THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003
THEMISPreliminary Design Review
November 13, 2003
THEMIS ASI Array
Eric Donovan on behalf of the NORSTAR TeamUniversity of Calgary & Athabasca University
![Page 2: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/2.jpg)
THEMIS/GBO Engineering Peer Review 2 UCB, Oct. 17, 2003
THEMIS - Canada
• Motivation for Canadian Involvement
• Prototyping the ASI
• Data Retrieval and Distribution
• Canadian Involvement
• Data Management• Summary • Searching, Sophisticated Analysis• Real-time Website
• Building on Existing Infrastructure
![Page 3: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/3.jpg)
THEMIS/GBO Engineering Peer Review 3 UCB, Oct. 17, 2003
CANOPUS ASI images (one CANOPUS ASI images (one minute cadence; 557 nm filter) minute cadence; 557 nm filter) for the late growth phase, early for the late growth phase, early expansive phase of a substorm. expansive phase of a substorm. The bottom panel is a keogram The bottom panel is a keogram showing high resolution MSP showing high resolution MSP data from the CANOPUS MSP, data from the CANOPUS MSP, also located at Gillam. also located at Gillam.
Note the spiral at 0332 UT, and Note the spiral at 0332 UT, and well defined north-south well defined north-south structure at 0337 UT. Events such structure at 0337 UT. Events such as this illustrate both the as this illustrate both the limitations and advantages of limitations and advantages of ground-based optical ground-based optical observations. The advantage is observations. The advantage is resolution (spatial here, and resolution (spatial here, and temporal not here, but easily temporal not here, but easily obtainable). The disadvantage is obtainable). The disadvantage is limitation to spatial scales smaller limitation to spatial scales smaller than ALL relevant substorm than ALL relevant substorm phenomena.phenomena.
![Page 4: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/4.jpg)
THEMIS/GBO Engineering Peer Review 4 UCB, Oct. 17, 2003
THEMIS & Canada
![Page 5: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/5.jpg)
THEMIS/GBO Engineering Peer Review 5 UCB, Oct. 17, 2003
![Page 6: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/6.jpg)
THEMIS/GBO Engineering Peer Review 6 UCB, Oct. 17, 2003
![Page 7: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/7.jpg)
THEMIS/GBO Engineering Peer Review 7 UCB, Oct. 17, 2003
![Page 8: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/8.jpg)
THEMIS/GBO Engineering Peer Review 8 UCB, Oct. 17, 2003
![Page 9: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/9.jpg)
THEMIS/GBO Engineering Peer Review 9 UCB, Oct. 17, 2003
![Page 10: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/10.jpg)
THEMIS/GBO Engineering Peer Review 10 UCB, Oct. 17, 2003
![Page 11: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/11.jpg)
THEMIS/GBO Engineering Peer Review 11 UCB, Oct. 17, 2003
![Page 12: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/12.jpg)
THEMIS/GBO Engineering Peer Review 12 UCB, Oct. 17, 2003
![Page 13: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/13.jpg)
THEMIS/GBO Engineering Peer Review 13 UCB, Oct. 17, 2003
![Page 14: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/14.jpg)
THEMIS/GBO Engineering Peer Review 14 UCB, Oct. 17, 2003
![Page 15: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/15.jpg)
THEMIS/GBO Engineering Peer Review 15 UCB, Oct. 17, 2003
THEMIS - Canada
• Motivation for Canadian Involvement
• Prototyping the ASI
• Data Retrieval and Distribution
• Canadian Involvement
• Data Management• Summary • Searching, Sophisticated Analysis• Real-time Website
• Building on Existing Infrastructure
![Page 16: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/16.jpg)
THEMIS/GBO Engineering Peer Review 16 UCB, Oct. 17, 2003
![Page 17: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/17.jpg)
THEMIS/GBO Engineering Peer Review 17 UCB, Oct. 17, 2003
Deployment
![Page 18: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/18.jpg)
THEMIS/GBO Engineering Peer Review 18 UCB, Oct. 17, 2003
Existing “backbone” internet (BEST) ATHA, CONT (Ekati), CHUR, INUV, FSMI, ….ATHA, CONT (Ekati), CHUR, INUV, FSMI, ….
