OUR TOP PROJECTS
03
TOP
PROJ
ECTS
AL
PHAB
ETIC
AL
ORDE
R
L-U
LAGGAN TORMORE / NORTH SEA (UK) OFFSHORE
EPC CONTRACTOR: PETROFAC / END USER: TOTAL
LAGGAN AND TORMORE ARE TWO GAS AND CONDENSATE FIELDS SITUATED ABOUT 125 KM NORTH-WEST OF THE SHET-
LAND ISLANDS IN THE UK. THE LAGGAN AND TORMORE PROJECT INVOLVES THE DEVELOPMENT OF THE TWO FIELDS AND
CONSTRUCTION OF A GAS PROCESSING PLANT AND EXPORT PIPELINE. HERE, WATER DEPTHS DESCEND RAPIDLY FROM
AN AVERAGE OF 120 M TO 600 M AND BEYOND. IT IS A UNIQUELY CHALLENGING ENVIRONMENT IN WHICH TO OPERATE,
BUT ALSO ONE WITH GREAT POTENTIAL.
“We are delighted to work with Skema and the kind of support you extend to us in the critical
phase of the project.”
Senior Electrical Engineer
UNITEDKINGDOM
Ireland
France
Germany
EPC CONTRACTOR: PETROFAC / END USER: TOTAL
The indoor distribution boards supplied for the project are
internal arc proof, have ESD functionality and IP31 de-
gree of protection. The outdoor distribution boards have
IP65 degree of protection.
All electrical details and requirements (short circuit, di-
electric, etc.) comply with IEC 61439.
“Good company. Good people. Good quality.”
Electrical Engineer
SOLUTIONS DELIVERED
SKEMA WAS AWARDED THE CONTRACT FOR THE DESIGN, ENGINEERING, MANUFACTURING, INSPECTION AND TESTING OF 81 INDOOR AND OUTDOOR DISTRIBUTION BOARDS.
MOPUSTOR YME / NORWAYOFFSHORE
EPC CONTRACTOR: SBM-GUSTO MSC / END USER: TALISMAN ENERGY NORGE
THE PROJECT CONSISTS OF THE DEVELOPMENT OF A PRODUCTION UNIT FOR THE YME PROJECT. THE YME FIELD IS LO-
CATED IN THE EGERSUND BASIN IN THE NORTH SEA, APPROXIMATELY 110 KM OFFSHORE IN THE NORWEGIAN CONTINEN-
TAL SHELF. THE YME FIELD CONSISTS OF TWO MAIN RESERVOIRS, BETA AND GAMMA, WHICH ARE APPROXIMATELY 12 KM
APART. THE YME RE-DEVELOPMENT PROJECT IS BASED ON A MOPUSTOR, WHICH IS A MOBILE OFFSHORE PRODUCTION
UNIT WITH A SUBSEA STORAGE TANK. THE MOPUSTOR IS LOCATED IN AT THE GAMMA RESERVOIR WITH SURFACE COM-
PLETION OF THE GAMMA WELLS AND TIE BACK OF THE COMPLETED SUBSEA BETA WELLS.
NORWAY Finland
Sweden
EPC CONTRACTOR: SBM-GUSTO MSC / END USER: TALISMAN ENERGY NORGE
SOLUTIONS DELIVERED
SKEMA WAS RESPONSIBLE FOR THE DESIGN, ENGINEERING, MANUFACTURING AND TESTING OF:
INTELLIGENT POWER MOTOR CONTROL CENTERS (62 COLUMNS, 283 DRAWERS)
The LV Switchgear supplied for the project complies with
the most stringent requirements for offshore marine ap-
plications: compact dimensions for limited space, han-
dles on the front of the Switchgear to prevent injury to
personnel in the event of sudden movements, shock-re-
sistant plinth.
“Skema’s performance in terms of the delivery of hard-ware and the submission of documents was excellent.
Particularly in relation to the close-out of the final doc-umentation (Manufacturing Record Books and Technical
Operating and Maintenance Manuals), Skema was an ex-ample to other suppliers. We would like to take this op-portunity to thank Skema for all their efforts in ensuring
a successful close-out of the purchase order.”
