the meg experiment t. mori for the meg collaboration
TRANSCRIPT
The MEG Experiment
T. Morifor the MEG Collaboration
MEG Physics• Clear signal of New Physics
Never occurs in the Standard Model
• SUSY GUT promisingUnification of 3 forces (LEP)
• Solar Neutrino mixing ( - e) is largeSuperKamiokande, SNO, KamLANDSeesaw mechanism
• Muon (g-2) may be SUSY
• And more… e
GUT, m
ICEPP, University of Tokyo Y. Hisamatsu, T. Iwamoto, T. Mashimo, S. Mihara, T. Mori, H. Nishiguchi, W. Ootani, K. Ozone, T. Saeki, R. Sawada, S. Yamada, S. YamashitaKEK, Tsukuba T. Haruyama, A. Maki, Y. Makida, A. Yamamoto, K. Yoshimura
Osaka University Y. Kuno
Waseda University T. Doke, J. Kikuchi, S. Suzuki, K. Terasawa, A. Yamaguchi, T. Yoshimura
Budker Institute, Novosibirsk L.M. Barkov, A.A. Grebenuk, D.G. Grigoriev, B, Khazin, N.M. Ryskulov
PSI, Villigen J. Egger, P. Kettle, M. Hildebrandt, S. Ritt
The MEG Collaboration
INFN & Pisa University A. Baldini, C. Bemporad, F.Cei, M.Grassi, F. Morsani, D. Nicolo’, R. Pazzi, F. Raffaelli, F. Sergiampietri, G. Signorelli
INFN & Pavia University A.de Bari, P. Cattaneo, G. Cecchet, G. Nardo’, M. Rossella
INFN & Genova University S. Dussoni, F. Gatti, D. Pergolesi, R. Valle
INFN Roma I D. Zanello
INFN & Lecce University S. Spagnolo, C. Chiri, P. Creti, M. Panareo, G. Palama’
Spokespersons: T.Mori, A.BaldiniTechnical Coordinator: S.Ritt
Detectors:• Beam line: PSI P.-R.Kettle• COBRA: KEK/Tokyo W.Ootani • Drift Chamber: PSI J.Egger• Timing Counter:Genova/Pavia/Roma G. Cecchet• Photon Detector: Tokyo/KEK/Pisa S.Mihara• Trigger: Pisa M.Grassi• DAQ/Elec.: PSI S.Ritt• Offline: S.Yamada/F.Cei/P.Cattaneo
The MEG Collaboration
The MEG Detector
Placed in SLS hall for the initial test. The installation in πE5 is planned this April.
COBRA arrived at PSI!
Excitation Test at PSIExcitation test was done between Jan.17-27,2004.Full excitation for SC and 8% excitation for NC because of limited utility at SLS.
Field mapping study is starting at SLS hall.
COBRA Magnet
2002 2003 2004 2005
Test MilestoneAssemblyDesign Manufactoring
Design Ass. TestWinding & Cryo.
Deliv.PSI
Test
Field Measurement
Platform
optional wall
small rail
electronics
LXestorage compressor
LN2 line
Trigger & DAQ
HV
triplets
separator
Transport solenoid
Experiment Area Layout
2003: established beam line design
Beam2002 2003 2004 2005
Test MilestoneAssemblyDesign Manufactoring
Studies
Solenoid BTS
Triplet I + II
Target
Part 1
New Separator
Part 2Beam Line Commissioning
BTS + COBRA coupling being studied
Drift Chamber
•Final design•Know how to build it
2002 2003 2004 2005
Test MilestoneAssemblyDesign Manufactoring
Full Prototype
Medium PrototypeCharge division & Cosmics
FP FP
Full Detector (18 DC)
Positron Tracker
Full Prototype Beam test
Timing Counter
Minimal CrossSection 39x30 mm
60º
PM section
PM activediameter
20º 20º8.5º
From COBRA center
105 cm
10º
25 cm
BB
0.75 T 1.05 T
-Final design in progress
-APD tests for Phi counters (trigger)
-Tests under B field planned
Timing Counter
Beam Test
2002 2003 2004 2005
Test MilestoneAssemblyDesign Manufactoring
Design
Assembly
PMT Evaluation PMT procur.
Procur & Manuf.
2” Fine Mesh 19 dyn. R5924
APD Evaluation APD test APD procur.
