Source: JMAV Source: B. Kerem Rendering from NW Corner View from SE Project Team Owner: BMPI, LLC GC: John Moriarty and Associates ARCH: Rust Orling Architecture STRUC: Structura Inc. MECH: Mechanical Design Group LTD ELEC: Power Design Inc. CVL: Urban LTD Project Overview Size: 151,000 SF Stories: 10 above grade + 2 below grade Building Height: 99 ft Delivery Method: CM at Risk Contract Type: Negotiated GMP $29,949,641 Construction Dates: 2.11.13 - 2.19.15 Architecture Brick, stone, and metal panel facade 165 high- quality units 10,000 SF public pedestrian park with outdoor pool Amenities include lounge, business center, fitness room, club room and accessible terraces Structural System Cast-in-place concrete Postensioning used starting on second floor Average slab thickness of 8in Mechanical System Centrally located mechanical room Two Rooftop Units (5580 and 6150 CFM) Split system heat pumps condition inviidual units and common areas Electrical System Main electrical room and transformer vault located on G2 level 208/120V Four 100A switchgears supply the 16-20 load centers located on each floor B. Kerem Demirci | Construction Option | Messner https://www.engr.psu.edu/ae/thesis/portfolios/2015/bkd5069/index.html The Apartment Buidling East Coast, USA

Upload: others

Post on 26-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Apartment Buidling - Pennsylvania State University...• Postensioning used starting on second floor • Average slab thickness of 8in Mechanical System • Centrally located mechanical

Source: JMAV

Source: B. Kerem

Rendering from NW Corner

View from SE

Project TeamOwner: BMPI, LLCGC: John Moriarty and AssociatesARCH: Rust Orling ArchitectureSTRUC: Structura Inc.MECH: Mechanical Design Group LTDELEC: Power Design Inc.CVL: Urban LTD

Project OverviewSize: 151,000 SFStories: 10 above grade + 2 below gradeBuilding Height: 99 ftDelivery Method: CM at RiskContract Type: Negotiated GMP $29,949,641Construction Dates: 2.11.13 - 2.19.15

Architecture• Brick, stone, and metal panel facade• 165 high- quality units• 10,000 SF public pedestrian park with outdoor pool• Amenities include lounge, business center, fitness room, club

room and accessible terraces

Structural System• Cast-in-place concrete• Postensioning used starting on second floor• Average slab thickness of 8in

Mechanical System• Centrally located mechanical room• Two Rooftop Units (5580 and 6150 CFM)• Split system heat pumps condition inviidual units and common

areas

Electrical System• Main electrical room and transformer vault located on G2 level• 208/120V• Four 100A switchgears supply the 16-20 load centers located on