Project Expeditors
RUSSIA
Kazakhstan
NIZHNEKAMSK REFINERY / RUSSIAONSHORE
END USER: TANECO
THE REFINING AND PETROCHEMICAL COMPLEX IN NIZHNEKAMSK, REPUBLIC OF TATARSTAN, 250 KM FROM THE CAPITAL
CITY OF KAZAN, IS ONE OF THE MOST AMBITIOUS OIL & GAS PROJECTS IN RUSSIA, WHICH DOUBLED THE REFINED CRUDE
RUN FROM ANNUAL 7 TO 14 MILLION TONS. THE REFINERY HAS AROMATICS UNITS AND A DEEP CONVERSION SECTION
WITH A FLUIDIZED CATALYTIC CRACKER, A DISTILLATE HYDROCRACKER, A DELAYED COKER, AND A GASIFICATION PLANT.
THE PETROCHEMICAL PLANT INCLUDES PURIFIED TEREPHTHALIC ACID, POLYETHYLENE TEREPHTHALATE, LINEAR ALKYLB-
ENZENE AND POLYPROPYLENE UNITS, PLUS THE ASSOCIATED POWER GENERATION FACILITIES.
END USER: TANECO
Skema operates actively in Russia, supplying its prod-
ucts for use on projects in an array of different indus-
tries: Oil & Gas, petrochemical, energy and utilities, pro-
cessing and manufacturing.
SOLUTIONS DELIVERED
MOTOR CONTROL CENTERS (600 COLUMNS, 2,529 DRAWERS)
POWER CENTERS (124 COLUMNS)
DISTRIBUTION BOARDS “We have been very happy with the support Skema gave us in relation to every aspect of our operations. Skema’s
state-of-the-art products are very attractive to Russian design-engineering organizations and end users.
The high-level professional skills of Skema’s specialist team that conducts the training sessions is
particularly noteworthy”.
Managing Director
EPC CONTRACTOR: BECHTEL / END USER: GASCO
THE $ 1.5 BILLION ONSHORE GAS DEVELOPMENT (OGD) III PROJECT INVOLVES THE EXPANSION OF THE PRODUCTION CA-
PACITY OF A MASSIVE GAS-PROCESSING PLANT IN HABSHAN, APPROXIMATELY 130 KM SOUTH-WEST OF ABU DHABI, IN
THE UNITED ARAB EMIRATES. THE HABSHAN COMPLEX IS ONE OF THE LARGEST GAS-PROCESSING PLANTS IN THE WORLD.
OGD III / UAE ONSHORE
IranIraq
Saudi Arabia
Yemen
Oman
UAEQatar
Kuwait
“I appreciate all aspects of Skema’s performance, and in particular: your team’s efforts in turning around accurate en-gineering documentation in a timely fashion, Skema’s proactiveness
in dealing with third parties, Skema’s flexible and adaptable man-ufacturing approach to accommodate EBCL’s construction priori-
ties, and Skema’s swift clear communication with the OGD III Project team and the overall quality of Skema’s work product. Skema’s ap-
proach to the OGD III project has been most professional at all times and its high caliber performance has been noted.”
Project Director
INTEGRATED PROTECTION AND CONTROL SYSTEM (IPCS)
The IPCS is based on ICUs (Integrat-
ed Control Units) located in each sub-
station, which communicate with the
motor starters and the protection re-
lays, making all the information avail-
able for the operator workstations
and the redundant servers installed
in the Main Control Room, and op-
erate as a gateway with the DCS,
which sends commands and receives
feedback via the TCP/IP interface.
The IPCS created for the Gasco OGD
III project not only displays the status
and alarms of all the components of the
electrical network but also greatly as-
sists the operators in maintaining the
plant because it stores the parameter
settings of all the control units (both
motor managers and protection relays)
and compiles the sequence of events
and the disturbance waves recorded by
the protection relays in case of faults.
