603 38,971 43,684 44,965 46,022 48,369 51,427 56,473
Engr. Carlos B. Itable
BOHOL II ELECTRIC COOPERATIVE, INC. (BOHECO II)Cantagay, Jagna, Bohol
Tel. Nos. (038) 238-2215, 238-2541, 238-2483; Telefax No. (038) 531-0023; Fax No. (038) 531-0053; E-mail: [email protected]
2008 20092007
Extra Large
A+
Extra Large
Mr. Wilfredo J. Lingatong
Engr. Carlos B. Itable
A+ A+
Mr. Baltazar Federico C. Liao Mr. Mariano Ll. Salas
Engr. Carlos B. Itable
Legislative DistrictPotential
MUNICIPALITIES
Extra Large
Monthly Average
83,676 87,40779,738
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.Served
172
Energized Coop System
LEGEND :
Headquarters
Energized Other System
173
N
NORSAMELCOBobon, Northern Samar
SAMELCO ICalbayog City
SAMELCO IIParanas, SamarBILECO
Naval, Biliran
LEYECO IIITunga, Leyte
LEYECO VOrmoc City
LEYECO IITacloban City
LEYECO IVHilongos, Leyte
SOLECOCity of Maasin
ESAMELCOCity of Borongan
DORELCOTolosa, Leyte
Served byMaripipi Multi PurposeCooperative, Inc.
Served byHilabaan Fishermen Multi Purpose Coop.
I. STATUS OF ENERGIZATION (Cumulative):
CONNECTIONS
2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %
A. Electric Cooperatives:
1 Leyte I 13 13 13 13 100 499 495 497 498 99 76,400 54,286 56,414 58,160 76
2 Leyte II 3 3 3 3 100 196 196 196 196 100 57,300 49,018 51,867 54,641 95
3 Leyte III 9 9 9 9 100 285 285 285 285 100 49,200 29,163 30,888 31,973 65
4 Leyte IV 6 6 6 6 100 245 243 243 245 100 56,600 50,035 52,849 55,032 97
5 Leyte V 12 12 12 12 100 414 414 414 414 100 116,700 85,811 89,760 92,624 79
6 Southern Leyte 19 19 19 19 100 500 483 485 500 100 85,000 60,688 63,819 66,974 79
7 Biliran 7 7 7 7 100 117 117 117 117 100 28,400 20,901 21,998 23,121 81
8 Northern Samar 24 24 24 24 100 569 515 557 569 100 106,100 43,497 47,377 49,908 47
9 Samar I 10 10 10 10 100 427 379 385 414 97 59,500 38,966 41,837 43,230 73
10 Samar II 16 16 16 16 100 524 492 516 520 99 78,600 43,497 45,703 49,280 63
11 Eastern Samar 23 23 23 23 100 596 532 538 563 94 75,400 39,444 43,195 45,096 60
Total 142 142 142 142 100 4,372 4,151 4,233 4,321 99 789,200 515,306 545,707 570,039 72
ELECTRIC DISTRIBUTION UTILITIES
MUNICIPALITIES/CITIES BARANGAYS
Coverage
REGION VIII
EnergizedCoverage
Energized ServedPotential
EASTERN VISAYAS REGION
174
Total 343,633 360,384 391,753 437,945 481,638 491,755 490,416 551,720 578,500 625,722
Others 9,614 10,361 11,636 11,726 12,689 13,843 11,015 11,763 10,762 11,651
Public Bldgs. 15,503 20,032 29,548 34,930 37,853 37,672 38,695 44,450 48,748 52,745
Industrial 62,968 64,056 63,507 72,972 78,953 75,263 78,964 93,286 96,103 111,557
Commercial 47,792 48,557 51,390 55,998 62,645 68,456 70,788 77,794 84,411 91,702
Residential 207,756 217,378 235,672 262,319 289,499 296,521 290,954 324,427 338,476 358,067
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):
N
HQ Location
Municipality
5 MVA Substation
10 MVA Substation
3 PH Backbone Line
LEGEND :
H Q
Energized Coop System
175
MAHAPLAG
MACARTHUR
TANAUAN
TOLOSA
BURAUEN
JULITA
ABUYOG
DAGAMI
TABON-TABON
LA PAZ
JAVIER(Bugho)
H Q
DULAG
MAYORGA
I. DATE OF INCORPORATION AND REGISTRATION : November 14, 1970/December 3, 1970
II. DATE OF FIRST ENERGIZATION : July 2, 1973
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 219.9 225.0 253.5
Subsidy 18.2 40.8 44.2
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Tanauan 54 54 54 54 100 0 9,800 8,185 8,425 8,665 88
2 Tolosa 15 15 15 15 100 0 4,100 3,739 3,817 3,893 95
Second District
3 Burauen 77 75 76 76 99 1 10,200 6,267 6,675 6,836 67
4 Dagami 65 65 65 65 100 0 6,300 3,972 4,094 4,200 67
5 Dulag 45 45 45 45 100 0 8,400 6,494 6,714 6,908 82
6 Julita 26 26 26 26 100 0 3,600 3,098 3,145 3,205 89
7 La Paz 35 34 35 35 100 0 3,800 2,855 2,950 3,030 80
8 MacArthur 31 31 31 31 100 0 3,600 2,781 2,883 3,015 84
9 Mayorga 16 16 16 16 100 0 2,700 1,489 1,597 1,682 62
10 Tabontabon 16 16 16 16 100 0 1,800 1,394 1,465 1,532 85
Fifth District
11 Abuyog 63 63 63 63 100 0 11,500 7,170 7,469 7,798 68
12 Javier (Bugho) 28 28 28 28 100 0 4,900 3,422 3,551 3,659 75
13 Mahaplag 28 27 27 28 100 0 5,700 3,420 3,629 3,737 66
Total 499 495 497 498 99 1 76,400 54,286 56,414 58,160 76
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 21,313 22,868 27,519 Residential 51,849 53,802 55,508
MWH Purchased 4,066 4,211 4,619 Commercial 1,579 1,582 1,579
MWH Sold 3,339 3,555 3,903 Industrial 2 3 2
Systems Loss (%) 18 15 15 Public Building 557 681 704
Peak Load (KW) 10,715 11,348 11,242 Others 299 346 367
Load Factor (%) 52 51 56 Total 54,286 56,414 58,160
Collection Efficiency (%) 98 96 95
Ave. Systems Rate (P/KWH) 6.38 6.43 7.05
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 16,754 17,757 18,281 19,651 21,697 22,467 22,367 23,411 25,221 26,148
Commercial 2,024 2,106 2,734 3,187 3,598 4,387 4,680 5,061 5,470 6,957
Industrial 1,788 1,108 1,178 1,281 2,943 1,435 1,987 9,158 9,034 10,430
Public Building 363 425 550 1,201 1,632 1,687 1,805 1,937 2,319 2,610
Others 291 260 256 455 581 541 468 502 612 695
Total 21,220 21,656 22,999 25,775 30,451 30,517 31,307 40,069 42,656 46,840
DON ORESTES ROMUALDEZ ELECTRIC COOPERATIVE, INC. (DORELCO / LEYECO I)Brgy. San Roque, Tolosa, Leyte
Tel. Nos. (053) 322-7118 to 19, 322-7103; Telefax No. (053) 322-7101
2008 20092007
B
Extra Large
Mr. Percival M. Maballo Mr. Valentino V. Adolfo
Atty. Emmanuel P. Saño Atty. Emmanuel P. Saño
Mr. Edilberto G. Bagueros
Atty. Emmanuel P. Saño
A A
Served
Extra Large Extra Large
B A R A N G A Y S C O N N E C T I O N S
51,368
Legislative DistrictPotential
Monthly Average
55,56053,024
MUNICIPALITIES
CoverageEnergized
Unenerg.
176
N
H QEnergized Coop SystemHQ Location
Municipality
10 MVA Substation
12 MVA Substation
15 MVA Substation
3 PH Backbone Line
177
PALO
BABATNGON
TACLOBAN CITY
H Q
LEGEND :
I. DATE OF INCORPORATION AND REGISTRATION : October 26, 1975
II. DATE OF FIRST ENERGIZATION : June 1974
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 19.4 19.4 19.4
Subsidy 22.6 36.1 42.6
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Babatngon 25 25 25 25 100 0 4,500 2,409 2,652 2,843 63
2 Palo 33 33 33 33 100 0 10,200 8,071 8,659 9,312 91
3 Tacloban City 138 138 138 138 100 0 42,600 38,538 40,556 42,486 99
Total 196 196 196 196 100 0 57,300 49,018 51,867 54,641 95
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 63,839 65,771 84,897 Residential 43,305 46,023 48,551
MWH Purchased 13,470 14,060 15,597 Commercial 4,431 4,518 4,700
MWH Sold 11,627 12,254 13,737 Industrial 688 686 710
Systems Loss (%) 13 12 11 Public Building 498 529 551
Peak Load (KW) 32,908 32,080 34,553 Others 96 111 129
Load Factor (%) 56 60 62 Total 49,018 51,867 54,641
Collection Efficiency (%) 93 94 96
Ave. Systems Rate (P/KWH) 5.49 5.37 6.18
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 43,110 44,063 48,375 51,881 54,764 53,901 55,756 59,988 61,804 66,760
Commercial 19,309 18,555 17,988 19,209 20,447 20,184 21,461 23,054 24,375 25,913
Industrial 29,944 29,906 27,906 32,306 34,448 35,010 37,108 39,301 43,431 53,492
Public Building 603 3,575 10,725 11,656 12,191 11,150 11,729 12,791 13,434 14,715
Others 3,227 3,280 3,444 4,359 5,920 6,440 4,170 4,390 4,007 3,969
Total 96,193 99,379 108,438 119,411 127,769 126,685 130,224 139,524 147,051 164,849
LEYTE II ELECTRIC COOPERATIVE, INC. (LEYECO II)Real St., Sagkahan District, Tacloban City, Leyte
Tel. Nos. (053) 321-4292, 321-1493, 321-2629, 321-2809, 321-8384; Fax No. (053) 325-7199 ; E-mail: [email protected]
2008 20092007
A+
Extra Large
Engr. Reynaldo L. Galapon (Acting Pres.) Mr. Rolando G. Hidalgo
Atty. Jerry Gwen L. Conde Atty. Jerry Gwen L. Conde
Engr. Reynaldo L. Galapon (Acting Pres.)
Atty. Jerry Gwen L. Conde
A+ A+
Served
Extra Large Extra Large
B A R A N G A Y S C O N N E C T I O N S
54,605
Legislative DistrictPotential
Monthly Average
52,07249,555
MUNICIPALITIES/CITY
CoverageEnergized
Unenerg.
178
N
LEGEND :
HQ Location
Municipality
Below 5 MVA Substation
3 PH Backbone Line
H QEnergized Coop System
179
SANMIGUEL
ALANGALANG
SANTA FE
CAPOOCAN
BARUGO
PASTRANA
JARO
CARIGARA H Q
TUNGA
I. DATE OF INCORPORATION AND REGISTRATION : October 30, 1975
II. DATE OF FIRST ENERGIZATION : June 18, 1977
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 1.7 1.7 4.6
Subsidy 17.0 32.4 32.6
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Alangalang 54 54 54 54 100 0 8,900 4,973 5,264 5,502 62
2 San Miguel 21 21 21 21 100 0 3,200 1,840 1,931 1,984 62
3 Santa Fe 20 20 20 20 100 0 3,200 1,858 1,990 2,068 65
Second District
4 Barugo 37 37 37 37 100 0 5,800 3,833 4,075 4,204 72
5 Capoocan 21 21 21 21 100 0 5,900 3,242 3,417 3,523 60
6 Carigara 49 49 49 49 100 0 9,500 6,373 6,630 6,830 72
7 Jaro 46 46 46 46 100 0 8,100 4,426 4,792 4,979 61
8 Pastrana 29 29 29 29 100 0 3,100 1,621 1,750 1,806 58
9 Tunga 8 8 8 8 100 0 1,500 997 1,039 1,077 72
Total 285 285 285 285 100 0 49,200 29,163 30,888 31,973 65
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 10,756 10,898 13,058 Residential 27,440 29,278 30,350
MWH Purchased 1,911 1,970 2,123 Commercial 1,121 962 946
MWH Sold 1,593 1,595 1,720 Industrial 143 146 157
Systems Loss (%) 16 19 19 Public Building 364 404 422
Peak Load (KW) 5,273 5,884 7,910 Others 95 98 98
Load Factor (%) 50 46 7 Total 29,163 30,888 31,973
Collection Efficiency (%) 93 93 92
Ave. Systems Rate (P/KWH) 6.75 6.83 7.59
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 9,378 10,170 10,650 11,967 13,752 13,233 12,889 14,500 14,396 15,329
Commercial 1,001 1,198 1,551 1,879 2,245 2,199 2,090 2,086 2,044 2,259
Industrial 473 527 567 594 624 675 836 1,060 1,149 1,340
Public Building 446 542 667 904 920 921 961 1,151 1,230 1,368
Others 266 257 279 316 343 314 302 324 324 338
Total 11,564 12,694 13,714 15,660 17,884 17,341 17,078 19,121 19,143 20,634
Coverage
Monthly Average
MUNICIPALITIES
Potential
C O N N E C T I O N S
Legislative District
31,118
Ms. Lolita N. Cadapan (OIC)
BC
Large
Ms. Lolita N. Cadapan (OIC) Ms. Lerma G. Esquibel (OIC)
EnergizedUnenerg.
32,932
Served
Large Large
B
B A R A N G A Y S
32,238
Engr. Alejandro L. Lantajo
LEYTE III ELECTRIC COOPERATIVE, INC. (LEYECO III)Brgy. San Roque, Tunga, Leyte
Tel Nos. (053) 323-1265, 331-8506, 331-8509; Fax No. (053) 331-8522
2008 20092007
Mr. Juanito Fallorina, Jr. Mr. Juanito Fallorina, Jr.
180
N
LEGEND :
H Q HQ Location
Municipality
Below 5MVA Substation
5 MVA Substation
10 MVA Substation
3 PH Backbone Line
Energized Coop System
181
CITY ofBAYBAY
INOPACAN
HINDANG
MATALOM
HILONGOS
BATO
H Q
I. DATE OF INCORPORATION AND REGISTRATION : November 7, 1975
II. DATE OF FIRST ENERGIZATION : December 1977
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 6.2 14.8 18.5
Subsidy 15.9 33.2 33.2
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Fifth District
1 Bato 32 32 32 32 100 0 7,100 5,798 6,127 6,396 90
2 City of Baybay 92 92 92 92 100 0 21,400 19,194 20,272 21,007 98
3 Hilongos 51 50 50 51 100 0 12,700 11,439 12,073 12,644 99
4 Hindang 20 20 20 20 100 0 4,700 4,240 4,430 4,612 98
5 Inopacan 20 19 19 20 100 0 4,200 3,849 4,021 4,194 99
6 Matalom 30 30 30 30 100 0 6,500 5,515 5,926 6,179 95
Total 245 243 243 245 100 0 56,600 50,035 52,849 55,032 97
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 18,787 21,681 22,894 Residential 45,285 48,010 50,107
MWH Purchased 3,336 3,417 3,695 Commercial 3,246 3,381 3,447
MWH Sold 2,860 2,957 3,218 Industrial 295 307 314
Systems Loss (%) 14 13 13 Public Building 976 1,029 1,038
Peak Load (KW) - - - Others 233 122 126
Load Factor (%) - - - Total 50,035 52,849 55,032
Collection Efficiency (%) 99 98 100
Ave. Systems Rate (P/KWH) 6.57 7.33 7.11
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 12,877 13,474 15,003 17,064 18,844 20,165 19,809 21,129 21,625 23,101
Commercial 3,980 4,006 4,478 5,249 5,795 6,223 6,381 6,977 7,524 8,269
Industrial 827 832 804 1,030 1,212 1,350 1,552 1,661 1,590 1,963
Public Building 3,301 2,979 3,039 3,235 3,516 3,963 3,869 4,082 4,305 4,791
Others 83 108 245 306 364 400 474 473 442 498
Total 21,068 21,399 23,569 26,884 29,731 32,100 32,085 34,322 35,486 38,622
LEYTE IV ELECTRIC COOPERATIVE, INC. (LEYECO IV)Brgy. Lamak, Hilongos, Leyte
Tel Nos. (053) 567-9348 to 49; Fax No. (053) 567-9661
2008 20092007
A+
Large
Engr. Ernesto G. Paredes Mr. Carlito P. Suba-an
Ms. Helen B. Ybañez Ms. Helen B. Ybañez
Engr. Ernesto G. Paredes
Ms. Helen B. Ybañez (OIC)
A+ A+
Served
Extra Large Extra Large
B A R A N G A Y S C O N N E C T I O N S
51,389
Legislative DistrictPotential
Monthly Average
49,53547,271
MUNICIPALITIES
CoverageEnergized
Unenerg.
182
LEYECO VLEYECO V
N
183
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
20 MVA Substation
Power Plant
3 PH Backbone Line
Energized Coop System
P P
MERIDA
KANANGA
TABANGO
LEYTE
VILLABA
ORMOC CITY
ALBUERA
ISABEL
PALOMPON
H Q
P P
CALUBIAN
SANISIDRO
MATAG-OB
I. DATE OF INCORPORATION AND REGISTRATION : December 21, 1977
II. DATE OF FIRST ENERGIZATION : June 1979
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 45.9 46.1 46.1
Subsidy 28.5 45.9 61.5
610.180
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Third District1 Calubian 53 53 53 53 100 0 6,100 3,259 3,429 3,605 59
2 Leyte 30 30 30 30 100 0 7,600 2,673 2,855 3,027 40
3 San Isidro 19 19 19 19 100 0 6,300 2,349 2,539 2,661 42
4 Tabango 13 13 13 13 100 0 6,800 2,923 3,068 3,203 47
5 Villaba 35 35 35 35 100 0 7,800 4,593 4,835 4,985 64
Fourth District6 Albuera 16 16 16 16 100 0 7,400 6,722 7,014 7,198 97
7 Isabel 24 24 24 24 100 0 8,300 7,288 7,568 7,789 94
8 Kananga (23) 21 21 21 21 100 0 8,500 6,865 7,124 7,355 87
9 Matag-ob 21 21 21 21 100 0 3,800 2,325 2,422 2,509 66
10 Merida 22 22 22 22 100 0 5,500 3,955 4,126 4,295 78
11 Ormoc City 110 110 110 110 100 0 37,600 34,571 36,073 36,978 99
12 Palompon 50 50 50 50 100 0 11,000 8,288 8,707 9,019 82
Total 414 414 414 414 100 0 116,700 85,811 89,760 92,624 79
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 46,969 47,982 60,948 Residential 81,733 85,437 88,187
MWH Purchased 9,893 10,242 10,938 Commercial 1,889 2,063 2,085
MWH Sold 8,558 8,785 9,541 Industrial 819 791 798
Systems Loss (%) 13 14 13 Public Building 946 1,013 1,085
Peak Load (KW) 25,963 24,962 25,784 Others 424 456 469
Load Factor (%) 52 56 58 Total 85,811 89,760 92,624
Collection Efficiency (%) 99 100 100
Ave. Systems Rate (P/KWH) 5.49 5.46 6.39
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 40,546 41,503 45,004 50,041 54,056 55,227 54,363 58,467 60,441 64,764
Commercial 4,208 3,989 4,337 4,743 5,263 5,657 5,922 6,452 6,964 7,405
Industrial 23,745 23,991 26,909 29,214 31,034 28,817 28,584 30,893 30,623 33,955
Public Building 856 1,145 1,751 2,969 3,266 3,044 3,672 5,189 5,615 6,294
Others 3,187 3,704 3,549 2,506 1,532 1,665 1,649 1,690 1,774 2,073
Total 72,542 74,332 81,550 89,473 95,151 94,410 94,190 102,691 105,417 114,491
LEYTE V ELECTRIC COOPERATIVE, INC. (LEYECO V)Brgy. San Pablo, Ormoc City, Leyte 6541
Tel. Nos. (053) 561-0579, 561-4111, 561-4668; Telefax Nos. (053) 255-7211, 561-4075
2008 20092007
Mr. Jovenal R. Alesna
A+
Extra Large
Mr. Wilfredo P. Madjus
A+
Project Name/Proponent
Mr. Joselito P. YapMr. Lamitz T. Pañares
Type
Palinpinon-Tongonan GPP/ Green Core Geothermal, Inc. Geothermal
112.500
Mr. Jovenal R. Alesna Engr. Juanito E. Jorda (OIC)
A+
EnergizedUnenerg.
POWER PLANT
Location
Legislative District
Mega Large Mega Large
B A R A N G A Y S C O N N E C T I O N S
87,039
Potential
Tongonan II&III/PNOC
Kananga
Served
Monthly Average
84,27481,148
MUNICIPALITIES/CITY
Coverage
184
SOLECO
N
LEGEND :
HQ Location
Municipality
5 MVA Substation
10 MVA Substation
Generating Set
Mini Hydro
3 PH Backbone Line
Energized Coop System
H Q
G S
MH
185
CITY ofMAASIN
TOMASOPPUS
BONTOC
SAN FRANCISCO
LIMASAWA
LIBAGON
MALITBOG
LILOAN
PINTUYAN
HINUNANGAN
SOGOD
SILAGO
ANAHAWAN
HINUNDAYAN
H Q
MH
G S
SAINTBERNARD
SAN JUAN(Cabalian)
LILOAN
PADREBURGOS
MACROHON
SAN RICARDO
I. DATE OF INCORPORATION AND REGISTRATION : August 27, 1971
II. DATE OF FIRST ENERGIZATION : February 1976
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 7.5 7.5 12.5 0.326
Subsidy 45.5 68.0 68.0 0.810
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Lone District
1 Anahawan 14 14 14 14 100 0 1,700 1,188 1,236 1,285 76
2 Bontoc 40 39 39 40 100 0 6,500 3,195 3,357 3,523 54
3 Hinunangan 40 39 39 40 100 0 5,900 3,774 3,935 4,172 71
4 Hinundayan 17 17 17 17 100 0 2,600 1,893 1,978 2,058 79
5 Libagon 14 14 14 14 100 0 3,000 2,007 2,093 2,161 72
6 Liloan 24 23 23 24 100 0 4,700 3,365 3,583 3,787 81
7 Limasawa 6 6 6 6 100 0 1,200 909 936 961 80
8 City of Maasin 70 70 70 70 100 0 17,100 14,884 15,510 16,163 95
9 Macrohon 30 30 30 30 100 0 5,400 4,059 4,246 4,423 82
10 Malitbog 37 36 36 37 100 0 4,500 2,897 3,046 3,190 71
11 Padre Burgos 11 11 11 11 100 0 2,200 1,761 1,858 1,946 88
12 Pintuyan 23 23 23 23 100 0 2,300 1,847 1,904 1,951 85
13 Saint Bernard 30 30 30 30 100 0 5,400 3,706 4,004 4,332 80
14 San Francisco 22 22 22 22 100 0 2,500 2,087 2,193 2,274 91
15 San Juan (Cabalian) 18 18 18 18 100 0 3,200 2,364 2,441 2,512 79
16 San Ricardo 15 10 10 15 100 0 2,100 1,039 1,091 1,261 60
17 Silago 15 12 14 15 100 0 2,400 1,673 1,874 1,987 83
18 Sogod 45 40 40 45 100 0 8,800 5,833 6,218 6,566 75
19 Tomas Oppus 29 29 29 29 100 0 3,500 2,207 2,316 2,422 69
Total 500 483 485 500 100 0 85,000 60,688 63,819 66,974 79
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 23,028 26,198 31,620 Residential 57,658 60,485 63,402
MWH Purchased 4,915 5,112 5,347 Commercial 1,357 1,524 1,679
MWH Sold 4,213 4,438 4,645 Industrial 3 2 2
Systems Loss (%) 14 13 13 Public Building 1,587 1,727 1,808
Peak Load (KW) 12,066 12,666 13,167 Others 83 81 83
Load Factor (%) 56 55 56 Total 60,688 63,819 66,974
Collection Efficiency (%) 94 99 100
Ave. Systems Rate (P/KWH) 5.47 5.90 6.81
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 21,616 22,805 25,656 28,780 31,576 33,803 33,719 36,885 38,751 39,932
Commercial 3,793 4,016 4,403 4,968 6,136 7,003 7,482 8,175 8,561 9,273
Industrial 413 341 408 353 409 598 558 524 449 553
Public Building 2,158 2,583 2,999 3,412 3,713 3,913 4,317 4,552 5,054 5,534
Others 214 229 279 331 350 380 403 419 440 452
Total 28,194 29,974 33,745 37,844 42,184 45,697 46,479 50,555 53,255 55,744
Henabian/SOLECO Mini Hydro
POWER PLANT
Location Project Name/Proponent Type
SOUTHERN LEYTE ELECTRIC COOPERATIVE, INC. (SOLECO)Nasaug, City of Maasin, Southern Leyte
Telefax No. (053) 570-9823; Fax No. (053) 381-2144; E-mail: [email protected]
2008 20092007
A+
Extra Large
Mr. Peregrino P. Regis Mr. Peregrino P. Regis
Mr. Rosello S. Gerong Mr. Rosello S. Gerong
Mr. Peregrino P. Regis
Mr. Rosello S. Gerong
A+ A+
Served
Extra Large Extra Large
B A R A N G A Y S C O N N E C T I O N S
62,400
Limasawa NPC-SPUG Diesel
Saint Bernard
Legislative DistrictPotential
Monthly Average
60,07157,815
MUNICIPALITIES/CITY
CoverageEnergized
Unenerg.
186
LEGEND :
Energized Other System
HQ Location
Municipality
5 MVA Substation
3 PH Backbone Line
Energized Coop System
H Q
N
MARIPIPI
BILIRAN
NAVAL
CABUCGAYAN
CAIBIRAN
KAWAYAN
HIGATANGAN IS.
ALMERIACULABA
H Q
187
Served byMaripipi Multi PurposeCooperative, Inc.
