the koffler institute
DESCRIPTION
ÂTRANSCRIPT
Client:
UNIVERSITY OF TORONTO
172 Saint George Street
Toronto, ON
M5R 0A3
Contractor:
BIRD CONSTRUCTION CO.
Suite 206, 5405 Eglinton Ave. W.
Etobicoke, ON
M9C 5KR
Structural:
BANERJEE & ASSOCIATES LTD.
206 Town Centre Blvd, Suite 102
Markham, ON
L3R 8H8
Mechanical & Electrical:
MCW CONSULTANTS LTD.
156 Front Street. W. Suite 600
Toronto, ON
M5J 2L6
Civil & Landscape:
MMM GROUP
100 Commerce Valley Dr. W.
Thornhill, ON
L3T 0A1
N S MODERN DESIGNS
123 Fake Street
Faketown, ON
Prepared by:
Shawn Aguilera
Neil Singh
Nirvani Sohan
SHERIDAN COLLEGE
Faculty of Applied Science
& Technology
Architectural Technology
Architectural Studio 4
ARCH 30043
Winter 2014
V. Picicci
Item
1
Name of Practice:
N S Modern Designs123 Fake StreetFaketown, ON
Name of Project:
Koffler InstituteUniversity of Toronto
Location:
569 Spadina CrescentToronto, ONM5S 2J7Canada
Ontario Building Code 2012Data Matrix Parts 3 or 9
Building Code Reference
ProjectDescription:
Major Occupancy:
Building Area (m²):
Gross Area:
Number ofStoreys:Number of Streets/ Access Routes: 3
Building Classification(s):
Sprinkler System Proposed:
Standpipe Required:
Fire Alarm Required:
Water Service/ Supply is Adequate:
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
High Building: 3.2.6.
Permitted Construction:
Barrier-free Design:
Actual Construction:
Mezzanine(s) Area (m²): N/A
Occupant Load based on:
Hazardous Substances:
Required FireResistanceRating(F.R.R.)
18
19 Spatial Separation - Construction of Exterior Walls
20 Plumbing Fixture Requirements:
21 Others:
11.1 to 11.4 1.1.2.[ A ] 1.1.2.[ A ] & 9.10.1.3.
Part 11 Part 3 Part 9New
Addition
AlterationChange of Use
A B C D E F
New 695 Total 695Existing N/A
New 1990 Total 1990Existing N/A
Below Grade 1Above Grade 3
3.2.2.24.
Entire Building
Selected Compartments
Selected Floor Areas
Basement
Not Required
in lieu of Roof Rating
Yes No
Yes No
Yes No
Yes No
Non-CombustibleCombustible Both
Non-CombustibleCombustible Both
Design of Buildingm²/person
Basement Load N/AOccupancy N/A persons
1st Floor Load 230Occupancy A persons
2nd Floor Load 150Occupancy A persons
3rd Floor Load 100Occupancy D/ A persons
Yes No (Explain)
Yes No
Horizontal AssembliesF.R.R. (Hours)
Listed Design No.or Description (SG-2)
F.R.R. of SupportingMembers
Listed Design No.or Description (SG-2)
WallArea of
EBF (m²)L.D.(m)
L/H orH/L
PermittedMax.% ofOpenings
Proposed %of Openings
F.R.R.(Hours)
ListedDesign or
Description
Comb.Constr.
Comb. Constr.Nonc. Cladding
Non-comb.Constr.
Part 3 Part 9
Building Code Reference
OccupantLoad
BC TableNumber
FixturesRequired
FixturesProvided
Basement:Occupancy N/A
Occupancy
Occupancy A2
Occupancy
Occupancy A2
Occupancy
Occupancy A2
Occupancy D
1st Floor:
2nd Floor:
3rd Floor:
3.1.2.1.(1) 9.10.2.
1.4.1.2. [ A ]
1.4.1.2. [ A ]
1.4.1.2. [ A ] & 9.10.4.
9.10.20.
9.10.2.
9.10.8.2.
INDEX
N/A
9.10.18.
N/A
N/A
9.10.6.
9.10.4.1.
9.9.1.3.
9.5.2.
9.10.1.3.(4)
9.10.8.
9.10.9.
9.10.14.
1.4.1.2. [ A ]
1.4.1.2. [ A ]
1.4.1.2. [ A ] &3.2.1.1.3.2.2.10. & 3.2.5.
3.2.2.20.-.83.
3.2.2.20.-.83
INDEX
3.2.9.
3.2.4.
3.2.5.7.
3.2.6.
3.2.2.20.-.83
3.2.1.1.(3)-(8)
3.1.17.
3.8.
3.3.1.2. & 3.3.1.19.
3.2.2.20.-.83
3.2.1.4.
3.2.3.
3.2.1.5.
3.2.2.17.
Male/ Female Count @ 50% / 50%
References are to Division B unless noted[A] for Division A or [C] for Division C
3.2.2.53.
230
150
86
14
3.7.4.3.(15)
3.7.4.3.(15)
3.7.4.3.(15)
3.7.4.7.(2)
4 6
2 6
2 4
1 2
3.7.4.3.(15)
3.7.4.3.(15)
3.7.4.3.(15)
3.7.4.7.(2)
Floors 1 Hour
Roof 0 Hour
Mezzanine N/A
Floors 1 Hour
Roof 1 Hour
Mezzanine N/A
UL Des G262
UL Des P255
N/A
UL Des X528 ULC Des O503
UL Des X528 ULC Des O503
N/A
2.5North
East
South
West
5.0
5.3
4.2
1 Hour
1 Hour
1 Hour
1 Hour
Yes
Yes
Yes
Yes
No
No
No
No
No
No
No
No
388
388
431
445
>3:1
30%
>3:1
>3:1
>3:1
40%
40%
16% 7%
23%
17%
27%
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
GENERAL NOTES:
SHEET DATE:
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
N. Singh S. Aguilera N. Sohan
V. Picicci
A001
University of Toronto: Koffler Institute
569 Spadina AvenueToronto ON
M5S 2J7
OBC Matrix & Sheet List
03/24/2014
Drawing List
SheetNumber Sheet Name
Sheet IssueDate Drawn By
A000 Cover 04/06/14 N. Singh S. Aguilera N. Sohan
A001 OBC Matrix & Sheet List 03/24/2014 N. Singh S. Aguilera N. Sohan
A002 Partition Schedule 03/24/14 N. Singh S. Aguilera N. Sohan
A003 Site Plan 04/13/14 N. Singh S. Aguilera N. Sohan
A004 Basement & Ground FloorFire Safety Diagram
04/12/14 Neil Singh
A005 Second Floor Fire SafetyDiagram
04/12/14 Shawn Aguilera
A006 Third Floor Fire SafetyDiagram
04/12/14 Nirvani Sohan
A101 Ground Floor Plan &Partial Basement Plan
03/23/2014 Neil Singh
A102 Second Floor Plan 03/23/2014 Shawn Aguilera
A103 Third Floor 03/23/2014 Nirvani Sohan
A111 Ground Floor ReflectedCeiling Plan
04/05/14 Neil Singh
A112 Second Floor ReflectedCeiling Plan
04/05/14 Shawn Aguilera
A113 Third Floor ReflectedCeiling Plan
04/05/14 Nirvani Sohan
A201 East Elevation 03/23/14 Neil Singh
A202 South Elevation 03/23/14 Nirvani Sohan
A203 West Elevation 03/23/14 Shawn Aguilera
A204 North Elevation 03/23/14 N. Singh S. Aguilera N. Sohan
A301 Building Section A 03/23/14 N. Singh S. Aguilera N. Sohan
A302 Building Section B 03/23/14 N. Singh S. Aguilera N. Sohan
A303 Building Section C 03/23/14 N. Singh S. Aguilera N. Sohan
A303a Partial Section C-1 04/01/14 N. Singh S. Aguilera N. Sohan
A303b Partial Section C-2 04/01/14 N. Singh S. Aguilera N. Sohan
A310 Wall Sections 03/30/14 N. Singh S. Aguilera N. Sohan
A311 Wall Sections 04/12/14 N. Singh S. Aguilera N. Sohan
A501 Section Details 04/12/14 N. Singh S. Aguilera N. Sohan
A502 Section Details 04/12/14 N. Singh S. Aguilera N. Sohan
A601 Door Schedule 04/12/14 N. Singh S. Aguilera N. Sohan
A602 Room Finish Schedule 04/12/14 N. Singh S. Aguilera N. Sohan
A700 Partial Stair Plans 03/24/2014 N. Singh S. Aguilera N. Sohan
A701 Stair No. 1 03/30/14 N. Singh S. Aguilera N. Sohan
A702 Stair No.2 03/31/14 N. Singh S. Aguilera N. Sohan
A703 Stair No. 3 03/31/14 N. Singh S. Aguilera N. Sohan
No. Description Date
EXTERIOR MASONRYCAVITY WALL w/BANDING
P1:
90mm FACE BRICK25mm AIR SPACE50mm EXTRUDED POLYSTYRENE