EPC CONTRACTOR: BECHTEL / END USER: GASCO
The Intelligent LV Switchgear supplied for the project com-
plies with the most stringent requirements of the Oil & Gas
industry, the internationally recognized Shell DEP: inter-
nal-arc proof, IP 41 external protection, Form 4 separa-
tion, IP 4X internal protection, IP 20 protection when a
drawer has been removed from the assembly, secondary
PVC-insulated 600/1000 V grade wiring, stranded cop-
per conductors (minimum size 2.5 mm2), busbar insula-
tion 2kV AC 60 sec, distribution busbars (droppers) fully
segregated by insulated material, contactor and starter
units fully withdrawable, drawers which are mechanically
identical but electrically different are not interchangeable.
SOLUTIONS DELIVERED
INTELLIGENT 415 V SWITCHGEAR / MOTOR CONTROL CENTERS (378 COLUMNS, 1662 DRAWERS)
14 REMOTE TERMINAL UNITS
INTEGRATED PROTECTION AND CONTROL SYSTEM (IPCS)
THE QATAR FERTILIZER COMPANY (QAFCO) SITE IS LOCATED ABOUT 40 KM SOUTH OF DOHA CITY AND 7 KM SOUTH OF
THE RESIDENTIAL AREA OF MESAIEED. THE PROJECT FACILITIES INCLUDE TWO AMMONIA PLANTS WITH A TOTAL DAI-
LY PRODUCTION CAPACITY OF 4,600 TONS AND A UREA PLANT WITH A DAILY PRODUCTION CAPACITY OF 3,850 TONS,
ALONG WITH OTHER SUPPORT UTILITIES. WITH THESE HUGE PRODUCTION CAPACITIES, QAFCO IS CONSIDERED TO BE
THE LARGEST AMMONIA AND UREA PROJECT ANYWHERE IN THE WORLD, AND ALSO THE MOST INVESTMENT-INTENSIVE.
QAFCO 5-6 / QATARONSHORE
EPC CONTRACTOR: SAIPEM / END USER: QAFCO
Saudi Arabia
Yemen
Oman
UAE
IranIraq
QATAR
Kuwait
“We confirm your performance as excellent (Grade A).”
Head of Contracting & Procurement
INTELLIGENT PMCCs
The Intelligent Motor Control Centers
were equipped with an on-board touch-
screen operator interface to operate
the switchboards and compile data on
trends, alarms and event sequences.
This operator interface acts as a
gateway to the DCS (Distributed Con-
trol System) to allow the process con-
trol system to start/stop motors and
record the activation of alarms.
The PMCC switchboards were de-
signed to prevent any risk of a short
circuit and internal arc fault at 75 kA-
690 V for 0.3 seconds – to this end,
they were fully type-tested by an in-
dependent laboratory.
WATCH THE VIDEO!
Skema was awarded the contract for the design, man-
ufacturing, inspection, testing and supervision of the
on-site commissioning of reliable, high-performance
Intelligent LV Switchgear.
SOLUTIONS DELIVERED
INTELLIGENT MOTOR CONTROL CENTERS (1,223 COLUMNS, 1,608 DRAWERS)
POWER CENTERS (193 COLUMNS)
DISTRIBUTION BOARDS (274 COLUMNS)
11 INTERFACE MONITORING SYSTEMS (IMS)
1.5 km = the total length of the Intelligent PMCC columns
supplied by Skema
EPC CONTRACTOR: SAIPEM / END USER: QAFCO
IranIraq
Saudi Arabia
Yemen
Oman
UAEQatar
KuwaitSATAH FULL FIELD / UAEONSHORE
EPC CONTRACTOR: NPCC-TECHNIP CONSORTIUM / END USER: ZAKUM DEVELOPMENT COMPANY (ZADCO)
SATAH FULL FIELD IS LOCATED 200 KM NORTHWEST OF ABU DHABI, UNITED ARAB EMIRATES. THE SATAH FULL FIELD
DEVELOPMENT PROJECT’S OBJECTIVE IS TO MAXIMIZE CRUDE OIL PRODUCTION AND OIL RECOVERY BY REDUCING THE
WELL HEADS’ BACK PRESSURE AND INTRODUCING OF GAS INJECTION AND GAS LIFT FACILITIES. THE PROJECT SCOPE IN-
VOLVES OFFSHORE BROWNFIELD WORKS TO THE EXISTING WELL HEAD PLATFORMS AND PRODUCTION MANIFOLD PLAT-
FORM, INSTALLATION OF INFIELD PIPELINES, AS WELL AS MODIFICATIONS AND INSTALLATION OF NEW FACILITIES AT THE
ONSHORE SATAH PLANT AT ZIRKU ISLAND.