I. DATE OF INCORPORATION AND REGISTRATION : July 6, 1973
II. DATE OF FIRST ENERGIZATION : August 1983
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative) POWER PLANT
2007 2008 2009 Location Project Name/Proponent Cap.(MW)
Residual Loan 7.6 26.2 44.7 Biliran 0.326
Subsidy 26.4 34.1 36.2
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Lone District
1 Almeria 13 13 13 13 100 0 3,100 2,443 2,558 2,723 88
2 Biliran 11 11 11 11 100 0 2,900 2,116 2,218 2,330 80
3 Cabucgayan 13 13 13 13 100 0 3,800 2,455 2,581 2,684 71
4 Caibiran 17 17 17 17 100 0 4,200 2,447 2,575 2,696 64
5 Culaba 17 17 17 17 100 0 2,400 1,527 1,625 1,703 71
6 Kawayan 20 20 20 20 100 0 3,700 2,689 2,800 2,921 79
7 Naval 26 26 26 26 100 0 8,300 7,224 7,641 8,064 97
Total 117 117 117 117 100 0 28,400 20,901 21,998 23,121 81
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 8,781 10,013 12,234 Residential 19,775 20,843 21,909
MWH Purchased 1,552 1,609 1,746 Commercial 615 626 655
MWH Sold 1,303 1,363 1,485 Industrial - - -
Systems Loss (%) 15 14 14 Public Building 477 494 518
Peak Load (KW) 3,941 4,186 4,338 Others 34 35 39
Load Factor (%) 54 53 55 Total 20,901 21,998 23,121
Collection Efficiency (%) 104 97 97
Ave. Systems Rate (P/KWH) 6.74 7.34 8.24
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 6,717 7,561 7,995 9,099 10,189 10,614 10,509 11,694 12,204 13,397
Commercial 1,147 1,253 1,372 1,483 1,597 1,737 1,945 2,106 2,179 2,294
Industrial 12 9 - - - - - - - -
Public Building 799 989 1,190 1,409 1,514 1,526 1,534 1,657 1,795 1,934
Others 64 63 95 126 159 157 161 174 183 194
Total 8,739 9,875 10,652 12,117 13,460 14,034 14,149 15,631 16,361 17,819
BILIRAN ELECTRIC COOPERATIVE, INC. (BILECO)Caray-caray, Naval, Biliran
Tel. Nos. (053) 500-9041 to 42; 500-9744; Telefax No. (053) 500-9039; Fax No.(053) 500-9040; E-mail: [email protected]
2008 20092007
A
Medium
Mr. Leonardo V. Madeja, Jr. Mr. Leonardo V. Madeja, Jr.
Mr. Marlon B. Roa Mr. Marlon B. Roa
Mr. Sammy A. Sale
Mr. Marlon B. Roa
A+ A+
Served
Large Large
B A R A N G A Y S C O N N E C T I O N S
22,670
Type
NPC-SPUG Diesel
Legislative DistrictPotential
Monthly Average
21,69120,719
MUNICIPALITIES
CoverageEnergized
Unenerg.
188
LEGEND :
H Q HQ Location
Municipality
Below 5 MVA Substation
5 MVA Substation
Generating Set
3 PH Backbone Line
Energized Coop System
G S
NORSAMELCO
N
189
SAN VICENTE
CAPUL
SAN ANTONIO
G SG S
VICTORIA
MONDRAGON
LAS NAVAS
MAPANAS
LAPINIG
BIRI
PALAPAG
GAMAY
CATUBIG
LOPEDE VEGA
SILVINO LOBOS
CATARMANSANJOSE
BOBON
ROSARIO
SAN ISIDRO
PAM
BU
JAN
SANJUAN
CABAUN
G S
G S
H Q
LAVEZARES
SANROQUE
LAOANG
ALLEN
I. DATE OF INCORPORATION AND REGISTRATION : October 1, 1977
II. DATE OF FIRST ENERGIZATION : August 11, 1980
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 23.8 23.8 23.8 0.576
Subsidy 149.8 200.5 229.0 0.326
0.263
0.489
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %First District
1 Allen 20 20 20 20 100 0 4,300 3,044 3,230 3,354 78
2 Biri 8 8 8 8 100 0 1,800 470 513 526 29
3 Bobon 18 18 18 18 100 0 3,500 1,853 2,019 2,087 60
4 Capul 12 12 12 12 100 0 2,200 529 571 636 29
5 Catarman 55 55 55 55 100 0 14,600 9,532 10,094 10,411 71
6 Lavezares 26 26 26 26 100 0 5,100 2,050 2,202 2,511 49
7 Lope de Vega* 22 22 22 22 100 0 2,500 506 583 641 26
8 Mondragon 24 24 24 24 100 0 6,000 2,379 2,535 2,640 44
9 Rosario 11 11 11 11 100 0 1,800 770 831 853 47
10 San Antonio 10 10 10 10 100 0 1,600 763 798 829 52
11 San Isidro 14 14 14 14 100 0 4,800 2,579 2,749 2,846 59
12 San Jose 16 16 16 16 100 0 2,900 1,620 1,716 1,753 60
13 San Vicente 7 7 7 7 100 0 1,200 232 320 322 27
14 Victoria 16 16 16 16 100 0 2,400 1,187 1,355 1,397 58 Second District
15 Catubig 47 44 47 47 100 0 5,700 2,031 2,508 2,694 47
16 Gamay 26 25 26 26 100 0 4,500 1,460 1,582 1,743 39
17 Laoang 56 43 52 56 100 0 11,600 4,437 4,733 4,978 43
18 Lapinig 15 15 15 15 100 0 2,300 704 930 948 41
19 Las Navas 53 33 53 53 100 0 6,200 641 781 1,028 17
20 Mapanas 13 13 13 13 100 0 2,300 514 538 572 25
21 Palapag 32 32 32 32 100 0 6,500 2,717 2,907 3,056 47
22 Pambujan 26 26 26 26 100 0 5,400 1,707 1,970 2,080 39
23 San Roque 16 14 16 16 100 0 4,200 1,760 1,900 1,991 47
24 Silvino Lobos 26 11 18 26 100 0 2,700 12 12 12 0
Total 569 515 557 569 100 0 106,100 43,497 47,377 49,908 47
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 17,562 22,826 23,702 Residential 40,840 44,673 47,153
MWH Purchased 3,716 4,180 4,530 Commercial 1,844 1,854 1,858
MWH Sold 3,064 3,537 3,611 Industrial 5 6 11
Systems Loss (%) 17 15 20 Public Building 719 746 787
Peak Load (KW) 8,499 9,529 9,783 Others 89 98 99
Load Factor (%) 60 60 63 Total 43,497 47,377 49,908
Collection Efficiency (%) 84 83 81
Ave. Systems Rate (P/KWH) 5.73 6.45 6.56
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 15,979 16,747 17,750 20,109 22,632 23,621 17,682 25,618 29,094 30,424
Commercial 3,075 3,564 4,312 4,538 5,141 5,646 4,664 6,608 7,308 7,331
Industrial 102 120 169 180 183 166 335 463 1,402 1,106
Public Building 1,578 1,862 2,293 2,714 3,078 3,487 2,742 3,903 5,228 4,849
Others 112 126 696 413 215 178 (71) 171 (583) (381)
Total 20,846 22,419 25,220 27,954 31,249 33,097 25,352 36,763 42,449 43,329
* With Provisional Franchise, NEC Res. No. 4 s. 1976
NORTHERN SAMAR ELECTRIC COOPERATIVE, INC. (NORSAMELCO)Brgy. Magsaysay, Bobon, Northern Samar
Fax No. (055) 251-8163; Cel. Nos. (0917) 361-9744, (0920) 910-6364
2008 20092007
Type
Diesel
E
Large
NPC-SPUG
NPC-SPUG Diesel
- E
Engr. Salvador G. Hernandez Engr. Salvador G. Hernandez
Mr. Danilo D. Anaviso
Engr. Salvador G. Hernandez
Mr. Danilo D. Anaviso Mr. Danilo D. Anaviso
Legislative District
- Large
B A R A N G A Y S C O N N E C T I O N S
46,839
POWER PLANT
Location Project Name/Proponent
Capul
Monthly Average
44,51341,154
MUNICIPALITIES
CoverageEnergized
Unenerg.
San Vicente
PotentialServed
San Antonio NPC-SPUG Diesel
Biri NPC-SPUG Diesel
190
N
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
Generating Set
Mini Hydro
3 PH Backbone Line
Energized Coop System
G S
MH
191
LIBUCAN
ALMAGRO
TAGAPUL-AN
MATUGUINAO
SAN JORGE
GANDARA
CALBAYOG CITY
OQUENDO
CAMANDAG
SANTO NIÑO
PAGSANGHAN
G S
G S
G S
MH
TARANGNAN
TINAMBACAN
SANTAMARGARITA
H Q
I. DATE OF INCORPORATION AND REGISTRATION : February 27, 1974
II. DATE OF FIRST ENERGIZATION : November 1974
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative) POWER PLANT
2007 2008 2009 Cap.(MW)
Residual Loan 25.2 37.1 37.1 0.326
Subsidy 86.3 103.5 105.0 0.217
0.263
1.080
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District1 Almagro 23 13 15 15 65 8 2,200 375 436 449 20
2 Calbayog City 86 84 83 85 99 1 16,650 17,485 18,034
Oquendo 46 45 45 45 98 1 32,000 4,119 4,566 4,667 92
Tinambacan 25 25 25 25 100 0 6,198 6,579 6,756
3 Gandara 69 60 62 69 100 0 6,200 3,065 3,444 3,619 58
4 Matuguinao 20 17 17 20 100 0 1,100 237 339 379 34
5 Pagsanghan 13 13 13 13 100 0 1,600 1,226 1,292 1,338 84
6 San Jorge 41 28 31 41 100 0 2,800 1,477 1,639 1,717 61
7 Santa Margarita 36 34 34 34 94 2 4,700 3,305 3,493 3,604 77
8 Santo Niño 13 12 12 13 100 0 2,700 295 301 307 11
9 Tagapul-an 14 8 8 14 100 0 1,800 365 399 409 23
10 Tarangnan 41 40 40 40 98 1 4,400 1,654 1,864 1,951 44
Total 427 379 385 414 97 13 59,500 38,966 41,837 43,230 73
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 16,834 18,070 22,072 Residential 34,115 36,906 38,175
MWH Purchased 3,611 3,744 3,878 Commercial 1,411 1,471 1,570
MWH Sold 3,150 3,248 3,330 Industrial 2 2 2
Systems Loss (%) 12 12 13 Public Building 432 452 475
Peak Load (KW) 8,836 8,788 8,980 Others 3,006 3,006 3,008
Load Factor (%) 56 58 59 Total 38,966 41,837 43,230
Collection Efficiency (%) 90 96 94
Ave. Systems Rate (P/KWH) 5.34 5.56 6.63
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 11,496 12,358 12,483 14,800 17,141 17,997 17,908 20,620 21,093 21,006
Commercial 3,607 4,005 4,131 4,387 4,684 4,921 5,486 6,121 6,564 7,318
Industrial 4,246 5,254 3,968 5,388 5,522 5,812 6,497 6,849 7,002 7,143
Public Building 1,311 1,436 1,602 2,092 2,669 2,725 2,618 3,211 3,376 3,491
Others 616 692 739 818 993 1,080 906 1,001 946 1,003
Total 21,276 23,745 22,923 27,485 31,009 32,535 33,415 37,802 38,981 39,961
NPC-SPUG Diesel
Tagapul-an
ServedPotential
B A R A N G A Y S
Monthly Average
Ms. Placida P. Balios (OIC)
AB
Large
MUNICIPALITIES/CITY
40,920
Ton-ok/SAMELCO I
Large
C O N N E C T I O N S
38,651
Mini Hydro
Diesel
NPC-SPUG
NPC-SPUG
42,079
Diesel
Project Name/Proponent TypeLocation
Almagro
Legislative District
Calbayog City
CoverageEnergized
Unenerg.
Sto. Niño
Mr. Reynaldo A. Lim
Ms. Placida P. Balios (OIC)
Large
Mr. Reynaldo A. Lim
Ms. Placida P. Balios (OIC)
Mr. Reynaldo A. Lim
B
SAMAR I ELECTRIC COOPERATIVE, INC. (SAMELCO I)Brgy. Carayman, Calbayog City, Samar
Tel Nos. (055) 209-8212 to 16; Telefax No. (055) 209-8211; Hotline: (055) 209-2661, 533-9757
2008 20092007
192
N
SAMELCO IILEGEND :
H Q HQ Location
Municipality
5 MVA Substation
Generating Set
3 PH Backbone Line
Energized Coop System
G S
193
BASEY
CALBIGA
CITY of CATBALOGAN
HINABANGAN
MOTIONG
TALALORA
(WRIGHT)PARANAS
PINABACDAO
SANTA RITA
VILLAREAL
SAN JOSEDE BUAN
G S
H Q
MARABUT
SAN SEBASTIANZUMARRAGA
I. DATE OF INCORPORATION AND REGISTRATION : August 23, 1975
II. DATE OF FIRST ENERGIZATION : December 1975
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 1.8 1.8 14.1 0.589
Subsidy 144.6 181.3 188.2
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Second District
1 Basey 51 49 50 51 100 0 9,400 5,226 5,443 6,527 69
2 Calbiga 41 33 41 41 100 0 4,000 2,237 2,369 2,545 64
3 City of Catbalogan 57 50 50 53 93 4 18,300 14,098 14,556 15,141 83
4 Daram 58 58 58 58 100 0 7,600 2,712 2,923 3,373 44
5 Hinabangan 21 21 21 21 100 0 2,600 1,280 1,353 1,505 58
6 Jiabong 34 34 34 34 100 0 3,300 1,802 1,906 2,009 61
7 Marabut 24 24 24 24 100 0 2,800 1,689 1,775 1,845 66
8 Motiong 30 29 30 30 100 0 2,800 1,327 1,452 1,585 57
9 Paranas (Wright) 44 41 44 44 100 0 6,000 3,384 3,530 3,684 61
10 Pinabacdao 24 19 24 24 100 0 2,800 1,464 1,579 1,675 60
11 San Jose de Buan 14 8 14 14 100 0 1,300 184 204 241 19
12 San Sebastian 14 14 14 14 100 0 1,400 807 845 883 63
13 Santa Rita 38 38 38 38 100 0 6,500 2,888 3,136 3,338 51
14 Talalora 11 11 11 11 100 0 1,400 678 723 841 60
15 Villareal 38 38 38 38 100 0 5,100 2,466 2,604 2,736 54
16 Zumarraga 25 25 25 25 100 0 3,300 1,255 1,305 1,352 41
Total 524 492 516 520 99 4 78,600 43,497 45,703 49,280 63
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 21,175 21,491 25,705 Residential 37,669 39,711 43,189
MWH Purchased 3,784 3,864 4,124 Commercial 1,071 1,159 1,207
MWH Sold 3,203 3,291 3,527 Industrial 6 - -
Systems Loss (%) 14 14 14 Public Building 414 512 636
Peak Load (KW) 8,877 9,204 9,600 Others 4,337 4,321 4,248
Load Factor (%) 58 58 59 Total 43,497 45,703 49,280
Collection Efficiency (%) 98 96 96
Ave. Systems Rate (P/KWH) 6.61 6.53 7.29
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 15,267 16,092 17,888 20,137 22,556 22,823 22,989 25,183 25,662 27,237
Commercial 3,583 3,595 3,659 3,778 4,739 7,134 7,012 6,805 8,976 9,746
Industrial 1,067 1,656 1,267 2,190 1,778 302 303 1,823 - -
Public Building 2,851 2,976 3,031 3,387 3,223 3,053 3,196 3,216 3,471 3,915
Others 762 866 1,085 1,123 1,221 1,436 1,385 1,405 1,388 1,428
Total 23,530 25,185 26,930 30,615 33,516 34,748 34,885 38,432 39,497 42,326
SAMAR II ELECTRIC COOPERATIVE, INC. (SAMELCO II)Brgy. Arado, Paranas, Samar
Tel. Nos. Cat SC (055) 356-0002, 356-1451; Paranas (055) 356-0541; Telefax No. (055) 251-5645; Fax No. (055) 356-1003
2008 20092007
A+
Extra Large
Ms. Deborah T. Marco Mr. Nicolas A. Mendova
Mr. Ponciano R. Rosales Mr. Ponciano R. Rosales
Mr. Alfonso F. Quilapio
Mr. Ponciano R. Rosales
A+ A+
Served
Extra Large Extra Large
B A R A N G A Y S C O N N E C T I O N S
53,206
POWER PLANT
Location Project Name/Proponent Type
Legislative DistrictPotential
Monthly Average
50,55647,786
MUNICIPALITIES
CoverageEnergized
Unenerg.
Zumarraga NPC-SPUG Diesel
194
LEGEND :
HQ Location
Municipality
5 MVA Substation
3 PH Backbone Line
Energized Coop System
H Q
Energized Other System
195
N
MASLOG
BALANGIGA
GUIUAN
MERCEDES
MAYDOLONG
CITY ofBORONGAN
SAN POLICARPIO
JIPAPAD
SAN VICENTE IS.
GIPORLOS
HERNANI
LLORENTE
TAFT
CAN-AVID
DOLORES
ORAS
ARTECHE
LAWA-AN
GENERAL MACARTHUR
ANDO
DIVINUBO IS.
SULANGAN IS.
MANICANI IS.
SULU-AN IS.HAMONHON IS.
H Q
STA. MONICA
HILABAAN
Served by Hilabaan Fishermen'sMulti-Purpose Coop.
SULAT
SAN JULIAN
QUINAPONDANSALCEDO
I. DATE OF INCORPORATION AND REGISTRATION : December 9, 1977
II. DATE OF FIRST ENERGIZATION : June 26, 1981
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 207.8 261.1 270.1
Subsidy 157.7 187.1 190.1
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Lone District
1 Arteche 20 11 11 11 55 9 2,600 700 837 882 34
2 Balangiga 13 12 12 13 100 0 2,100 1,253 1,352 1,411 67
3 Balangkayan 15 13 13 15 100 0 1,600 885 957 1,003 63
4 City of Borongan 61 61 61 61 100 0 11,200 9,197 9,701 10,050 90
5 Can-Avid 28 22 22 26 93 2 3,500 1,268 1,419 1,489 43
6 Dolores 45 30 30 31 69 14 6,600 2,164 2,463 2,577 39
7 General MacArthur 30 30 30 30 100 0 2,100 932 987 1,031 49
8 Giporlos 18 16 17 18 100 0 2,000 992 1,098 1,157 58
9 Guiuan 60 58 58 60 100 0 7,800 4,616 4,934 5,171 66
10 Hernani 13 13 13 13 100 0 1,500 776 818 859 57
11 Jipapad 13 8 8 8 62 5 1,300 13 13 13 1
12 Lawa-an 16 16 16 16 100 0 2,000 1,370 1,447 1,495 75
13 Llorente 33 32 32 33 100 0 3,900 1,919 2,148 2,249 58
14 Maslog 12 6 6 12 100 0 800 12 12 12 2
15 Maydolong 20 17 19 20 100 0 2,300 1,358 1,494 1,572 68
16 Mercedes 16 16 16 16 100 0 900 460 550 593 66
17 Oras 42 37 37 40 95 2 6,300 2,230 2,681 2,813 45
18 Quinapondan 25 23 23 25 100 0 2,300 1,098 1,265 1,343 58
19 Salcedo 41 40 41 41 100 0 3,400 1,589 1,903 2,024 60
20 San Julian 16 16 16 16 100 0 2,500 1,701 1,780 1,820 73
21 San Policarpio 17 15 16 16 94 1 2,500 1,078 1,173 1,250 50
22 Sulat 18 17 17 18 100 0 2,900 1,949 2,078 2,129 73
23 Taft 24 23 24 24 100 0 3,300 1,884 2,085 2,153 65
Total 596 532 538 563 94 33 75,400 39,444 43,195 45,096 60
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 20,743 22,145 25,657 Residential 37,157 40,804 42,584
MWH Purchased 3,740 3,886 4,099 Commercial 1,218 1,219 1,265
MWH Sold 3,068 3,184 3,426 Industrial 114 112 112
Systems Loss (%) 17 17 16 Public Building 617 688 755
Peak Load (KW) - - - Others 338 372 380
Load Factor (%) - - - Total 39,444 43,195 45,096
Collection Efficiency (%) 94 96 93
Ave. Systems Rate (P/KWH) 6.76 6.96 7.49
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 14,016 14,848 16,587 18,790 22,292 22,671 22,963 26,932 28,185 29,969
Commercial 2,065 2,270 2,425 2,577 3,001 3,365 3,665 4,349 4,446 4,937
Industrial 351 312 331 436 799 1,099 1,204 1,554 1,423 1,575
Public Building 1,237 1,520 1,701 1,951 2,131 2,203 2,252 2,761 2,921 3,244
Others 792 776 969 973 1,010 1,251 1,168 1,214 1,229 1,382
Total 18,461 19,726 22,013 24,727 29,233 30,590 31,252 36,810 38,204 41,107
Legislative DistrictCoverage
Monthly Average
Engr. Nerio T. Aberia, Jr.
CC
Large
MUNICIPALITIES
PotentialEnergized
Unenerg.
41,953
Served
B A R A N G A Y S
Large
C O N N E C T I O N S
EASTERN SAMAR ELECTRIC COOPERATIVE, INC. (ESAMELCO)Brgy. Cabong, City of Borongan, Eastern Samar
Tel. No. (055) 261-2014; Fax Nos. (055) 261-2391, 560-0013
2008 20092007
36,754
Mr. Francisco S. De Paz
Large
Mr. James S. Hupp
B
Dr. Aniceto N. Quintua
Ms. Marilen Q. Reyes (OIC) Ms. Marilen Q. Reyes (OIC)
40,210
196
Energized Coop System
LEGEND :
Headquarters
N
ZAMSURECO IPagadian City
197
ZAMBOANGA SUR IIIpil, Zamboanga Sibugay
ZANECODipolog City
ZAMCELCOZamboanga City
I. STATUS OF ENERGIZATION (Cumulative):
CONNECTIONS
2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %
A. Electric Cooperatives:
1 Zamboanga Norte 23 23 23 23 100 585 557 574 584 99 156,000 71,371 75,257 78,617 50
2 Zamboanga Sur I 25 25 25 25 100 628 589 624 627 99 173,900 76,475 80,947 84,812 49
3 Zamboanga Sur II 23 23 23 23 100 558 510 526 557 99 153,400 75,195 79,940 84,074 55
4 Zamboanga City 1 1 1 1 100 94 94 94 94 100 131,200 109,779 114,081 118,352 90
Total 72 72 72 72 100 1,865 1,750 1,818 1,862 99 614,500 332,820 350,225 365,855 60
EnergizedPotential
REGION IX
ZAMBOANGA PENINSULA REGION
MUNICIPALITIES/CITIES BARANGAYS
CoverageServed
ELECTRIC DISTRIBUTION UTILITIES
EnergizedCoverage
198
Total 480,444 508,401 543,514 588,755 636,122 624,232 620,195 672,240 698,022 721,235
Others 12,567 13,442 14,484 15,614 16,494 16,633 17,370 17,467 17,994 18,527
Public Bldgs. 31,380 33,964 38,610 41,610 44,899 45,432 47,520 54,356 56,554 59,159
Industrial 130,178 131,258 138,186 142,021 147,999 139,698 139,776 150,329 156,323 149,529
Commercial 117,041 123,022 128,463 136,273 142,035 138,840 137,877 149,032 157,540 171,548
Residential 189,278 206,715 223,771 253,237 284,695 283,628 277,652 301,056 309,611 322,472
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
3 PH Backbone Line
Energized Coop System
N
199
SERGIO OSMENA, SR.
DAPITANCITY
MUTIA
SIAYAN
SINDANGAN
LABASONLILOY
TAMPILISAN
SALUG
JOSEDALMAN(PONOT)
PRES.MANUEL A.
ROXAS
PIÑAN(New Piñan)
RIZAL
LALIBERTAD
BACUNGAN(Leon T. Postigo)
GUTALAC
KALAWIT
GODOD
KATIPUNANMANUKAN
POLANCO
DIPOLOG CITY
SIBUTAD
H Q
I. DATE OF INCORPORATION AND REGISTRATION : August 23, 1972
II. DATE OF FIRST ENERGIZATION : September 1978
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 1.4 12.5 52.0
Subsidy 153.5 193.4 208.7
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Dapitan City 50 49 49 49 98 1 14,500 7,325 7,678 8,079 56
2 La Libertad 13 13 13 13 100 0 1,600 965 989 1,006 63
3 Mutia 16 16 16 16 100 0 2,000 1,136 1,178 1,201 60
4 Piñan (New Piñan) 22 22 22 22 100 0 3,800 1,848 1,978 2,046 54
5 Polanco 30 30 30 30 100 0 7,300 3,901 4,108 4,322 59
6 Rizal (22) 21 21 21 21 100 0 3,200 1,798 1,864 1,906 60
7 Sergio Osmeña, Sr. 39 34 36 39 100 0 5,800 1,125 1,218 1,356 23
8 Sibutad 16 16 16 16 100 0 3,300 1,684 1,730 1,757 53
Second District
9 Dipolog City 21 21 21 21 100 0 21,300 17,731 18,608 19,615 92
10 Jose Dalman (Ponot) 18 16 18 18 100 0 4,900 1,132 1,286 1,415 29
11 Katipunan 30 30 30 30 100 0 8,000 2,572 2,744 2,890 36
12 Manukan 22 22 22 22 100 0 6,800 2,113 2,229 2,381 35
13 Pres. Manuel A. Roxas 31 28 29 31 100 0 7,100 1,679 1,791 1,874 26
14 Siayan 22 19 22 22 100 0 7,000 881 974 1,048 15
15 Sindangan 52 49 52 52 100 0 17,100 7,577 7,975 8,352 49
Third District
16 Bacungan (Leon T. Postigo) 18 17 17 18 100 0 4,100 1,509 1,601 1,676 41
17 Godod 17 15 16 17 100 0 3,200 655 712 725 23
18 Gutalac 33 26 30 33 100 0 6,000 1,524 1,676 1,817 30
19 Kalawit 14 13 14 14 100 0 4,500 965 1,064 1,091 24
20 Labason 20 20 20 20 100 0 7,100 3,837 3,974 4,020 57
21 Liloy 37 37 37 37 100 0 7,200 4,879 5,109 5,192 72
22 Salug 23 23 23 23 100 0 6,100 2,740 2,856 2,905 48
23 Tampilisan 20 20 20 20 100 0 4,100 1,795 1,915 1,943 47
Total 585 557 574 584 99 1 156,000 71,371 75,257 78,617 50
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 42,772 47,436 53,338 Residential 64,509 68,113 71,229
MWH Purchased 10,294 11,226 11,895 Commercial 3,674 3,846 3,961
MWH Sold 8,970 9,574 10,139 Industrial 479 473 496
Systems Loss (%) 13 14 14 Public Building 2,275 2,381 2,484
Peak Load (KW) 25,421 26,814 27,338 Others 434 444 447
Load Factor (%) 55 57 60 Total 71,371 75,257 78,617
Collection Efficiency (%) 95 100 94
Ave. Systems Rate (P/KWH) 4.77 4.95 5.26
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 37,588 41,828 44,499 51,669 59,175 59,156 60,435 63,789 67,303 69,378
Commercial 9,704 10,458 10,333 11,570 12,994 13,357 14,022 15,216 16,442 16,489
Industrial 13,918 14,985 14,882 16,476 16,652 16,896 17,805 17,744 18,901 23,251
Public Building 3,329 3,685 3,819 4,562 6,519 6,791 7,496 8,754 9,794 10,233
Others 1,006 1,089 1,126 1,241 1,369 1,576 1,880 2,141 2,445 2,320
Total 65,545 72,045 74,659 85,518 96,709 97,776 101,638 107,644 114,885 121,671
Mega Large Mega Large
Monthly Average
86,203 89,69982,329
B A R A N G A Y S C O N N E C T I O N S
CoverageServed
Legislative DistrictPotential
MUNICIPALITIES/CITIESEnergized
Unenerg.