Local ISP & RF Link
[A]DSL Telus, Manitoba Telecom, Aliant, …..
Hardcopy via traditional mail
3k 1k/yr
5k 9k/yr
0.1k 1k/yr
8k 3k/yr
FSIM, INUV, FSMI, RANK, PBQ (2005+), …FSIM, INUV, FSMI, RANK, PBQ (2005+), …
PGEO, ATHA, FLIN, PINA, KAPU, HEBR, CART, ….PGEO, ATHA, FLIN, PINA, KAPU, HEBR, CART, ….
Telesat HSI Canadian Satellite
NOT INUVNOT INUV
“VSAT” 45k 1k/yr All sitesAll sites
Glentel, Nanometrics, PolarSat, Stratos, ….
Never fails (well almost never); Not at all sexy!Never fails (well almost never); Not at all sexy!
Sta
ndar
d In
tern
et
Dial up to local ISP
All sites; Not real time; Not very sexy.All sites; Not real time; Not very sexy.
0.1k 1k/yr
1k 1k/yr
Telus Cell Phone (Really)
Many sites in BC and Alberta (MacMurray, P. George, High Level ….)Many sites in BC and Alberta (MacMurray, P. George, High Level ….)
0.1k 1k/yr
Data Recovery
![Page 19: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/19.jpg)
THEMIS/GBO Engineering Peer Review 19 UCB, Oct. 17, 2003
• 5 imagers 2003-2004 • 5 imagers 2004-2005• 6 imagers 2005-2006
• Mike Greffen (Team Leader)• Trond Trondsen• Mikko Syrjäsuo• Brian Jackel• Hercules Olivier• Eric Donovan• Igor Voronkov• P. T. Jayachandran
Canadian Personnel Involved in Deployment
Deployment Milestones for Canadian ASIs
DeploymentDeployment
![Page 20: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/20.jpg)
THEMIS/GBO Engineering Peer Review 20 UCB, Oct. 17, 2003
U. Calgary Heritage & Team
• ISIS II Scanning Photometer• Other ground-based instruments (MSPs; FP; Spect.; First ASI, POCA)• CANOPUS (ASI; MSPs; Communications Infrastructure)• Viking UV• Freja UV• Interball II UVAI• Nozomi TPA• Numerous rocket optical and particle instruments• NORSTAR• MIRACLE ASI array (experience via Mikko Syrjäsuo)• Portable Auroral Imager; High Speed Photometer; Induction Coil Mags
Brief History of Relevant U. Calgary Space Group Experience
![Page 21: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/21.jpg)
THEMIS/GBO Engineering Peer Review 21 UCB, Oct. 17, 2003
Canadian THEMIS ASI Team
• Eric Donovan (Team Leader).• Brian Jackel, Trond Trondsen (ASI specialists; Space Scientists)• Mikko Syrjäsuo (ASI specialist; Machine Vision)• Noora Partamies (PDF – as of 2004)• Leroy Cogger (senior advisor)• Mike Greffen (Deployment, Site Manager, Operations, Public Outreach)• Emma Spanswick (riometers, NORSTAR/THEMIS Web Site Project Manager)• Hercules Olivier (Electrical Engineering; Communications; Operations)• Cliff Marcellus, Greg Enno, Peter King (Technical/Engineering support as needed)
U. Calgary
Athabasca U.• Martin Connors (Athabasca Geophysical Observatory - PI).• TBD (Technician and Site Manager)
Contractors• Fokke Creutzberg (Keometrics – MSP Specialist)• Don Wallis (Magnametrics – Riometer Specialist)
![Page 22: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/22.jpg)
THEMIS/GBO Engineering Peer Review 22 UCB, Oct. 17, 2003
THEMIS - Canada
• Motivation for Canadian Involvement
• Prototyping the ASI
• Data Retrieval and Distribution
• Canadian Involvement
• Data Management• Summary • Searching, Sophisticated Analysis• Real-time Website
• Building on Existing Infrastructure
![Page 23: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/23.jpg)
THEMIS/GBO Engineering Peer Review 23 UCB, Oct. 17, 2003
Starlight Xpress MX716 w/all-sky optics
Linux Red Hat 9 w/MX716 driver
Image interval 5 sec; 1-sec exposures
NORSTAR/MIRACLE imaging code
Web server provides real-time access
Network time protocol
Instrument & Housing
Deployed at Athabasca Summer ‘03
Assessment by Calgary Team Fall ‘03