EPC CONTRACTOR: NPCC-TECHNIP CONSORTIUM / END USER: ZAKUM DEVELOPMENT COMPANY (ZADCO)
Skema was awarded the contract for the design, manufac-
turing, inspection and testing of Power and Lighting Distri-
bution Boards and Lighting Panels (Safe Area) for the on-
shore portion of the project. The Distribution Boards supplied
for the project are for both indoor and outdoor usage; they
have IP42 degree of protection, meet special requirements
for saline environments and are equipped with a very large
number of cables.
SOLUTIONS DELIVERED
POWER MOTOR CONTROL CENTERS (18 COLUMNS)
DISTRIBUTION BOARDS (12 COLUMNS)
CABLE BOXES AND GLANDS
GEORGIA
AZERBAIJAN
Caspian Sea
Turkey
IranIraq
Syria
Black Sea
THE EXISTING SOUTH CAUCASUS PIPELINE EXPORTS GAS FROM THE CASPIAN SEA SHAH DENIZ FIELD STARTING
FROM THE SANGACHAL TERMINAL (NEAR BAKU, AZERBAIJAN) THROUGH GEORGIA UP TO THE TURKISH BORDER. THE
690-KILOMETER PIPELINE INCLUDES A 442-KILOMETER SECTION IN AZERBAIJAN AND A 248-KILOMETER SECTION
IN GEORGIA. THE EXPANSION OF THE SOUTH CAUCASUS PIPELINE INVOLVES THE LAYING OF NEW PIPELINE ACROSS
AZERBAIJAN AND THE CONSTRUCTION OF TWO NEW COMPRESSOR STATIONS IN GEORGIA. THIS TRIPLES THE GAS
VOLUMES EXPORTED THROUGH THE PIPELINE TO OVER 20 BILLION CUBIC METERS PER YEAR.
SCP EXPANSION / AZERBAIJAN AND GEORGIA ONSHORE
EPC CONTRACTOR: CB&I / END USER: SOUTH CAUCASUS PIPELINE COMPANY / A JV BETWEEN: BP (OPERATOR), STATOIL, TOTAL, LUKOIL, NICO, TPAO, SOCAR
MV AND LV SWITCHGEAR
Skema’s Intelligent Power Motor Con-
trol Centers were designed to deal with
seismic loads at the following levels:
> Earthquake-proof construction:
Zone 4
> Peak Horizontal Ground
Acceleration: 0.83g
> Peak Vertical Ground
Acceleration: 0.59g
> Seismic Design Code:
ASCE 7/IBC 2000
The robustness of the modules was
tested in relation to the following
structural aspects:
> Resistance and stability for
individual modules
> Ground anchors
> Links between modules (bolts)
> Internal links to modules (rives)
In addition, Skema’s Switchgear was
successfully tested for seismic loads in
compliance with IEC 60068-3-3 (1 g).
The incomers, the bus-ties and the ACB
feeders of the PMCCs and the cells of
the MV switchgear are equipped with
protection relays configured accord-
ing to the IEC 61850 communica-
tion protocol. Goose signals are used
by the PMCCs to exchange informa-
tion, and by the MV cells to exchange
information and provide protection.
PACKAGED SUBSTATION
Skema supplied for the Project a 400V
Modular Primary Substation, a pre-
fabricated, modular enclosure inclu-
sive of all external appurtenances and
walkways, access ways and stairways.