B B
Mr. Dolfuss Duhaylungsod Mr. Dolfuss Duhaylungsod
Mr. Adelmo P. Laput Mr. Adelmo P. Laput
A
Mega Large
Mr. Levy E. Lagutin
Mr. Adelmo P. Laput
ZAMBOANGA DEL NORTE ELECTRIC COOPERATIVE, INC. (ZANECO)Gen. Luna St., Dipolog City, Zamboanga Del Norte
Tel. Nos. (065) 212-3444 to 47, 212-9756; Fax No. (065) 212-2335
2008 20092007
200
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
Below 5MVA Substation
10 MVA Substation
3 PH Backbone Line
Energized Coop System
PITOGO
TABINA
VINCENZOA. SAGUN
201
JOSEFINA
MIDSALIP
MAHAYAG
PAGADIAN CITY
MARGOSATUBIG
DINAS
SAN PABLO
SANMIGUEL
LAPUYAN
DUMALINAO
RAMONMAGSAYSAY
(Liargo)
SOMINOT(Don MarianoMarcos)
MOLAVEDON VICTORIANO CHIONGBIAN(Don Mariano Marcos)MISAMIS OCCIDENTAL
DUMINGAG
TAMBULIG
AURORA
TIGBAO
TUKURAN
LABANGAN
DIMATALING
GUIPOS
H Q
N
I. DATE OF INCORPORATION AND REGISTRATION : August 25, 1972
II. DATE OF FIRST ENERGIZATION : August 1977
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 2.1 26.2 26.2
Subsidy 169.7 261.6 273.5
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Aurora (44) 41 41 41 41 100 0 9,100 4,889 5,135 5,366 59
2 Dumingag 44 39 44 44 100 0 9,500 2,551 2,854 3,101 33
3 Josefina 14 14 14 14 100 0 1,900 692 767 795 42
4 Labangan 25 24 24 24 96 1 7,700 3,494 3,626 3,744 49
5 Mahayag 29 29 29 29 100 0 9,600 3,966 4,178 4,382 46
6 Midsalip 33 30 33 33 100 0 6,500 1,564 1,639 1,684 26
7 Molave 25 25 25 25 100 0 10,000 5,733 6,076 6,307 63
8 Pagadian City 54 53 54 54 100 0 32,200 21,750 22,572 23,544 73
9 Ramon Magsaysay (Liargo) 27 25 27 27 100 0 5,200 2,178 2,324 2,470 48
10 Sominot (Don Mariano Marcos) 18 17 18 18 100 0 3,300 853 896 976 30
11 Tambulig 31 31 31 31 100 0 7,000 2,966 3,147 3,242 46
12 Tukuran (25) 24 20 24 24 100 0 7,400 3,546 3,617 3,769 51
Second District
13 Dimataling 24 24 24 24 100 0 5,800 1,660 1,783 1,862 32
14 Dinas 30 28 30 30 100 0 7,100 2,072 2,202 2,298 32
15 Dumalinao 30 29 30 30 100 0 5,800 3,504 3,649 3,750 65
16 Guipos 17 16 17 17 100 0 4,100 1,630 1,767 1,863 45
17 Lapuyan 26 24 26 26 100 0 5,500 1,174 1,342 1,477 27
18 Margosatubig 17 17 17 17 100 0 7,800 3,263 3,482 3,610 46
19 Pitogo 15 13 15 15 100 0 4,700 1,444 1,627 1,733 37
20 San Miguel 18 15 16 18 100 0 3,400 1,841 1,934 2,068 61
21 San Pablo 28 20 27 28 100 0 5,300 1,600 1,710 1,895 36
22 Tabina 15 15 15 15 100 0 4,900 1,724 1,914 2,012 41
23 Tigbao 18 18 18 18 100 0 3,800 879 944 979 26
24 Vincenzo A. Sagun 14 12 14 14 100 0 4,300 1,163 1,334 1,419 33
Second District, Misamis Occidental
25 Don Victoriano Chiongbian 11 10 11 11 100 0 2,000 339 428 466 23
(Don Mariano Marcos)
Total 628 589 624 627 99 1 173,900 76,475 80,947 84,812 49
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 50,169 52,330 60,292 Residential 65,074 69,534 72,976
MWH Purchased 11,061 11,435 12,360 Commercial 5,493 5,579 5,697
MWH Sold 9,619 10,001 10,907 Industrial 193 188 199
Systems Loss (%) 13 13 12 Public Building 2,408 2,614 2,783
Peak Load (KW) 24,029 25,804 27,680 Others 3,307 3,032 3,157
Load Factor (%) 63 61 61 Total 76,475 80,947 84,812
Collection Efficiency (%) 101 100 102
Ave. Systems Rate (P/KWH) 5.22 5.23 5.53
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 34,796 37,735 40,458 44,661 50,605 48,934 47,930 53,385 56,443 58,478
Commercial 19,904 21,125 21,792 23,637 24,079 24,073 24,275 28,595 28,743 35,281
Industrial 12,026 12,391 13,218 14,964 13,260 14,186 14,117 14,437 14,862 15,654
Public Building 7,073 7,743 8,375 9,256 9,820 9,913 9,561 10,601 11,125 12,080
Others 4,493 5,199 6,056 7,135 7,277 7,507 8,371 8,412 8,839 9,395
Total 78,292 84,193 89,899 99,653 105,041 104,614 104,254 115,430 120,012 130,888
ZAMBOANGA DEL SUR I ELECTRIC COOPERATIVE, INC. (ZAMSURECO I)J.S. Alano St., Pagadian City
Tel. Nos. (062) 215-2737 to 38, 215-1708; Telefax No. (062) 214-2635; Fax No. (062) 214-1880; E-mail: [email protected]/[email protected]
2008 20092007
A+
Mega Large
Ms. Cheryl B. Dayondon Ms. Cheryl B. Dayondon
Mr. Jose Raul A. Saniel Mr. Jose Raul A. Saniel
Mr. Rogelio C. Mabanag
Mr. Jose Raul A. Saniel
A+ A+
Unenerg.Served
Mega Large Mega Large
B A R A N G A Y S C O N N E C T I O N S
Legislative District
Monthly Average
76,461 79,319
Potential
72,604
MUNICIPALITIES/CITY
CoverageEnergized
202
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
3 PH Backbone Line
Energized Coop System
203
N
SIBUCO
TITAY
OLUTANGA
PAYAO
MABUHAY
BAYOG LAKEWOOD
SIAY
KUMALARANG
NAGABALIGUIAN
TUNGAWAN
SIRAWAI
SIOCON
ALICIA
TALUSAN
MALANGAS
BUUG
DIPLAHAN
Tapped at ZAMCELCO Distribution
ROSELLERLIM
KABASALAN
IMELDA
I P I L
Part ofZAMBOANGA
DEL SUR
Part of ZAMBOANGA DEL NORTE
VITALI
H Q
I. DATE OF INCORPORATION AND REGISTRATION : May 8, 1980
II. DATE OF FIRST ENERGIZATION : November 1981
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 26.2 43.2 102.1
Subsidy 154.4 209.9 229.4
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Second District
1 Bayog 28 27 28 28 100 0 5,900 2,200 2,316 2,458 42
2 Kumalarang 18 17 18 18 100 0 5,600 1,713 1,818 1,912 34
3 Lakewood 14 13 13 13 93 1 3,600 1,451 1,497 1,549 43
First District, Zamboanga Sibugay
4 Alicia 27 27 27 27 100 0 6,700 2,144 2,475 2,625 39
5 Buug 27 27 27 27 100 0 7,600 5,318 5,569 5,773 76
6 Diplahan 22 22 22 22 100 0 5,400 3,325 3,543 3,777 70
7 Imelda 18 18 18 18 100 0 4,800 2,627 2,812 2,972 62
8 Mabuhay 18 18 18 18 100 0 5,600 823 941 1,150 21
9 Malangas 25 25 25 25 100 0 6,700 3,301 3,428 3,575 53
10 Olutanga 19 19 19 19 100 0 5,100 1,874 1,969 2,042 40
11 Payao 29 29 29 29 100 0 6,100 2,137 2,325 2,494 41
12 Talusan 14 14 14 14 100 0 4,100 803 909 975 24
Second District, Zamboanga Sibugay
13 Ipil 28 28 28 28 100 0 15,100 13,556 14,296 15,060 99
14 Kabasalan 29 29 29 29 100 0 8,400 6,146 6,402 6,584 78
15 Roseller Lim 26 26 26 26 100 0 7,700 3,413 3,717 3,916 51
16 Naga 23 23 23 23 100 0 7,900 5,316 5,537 5,680 72
17 Siay 29 29 29 29 100 0 7,400 4,421 4,648 4,858 66
18 Titay 30 28 30 30 100 0 8,900 4,716 5,184 5,475 62
19 Tungawan 25 25 25 25 100 0 7,500 2,763 3,059 3,262 43
Third District, Zamboanga del Norte
20 Baliguian 17 14 14 17 100 0 3,300 659 679 720 22
21 Sibuco 28 11 18 28 100 0 5,200 639 793 832 16
22 Siocon 26 24 25 26 100 0 6,900 3,103 3,155 3,334 48
23 Sirawai 34 13 17 34 100 0 3,500 837 848 903 26
2nd District, Zamboanga City
Zamboanga City 4 4 4 4 100 0 4,400 1,910 2,020 2,148 49
Total 558 510 526 557 99 1 153,400 75,195 79,940 84,074 55
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 29,618 31,426 35,658 Residential 66,668 71,398 75,448
MWH Purchased 6,422 6,848 7,199 Commercial 5,386 5,259 5,219
MWH Sold 5,533 5,897 6,199 Industrial 631 728 705
Systems Loss (%) 14 14 14 Public Building 2,012 2,159 2,322
Peak Load (KW) 16,492 16,983 18,232 Others 498 396 380
Load Factor (%) 53 55 54 Total 75,195 79,940 84,074
Collection Efficiency (%) 92 95 97
Ave. Systems Rate (P/KWH) 5.35 5.33 5.75
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 20,619 21,561 23,443 27,337 31,508 32,028 31,709 34,990 37,382 39,507
Commercial 9,890 10,367 10,451 11,310 11,189 9,964 9,800 10,162 10,352 10,763
Industrial 10,400 10,362 10,171 10,917 13,610 15,076 14,516 15,334 16,866 17,361
Public Building 1,440 1,764 2,537 2,852 3,165 3,432 4,217 4,752 5,177 5,805
Others 674 714 640 642 786 1,190 959 1,153 985 950
Total 43,023 44,768 47,242 53,058 60,257 61,690 61,201 66,391 70,762 74,386
Pangi, Ipil, Zamboanga Sibugay
Telefax No. (062) 333-2416; Fax Nos. (062) 333-5643, 333-2212
2008 20092007
A+
Extra Large
Mr. Ricardo O. Calonge, Jr. Mr. Jeric S. Kagaoan
Engr. Jesus Y. Castro Engr. Jesus Y. Castro
Mr. Rogelio A. Gomez
Engr. Jesus Y. Castro
A+ A+
Unenerg.Served
Extra Large Extra Large
B A R A N G A Y S C O N N E C T I O N S
Legislative District
Monthly Average
87,343 91,037
Potential
82,505
MUNICIPALITIES
CoverageEnergized
204
ZAMBOANGA DEL SUR II ELECTRIC COOPERATIVE, INC. (ZAMSURECO II)
N
LEGEND :
HQ Location
City
5 MVA Substation
10 MVA Substation
20 MVA Substation
Power Plant
3 PH Backbone Line
Energized Coop System
H Q
P P
205
ZAMBOANGA CITY
SACOL IS.
TICTAUAN IS.
P P
H Q
GS Generating Set
G S
I. DATE OF INCORPORATION AND REGISTRATION : February 23, 1974
II. DATE OF FIRST ENERGIZATION : April 1974
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 880.1 1347.9 1,959.9
Subsidy 20.4 38.9 38.9
0.163
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Zamboanga City (98) 37 37 37 37 100 0 66,100 61,452 63,499 65,543 99
Second District
Zamboanga City 57 57 57 57 100 0 65,100 48,327 50,582 52,809 81
94 94 94 94 100 0 131,200 109,779 114,081 118,352 90
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 142,453 147,948 158,187 Residential 100,154 104,428 108,330
MWH Purchased 38,394 38,982 39,558 Commercial 7,768 7,831 8,144
MWH Sold 31,898 32,697 32,858 Industrial 177 176 175
Systems Loss (%) 17 16 17 Public Building 1,149 1,125 1,176
Peak Load (KW) 79,072 80,199 81,382 Others 531 521 527
Load Factor (%) 67 67 67 Total 109,779 114,081 118,352
Collection Efficiency (%) 97 98 98
Ave. Systems Rate (P/KWH) 4.47 4.52 4.81
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 96,275 105,591 115,371 129,570 143,407 143,510 137,578 148,892 148,483 155,109
Commercial 77,543 81,072 85,887 89,756 93,774 91,446 89,780 95,059 102,003 109,015
Industrial 93,834 93,520 99,915 99,664 104,477 93,541 93,338 102,814 105,694 93,263
Public Building 19,538 20,772 23,879 24,940 25,394 25,295 26,246 30,249 30,458 31,041
Others 6,394 6,440 6,662 6,596 7,062 6,360 6,160 5,761 5,725 5,862
Total 293,584 307,395 331,714 350,526 374,114 360,152 353,102 382,775 392,363 394,290
Putik Complex, Zamboanga City
Tel. Nos. (062) 991-2117, 991-1588, 991-0594, 993-2873; Telefax No. (062) 992-4130; Fax No. (062) 991-3877; E-mail: [email protected]
2008 20092007
Monthly Average
B
EnergizedUnenerg.
Mega Large
Project Name/Proponent
Mega Large
C
ServedPotential
Total
B
Mega Large
100,031
CITY
CoverageLegislative District
POWER PLANT
96,906
Western Mindanao Power Corp./Alsons/Tomen
113.000
Engr. Reinerio R. Ramos
Mr. Gilbert R. Alvarez Mr. Rolando G. Gregorio
Engr. Reinerio R. Ramos Engr. Reinerio R. Ramos
Mr. Luciano O. Arquiza
C O N N E C T I O N SB A R A N G A Y S
Sacol NPC-SPUG Diesel
102,973
Diesel
TypeLocation
Zamboanga City
206
ZAMBOANGA CITY ELECTRIC COOPERATIVE, INC. (ZAMCELCO)
Energized Coop System
LEGEND :
Energized Other System
Headquarters
N
207
Served byCagayan Electric Power & Light Co., Inc.
CAMELCOMambajao, Camiguin
MOELCI ICalamba, Misamis Occidental
MORESCO IIMedina, Misamis Oriental
MOELCI IIOzamis City
MORESCO ILaguindingan, Misamis Oriental
FIBECOMaramag, Bukidnon
BUSECOManolo Fortich, Bukidnon
LANECOTubod, Lanao del Norte
Served byIligan Light & Power, Inc.
Served byZAMSURECO I
I. STATUS OF ENERGIZATION (Cumulative):
CONNECTIONS
2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %
A. Electric Cooperatives:
1 Misamis Occ. I 8 8 8 8 100 227 227 227 227 100 46,600 39,362 41,053 42,831 92
2 Misamis Occ. II 8 8 8 8 100 253 253 253 253 100 69,900 62,177 64,323 66,127 95
3 Misamis Or. I 10 10 10 10 100 155 155 155 155 100 63,200 50,143 53,028 56,804 90
4 Misamis Or. II 12 12 12 12 100 269 269 269 269 100 78,400 45,931 48,034 50,570 65
5 Bukidnon I 13 13 13 13 100 303 302 302 302 99 139,800 90,546 95,421 99,578 71
6 Bukidnon II 10 10 10 10 100 171 170 171 171 100 93,200 58,913 63,469 66,877 72
7 Camiguin 5 5 5 5 100 58 58 58 58 100 16,700 12,758 13,042 13,320 80
8 Lanao Norte 19 19 19 19 100 407 333 334 343 84 90,700 62,929 65,325 67,986 75
Total 85 85 85 85 100 1,843 1,767 1,769 1,778 96 598,500 422,759 443,695 464,093 78
CoverageEnergized
CoverageEnergized
PotentialServed
REGION XNORTHERN MINDANAO REGION
ELECTRIC DISTRIBUTION UTILITIES
MUNICIPALITIES/CITIES BARANGAYS
208
Total 313,369 349,042 371,881 411,217 455,908 477,298 478,210 514,446 542,930 575,888
Others 9,961 11,924 12,321 15,391 20,145 19,203 15,022 16,653 18,021 20,378
Public Bldgs. 16,011 18,188 19,721 23,188 24,342 24,163 25,268 27,949 29,621 31,762
Industrial 65,799 79,112 82,246 86,650 96,094 113,580 116,671 127,960 136,223 148,709
Commercial 68,485 74,844 80,445 88,036 92,967 95,953 96,660 104,057 110,659 117,160
Residential 153,113 164,974 177,148 197,952 222,361 224,399 224,589 237,827 248,406 257,879
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):
N
HQ Location
Municipality
5 MVA Substation
3 PH Backbone Line
H Q
LEGEND :
Energized Coop System
209
BALIANGAO PLARIDEL
SAPANGDALAGA
CONCEPCION
CALAMBA
LOPEZ JAENA
ALORAN
OROQUIETA CITY
H Q
I. DATE OF INCORPORATION AND REGISTRATION : August 18, 1972
II. DATE OF FIRST ENERGIZATION : June 1978
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 13.7 25.8 37.8
Subsidy 44.0 44.0 58.1
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Aloran 38 38 38 38 100 0 5,200 4,599 4,867 5,112 98
2 Baliangao 15 15 15 15 100 0 3,100 2,665 2,811 2,892 93
3 Calamba 19 19 19 19 100 0 5,000 4,476 4,720 4,876 98
4 Concepcion 18 18 18 18 100 0 1,500 322 333 515 34
5 Lopez Jaena 28 28 28 28 100 0 4,600 3,247 3,365 3,537 77
6 Oroquieta City 47 47 47 47 100 0 15,100 14,071 14,561 15,084 99
7 Plaridel 33 33 33 33 100 0 8,100 7,378 7,696 8,030 99
8 Sapang Dalaga 28 28 28 28 100 0 3,900 2,604 2,700 2,785 71
First District, Zamboanga del Norte
Rizal 1 1 1 1 100 0 100
Total 227 227 227 227 100 0 46,600 39,362 41,053 42,831 92
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 15,926 17,051 19,129 Residential 36,358 38,008 39,687
MWH Purchased 3,197 3,307 3,565 Commercial 1,925 1,930 1,977
MWH Sold 2,779 2,909 3,147 Industrial 105 102 105
Systems Loss (%) 12 11 11 Public Building 929 956 980
Peak Load (KW) 7,340 7,653 - Others 45 57 82
Load Factor (%) 60 59 - Total 39,362 41,053 42,831
Collection Efficiency (%) 96 96 96
Ave. Systems Rate (P/KWH) 5.73 5.86 6.08
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 12,642 13,619 14,766 16,017 17,664 17,728 17,702 18,567 19,081 20,190
Commercial 4,259 4,703 4,674 5,262 5,418 5,574 5,604 6,584 7,130 7,823
Industrial 1,448 1,708 1,970 2,229 3,157 3,290 3,444 4,104 4,291 5,083
Public Building 1,672 2,005 2,237 2,511 2,859 2,878 2,971 3,259 3,581 3,821
Others 805 912 983 993 851 809 821 828 829 843
Total 20,826 22,947 24,630 27,012 29,949 30,279 30,542 33,342 34,912 37,760
Monthly Average
44,90043,271
B A R A N G A Y S C O N N E C T I O N S
Coverage
included in Concepcion
EnergizedUnenerg.
Large
A+
46,249
Served
A+A+
MUNICIPALITIES/CITY
Legislative DistrictPotential
Mr. Hurlito L. Paderanga Mr. Hurlito L. Paderanga
Mr. Noel B. Dumalagan Mr. Noel B. Dumalagan
Large Large
Mr. Hurlito L. Paderanga
Mr. Noel B. Dumalagan
MISAMIS OCCIDENTAL I ELECTRIC COOPERATIVE, INC. (MOELCI I)Macamiguing, Calamba, Misamis Occidental
Tel. No. (088) 271-3660, 271-3346; Fax No. (088) 271-3661
2008 20092007
210
N
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
3 PH Backbone Line
LEGEND :
Energized Coop System
211
BONIFACIO
OZAMIS CITY
TUDELA
CLARIN
SINACABAN
JIMENEZ
PANAON
TANGUB CITY
H Q
I. DATE OF INCORPORATION AND REGISTRATION : June 2, 1976
II. DATE OF FIRST ENERGIZATION : September 1977
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 23.9 23.9 23.9
Subsidy 47.8 64.9 65.2
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Jimenez 24 24 24 24 100 0 5,900 5,376 5,598 5,826 99
2 Panaon 16 16 16 16 100 0 2,400 2,138 2,223 2,289 95
Second District
3 Bonifacio 28 28 28 28 100 0 6,000 3,849 4,051 4,281 71
4 Clarin 29 29 29 29 100 0 6,600 6,056 6,299 6,558 99
5 Ozamis City 51 51 51 51 100 0 28,800 27,485 28,100 28,535 99
6 Sinacaban 17 17 17 17 100 0 3,800 3,535 3,666 3,782 99
7 Tangub City 55 55 55 55 100 0 11,000 8,954 9,323 9,638 88
8 Tudela 33 33 33 33 100 0 5,400 4,784 5,063 5,218 97
Total 253 253 253 253 100 0 69,900 62,177 64,323 66,127 95
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 41,116 43,314 46,565 Residential 58,446 60,667 62,444
MWH Purchased 9,005 9,570 9,900 Commercial 2,317 2,221 2,235
MWH Sold 7,685 8,243 8,874 Industrial 96 98 97
Systems Loss (%) 14 12 9 Public Building 1,119 1,102 1,131
Peak Load (KW) 22,324 23,202 23,352 Others 199 235 220
Load Factor (%) 55 56 58 Total 62,177 64,323 66,127
Collection Efficiency (%) 103 94 92
Ave. Systems Rate (P/KWH) 5.35 5.25 5.25
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 28,347 30,571 30,902 35,914 40,605 40,892 40,776 42,782 44,861 47,746
Commercial 15,865 17,615 18,414 21,704 23,299 24,922 25,012 26,738 28,118 29,324
Industrial 8,006 13,622 15,234 15,171 9,413 10,133 9,287 9,369 10,951 12,540
Public Building 3,627 4,099 4,356 5,691 5,531 5,221 5,721 6,021 6,109 6,399
Others 725 662 644 567 7,950 9,189 5,833 7,315 8,875 10,473
Total 56,570 66,569 69,550 79,047 86,799 90,358 86,629 92,225 98,914 106,482
MISAMIS OCCIDENTAL II ELECTRIC COOPERATIVE, INC. (MOELCI II)Don Anselco Bernad Ave., Bitoon, Ozamis City
Tel. No. (088) 521-1881; Telefax No. (088) 521-1461; E-mail: [email protected]
2008 20092007
Engr. Eddie L. Caluna
Mr. Jemilo L. Pelimer
Extra Large Extra Large
Mr. Mario Genis B. Sarigumba Mr. Mario Genis B. Sarigumba
Mr. Jemilo L. Pelimer Mr. Jemilo L. Pelimer
B A R A N G A Y S C O N N E C T I O N S
Legislative District
A+
Extra Large
A+ A+
Monthly Average
57,817 59,358
Potential
55,831
MUNICIPALITIES/CITIES
CoverageEnergized
Unenerg.Served
212
N
213
LAGUINDINGANA
LUBIJ
ID
OPOLCAGAYAN DE ORO CITY
LUGAIT
MANTICAO
INITAO
NAAWAN
TALAKAG
JASAAN
TAGOLOAN
VILLANUEVA
PART OF BUKIDNON
CITY ofEL SALVADOR
H Q
GITAGUM
LIBERTAD
Served byCagayan Electric Power & Light Co.
H Q HQ Location
Municipality
Below 5 MVA Substation
10 MVA Substation
3 PH Backbone Line
Energized Coop System
Energized Other System
LEGEND :
I. DATE OF INCORPORATION AND REGISTRATION : May 21, 1968 / February 1, 1971
II. DATE OF FIRST ENERGIZATION : September 21, 1971
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 42.3 76.6 117.2
Subsidy 70.8 92.2 104.1
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District, Bukidnon
Talakag 17 17 17 17 100 0 5,600 2,713 2,967 3,229 58
Baungon 1 1 1 1 100 0 300 102 103 106 35
Second District
1 Alubijid 16 16 16 16 100 0 5,200 3,921 4,230 4,495 86
2 City of El Salvador 15 15 15 15 100 0 8,000 6,927 7,354 7,989 99
3 Gitagum 11 11 11 11 100 0 2,800 2,401 2,479 2,579 92
4 Initao 16 16 16 16 100 0 5,900 4,927 5,087 5,315 90
5 Laguindingan 11 11 11 11 100 0 4,200 3,383 3,735 3,990 95
6 Libertad 9 9 9 9 100 0 2,300 1,868 1,945 2,087 91
7 Lugait 8 8 8 8 100 0 3,300 2,798 2,893 3,062 93
8 Manticao 13 13 13 13 100 0 5,300 3,454 3,578 3,814 72
9 Naawan 10 10 10 10 100 0 3,400 2,910 3,044 3,306 97
10 Opol 14 14 14 14 100 0 10,300 9,065 9,560 10,217 99
First District, Cagayan de Oro City
Cagayan de Oro City 14 14 14 14 100 0 6,600 5,627 6,005 6,557 99
First District, Lanao del Norte
Iligan City (Hindang) 47 48 58
Total 155 155 155 155 100 0 63,200 50,143 53,028 56,804 90
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 38,696 41,246 47,399 Residential 46,461 47,467 51,123
MWH Purchased 7,695 8,074 8,517 Commercial 2,154 2,251 2,303
MWH Sold 7,130 7,526 7,979 Industrial 23 22 22
Systems Loss (%) 6 6 6 Public Building 1,072 1,093 1,123
Peak Load (KW) 16,869 19,020 19,470 Others 433 2,195 2,233
Load Factor (%) 62 58 60 Total 50,143 53,028 56,804
Collection Efficiency (%) 100 100 106
Ave. Systems Rate (P/KWH) 5.43 5.48 5.94
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 23,335 25,187 27,572 30,890 33,828 32,465 31,904 33,944 35,103 36,255
Commercial 11,727 12,972 13,909 12,571 13,152 16,689 16,574 17,424 18,760 19,966
Industrial 19,697 22,156 21,834 22,903 25,111 25,710 25,338 28,418 30,525 33,235
Public Building 1,668 1,935 2,180 2,356 2,528 2,522 2,561 2,629 2,682 2,776
Others 2,239 2,596 2,950 3,253 3,237 3,029 3,133 3,146 3,239 3,522
Total 58,666 64,846 68,445 71,973 77,856 80,415 79,510 85,561 90,309 95,754
Legislative DistrictPotential
MUNICIPALITIES/CITIES
Extra Large
CoverageEnergized
Unenerg.