RIGID INSULATION190mm CONCRETE MASONRY UNITS
VAPOUR BARRIER25mm METAL FURRING13mm GYPSUM WALL BOARD
EXTERIOR CONCRETECAVITY WALLP2:
90mm FACE BRICK25mm AIR SPACE50mm EXTRUDED POLYSTYRENE
RIGID INSULATION190mm CAST-IN-PLACE CONCRETE
VAPOUR BARRIER
EXTERIOR CONCRETECAVITY WALL w/oBANDING
P3:
90mm FACE BRICK25mm AIR SPACE50mm EXTRUDED POLYSTYRENE
RIGID INSULATION190mm CAST-IN-PLACE CONCRETE
VAPOUR BARRIER
EXTERIOR DOUBLEMASONRY CAVITYWALL
P4:
90mm FACE BRICK25mm AIR SPACE
AIR BARRIER50mm EXTRUDED POLYSTYRENE
RIGID INSULATION190mm CONCRETE MASONRY UNITS50mm EXTRUDED POLYSTYRENE
RIGID INSULATION25mm AIR SPACE90mm FACE BRICK
EXTERIOR DOUBLE MASONRYCAVITY WALL w/ BANDINGP4a:
90mm FACE BRICK25mm AIR SPACE
AIR BARRIER50mm EXTRUDED POLYSTYRENE
RIGID INSULATION190mm CONCRETE MASONRY UNITS50mm EXTRUDED POLYSTYRENE
RIGID INSULATION25mm AIR SPACE90mm FACE BRICK
CONCRETE BANDINGBEAMP5:
90mm FACE BRICK25mm AIR SPACE50mm EXTRUDED POLYSTYRENE
RIGID INSULATION190mm CAST-IN-PLACE CONRETE
EXTERIOR WASHROOMWALLP6:
90mm FACE BRICK25mm AIR SPACE50mm EXTRUDED POLYSTYRENE
RIGID INSULATION190mm CONCRETE MASONRY UNITS
VAPOUR BARRIER5mm CERAMIC WALL TILE
TYPICAL INTERIORPARTITIONP7:
13mm GYPSUM WALL BOARD140mm METAL STUDS13mm GYPSUM WALL BOARD
2HRS INTERIOR FIRESEPARATION WALLP8:
13mm GYPSUM WALL BOARD25mm METAL FURRING190mm CONCRETE MASONRY UNITS25mm METAL FURRING13mm GYPSUM WALL BOARD
2HRS INTERIOR FIRESEPARATION, ONE SIDE FINISHP9:
13mm GYPSUM WALL BOARD25mm METAL FURRING190mm CONCRETE MASONRY UNITS
2HRS INTERIOR FIRESEPARATION WALL w/CERAMIC TILE FINISH
P9a:
13mm GYPSUM WALL BOARD25mm METAL FURRING190mm CAST-IN-PLACE CONCRETE5mm CERAMIC WALL TILE
STRUCTURALWASHROOM WALLP10:
190mm CONCRETE MASONRY UNITS5mm CERAMIC WALL TILE
TYPICAL PLUMBINGWALLP11:
5mm CERAMIC WALL TILE13mm GYPSUM WALL BOARD89mm METAL STUDS400mm AIR SPACE89mm METAL STUDS13mm GYPSUM WALL BOARD5mm CERAMIC WALL TILE
LAVATORY PLUMBINGWALLP12:
190MM CAST-IN-PLACE CONCRETE140mm METAL STUDS13mm GYPSUM WALL BOARD5mm CERAMIC WALL TILE
LAVATORY PLUMBINGWALL, FINSIH ON E.F.P12a:
13mm GYPSUM WALL BOARD25mm METAL FURRING190mm CAST-IN-PLACE CONCRETE140mm METAL STUDS13mm GYPSUM WALL BOARD
340mm EXTERIOR INSULATEDFOUNDATION WALLP14:
VAPOUR BARRIER340mm CAST-IN-PLACE CONCRETE
DAMPPROOFING MEMBRANE50mm EXPANDED POLYSTYRENE
RIGID INSULATION
200mm INTERIORBASEMENT WALLP15:
200mm CONCRETE MASONRY UNITS
200mm FOUNDATIONWALLP16:
200mm CAST-IN-PLACE CONCRETE
200mm EXTERIOR INSULATEDFOUNDATION WALLP17:
VAPOUR BARRIER200mm CAST-IN-PLACE CONCRETE
DAMP PROOFING MEMBRANE50mm EXPANDED POLYSTYRENE
RIGID INSULATION
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
GENERAL NOTES:
SHEET DATE:
1 : 20
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
N. Singh S. Aguilera N. Sohan
V. Picicci
A002
University of Toronto: Koffler Institute
569 Spadina AvenueToronto ON
M5S 2J7
Partition Schedule
03/24/14
1 : 20
PARTITION SCHEDULE
No. Description Date
ZONING INFORMATION
ZONING CR 3.0
LOT 569
ADDRESS 569 SPADINA AVENUE
AREA OF PROPERTY 1139 SQ. M
AREA
BASEMENT
GROUND 685 SQ M.
SECOND 695 SQ M.
THIRD 610 SQ M.
GROSS FLOOR AREA 1990 SQ M.
TOTAL AREA ACADEMIC USE 697 SQ M.
LANDSCAPE AREA 122 SQ. M.
PAVED AREA 322 SQ. M.
LOADING SPACES EAST
ZONE 1
ZONE 2 ZONE 3
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
CONSTRUCTION NORTH TRUE NORTH
KEY PLAN:
GENERAL NOTES:
SHEET DATE:
1 : 200
D:\0214-004\0214-004_A-3D_Model_30043.rvtD:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
N. Singh S. Aguilera N. Sohan
V. Picicci
A003
University of Toronto: Koffler Institute569 Spadina Avenue
Toronto ONM5S 2J7
Site Plan
04/13/14
No. Description Date
1 : 200
SITE PLAN1
UP
UP DN
UP
A204
1
A2011
A203 1
A202
1
A B
B
C
C
D E
F
G
H
J K
L
X
11
22
3
4
5
6
8
9
10
11
7
Y
17 m²
PROJECTION ROOM
111
21 m²
MECH. ROOM
110
8 m²
ELEC. ROOM
112
193 m²
AUDITORIUM
114
Occ. Load = 177
38 m²
STUDENT LOUNGE
104
Occ. Load = 20
25 m²
MAIN ENTRANCE
101
8 m²
WEST ENTRANCE
103 105 m²
MAIN CORRIDOR
113
84 m²
CLASSROOM 1
102
Occ. Load= 31
7 m²
SERVERY
105
Occ. Load = 27 m²
STORAGE
106
5 m²
JANITOR'S CLOSET
108
13 m²
M.W.R.
107
13 m²
W.W.R
109
SKYLIGHTABOVE
27 / 1000
35.
9m
GR
EA
TES
T D
IAG
ON
AL
DIS
TA
NC
E
DISTANCE BETWEEN EXITS = 19m
28.3m
28.4m
28.4m
18.7m
25.1m
WALK OFF GRILLE
WALK OFF GRILLE
R @24 175.0 mm
STAIR NO.2
STAIR NO. 1
STAIR NO. 3
1
A302
1
A301
1
A303
1
A701
1
A702
1
A703
1
A303a
2
A311
542855 4221 989 10004 1559 2244 4093 2845
1559
1559
1510
9483
4221
1397
2200
3736
2720
4981
1397
4620
4620
9799
8557
880
00.0 m
TRAVEL PATH TO EXIT
TRAVEL DISTANCE TO EXIT
1-HR F.R.R.
NOTES:
FLOOR ASSEMBLIES WILL HAVE 1HR FIRERESISTANCE RATING
DOORS IN FIRE RATED WALLS SHALL HAVE A F.R.R.OF 45MINS AND BE EQUIPPED WITH A MECHANICALCLOSING DEVICE
VISION PANES IN FIRE RATED DOORS SHALL BE WITHGEORGIAN WIRE GLASS
OCCUPANT LOAD INDICATED BASED ON SEATINGSCHEDULE PROVIDED BY OWNER
FIRE SAFETY LEGEND:
G H J K L
1
2
4
5
6
18 m²
MECHANICAL ROOM
003
18 m²
ELEC. & DATA ROOM
002
7 m²
MACHINE ROOM
004
44 m²
STORAGE ROOM
005
21 m²
CORRIDOR
001
15.9m
15.5m
1
A302
1
A701
ZONE 1
ZONE 2 ZONE 3
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
CONSTRUCTION NORTH TRUE NORTH
KEY PLAN:
GENERAL NOTES:
SHEET DATE:
As indicated
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
Neil Singh
V. Picicci
A004
University of Toronto: Koffler Institute569 Spadina Avenue
Toronto ONM5S 2J7
Basement & Ground Floor Fire Safety Diagram
04/12/14
1 : 100
GROUND FLOOR F.S.D.1
No. Description Date
1 : 100
BASEMENT F.S.D.2
DN
UP
UP
UP
DN
A B
B
C
C
D E
F
G
H
J K
L
X
1
2
3
4
5
8
9
10
11
7
Y
105 m²
SEMINAR ROOM 3
205
Occ. Load = 44
103 m²
SEMINAR ROOM 2
204
Occ. Load = 44
51 m²
CONFERENCE ROOM
207
Occ. Load = 27
78 m²
SEMINAR ROOM 1
202
Occ. Load = 34
24 m²
DECK
206
6 m²
CLOSET
203
13 m²
M.W.R
209
12 m²
W.W.R
208
R @24 175.0 mm
R @24 175.0 mm
97 m²
CORRIDOR
201
10 m²
ELEC. ROOM
210
8 m²
STORAGE
211
R @24 175.0 mm
STAIR NO. 2
5 m²
JANITOR'S CLOSET
212
STAIR NO. 1
STAIR NO. 3
35.4
m
GR
EATEST D
IAG
ON
AL
DIS
TAN
CE
29.0 m
24.4 m
DIS
TAN
CE B
ETW
EEN
EXIT
S=2
4.4
m
14.8 m
19.3m
1
A302
1
A301
1
A303
1
A701
1
A702
1
A703
1
A303a
00.0 m
TRAVEL PATH TO EXIT
TRAVEL DISTANCE TO EXIT
1-HR F.R.R.