![Page 24: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/24.jpg)
THEMIS/GBO Engineering Peer Review 24 UCB, Oct. 17, 2003
Athabasca Alberta
Deployment
![Page 25: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/25.jpg)
THEMIS/GBO Engineering Peer Review 25 UCB, Oct. 17, 2003
http://www.phys.ucalgary.ca/NORSTAR/themis/data/Movies/
athabasca_2003_10_04.mov
![Page 26: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/26.jpg)
THEMIS/GBO Engineering Peer Review 26 UCB, Oct. 17, 2003
THEMIS - Canada
• Motivation for Canadian Involvement
• Prototyping the ASI
• Data Retrieval and Distribution
• Canadian Involvement
• Data Management• Summary • Searching, Sophisticated Analysis• Real-time Website
• Building on Existing Infrastructure
![Page 27: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/27.jpg)
THEMIS/GBO Engineering Peer Review 27 UCB, Oct. 17, 2003
Existing “backbone” internet (BEST) ATHA, CONT (Ekati), CHUR, INUV, FSMI, ….ATHA, CONT (Ekati), CHUR, INUV, FSMI, ….
Local ISP & RF Link
[A]DSL Telus, Manitoba Telecom, Aliant, …..
Hardcopy via traditional mail
3k 1k/yr
5k 9k/yr
0.1k 1k/yr
5k 3k/yr
FSIM, INUV, FSMI, RANK, PBQ (2005+), …FSIM, INUV, FSMI, RANK, PBQ (2005+), …
PGEO, ATHA, FLIN, PINA, KAPU, HEBR, CART, ….PGEO, ATHA, FLIN, PINA, KAPU, HEBR, CART, ….
Telesat HSI Canadian Satellite
NOT INUVNOT INUV
“VSAT” 45k 1k/yr All sitesAll sites
Glentel, Nanometrics, PolarSat, Stratos, ….
Never fails (well almost never); Not at all sexy!Never fails (well almost never); Not at all sexy!
Sta
ndar
d In
tern
et
Dial up to local ISP
All sites; Not real time; Not very sexy.All sites; Not real time; Not very sexy.
0.1k 1k/yr
1k 1k/yr
Telus Cell Phone (Really)
Many sites in BC and Alberta (MacMurray, P. George, High Level ….)Many sites in BC and Alberta (MacMurray, P. George, High Level ….)
0.1k 1k/yr
Data Recovery
![Page 28: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/28.jpg)
THEMIS/GBO Engineering Peer Review 28 UCB, Oct. 17, 2003
Data Recovery
![Page 29: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/29.jpg)
THEMIS/GBO Engineering Peer Review 29 UCB, Oct. 17, 2003
THEMIS - Canada
• Motivation for Canadian Involvement
• Prototyping the ASI
• Data Retrieval and Distribution
• Canadian Involvement
• Data Management• Summary • Searching, Sophisticated Analysis• Real-time Website
• Building on Existing Infrastructure
![Page 30: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/30.jpg)
THEMIS/GBO Engineering Peer Review 30 UCB, Oct. 17, 2003
CGSM - NowCGSM - Now
![Page 31: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/31.jpg)
THEMIS/GBO Engineering Peer Review 31 UCB, Oct. 17, 2003
CGSM - EnhancedCGSM - Enhanced
![Page 32: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/32.jpg)
THEMIS/GBO Engineering Peer Review 32 UCB, Oct. 17, 2003
THEMIS - Canada
• Motivation for Canadian Involvement
• Prototyping the ASI
• Data Retrieval and Distribution
• Canadian Involvement
• Data Management• Summary • Searching, Sophisticated Analysis• Real-time Website• CDF files & FTP tree
• Building on Existing Infrastructure
![Page 33: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/33.jpg)
THEMIS/GBO Engineering Peer Review 33 UCB, Oct. 17, 2003
Station
Imager
Filters
Summary Images
Calibration Data
Classification
Top 60
Entire Dataset
Name, location, mag midnight, history of operation, …
Rel
atio
nal D
atab
ase
--
130
GB
Online publicly accessible storage of complete high-res data for subset of nights of greatest interest for mission scientific objectives (ie., the Top 60 Substorms).