48,129
B A R A N G A Y S C O N N E C T I O N S
Monthly Average
50,856
Extra Large
A+
Extra Large
Served
54,942
Mr. Pedrito H. Baculio
Engr. Julie B. Real
A+ A+
Mr. Pedrito H. Baculio Mr. Bernard R. Benavides
Engr. Julie B. Real Engr. Julie B. Real
MISAMIS ORIENTAL I RURAL ELECTRIC SERVICE COOPERATIVE, INC. (MORESCO I)Laguindingan, Misamis Oriental 9019
Telefax No.(088) 282-2234; 583-0617; A29-E-mail: [email protected], moresco-webgate.ph
2008 20092007
214
N
LEGEND :
Energized Coop System
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
3 PH Backbone Line
215
CLAVERIA
MEDINA
BALINGASAG
GINGOOG CITY
SUGBONGCOGON
KINOGUITAN
SALAY
LAGONGLONG
TALISAYAN
BALINGOAN
BINUANGAN
JASAAN
H QMAGSAYSAY (Linugos)
I. DATE OF INCORPORATION AND REGISTRATION : October 1, 1976
II. DATE OF FIRST ENERGIZATION : June 26, 1978
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 18.6 54.3 72.8
Subsidy 79.9 109.1 111.3
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Balingasag 30 30 30 30 100 0 11,800 7,210 7,475 7,865 67
2 Balingoan 9 9 9 9 100 0 1,800 1,362 1,395 1,465 81
3 Binuangan 8 8 8 8 100 0 1,400 988 1,007 1,028 73
4 Gingoog City 79 79 79 79 100 0 23,300 13,519 14,253 15,092 65
5 Kinoguitan 15 15 15 15 100 0 2,400 1,591 1,634 1,694 71
6 Lagonglong 10 10 10 10 100 0 3,800 2,109 2,359 2,452 65
7 Magsaysay (Linugos) 25 25 25 25 100 0 5,600 2,534 2,635 2,778 50
8 Medina 19 19 19 19 100 0 5,900 4,392 4,612 4,870 83
9 Salay 18 18 18 18 100 0 4,600 3,509 3,585 3,726 81
10 Sugbongcogon 10 10 10 10 100 0 1,600 1,194 1,233 1,285 80
11 Talisayan 18 18 18 18 100 0 4,500 3,301 3,386 3,535 79
Second District
12 Claveria 24 24 24 24 100 0 9,100 3,005 3,224 3,512 39
Jasaan 4 4 4 4 100 0 2,600 1,217 1,236 1,268 49
Total 269 269 269 269 100 0 78,400 45,931 48,034 50,570 65
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 29,511 30,211 35,091 Residential 42,587 44,602 47,032
MWH Purchased 6,911 6,689 7,188 Commercial 1,835 1,865 1,900
MWH Sold 6,043 5,834 6,340 Industrial 310 321 348
Systems Loss (%) 12 12 11 Public Building 1,026 1,080 1,128
Peak Load (KW) 15,687 15,776 18,123 Others 173 166 162
Load Factor (%) 60 58 54 Total 45,931 48,034 50,570
Collection Efficiency (%) 93 93 97
Ave. Systems Rate (P/KWH) 4.88 5.18 5.54
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 19,563 21,776 23,005 23,719 27,871 30,275 29,906 31,651 32,522 33,032
Commercial 3,194 3,500 3,492 3,820 5,310 5,330 4,960 4,995 5,265 5,314
Industrial 15,421 19,524 20,723 22,239 26,329 30,169 31,280 31,956 28,161 33,178
Public Building 1,790 1,891 2,010 1,886 2,167 2,478 2,610 2,673 2,848 3,079
Others 605 599 504 738 1,077 1,395 1,137 1,244 1,208 1,474
Total 40,573 47,290 49,734 52,402 62,754 69,647 69,893 72,519 70,004 76,077
Monthly Average
60,160 63,38757,524
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.Served
Legislative DistrictPotential
MUNICIPALITIES/CITY
Extra Large Extra LargeExtra Large
Mr. Eriel F. Sison
Engr. Amado B. Ke-e
A+ A+
Mr. Eriel F. Sison Mr. Antonio P. Reyes, Sr.
Engr. Amado B. Ke-e Engr. Amado B. Ke-e
A+
MISAMIS ORIENTAL II ELECTRIC SERVICE COOPERATIVE, INC. (MORESCO II)Medina, Misamis Oriental
Tel. No. (088) 331-2407; Telefax No. (088) 331-2076; 331-2771
2008 20092007
216
FIBECO
N
217
CITY ofVALENCIA
MARAMAG
QUEZON
PANGANTUCAN
KALILANGAN
SAN FERNANDO
DAMULOG
KIBAWE
KITAOTAO
DANGCAGAN
DON CARLOS
KADINGILAN
WAO
TALAKAG
BUMBARAN
Part ofLANAO SUR
Served byBumbaran Municipal System
P P
H Q
MH
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
Power Plant
Mini Hydro
3 PH Backbone Line
Energized Coop System
P P
Energized Other System
MH
I. DATE OF INCORPORATION AND REGISTRATION : May 13, 1972
II. DATE OF FIRST ENERGIZATION : November 1978
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 1.6 7.9 35.1 255.000
Subsidy 79.8 116.1 134.1 0.800
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Kalilangan 14 14 14 14 100 0 6,700 3,857 4,043 4,129 62
2 Pangantucan 19 19 19 19 100 0 9,500 4,620 4,960 5,202 55
Talakag 1 1 1 1 100 0 800 126 134 140 18
Second District
3 San Fernando 24 24 24 24 100 0 8,900 3,045 3,305 3,472 39
4 City of Valencia (31) 30 30 30 30 100 0 31,900 25,584 26,714 27,806 87
City of Malaybalay 1 1 1 1 100 0 300 156 159 172 57
Third District
5 Damulog 17 16 16 16 94 1 4,500 1,985 2,076 2,162 48
6 Dangcagan 14 14 14 14 100 0 4,200 2,916 3,024 3,155 75
7 Don Carlos 29 29 29 29 100 0 12,300 8,643 8,958 9,303 76
8 Kadingilan 17 17 17 17 100 0 5,700 3,095 3,288 3,416 60
9 Kibawe 23 23 23 23 100 0 7,300 3,929 4,153 4,326 59
10 Kitaotao 35 35 35 35 100 0 5,700 3,997 4,234 4,424 78
11 Maramag 20 20 20 20 100 0 16,700 13,007 13,749 14,465 87
12 Quezon 31 31 31 31 100 0 18,300 10,570 11,289 11,823 65
First District, Lanao Sur
13 Wao 26 26 26 26 100 0 6,300 4,565 4,862 5,081 81
Bumbaran 2 2 2 2 100 0 500 323 333 347 69
First District, Davao City
Davao City 200 128 140 155 78
Total 303 302 302 302 99 1 139,800 90,546 95,421 99,578 71
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 44,396 46,451 50,082 Residential 80,173 84,796 88,538
MWH Purchased 8,996 9,550 10,024 Commercial 7,280 7,316 7,345
MWH Sold 7,860 8,379 8,741 Industrial 307 319 335
Systems Loss (%) 12 12 12 Public Building 2,320 2,380 2,612
Peak Load (KW) 22,926 25,761 24,057 Others 466 610 748
Load Factor (%) 54 51 57 Total 90,546 95,421 99,578
Collection Efficiency (%) 97 97 99
Ave. Systems Rate (P/KWH) 5.65 5.54 5.73
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 27,457 28,589 31,228 35,039 37,717 37,835 37,705 40,627 41,895 45,071
Commercial 15,256 16,626 19,363 21,936 21,821 18,269 18,206 19,551 20,363 21,668
Industrial 9,436 9,255 8,312 7,842 13,363 20,410 21,992 27,944 32,097 31,563
Public Building 2,735 2,807 3,347 4,216 4,299 4,092 3,943 4,144 4,028 4,332
Others 2,067 2,128 1,360 3,011 3,277 2,430 2,024 2,054 2,170 2,261
Total 56,951 59,405 63,610 72,044 80,477 83,036 83,870 94,320 100,553 104,895
City of Valencia Mountain View Mini Hydro
Maramag Pulangi 4/NPC Hydro
FIRST BUKIDNON ELECTRIC COOPERATIVE, INC. (FIBECO)Anahawon, Maramag, Bukidnon
Tel. No. (088) 356-1026; Telefax No. (088) 356-1025, Fax No. (088) 356-1018; Cel. No. (0912) 711-8291
2008 20092007
A+
Mega Large
Arch. Raul L. Alkuino Arch. Raul L. Alkuino
Engr. Renato S. Cortezano (OIC) Engr. Renato S. Cortezano (OIC)
Mr. George J. Ares
Engr. Daniel A. Tangara (OIC)
A+ A+
Unenerg.Served
Mega Large Mega Large
B A R A N G A Y S C O N N E C T I O N S
POWER PLANT
Location Project Name/Proponent Type
Legislative District
Monthly Average
99,409 104,354
Potential
94,053
MUNICIPALITIES/CITIES
CoverageEnergized
218
N
219
LEGEND :
H Q HQ Location
Municipality
10 MVA Substation
Mini Hydro
3 PH Backbone Line
Energized Coop System
MH
MALITBOG
IMPASUG-ONG
SUMILAO
CABANGLASAN
CITY ofMALAYBALAY
MANOLO FORTICH
LIBONA
BAUNGON
LANTAPAN
TALAKAG
H Q
MH
MH
I. DATE OF INCORPORATION AND REGISTRATION : July 26, 1977
II. DATE OF FIRST ENERGIZATION : June 29, 1979
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 142.2 288.4 449.3 1.600
Subsidy 34.5 56.3 57.3
7.000
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District1 Baungon (16) 15 15 15 15 100 0 5,600 2,176 2,114 2,135 38
2 Libona 14 14 14 14 100 0 7,300 4,417 4,348 4,671 64
3 Malitbog 11 11 11 11 100 0 4,100 1,296 1,256 1,251 31
4 Manolo Fortich 22 22 22 22 100 0 16,600 12,989 13,577 13,943 84
5 Sumilao 10 10 10 10 100 0 3,900 2,443 2,185 2,323 60
6 Talakag (29) 11 10 11 11 100 0 4,200 452 582 756 18
Second District7 Cabanglasan 15 15 15 15 100 0 7,100 4,336 4,396 4,183 59
8 Impasug-ong 13 13 13 13 100 0 6,000 3,079 2,962 2,888 48
9 Lantapan 14 14 14 14 100 0 9,300 5,186 5,688 6,124 66
10 City of Malaybalay (46) 45 45 45 45 100 0 28,100 22,056 25,815 28,034 99
City of Valencia 1 1 1 1 100 0 1,000 483 546 569 57
Total 171 170 171 171 100 0 93,200 58,913 63,469 66,877 72
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 31,472 34,766 39,468 Residential 54,178 57,425 61,065
MWH Purchased 7,303 7,949 8,467 Commercial 3,098 3,308 3,740
MWH Sold 6,252 7,170 7,502 Industrial 380 365 368
Systems Loss (%) 14 10 11 Public Building 1,140 1,234 1,548
Peak Load (KW) 17,518 18,339 19,545 Others 117 1,137 156
Load Factor (%) 57 59 59 Total 58,913 63,469 66,877
Collection Efficiency (%) 92 91 92
Ave. Systems Rate (P/KWH) 5.03 4.85 5.26
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 17,596 19,517 21,485 24,174 27,094 27,344 29,224 31,286 35,441 34,864
Commercial 11,127 11,998 13,026 14,439 14,494 15,116 16,247 18,107 20,092 21,642
Industrial 7,565 8,173 9,239 10,514 12,215 16,063 17,999 19,002 23,372 25,768
Public Building 2,312 2,880 2,928 3,335 3,429 3,536 3,874 5,390 6,195 6,662
Others 2,363 2,747 3,155 3,736 2,389 1,368 1,163 1,242 944 1,085
Total 40,963 45,315 49,833 56,198 59,621 63,428 68,507 75,027 86,044 90,021
Agusan HEP/ /First Generation Holdings
Hydro
Legislative DistrictPotential
ServedMUNICIPALITIES/CITY
Monthly Average
61,684 65,92255,995
POWER PLANT
Location
CoverageEnergized
Unenerg.
Baungon
Extra Large Extra LargeExtra Large
B A R A N G A Y S C O N N E C T I O N S
Project Name/Proponent Type
Bubunawan/BPC Inc. Mini Hydro
Manolo Fortich
Mr. Edgar R. Masongsong
A+A+ A+
Mr. Edgar R. MasongsongMr. Edgar R. Masongsong
Mr. Bonifacio B. Ebueza Mr. Bonifacio B. EbuezaMr. Bonifacio B. Ebueza
BUKIDNON II ELECTRIC COOPERATIVE, INC. (BUSECO)Manolo Fortich, Bukidnon
2008 2009
Tel. Nos. (088) 230-2248, 230-2001; 230-2001; Telefax No. (088) 230-2240; 221-3314; Website: http://www.buseco.com.ph
2007
220
N
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
3 PH Backbone Line
Energized Coop System
MAMBAJAO
GUINSILIBAN
MAHINOG
CATARMAN
SAGAY
H Q
221
I. DATE OF INCORPORATION AND REGISTRATION : December 28, 1977
II. DATE OF FIRST ENERGIZATION : September 1983
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 8.4 8.7 8.7
Subsidy 52.3 65.2 74.5
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Lone District
1 Catarman 14 14 14 14 100 0 3,500 2,489 2,518 2,546 73
2 Guinsiliban 7 7 7 7 100 0 1,100 741 773 809 74
3 Mahinog 13 13 13 13 100 0 2,800 2,015 2,055 2,116 76
4 Mambajao 15 15 15 15 100 0 7,000 5,910 6,049 6,194 88
5 Sagay 9 9 9 9 100 0 2,300 1,603 1,647 1,655 72
Total 58 58 58 58 100 0 16,700 12,758 13,042 13,320 80
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 6,352 7,466 8,365 Residential 11,643 11,874 12,134
MWH Purchased 1,135 1,199 1,261 Commercial 651 667 660
MWH Sold 972 1,027 1,079 Industrial - - -
Systems Loss (%) 14 14 14 Public Building 407 437 459
Peak Load (KW) 3,111 3,281 3,382 Others 57 64 67
Load Factor (%) 50 50 51 Total 12,758 13,042 13,320
Collection Efficiency (%) 100 100 100
Ave. Systems Rate (P/KWH) 6.54 7.27 7.75
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 4,779 5,187 5,763 6,581 7,056 7,183 6,863 7,231 7,515 7,776
Commercial 1,902 1,904 1,889 1,987 2,175 2,586 2,634 2,812 3,091 3,318
Industrial - - - - - - - - - -
Public Building 588 717 816 972 1,161 1,260 1,291 1,408 1,521 1,655
Others 438 505 562 614 412 258 242 213 199 201
Total 7,707 8,313 9,030 10,154 10,803 11,287 11,030 11,664 12,326 12,950
Monthly Average
11,915 12,25811,552
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.Served
Legislative DistrictPotential
MUNICIPALITIES
Medium MediumMedium
Mr. Teodoro N. Banaag
Mr. Adrian A. Ebcas
A A+
Mr. Francisco V. Aguilar Mr. Francisco V. Aguilar
Mr. Adrian A. Ebcas Mr. Adrian A. Ebcas
A+
CAMIGUIN ELECTRIC COOPERATIVE, INC. (CAMELCO)Capitol Hills, Pandan, Mambajao, Camiguin Province
Tel. Nos. (088) 387-0113 to 14, 387-6019, 387-9963, 387-0963; Fax No. (088) 387-1227
2008 20092007
222
N
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
3 PH Backbone Line
Energized Coop System
Energized Other System
Served by Iligan Light & Power, Inc.
223
BACOLOD
MAIGO
KAUSWAGAN
POONAPIAGAPO
MATUNGAO
LINAMON
TAGOLOAN
ILIGAN CITY
TANGCAL
KOLAMBUGAN
MUNAI
MAGSAYSAY
TUBODBAROY
SALVADOR
LALA
NUNUNGANSAPAD
KAPATAGAN
SULTAN NAGADIMAPORO(KAROMATAN)
H Q
I. DATE OF INCORPORATION AND REGISTRATION : May 27, 1972
II. DATE OF FIRST ENERGIZATION : December 1974
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 47.2 64.4 180.3
Subsidy 79.9 98.9 109.5
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Bacolod 16 16 16 16 100 0 3,900 3,508 3,673 3,859 99
2 Baroy 23 23 23 23 100 0 4,800 4,490 4,619 4,768 99
3 Kauswagan 13 13 13 13 100 0 3,900 3,630 3,716 3,841 98
4 Kolambugan 26 24 24 26 100 0 6,300 5,595 5,730 5,876 93
5 Linamon 8 8 8 8 100 0 3,300 3,061 3,139 3,264 99
6 Maigo 13 13 13 13 100 0 3,800 3,535 3,637 3,751 99
7 Tubod 24 24 24 24 100 0 9,800 8,708 9,217 9,547 97
Second District
8 Kapatagan 33 33 33 33 100 0 8,900 7,724 7,963 8,194 92
9 Lala 27 27 27 27 100 0 11,800 10,294 10,705 11,248 95
10 Magsaysay 24 15 15 15 63 9 2,300 1,108 1,163 1,238 54
11 Matungao 12 12 12 12 100 0 1,900 667 690 722 38
12 Munai* 26 11 12 12 46 14 3,300 226 236 254 8
13 Nunungan** 25 1 1 1 4 24 2,500 1 1 1 0
14 Poona Piagapo* 26 16 16 16 62 10 3,300 296 314 328 10
15 Salvador 25 25 25 25 100 0 3,500 2,184 2,257 2,389 68
16 Sapad 17 15 15 16 94 1 3,100 1,785 1,852 1,976 64
17 Sultan Naga Dimaporo (Karomatan) 37 37 37 37 100 0 8,700 4,170 4,413 4,661 54
18 Tagoloan** 7 6 6 7 100 0 1,700 1 1 1 0
19 Tangcal 18 7 7 12 67 6 1,200 340 343 360 30
Baloi 3 3 3 3 100 0 2,000 1,241 1,280 1,320 66 First District, Zamboanga del Sur
Aurora 3 3 3 3 100 0 600 316 376 388 65
Tukuran 1 1 1 1 100 0 100 49 -
Total 407 333 334 343 84 64 90,700 62,929 65,325 67,986 75
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 24,738 25,338 27,447 Residential 56,720 58,856 61,636
MWH Purchased 4,635 4,646 4,845 Commercial 3,162 3,228 3,210
MWH Sold 4,149 4,156 4,329 Industrial 367 345 338
Systems Loss (%) 10 10 10 Public Building 1,319 1,475 1,519
Peak Load (KW) 11,394 11,490 11,559 Others 1,361 1,421 1,283
Load Factor (%) 56 55 57 Total 62,929 65,325 67,986
Collection Efficiency (%) 102 105 103
Ave. Systems Rate (P/KWH) 5.96 6.10 6.34
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 19,394 20,528 22,427 25,618 30,525 30,676 30,509 31,739 31,988 32,945
Commercial 5,155 5,526 5,678 6,317 7,298 7,467 7,423 7,846 7,840 8,105
Industrial 4,226 4,674 4,934 5,752 6,505 7,804 7,331 7,167 6,826 7,342
Public Building 1,619 1,854 1,847 2,221 2,368 2,176 2,297 2,425 2,657 3,038
Others 719 1,775 2,163 2,479 953 725 669 611 557 519
Total 31,113 34,357 37,049 42,387 47,648 48,849 48,229 49,788 49,868 51,949
* With Provisional Franchise, NEC. Res. No. 4 s. 1976
**Not included in the EC's Certificate of Franchise
LANAO DEL NORTE ELECTRIC COOPERATIVE, INC. (LANECO)9209 Tubod, Lanao Del Norte, Mindanao
Tel. Nos. (063) 341-5231, 495-0016; Fax No. (063) 341-5210
2008 20092007
A+
Extra Large
Mr. Lydon L. Abucay Mr. Reinario B. Bihag
Engr. Resnol C. Torres Engr. Resnol C. Torres
Mr. Lydon L. Abucay
Engr. Resnol C. Torres
A+ A+
Unenerg.Served
Extra Large Mega Large
B A R A N G A Y S C O N N E C T I O N S
Legislative District
Monthly Average
60,762 63,256
Potential
59,082
MUNICIPALITIES
CoverageEnergized
224
Energized Coop System
LEGEND :
Energized Other System
Headquarters
N
225
DANECOMontevista, Compostela Valley
SARANGANI ISLAND
DASURECOCity of Digos
Served byDavao Light & Power Co., Inc.
DORECOCity of Mati
I. STATUS OF ENERGIZATION (Cumulative):
2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %
A. Electric Cooperatives:
1 Davao Oriental 11 11 11 11 100 183 183 183 183 100 97,900 67,858 71,229 74,354 76
2 Davao Norte 18 18 18 18 100 374 374 374 374 100 245,200 131,278 137,054 141,443 58
3 Davao Sur 15 15 15 15 100 337 334 334 337 100 184,800 91,887 95,396 99,005 54
DAVAO REGIONREGION XI
ELECTRIC DISTRIBUTION UTILITIES
MUNICIPALITIES/CITIES BARANGAYS
ServedPotentialCoverage
EnergizedCoverage
CONNECTIONS
Energized
226
Total 294,149 329,074 350,198 378,798 418,780 424,302 426,811 461,517 487,535 538,099
Others 7,228 8,526 10,371 13,149 11,678 9,658 9,664 8,340 7,487 9,654
Public Bldgs. 12,696 12,633 13,128 15,230 16,451 16,244 17,030 17,810 20,595 23,203
Industrial 112,102 128,789 123,241 111,493 133,193 147,821 142,999 152,693 159,746 178,523
Commercial 38,677 43,168 49,706 52,951 53,661 58,238 63,373 68,986 75,639 86,232
Residential 123,446 135,958 153,752 185,975 203,797 192,341 193,745 213,688 224,068 240,487
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):
Total 44 44 44 44 100 894 891 891 894 100 527,900 291,023 303,679 314,802 60
LEGEND :
H Q HQ Location
Municipality
Below 5 MVA Substation
5 MVA Substation
10 MVA Substation
3 PH Backbone Line
Energized Coop System
227
N
SAN ISIDRO
LUPONTARRAGONA
BAGANGA
BANAY-BANAY
GOVERNORGENEROSO
CARAGA
MANAY
CATEEL
BOSTON
CITY of MATIH Q
I. DATE OF INCORPORATION AND REGISTRATION :December 30, 1977
II. DATE OF FIRST ENERGIZATION : June 1979
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 7.7 12.7 19.9
Subsidy 85.7 112.7 112.7
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Baganga 18 18 18 18 100 0 9,200 4,972 5,198 5,375 58
2 Boston 8 8 8 8 100 0 2,100 1,108 1,157 1,220 58
3 Caraga 17 17 17 17 100 0 7,100 2,100 2,217 2,351 33
4 Cateel 16 16 16 16 100 0 6,100 3,539 3,738 3,974 65
5 Manay 17 17 17 17 100 0 7,800 3,409 3,564 3,675 47
6 Tarragona 10 10 10 10 100 0 4,800 1,530 1,680 1,797 37
Second District
7 Banaybanay 14 14 14 14 100 0 7,700 7,164 7,420 7,641 99
8 Governor Generoso 20 20 20 20 100 0 9,100 6,018 6,415 6,708 74
9 Lupon 21 21 21 21 100 0 12,100 10,392 10,864 11,319 94
10 City of Mati 26 26 26 26 100 0 25,200 22,860 24,026 25,138 99
11 San Isidro 16 16 16 16 100 0 6,700 4,766 4,950 5,156 77
Total 183 183 183 183 100 0 97,900 67,858 71,229 74,354 76
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 24,810 30,475 32,892 Residential 56,773 58,798 61,498
MWH Purchased 4,863 5,580 6,714 Commercial 6,015 7,368 6,266
MWH Sold 4,520 5,215 6,082 Industrial 196 130 141
Systems Loss (%) 7 6 9 Public Building 1,528 1,669 1,860
Peak Load (KW) 12,865 13,941 15,662 Others 3,346 3,264 4,589
Load Factor (%) 52 55 59 Total 67,858 71,229 74,354
Collection Efficiency (%) 106 96 99
Ave. Systems Rate (P/KWH) 5.49 5.84 5.41
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 17,565 18,019 18,976 20,730 25,983 25,400 25,280 27,509 30,132 33,314
Commercial 9,741 11,155 13,241 14,320 8,522 9,632 11,931 9,282 12,164 14,695
Industrial 14,162 16,137 13,767 13,304 13,997 13,974 13,331 13,339 14,489 17,607
Public Building 3,370 3,581 3,981 4,661 4,599 3,892 4,266 3,118 4,626 5,707
Others 864 1,144 1,225 1,346 1,397 1,152 1,263 990 1,168 1,661
Total 45,702 50,036 51,190 54,361 54,498 54,050 56,071 54,238 62,579 72,984
Monthly Average
MUNICIPALITIES
Potential
54,413
Legislative District
Served
Extra Large Extra Large
Engr. Gregory A. Dukil
A+
B A R A N G A Y S
A+A+
Extra Large
57,317
DAVAO ORIENTAL ELECTRIC COOPERATIVE, INC. (DORECO)Madang Hi-Way, City of Mati, Davao Oriental
Tel. Nos. (087) 388-3263, 388-3127, 811-4210 to 11; Telefax Nos. (087) 388-3310, 338-3112; E-mail: [email protected]
2008 20092007
Mr. Villanueva P. Olea Mr. Luisito S. Gregorio
54,157
Coverage
Engr. Gregory A. Dukil
Mr. Villanueva P. Olea
EnergizedUnenerg.
C O N N E C T I O N S
Engr. Gregory A. Dukil
228
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
12 MVA Substation
20 MVA Substation
Power Plant
Generating Set
3 PH Backbone Line
Energized Coop System
Energized Other System
G S
P P
229
N
SAMAL
BABAK
PANTUKAN
MABINI(Doña Alicia)
MARAGUSAN(SAN MARIANO)
CARMEN
PANABO
NEW BATAAN
SANTO TOMAS
NEW CORELLA
KAPALONG
MAWAB
MONKAYO
LAAK(SAN VICENTE)
Served by Davao LightPower Co. Inc.
