The State of Power in a Maoist State
Nepal’s Micro-Hydro development
![Page 2: The State of Power in a Maoist State Nepal’s Micro-Hydro development](https://reader035.vdocument.in/reader035/viewer/2022062516/56649dd85503460f94acda64/html5/thumbnails/2.jpg)
Nepal Energy Stats
• 45,000MW economically feasible hydro potential• 640MW current generation
– Actual 320MW due to operation problems• Demand 720MW > blackout 16 hours/day
– Business standstill– Liquid political period > Interim Plan for 2008-11– Become a model of sustainability
• Interim Plan and MDGs– Reach 55% electrification by 2011– Transmission difficult/costly to remote areas– 1/3rd generation must be off grid
![Page 3: The State of Power in a Maoist State Nepal’s Micro-Hydro development](https://reader035.vdocument.in/reader035/viewer/2022062516/56649dd85503460f94acda64/html5/thumbnails/3.jpg)
What’s Happening?
• Microhydro <100KW• Exquisite example of modern/ancient engineering• Potential anywhere there is plentiful water and hills • Utilise kinetic energy of water falling from a height (head)
Power = efficiency x fluid density x gravity x head x volume flow rateP(W) = η(~0.5)ρ(1000)g(9.81)hQMedium to high head > 15m
• Low environmental impact, often positive– No need for large dams
• Sustainable and locally sourced materials• Reliable and low maintenance
![Page 4: The State of Power in a Maoist State Nepal’s Micro-Hydro development](https://reader035.vdocument.in/reader035/viewer/2022062516/56649dd85503460f94acda64/html5/thumbnails/4.jpg)
Microhydro solutionOutput: 100KWVillage: WamitaksarDistrict: Gulmi
![Page 5: The State of Power in a Maoist State Nepal’s Micro-Hydro development](https://reader035.vdocument.in/reader035/viewer/2022062516/56649dd85503460f94acda64/html5/thumbnails/5.jpg)
Microhydro components
![Page 6: The State of Power in a Maoist State Nepal’s Micro-Hydro development](https://reader035.vdocument.in/reader035/viewer/2022062516/56649dd85503460f94acda64/html5/thumbnails/6.jpg)
Microhydro components
Forebay
Penstock
Powerhouse
Spillway
Canal
Weir
Tailrace
![Page 7: The State of Power in a Maoist State Nepal’s Micro-Hydro development](https://reader035.vdocument.in/reader035/viewer/2022062516/56649dd85503460f94acda64/html5/thumbnails/7.jpg)
Microhydro components
Powerhouse
Spillway
Canal
Weir
Forebay
Tailrace
Penstock
![Page 8: The State of Power in a Maoist State Nepal’s Micro-Hydro development](https://reader035.vdocument.in/reader035/viewer/2022062516/56649dd85503460f94acda64/html5/thumbnails/8.jpg)
Management
• Central>District>Village development
Government of NepalAlternative Energy Promotion Centre AEPC
Energy Sector Assistance Programme ESAP
Rural Economic Development Agency REDARural Energy Development Project REDP
Community
ContractorConsultant Manufacturer Installer
![Page 9: The State of Power in a Maoist State Nepal’s Micro-Hydro development](https://reader035.vdocument.in/reader035/viewer/2022062516/56649dd85503460f94acda64/html5/thumbnails/9.jpg)
Installation Stats• 10MW supporting 100,000 homes
– Agriprocessing• Huller/grinder/press
– Lighting• Education
– Manufacturing• Saw mills/sewing machines
– Pumping• Irrigation• Clean water
– Entertainment• Radio/internet
• ~ £1000/KW installed– ~50% grant from government– Rest from bank/developer/local tariff
• 2 year project cycle• Locally sourced materials• Civil works by community
– Ownership
![Page 10: The State of Power in a Maoist State Nepal’s Micro-Hydro development](https://reader035.vdocument.in/reader035/viewer/2022062516/56649dd85503460f94acda64/html5/thumbnails/10.jpg)
Benefits
• Education
• New business
• Time management
• Community cohesion
• Farming efficiency
• Health improvements
Social
EconomicEnvironmental
TripleBottom
Line
![Page 11: The State of Power in a Maoist State Nepal’s Micro-Hydro development](https://reader035.vdocument.in/reader035/viewer/2022062516/56649dd85503460f94acda64/html5/thumbnails/11.jpg)
Observed Issues
• Sweat Labour
• Health and Safety
![Page 12: The State of Power in a Maoist State Nepal’s Micro-Hydro development](https://reader035.vdocument.in/reader035/viewer/2022062516/56649dd85503460f94acda64/html5/thumbnails/12.jpg)
Achievable Improvements
• Site/construction monitoring– Working hours– Labour w/age
• Safety Equipment– Dust masks– Eye protection– Gloves– Steel toecaps
• Maintenance monitoring
![Page 13: The State of Power in a Maoist State Nepal’s Micro-Hydro development](https://reader035.vdocument.in/reader035/viewer/2022062516/56649dd85503460f94acda64/html5/thumbnails/13.jpg)
Conclusions
• Micro hydro has great potential to improve living conditions
• Need to address working conditions• Input from UK engineers
– Cultural exchange– Knowledge sharing
• Nepal contact– www.redanepal.org
Office [email protected]