NOTES:
FLOOR ASSEMBLIES WILL HAVE 1HR FIRERESISTANCE RATING
DOORS IN FIRE RATED WALLS SHALL HAVE A F.R.R.OF 45MINS AND BE EQUIPPED WITH A MECHANICALCLOSING DEVICE
VISION PANES IN FIRE RATED DOORS SHALL BE WITHGEORGIAN WIRE GLASS
OCCUPANT LOAD INDICATED BASED ON SEATINGSCHEDULE PROVIDED BY OWNER
FIRE SAFETY LEGEND:
ZONE 1
ZONE 2 ZONE 3
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
CONSTRUCTION NORTH TRUE NORTH
KEY PLAN:
GENERAL NOTES:
SHEET DATE:
As indicated
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
Shawn Aguilera
V. Picicci
A005
University of Toronto: Koffler Institute569 Spadina Avenue
Toronto ONM5S 2J7
Second Floor Fire Safety Diagram
04/12/14
1 : 100
SECOND FLOOR F.S.D.1
No. Description Date
DN
UP
A204
1
A2011
A203 1
A202
1
A B
B
C
C
D E
F
G
H
J K
L
X
1
2
3
4
5
6
8
9
10
11
7
Y
A B
B
C
C
D E
F
G
H
J K
L
X
1
2
3
4
5
6
8
9
10
11
12
7
4x
Y
R @24 175.0 mm
STAIR NO.2
R @24 175.0 mm
STAIR NO. 1
86005975
7025
134 m²LIBRARY
317
Occ. Load = 72
31 m²MECH. ROOM
301
13 m²OFFICE
302
Occ. Load=1
13 m²OFFICE
303
Occ. Load=1
13 m²OFFICE
304
Occ. Load=1
35 m²OPEN OFFICE AREA
305
Occ. Load=5
16 m²OFFICE
306
Occ. Load=2
11 m²OFFICE
307
Occ. Load=1
12 m²OFFICE
308
Occ. Load=1
13 m²W.W.R
309
13 m²M.W.R
310
5 m²J.C
311
21 m²MAIL ROOM
313
Occ. Load=2
LOBBY
314
SOUTH FOYER
315
NORTH FOYER
316
28 m²STUDENT LOUNGE
312
Occ. Load=15
22.4m
ONE-H
ALF OF E
XIT D
ISTANCE
35.9
mEXIT
DIS
TANCE
22.6m
11.4m
14.4m
19.5m26.2m
23.6m
15m
BELOW
1
A302
1
A301
1
A303
1
A701
1
A702
1
A303a
00.0 m
TRAVEL PATH TO EXIT
TRAVEL DISTANCE TO EXIT
1-HR F.R.R.
NOTES:
FLOOR ASSEMBLIES WILL HAVE 1HR FIRERESISTANCE RATING
DOORS IN FIRE RATED WALLS SHALL HAVE A F.R.R.OF 45MINS AND BE EQUIPPED WITH A MECHANICALCLOSING DEVICE
VISION PANES IN FIRE RATED DOORS SHALL BE WITHGEORGIAN WIRE GLASS
OCCUPANT LOAD INDICATED BASED ON SEATINGSCHEDULE PROVIDED BY OWNER
FIRE SAFETY LEGEND:
ZONE 1
ZONE 2 ZONE 3
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
CONSTRUCTION NORTH TRUE NORTH
KEY PLAN:
GENERAL NOTES:
SHEET DATE:
As indicated
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
Nirvani Sohan
V. Picicci
A006
University of Toronto: Koffler Institute569 Spadina Avenue
Toronto ONM5S 2J7
Third Floor Fire Safety Diagram
04/12/14
1 : 100
THIRD FLOOR F.S.D.1
No. Description Date
UP
UP DN
UP
A204
1
A2011
A203 1
A202
1
A B
B
C
C
D E
F
G
H
J K
L
X
11
22
3
4
5
6
8
9
10
11
7
Y
542855 4221 989 10004 1559 2244 4093 2845
1559
1559
1510
9483
4221
1397
2200
3736
2720
4981
1397
4620
4620
9799
8557
880
R 2890
17 m²
PROJECTION ROOM
111
21 m²
MECH. ROOM
110
8 m²
ELEC. ROOM
112
193 m²
AUDITORIUM
114
Occ. Load = 177
38 m²
STUDENT LOUNGE
104
Occ. Load = 20
25 m²
MAIN ENTRANCE
101
8 m²
WEST ENTRANCE
103 105 m²
MAIN CORRIDOR
113
84 m²
CLASSROOM 1
102
Occ. Load= 31
7 m²
SERVERY
105
Occ. Load = 27 m²
STORAGE
106
5 m²
JANITOR'S CLOSET
108
13 m²
M.W.R.
107
13 m²
W.W.R
109
108
110
109
107
111
103
118
117
104
112
114113115
102
105106
P2
P4
P1
P1P3
P1
P3
P3
P3P3
P3
P1
P1
P1
P3
P3
P3P1
P1
P1 P6 P2P2
P7
P9
P9
P7
P7
P9
P9
P9
P9
P9
P9
P9
P9
P12
P11
P12
P10
P7
P7
P10
P9
P10
P10
P7
P9
P9
P9
P9
P9
0
200
350
500
650
27 / 1000
-1750
-2200
-1900
-1600
-1300
-1000
-700
-400-100
200
50
-250
-550
-850
-1150
-1450
-1750
-2050
393 4316 6001100
1060 TYP.
6347230
2730340 3249
6183534
345 2655 355
155 1
830
385
2055
895
230
4627
1972
1950
1950
3438
7777
1690
7044
7887
1900
706
750
449626172655
318
299 1
900
870
2700 1781 915 1647 915 584
P7
1404 915373 370
1830170
2862
1118 915 710
266
2888
3383
266
2737
W02
W02
W01
W01
501 7
00
1291
3486
R 2503
1772
341
1730
341
1772
520
700
C1
101
8129
R @24 175.0 mm
STAIR NO.2
STAIR NO. 1
119
STAIR NO. 3
C1
C1
116
C1
1
A302
1
A301
1
A303
2
A700
5
A700
1
A701
1
A702
1
A703
1
A303a
2
A311
G J K L
1
2
4
5
6
003 002
001
005
004
18 m²
MECHANICAL ROOM
003
18 m²
ELEC. & DATA ROOM
002
7 m²
MACHINE ROOM
004
44 m²
STORAGE ROOM
005
21 m²
CORRIDOR
001
P15P15
P15 P15
P14
P14
P14
P14
P14
P14
P17
P14
P14
P14 P14
P15
P15
P16
P16
P16
P15 P16
1
A302
R @23 139.1 mm
1559 2244 4093 2845 1640
3736
2720
4981
1397
3697 200 3674 200 2550 440
11968
2797 200 1695 200 4467 762
200 440
4951
200
900
200
1
A700
1
A701
ZONE 1
ZONE 2 ZONE 3
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
CONSTRUCTION NORTH TRUE NORTH
KEY PLAN:
GENERAL NOTES:
SHEET DATE:
1 : 100
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
Neil Singh
V. Picicci
A101
University of Toronto: Koffler Institute569 Spadina Avenue
Toronto ONM5S 2J7
Ground Floor Plan & Partial Basement Plan
03/23/2014 1 : 100
GROUND FLOOR1
No. Description Date
1 : 100
BASEMENT PLAN2
DN
UP
UP
UP
DN
A B
B
C
C
D E
F
G
H
J K
L
X
1
2
3
4
5
8
9
10
11
7
Y
105 m²
SEMINAR ROOM 3
205
Occ. Load = 44
103 m²
SEMINAR ROOM 2
204
Occ. Load = 44
51 m²
CONFERENCE ROOM
207
Occ. Load = 27
78 m²
SEMINAR ROOM 1
202
Occ. Load = 34
24 m²
DECK
206
6 m²
CLOSET
203
13 m²
M.W.R
209
12 m²
W.W.R
208
212
213
205
208
201
202
203
211
209
207
210
W01
W01
W01
W01
W01W01
P2
P2
P1
P1
P3
P3
P1
P3P9
P8
P7
P12
P3
P1
P3
P3
P7
P3
P3
P4
P4
P9
P9
P9
P7
P7
P9
P7P7
P9
P11
P10
P10
P4P4a
P1
P4
P2
P9
P10
P9
P7
P6
P2
P9
P9
P3
P3
R @24 175.0 mm
R @24 175.0 mm
97 m²
CORRIDOR
201
10 m²
ELEC. ROOM
210
8 m²
STORAGE
211
R @24 175.0 mm
2864
8987
266327
00
11749
1392
23739224
2946
2238
6192
10796
61905606
5654 6324
3406
8353
2454
1111
2327
3641
1110
2946
7305
2605
7866
1450
1842
4641
1688
1500
1510
2238
2725
1472 4551
2854
2560
P12a
P9a
P8
P9
P9
5 m²
JANITOR'S CLOSET
212
1326
1326
49595760
R 3140
P9P9
P9
P9
P94400
4400
1775
4400
4400
2300
9849
4400
4400
2825
4400
W02
W02
204
206
214
1
A302
1
A301
1
A303
3
A700
6
A700
1
A701
1
A702
1
A703
1
A303a
ZONE 1
ZONE 2 ZONE 3
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
CONSTRUCTION NORTH TRUE NORTH
KEY PLAN:
GENERAL NOTES:
SHEET DATE:
1 : 100
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
Shawn Aguilera
V. Picicci
A102
University of Toronto: Koffler Institute569 Spadina Avenue
Toronto ONM5S 2J7
Second Floor Plan
03/23/2014
1 : 100
SECOND FLOOR1
No. Description Date
DN
UP
A204
1
A2011
A203 1
A202
1
A B
B
C
C
D E
F
G
H
J K
L
X
1
2
3
4
5
6
8
9
10
11
7
Y
R @24 175.0 mm
STAIR NO.2
R @24 175.0 mm
STAIR NO. 1
86005975
7025
134 m²LIBRARY
317
Occ. Load = 72
31 m²MECH. ROOM
301
13 m²OFFICE
302
Occ. Load=1
13 m²OFFICE
303
Occ. Load=1
13 m²OFFICE
304
Occ. Load=1
35 m²OPEN OFFICE AREA
305
Occ. Load=5
16 m²OFFICE
306
Occ. Load=2
11 m²OFFICE
307
Occ. Load=1
12 m²OFFICE
308
Occ. Load=1
13 m²W.W.R
309
13 m²M.W.R
310
5 m²J.C
311
21 m²MAIL ROOM
313
Occ. Load=2
LOBBY
314
SOUTH FOYER
315
NORTH FOYER
316
305
303
302
315
316
301
307
308 309 310
317
306
313
304
311
W01
W01
W01W01
W01
W01
W01
W01
W01
W01
W01
W02
W02
P1
P2
P6
P1
P1
P1
P1
P1
P7
P7
P9
P9
P7
P7
P9
P1
P10
P12
P7
P7
P7P7
P7
C1
P10 P10
P10
P7
P11
C1
P9 P8
P8
P2C1
C1
P2
P1
P7 P9
P7
P1
P2
P1 P2
P9
P8
P10
P8
P1
C1
C1
P2
99844910
2830
2725
2900
4731
2837
2807
1021
2238
900 2278
3201
2203 2682
2653
5640 1900 2252
850
1900
2768 1137 1900 1114
P9
443900
1955
1042
2480
1333
1544900
3705
P9
P9
P9
P9
1307
1251
2855
2032
2833
4329
2890
1117
28 m²STUDENT LOUNGE
312
Occ. Load=15
P9
314
P9
3340
312
P6
P9
4903
3075
900
900
900
165
170
4282
4621
755
1
A302
1
A301
1
A303
4
A700
7
A700
1
A701
1
A702
1
A303a
ZONE 1
ZONE 2 ZONE 3
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
CONSTRUCTION NORTH TRUE NORTH
KEY PLAN:
GENERAL NOTES:
SHEET DATE:
1 : 100
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
Nirvani Sohan
V. Picicci
A103
University of Toronto: Koffler Institute569 Spadina Avenue
Toronto ONM5S 2J7
Third Floor
03/23/2014 1 : 100
THIRD FLOOR1
No. Description Date
A204
1
A2011
A203 1
A202
1
A B
B
C
C
D E
F
G
H
J K L
X
1
2
3
4
5
6
8
9
10
11
11
7
Y
AUDITORIUM
114
MECH. ROOM
110
W.W.R
109 M.W.R.
107
JANITOR'S CLOSET
108
SERVERY
105 STORAGE
106
STUDENT LOUNGE
104
MAIN ENTRANCE
101
WEST ENTRANCE
103
MAIN CORRIDOR
113
ELEC. ROOM
112
PROJECTION ROOM
111
MECH. ROOM
110
CLASSROOM 1
102
450 x 260 OPEN ENDRETURN AIR DUCT INCEILING SPACE
400 x 200 RETURN AIROPENINGS ABOVE CEILING
2-500 x 380 OPEN END RETURNAIR DUCT IN CEILING SPACE
500
x 48
0 S
UPPLY
AIR
SHAFT
IN S
LAB C
/W F
IRE D
AM
PERS
500 x 460 OPEN ENDDUCT IN CEILING SPACE
400 x 200 RETURN AIR OPENINGS ABOVE CEILING
500
x 50
0 RETU
RN A
IR O
PENIN
GS
IN S
LAB C
/W F
IRE D
AMPER
S
A.F.F.
GWB on Mtl Stud
3300 mm
U/N
A.F.F.
600 x 1200mm GRID
3300 mm
1
A302
1
A301
1
A303
1
A701
1
A702
1
A703
1
A303a
2
A311
MECHANICAL
ELECTRICAL
FIRE PROTECTION
WASHROOM EXHAUST REGISTER
600 x 600 SQUARE SUPPLY DIFFUSER
300 x 300 SQUARE SUPPLY DIFFUSER
600 x 600 SQUARE RETURN REGISTER
DUCT OPENING IN CEILING SPACE
FLAT ROUND CEILING LIGHT
EMERGENCY LIGHT w/ EXIT SIGN
INTERIOR ASYMMETRICAL LIGHTWALL SCONE
EXTERIOR UPLIGHT WALL SCONE
1200 TWO-LAMP LINEAR PENDANTLIGHT
LINEAR VALANCE WASHROOMLIGHTING
UPRIGHT CEILING MOUNTEDSPRINKLER HEAD
LIGHTING FIXTURES NOTES:
ALL WALL MOUNTED EMERGENCY LIGHTING HEADS SHALLBE MOUNTED 2400mm A.F.F. UNLESS OTHERWISE NOTED.
ALL STAIRWELL WALL MOUNTED SCONES SHALL BEMOUNTED 2400mm A.F.F. UNLESS OTHERWISE NOTED.
ALL ROTUNDA UPLIGHTING SHALL BE MOUNTED 4400mmA.F.F. UNLESS OTHERWISE NOTED.
ALL SERVICE ROOM LIGHTING SHALL BE SUSPENDED AT2400mm A.F.F. UNLESS OTHERWISE NOTED
RCPs LEGEND
G H J K L
1
2
4
5
6
Y
MECHANICAL ROOM
003
ELEC. & DATA ROOM
002
STORAGE ROOM
005
CORRIDOR
001
MACHINE ROOM
004
A.F.F.
Exposed Ceiling (Unfinished)
2400 mm
1
A302
1
A701
ZONE 1
ZONE 2 ZONE 3
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
CONSTRUCTION NORTH TRUE NORTH
KEY PLAN:
GENERAL NOTES:
SHEET DATE:
As indicated
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
Neil Singh
V. Picicci
A111
University of Toronto: Koffler Institute569 Spadina Avenue
Toronto ONM5S 2J7
Ground Floor Reflected Ceiling Plan
04/05/14
1 : 100
GROUND FLOOR1
No. Description Date
1 : 100
BASEMENT2
A204
1
A2011
A203 1
A202
1
A B
B
C
C
D E
F
G
H
J K
L
X
1
2
3
4
5
6
8
9
10
11
V
714
Y
450 x 230 OPEN ENDRETURN AIR DUCT INCEILING SPACE
500 x 300 OPENEND DUCT INCEILING SPACE
500 x 300 OPENEND DUCT INCEILING SPACE
DECK
206
CONFERENCE ROOM
207
M.W.R
209
W.W.R
208
CORRIDOR
201
CLOSET
203
SEMINAR ROOM 2
204
SEMINAR ROOM 3
205
STORAGE
211
JANITOR'S CLOSET
212
ELEC. ROOM
210
350 x 250 OPENEND DUCT INCEILING SPACE
340 x 300 UP SANITARYEXHAUST DUCT UP C/WFIRE DAMPER IN SLAB
SEMINAR ROOM 1
202
1
A302
1
A301
1
A303
1
A701
1
A702
1
A703
1
A303a
MECHANICAL
ELECTRICAL
FIRE PROTECTION
WASHROOM EXHAUST REGISTER
600 x 600 SQUARE SUPPLY DIFFUSER
300 x 300 SQUARE SUPPLY DIFFUSER
600 x 600 SQUARE RETURN REGISTER
DUCT OPENING IN CEILING SPACE
FLAT ROUND CEILING LIGHT
EMERGENCY LIGHT w/ EXIT SIGN
INTERIOR ASYMMETRICAL LIGHTWALL SCONE
EXTERIOR UPLIGHT WALL SCONE
1200 TWO-LAMP LINEAR PENDANTLIGHT
LINEAR VALANCE WASHROOMLIGHTING
UPRIGHT CEILING MOUNTEDSPRINKLER HEAD
LIGHTING FIXTURES NOTES:
ALL WALL MOUNTED EMERGENCY LIGHTING HEADS SHALLBE MOUNTED 2400mm A.F.F. UNLESS OTHERWISE NOTED.
ALL STAIRWELL WALL MOUNTED SCONES SHALL BEMOUNTED 2400mm A.F.F. UNLESS OTHERWISE NOTED.
ALL ROTUNDA UPLIGHTING SHALL BE MOUNTED 4400mmA.F.F. UNLESS OTHERWISE NOTED.
ALL SERVICE ROOM LIGHTING SHALL BE SUSPENDED AT2400mm A.F.F. UNLESS OTHERWISE NOTED
RCPs LEGEND
ZONE 1
ZONE 2 ZONE 3
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
CONSTRUCTION NORTH TRUE NORTH
KEY PLAN:
GENERAL NOTES:
SHEET DATE:
As indicated
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
Shawn Aguilera
V. Picicci
A112
University of Toronto: Koffler Institute569 Spadina Avenue
Toronto ONM5S 2J7
Second Floor Reflected Ceiling Plan
04/05/14
1 : 100
SECOND FLOOR1
No. Description Date
A204
1
A2011
A203 1
A202
1
A B
B
C
C
D E
F
G
H
J K L
L
X
1
2
3
4
5
6
8
9
10
11
7
Y
500 X 1080RETURN AIRDUCT
EXHAUST OPENINGIN ROOF TO EXHAUST FAN
500 X 1060RETURN AIR DUCT 500 X 1060
SUPPLY AIR DUCT
500 X 1060SUPPLY AIRSHAFTFROM ROOF
LIBRARY
317
OFFICE
302
OFFICE
303
OFFICE
304
OPEN OFFICE AREA
305
OFFICE
306
OFFICE
307
OFFICE
308
W.W.R
309
M.W.R
310
MAIL ROOM
313
STUDENT LOUNGE
312
MECH. ROOM
301
J.C
311
500 X 200OPEN ENDRETURN AIR DUCT
400 X 200OPEN ENDRETURN AIR DUCT
500 X 200OPEN ENDRETURN AIR DUCT
400 X 200OPEN ENDRETURN AIR DUCT
1
A302
1
A301
1
A303
1
A303a
MECHANICAL
ELECTRICAL
FIRE PROTECTION
WASHROOM EXHAUST REGISTER
600 x 600 SQUARE SUPPLY DIFFUSER
300 x 300 SQUARE SUPPLY DIFFUSER
600 x 600 SQUARE RETURN REGISTER
DUCT OPENING IN CEILING SPACE
FLAT ROUND CEILING LIGHT
EMERGENCY LIGHT w/ EXIT SIGN
INTERIOR ASYMMETRICAL LIGHTWALL SCONE
EXTERIOR UPLIGHT WALL SCONE
1200 TWO-LAMP LINEAR PENDANTLIGHT
LINEAR VALANCE WASHROOMLIGHTING
UPRIGHT CEILING MOUNTEDSPRINKLER HEAD
LIGHTING FIXTURES NOTES:
ALL WALL MOUNTED EMERGENCY LIGHTING HEADS SHALLBE MOUNTED 2400mm A.F.F. UNLESS OTHERWISE NOTED.
ALL STAIRWELL WALL MOUNTED SCONES SHALL BEMOUNTED 2400mm A.F.F. UNLESS OTHERWISE NOTED.
ALL ROTUNDA UPLIGHTING SHALL BE MOUNTED 4400mmA.F.F. UNLESS OTHERWISE NOTED.