TALICUD ISLAND
MACO
CITY ofTAGUM
NABUNTURAN
COMPOSTELA
TALAINGOD
MONTEVISTA
ISLAND GARDENCITY OF SAMAL
P P
H Q
G S
KAPUTIAN
ASUNCION (Saug)
DUJALI
SAN ISIDRO
I. DATE OF INCORPORATION AND REGISTRATION :September 24, 1971
II. DATE OF FIRST ENERGIZATION : June 16, 1975
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 1123.5 1496.9 1856.9
Subsidy 118.1 161.4 163.9
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District, Compostela Valley
1 Compostela 16 16 16 16 100 0 14,700 9,643 9,950 10,198 69
2 Maragusan (San Mariano) 24 24 24 24 100 0 11,000 4,721 5,023 5,137 47
3 Monkayo 21 21 21 21 100 0 20,500 9,059 9,318 9,511 46
4 Montevista 20 20 20 20 100 0 7,900 4,330 4,523 4,629 59
5 New Bataan 14 14 14 14 100 0 10,100 4,504 4,688 4,811 48
Second District, Compostela Valley
6 Mabini (Doña Alicia) 11 11 11 11 100 0 7,600 3,039 3,145 3,249 43
7 Maco 37 37 37 37 100 0 15,600 7,295 7,538 7,866 50
8 Mawab 11 11 11 11 100 0 7,600 4,373 4,463 4,567 60
9 Nabunturan 28 28 28 28 100 0 14,500 10,443 10,809 11,110 77
10 Pantukan 13 13 13 13 100 0 14,800 5,318 5,594 6,013 41
11 Laak (San Vicente) 40 40 40 40 100 0 14,200 3,909 4,263 4,399 31
First District
12 Asuncion (Saug) 20 20 20 20 100 0 14,000 5,021 5,187 5,341 38
13 Kapalong 14 14 14 14 100 0 15,800 5,410 5,760 6,022 38
14 New Corella 20 20 20 20 100 0 10,300 4,256 4,454 4,577 44
15 Talaingod 3 3 3 3 100 0 584 605 617
16 San Isidro 13 13 13 13 100 0 1,875 1,967 2,023
Second District
18 Island Garden City of Samal
Babak 16 16 16 16 100 0 3,265 3,494 3,841
Kaputian 15 15 15 15 100 0 19,100 1,888 2,042 2,152 44
Samal 15 15 15 15 100 0 2,180 2,321 2,502
Total 374 374 374 374 100 0 245,200 131,278 137,054 141,443 58
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 114,988 118,083 134,095 Residential 113,272 118,226 121,728
MWH Purchased 24,698 26,236 28,590 Commercial 9,447 9,237 9,668
MWH Sold 21,671 22,527 24,587 Industrial 695 544 607
Systems Loss (%) 12 14 14 Public Building 2,634 3,006 3,096
Peak Load (KW) 57,986 61,420 68,877 Others 5,230 6,041 6,344
Load Factor (%) 58 59 57 Total 131,278 137,054 141,443
Collection Efficiency (%) 95 95 95
Ave. Systems Rate (P/KWH) 5.31 5.24 5.45
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 66,054 73,246 85,421 108,701 115,065 103,325 106,427 119,950 126,468 133,918
Commercial 17,855 20,264 24,250 25,650 31,024 33,820 36,915 44,570 47,675 53,911
Industrial 61,580 71,610 64,351 50,491 65,077 79,215 76,945 81,364 81,391 91,266
Public Building 6,780 6,234 6,063 6,970 7,798 8,260 8,879 10,781 11,891 13,178
Others 2,356 2,702 3,542 6,563 3,893 3,865 4,003 3,391 2,896 2,775
Total 154,625 174,056 183,627 198,375 222,857 228,485 233,169 260,056 270,321 295,048
Diesel 0.326Island Garden
City of SamalNPC-SPUG
Unenerg.Served
Monthly Average
145,891 149,817
Potential
141,997
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
TypeProject Name/Proponent
100.000
Mr. Edgardo D. Savellano, CPA, MPA
Mega Large Mega Large
Mr. Antonio C. Sebumpan Mr. Dean C. Briz
Mr. Edgardo D. Savellano, CPA, MPA Mr. Allan L. Laniba (OIC)
2007
Mr. Geronimo O. Balana
Legislative District
MUNICIPALITIES/CITIES
A+ A+A+
Mega Large
POWER PLANT
Location
69 3,800
DieselPower Barge 118/Therma
Marine, Inc.Maco
DAVAO DEL NORTE ELECTRIC COOPERATIVE, INC. (DANECO)Km. 100 Montevista, Compostela Valley/Tipaz District, Tagum City
Tel. Nos. (084) 400-1146, 218-4313; Telefax No. (084) 400-1129; Fax Nos. (084) 400-1128; 400-2719; E-mail: [email protected]
2008 2009
230
17 City of Tagum 23 23 23 23 100 0 43,700 40,165 41,910 42,878 99
HQ Location
Municipality
5 MVA Substation
10 MVA Substation
20 MVA Substation
Generating Set
3 PH Backbone Line
LEGEND :
H Q
Energized Coop System
Energized Other System
G S
231
N
Served byDavao Light Power Co., Inc.
DAVAO CITY
KIBLAWAN
MALALAG
SANTAMARIA
SANTA CRUZ
PADADAMATANAO
HAGONOY
BANSALAN
SULOP
MALITA
JOSE ABADSANTOS(Trinidad)
SARANGANI
G S
DONMARCELINO
MAGSAYSAY CITY of DIGOS
G S
H Q
I. DATE OF INCORPORATION AND REGISTRATION : June 1, 1975
II. DATE OF FIRST ENERGIZATION : November 1975
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 40.6 60.6 60.6 0.423
Subsidy 101.4 129.0 135.1 0.326
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Bansalan 25 25 25 25 100 0 12,600 8,790 9,045 9,372 74
2 City of Digos 26 26 26 26 100 0 30,400 27,071 28,114 29,251 96
3 Hagonoy 21 21 21 21 100 0 10,700 6,622 6,887 7,127 67
4 Magsaysay 22 22 22 22 100 0 10,500 5,488 5,637 5,859 56
5 Matanao 33 33 33 33 100 0 11,400 6,322 6,607 6,910 61
6 Padada 17 17 17 17 100 0 6,200 5,713 5,920 6,042 97
7 Santa Cruz 18 18 18 18 100 0 16,400 9,821 10,180 10,537 64
Second District
8 Don Marcelino 15 15 15 15 100 0 8,100 980 1,030 1,081 13
9 Jose Abad Santos (Trinidad) 26 26 26 26 100 0 13,900 579 623 660 5
10 Kiblawan 30 30 30 30 100 0 10,000 2,927 3,055 3,176 32
11 Malalag 15 15 15 15 100 0 8,100 3,918 4,087 4,238 52
12 Malita 30 30 30 30 100 0 24,400 6,477 6,754 7,013 29
13 Sarangani 12 9 9 12 100 0 4,400 418 447 465 11
14 Santa Maria 22 22 22 22 100 0 11,100 3,698 3,840 3,983 36
15 Sulop 25 25 25 25 100 0 6,600 3,063 3,170 3,291 50
Total 337 334 334 337 100 0 184,800 91,887 95,396 99,005 54
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 59,346 65,209 74,132 Residential 80,558 83,908 86,265
MWH Purchased 13,430 14,012 15,415 Commercial 5,136 5,262 5,366
MWH Sold 12,269 12,886 14,172 Industrial 334 346 373
Systems Loss (%) 8 8 7 Public Building 1,797 1,894 2,008
Peak Load (KW) 32,971 35,404 37,390 Others 4,062 3,986 4,993
Load Factor (%) 56 54 56 Total 91,887 95,396 99,005
Collection Efficiency (%) 97 96 97
Ave. Systems Rate (P/KWH) 4.84 5.06 5.23
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 39,827 44,693 49,355 56,544 62,749 63,616 62,038 66,229 67,468 73,255
Commercial 11,081 11,749 12,215 12,981 14,114 14,786 14,527 15,134 15,800 17,626
Industrial 36,360 41,042 45,123 47,698 54,119 54,632 52,723 57,990 63,866 69,650
Public Building 2,546 2,818 3,084 3,599 4,054 4,091 3,885 3,911 4,078 4,318
Others 4,008 4,680 5,604 5,240 6,388 4,641 4,398 3,959 3,423 5,218
Total 93,822 104,982 115,381 126,062 141,424 141,766 137,571 147,223 154,635 170,067
Legislative DistrictPotential
MUNICIPALITIES/CITYC O N N E C T I O N S
Mega Large
Jose Abad Santos
Diesel
Unenerg.Served
Sarangani NPC-SPUG
83,425
Diesel
Project Name/Proponent Type
Mega Large Mega Large
Monthly Average
77,997
B A R A N G A Y S
CoverageEnergized
POWER PLANT
Location
80,223
NPC-SPUG
Atty. Artemio A. Tajon
Engr. Jesus P. dela Victoria
A+ A+
Atty. Leonardo Suario Atty. Rodolfo A. Escovilla
Engr. Jesus P. dela Victoria Engr. Jesus P. dela Victoria
A+
DAVAO DEL SUR ELECTRIC COOPERATIVE, INC. (DASURECO)Cogon, City of Digos, Davao del Sur
Tel Nos. (082) 553-2643, 553-2463, 553-2563, 570-0236; Fax. No. (082) 553-3589; E-mail: [email protected]
2008 20092007
232
Energized Coop System
LEGEND :
Headquarters
N
233
COTELCOMatalam, North Cotabato
SUKELCOCity of Tacurong
SOCOTECO ICity of Koronadal
SOCOTECO IIGeneral Santos City
I. STATUS OF ENERGIZATION (Cumulative):
CONNECTIONS
2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %
A. Electric Cooperatives:
1 No. Cotabato 18 12 12 18 100 543 331 342 540 99 219,000 88,325 93,775 127,655 58
2 So. Cotabato I 10 10 10 10 100 172 172 172 172 100 143,700 73,041 76,267 79,506 55
3 So. Cotabato II 10 10 10 10 100 204 193 196 204 100 241,600 115,829 118,801 122,407 51
4 Sultan Kudarat 17 17 17 17 100 307 283 287 305 99 145,600 52,430 54,893 57,250 39
Total 55 49 49 55 100 1,226 979 997 1,221 99 749,900 329,625 343,736 386,818 52
CoverageEnergized
PotentialServed
REGION XIISOCCSKSARGEN
ELECTRIC DISTRIBUTION UTILITIES
MUNICIPALITIES/CITIES BARANGAYS
CoverageEnergized
234
Total 510,090 559,157 591,070 657,724 722,406 725,092 745,065 791,802 817,641 865,480
Others 5,093 5,972 7,169 9,181 7,933 8,593 9,268 9,501 9,854 10,406
Public Bldgs. 18,344 19,860 22,059 24,649 30,510 31,757 35,841 39,153 40,377 43,979
Industrial 168,792 183,165 189,365 212,165 219,292 216,756 219,404 225,981 236,636 244,162
Commercial 104,029 113,135 118,910 130,205 153,190 159,159 164,547 177,723 182,862 196,755
Residential 213,832 237,025 253,567 281,524 311,482 308,827 316,005 339,444 347,912 370,178
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):
I. DATE OF INCORPORATION AND REGISTRATION : May 16, 1972
II. DATE OF FIRST ENERGIZATION : July 16, 1979
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 40.5 58.6 88.6
Subsidy 114.4 142.3 210.8
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Banisilan 20 16 19 20 100 0 8,000 2,141 2,254 2,518 31
2 Carmen 28 28 28 28 100 0 10,300 4,934 5,148 5,355 52
3 Kabacan 24 22 22 22 92 2 13,900 10,553 10,982 11,439 82
P-Palma Area*
4 Alamada 17 17 100 0 9,900 2,433 25
5 Aleosan 19 18 95 1 5,900 1,294 22
6 Libungan 20 20 100 0 9,100 4,096 45
7 Midsayap 57 57 100 0 23,900 12,425 52
8 Pigkawayan 40 40 100 0 11,500 5,300 46
9 Pikit 42 42 100 0 15,400 3,378 22
Second District
10 Antipas 13 13 13 13 100 0 4,400 2,857 3,017 3,174 72
11 Arakan 28 23 26 28 100 0 7,700 2,122 2,500 2,807 36
12 City of Kidapawan 40 40 40 40 100 0 26,600 23,967 25,263 26,304 99
13 Magpet 32 32 32 32 100 0 8,700 3,688 3,985 4,214 48
14 Makilala 38 38 38 38 100 0 14,100 10,465 11,128 11,832 84
15 Matalam 34 34 34 34 100 0 13,500 7,276 7,899 8,499 63
16 M'lang 37 37 37 37 100 0 17,500 11,229 11,898 12,344 71
17 President Roxas 25 20 25 25 100 0 9,200 3,637 3,976 4,213 46
18 Tulunan 29 28 28 29 100 0 9,400 5,456 5,725 6,030 64
Total 543 331 342 540 99 3 219,000 88,325 93,775 127,655 58
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 48,147 51,744 57,638 Residential 73,617 79,217 112,890
MWH Purchased 10,588 11,105 11,230 Commercial 7,766 7,922 8,108
MWH Sold 9,015 9,512 10,100 Industrial 269 274 276
Systems Loss (%) 14 14 14 Public Building 1,932 2,067 2,299
Peak Load (KW) 24,845 26,627 35,241 Others 4,741 4,295 4,082
Load Factor (%) 58 57 46 Total 88,325 93,775 127,655
Collection Efficiency (%) 94 95 94
Ave. Systems Rate (P/KWH) 5.34 5.44 5.71
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 27,763 30,849 33,722 38,240 43,989 45,961 47,254 49,741 52,925 56,018
Commercial 14,217 12,021 13,113 14,530 24,654 25,820 25,269 25,369 25,799 27,399
Industrial 13,332 19,441 22,828 28,163 21,248 19,269 20,777 21,138 23,291 25,443
Public Building 3,414 2,484 2,638 2,884 5,721 6,423 8,528 9,373 9,583 9,899
Others 1,286 1,434 1,483 3,191 1,645 1,694 1,865 2,558 2,550 2,446
Total 60,012 66,229 73,784 87,008 97,258 99,166 103,693 108,179 114,148 121,205
*Transferred from MAGELCO
Type
City of KidapawanMindanao I & II (Mt.
Apo)/PNOCGeothermal
Mr. Alejandro Q. Collados Mr. Alejandro Q. Collados
108.480
POWER PLANT
NORTH COTABATO ELECTRIC COOPERATIVE, INC. (COTELCO)Manubuan, Matalam, Cotabato
Tel Nos. (064) 392-1034, 288-1448, 288-5264, 288-1617; Telefax No. (064) 392-1032; E-mail: [email protected]; Website: www.cotelconet.com
2008 20092007
Mr. Rudy S. Caoagdan
Mr. Alejandro Q. Collados
Mega Large Mega Large
A+
Mega Large
A+ A+
Mr. Rudy S. Caoagdan Mr. Rudy S. Caoagdan
Served
Legislative DistrictPotential
MUNICIPALITIES/CITYEnergized
Unenerg.
Monthly Average
91,136 96,23786,128
B A R A N G A Y S C O N N E C T I O N S
Coverage
Location Project Name/Proponent
236
N
HQ Location
Municipality
5 MVA Substation
10 MVA Substation
20 MVA Substation
LEGEND :
H QEnergized Coop System
237
Part of SULTAN KUDARAT
T'BOLI
TAMPAKAN
NORALA
LUTAYAN
TANTANGAN
SANTONIÑO
BANGA
CITY of KORONADAL
SURALLAH
LAKE SEBU
H Q
I. DATE OF INCORPORATION AND REGISTRATION : August 31, 1971
II. DATE OF FIRST ENERGIZATION : June 12, 1978
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 41.7 54.8 68.2
Subsidy 42.3 63.1 71.1
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Lone District, Sultan Kudarat
1 Lutayan 11 11 11 11 100 0 9,200 1,878 1,966 2,104 23
First District
2 Tampakan 14 14 14 14 100 0 8,400 4,123 4,328 4,525 54
Second District
3 Banga 22 22 22 22 100 0 17,600 9,034 9,369 9,743 55
4 City of Koronadal 27 27 27 27 100 0 34,200 27,567 28,875 29,880 87
5 Lake Sebu 19 19 19 19 100 0 13,800 1,889 2,019 2,133 15
6 Norala 14 14 14 14 100 0 10,400 5,216 5,420 5,616 54
7 Santo Niño 10 10 10 10 100 0 9,200 5,284 5,443 5,653 61
8 Surallah 17 17 17 17 100 0 17,100 10,176 10,538 11,003 64
9 Tantangan 13 13 13 13 100 0 8,300 4,425 4,637 4,781 58
10 T'boli 25 25 25 25 100 0 15,500 3,449 3,672 4,068 26
Solar (NRE)
Total 172 172 172 172 100 0 143,700 73,041 76,267 79,506 55
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 52,108 53,951 61,369 Residential 65,116 68,113 70,987
MWH Purchased 12,041 12,261 13,316 Commercial 5,515 5,701 5,873
MWH Sold 10,776 10,874 11,817 Industrial 146 139 140
Systems Loss (%) 10 11 11 Public Building 1,320 1,371 1,462
Peak Load (KW) 28,687 27,820 31,603 Others 944 943 1,044
Load Factor (%) 57 60 58 Total 73,041 76,267 79,506
Collection Efficiency (%) 98 99 99
Ave. Systems Rate (P/KWH) 4.84 4.96 5.19
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 40,688 44,587 48,321 53,911 58,408 56,383 57,879 64,114 64,709 69,581
Commercial 18,317 23,318 25,084 32,992 38,895 39,645 39,830 42,327 42,381 46,444
Industrial 15,753 15,852 16,664 14,831 11,888 8,591 10,364 14,002 14,209 15,409
Public Building 3,369 4,053 4,652 5,287 6,505 6,751 7,207 8,424 8,657 9,954
Others 327 338 434 474 508 418 405 439 528 417
Total 78,454 88,148 95,155 107,495 116,204 111,788 115,685 129,306 130,484 141,805
SOUTH COTABATO I ELECTRIC COOPERATIVE, INC. (SOCOTECO I)Matulas, City of Koronadal, South Cotabato
Tel. Nos. (083) 228-2701, 228-4399, 228-2528, 228-5057, 228-5059 to 60; Fax No. (083) 228-3690; E-mail: info@socoteco_1.com
2007
Mr. Teotico E. Peliño
Mr. Santiago Tudio Mr. Santiago Tudio Mr. Santiago Tudio
2008 2009
Mr. Virgilio S. De Leon Mr. Floro D. Calixton, Jr.
A+
Monthly Average
B A R A N G A Y S
Legislative District
MUNICIPALITIES/CITY
A+ A+
Mega Large
77,382 79,698
Mega Large
74,700
Mega Large
C O N N E C T I O N S
CoverageEnergized
Unenerg.Served
Potential
238
N
SOCOTECO II
LEGEND :
H Q HQ Location
Municipality
Below 5 MVA Substation
5 MVA Substation
10 MVA Substation
20 MVA Substation
NPC Substation
Power Plant
3 PH Backbone Line
Energized Coop System
P P
239
MALAPATAN
TUPI
MAITUM
MAASIM
KIAMBA
MALUNGON
GLAN
GEN. SANTOSCITY (Dadiangas)
ALABEL
Part of SO. COTABATO
POLOMOLOKP P
H Q
I. DATE OF INCORPORATION AND REGISTRATION : May 7, 1977
II. DATE OF FIRST ENERGIZATION : September 1978
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 7.5 49.5 49.5
Subsidy 39.2 82.2 95.7
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Lone District, Sarangani1 Alabel 12 11 11 12 100 0 14,000 4,416 4,483 4,643 33
2 Glan 31 27 29 31 100 0 19,000 5,199 4,813 4,938 26
3 Kiamba 19 18 19 19 100 0 10,400 4,676 4,767 4,845 47
4 Maasim 16 15 15 16 100 0 9,000 2,609 2,980 3,062 34
5 Maitum 19 17 17 19 100 0 8,000 2,922 2,696 2,784 35
6 Malapatan 12 10 10 12 100 0 12,500 2,951 3,004 3,064 25
7 Malungon 31 31 31 31 100 0 21,700 4,672 5,242 5,412 25
First District8 Gen. Santos City (Dadiangas) 26 26 26 26 100 0 105,400 68,392 70,390 72,651 69
9 Polomolok 23 23 23 23 100 0 28,000 14,517 14,839 15,286 55
10 Tupi 15 15 15 15 100 0 13,600 5,475 5,587 5,722 42
Total 204 193 196 204 100 0 241,600 115,829 118,801 122,407 51
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 168,745 180,685 204,434 Residential 102,534 105,221 108,499
MWH Purchased 45,016 46,863 49,356 Commercial 5,974 6,224 6,506
MWH Sold 38,634 40,053 41,793 Industrial 188 190 195
Systems Loss (%) 14 15 15 Public Building 1,980 2,027 2,068
Peak Load (KW) 94,049 97,419 104,166 Others 5,153 5,139 5,139
Load Factor (%) 66 66 65 Total 115,829 118,801 122,407
Collection Efficiency (%) 95 95 97
Ave. Systems Rate (P/KWH) 4.37 4.51 4.89
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 114,515 125,477 133,465 146,558 161,221 159,515 164,035 178,194 180,297 190,948
Commercial 65,344 70,999 73,231 75,034 81,542 85,688 91,497 99,543 99,976 106,362
Industrial 119,232 126,227 125,537 142,765 156,433 159,262 158,352 161,851 175,628 177,043
Public Building 9,836 11,263 12,609 14,094 15,547 15,877 17,360 18,561 19,080 20,894
Others 3,080 3,793 4,829 5,048 5,278 5,790 6,441 5,454 5,654 6,269
Total 312,007 337,759 349,671 383,499 420,022 426,132 437,685 463,603 480,635 501,516
A+
Type
AlabelGen Santos
(SPPC)/Alsons/TomenDiesel
Mr. Marfenio Y. Tan
Engr. Rodolfo G. Ocat
A
POWER PLANT
Ms. Vivien B. Yap Dr. Apolinario B. Hatulan
Mega Large
A
Engr. Rodolfo G. Ocat Engr. Rodolfo G. Ocat
SOUTH COTABATO II ELECTRIC COOPERATIVE, INC. (SOCOTECO II)Jose P. Catolico Avenue, Lagao, General Santos City, South Cotabato
Tel. Nos. (083) 553-5848 to 50, 552-4313, 301-4567 to 68, 554-6894; 552-3964; Fax No. (083) 552-4856; E-mail: [email protected]
2008 20092007
Legislative DistrictPotential
MUNICIPALITIES/CITY
Mega Large
Location Project Name/Proponent
Mega Large
59.000
Monthly Average
115,527 119,215112,217
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.Served
240
HQ Location
Municipality
5 MVA Substation
10 MVA Substation
Generating Set
3 PH Backbone Line
LEGEND :
H Q
Energized Coop System
G S
241
N
PALIMBANG
GEN. S.K.PENDATUN
BULUANCITY ofTACURONG
KALAMANSIG
LEBAK
Part of MAGUINDANAO
DATU PAGLAS
COLUMBIOPRESIDENTQUIRINO
ESPERANZA
ISULAN
BAGUMBAYAN
LAMBAYONG(Mariano Marcos)
SEN. NINOY AQUINO
G S
H Q
G S
PAGLAT
MANGUDADATU
PANDAG
G SG S
I. DATE OF INCORPORATION AND REGISTRATION : November 4, 1975
II. DATE OF FIRST ENERGIZATION : December 1977
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 30.9 31.5 43.5 5.267
Subsidy 85.0 108.1 123.5 0.326
0.054
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Columbio 16 15 16 16 100 0 4,900 1,127 1,255 1,378 28
2 Isulan 17 17 17 17 100 0 16,500 10,982 11,444 11,839 72
3 Lambayong (Mariano Marcos) 26 26 26 26 100 0 11,500 5,749 5,978 6,229 54
4 President Quirino 19 19 19 19 100 0 7,500 3,704 3,903 4,100 55
5 City of Tacurong 20 20 20 20 100 0 17,200 14,115 14,597 14,993 87
Second District
6 Bagumbayan 19 19 19 19 100 0 12,000 3,588 3,835 4,096 34
7 Esperanza 19 19 19 19 100 0 10,700 5,502 5,725 5,933 55
8 Kalamansig 15 15 15 15 100 0 10,000 1,309 1,323 1,326 13
9 Lebak 27 27 27 27 100 0 16,000 3,175 3,202 3,215 20
10 Palimbang 40 29 31 40 100 0 9,900 206 236 332 3
11 Sen. Ninoy Aquino 20 19 20 20 100 0 6,800 771 977 1,093 16
Second District, Maguindanao
12 Buluan 7 5 5 7 100 0
13 Mangudadatu 8 7 7 8 100 0
14 Pandag 8 8 8 8 100 0
15 Datu Paglas 23 21 21 23 100 0 4,500 525 606 767 17
16 Gen. S. K. Pendatun 19 15 15 19 100 0 6,500 384 401 418 6
17 Paglat 4 2 2 2 50 2 68 85 116
Total 307 283 287 305 99 2 145,600 52,430 54,893 57,250 39
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 39,211 39,772 45,909 Residential 46,425 48,689 50,612
MWH Purchased 8,933 8,700 9,758 Commercial 3,196 3,314 3,466
MWH Sold 7,559 7,698 8,413 Industrial 368 176 176
Systems Loss (%) 15 12 14 Public Bldg. 930 960 985
Peak Load (KW) 22,068 21,666 23,011 Others 1,511 1,754 2,011
Load Factor (%) 55 55 58 Total 52,430 54,893 57,250
Collection Efficiency (%) 95 97 96
Ave. Systems Rate (P/KWH) 5.19 5.17 5.46
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 30,866 36,112 38,059 42,815 47,864 46,968 46,837 47,395 49,981 53,631
Commercial 6,151 6,797 7,482 7,649 8,098 8,006 7,951 10,484 14,706 16,550
Industrial 20,475 21,645 24,336 26,406 29,723 29,635 29,911 28,990 23,508 26,267
Public Building 1,725 2,060 2,160 2,384 2,736 2,706 2,746 2,795 3,057 3,232
Others 400 407 423 468 502 691 557 1,050 1,122 1,274
Total 59,617 67,021 72,460 79,722 88,922 88,006 88,002 90,714 92,374 100,954
SULTAN KUDARAT ELECTRIC COOPERATIVE, INC. (SUKELCO)National Highway, Tacurong City, Sultan Kudarat
Tel. Nos. (064) 477-0326 to 27, 200-3155 to 56; Telefax No. (064) 200-3156
2008 20092007
Mr. Demetrio O. Jerez
A+A
Mr. Cecilio C. Mejia
Mr. Demetrio O. Jerez
Mr. Cecilio C. Mejia
Mr. Demetrio O. Jerez
A+
Mr. Cecilio C. Mejia
Legislative DistrictPotential
MUNICIPALITIES/CITY
Mega Large
Sen. Ninoy Aquino NPC-SPUG
Mega Large
Diesel/PB 111
Extra Large
NPC-SPUG
POWER PLANT
Kalamansig
59,474 61,67156,888
Location Project Name/Proponent Type
Diesel
Served
12 1,225
B A R A N G A Y S C O N N E C T I O N S
Palimbang NPC-SPUG Diesel
Coverage
Monthly Average
EnergizedUnenerg.