The Packaged Substation is designed
for extreme outdoor conditions (-34°C
/+38°C) and incorporates the require-
ments for seismic, wind, snow and ice
loading, elevated at a typical 1,800
mm to underside of steel above site
grade on a steel support frame.
The Packaged Substation is composed
of two Modules:
> The Modular Primary Substation
(32,000 mm (L) x 4,000 mm (W)
x 3,500 mm (H) - weight 71,790
kg), designed to house MV 10kV
Switchgear, a 10/0.42 kV Trans-
former, LV electrical switchgear,
Motor Control Centers, CDAS and
PMS cabinets and LV distribution
boards
> The HVAC module (dimensions =
8,000 mm (L) x 4,000 mm (W) x
3,500 mm (H) - weight 19,000 kg),
used for conditioning and pressur-
ization of the substation
HVAC SYSTEM
The HVAC system consists of 2 pack-
aged air conditioning units suitable
for overpressure, cooling and heat-
ing control during summer and winter
conditions. The 2 redundant automat-
ic units (1 duty, 1 standby) are capa-
ble also of automatic changeover with
programmable timetable and a manu-
al mode is available for maintenance.
The units are installed indoor on a
dedicated Module adjacent to the
substation building and provide sup-
ply and recirculate air flow from/to
the electrical room.
The transformer room is provided
with 2 exhaust fans (1 duty, 1 stand-
by) and fresh air intake. A temper-
ature transmitter will be monitoring
the room temperature which will be
kept within the design limits through
the duty fan started by the HVAC Lo-
cal Control Panel. When the fans are
not operating, a non-return damper
isolates the indoor from the outdoor.
A static electric heater in the trans-
former room keeps the room at +5°C
during winter, in case the transform-
er is not running.
The fresh air intake for the HVAC
units and the transformer room has
been installed on the roof of the
HVAC module and of the substa-
tion, and it has been realized with
materials, dimensions and weld-
ing length suitable to prevent any
gas from entering the substation.
The constant overpressure of the
building prevents entry of any airborne
contaminants that should be present
outdoor, and the filters included in the
HVAC packaged units ensure suitable
indoor ambient conditions.
FIRE & GAS SYSTEM
The Fire & Gas System has been de-
signed to prevent the presence of gas
and fire (by means of detectors) inside
the substation.
“The construction site manager has asked us to thank Skema for the way in which you have shipped and provided packing and as-sembly documentation for the Modular Sup-
port Frame. The site team were impressed with the individual marking of each piece of
the frame, identifying the container it is in and where it is located within it. The level
of detail Skema has provided has simplified the site assembly of the sub-frame and is
much appreciated.”
Procurement, Engineering & Construction
Skema acted as an EPC contractor for the solutions de-
livered, managing, coordinating and monitoring every
aspect of the project: detailed design, project manage-
ment, scheduling, procurement and expediting, QA/HSE
management, documentation, fabrication, all multidisci-
plinary installation activities (architectural, mechanical,
E&I, HVAC, etc.), and testing and pre-commissioning at
Skema’s facilities.
SOLUTIONS DELIVERED
PACKAGED SUBSTATION
MV 10 KV SWITCHGEAR (81 COLUMNS)
INTELLIGENT POWER MOTOR CONTROL CENTERS (409 COLUMNS, 1,201 DRAWERS)
DISTRIBUTION BOARDS (4 COLUMNS)
26 LOCAL CONTROL PANELS
EPC CONTRACTOR: CB&I / END USER: SOUTH CAUCASUS PIPELINE COMPANY / A JV BETWEEN: BP (OPERATOR), STATOIL, TOTAL, LUKOIL, NICO, TPAO, SOCAR
TENGIZ FIELD (TENGIZ IS KAZAKH FOR “SEA”), IN WESTERN KAZAKHSTAN, IS LOCATED IN THE LOW-LYING WETLANDS
ALONG THE NORTHEAST SHORES OF THE CASPIAN SEA AND IS ONE OF THE BIGGEST OIL FIELDS IN THE WORLD. DIS-
COVERED IN 1979, TENGIZ CONTAINS 24 BILLION BARRELS OF HIGH QUALITY OIL AND SIX TO NINE BILLION BAR-
RELS (1 KM³ AND 1.4 KM³) OF RECOVERABLE OIL. IT IS DEEP, HAVING A TARGET DEPTH OF 4,500 M. IT ALSO CON-
TAINS SIGNIFICANT GAS RESERVES (18,000 BILLION M3). THE PROCESSING PLANT IS MADE UP OF BUILDING BLOCKS.