ALL SERVICE ROOM LIGHTING SHALL BE SUSPENDED AT2400mm A.F.F. UNLESS OTHERWISE NOTED
RCPs LEGEND
ZONE 1
ZONE 2 ZONE 3
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
CONSTRUCTION NORTH TRUE NORTH
KEY PLAN:
GENERAL NOTES:
SHEET DATE:
As indicated
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
Nirvani Sohan
V. Picicci
A113
University of Toronto: Koffler Institute569 Spadina Avenue
Toronto ONM5S 2J7
Third Floor Reflected Ceiling Plan
04/05/14
1 : 100
THIRD FLOOR1
No. Description Date
GROUND FLOOR
200
SECOND FLOOR
4400
12345689
THIRD FLOOR
8600
T/O STEEL DECK
12800
T/O PARAPET
13588
T/O ROTUNDA
17859
GRADE
0
W01
W02
101
W01
118 115
M1M1M1
PC
P2P1P1
P1 P3 P1
W01
W02
W01
P2
B1 B1 B1
M1B2
M1B2
M1B2
CP CP
W01W02 W02
W01
116
P1
P1 P1
P1 P2
1
A302
1
A301
T/O BASEMENT FOOTING
-3800
T/O BASEMENT SLAB
-3000
1
A702
1
A703
B2
CP
M1
PC
B1 90mm BRICK VENEER COURSE
90mm BRICK VENEER SOLDIER COURSE
SPANDREL COPPER PANEL
200mm CONCRETE MASONRY UNITS
PRE CAST CONRETE
MATERIAL LEGEND:
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
GENERAL NOTES:
SHEET DATE:
1 : 100
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
Neil Singh
V. Picicci
A201
University of Toronto: Koffler Institute
569 Spadina AvenueToronto ON
M5S 2J7
East Elevation
03/23/14
1 : 100
EAST ELEVATION1
No. Description Date
GROUND FLOOR
200
SECOND FLOOR
4400
A B C D E G H J K L
THIRD FLOOR
8600
T/O STEEL DECK
12800
T/O PARAPET
13588
T/O ROTUNDA
17859
GRADE
0
M1 M1 M1 M1W01
P3P9P9
P1 P1 P3 P3
W01
P3P3
M1B2 B2
M1
W01 W01 W01 W01 W01 W01
1
A303
T/O BASEMENT FOOTING
-3800
T/O BASEMENT SLAB
-3000
1
A701
1
A303a
B2
CP
M1
PC
B1 90mm BRICK VENEER COURSE
90mm BRICK VENEER SOLDIER COURSE
SPANDREL COPPER PANEL
200mm CONCRETE MASONRY UNITS
PRE CAST CONRETE
MATERIAL LEGEND:
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
GENERAL NOTES:
SHEET DATE:
1 : 100
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
Nirvani Sohan
V. Picicci
A202
University of Toronto: Koffler Institute
569 Spadina AvenueToronto ON
M5S 2J7
South Elevation
03/23/14
1 : 100
SOUTH ELEVATION1
No. Description Date
GROUND FLOOR
200
SECOND FLOOR
4400
1 2 3 4 5 6 8 9
THIRD FLOOR
8600
T/O STEEL DECK
12800
T/O PARAPET
13588
T/O ROTUNDA
17859
GRADE
0
P1 P1P3
PC
M1M1 M1
106
P1P3 P3 P1P3P3
W01 W01
P4
P4a
213212
M1B2
M1B2
M1B2
W01 W01 W01 W01 W01 W01
1
A302
1
A301
T/O BASEMENT FOOTING
-3800
T/O BASEMENT SLAB
-3000
1
A702
1
A703
B2
CP
M1
PC
B1 90mm BRICK VENEER COURSE
90mm BRICK VENEER SOLDIER COURSE
SPANDREL COPPER PANEL
200mm CONCRETE MASONRY UNITS
PRE CAST CONRETE
MATERIAL LEGEND:
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
GENERAL NOTES:
SHEET DATE:
1 : 100
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
Shawn Aguilera
V. Picicci
A203
University of Toronto: Koffler Institute
569 Spadina AvenueToronto ON
M5S 2J7
West Elevation
03/23/14
1 : 100
WEST ELEVATION1
No. Description Date
GROUND FLOOR
200
SECOND FLOOR
4400
ABCDEGHJKL
THIRD FLOOR
8600
T/O STEEL DECK
12800
T/O PARAPET
13588
T/O ROTUNDA
17859
GRADE
0
M1 M1
P4 P6 P1
P6 P1P1 P2
P3
212 213
W01 W01
M1
M1B2
W01
1
A303
T/O BASEMENT FOOTING
-3800
T/O BASEMENT SLAB
-3000
1
A701
1
A303a
B2
CP
M1
PC
B1 90mm BRICK VENEER COURSE
90mm BRICK VENEER SOLDIER COURSE
SPANDREL COPPER PANEL
200mm CONCRETE MASONRY UNITS
PRE CAST CONRETE
MATERIAL LEGEND:
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
GENERAL NOTES:
SHEET DATE:
1 : 100
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
N. Singh S. Aguilera N. Sohan
V. Picicci
A204
University of Toronto: Koffler Institute
569 Spadina AvenueToronto ON
M5S 2J7
North Elevation
03/23/14
1 : 100
NORTH ELEVATION1
No. Description Date
GROUND FLOOR
200
SECOND FLOOR
4400
A B C D E G H J K L
THIRD FLOOR
8600
T/O STEEL DECK
12800
T/O PARAPET
13588
T/O ROTUNDA
17859
GRADE
0
1
A303
T/O BASEMENT FOOTING
-3800
T/O BASEMENT SLAB
-3000
OFFICE
304
MAIN CORRIDOR
113
WEST ENTRANCE
103
MAIN ENTRANCE
101
1
A701
304 307
308W01 W01
204
205 211
102112108107105106
A.F.F.
600 x 1200mm grid
3300 mm A.F.F.
Gypsum Ceiling
3300 mm
A.F.F.
GWB on Mtl Stud
3300 mm
A.F.F.
600 x 600mm grid
3300 mm
788
1600
2200
4200
800
3200
600
CORRIDOR
201
713
175
900
1200
2100
165
350
385
1192
2108
165
300
435
1090
2210
200
1800
1250
600
600
600
700
200
2200
700
800
500
2200
700
800
1000
2800
200
1550
300
1350
250
600
1087
3390
810
5415
2110
175
1550
250
300
300
1550
300
600
3200
1
A303a
1
A310
P1
P3
P3
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
GENERAL NOTES:
SHEET DATE:
1 : 50
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
N. Singh S. Aguilera N. Sohan
V. Picicci
A301
University of Toronto: Koffler Institute
569 Spadina AvenueToronto ON
M5S 2J7
Building Section A
03/23/14
1 : 50
SECTION A1
No. Description Date
GROUND FLOOR
200
SECOND FLOOR
4400
A B C D E G
H
J K L
THIRD FLOOR
8600
T/O STEEL DECK
12800
T/O PARAPET
13588
GRADE
0
1
A303
T/O BASEMENT FOOTING
-3800
T/O BASEMENT SLAB
-3000
CONFERENCE ROOM
207
SEMINAR ROOM 3
205
SEMINAR ROOM 2
204
AUDITORIUM
114
MECH. ROOM
110
MAIN CORRIDOR
113
SERVERY
105
STORAGE
106
CORRIDOR
001
MACHINE ROOM
004
LIBRARY
317
1
A701
C1
308 310
208211213
112
001004
W01 W01
A.F.F.
600 x 1200mm grid
3300 mm A.F.F.
600 x 1200mm grid
3300 mmA.F.F.
Gypsum Ceiling
3300 mm
A.F.F.
600 x 1200mm grid
3300 mmA.F.F.
?
?A.F.F.
600 x 1200mm grid
3300 mmA.F.F.
600 x 1200mm grid
3300 mm
A.F.F.
GWB on Mtl Stud
3300 mmA.F.F.
GWB on Mtl Stud
3300 mmA.F.F.
GWB on Mtl Stud
3300 mm
002
118117
4588
788
900
3300
900
900
2700
600
892
2108
200
250
600
192
810
1268
1219
813
697
3503
1500
200
300
1850
3300
1075
1090
2210
165
735
1090
2210
140
760
1090
2210
200
892
2108
200
250
600
1
A303a
2
A310
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
GENERAL NOTES:
SHEET DATE:
1 : 50
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
N. Singh S. Aguilera N. Sohan
V. Picicci
A302
University of Toronto: Koffler Institute
569 Spadina AvenueToronto ON
M5S 2J7
Building Section B
03/23/14
1 : 50
SECTION B1
No. Description Date
GROUND FLOOR
200
SECOND FLOOR
4400
12389 7
THIRD FLOOR
8600
T/O STEEL DECK
12800
T/O PARAPET
13588
GRADE
0
1
A302
1
A301
T/O BASEMENT FOOTING
-3800
T/O BASEMENT SLAB
-3000
LIBRARY
317OFFICE
302
OFFICE
303
OFFICE
304
SEMINAR ROOM 2
204
AUDITORIUM
114
WEST ENTRANCE
103 ELEC. ROOM
112
DECK
206
SEMINAR ROOM 3
205
1
A702
1
A703
W01 W01C1
W01
W01 W01
106
212
A.F.F.
600 x 1200mm grid
3300 mm
A.F.F.
GWB on Mtl Stud
3300 mm
A.F.F.
600 x 1200mm grid
3300 mm A.F.F.
600 x 1200mm grid
3300 mm
A.F.F.
600 x 1200mm grid
3300 mm A.F.F.
600 x 1200mm grid
3300 mm
R @24 175.0 mm
R @24 175.0 mm
R @24 175.0 mm
1075
700
650
900
700
2200
1950
0400
4110
300
200
1500
1
A311
1011
OPEN OFFICE AREA
305
OFFICE
307
A.F.F.
600 x 1200mm grid
3300 mm
A.F.F.
600 x 1200mm grid
3300 mm
A.F.F.