1,415 1,326 11,600
242
LEGEND :
Energized Other SystemHeadquarters
Energized Coop System
243
TAWELCOBongao, Tawi-Tawi
N
LASURECOMarawi City
Served byCotabato LightPower Co., Inc.
MAGELCODatu Odin Sinsuat(Dinaig), Maguindanao
SIASELCOSiasi, Sulu
SULECOJolo, Sulu
TURTLE ISLAND
Served bySUKELCO
CASELCOMapun, Tawi-tawi
Served byFIBECO
Served byBASELCO
BASELCOCity of Isabela
Served byBumbaranElectric System
I. STATUS OF ENERGIZATION (Cumulative):
CONNECTIONS
2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %
A. Electric Cooperatives:
1 Tawi-Tawi 9 9 9 9 100 186 178 179 186 100 68,700 8,952 9,312 10,202 15
2 Siasi 2 2 2 2 100 66 58 61 66 100 15,000 2,816 3,117 3,218 21
3 Sulu 16 16 16 16 100 330 246 253 330 100 99,400 20,072 20,889 21,490 22
4 Basilan 14 14 14 14 100 269 266 266 269 100 74,600 27,997 29,673 31,194 42
5 Cagayan de Sulu 2 2 2 2 100 17 9 14 14 82 5,900 1,185 1,415 1,418 24
6 Lanao Sur 41 40 41 41 100 1,173 970 1,031 1,173 100 145,300 51,731 56,357 56,357 39
7 Maguindanao 30 33 33 30 100 381 451 499 360 94 141,400 40,761 43,128 19,419 14
Total 114 116 117 114 100 2,422 2,178 2,303 2,398 99 550,300 153,514 163,891 143,298 26
ARMMAUTONOMOUS REGION IN MUSLIM MINDANAO
CoverageEnergized
CoverageEnergized
PotentialServed
ELECTRIC DISTRIBUTION
UTILITIES
MUNICIPALITIES/CITIES BARANGAYS
244
Total 85,342 79,139 83,225 87,349 87,566 127,090 109,513 88,597 69,435 177,089
Others 2,107 1,694 1,588 1,789 1,584 2,165 1,479 1,261 957 2,116
Public Bldgs. 5,540 5,070 5,610 6,405 6,634 7,800 6,982 6,852 6,882 9,806
Industrial 11,125 9,746 8,446 7,405 7,152 11,688 11,790 9,897 4,969 4,914
Commercial 13,888 14,802 16,718 17,182 16,371 19,303 18,238 15,802 12,234 17,206
Residential 52,682 47,827 50,863 54,568 55,825 86,134 71,024 54,785 44,393 143,047
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):
LEGEND :
H Q HQ Location
Municipality
Below 5 MVA Substation
Generating Set
3 PH Backbone Line
Energized Coop System
G S
N
245
BONGAO
SIMUNUL
TANDUBAS
SOUTH UBIAN
SAPA-SAPA
LANGUYAN
PANGLIMASUGALA(Balimbing)
SIBUTU IS.
G S
G S
G S
G S
G S
G SG S
H Q
KANG TIPAYAN DAKULA IS.
KANG TIPAYAN IS.CATCATAN IS. HANICOLAT IS.
BUBUAN IS.SUGBAY IS.
TUMBAGAAN IS.
TANDOBAN IS.
SAHARAH IS.
MANTABUAN IS.
BATLUNGAN IS.SUAN IS.
LUPA IS.
BANARAN IS.
BILATAN IS.
MANOK MANKAW IS.
SANGA-SANGA
TUMINDAO IS.
BASUN BAKULA IS.
G S
SITANGKAI
I. DATE OF INCORPORATION AND REGISTRATION : January 25, 1975
II. DATE OF FIRST ENERGIZATION : September 1976
III. ELECTRIC COOPERATIVE OFFICIALS :
President :Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 9.0 10.0 13.5 6.588
Subsidy 45.8 61.7 63.8 0.726
0.258
0.500
0.531
0.440
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Lone District
1 Bongao 35 33 33 35 100 0 13,500 5,918 6,212 6,571 49
2 Panglima Sugala (Balimbing) 17 16 16 17 100 0 7,700 634 638 646 8
3 Languyan 20 19 19 20 100 0 9,700 400 400 400 4
4 Sapa-sapa 23 22 22 23 100 0 6,100 430 430 430 7
5 Simunul 15 15 15 15 100 0 7,400 589 614 670 9
6 Sitangkai 9 9 9 9 100 0 12,200 29 29 217 8
7 Sibutu 16 14 15 16 100 0 421 446 716
8 South Ubian 31 30 30 31 100 0 6,300 250 250 250 4
9 Tandubas 20 20 20 20 100 0 5,800 281 293 302 5
Total 186 178 179 186 100 0 68,700 8,952 9,312 10,202 15
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 6,079 6,516 6,447 Residential 8,241 8,361 9,322
MWH Purchased 1,278 1,326 1,234 Commercial 512 735 641
MWH Sold 721 778 761 Industrial - - -
Systems Loss (%) 43 41 38 Public Building 167 184 196
Peak Load (KW) - - - Others 32 32 43
Load Factor (%) - - - Total 8,952 9,312 10,202
Collection Efficiency (%) 46 39 44
Ave. Systems Rate (P/KWH) 8.43 8.38 8.47
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 2,527 1,847 3,468 3,996 4,510 4,396 5,127 3,330 4,944 5,137
Commercial 1,075 802 2,116 2,427 2,499 2,112 2,947 2,448 3,390 3,065
Industrial - - - - - - - - - -
Public Building 375 295 576 695 697 525 789 595 839 774
Others 47 24 75 126 159 107 111 117 158 157
Total 4,024 2,968 6,235 7,244 7,865 7,140 8,974 6,490 9,331 9,133
Project Name/Proponent
Tubig-Boh, Bongao, Tawi-Tawi
Tel. No. (068) 268-1304; Telefax No. (068) 268-1363
2008 20092007
Mr. Romeo S. Taup Mr. Ibnotalib Nasirin Mr. Ibnotalib Nasirin
- Small
9,539
ASEC Lorenzo R. Reyes (PS) Mr. Hector N. Tabilisma (PS/AGM)Engr. Sergio A. Bautista (PS/AGM)-
POWER PLANT
-
-
E
Balimbing NPC-SPUG
Diesel
Diesel
Tandubas
Location Type
Diesel/PB-108Bongao NPC-SPUG
Diesel
Potential
C O N N E C T I O N S
Energized
Simunul NPC-SPUG Diesel
Diesel
Monthly Average
Unenerg.Served
Sibutu NPC-SPUG
Legislative DistrictCoverage
8,305
MUNICIPALITIES
8,691
Sitangkai NPC-SPUG
B A R A N G A Y S
NPC-SPUG
246
TAWI-TAWI ELECTRIC COOPERATIVE, INC. (TAWELCO)
N
LEGEND :
H Q HQ Location
Municipality
NPC Substation
Generating Set
Solar Home System
3 PH Backbone Line
Energized Coop System
SHS
G S
247
P A N D A M I
S I A S I
SHS
SHS
H Q G S
I. DATE OF INCORPORATION AND REGISTRATION : February 25, 1991
II. DATE OF FIRST ENERGIZATION : November 1991
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan - - - 2.640
Subsidy 29.0 33.8 37.1
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Second District, Sulu
1 Siasi 50 42 45 50 100 0 11,200 2,746 2,957 3,058 27
2 Pandami 16 16 16 16 100 0 3,800 70 160 160 4
Total 66 58 61 66 100 0 15,000 2,816 3,117 3,218 21
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 993 1,055 1,244 Residential 2,336 2,661 2,754
MWH Purchased 133 141 165 Commercial 186 179 187
MWH Sold 113 122 144 Industrial 4 4 4
Systems Loss (%) 15 13 12 Public Building 47 46 46
Peak Load (KW) 460 480 485 Others 243 227 227
Load Factor (%) 40 40 46 Total 2,816 3,117 3,218
Collection Efficiency (%) 83 88 86
Ave. Systems Rate (P/KWH) 8.81 8.65 8.63
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 752 637 959 927 940 851 672 780 897 1,100
Commercial 237 124 125 118 139 199 244 247 217 251
Industrial 406 111 107 116 166 171 151 176 188 196
Public Building 33 17 16 33 34 50 51 58 69 79
Others 47 40 23 40 51 62 86 92 93 103
Total 1,475 929 1,230 1,234 1,330 1,333 1,204 1,353 1,464 1,729
SIASI ELECTRIC COOPERATIVE, INC. (SIASELCO)Poblacion, Siasi, Sulu
2008 20092007
D
Small
Imam Suudi Dandun
Mr. Attha I. Anuddin
B B
Imam Suudi Dandun Imam Suudi Dandun
Mr. Attha I. Anuddin Mr. Attha I. Anuddin
Served
Legislative District
MUNICIPALITIES
Small Small
POWER PLANT
Location Project Name/Proponent Type
Monthly Average
NDA
Potential
NDA
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.
Siasi NPC-SPUG Diesel
248
LEGEND :
H Q HQ Location
Municipality
Below 5 MVA Substation
Generating Set
3 PH Backbone Line
Energized Coop System
249
N
KALINGALANCALUANG
PATA
LUGUS
TAPUL
JOLO
PANGUTARAN
PATIKUL
LUUKOLDPANAMAO
INDANAN
HADJI PANGLIMA TAHIL (Marunggas)
TALIPAOMAIMBUNG
PANGLIMAESTINO
(NEW PANAMAO)PARANG
H Q
G S
OMAR
CAPUAL ISLANDTALAYAN ISLAND
G S
I. DATE OF INCORPORATION AND REGISTRATION : February 24, 1973
II. DATE OF FIRST ENERGIZATION : August 1975
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 4.3 14.7 14.7 8.440
Subsidy 83.5 91.1 118.7 0.229
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Hadji Panglima Tahil (Marunggas) 5 5 5 5 100 0 1,000
2 Indanan 34 22 22 34 100 0 10,100 2,645 2,797 2,887 29
3 Jolo 8 8 8 8 100 0 16,800 11,299 11,581 11,797 70
4 Patikul 30 24 24 30 100 0 6,500 4,401 4,653 4,893 75
5 Parang 40 32 32 40 100 0 10,400 520 545 553 5
6 Maimbung 27 18 18 27 100 0 4,700 426 449 451 10
7 Talipao 52 39 41 52 100 0 13,900 405 479 493 4
8 Pangutaran 16 15 16 16 100 0 5,000
Second District
9 Luuk 12 7 9 12 100 0
10 Omar 8 6 6 8 100 0 7,400 239 248 279 4
11 Old Panamao 31 19 19 31 100 0 6,800 79 79 79 1
12 Panglima Estino (New Panamao) 12 7 7 12 100 0 4,000 58 58 58 1
13 Lugus 17 14 14 17 100 0 3,500
14 Pata 14 14 14 14 100 0 2,200
15 Tapul 15 12 14 15 100 0 2,800
16 Kalingalan Caluang 9 4 4 9 100 0 4,300
Total 330 246 253 330 100 0 99,400 20,072 20,889 21,490 22
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 11,394 13,588 15,436 Residential 18,660 19,498 20,030
MWH Purchased 2,554 2,614 2,852 Commercial 1,091 1,066 1,120
MWH Sold 1,364 1,763 1,958 Industrial - - -
Systems Loss (%) 46 32 30 Public Building 294 299 313
Peak Load (KW) 5,974 6,081 6,901 Others 27 26 27
Load Factor (%) 59 59 57 Total 20,072 20,889 21,490
Collection Efficiency (%) 52 48 43
Ave. Systems Rate (P/KWH) 8.35 7.71 7.88
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 8,405 7,961 8,460 8,387 10,598 11,762 9,694 10,622 12,946 15,746
Commercial 2,760 3,320 3,298 3,181 2,916 3,288 2,491 2,799 3,274 3,815
Industrial 3,631 2,426 1,341 3 - - - - - -
Public Building 1,823 1,477 1,375 1,562 1,894 2,264 1,918 2,565 2,850 3,555
Others 525 433 283 260 301 547 248 384 323 381
Total 17,144 15,617 14,757 13,393 15,709 17,861 14,351 16,370 19,393 23,497
E
MUNICIPALITIES
18,037
Energized
Medium
Jolo
Unenerg.
Luuk
NPC-SPUG
Legislative District
-
C O N N E C T I O N S
Diesel/Genset
NPC-SPUG Diesel
Monthly Average
Hadji Rogelio T. Asaali
Ms. Peraida T. Akalal
18,602 19,050
B A R A N G A Y S
Project Name/Proponent TypeLocation
Coverage
Hadji Rogelio T. Asaali
Ms. Peraida T. Akalal
ServedPotential
-
POWER PLANT
Hadji Rogelio T. Asaali
Ms. Peraida T. Akalal
E
Large
Bus-Bus St., Jolo, Sulu 7400
Tel. No. (085) 341-8911 loc. 2124/2743; Cel. Nos. 0918-6757019
2008 20092007
250
SULU ELECTRIC COOPERATIVE, INC. (SULECO)
LEGEND :
H QEnergized Coop System
HQ Location
Municipality
Below 5 MVA Substation
7.2 MVA Substation
Generating Set
Mini Hydro
3 PH Backbone Line
G S
MH
251
TONGKIL, SULU
MALUSO
LANTAWAN
TABUAN-LASA
CITY ofISABELA
CITY ofLAMITAN
TUBURAN
TIPO-TIPO
MHG S
H Q
NAKBAR
HADJI MOHAMMAD AJUL
AL-BARKA
UNGKAYA PUKAN
HADJIIMUHTAMAD
MH
SUMISIP
I. DATE OF INCORPORATION AND REGISTRATION : May 24, 1975
II. DATE OF FIRST ENERGIZATION : February 1976
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 10.3 10.3 10.3 12.422
Subsidy 81.7 81.9 99.2 0.680
0.270
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Lone District
1 City of Isabela 45 45 45 45 100 0 15,800 14,052 14,654 15,258 97
2 City of Lamitan 45 44 44 45 100 0 12,600 7,614 8,129 8,693 69
3 Lantawan 25 25 25 25 100 0
4 Hadji Muhtamad 10 10 10 10 100 0 5,900 849 1,070 1,146 19
5 Maluso 20 20 20 20 100 0 6,700 2,684 2,855 2,980 44
6 Sumisip 29 40 40 29 100 0 11,100 839 893 974 9
7 Tabuan-Lasa (Sumisip) 12 12 100 0
8 Tipo-Tipo 11 11 11 11 100 0
9 Al-Barka 16 16 16 16 100 0 10,400 962 1,002 1,016 10
10 Ungkaya Pukan 12 12 12 12 100 0
11 Tuburan 10 10 10 10 100 0
12 Akbar 9 9 9 9 100 0 9,100 997 1,070 1,127 12
13 Hadji Mohammad Ajul 11 10 10 11 100 0
Second District, Sulu
14 Tongkil 14 14 14 14 100 0 3,000
Total 269 266 266 269 100 0 74,600 27,997 29,673 31,194 42
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 13,482 13,854 15,070 Residential 26,365 28,023 29,523
MWH Purchased 2,254 2,338 2,524 Commercial 1,056 1,065 1,072
MWH Sold 1,719 1,760 1,910 Industrial 6 8 8
Systems Loss (%) 23 24 24 Public Building 255 283 297
Peak Load (KW) 6,500 7,200 7,200 Others 315 294 294
Load Factor (%) 48 44 48 Total 27,997 29,673 31,194
Collection Efficiency (%) 72 70 67
Ave. Systems Rate (P/KWH) 7.84 7.87 7.89
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 9,404 10,148 9,676 11,108 11,985 12,330 12,324 13,957 14,217 15,020
Commercial 2,317 2,282 2,286 2,537 2,787 3,302 3,329 3,560 3,557 3,764
Industrial 393 602 574 705 635 576 542 1,135 1,281 1,439
Public Building 1,134 1,086 1,200 1,395 1,363 1,280 1,434 1,726 1,803 2,390
Others 201 205 220 317 290 258 206 251 258 310
Total 13,449 14,323 13,956 16,062 17,060 17,746 17,835 20,629 21,116 22,923
Mr. Abdulgappar B. LatipMr. Ismael J. Basa
Isabela City, Zamboanga Peninsula
Tel. No. (062) 200-7907; Fax No. (062) 200-7905
2008 20092007
Fr. Alfredo E. Oyao-
MUNICIPALITIES/CITY
Location Project Name/Proponent Type
29,988
Legislative DistrictPotential
Mr. Ismael J. Basa
E
Large
28,546
Fr. Alfredo E. Oyao Fr. Alfredo E. Oyao-
POWER PLANT
31,226
- -
Lamitan Balactasan/BASELCO Mini Hydro
NPC-SPUG Diesel/PB-119
Kumalarang/BASELCOLantawan
City of Isabela
Mini Hydro
Monthly Average
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.Served
252
BASILAN ELECTRIC COOPERATIVE, INC. (BASELCO)
N
HQ Location
Municipality
Generator Substation
3 PH Backbone Line
LEGEND :
H QEnergized Coop System
(CAGAYAN DE TAWI-TAWI)MAPUN
TURTLE ISLAND
TURTLE ISLANDS
G S
H Q
253
G S
I. DATE OF INCORPORATION AND REGISTRATION : April 4, 1975
II. DATE OF FIRST ENERGIZATION : August 1976
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 0.03 0.03 1.020
Subsidy 12.1 12.1 12.1
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Lone District, Tawi-tawi
1 Mapun 15 7 12 12 80 3 5,100
(Cagayan de Tawi-Tawi) 1,418
2 Turtle Islands 2 2 2 2 100 0 800
Total 17 9 14 14 82 3 5,900 1,185 1,415 1,418 24
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 325 Residential 1,275
MWH Purchased N 53 N Commercial N 32 N
MWH Sold 35 Industrial D 1 D
Systems Loss (%) D 34 D Public Building A 28 A
Peak Load (KW) - Others 79
Load Factor (%) A - A Total 1,185 1,415 1,418
Collection Efficiency (%) -
Ave. Systems Rate (P/KWH) 9.22
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 234 204 223 236 194 164 189 157
Commercial 12 14 36 36 25 13 6 10
Industrial - - - - - - - -
Public Building 26 26 26 34 19 10 8 7
Others 8 6 10 8 5 2 2 2
Total 280 250 295 314 243 189 205 NDA 176 NDA
NDA - No Data Available
EnergizedUnenerg.
24
-
Location
POWER PLANT
-
Type
PotentialServed
Project Name/Proponent
NDA
CAGAYAN DE SULU ELECTRIC COOPERATIVE, INC. (CASELCO)Mapun, Tawi-Tawi
Tel No. (098) 199-0195
2008 2009
Engr. Edgar R. Billiones
Engr. Julian J. Lim, Jr.
Engr. Edgar R. Billiones Engr. Edgar R. Billiones
2007
Ms. Lolita Zaldivar Ms. Lolita Zaldivar
-
Coverage
C O N N E C T I O N SB A R A N G A Y S
NPC-SPUG
-
-
-
Monthly Average
Diesel
NDA
MUNICIPALITIES
NDA
1,185 1,415
Legislative District
Mapun
254
255
N
PIAGAPO
MARANTAO
TUGAYA
BACOLOD-KALAWI(Bacolod Grande)
MADAMBA
BINIDAYAN
PAGAYAWAN(Tatarikan)
PUALAS
BAYANGCALANOGAS
TUBARANSULTAN GUMANDER
BALABAGAN
MAROGONG
BUTIG
LUMBATAN
LUMBA-BAYABAO (Maguing)
BUBONG
BUADIPOSO-BUNTONG
MARAWICITY
BALOI
Part of LANAO DEL NORTE
BALINDONG (Watu)
MASIU
TAGOLOAN II
LUMBAYANAGUE
SULTANDUMALONDONG
PANTAR
KAPAI
PANTAO RAGAT
TARAKA
TAMPARAN
DITSAAN-RAMAIN
MULONDO
MALABANG
KAPATAGAN
GANASSI
POONABAYABAO(Gata)
MADALUM
SAGUIARAN
MAGUING
H QP P P PP P
LUMBACA UNAYAN
MH
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
20 MVA Substation
Power Plant
Mini Hydro
3 PH Backbone Line
Energized Coop System
P PMH
I. DATE OF INCORPORATION AND REGISTRATION : September 7, 1971
II. DATE OF FIRST ENERGIZATION : August 1973
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 22.2 32.4 42.4 80.000
Subsidy 227.1 270.7 382.9 180.000
1.500
158.100
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Buadiposo-Buntong 33 30 30 33 100 0 2,300 629 629 629 27
2 Bubong 36 33 34 36 100 0 3,300 1,080 1,080 1,080 33
3 Ditsaan-Ramain 34 33 34 34 100 0 3,300 1,143 1,158 1,158 35
4 Kapai 20 15 15 20 100 0 2,900 389 389 389 13
5 Lumba-Bayabao (Maguing) 38 37 37 38 100 0 4,100 785 966 966 24
6 Maguing 34 30 33 34 100 0 3,200 881 1,021 1,021 32
7 Marantao 34 31 33 34 100 0 4,300 2,102 2,407 2,407 56
8 Marawi City 96 96 96 96 100 0 24,200 13,102 18,858 18,858 78
9 Masiu 35 34 34 35 100 0 4,200 1,267 1,267 1,267 30
10 Mulondo 26 25 25 26 100 0 2,100 630 880 880 42
11 Piagapo 37 33 33 37 100 0 4,200 1,064 1,066 1,066 25
12 Poona Bayabao (Gata) 25 18 25 25 100 0 3,000 1,069 1,069 1,069 36
13 Saguiaran 30 26 28 30 100 0 3,900 1,070 1,344 1,344 34
14 Tagoloan II 19 4 7 19 100 0 1,500 150 150 150 10
15 Tamparan 44 44 44 44 100 0 3,500 1,221 1,221 1,221 35
16 Taraka 43 27 37 43 100 0 3,300 835 1,172 1,172 36
Second District
17 Bacolod-Kalawi (Bacolod Grande) 26 24 26 26 100 0 3,100 871 816 816 26
18 Balabagan 27 20 20 27 100 0 4,300 1,683 1,845 1,845 43
19 Balindong (Watu) 38 38 38 38 100 0 4,300 1,888 1,888 1,888 44
20 Bayang 49 44 44 49 100 0 3,700 830 730 730 20
21 Binidayan 26 20 22 26 100 0 3,200 892 677 677 21
22 Butig 16 13 13 16 100 0 2,800 714 756 756 27
23 Calanogas 17 10 15 17 100 0 1,700 620 340 340 20
24 Ganassi 32 32 32 32 100 0 3,300 1,465 1,226 1,226 37
25 Kapatagan 15 7 8 15 100 0 1,300 909 248 248 19
26 Lumbatan 20 18 19 20 100 0 3,000 1,025 1,128 1,128 38
27 Lumbaca-Unayan 9 7 8 9 100 0 233 356 356
28 Lumbayanague 22 17 22 22 100 0 2,200 874 407 407 19
29 Madalum 37 20 20 37 100 0 3,200 550 475 475 15
30 Madamba 24 13 23 24 100 0 2,700 460 460 460 17
31 Malabang 37 29 30 37 100 0 5,900 3,537 2,894 2,894 49
32 Marogong 24 5 5 24 100 0 2,800 117 553 553 20
33 Pagayawan (Tatarikan) 18 15 15 18 100 0 1,700 693 456 456 27
34 Pualas 23 21 22 23 100 0 1,400 961 568 568 41
35 Sultan Dumalondong 7 4 4 7 100 0 1,900 247 384 384 20
36 Sultan Gumander 19 12 14 19 100 0 2,100 849 729 729 35
37 Tubaran 21 13 14 21 100 0 1,900 720 473 473 25
38 Tugaya 23 23 23 23 100 0 3,500 1,036 1,131 1,131 32
Second District, Lanao del Norte
39 Baloi (21) 18 16 16 18 100 0 6,000 1,758 1,758 1,758 29
40 Pantao Ragat 20 20 20 20 100 0 3,400 770 770 770 23
41 Pantar 21 13 13 21 100 0 2,600 612 612 612 24
Total 1,173 970 1,031 1,173 100 0 145,300 51,731 56,357 56,357 39
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 52,404 Residential 52609
MWH Purchased N N 11,989 Commercial N N 1855
MWH Sold 9,317 Industrial D D 55
Systems Loss (%) D D 22 Public Building A A 182
Peak Load (KW) 59,326 Others 1656
Load Factor (%) A A 28 Total 51,731 56,357 56357
Collection Efficiency (%) 34
Ave. Systems Rate (P/KWH) 5.62
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 7,613 22,076 9,433 101,707
Commercial 729 1,186 517 5,361
Industrial 469 869 274 1,371
Public Building 370 1,126 406 2,245
Others 338 523 212 1,116
Total 9,519 NDA NDA NDA NDA 25,780 10,842 NDA NDA 111,800
NDA - No Data Available
Mr. Ameroddin Sarangani
POWER PLANT
Mr. Salipada S. Tamano, Ph. D.
Sultan Ashary P. Maongco (PS/AGM)
-
46,185
Sultan Ashary P. Maongco (PS/AGM)
46,185
-
Saguiaran Agus 2/NPC Hydro
Mr. Ameroddin Sarangani
Sultan Ashary P. Maongco
HydroMarawi City
Location Project Name/Proponent Type
Baloi Agus 4/NPC Hydro
Malabang Matling Ind'l Corp. Mini Hydro
LANAO DEL SUR ELECTRIC COOPERATIVE, INC. (LASURECO) Marawi City, Lanao del Sur
Tel Nos. (063) 352-0313, 352-0045, 352-0381; Fax Nos. (063) 221-5764 to 65
2008 20092007
Served
- E
- Large
Unenerg. Potential
46,185
C O N N E C T I O N S
Agus 1/NPC
Legislative District
MUNICIPALITIES/CITY
Monthly Average
EnergizedCoverage
B A R A N G A Y S
256
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
10 MVA Substation
12.5 MVA Substation
3 PH Backbone Line
Energized Coop System
Energized Other System
257
PAGALUNGAN
COTABATO CITY
KABUNTALAN(TUMBAO)
Served byCotabato Light &Power Co., Inc.