TENGIZ / KAZAKHSTAN ONSHORE /
END USER: TENGIZCHEVROIL / A CONSORTIUM OF: CHEVRON / EXXONMOBIL / KAZMUNAIGAZ / LUKARCO
FIELD SUBSTATION REPLACEMENT
The Field Substation Replacement
Project aims to upgrade and ration-
alize the existing Field Power Supply
System by replacing 6 existing field
substations with 3 new substations.
SOLUTIONS DELIVERED
Skema was awarded the contract for
the design, manufacturing, inspec-
tion and testing of HV switchboards
and Remote Terminal Units (RTUs):
> 3 35 kV, 1250 A, gas insulated
switchboards (26 columns)
> 3 6 kV, 1250 A, 20 kA, 1 sec., air in-
sulated switchgear units (74 Columns)
> 4 redundant RTUs (10 columns)
and Electrical Control Systems -
based on PLC
> Switchgear continuous thermal
monitoring solution
> Arc fault protection system
INTEGRATED PROTECTION AND
CONTROL SYSTEM
The Integrated Protection and Con-
trol System (IPCS) for the project
was designed to monitor and con-
trol HV and LV switchgear located in-
side the different packaged Substa-
tions (North, South and West). Each
packaged substation is equipped
with a redundant Interface Con-
trol Unit (ICU) controlling 33 kV and
6.6 kV Switchgear with protocol IEC-
61850, Low Voltage Switchgear and
other utilities (HVAC, UPS, F&G) via
Modbus and hardwired interfaces.
A SCADA system is installed in the
Field Control Room to control and
supervise the electrical network.
Every substation is also equipped
with 4 video cameras and a vocal
communication system. This allows
to control the unattended substa-
tions (both through cabled alarms
and alarms generated by the vid-
eo cameras registering unexpect-
ed movements), and to commu-
nicate with the operators, giving
them directions. Data are record-
ed and are available in real time
for an Asset Lifet ime Manage-
ment System (maintenance and
energy ef f ic iency management
of the plant and its components).
SWITCHGEAR CONTINUOUS
THERMAL MONITORING SOLUTION
Skema provided TCO with Ex-
ertherm™, a continuous thermal mon-
itoring solution which allows to moni-
tor, in real time, the thermal health and
status of key bus bar joints and criti-
cal cable connections. This is achieved
by installing small plastic, non-con-
tact, non-powered, lifetime calibrat-
ed infrared and cable sensors within
the main electrical panels supplied.
This solution provides numerous tan-
gible benefits over traditional period-
ic scans, including greatly increased
levels of safety and integrity protec-
tion and reliability assurance through-
out the lifecycle of the electrical pan-
els. The integrity protection was further
enhanced by utilising a Load-Map™
software module which enables TCO to
dynamically adjust the thermal alarm
levels applicable to the load on the cir-
cuit being monitored, which provided
TCO with a level of integrity protec-
tion even at lower utilized load levels.
ARC FAULT PROTECTION SYSTEM
The 6 kV switchgear supplied for the
project has been equipped with a REA
arc fault protection system, which can
operate as a stand-alone device or in
combination with other modules, like
the REF relays. The REA arc fault pro-
tection system function is based on de-
tecting the intense light of an electric
arc, alone or on a detection of light and
simultaneous phase or neutral over-
current. On detection of an arc fault,
the REA protection system delivers
trip commands in less than 2.5 ms to
all circuit breakers that feed the fault
zone. Furthermore, the system oper-
ation indicators help localizing faults
by selectively guiding the maintenance
staff to the fault zone, that was identi-
fied by the arc fault protection system.