600 x 1200mm GRID
3300 mm
317
W01
CLASSROOM 1
102
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
GENERAL NOTES:
SHEET DATE:
1 : 100
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
N. Singh S. Aguilera N. Sohan
V. Picicci
A303
University of Toronto: Koffler Institute
569 Spadina AvenueToronto ON
M5S 2J7
Building Section C
03/23/14
1 : 100
SECTION C1
No. Description Date
GROUND FLOOR
200
SECOND FLOOR
4400
12389 7
THIRD FLOOR
8600
T/O STEEL DECK
12800
T/O PARAPET
13588
GRADE
0
1
A302
1
A301
T/O BASEMENT FOOTING
-3800
T/O BASEMENT SLAB
-3000
1
A702
1
A703
LIBRARY
317
OFFICE
302
OFFICE
303
OFFICE
304
SEMINAR ROOM 2
204
AUDITORIUM
114
WEST ENTRANCE
103
ELEC. ROOM
112
DECK
206SEMINAR ROOM 3
205
W01 W01
C1
W01
W01 W01
106
212
A.F.F.
600 x 1200mm grid
3300 mm
A.F.F.
GWB on Mtl Stud
3300 mm
A.F.F.
600 x 1200mm grid
3300 mm A.F.F.
600 x 1200mm grid
3300 mm
A.F.F.
600 x 1200mm grid
3300 mm A.F.F.
600 x 1200mm grid
3300 mm
R @24 175.0 mm
R @24 175.0 mm
R @24 175.0 mm
1075
700
650
900
700
2200
1950
0400
4110
300
200
1500
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
GENERAL NOTES:
SHEET DATE:
1 : 50
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
N. Singh S. Aguilera N. Sohan
V. Picicci
A303a
University of Toronto: Koffler Institute
569 Spadina AvenueToronto ON
M5S 2J7
Partial Section C-1
04/01/14
1 : 50
SECTION C-11
No. Description Date
1011
OPEN OFFICE AREA
305
OFFICE
307
A.F.F.
600 x 1200mm grid
3300 mm
A.F.F.
600 x 1200mm grid
3300 mm
A.F.F.
600 x 1200mm GRID
3300 mm
317
W01
2
A501
CLASSROOM 1
102
SEMINAR ROOM 1
202
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
GENERAL NOTES:
SHEET DATE:
1 : 50
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
N. Singh S. Aguilera N. Sohan
V. Picicci
A303b
University of Toronto: Koffler Institute
569 Spadina AvenueToronto ON
M5S 2J7
Partial Section C-2
04/01/14
1 : 50
SECTION C-21
No. Description Date
GROUND FLOOR200
SECOND FLOOR4400
C
THIRD FLOOR8600
T/O STEEL DECK12800
T/O PARAPET13588
GRADE0
OFFICE304
WEST ENTRANCE103 GROUND FLOOR
200
SECOND FLOOR4400
A B C
THIRD FLOOR8600
T/O STEEL DECK12800
T/O PARAPET13588
GRADE0
T/O BASEMENT FOOTING-3800
T/O BASEMENT SLAB-3000
AUDITORIUM114
SEMINAR ROOM 2204
LIBRARY317
1A502
1A501
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
GENERAL NOTES:
SHEET DATE:
1 : 20
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
N. Singh S. Aguilera N. Sohan
V. Picicci
A310
University of Toronto: Koffler Institute569 Spadina Avenue
Toronto ONM5S 2J7
Wall Sections
03/30/14 1 : 20WALL SECTION A
1 1 : 20WALL SECTION B
2
No. Description Date
GROUND FLOOR200
SECOND FLOOR4400
12
THIRD FLOOR8600
T/O STEEL DECK12800
T/O PARAPET13588
GRADE0
T/O BASEMENT FOOTING-3800
T/O BASEMENT SLAB-3000
AUDITORIUM114
DECK206
SEMINAR ROOM 3205
LIBRARY317
1800
3288
900
2230
670
400
677
3523
1950
650
2150
300
GROUND FLOOR200
GRADE0
3A502
2A502
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
GENERAL NOTES:
SHEET DATE:
1 : 20
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
N. Singh S. Aguilera N. Sohan
V. Picicci
A311
University of Toronto: Koffler Institute569 Spadina Avenue
Toronto ONM5S 2J7
Wall Sections
04/12/14
1 : 20WALL SECTION C
1
1 : 20WALL SECTION D
2
No. Description Date
C
T/O STEEL DECK
12800
T/O PARAPET
13588
50mm GRAVEL4 PLY BUILT UP ROOF MEMBRANE75mm RIGID INSULATION38mm METAL DECKINGC/W 90mm CONCRETE TOPPINGW FLANGE BEAM
BLOCKING
CANT STRIP
BASE FLASHING
CAP FLASHING
COUNTER FLASHING
ANCHOR BOLT
CONCRETE COPING
SECOND FLOOR
4400
11
90mm BRICK VENEER25mm AIR SPACE
AIR BARRIER50mm RIGID INSULATION
190mm CONCRETE MASONRY UNITSVAPOUR BARRIER
25mm METAL FURRING13mm GYPSUM WALL BOARD
BRICK TIE
LINTEL BEAM
BRICK REVEAL COURSE
W FLANGE BEAM
38mm STEEL DECKING C/W90mm CONCRETE TOPPING
BRICK SOLDIER COURSE
13mm GYPSUM WALL BOARD SUSPENDEDCEILING ON 25mm METAL FURRING
REBAR
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
GENERAL NOTES:
SHEET DATE:
1 : 5
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
N. Singh S. Aguilera N. Sohan
V. Picicci
A501
University of Toronto: Koffler Institute
569 Spadina AvenueToronto ON
M5S 2J7
Section Details
04/12/14
1 : 5
PARAPET AT THIRD FLOOR ROOF1
1 : 5
EXTERIOR WALL AT SECOND FLOOR2
No. Description Date
GROUND FLOOR
200
A
GRADE
0
390mm FIBRE REINFORCED POUREDCONCRETE FOUNDATION WALL
BASE COURSEMETAL FLASHING
90mm BRICK VENEER25mm AIR SPACE
AIR BARRIER50mm RIGID INSULATION
190mm CONCRTE MASONRY UNITSVAPOUR BARRIER
25mm METAL FURRING13mm GYPSUM WALL BOARD
DOWEL
BACKFILL
WEEPING COURSE
50mm RIGID INSULATION
BRICK TIE
90mm BRICK VENEER25mm AIR SPACEAIR BARRIER50mm RIGID INSULATION190mm CONCRETE MASONRY UNITSVAPOUR BARRIER25mm METAL FURRING13mm GYPSUM WALL BOARD
BRICK BEYOND
METAL FLASHING
WINDOW HEAD FRAME
REVEAL BRICK COURSE
GLAZING
REINFORCEDLINTEL BEAM
L ANGLE
13mm GYPSUM WALL BOARD25mm METAL FURRING
VAPOUR BARRIER190mm CONCRETE MASONRY UNITS
50mm RIGID INSULATIONAIR BARRIER
25mm AIR SPACE90mm CONCRTE MASONRY UNITS
GLAZING
CONCRETE MASONRYUNITS BEYOND
BRICK TIE
BRICK BEYOND
WINDOW SILL FRAME
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
GENERAL NOTES:
SHEET DATE:
1 : 5
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
N. Singh S. Aguilera N. Sohan
V. Picicci
A502
University of Toronto: Koffler Institute
569 Spadina AvenueToronto ON
M5S 2J7
Section Details
04/12/14
1 : 5
EXTERIOR WALL AT FOUNDATION1
1 : 5
WINDOW HEAD AT PUNCHED OPENING2
1 : 5
WINDOW SILL AT PUNCHED OPENING3
No. Description Date
Door Schedule
Mark
Door Frame Hardware
DoorType
Level Description Hinge Height Width Thickness Material Glazing Finish Fire Rating Type Height Width Thickness Material Finish Lockset Finish Closer Floor Stop Vision Pane Kick Plate Comments
001 19 Basement 0762 x 2032mm RH 2032 762 38 Composite Core Yes Paint 45 mins 19 2082 812 115 Aluminium Paint Knob Lock Stainless Yes None Georgian Wire Yes None
002 19 Basement 0762 x 2032mm LH 2032 762 38 Composite Core No Paint 45 mins 19 2082 812 115 Aluminium Paint Knob Lock Stainless No None No No None
003 19 Basement 0762 x 2032mm LH 2032 762 38 Composite Core No Paint 45 mins 19 2082 812 115 Aluminium Paint Knob Lock Stainless No None No No None
004 19 Basement 0762 x 2032mm RH 2032 762 38 Composite Core No Paint 45 mins 19 2082 812 115 Aluminium Paint Knob Lock Stainless No None No No None
005 19 Basement 0762 x 2032mm RH 2032 762 38 Composite Core No Paint 45 mins 19 2082 812 115 Aluminium Paint Knob Lock Stainless No None No No None
101 27 Ground Floor Store Front Double Door LHR/RHR 2385 1700 45 Georgian Wire Yes N/A 45 mins 27 2435 1750 150 Aluminium Brushed Panic Bar Brushed Yes Door Mounted N/A Yes Weatherstrip
102 29 Ground Floor 1730 x 2032mm LHR/RHR 2032 1730 45 Glass Yes N/A None 29 2082 1780 115 Aluminium Brushed Panic Bar Brushed Yes Door Mounted N/A Yes None
103 15 Ground Floor 0915 x 2134mm LH 2134 915 38 Composite Core No Wood Veneer 45 mins 15 2184 965 115 Aluminium Brushed Pull + Push Plate Brushed Yes Wall Mounted No No None
104 15 Ground Floor 0915 x 2134mm LHR 2134 915 38 Composite Core Yes Wood Veneer 45 mins 15 2184 965 115 Aluminium Brushed Panic Bar Brushed Yes Door Mounted Georgian Wire Yes None
105 27 Ground Floor Store Front Double Door LHR/RHR 2070 1850 45 Glass Yes N/A None 27 2120 1900 115 Aluminium Brushed Panic Bar Brushed Yes Door Mounted N/A Yes None
106 27 Ground Floor Store Front Double Door LHR/RHR 2365 1810 45 Georgian Wire Yes N/A 45 mins 27 2415 1860 150 Aluminium Brushed Panic Bar Brushed Yes None N/A Yes Weatherstrip