UPI
SOUTH UPI
AMPATUAN
TALAYAN
DATU PIANG
SULTAN SABARONGIS(Lambayong)
PARANG
MATANOG
SHARIFF AGUAK (MAGANOY)
BULDONBARIRA
MAMASAPANO
DATU ODINSINSUAT(DINAIG)
SULTANKUDARAT (Nuling)
TALITAY
PAGAG
AWAN
H Q
PARANG
DATUABDULLAHSANGKI
RAJAHBUAYANDATU
UNSAY
DATU SAUDIAMPATUAN
SULTANMASTURA
GUINDULUNGANDATU BLAH T.SINSUAT
N
DATU ANGGALMIDTIMBANG
NORTHERNKABUNTALAN
DATU SALIDO
SHARIFFSAYDONAMUSTAPHA
DATU HOFFERAMPATUAN
I. DATE OF INCORPORATION AND REGISTRATION : September 4, 1975
II. DATE OF FIRST ENERGIZATION : March 1976
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 2.2 2.7 16.1
Subsidy 110.1 192.4 237.5
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Barira 11 7 10 11 100 0 4,100 85 179 226 6
2 Buldon 15 9 11 13 87 2 6,100 374 429 465 8
3 Datu Odin Sinsuat(Dinaig)(34) 21 16 20 21 100 0 9,300 1,491 1,525 1,626 17
4 Kabuntalan (Tumbao) 17 13 13 16 94 1
5 Northern Kabuntalan 11 9 9 10 91 1
6 Matanog 8 5 6 8 100 0 4,300 233 318 320 7
7 Upi 23 23 23 23 100 0
8 Datu Blah T. Sinsuat 12 9 9 10 83 2
9 Parang 23 20 23 23 100 0 14,000 5,640 5,694 5,717 41
10 Sultan Kudarat (Nuling) (39) 22 17 19 21 95 1
11 Sultan Mastura 12 13 12 12 100 0
Second District 0
12 Ampatuan 11 10 10 11 100 0 7,500 1,201 1,391 1,506 20
13 Datu Abdullah Sangki 10 9 10 10 100 0
14 Datu Piang 15 16 18 15 100 0 15,400 1,748 1,802 1,877 12
15 Datu Saudi Ampatuan 8 11 12 8 100 0
16 Datu Unsay 8 3 2 4 50 4
17 Guindulungan 11 6 7 9 82 2
18 Mamasapano 14 16 16 14 100 0 4,500 453 484 506 11
19 Pagagawan 11 9 11 11 100 0
20 Pagalungan 12 7 11 12 100 0
21 Rajah Buayan 11 10 11 11 100 0
22 Shariff Aguak (Maganoy) 13 14 19 13 100 0
23 South Upi 11 8 9 9 82 2 6,400 320 327 333 5
24 Sultan sa Barongis (Lambayong) 12 9 12 12 100 0 7,900 355 657 657 8
25 Talayan 15 9 11 11 73 4 7,500 884 924 998 13
26 Talitay 9 4 7 9 100 0
27 Datu Anggal Midtimbang 7 6 6 7 100 0
28 Datu Hoffer Ampatuan 9 8 89 1
29 Shariff Saydona Mustapha 12 11 92 1
30 Datu Salido 7 7 100 0
First District, Cotabato*
4 Alamada 16 16 2,011 2,406
5 Aleosan 16 17 1,128 1,071
6 Libungan 20 20 3,435 3,509
7 Midsayap 47 47 10,035 9,934
8 Pigkawayan 37 40 3,940 4,831
9 Pikit 27 32 2,894 2,945
Total 381 451 499 360 94 21 141,400 40,761 43,128 19,419 14
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
Gross Revenue (P'000) 27,864 9,477 8,350 Residential 35,444 39,297 17,942
MWH Purchased 7,129 3,970 2,425 Commercial 3,955 2,866 1,010
MWH Sold 4,862 1,632 1,144 Industrial 418 297 131
Systems Loss (%) 31 58 52 Public Building 825 559 324
Peak Load (KW) 17,547 - - Others 119 109 12
Load Factor (%) 56 - - Total 40,761 43,128 19,419
Collection Efficiency (%) 85 - 57
Ave. Systems Rate (P/KWH) 5.73 5.81 7.30
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
Monthly Average
44,136
EnergizedUnenerg.
42,419
MUNICIPALITIES
Legislative DistrictPotential
11,100 518 518 516
Engr. Edgardo D. Dafilmoto
-
-
Ms. Delia B. Sotelo (OIC)
- D
- Extra Large
5
B A R A N G A Y S C O N N E C T I O N S
CoverageServed
Awang, Datu Odin Sinsuat, Maguindanao
Tel./Fax No. (064) 431-0362
2008 20092007
9956 924 879 11,100
Mr. Maydu P. Wawa
45,197
Mr. Maydu P. Wawa Hji Tumagantang Zainal (Vice Pres)
Ms. Delia B. Sotelo (OIC)
91,003 716 676 11,300
161,819 1,721 1,661 11,700
6225 173 163 3,900
13667 650 639 5,300
258
2007 2008 2009 2007 2008 2009**
2000 2001 2002 2003 2004 2005 2006 2007 2008** 2009***
Commercial 6,758 8,260 8,857 8,883 8,005 9,203 8,704 6,748 1,786
Industrial 6,226 6,607 6,424 6,581 6,351 10,072 10,823 8,586 3,500
Residential 23,747 27,030 28,077 29,914 27,597 34,554 33,585 26,096 11,232
Public Building 1,779 2,169 2,417 2,686 2,628 2,546 2,376 1,908 1,314
Others 941 986 977 1,038 779 666 614 417 123
Total 39,451 45,052 46,752 49,102 45,360 57,041 56,102 43,755 17,955
*** Incomplete data
* Transferred to COTELCO
** Does not include Area III (Palma Area)
MAGUINDANAO ELECTRIC COOPERATIVE, INC. (MAGELCO)
Energized Coop System
LEGEND :
Headquarters
N
259
SURSECO IICity of Tandag
SURNECOSurigao City
ANECOButuan City
SURSECO ICity of Bislig
ASELCOSan Francisco, Agusan del Sur
DIELCOSan Jose, Dinagat Islands SIARELCO
Dapa, Surigao del Norte
I. STATUS OF ENERGIZATION (Cumulative):
2007 2008 2009 % 2007 2008 2009 % 2007 2008 2009 %
A. Electric Cooperatives:
1 Agusan Norte 12 12 12 12 100 252 252 252 252 100 121,500 104,438 108,189 111,884 92
2 Agusan Sur 14 14 14 14 100 314 297 297 314 100 115,200 70,358 72,735 75,956 66
3 Surigao Norte 12 12 12 12 100 203 203 203 203 100 60,500 50,806 52,947 55,006 91
4 Siargao 9 9 9 9 100 132 132 132 132 100 21,900 19,482 20,342 21,327 97
5 Dinagat 7 7 7 7 100 100 99 100 100 100 22,700 12,028 13,374 14,588 64
6 Surigao Sur I 5 5 5 5 100 112 112 112 112 100 59,600 51,788 55,319 56,811 95
7 Surigao Sur II 14 14 14 14 100 197 190 195 195 99 59,000 46,929 49,956 52,232 89
Total 73 73 73 73 100 1,310 1,285 1,291 1,308 99 460,400 355,829 372,862 387,804 84
ELECTRIC DISTRIBUTION UTILITIES
MUNICIPALITIES/CITIES BARANGAYS
CARAGA
ServedCoverage Potential
EnergizedCoverage
Energized
CONNECTIONS
260
Total 290,069 306,308 326,851 366,916 401,209 400,968 408,975 427,677 442,045 514,510
Others 5,492 6,283 6,676 9,257 7,734 7,735 7,342 8,666 11,978 17,644
Public Bldgs. 17,385 19,279 21,533 25,051 27,408 27,153 29,029 31,630 32,117 37,164
Industrial 86,814 86,213 91,900 102,342 108,383 106,137 112,054 109,786 113,053 143,739
Commercial 47,309 50,530 52,679 56,817 61,791 63,918 67,571 72,465 74,776 86,407
Residential 133,069 144,003 154,063 173,449 195,893 196,025 192,979 205,130 210,121 229,556
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
II. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment):
ANECO
HQ Location
Municipality
5 MVA Substation
7.5 MVA Substation
10 MVA Substation
NPC Substation
Power Plant
3PH Backbone Line
LEGEND :
H QEnergized Coop System
P P
261
N
TUBAY
CITY ofCABADBARAN
BUENAVISTA
MAGALLANES
KITCHARAO
JABONGA
SANTIAGO
CARMEN
REMEDIOS T.ROMUALDEZ
LAS NIEVES
BUTUAN CITY
NASIPIT
P P H Q
I. DATE OF INCORPORATION AND REGISTRATION : February 12, 1977
II. DATE OF FIRST ENERGIZATION : December 12, 1977
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan - 37.2 97.7
Subsidy 24.4 54.1 59.3
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Butuan City 86 86 86 86 100 0 62,400 58,419 60,372 62,365 99
2 Las Nieves 20 20 20 20 100 0 4,400 2,370 2,456 2,607 59
Second District
3 Buenavista 25 25 25 25 100 0 10,300 7,901 8,172 8,439 82
4 City of Cabadbaran 31 31 31 31 100 0 12,700 11,602 12,118 12,620 99
5 Carmen 8 8 8 8 100 0 3,400 2,839 2,886 2,953 87
6 Jabonga 15 15 15 15 100 0 4,200 2,977 3,094 3,193 76
7 Kitcharao 11 11 11 11 100 0 2,900 2,335 2,481 2,591 89
8 Magallanes 8 8 8 8 100 0 4,000 3,742 3,814 3,910 98
9 Nasipit 19 19 19 19 100 0 7,300 5,969 6,075 6,168 84
10 Remedios T. Romualdez 8 8 8 8 100 0 2,700 2,071 2,169 2,253 83
11 Santiago 8 8 8 8 100 0 3,600 2,144 2,279 2,408 67
12 Tubay 13 13 13 13 100 0 3,600 2,069 2,273 2,377 66
Total 252 252 252 252 100 0 121,500 104,438 108,189 111,884 92
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 95,066 95,176 107,309 Residential 97,873 101,533 104,773
MWH Purchased 20,874 21,147 23,201 Commercial 4,430 4,466 4,757
MWH Sold 17,878 18,157 19,866 Industrial 834 865 862
Systems Loss (%) 14 14 14 Public Building 1,047 1,070 1,243
Peak Load (KW) 47,249 46,869 50,174 Others 254 255 249
Load Factor (%) 61 62 63 Total 104,438 108,189 111,884
Collection Efficiency (%) 95 96 95
Ave. Systems Rate (P/KWH) 5.32 5.24 5.40
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 57,711 63,497 68,478 76,349 84,950 85,641 83,331 88,139 90,601 96,591
Commercial 16,593 17,452 17,679 18,652 19,729 19,147 19,408 20,351 20,910 23,357
Industrial 75,228 73,916 79,103 88,346 94,611 92,504 95,849 91,825 93,086 99,478
Public Building 7,344 7,951 8,713 9,566 10,236 9,942 10,460 10,481 10,243 11,462
Others 2,714 2,932 2,705 2,712 2,720 2,766 2,834 3,744 3,038 7,505
Total 159,590 165,748 176,678 195,625 212,246 210,000 211,882 214,540 217,878 238,393
Monthly Average
99,815
C O N N E C T I O N S
Arch. Horacio T. Santos
102,943
A+ A+
Mega Large Mega Large
EnergizedUnenerg.
Served
POWER PLANT
Location Project Name/Proponent Type
Nasipit Diesel 100.000Power Barge
117/Therma Marine, Inc.
Mr. Dioscoro P. Boco
Legislative DistrictPotential
96,277
B A R A N G A Y S
A+
Mega Large
MUNICIPALITIES/CITY
Coverage
Mr. Dioscoro P. Boco
Arch. Horacio T. Santos
AGUSAN DEL NORTE ELECTRIC COOPERATIVE, INC. (ANECO)Km. 2 J.C. Aquino Avenue, Butuan City, Agusan Norte
Tel. Nos. (085) 341-7935, 342-1790, 341-5138 to 39; Telefax Nos. (085) 342-6000, 341-3870; E-mail: [email protected]
2008 20092007
Mr. Dioscoro P. Boco
Arch. Horacio T. Santos
262
HQ Location
Municipality
5 MVA Substation
10 MVA Substation
3 PH Backbone Line
LEGEND :
H Q
Energized Coop System
263
N
ESPERANZA
LA PAZ
SIBAGAT
SANFRANCISCO
BUNAW AN
TRENTO
VERUELA
SANTA JOSEFA
ROSARIO
TALACOGON
SAN LUIS
LORETO
PROSPERIDAD
CITY ofBAYUGAN
H Q
I. DATE OF INCORPORATION AND REGISTRATION : August 26, 1977
II. DATE OF FIRST ENERGIZATION : December 22, 1979
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 5.8 35.8 57.3
Subsidy 85.8 107.8 107.8
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Lone District
1 City of Bayugan 43 43 43 43 100 0 19,300 15,329 15,788 16,304 84
2 Bunawan 10 9 9 10 100 0 5,500 3,242 3,390 3,606 66
3 Esperanza 47 47 47 47 100 0 9,100 4,353 4,519 4,751 52
4 La Paz 15 12 12 15 100 0 4,300 1,444 1,497 1,615 38
5 Loreto 17 16 16 17 100 0 6,400 2,019 2,116 2,210 35
6 Prosperidad 32 32 32 32 100 0 14,600 10,416 10,682 11,054 76
7 Rosario 11 11 11 11 100 0 5,900 3,586 3,715 3,929 67
8 San Francisco 27 27 27 27 100 0 12,000 10,726 11,016 11,383 95
9 San Luis 25 20 20 25 100 0 5,300 2,065 2,176 2,384 45
10 Santa Josefa 11 11 11 11 100 0 4,600 2,480 2,573 2,683 58
11 Sibagat 24 20 20 24 100 0 5,900 2,627 2,667 2,851 48
12 Talacogon 16 14 14 16 100 0 6,300 3,895 4,062 4,283 68
13 Trento 16 16 16 16 100 0 8,600 5,838 6,022 6,254 73
14 Veruela 20 19 19 20 100 0 7,400 2,338 2,512 2,649 36
Total 314 297 297 314 100 0 115,200 70,358 72,735 75,956 66
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 26,350 26,887 37,429 Residential 61,605 63,748 66,844
MWH Purchased 6,254 5,676 7,728 Commercial 4,412 4,513 4,613
MWH Sold 5,343 4,910 6,640 Industrial 142 143 146
Systems Loss (%) 14 13 14 Public Building 1,808 1,899 1,961
Peak Load (KW) 16,365 17,230 19,336 Others 2,391 2,432 2,392
Load Factor (%) 52 45 55 Total 70,358 72,735 75,956
Collection Efficiency (%) 97 96 96
Ave. Systems Rate (P/KWH) 4.93 5.48 5.64
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 20,420 21,495 22,783 26,088 30,353 29,427 29,616 31,997 28,475 35,603
Commercial 5,991 7,466 8,494 9,105 9,952 10,397 11,258 12,546 11,644 15,743
Industrial 4,740 5,261 5,440 5,961 6,297 8,540 11,115 11,894 11,940 19,091
Public Building 3,209 3,737 4,263 5,089 5,527 5,581 5,910 6,896 6,177 8,124
Others 564 795 1,192 3,026 814 1,338 1,161 779 689 1,113
Total 34,924 38,754 42,172 49,269 52,943 55,283 59,060 64,112 58,925 79,674
AGUSAN DEL SUR ELECTRIC COOPERATIVE, INC. (ASELCO)San Isidro, San Francisco, Agusan Del Sur
Tel. No. (085) 343-8456; Telefax No. (085) 839-2275; E-mail: [email protected]
2008 20092007
MUNICIPALITIES
A+
Extra Large
56,847
Mr. Expectacion P. Guay Mr. Romeo S. Castulo
Mr. Ursulo E. Anuta
Mr. Expectacion P. Guay
Mr. Ursulo E. Anuta
Served
A+ A+
Extra Large Extra Large
PotentialLegislative District
Monthly Average
Mr. Francisco L. Suarez, Jr. (OIC)
58,863 61,652
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.
264
LEGEND :
H QEnergized Coop System
HQ Location
Municipality
5 MVA Substation
10 MVA Substation
NPC Substation
Generating Set
3 PH Backbone LineG S
265
N
CLAVER
MAINIT
SISON
SURIGAOCITY
ALEGRIA
GIGAQUITTUBOD
BACUAG
PLACER
TAGANA-AN
HikdopIsland
MALIMONO
SAN FRANCISCO (ANAO-AON)
G S
H Q
I. DATE OF INCORPORATION AND REGISTRATION : September 24, 1977
II. DATE OF FIRST ENERGIZATION : June 1978
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 82.1 86.8 209.9 0.326
Subsidy 27.7 43.6 43.9
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Second District
1 Alegria 12 12 12 12 100 0 2,700 1,795 1,855 1,888 70
2 Bacuag 9 9 9 9 100 0 2,600 1,998 2,035 2,083 80
3 Claver 14 14 14 14 100 0 3,500 3,084 3,287 3,401 97
4 Gigaquit 13 13 13 13 100 0 3,400 2,184 2,220 2,266 67
5 Mainit 21 21 21 21 100 0 5,000 3,073 3,142 3,408 68
6 Malimono 14 14 14 14 100 0 3,400 3,207 3,261 3,337 98
7 Placer 20 20 20 20 100 0 4,600 3,765 3,905 4,036 88
8 San Francisco (Anao-aon) 11 11 11 11 100 0 2,400 2,183 2,245 2,307 96
9 Sison 12 12 12 12 100 0 2,100 1,940 1,996 2,046 97
10 Surigao City 54 54 54 54 100 0 25,400 23,264 24,197 25,312 99
11 Tagana-an 14 14 14 14 100 0 3,100 2,282 2,677 2,762 89
12 Tubod 9 9 9 9 100 0 2,300 2,031 2,127 2,160 94
Total 203 203 203 203 100 0 60,500 50,806 52,947 55,006 91
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 31,442 33,288 42,221 Residential 43,448 45,321 47,004
MWH Purchased 7,028 7,528 9,061 Commercial 3,854 3,918 4,300
MWH Sold 5,663 6,115 7,798 Industrial 75 74 79
Systems Loss (%) 19 18 13 Public Building 1,159 1,178 1,257
Peak Load (KW) 16,850 17,436 17,579 Others 2,270 2,456 2,366
Load Factor (%) 57 59 71 Total 50,806 52,947 55,006
Collection Efficiency (%) 96 96 99
Ave. Systems Rate (P/KWH) 5.55 5.44 5.41
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 23,928 25,900 27,401 31,204 34,887 35,319 34,997 37,365 39,954 42,805
Commercial 11,200 12,398 13,039 14,452 16,090 18,135 18,850 20,159 21,820 25,077
Industrial 2,396 3,098 3,122 3,327 2,823 2,405 2,792 3,113 3,712 16,988
Public Building 3,252 3,581 4,031 4,694 5,181 5,129 5,220 6,097 6,656 7,490
Others 886 1,034 1,319 1,570 1,557 1,503 1,351 1,224 1,240 1,216
Total 41,662 46,011 48,912 55,247 60,538 62,491 63,210 67,958 73,382 93,576
Monthly Average
54,057 55,77553,167
MUNICIPALITIES/CITY
CoverageEnergized
Unenerg.Served
Legislative District
B A R A N G A Y S
Extra Large Extra Large
Location Project Name/Proponent
Surigao City(Hikdop Is.) NPC-SPUG
Extra Large
C O N N E C T I O N S
Engr. Danilo Z. Escalante
B A+
Mr. Greg C. Gorgod Mr. Jose D. Montederamos
Engr. Danilo Z. Escalante Engr. Danilo Z. Escalante
B
Mr. Luis D. Catubigan
Potential
POWER PLANT
Type
Diesel
SURIGAO DEL NORTE ELECTRIC COOPERATIVE, INC. (SURNECO)01308 Narciso Corner, Espina St., Surigao City
Tel. Nos. (086) 826-0429, 826-5456, 826-0499; Telefax No. (086) 826-2148; e-mail: [email protected]
2008 20092007
266
SIARELCO
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
Submarine Cable
3 PH Backbone Line
Energized Coop System
267
N
DAPA
DEL CARMEN
GENERAL LUNA
SAN BENITO
SAN ISIDRO
PILAR
SURNECO
CASULIAN IS.
SAN MIGUEL
69/34.5 KV
BUCASGRANDEISLAND
MIDDLEBUCAS IS.
EASTBUCAS IS.
SOCORRO
BARANGAY CAGDIANAO
SANTAMONICA(Sapao)
BURGOS
H Q
I. DATE OF INCORPORATION AND REGISTRATION : September 8, 1979
II. DATE OF FIRST ENERGIZATION : January 16, 1985
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 3.2 3.7 3.7
Subsidy 40.9 48.4 48.4
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Burgos 6 6 6 6 100 0 900 787 832 866 96
2 Dapa 29 29 29 29 100 0 5,200 4,675 4,880 5,133 99
3 Del Carmen 20 20 20 20 100 0 3,000 2,646 2,789 2,972 99
4 General Luna 19 19 19 19 100 0 2,900 2,584 2,730 2,885 99
5 Pilar 15 15 15 15 100 0 2,000 1,781 1,827 1,875 94
6 San Benito 6 6 6 6 100 0 1,100 942 970 1,019 93
7 San Isidro 12 12 12 12 100 0 1,300 1,183 1,221 1,274 98
8 Santa Monica (Sapao) 11 11 11 11 100 0 1,900 1,715 1,772 1,820 96
9 Socorro 14 14 14 14 100 0 3,600 3,169 3,321 3,483 97
Total 132 132 132 132 100 0 21,900 19,482 20,342 21,327 97
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 5,141 5,773 6,512 Residential 18,427 19,131 20,055
MWH Purchased 820 884 952 Commercial 414 451 520
MWH Sold 758 819 900 Industrial - - -
Systems Loss (%) 7 7 5 Public Building 506 553 625
Peak Load (KW) 2,298 2,458 2,516 Others 135 207 127
Load Factor (%) 49 49 52 Total 19,482 20,342 21,327
Collection Efficiency (%) 100 100 100
Ave. Systems Rate (P/KWH) 6.78 7.05 7.23
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 3,115 3,521 3,858 4,879 5,533 5,724 5,691 6,134 6,519 6,902
Commercial 537 530 588 721 939 1,263 1,529 1,906 2,147 2,574
Industrial 234 161 - - - - - - - -
Public Building 264 342 378 423 491 553 674 755 862 1,031
Others 380 415 226 299 351 310 301 303 300 299
Total 4,530 4,969 5,050 6,322 7,314 7,850 8,195 9,098 9,828 10,806
A+
Medium
17,352
Legislative District
MUNICIPALITIES
Monthly Average
Mr. Sergio C. Dagooc
18,088 18,872
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.Served
Potential
Mr. Joseph E. Cometa Mr. Sanny D. Seco
Mr. Sergio C. Dagooc
A+ A+
Medium Large
Mr. Edelito C. Sangco
Mr. Sergio C. Dagooc
SIARGAO ELECTRIC COOPERATIVE, INC. (SIARELCO)Catabaan, Dapa, Surigao del Norte
Tel No. (086) 826-7555 to 56; E-mail: [email protected]
2008 20092007
268
LEGEND :
H Q
Energized Coop System
HQ Location
Municipality
Generating Set
3 PH Backbone Line
G S
269
N
CAGDIANAO
LORETO
BASILISA (Rizal)
SANJOSE
DINAGAT
TUBAJON
LIBJO(ALBOR)
G S
G S
KAYOGA IS.
PUYO IS.
HINUBONG IS.
HANAO IS.
KANIHAAN IS.
KAYABANGAN IS.
KANHANUZA IS.
KOTKOT IS.
MACARMAR IS.
LINIS IS.
SIBANAG IS.
KAPAQUIAN IS.
CAG-ILAN IS.DANAOAN IS.
AWASAN IS.
HIKDOP IS.
HANIGAD IS.NONOC IS.
SIBALE IS.
H Q
I. DATE OF INCORPORATION AND REGISTRATION : August 29, 1990
II. DATE OF FIRST ENERGIZATION : November 1990
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009 Cap.(MW)
Residual Loan 5.1 8.1 8.1 3.422
Subsidy 66.1 89.9 91.1 0.940
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Lone District
1 Basilisa (Rizal) 27 27 27 27 100 0 5,600 1,989 2,183 2,384 43
2 Cagdianao 14 13 14 14 100 0 2,700 1,545 1,800 2,058 76
3 Dinagat 12 12 12 12 100 0 2,100 1,156 1,232 1,300 62
4 Libjo (Albor) 16 16 16 16 100 0 3,500 1,629 1,852 2,021 58
5 Loreto 10 10 10 10 100 0 1,800 1,035 1,151 1,253 70
6 San Jose 12 12 12 12 100 0 5,600 4,016 4,279 4,541 81
7 Tubajon 9 9 9 9 100 0 1,400 658 877 1,031 74
Total 100 99 100 100 100 0 22,700 12,028 13,374 14,588 64
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 2,992 3,343 3,969 Residential 11,327 12,597 13,679
MWH Purchased 391 448 515 Commercial 324 361 408
MWH Sold 360 416 484 Industrial - - -
Systems Loss (%) 7 7 5 Public Building 334 372 454
Peak Load (KW) 1,400 1,400 1,860 Others 43 44 47
Load Factor (%) 38 44 38 Total 12,028 13,374 14,588
Collection Efficiency (%) 99 98 99
Ave. Systems Rate (P/KWH) 8.30 8.03 8.20
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 1,632 1,688 1,828 2,164 2,557 2,780 3,100 3,217 3,651 4,254
Commercial 309 324 312 282 329 469 594 627 767 807
Industrial - - - - - - - - - -
Public Building 188 175 193 216 247 262 301 330 421 591
Others 104 121 116 88 119 144 139 149 155 156
Total 2,233 2,308 2,449 2,750 3,252 3,655 4,134 4,323 4,994 5,808
A+
Medium Medium
12,751
Diesel
Mr. Sonny D. Seco
Mr. Sergio C. Dagooc (OIC)
A+
Medium
Diesel
Mr. Sergio C. Dagooc (OIC)
Mr. Sonny D. Seco
Mr. Sergio C. Dagooc (OIC)
13,887
Mr. Sonny D. Seco
Legislative DistrictPotential
A+
Loreto
MUNICIPALITIES
DINAGAT ISLANDS ELECTRIC COOPERATIVE, INC. (DIELCO)Justiniana, San Jose, Dinagat Islands
Tel. No. (086) 826-8189, 826-8324; Fax Nos. (086) 826-5331, 826-5454
2008 20092007
Monthly Average
B A R A N G A Y S C O N N E C T I O N S
CoverageEnergized
Unenerg.Served
NPC-SPUG
11,499
POWER PLANT
Location Project Name/Proponent Type
Dinagat NPC-SPUG
270
LEGEND :
H Q HQ Location
Municipality
5 MVA Substation
3 PH Backbone Line
Energized Coop System
271
N
HINATUAN
LINGIG
CITY ofBISLIG
BAROBO
TAGBINA
H Q
I. DATE OF INCORPORATION AND REGISTRATION : July 20, 1971
II. DATE OF FIRST ENERGIZATION : October 1, 1974
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 221.4 263.9 335.9
Subsidy 34.4 46.4 49.0
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
Second District
1 Barobo 21 21 21 21 100 0 9,400 7,798 8,588 8,907 99
2 City of Bislig 24 24 24 24 100 0 30,100 27,754 28,903 29,483 99
3 Hinatuan 24 24 24 24 100 0 7,300 5,585 6,166 6,340 87
4 Lingig 18 18 18 18 100 0 5,800 4,726 5,227 5,423 94
5 Tagbina 25 25 25 25 100 0 7,000 5,925 6,435 6,658 95
Total 112 112 112 112 100 0 59,600 51,788 55,319 56,811 95
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 17,746 19,106 21,602 Residential 47,695 51,703 53,371
MWH Purchased 3,402 3,641 3,934 Commercial 3,038 2,674 2,442
MWH Sold 2,918 3,189 3,483 Industrial 5 4 3
Systems Loss (%) 14 12 11 Public Building 922 826 886
Peak Load (KW) 8,607 9,475 9,499 Others 128 112 109
Load Factor (%) 54 53 57 Total 51,788 55,319 56,811
Collection Efficiency (%) 95 96 96
Ave. Systems Rate (P/KWH) 6.08 5.99 6.20
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 14,901 15,476 15,785 17,145 19,977 19,771 18,961 19,223 17,573 18,327
Commercial 8,303 7,729 7,865 8,488 8,612 8,223 8,684 9,479 9,155 9,752
Industrial 2,761 2,269 2,378 2,556 2,461 528 1,008 1,552 2,783 4,245
Public Building 1,280 1,456 1,657 2,409 2,948 2,754 2,967 3,233 3,265 3,384
Others 389 474 536 572 749 749 756 1,533 5,486 6,082
Total 27,634 27,404 28,221 31,170 34,747 32,025 32,376 35,020 38,262 41,790
A+
Extra Large
ServedPotential
MUNICIPALITIES/CITY
Coverage
C O N N E C T I O N S
Unenerg.
