Page 1: The first successful concessioner · At the end of 2015, net profit of Batys Transit JSC amounted to 611,793 thous. tenge. In 2015, the volume of electric power transit increased

The first successful concessioner

Page 2: The first successful concessioner · At the end of 2015, net profit of Batys Transit JSC amounted to 611,793 thous. tenge. In 2015, the volume of electric power transit increased

Promoting the development of electric power industry through participating

in the improvement of the structure of the unified power system of

Kazakhstan. Support of the implementation of the state policy in the field of

public-private partnership.

Our mission

Page 3: The first successful concessioner · At the end of 2015, net profit of Batys Transit JSC amounted to 611,793 thous. tenge. In 2015, the volume of electric power transit increased

over the past 10 years implemented:

Concession project about the construction and operation of interregional power transmission line OHL 500 kV “Northern

Kazakhstan – Aktyubinsk region” ($188 million);

Investment project about the construction and operation of two single-circuit power transmission lines OHL 220 kV from

Ulke substation to the MSDS-2 of Kazchrome AFAP ($20 million).

“Batys transit” JSC was registered in the Department of justice of Almaty city Ministry of justice of the Republic of Kazakhstan on

22nd of November, 2005. Shareholders:

“KEGOC” JSC – 20%;

“Mekhenergostroy” Ltd – 80%.

About us

Page 4: The first successful concessioner · At the end of 2015, net profit of Batys Transit JSC amounted to 611,793 thous. tenge. In 2015, the volume of electric power transit increased

About the concession project

On 28th of December, 2005 the Government of the

Republic of Kazakhstan and “Batys transit” JSC

concluded the Concession agreement about the

construction and operation of interregional power

transmission line with the voltage of 500 kV

“Northern Kazakhstan – Aktyubinsk region”.

The Construction was ended in December of 2008;

The length of the power transmission line – 487 km;

The duration of operation according to the concession is from 2009 to 2022 years;

The total amount spent on the construction – USD 188 million;

Financing - infrastructure obligations and loan from Eurasian Development Bank;

The project pays off at the expense of a tariff for services in transfer of the electric power.

500 kV power transmission “Northern Kazakhstan – Aktyubinsk region”

RUSSIA

KAZAKHSTAN

Page 5: The first successful concessioner · At the end of 2015, net profit of Batys Transit JSC amounted to 611,793 thous. tenge. In 2015, the volume of electric power transit increased

About investment project

In February, 2012 “Batys transit” JSC and

“TNC Kazchrome” JSC (ERG) signed a

cooperation agreement on the construction

of two single-circuit 220 kV high-voltage power

transmission lines for the external power supply of

the smelter shop No.4 of Aktyubinsk Ferroalloy

Plant of “TNC Kazchrome” JSC branch.

The volume of the transferred electric power from

this consumer will allow to lower a tariff of the

company for services in transfer of the electric

power. The construction of two high voltage lines of 220 kW was ended in May, 2013;

The length of the power transmission lines – 37 km each;

The capacity – 280 mV;

The total amount of the construction - $ 20 million;

The project pays off at the expense of a tariff for services in transfer of the electric power.

two single-circuit 220 kV high-voltage power transmission lines

RUSSIA

KAZAKHSTAN

Page 6: The first successful concessioner · At the end of 2015, net profit of Batys Transit JSC amounted to 611,793 thous. tenge. In 2015, the volume of electric power transit increased

Over a period from 2011 to 2015, Aktobe region increased the electric power consumption by 23%.

Thus, in 2015, the energy deficiency of the Aktobe region increased by 2% as compared to the previous year and amounted to 36% (1,693,357 thous. kW) of the total energy consumption in the region.

Over a period from 2011 to 2015, there was a significant increase in a share of local content of electric power transmitted through OHL 500 kV of Batys Transit JSC for coverage of the energy deficiency in Aktobe region.