107 15 Ground Floor 0915 x 2134mm RH 2134 915 38 Composite Core No Wood Veneer 45 mins 15 2184 965 115 Aluminium Brushed Knob Lock Brushed Yes Wall Mounted No No None
108 26 Ground Floor 1830 x 2134mm LHR/RHR 2134 1830 38 Composite Core No Wood Veneer 45 mins 26 2184 1880 115 Aluminium Brushed Panic Bar Brushed Yes Door Mounted No Yes None
109 15 Ground Floor 0915 x 2134mm RH 2134 915 38 Composite Core No Wood Veneer None 15 2184 965 115 Aluminium Brushed Knob Lock Brushed No Wall Mounted No No None
110 26 Ground Floor 1830 x 2134mm LHR/RHR 2134 1830 38 Composite Core No Wood Veneer 45 mins 26 2184 1880 115 Aluminium Brushed Panic Bar Brushed Yes Door Mounted No Yes None
111 15 Ground Floor 0915 x 2134mm LH 2134 915 38 Composite Core No Wood Veneer None 15 2184 965 115 Aluminium Brushed Knob Lock Brushed Yes Door Mounted No No None
112 15 Ground Floor 0915 x 2134mm RH 2134 915 38 Composite Core No Wood Veneer 45 mins 15 2184 965 115 Aluminium Brushed Pull + Push Plate Brushed Yes Floor Mounted No Yes Louvered Insert
113 15 Ground Floor 0915 x 2134mm RH 2134 915 38 Composite Core No Wood Veneer 45 mins 15 2184 965 115 Aluminium Brushed Knob Lock Brushed Yes Door Mounted No No None
114 15 Ground Floor 0915 x 2134mm RH 2134 915 38 Composite Core No Wood Veneer 45 mins 15 2184 965 115 Aluminium Brushed Pull + Push Plate Brushed Yes Floor Mounted No Yes Louvered Insert
115 15 Ground Floor 0915 x 2134mm RH 2134 915 38 Composite Core Yes Wood Veneer 45 mins 15 2184 965 115 Aluminium Brushed Panic Bar Brushed Yes Door Mounted Georgian Wire Yes None
116 37 Ground FloorM_Curtain Wall Sgl
GlassLHR 2075 900 45 Glazing Georgian Wire N/A 45 mins 37 2125 950 150 Aluminum Brushed Panic Bars Brushed Yes Wall Mounted Yes Yes Weatherstrip
117 19 Ground Floor 0762 x 2032mm LH 2032 762 38 Hollow Core Yes Wood Veneer None 19 2082 812 115 Aluminium Brushed Passage Brushed No Floor Mounted Yes Yes None
118 15 Ground Floor 0915 x 2134mm LH 2134 915 38 Composite Core No Paint 45 mins 15 2184 965 150 Aluminium Paint Knob Lock Brushed No Door Mounted No No Weatherstrip
119 33 Ground FloorM_Curtain Wall Sgl
GlassRHR 2085 1037 45 Georgian Wire Georgian Wire N/A 45 mins 33 2135 1087 150 Aluminium Brushed Panic Bar Brushed Yes N/A Georgian Wire Yes Weatherstrip
201 22 Second Floor 0915 x 2134mm LH 2134 915 38 Composite Core Yes Paint 45 mins 22 2184 965 115 Aluminium Brushed Panic Bar Brushed Yes Wall Mounted Georgian Wire Yes None
202 15 Second Floor 0915 x 2134mm LH 2134 915 38 Composite Core Yes Wood Veneer 45 mins 15 2184 965 115 Aluminium Brushed Lever Brushed Yes Floor Mounted Georgian Wire No None
203 26 Second Floor 0915 x 2032mm LHR 2032 915 38 Composite Core Yes Wood Veneer 45 mins 26 2082 965 115 Aluminium Brushed Pull + Push Plate Brushed Yes Floor Mounted Georgeian Wire No None
204 26 Second Floor 0915 x 2032mm RH 2032 915 38 Composite Core Yes Wood Veneer 45 mins 26 2082 965 115 Aluminium Brushed Pull + Push Plate Brushed Yes Floor Mounted Georgian Wire No None
205 15 Second Floor 0915 x 2134mm RH 2134 915 38 Composite Core No Wood Veneer 45 mins 15 2184 965 115 Aluminium Brushed Knob Lock Brushed Yes Wall Mounted No No None
206 26 Second Floor 0915 x 2032mm LH 2032 915 38 Composite Core Yes Wood Veneer 45 mins 26 2082 965 115 Aluminium Brushed Pull + Push Plate Brushed Yes Floor Mounted Georgian Wire No None
207 15 Second Floor 0915 x 2134mm RH 2134 915 38 Hollow Core No Wood Veneer None 15 2184 965 115 Aluminium Brushed Knob Lock Brushed No Floor Mounted No No None
208 22 Second Floor 0915 x 2134mm RHR 2134 915 38 Hollow Core No Wood Veneer None 22 2184 965 115 Aluminium Brushed Lever Brushed No Wall Mounted No No None
209 15 Second Floor 0915 x 2134mm LH 2134 915 38 Composite Core No Wood Veneer 45 mins 15 2184 965 115 Aluminium Brushed Pull + Push Plate Brushed Yes Wall Mounted No Yes Louvered Insert
210 15 Second Floor 0915 x 2134mm RH 2134 915 38 Composite Core No Wood Veneer 45 mins 15 2184 965 115 Aluminium Brushed Knob Lock Brushed Yes Wall Mounted No No None
211 15 Second Floor 0915 x 2134mm RH 2134 915 38 Composite Core No Wood Veneer 45 mins 15 2184 965 115 Aluminium Brushed Pull + Push Plate Brushed Yes Wall Mounted No Yes Louvered Inset
212 22 Second Floor 0915 x 2134mm RHR 2134 915 38 Composite Core No Painted Metal 45 mins 22 2184 965 150 Aluminium Paint Panic Bar Brushed Yes None No Yes Weatherstrip
213 22 Second Floor 0915 x 2134mm LHR 2134 915 38 Composite Core No Painted Metal 45 mins 22 2184 965 150 Aluminium Paint Panic Bar Brushed Yes None No Yes Weatherstrip
214 26 Second Floor 0915 x 2032mm RH 2032 915 38 Composite Core Yes Paint 45 Mins 26 2082 965 115 Aluminium Brushed Panic Bar Brushed Yes Door Mounted Georgian Wire Yes None
301 22 Third Floor 900mm LHR 2134 900 38 Composite Core Georgian Wire Paint 45 mins 22 2184 950 115 Aluminum Brushed Panic Bars Brushed Yes Wall Mounted Yes Yes None
302 22 Third Floor 900mm RH 2134 900 38 Veneer No Wood Veneer None 22 2184 950 115 Aluminum Brushed Thumb Lock Brushed No Floor Mounted No No None
303 22 Third Floor 900mm LH 2134 900 38 Veneer No Wood Veneer None 22 2184 950 115 Aluminum Brushed Thumb Lock Brushed No Floor Mounted No No None
304 22 Third Floor 900mm LHR 2134 900 38 Veneer No Wood Veneer None 22 2184 950 115 Aluminum Brushed Thumb Lock Brushed No Floor Mounted No No None
305 22 Third Floor 900mm LH 2134 900 38 Veneer No Wood Veneer None 22 2184 950 115 Aluminum Brushed Thumb Lock Brushed No Floor Mounted No No None
306 22 Third Floor 900mm RH 2134 900 38 Composite Core No Paint 45 mins 22 2184 950 115 Aluminum Brushed Knob Lock Brushed Yes Wall Mounted No No None
307 29 Third Floor Store Front Double Door LHR/RHR 2075 1982 38 Glazing Georgian Wire N/A 45 mins 29 2125 2032 115 Aluminum Brushed Lever Brushed No Floor Mounted Yes No None
308 22 Third Floor 900mm LH 2134 900 38 Composite Core No Paint 45 mins 22 2184 950 115 Aluminum Brushed Pull + Push Plate Brushed Yes Floor Mounted No Yes Louvered Insert
309 22 Third Floor 900mm LH 2134 900 38 Composite Core No Paint 45 mins 22 2184 950 115 Aluminum Brushed Lever Brushed Yes Floor Mounted No Yes None
310 22 Third Floor 900mm RH 2134 900 38 Composite Core No Paint 45 mins 22 2184 950 115 Aluminum Brushed Pull + Push Plate Brushed Yes Floor Mounted No Yes Louvered Insert
311 22 Third Floor 900mm LH 2134 900 38 Composite Core Georgian Wire Paint 45 mins 22 2184 950 115 Aluminum Brushed Panic Bars Brushed Yes Wall Mounted Yes Yes None
312 22 Third Floor 900mm RH 2134 900 38 Veneer No Wood Veneer None 22 2184 950 115 Aluminum Brushed Thumb Lock Brushed No Floor Mounted No No None
313 22 Third Floor 900mm RH 2134 900 38 Veneer No Wood Veneer None 22 2184 950 115 Aluminum Brushed Thumb Lock Brushed No Floor Mounted No No None
314 29 Third Floor Store Front Double Door LHR/RHR 2075 1750 38 Glazing Georgian Wire N/A 45 mins 29 2125 2032 115 Aluminum Brushed Lever Brushed No Floor Mounted Yes No None
315 22 Third Floor 900mm RH 2134 900 38 Veneer No Wood Veneer None 22 2184 950 115 Aluminum Brushed Thumb Lock Brushed No Floor Mounted No No None
316 22 Third Floor 900mm LH 2134 900 38 Veneer No Wood Veneer None 22 2184 950 115 Aluminum Brushed Thumb Lock Brushed No Floor Mounted No No None
317 22 Third Floor 900mm RH 2134 900 38 Veneer No Wood Veneer None 22 2184 950 115 Aluminum Brushed Thumb Lock Brushed No Floor Mounted No No None
