The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a
model of an energy-efficient social object’
![Page 2: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/2.jpg)
History
• The greenhouse was built in 1969, under the higher plant taxonomy department, on the initiative and under the guidance of Academician Turakulov, the rector of the Samarkand State University.
• As a result of scrupulous work, which continued for many years, a unique collection of various plants was gathered in the greenhouse of the State
Samarkand University.
![Page 3: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/3.jpg)
Why the project was necessary
• In the cold winter of 2008, more than half of the unique plants of the greenhouse died, which was caused primarily by the outdated equipment.
![Page 4: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/4.jpg)
Description of technical problems
• Outdated, ineffective heating system;• Cracked and broken glass; • Leaky water supply system; • Absence of conditioning system; • Outdated ventilation system;• Absence of artificial illumination.
![Page 5: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/5.jpg)
• Many plants were not calculated and registered;
• Not all of the plants were labelled;
• Most of the Samarkanders and guests of the city were not aware of the greenhouse.
Administrative mistakes
![Page 6: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/6.jpg)
Project measures and results achieved
I. Modernisation of the greenhouse power supply
system
Installation of gas equipment for the
heating system of the greenhouse
Heat insulationLight protection and
temperature regulation systems
Solution of the power supply problem
A new boiler house was built, where a
new boiler was installed; the heating
system was repaired;
polycarbonate glass and light protection systems were made;
the illumination system was
installed.
![Page 7: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/7.jpg)
Working process
![Page 8: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/8.jpg)
Working process
![Page 9: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/9.jpg)
Working process
![Page 10: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/10.jpg)
Working process
![Page 11: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/11.jpg)
Working process
![Page 12: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/12.jpg)
Working process
![Page 13: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/13.jpg)
Так выполнялась работа
![Page 14: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/14.jpg)
Working process
![Page 15: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/15.jpg)
Working process
![Page 16: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/16.jpg)
Working process
![Page 17: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/17.jpg)
Working process
![Page 18: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/18.jpg)
Working process
![Page 19: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/19.jpg)
Working process
![Page 20: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/20.jpg)
Working process
![Page 21: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/21.jpg)
Working process
![Page 22: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/22.jpg)
Working process
![Page 23: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/23.jpg)
Heating system
• Before the project Gas boilers with gas burners НР16
• After the project New automatic floor gas boiler «Kiturami»
KSOG-200 R
AdvantagesThe new boiler consumes 270 cubic metres of gas per day; the old gas boilers used 700 cubic metres of gas (at a temperature of –20º С; thus, the consummation of gas is reduced, which resulted in the reduction of
carbon dioxide emission – 1.8 tonnes (in comparison with the 5 tonnes before).
![Page 24: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/24.jpg)
Heating system
• Before the project Three-phase electric pump (1,500 Wt)
• After the project One
phase circulation pump (1,500 Wt)
AdvantagesThe one-phase circulation pump consumes 2.5 times less electricity in comparison with the three-phase one of the same power. The boiler house is also equipped with accumulator inverter power
supply system (two accumulators 24Wt /190 Ам), which will secure the regular work of the boiler and pumps.
![Page 25: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/25.jpg)
Heating system
• Before the project Six metal heating pipes 100 mm in
diameter which functioned and 12 pipes which did not. Total length – 1,350 m. All the pipes were a part of the supporting construction.
• After the project The system of heating plastic pipes
called ‘Spider Web’ with the total leangth of 1,280 m, 20 and 50 mm in diameter.
AdvantagesThe new ‘Spider web’ system runs under the inner surface of the greenhouse, which
results in an equal distribution of heat in the whole greenhouse. The pipes are not subject to corrosion, are easily installed, with the warrant of 50-60 yearrs.
![Page 26: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/26.jpg)
Glass
• Before the project Old standard glass, 4-5
mm thick
• After the project Crystalline iodic polycarbonate, 1,500 square
metres, 10 mm thick, with the size of the sheet 2,100 mm by 6,000 mm
AdvantageThe light transmissibility of the crystalline polycarbonate is 30,000 lux, of the iodic one –
6,000, which means that the new glass transmits 30% less ultraviolet than the former glass. The heat transfer is 6 times as little as that of the old glass. The polycarbonate is 200 times as strong as the ordinary glass; it is also fire-resistant, wrinkling at high temperatures, but not burning (melting temperature – 250 degrees, burning temperature – 5,400 degrees).
![Page 27: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/27.jpg)
Water supply and watering systems
• Before the project Watering with the help of a hose
• After the project Sprinkling system
Advantages
The sprinkling system: water is evenly sprinkled upon the plants, thus helping to save water in comparison with the old system.
![Page 28: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/28.jpg)
Water supply and watering systems
Reconstructed poolOld leaky pool
•Before the project •After the project
The old pool lost 2 cubic metres of water daily. The reconstruction of the pool made it possible to avoid these water losses
Advantages
![Page 29: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/29.jpg)
Conditioning and ventilation systems
Before the project The conditioning system
did not exist
• After the project New air conditioners installed
Advantages
The new air conditioning systems help to maintain normal temperature within the greenhouse in summer and winter and are very effective.
![Page 30: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/30.jpg)
Illumination system
• Before the project The illumination system did not function
• After the project The illumination is restored completely
Advantages38 energy efficient lamps were installed, 36 Wt each, and 2 lamps 30 and 10 Wt accordingly.
The old electric wiring was replaced by new one. The life time of such lamps is 10,000-12,000 hours and energy consummation is 2.5 times less.
![Page 31: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/31.jpg)
Illumination system
Before the project
After the project
There was no photoelectric system Solar panels
Advantages
The photoelectric system uses solar energy and will provide electricity to illuminate the greenhouse in case of emergency
![Page 32: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/32.jpg)
Project measures and results achieved
II. Improvement of the greenhouse activity
Labelling of plants and creation of
electronic catalogue available in Internet. Working out of a
series of excursions for various target groups
Guide training for the workers of biological
faculty
Informative and visual electronic catalogue
(available on the web-pages of the university and SGP
GEF). Interesting excursion programme for a wide circle
of visitors (in three languages). All the plants of
the greenhouse are identified and ccatalogued
![Page 33: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/33.jpg)
Perspectives
• Planting of rare and local species in the territory at the side of the greenhouse (sea-buckthorn, oleaster, tamarisk, saltwort, tulips etc.) in 2012
• New excursion route ‘Landscapes of Uzbekistan’ and relevant plants (mountains, adyrs, tugais, desert)
![Page 34: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/34.jpg)
Thanks
![Page 35: The SGP GEF project ‘The modernisation of the greenhouse of the Samarkand State University as a model of an energy-efficient social object’](https://reader036.vdocument.in/reader036/viewer/2022062321/56649e0b5503460f94af33c7/html5/thumbnails/35.jpg)
Thank you for your Thank you for your attention!attention!
Greenhouse web-site Greenhouse web-site –– www.samdu.uz
GEF SGP web-siteGEF SGP web-site - -