the ilcta_mdb horizontal test stand for srf cavities andy hocker fnal-td aem, 25-jun-2007
TRANSCRIPT
A. Hocker, 25-JUN-2007 AEM 2
Surface Processing
Cavity Fabrication
Vertical Testing
Cavity Dressing
Surface Processin
g
Horizontal Testing
Cold String Assembly
Pass!
Pass!
Fail!
Fail!
Horizontal Testing --- Context
A. Hocker, 25-JUN-2007 AEM 3
MDB: Lay of the Land
Horizontal test area for ILC
RF Hut Vertical Test area for HINS
A. Hocker, 25-JUN-2007 AEM 4
HTS Cave and RF Hut
300 kW klystron
charging supply modulator
WG switch
Horizontal Test Cryostat (HTC)
LHe/LN2 feed can
RF waveguide (1.3 and 3.9 GHz)
High power pulsed RF system (operated w/ CC2 for > 1 yr)
A. Hocker, 25-JUN-2007 AEM 5
Typical HTS test cycle
• Install cavity in HTC• Warm, off-resonance coupler conditioning
(high pulsed power processing)• Cooldown to 1.8 K• On-resonance conditioning of coupler/cavity
• Map out Q0 vs Eacc curve
• Test new widgets, etc.• Warmup• Remove cavity• Goal: ~10 day turnaround
Geophones (ILC CM vibration R&D)
A. Hocker, 25-JUN-2007 AEM 6
C22 prep (“dressing”)
Installation of cold part of input coupler at CAF-MP9 clean room
Cavity tuner installation
Ready to install in HTCInstallation of warm part of input coupler
A. Hocker, 25-JUN-2007 AEM 7
First measurement at HTS
• Room-temperature measurement of fundamental passband modes
• Zoom of “pi-mode” (accelerating mode)
A. Hocker, 25-JUN-2007 AEM 8
Status and plans
• Struggling with cavity cooldown– Identified a leaky liquid level probe as culprit, repairing
this week, go for cooldown again
• Finishing up RF distribution/interlock checkout– Installing WG shutters to allow for multi-cave (HTS and
CC2) configuration– Finishing up safety paperwork, final walk-through soon
• After RF checkout, begin commissioning– Execute HTS test cycle (~1 month)
• Declare open for business– First customer: FNAL third-harmonic (3.9 GHz) cavity for
DESY’s FLASH facility– 1.3 GHz cavities for first US-built ILC CM as schedule
allows