Thus, in 2015, a share of the Russian electric power reduced to 4%, while in 2011 and 2012 it was equal to 30% and 20%, respectively.

During the reporting period, a share of electric power supply to Aktobe region through OHL 500 kV of Batys Transit JSC increased from 21% in 2011 to 34% in 2015.

Analysis of the electric power market of Aktobe region

Page 7: The first successful concessioner · At the end of 2015, net profit of Batys Transit JSC amounted to 611,793 thous. tenge. In 2015, the volume of electric power transit increased

At the end of 2015, net profit of Batys Transit JSC amounted to 611,793 thous. tenge.

In 2015, the volume of electric power transit increased by 16% as compared to the previous year and amounted to 1,620,790 thous. kW.

The line loading reached 54% of its capacity.

The main service consumers of Batys Transit JSC were the following:

Aktobe Ferrous Alloys Plant of Kazchrome TNC JSC with a share of 63%; Don Melting and Processing Plant of Kazchrome TNC JSC – 18%; Aktobeenergosnad LLP – 16%.

Analysis of financial and economic operations

Page 8: The first successful concessioner · At the end of 2015, net profit of Batys Transit JSC amounted to 611,793 thous. tenge. In 2015, the volume of electric power transit increased

The board of directors

Page 9: The first successful concessioner · At the end of 2015, net profit of Batys Transit JSC amounted to 611,793 thous. tenge. In 2015, the volume of electric power transit increased

The management board

Page 10: The first successful concessioner · At the end of 2015, net profit of Batys Transit JSC amounted to 611,793 thous. tenge. In 2015, the volume of electric power transit increased

our professional team will help:

to create, control and develop PPP projects;

to develop the concept, the business plan, financial

and economic model;

to prepare the request and to approve the tariff for

subjects of natural monopoly;

to realize construction or reconstruction of electricity

related facilities;

all other questions regarding to public-private

partnership and concession.

Our services

162-zh, Shevchenko street, Almaty, Kazakhstan; http://www.bttr.kz, e-mail: [email protected]

Page 11: The first successful concessioner · At the end of 2015, net profit of Batys Transit JSC amounted to 611,793 thous. tenge. In 2015, the volume of electric power transit increased

г. Алматы, ул. Шевченко, 162-ж; тел.: +7 727 375 65 14, http://www.bttr.kz, e-mail: [email protected]

New projects (in development)

1. PPP project - the construction and operation of power lines and substation Ishim • Estimated construction time - from March 2017 to August 2018 • The preliminary project cost - 11.0 billion tenge. • Location - Astana • The length of the cable lines - 4 km • The main condition - the presence of experience of PPP projects in the energy sector

2. Construction and operation of power line and substation in Atyrau

• Estimated construction time - from March 2017 to April 2018 • The preliminary cost of the project - 8.0 billion tenge. • Location - Atyrau • The length of the lines - 47 km • The main condition - the presence of experience in conducting energy projects

3. The construction and operation of power line and substation Shalkiya

• Estimated construction time - from September 2017 to November 2018 • The preliminary cost of the project - 3.7 billion tenge. • Location - Kyzylorda • The length of the lines - 18 km • The main condition - the presence of experience in conducting energy projects

Page 12: The first successful concessioner · At the end of 2015, net profit of Batys Transit JSC amounted to 611,793 thous. tenge. In 2015, the volume of electric power transit increased

г. Алматы, ул. Шевченко, 162-ж; тел.: +7 727 375 65 14, http://www.bttr.kz, e-mail: [email protected]

Joint implementation of the projects

Types of required investments:

1. Attraction of credit. Borrower - "Batys

transit". The investor receives a fixed

income.

2. Attraction of investors in the capital of

JSC "Batys transit" (common shares). The

investor will receive dividends from

retained earnings of the year.

3. Attract investors to the capital of JSC

"Batys transit" (preferred shares). The

investor receives a fixed income.