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
GENERAL NOTES:
SHEET DATE:
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
N. Singh S. Aguilera N. Sohan
V. Picicci
A601
University of Toronto: Koffler Institute
569 Spadina AvenueToronto ON
M5S 2J7
Door Schedule
04/12/14
No. Description Date
Room Finish Schedule
RoomNumber
Level Name Floor AreaOccupant
LoadWall Finish Ceiling Finish Floor Finish Base Finish Trim Finish Comments
001 Basement Corridor 21 m² N/A Unfinished Concrete Exposed Structure Unfinished Concrete None None
002 Basement Electrical & Data Room 18 m² N/A Unfinished Concrete Exposed Structure Unfinished Concrete None None
003 Basement Mechanical Room 18 m² N/A Unfinished Concrete Exposed Structure Unfinished Concrete None None
004 Basement Elevator Machine Room 7 m² N/A Unfinished Concrete Exposed Structure Unfinished Concrete None None
005 Basement Storage 44 m² N/A Unfinished Concrete Exposed Structure Unfinished Concrete None None
101 Ground Floor Main Entrance 25 m² N/A Glazing & Gypsum N/A Ceramic Tile & Walk-off Mat Ceramic Tile Rail Trim
102 Ground Floor Classroom 1 84 m² 31 Gypsum Acoustic Carpet Carpet None
103 Ground Floor West Entrance 8 m² N/A Glazing & Gypsum Gypsum Walk-off Mat Ceramic Tile Rail Trim
104 Ground Floor Student Lounge 38 m² 20 Gypsum Gypsum Ceramic Tile Ceramic Tile None
105 Ground Floor Servery 7 m² 2 Gypsum Gypsum Quarry Tile Quarry Tile None
106 Ground Floor Storage 7 m² N/A Gypsum Gypsum Quarry Tile Quarry Tile None
107 Ground Floor Men's Washroom 13 m² N/A Ceramic Tile Gypsum Quarry Tile Quarry Tile None
108 Ground Floor Janitor's Closet 5 m² N/A Unfinished Concrete Exposed Structure Quarry Tile Quarry Tile None
109 Ground Floor Women's Washroom 13 m² N/A Ceramic Tile Gypsum Quarry Tile Quarry Tile None
110 Ground Floor Mechanical Room 21 m² N/A Unfinished Concrete Exposed Structure Quarry Tile Quarry Tile None
111 Ground Floor Projection Room 17 m² N/A Gypsum Gypsum Quarry Tile Quarry Tile None
112 Ground Floor Electrical Room 8 m² N/A Unfinished Concrete Exposed Structure Unfinished Concrete None None
113 Ground Floor Corridor 105 m² N/A Gypsum Gypsum Ceramic Tile Ceramic Tile Rail Trim & Crown Moulding
114 Ground Floor Auditorium 193 m² 177 Gypsum Gypsum Carpet Carpet Rail Trim & Crown Moulding
201 Second Floor Corridor 97 m² N/A Gypsum Gypsum Carpet Carpet Rail Trim
202 Second Floor Seminar Room 1 78 m² 34 Gypsum Acoustic Carpet Carpet Rail Trim
203 Second Floor Closet 6 m² N/A Gypsum Acoustic Carpet Carpet N/A
204 Second Floor Seminar Room 2 103 m² 44 Gypsum Acoustic Carpet Carpet Rail Trim
205 Second Floor Seminar Room 3 105 m² 44 Gypsum Acoustic Carpet Carpet Rail Trim
206 Second Floor Deck 24 m² N/A Brick N/A Wood N/A N/A
207 Second Floor Conference Room 51 m² 27 Gypsum Acoustic Carpet Carpet Crown Moulding
208 Second Floor Women's Washroom 12 m² N/A Ceramic Tile Gypsum Quarry Tile Quarry Tile N/A
209 Second Floor Men's Washroom 13 m² N/A Ceramic Tile Gypsum Quarry Tile Quarry Tile N/A
210 Second Floor Electrical Room 10 m² N/A Unfinished Unfinished Quarry Tile Quarry Tile N/A
211 Second Floor Storage 8 m² N/A Unfinished Unfinished Quarry Tile Quarry Tile N/A
212 Second Floor Janitor's Closet 5 m² N/A Unfinished Unfinished Quarry Tile Quarry Tile N/A
301 Third Floor Mechanical Room 31 m² N/A Unfinished Concrete Gypsum Unfinished Concrete Quarry Tile N/A
302 Third Floor Office 13 m² 1 Gypsum Acoustic Carpet Carpet Rail
303 Third Floor Office 13 m² 1 Gypsum Acoustic Carpet Carpet Rail
304 Third Floor Office 13 m² 1 Gypsum Acoustic Carpet Carpet Rail
305 Third Floor Open Office Area 35 m² 5 Gypsum and Curtain Acoustic Carpet Carpet Rail
306 Third Floor Office 16 m² 2 Gypsum Acoustic Carpet Carpet Rail
307 Third Floor Office 11 m² 1 Gypsum Acoustic Carpet Carpet Rail
308 Third Floor Office 12 m² 1 Gypsum Acoustic Carpet Carpet Rail
309 Third Floor Women's Washroom 13 m² N/A Ceramic Tile Gypsum Quarry Tile Quarry Tile N/A
310 Third Floor Men's Washroom 13 m² N/A Ceramic Tile Gypsum Quarry Tile Quarry Tile N/A
311 Third Floor Janitor's Closet 5 m² N/A Unfinished Concrete Gypsum Quarry Tile Quarry Tile N/A
312 Third Floor Student Lounge 28 m² 15 Gypsum Acoustic Carpet Carpet Rail
313 Third Floor Mail Room 21 m² 2 Gypsum Acoustic Carpet Carpet N/A
314 Third Floor Lobby 104 m² N/A Gypsum Gypsum Carpet Carpet N/A
315 Third Floor South Foyer N/A N/A Gypsum Gypsum Carpet Carpet N/A
316 Third Floor North Foyer N/A N/A Gypsum Gypsum Carpet Carpet N/A
317 Third Floor Library 134 m² 72 Curtain and Gypsum Acoustic Carpet Carpet N/A
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
GENERAL NOTES:
SHEET DATE:
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
N. Singh S. Aguilera N. Sohan
V. Picicci
A602
University of Toronto: Koffler Institute
569 Spadina AvenueToronto ON
M5S 2J7
Room Finish Schedule
04/12/14
No. Description Date
UP DN
UP
UP DN DN
UPUP UP
UP
J K
1
2
4
115
2655 355
STAIR NO. 1
1000
690
623
1
A701
BC
9
10
104
P3
P9
350
500
650
7044
R @24 175.0 mm
STAIR NO.2
119
C1
1
A303
782
1
A702
J K
1
2
4
R @24 175.0 mm
1450 18
42
STAIR NO. 1
214
1
A701
J K
1
2
4
R @24 175.0 mm
STAIR NO. 1
311P8
2653
1
A701
B C
9
10
P9
P3
P3
P7
R @24 175.0 mm
STAIR NO. 2
25601775
2825
1
A303
1
A702
B C
9
10
R @24 175.0 mm
STAIR NO.2
86005975
7025
317
P9
P2
P2
1544
900
1
A303
1
A702
J K
1
2
4001
P15
P15
P14
P15
1
A701
ZONE 1
ZONE 2 ZONE 3
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
CONSTRUCTION NORTH TRUE NORTH
KEY PLAN:
GENERAL NOTES:
SHEET DATE:
1 : 50
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
N. Singh S. Aguilera N. Sohan
V. Picicci
A700
University of Toronto: Koffler Institute569 Spadina Avenue
Toronto ONM5S 2J7
Partial Stair Plans
03/24/2014
1 : 50STAIR NO.1 1st FLOOR
2
1 : 50STAIR NO.2 1st FLOOR
5
1 : 50STAIR NO.1 2nd FLOOR
3 1 : 50STAIR NO.1 3rd FLOOR
4
1 : 50STAIR NO.2 2nd FLOOR
6 1 : 50STAIR NO.2 3rd FLOOR
7
1 : 50STAIR NO.1 BASEMENT
1
No. Description Date
GROUND FLOOR
200
SECOND FLOOR
4400
1 2 4
THIRD FLOOR
8600
GRADE
0
T/O BASEMENT SLAB
-3000
R @24 175.0 mm
R @24 175.0 mm
4200
4200
3200
R @23 139.1 mm
825
1100
2275
825
1100
2275
291
1100
1809
1100
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
GENERAL NOTES:
SHEET DATE:
1 : 20
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
N. Singh S. Aguilera N. Sohan
V. Picicci
A701
University of Toronto: Koffler Institute
569 Spadina AvenueToronto ON
M5S 2J7
Stair No. 1
03/30/14
1 : 20
STAIR NO. 11
No. Description Date
GROUND FLOOR
200
SECOND FLOOR
4400
THIRD FLOOR
8600
GRADE
0
1
A303
1575
1100
1050
2050
1097
1053
475
1100
4200
4200
R @24 175.0 mm
R @24 175.0 mm
1
A303a
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
GENERAL NOTES:
SHEET DATE:
1 : 20
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
N. Singh S. Aguilera N. Sohan
V. Picicci
A702
University of Toronto: Koffler Institute
569 Spadina AvenueToronto ON
M5S 2J7
Stair No.2
03/31/14
1 : 20
STAIR NO. 21
No. Description Date
GROUND FLOOR
200
SECOND FLOOR
4400
DE
GRADE
0
1
A303
R @24 175.0 mm
2100
2100
W01 W01
213212
1
A303a
SCALE
CHECKED BY:
DRAWN BY:
PROJECT DATE:
PROJECT #:
FILE NAME:
SHEET #:
DRAWING TITLE:
PROJECT INFO:
ARCHITECT'S SEAL:
REVISIONS ISSUED
GENERAL NOTES:
SHEET DATE:
1 : 20
D:\0214-004\0214-004_A-3D_Model_30043.rvt
0214-004
02/11/14
N. Singh S. Aguilera N. Sohan
V. Picicci
A703
University of Toronto: Koffler Institute
569 Spadina AvenueToronto ON
M5S 2J7
Stair No. 3
03/31/14
1 : 20
STAIR NO. 31
No. Description Date