5x5 mm APD Hmamatsu
Carbon degrader
Lead Collimator at the beam line exit
LXe Photon Detector
Beam test at PiE1 in Sept-Dec 2003
Elementary process - (essentially) at rest captured on protons:
- p 0 n - p n
0
Photon spectrum
54.9 82.9 129MeV
M/2
M/2(1cos*)
M/2
*
E=55 MeV * =
Energy measurement
FWHM
Material, leakage
Backgroundrejection
~4.5%
FWHM [%]FWHM [%]
4.3±1.0 4.8±0.4 4.6±0.7
4.5±0.6 4.5±0.3 4.5±0.6
4.1±0.9 5.0±0.5 5.0±1.6
center ofthe detector
center ofF14
center ofF21
center ofF20
center ofF15
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
30 40 50 60 70 80 90
Sigma2 threshold
Res
olut
ion
(%)
#689[6-7], trigger:S1*Xe#689[6-7], trigger:S1*Xe
Laser-Compton scattering at TERAS
10, 20, 40MeV
PSI 2003TERAS 2003alpha
PSI 2003TERAS 2003alpha
L-R timing resolutionSigma = 65 psec
•Resolution improves in proportion to 1/sqrt(Npe).
•For 52.8 MeV psec + depth resolution.
•QE improvement and wave-form analysis will help to achieve better resolution.
KSR measurementOf electron beamIn 2002
Depth (cm)
E d
epos
it/u
nit l
engt
h electron
gamma
Xe – TC timing resolutionSigma = 100 psec
Position measurement
Background and Sensitivity
July 2002 NowGamma Energy (%) 4.0-4.5 4.5-5.0*e+ Timing (nsec) 0.1* 0.1*Gamma Timing 0.1 <0.23*Gamma Position (mm) 9-10.5 4.5-9.0*Gamma acceptance 0.6 >0.4*Muon rate (108/sec) 0.2-0.3 0.2-0.3Running Time (107sec) 2.6 4.0Accidental Rate (10-14) 2.2-3.5 2.3-3.5# Accidental Events 0.6 0.690% CL Limit (10-13) 1.0-1.6 1.2-1.7
* MeasuredMore detailed calculation necessary
QE abs=1 m abs=
5% 6% 2.0%
10% 6% 1.7%
20% 6% 1.5%
Problems arising…
- PMT instability
- neutron background
Photon Detector
2002 2003 2004 2005
Test MilestoneAssemblyDesign Manufactoring
Large Prototype Beam Test Beam Test
Vessel Design Assembly & Test
PMT Delivery + Testing
Refrigerator Manufactoring Assembly
Liq. Purification
Assembly Test
Manufactoring
Engineering runs
Prototype system tests• Debugging of the first board Type0 in Pisa
– A minor error fixed
• System assembled at PSI in Nov. ‘03– 100MHz synchronous operation– Negligible transmission error rate– Satisfactory operation of the analog interface
• Connection with the Large Prototype
– PMT from #0 to #31
– Collected data
• Alpha
• Led
• 0
Trigger / DAQ / Electronics
The boardType0
PMT inputs
LVDS transm.
LVDS receiv.
FADC
FPGA
configuration EPROMS
Differential drivers
package error solved with a patch board
control signals.
Internal trigger
Time [10 ns]
Am
plit
ud
e
[mV
]
Max. Amplitude (2)
Index of Max
Amplitude sum
Pulse time
Inpu
t cy
clic-b
uffer
boar
d 0
Out
put cy
clic-
buffer
boa
rd 0
Full System
2002 2003 2004 2005
Test MilestoneAssemblyDesign Manufactoring
Prototype Board
Final Prototype
Trigger
now
PMC carrier board
Joint effort with the MAGIC experiment (Uni. of Siena and INFN Pisa)
– Clock control (locking to external source)
– DRS readout with FADC
– DRS control signals
DRS
1st Prototype
Wave form digitizer - DRS
DRS (DAQ)
2002 2003 2004 2005
Test MilestoneAssemblyDesign Manufactoring
2nd Prototype
Tests1st Prototype
Boards & Chip Test
now
By May 2004: -Finish merging LXe geometry & scintillation tracking (Cei/Yamada)-ZEBRA framework for MC outputs (Cattaneo)
By July 2004:-Detector digitization (TC:Paolo, XE: Yamada/Cei, DC: Nishiguchi)
Unified MC available for the DC beam test in summer
Offline Software
More people are joining the efforts now
Coordination meeting planned in May-June
Conclusion