Mr. Raul K. Salazar
Atty. Edwin M. Malazarte
Mr. Crispo M. Jabagat, Sr.
Atty. Edwin M. Malazarte
Monthly Average
Energized
46,277
Legislative District
B A R A N G A Y S
Mr. Crispo M. Jabagat, Sr.
Atty. Edwin M. Malazarte
47,126 47,126
Extra Large
A+
Extra Large
A+
San Fernando, City of Bislig
Tel. Nos. (086) 628-2211 to 13, 853-6100; Fax No. (086) 853-6096, 628-2212
2008 20092007
272
SURIGAO DEL SUR I ELECTRIC COOPERATIVE, INC. (SURSECO I)
HQ Location
Municipality
Below 5 MVA Substation
5 MVA Substation
10 MVA Substation
3 PH Backbone Line
Energized Coops System
LEGEND :
H Q
273
CORTES
CAGWAIT
MARIHATAG
TAGO
MADRID
BAYABAS
CANTILAN
CARRASCAL
CARMEN
LANUZA
CITY ofTANDAG
SAN MIGUEL
H Q
SAN AGUSTIN
LIANGA
N
I. DATE OF INCORPORATION AND REGISTRATION : September 10, 1979
II. DATE OF FIRST ENERGIZATION : November 10, 1983
III. ELECTRIC COOPERATIVE OFFICIALS :
President :
Gen. Manager :
IV. CATEGORY
CLASSIFICATION
V. TOTAL MEMBERSHIP
VI. STATUS OF RELEASES (P'M) : (Cumulative)
2007 2008 2009
Residual Loan 79.6 103.4 143.6
Subsidy 44.6 72.8 74.2
VII. STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
First District
1 Bayabas 7 7 7 7 100 0 1,500 1,019 1,101 1,167 78
2 Cagwait 11 11 11 11 100 0 3,700 3,226 3,394 3,541 96
3 Cantilan 17 16 16 16 94 1 5,600 5,178 5,384 5,588 99
4 Carmen 8 8 8 8 100 0 1,900 1,596 1,662 1,731 91
5 Carrascal 14 13 14 14 100 0 2,600 2,155 2,381 2,556 98
6 Cortes 12 12 12 12 100 0 3,000 2,500 2,629 2,745 92
7 Lanuza 13 11 13 13 100 0 2,000 1,735 1,823 1,906 95
8 Lianga 13 13 13 13 100 0 5,300 3,740 4,106 4,317 81
9 Madrid 14 14 14 14 100 0 3,400 3,148 3,250 3,340 98
10 Marihatag 12 12 12 12 100 0 3,300 1,792 1,895 2,006 61
11 San Agustin 13 13 13 13 100 0 3,000 2,055 2,295 2,381 79
12 San Miguel 18 15 17 17 94 1 5,600 3,142 3,397 3,593 64
13 Tago 24 24 24 24 100 0 6,000 4,670 5,100 5,334 89
14 City of Tandag 21 21 21 21 100 0 12,100 10,973 11,539 12,027 99
Total 197 190 195 195 99 2 59,000 46,929 49,956 52,232 89
VIII. GENERAL STATISTICS IX. CONNECTION PER TYPE OF CONSUMER: (Cum)
2007 2008 2009 2007 2008 2009
Gross Revenue (P'000) 16,191 19,174 22,645 Residential 43,158 46,106 48,274
MWH Purchased 3,058 3,636 4,143 Commercial 2,421 2,459 2,482
MWH Sold 2,719 3,231 3,705 Industrial 48 51 54
Systems Loss (%) 11 11 10 Public Building 1,166 1,190 1,264
Peak Load (KW) 7,663 9,315 10,699 Others 136 150 158
Load Factor (%) 55 53 53 Total 46,929 49,956 52,232
Collection Efficiency (%) 97 97 97
Ave. Systems Rate (P/KWH) 5.96 5.93 6.11
X. MWH ENERGY CONSUMPTION PER TYPE OF CONSUMER (Increment)
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Residential 11,362 12,426 13,930 15,620 17,637 17,362 17,283 19,055 23,348 25,074
Commercial 4,376 4,631 4,702 5,117 6,140 6,284 7,248 7,397 8,333 9,097
Industrial 1,455 1,508 1,857 2,152 2,191 2,161 1,290 1,402 1,532 3,937
Public Building 1,848 2,037 2,298 2,654 2,778 2,932 3,497 3,838 4,493 5,082
Others 455 512 582 990 1,424 924 800 934 1,070 1,273
Total 19,496 21,114 23,369 26,533 30,170 29,663 30,118 32,626 38,776 44,463
Mr. Jose A. Trugillo
City of Tandag, Surigao del Sur
Tel No. (086) 211-3031; Telefax No. (086) 211-3553; E-mail: [email protected]
2008 20092007
Mr. Jose A. Trugillo Mr. Jose A. Trugillo
Engr. Iglorio R. Hinayon
EnergizedUnenerg.
50,167
Served
Large Large
A+
B A R A N G A Y S
50,16750,322
Engr. Iglorio R. Hinayon
A+A+
Large
Engr. Iglorio R. Hinayon
Coverage
Monthly Average
MUNICIPALITIES
Potential
C O N N E C T I O N S
Legislative District
274
SURIGAO DEL SUR II ELECTRIC COOPERATIVE, INC. (SURSECO II)
STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 % 2007 2008 2009 %
A. PRIVATE INVESTOR-OWNED UTILITIES
1. MERALCO 111 111 111 111 100 4,322 4,254 4,261 4,268 99 54 2. LUECO 3 3 3 3 100 84 84 84 84 100 - 3. DECORP 6 6 6 6 100 154 154 154 154 100 - 4. TEI 1 1 1 1 100 70 70 70 70 100 - 5 CELCOR 1 1 1 1 100 87 87 87 87 100 -
6. AEC 1 1 1 1 100 35 35 35 35 100 - 7. SFELAPCO 2 2 2 2 100 63 62 62 63 100 - 8. IEES 1 1 1 1 100 26 26 26 26 100 - 9. PECO 1 1 1 1 100 180 180 180 180 100 -
10. VECO 8 8 8 8 100 232 232 232 232 100 - 11. MECO 2 2 2 2 100 43 43 43 43 100 - 12. PES Bohol 1 1 1 1 100 15 15 15 15 100 - 13. CEPALCO 4 4 4 4 100 96 96 96 96 100 - 14. ILPI 1 1 1 1 100 44 44 44 44 100 - 15. DLPC 5 5 5 5 100 266 263 266 266 100 - 16. COLIGHT 1 1 1 1 100 68 67 67 68 100 -
Sub Total 149 149 149 149 100 5,785 5,712 5,722 5,731 99 54
B. LOCAL GOVERNMENT UTILITIES
1. PANTABANGAN 1 1 1 1 100 9 9 9 9 100 - 2. OLONGAPO CITY 1 1 1 1 100 17 17 17 17 100 - 3. BAUAN 1 1 1 1 100 40 40 40 40 100 - 4. BANTON 1 1 1 1 100 17 17 17 17 100 - 5. CONCEPCION 1 1 1 1 100 9 9 9 9 100 - 6. CORCUERA 1 1 1 1 100 15 15 15 15 100 - 7. CLAVERIA 1 1 1 1 100 22 2 2 22 100 - 8. BUMBARAN 1 1 1 1 100 17 9 10 10 59 7
Sub Total 8 8 8 8 100 146 118 119 139 95 7
C. OTHERS
1. WESTERN COMMAND (AFP) 1 1 1 1 100 1 1 1 1 100 - 2. TONGONAN (PNOC) - - - - - 2 2 2 2 100 - 3. MMPC 1 1 1 1 100 15 15 15 15 100 - 4. HFMPC - - - - - 1 1 1 1 100 -
2 2 2 2 100 19 19 19 19 100 - 159 159 159 159 100 5,950 5,849 5,860 5,889 99 61
EnergizedUnenerg.
CITIES/MUNICIPALITIES
CoverageEnergized
TOTAL
SUMMARY
OTHER ELECTRIC DISTRIBUTION UTILITIES
Sub Total
MUNICIPALITIES/CITYB A R A N G A Y S
Coverage
275
STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 %
1. Bulacan 569 568 569 569 1002. Pampanga 20 20 20 20 1003. Cavite 830 828 830 830 1004. Laguna 510 488 488 490 965. Batangas 164 160 160 164 1006. Rizal 188 187 188 188 1007. Quezon 347 310 312 313 888. NCR 1,694 1,693 1,694 1,694 100
4,322 4,254 4,261 4,268 99
Bulacan
1 Angat 16 16 16 16 100 2 Balagtas (Bigaa) 9 9 9 9 100 3 Baliuag 27 27 27 27 100 4 Bocaue 19 19 19 19 100 5 Bulacan 14 14 14 14 100 6 Bustos 14 14 14 14 100 7 Calumpit 29 29 29 29 100 8 Guiguinto 14 14 14 14 100 9 Hagonoy 26 26 26 26 100
10 City of Malolos 51 51 51 51 100 11 Marilao 16 16 16 16 100 12 City of Meycauayan 26 26 26 26 100 13 Norzagaray 13 12 13 13 100 14 Obando 11 11 11 11 100 15 Pandi 22 22 22 22 100 16 Paombong 14 14 14 14 100 17 Plaridel 19 19 19 19 100 18 Pulilan 19 19 19 19 100 19 Remedios Trinidad 8 8 8 8 100 20 San Ildefonso 36 36 36 36 100 21 City of San Jose del Monte 59 59 59 59 100 22 San Miguel 49 49 49 49 100 23 San Rafael 34 34 34 34 100 24 Sta. Maria 24 24 24 24 100
569 568 569 569 100
Energized
Total
Total
Other Electric Distribution Utilities
CoveragePROVINCES/CITIES/
MUNICIPALITIES
B A R A N G A Y S
Manila Electric Company (MERALCO)
276
STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 %Energized
Other Electric Distribution Utilities
CoveragePROVINCES/CITIES/
MUNICIPALITIES
B A R A N G A Y S
Manila Electric Company (MERALCO)
Pampanga
Apalit 3 3 3 3 100 Candaba 16 16 16 16 100 San Simon 1 1 1 1 100
20 20 20 20 100
Cavite
1 Alfonso 32 32 32 32 100 2 Amadeo 26 26 26 26 100 3 Bacoor 73 73 73 73 100 4 Carmona 14 14 14 14 100 5 Cavite City 84 84 84 84 100 6 Dasmariñas 75 73 75 75 100 7 Gen. Aguinaldo 14 14 14 14 100 8 Gen. Alvarez 27 27 27 27 100 9 Gen. Trias 33 33 33 33 100
10 Imus 97 97 97 97 100 11 Indang 36 36 36 36 100 12 Kawit 23 23 23 23 100 13 Magallanes 16 16 16 16 100 14 Maragondon 27 27 27 27 100 15 Mendez-Nunez 24 24 24 24 100 16 Naic 30 30 30 30 100 17 Noveleta 16 16 16 16 100 18 Rosario 20 20 20 20 100 19 Silang 64 64 64 64 100 20 Tagaytay City 35 35 35 35 100 21 Tanza 41 41 41 41 100 22 Ternate 10 10 10 10 100 23 Trece Martires City 13 13 13 13 100
830 828 830 830 100 Total
Total
277
STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 %Energized
Other Electric Distribution Utilities
CoveragePROVINCES/CITIES/
MUNICIPALITIES
B A R A N G A Y S
Manila Electric Company (MERALCO)
Laguna
1 Alaminos 15 15 15 15 100 2 Bay 16 16 16 16 100 3 Binan 24 24 24 24 100 4 Cabuyao 18 18 18 18 100 5 City of Calamba 54 54 54 54 100 6 Calauan 17 17 17 17 100 7 Liliw 33 28 28 28 85 8 Los Banos 14 14 14 14 100 9 Luisiana 23 23 23 23 100
10 Magdalena* 23 18 18 18 78 11 Majayjay* 40 29 29 30 75 12 Nagcarlan 52 52 52 52 100 13 Pila 17 17 17 17 100 14 Rizal 11 11 11 11 100 15 San Pablo City 80 80 80 80 100 16 San Pedro 20 20 20 20 100 17 Sta. Cruz 26 25 25 26 100 18 City of Santa Rosa 18 18 18 18 100 19 Victoria 9 9 9 9 100
*adjusted
510 488 488 490 96
Batangas
1 Batangas City 105 101 101 105 100 2 San Pascual 29 29 29 29 100 3 Sto. Tomas 30 30 30 30 100
164 160 160 164 100
Rizal
1 Angono 10 10 10 10 100 2 City of Antipolo 16 16 16 16 100 3 Baras 10 10 10 10 100 4 Binangonan 40 39 40 40 100 5 Cainta 7 7 7 7 100 6 Cardona 18 18 18 18 100 7 Jala-Jala 11 11 11 11 100 8 Montalban (Rodriguez) 11 11 11 11 100 9 Morong 8 8 8 8 100
10 Pililla 9 9 9 9 100 11 San Mateo 15 15 15 15 100 12 Tanay 19 19 19 19 100 13 Taytay 5 5 5 5 100 14 Teresa 9 9 9 9 100
188 187 188 188 100 Total
Total
Total
278
STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 %Energized
Other Electric Distribution Utilities
CoveragePROVINCES/CITIES/
MUNICIPALITIES
B A R A N G A Y S
Manila Electric Company (MERALCO)
Quezon
1 Candelaria 25 25 25 25 100 2 Dolores 16 16 16 16 100 3 Lucban 32 32 32 32 100 4 Lucena City 33 33 33 33 100 5 Mauban* 40 22 21 21 53 6 Pagbilao 27 22 25 25 93 7 Sampaloc 14 9 9 10 71 8 San Antonio 20 20 20 20 100 9 Sariaya 43 43 43 43 100
10 City of Tayabas 66 57 57 57 86 11 Tiaong 31 31 31 31 100
*adjusted
347 310 312 313 90
National Capital Region
1 Caloocan City 188 188 188 188 100 2 City of Las Pinas 20 20 20 20 100 3 City of Makati 33 33 33 33 100 4 City of Malabon 21 21 21 21 100 5 City of Mandaluyong 27 27 27 27 100 6 City of Manila 897 897 897 897 100 7 City of Marikina 15 14 15 15 100 8 City of Muntinlupa 9 9 9 9 100 9 City of Navotas 14 14 14 14 100
10 City of Paranaque 16 16 16 16 100 11 Pasay City 201 201 201 201 100 12 City of Pasig 30 30 30 30 100 13 Pateros 10 10 10 10 100 14 Quezon City 142 142 142 142 100 15 City of San Juan 21 21 21 21 100 16 Taguig City 18 18 18 18 100 17 City of Valenzuela 32 32 32 32 100
1,694 1,693 1,694 1,694 100 Total
Total
279
STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 %
La Union Electric Company, Inc. (LUECO) 1 City of San Fernando (59) 45 45 45 45 1002 Bauang (39) 32 32 32 32 1003 San Juan (41) 7 7 7 7 100
84 84 84 84 100
Dagupan Electric Corp. (DECORP) 1 Calasiao 24 24 24 24 100(Pangasinan) 2 Dagupan City 31 31 31 31 100
3 San Fabian (34) 26 26 26 26 1004 San Jacinto (19) 16 16 16 16 1005 Sta. Barbara 29 29 29 29 1006 Manaoag 26 26 26 26 100
San Carlos City 2 2 2 2 100154 154 154 154 100
Tarlac Electric, Inc. (TEI) 1 City of Tarlac (76) 70 70 70 70 100
Cabanatuan Electric Corp. (CELCOR) 1 Cabanatuan City (89) 87 87 87 87 100 (Nueva Ecija)
Angeles Electric Company (AEC) 1 Angeles City 33 33 33 33 100 (Pampanga) 2 San Fernando City 2 2 2 2 100
35 35 35 35 100
San Fernando Electric Light 1 City of San Fernando (35) 33 32 32 33 100 & Power Company (SFELAPCO) 2 Floridablanca (33) 30 30 30 30 100 (Pampanga) 63 62 62 63 100
Ibaan Electric & Engineering 1 Ibaan 26 26 26 26 100 System, Inc. (IEES)(Batangas)
Panay Electric Company (PECO) 1 Iloilo City 180 180 180 180 100 (Iloilo)
Visayan Electric Company (VECO) 1 Cebu City 80 80 80 80 100 (Cebu) 2 Consolacion 21 21 21 21 100
3 Liloan 14 14 14 14 100 4 Mandaue City 27 27 27 27 100 5 City of Naga 28 28 28 28 100 6 San Fernando 21 21 21 21 100 7 City of Talisay 22 22 22 22 100 8 Minglanilla 19 19 19 19 100
232 232 232 232 100
Mactan Electric Company (MECO) 1 Lapu-Lapu City 30 30 30 30 100 (Cebu) 2 Cordoba 13 13 13 13 100
43 43 43 43 100
Provincial Electric System, Province of 1 Tagbilaran City 15 15 15 15 100 Bohol (PES Bohol)
Cagayan Electric Power & 1 Cagayan de Oro City (80) 66 66 66 66 100 Light Company (CEPALCO) 2 Jasaan (15) 11 11 11 11 100 (Misamis Oriental) 3 Tagoloan 10 10 10 10 100
4 Villanueva 9 9 9 9 100 96 96 96 96 100
Iligan Light & Power Company, Inc. (ILPI) 1 Iligan City 44 44 44 44 100 (Lanao del Norte)
Davao Light & Power Company, Inc. 1 Davao City 182 179 182 182 100 (DLPC) 2 Carmen 20 20 20 20 100 (Davao del Sur) 3 City of Panabo 40 40 40 40 100
4 Sto. Tomas 19 19 19 19 100 5 Braulio E. Dujali 5 5 5 5 100
266 263 266 266 100
Cotabato Light & Power Company, Inc. 1 Cotabato City 37 36 36 37 100 (COLIGHT) Sultan Kudarat 18 18 18 18 100 (Maguindanao) Datu Odin Sinsuat (Dinaig) 13 13 13 13 100
68 67 67 68 100
Total
Total
Total
Total
Total
CoverageEnergized
Other Electric Distribution Utilities
Total
Total
Total
B A R A N G A Y SEDUs MUNICIPALITIES/CITIES
Total
Private Investor-Owned Utilities (PIOUs)
280
STATUS OF ENERGIZATION : (Cumulative)
2007 2008 2009 %
Pantabangan Electric System (PAMES) 1 Pantabangan 9 9 9 9 100(Nueva Ecija)
Public Utilities Department- 1 Olongapo City 17 17 17 17 100Olongapo City (PUD-Olongapo)(Zambales)
Bauan Electric Light System (BELS) 1 Bauan 40 40 40 40 100(Batangas)
Banton Electric System 1 Banton 17 17 17 17 100(Romblon)
Concepcion Electric System 1 Concepcion 9 9 9 9 100(Romblon)
Corcuera Electric System 1 Corcuera 15 15 15 15 100(Romblon)
Claveria Municipal Electric System* 1 Claveria 22 2 2 22 100(Masbate)
Bumbaran Municipal Electric System 1 Bumbaran 17 9 10 10 59(Lanao del Sur)
Western Command - AFP* 1 Kalayaan 1 1 1 1 100(Palawan)
Tongonan Geo-Thermal (PNOC) Kananga 2 2 2 2 100(Kananga, Leyte)
Maripipi Multi Purpose Coop., Inc. (MMPC) 1 Maripipi 15 15 15 15 100(Biliran)
Hilabaan Fishermen's Multi Purpose 1 Dolores 1 1 1 1 100Coop. (HFMPC) (Eastern Samar)
CITY/MUNICIPALITY
Other Electric Distribution Utilities
LGU-Owned Utilities/Other Electric System
LGUs/Others Coverage EnergizedB A R A N G A Y S
281
NEA ORGANIZATIONAL
STRUCTURE
INFORMATION TECHNOLOGY &
COMMUNICATION SERVICES
DEPARTMENT
Roderick N. PaduaOversight
OFFICE OF THE DEPUTY ADMINISTRATOR FOR
CORPORATE RESOURCES & FINANCIAL SERVICES
Mariano T. Cuenco
FINANCE SERVICES
DEPARTMENT
Sonia B. San DiegoDirector
ACCOUNTS MANAGEMENT &
GUARANTEEDEPARTMENT
Leila B. BonifacioDirector
HUMAN RESOURCES &
ADMINISTRATIONDEPARTMENT
Diana M. San LuisDirector
ENGINEERINGDEPARTMENT
Jose H. Seguban,Jr.Director
INSTITUTIONAL DEVELOPMENTDEPARTMENT
Milagros E. QuinajonDirector
Information Technology &
System Development
Division
Shirley J. SalvadorManager
Database Management
& Program Control Division
Ana Rosa D. Papa
Manager
Financial Services &
Accounting Division
Adelina A. Gabon
Manager
Financial Planning &
Control Division
Milagros A. RoblesManager
Treasury Division
Benita T. CuencoManager
Accounts Servicing Division
Lida E. Dela Merced
Manager
Accounts Management
Division
Rosie M. AlamilloManager
Human Resources
Management Division
Angelina M. Ramos
Manager
General Services Division
M.F. Carandang/ E.L. Morales
Manager
Technical Operations
Division
Ferdinand P. Villareal
Manager
Systems Planning& Evaluation
Division
Enrique J. DiamanteManager
Power Development &
Utilization Division
Wilfredo O. BucsitManager
Organization & Management Development
Division
Nora I. RiveraManager
Training & Development
Services Division
Diosdado A. Corsiga
Manager
EDU Consumer Development &
ProtectionDivision
Arnel P. GalarpeManager
Electric Cooperative
Financial Management Audit Division
Isidro E. EdquilaManager
Electric Cooperative Operations
Systems Audit Division
Nixon R. BautistaManager
OFFICE OF THE DEPUTY ADMINISTRATOR FOR FIELD
OPERATIONS/MANAGEMENT ASSISTANCE GROUP
Edilberto I. Bassig
OFFICE OF THE DEPUTY ADMINISTRATOR FOR ELECTRIC DISTRIBUTION UTILITIES SERVICES
Edgardo R. Piamonte
OFFICE OF THE DEPUTY ADMINISTRATOR FOR
LEGAL SERVICES
John Joseph M. Magtuloy
CORPORATE PLANNING OFFICE
Roderick N. PaduaDirector
PUBLIC AFFAIRS OFFICE
Judith T. AlferezDirector
OFFICE OF THE ADMINISTRATOR
Edita S. BuenoAdministrator
BOARD OF ADMINISTRATORS
Office of the Corporate Secretary
Nollie B. Alamillo
Internal Audit & Quality Standards
Management Office
Consolacion E. BalderasDirector
Finance & Special Audit Division
Judy B. ArcillaManager
System Audit & Quality Standards
Division
Jane A. BuenoManager
ELECTRIC COOPERATIVES AUDIT
DEPARTMENT
Veronica B. CruzDirector
Hon. Jose Rene D. Almendras - Chairman (July 2010 – Present)Hon. Jose C. Ibazeta - Chairman (March 2010-June 2010)Hon. Angelo T. Reyes - Chairman (August 2007-March 2010)Hon. Wilfred L. Billena - MemberHon. Jose Victor E. Lobrigo - MemberHon. Joseph D. Khonghun - MemberHon. Edita S. Bueno - Ex-Officio Member
Strategic Planning Division
Francisco A. Caymo
Manager
Rural Electrification
Project Planning & Development
Division
Roderick N. PaduaConcurrent OIC
MAG-Supervisory & Assessment
OfficeAdolben A. Flores
Director
MAG-MINDANAO Team
Benedicto B. PeraltaDirector
MAG-VISACOL Team
Paulino T. LopezDirector
MAG-LUZON Team
Rogelio B. Bernal
Director
MAG-FIT Team
Eddie A. AdlaoDirector
Legal Services
May M. JarangueDirector
Legal Services
Omar M. MayoDirector
Legal Services
Xerxes D. AdzuaraDirector
Editorial Box
Our Advisers . . .
EDITA S. BUENOAdministrator
MARIANO T. CUENCODeputy Administrator for Corporate Resources and Financial Services
RODERICK N. PADUAOversight, Information Technology and Communication Services Department
Our Team . . .
ANA ROSA D. PAPAManager
RHINA H. ANGUE JUSTINO S. CALVEZ EDWIN A. CONCEPCION
DEMOSTHENES EREÑO IRENE C. MARTIN GINA T. QUINDO
LEILANI L. RICO RENATO L. SUBIJANO NIELMA E. VERZOSA
Administrative Staff
BENEDICTO R. DE CHAVEZ JULIET A. OMBROG JONATHAN C. GARCIA
MARC MICHEL C. PELONE DENNIS P. SANTOS JOSEPH M. TRIUNFO
Special thanks to the following :
PUBLIC AFFAIRS OFFICE ENGINEERING DEPARTMENT
INSTITUTIONAL DEVELOPMENT DEPARTMENTHUMAN RESOURCES AND ADMINISTRATION DEPARTMENTACCOUNTS MANAGEMENT AND GUARANTEE DEPARTMENT
INFORMATION TECHNOLOGY AND SYSTEMS DEVELOPMENT DIVISION
For questions and inquiries, please contact :
Database Management and Program Control Division (DMPCD)Telefax No. 928-03-26
Email Address : [email protected]