The REA module supplied for the project
features: two high-speed, galvanically
isolated, insulated gate bipolar tran-
sistor (IGBT) outputs (HSO1 and HSO2)
for CB tripping purposes; it offers one
heavy-duty relay output (TRIP3) to be
used, for example, as a circuit-breaker
failure protection (CBFP) output for an
upstream circuit-breaker, or as an alarm
output; it features an adjustable three-
phase overcurrent or two-phase and
neutral overcurrent condition monitor-
ing function, which enhances the relia-
bility of the arc fault detection by elim-
inating unwanted CB tripping caused
by light not related to any arc fault,
e.g. flash light used in photography.
END USER: TENGIZCHEVROIL / A CONSORTIUM OF: CHEVRON / EXXONMOBIL / KAZMUNAIGAZ / LUKARCO
Skema supplied products and solutions to the Tengiz
field, and specifically for the Central Power Station, the
Central Distribution Substation, for KTL 1 and KTL
2 Load Relief Substations, Sulfur Forming, Train 2.3
Power Station Upgrade, Plant Nitrogen System, and the
Kulsary Rip Sea Rail Yard.
SOLUTIONS DELIVERED
MV 10/35 KV SWITCHGEAR (183 COLUMNS)
INTELLIGENT POWER MOTOR CONTROL CENTERS (190 COLUMNS, 782 DRAWERS)
4 REMOTE TERMINAL UNITS
DISTRIBUTION BOARDS (218 COLUMNS)
INTEGRATED PROTECTION AND CONTROL SYSTEM (IPCS)
EPC CONTRACTOR: SAIPEM / END USER: STAATSOLIE MAATSCHAPPIJ SURINAME
THE STAATSOLIE MAATSCHAPPIJ SURINAME N.V. IS LOCATED IN SURINAME, NEAR PARAMARIBO, IN THE WANICA DISTRICT.
THE PROJECT IS A MAJOR EXPANSION TO THE EXISTING REFINERY, AND THE OBJECTIVE IS TO INCREASE THE CRUDE CA-
PACITY AT THE FACILITY TO 15,000 BARRELS PER DAY. ELECTRICAL LOADS FOR THE ABOVE UNITS SHALL BE FED FROM
THE NEW ELECTRICAL SUBSTATION IN THE L-01 PLANT.
TOUT LUI FAUT REFINERY / SURINAME ONSHORE
SURINAME
Brazil
Bolivia
Paraguay
GuyanaFrench Guiana
“I would like to express my complete satisfaction for the activities performed by you during the engineering and
construction of equipment.”
Field Electrical Engineer
“It was really a great pleasure to work and deal with Skema as a switchgear supplier for the refinery project. I was well impressed with the quality of the products delivered by Skema (medium and low voltage switchgear). The technical
support and assistance in resolving the issues during commissioning stage was very good. I can recommend Skema as a professional company offering very good quality products.”
Commissioning Engineer
LV SWITCHGEAR /
INTELLIGENT MCCs
The Low Voltage Switchgear and In-
telligent MCCs supplied for the pro-
ject are equipped with smart relays
that communicate with the ECMS us-
ing the IEC 61850 Protocol, which
affords a number of benefits, such as
interoperability between all the de-
vices in the substations regardless
of the manufacturer, and free allo-
cation of real functions on all levels,
allowing for the construction of flex-
ible and open, yet tailored, solutions
that are future-proofed to deal with
upcoming advances in communica-
tion technology.
The IEC 61850 standard provides
long-term validity through the di-
viding of applications and commu-
nications, and support throughout
the life cycle thanks to the intro-
duction of a standardized substa-
tion configuration language (SCL).
The result is an appreciable reduc-
tion in costs for the secondary system
over its life cycle. The LV bus duct is of
the compact type with copper lines; it
provides a complete solution for con-
nections between power stations and
transformers and the main panel board.
LV switchgear features:
> 13 Incomers REF 615
> 5 bus-tie REF 630
> 352 LTMR motor managers
MV SWITCHGEAR
The Medium Voltage switchgear for the
project is equipped with a metal enclo-
sure suitable for indoor installations.
Since the switchgear is highly modular,
the selection of components required
by any application is very simple.
The switchgear’s functional units are
guaranteed arc-proof in accordance
with IEC 62271-200 Standards, ap-
pendix AA, class A accessibility, crite-
ria 1 to 5. All the installation, operation
and maintenance operations can be
carried out from the front of the unit.
The switchgear and earthing switches
are operated from the front, with the
door closed. The communication pro-
tocol for the MV protection relays is IEC
61850, as it is for the LV switchgear.
MV switchgear features:
> Rated current 1250 A
> 1 REF 630
(used for protection and ATS)
> 17 REF 615
EPC CONTRACTOR: SAIPEM / END USER: STAATSOLIE MAATSCHAPPIJ SURINAME
Skema was awarded the contract for the design,
manufacturing, inspection and testing of the MV and
LV Switchboards and the Electrical Integrated Control
and Monitoring System. The ECMS is based on a redun-
dant RTU which operates as a gateway between the elec-
trical users and the DCS. The DCS controls all the pro-
cess motors via a redundant Ethernet link over Modbus/
TCP; the motor activation time is shorter than 200 ms,
while the total loop response time is shorter than 400 ms.
SOLUTIONS DELIVERED
INTELLIGENT POWER MOTOR CONTROL CENTERS (109 COLUMNS, 461 STARTERS)
8 BUS DUCT LINES 3200 A
MV 6 KV SWITCHGEAR (24 COLUMNS)
MV 12.3 KV SWITCHGEAR (35 COLUMNS)
3 REMOTE TERMINAL UNITS
ECMS SYSTEM“The support at site is always very good, by dedi-
cated and highly skilled service engineers.”
Project Engineer
ALGERIA
Morocco
Western Sahara
Lybia
Tunisia
Mauritania
UTBS / ALGERIAONSHORE
EPC CONTRACTOR: SAIPEM / END USER: SONATRACH
THE UTBS (UNITÉ DE TRAITEMENT DE BRUT À HASSI MESSAOUD) CONSISTS OF THREE IDENTICAL TREATMENT TRAINS, EACH
WITH CAPACITY OF 100,000 BARRELS PER DAY, FOUR 50,000 M3 PRODUCT STORAGE VATS, TWO AERIAL ELECTRIC LINES
OF 30 KV, A STATION OF 30 KV AND 45 KM PIPELINES TRANSPORTING OIL, WATER AND GAS. THE PROJECT, WHICH AIMS
TO IMPROVE CRUDE OIL QUALITY AND PRODUCTION RATES, SIGNIFICANTLY CONTRIBUTES TO SONATRACH’S HASSI MES-
SAOUD FIELD OPTIMIZATION PRODUCTION PROGRAM, GIVEN THE EXTENT OF THE FIELD’S RESERVES, THEIR QUALITY AND
THEIR COMPLEXITY. THE FACILITY IS DESIGNED TO TREAT AND TRANSPORT CRUDE OIL FROM SIX FIELDS SOUTH OF THE
MAIN FIELD TO A STORAGE CENTER AT HAOUD EL HAMRA. HASSI MESSAOUD IS ALGERIA’S OLDEST AND LARGEST FIELD.
EPC CONTRACTOR: SAIPEM / END USER: SONATRACH
Skema was awarded the contract for the design, engineer-
ing, manufacturing, supply, inspection, testing and ons-
ite commissioning of LV Switchgear and Bus Ducts for the
UTBS Project.
SOLUTIONS DELIVERED
MOTOR CONTROL CENTERS (63 COLUMNS, 279 DRAWERS)
POWER CENTERS (11 COLUMNS)
DISTRIBUTION BOARDS (5 COLUMNS)
BUS DUCTS
www.skemaq.it