Great big pile of data online & in hardcopy at UCalgary and at UCB. This will not be culled.
THEMIS ASI UCalgary Data Management
![Page 34: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/34.jpg)
THEMIS/GBO Engineering Peer Review 34 UCB, Oct. 17, 2003
Mapping
![Page 35: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/35.jpg)
THEMIS/GBO Engineering Peer Review 35 UCB, Oct. 17, 2003
Thumbnails
![Page 36: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/36.jpg)
THEMIS/GBO Engineering Peer Review 36 UCB, Oct. 17, 2003
Merging in Real Time
![Page 37: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/37.jpg)
THEMIS/GBO Engineering Peer Review 37 UCB, Oct. 17, 2003
Data Summary
![Page 38: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/38.jpg)
THEMIS/GBO Engineering Peer Review 38 UCB, Oct. 17, 2003
Data Searching
Machine Vision – Content Based Image Retrieval
We are exploring automatic classification of images, rapid retrieval of images from large datasets, and determination of motion of auroral forms, all using sophisticated machine vision techniques.
This classification and CBIR exercise reduces each image to a 48 element feature vector.
![Page 39: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/39.jpg)
THEMIS/GBO Engineering Peer Review 39 UCB, Oct. 17, 2003
A classification of 300000 CANOPUS Gillam ASI images yielded these magnetic local time occurrence distributions for arcs, patches and omega bands. This took about 6 hours on a 1.5 GHz pentium. An equivalent manual survey, which yielded the same results, took 4 months of dedicated effort by a student (who miraculously stayed in the field!). This figure from Syrjäsuo and Donovan [Ann. Geophys., in press].
Data Searching
![Page 40: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/40.jpg)
THEMIS/GBO Engineering Peer Review 40 UCB, Oct. 17, 2003
Optical Flow – a technique in which two-dimensional velocity distributions are obtained from image sequences [Partamies, Syrjäsuo, Janhunen (FMI), Hiebert].
Other techniques under development include…
Tomography – sophisticated technique to infer heights from multiple overlapping fields of view [Jackel, Donovan, Partamies].
Energy Flux Determination – modification Janhunen [2001] method for THEMIS imagers to estimate energy flux [Partamies, Donovan, Janhunen (FMI)].
Data Analysis
![Page 41: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/41.jpg)
THEMIS/GBO Engineering Peer Review 41 UCB, Oct. 17, 2003
Data Distribution
Our contribution to distribution of THEMIS data will be carried out through the THEMIS webpage on NORSTAR-WEB.
We will display real time data products as well as housekeeping information vital to keeping downtime to a minimum.
All summary data, summary images, merged thumbnails, as well as tools for accessing the relational database will be publicly accessible (CDF files on our server FTP tree mirrored at UCB).
The “top 60’’ full time and space resolution image data base will be freely accessible to all THEMIS team members.
The complete full time and space resolution image data base will be publicly accessible via temporary passwords that will be granted in response to specific data requests.
![Page 42: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/42.jpg)
THEMIS/GBO Engineering Peer Review 42 UCB, Oct. 17, 2003
THEMIS CANADA WEB
http://www.phys.ucalgary.ca/NORSTAR/themis/themis_main.html
![Page 43: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/43.jpg)
THEMIS/GBO Engineering Peer Review 43 UCB, Oct. 17, 2003
THEMIS CANADA WEB
![Page 44: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/44.jpg)
THEMIS/GBO Engineering Peer Review 44 UCB, Oct. 17, 2003
THEMIS CANADA WEB
![Page 45: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/45.jpg)
THEMIS/GBO Engineering Peer Review 45 UCB, Oct. 17, 2003
THEMIS CANADA WEB
![Page 46: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/46.jpg)
THEMIS/GBO Engineering Peer Review 46 UCB, Oct. 17, 2003
THEMIS CANADA WEB
![Page 47: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/47.jpg)
THEMIS/GBO Engineering Peer Review 47 UCB, Oct. 17, 2003
THEMIS CANADA WEB
![Page 48: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/48.jpg)
THEMIS/GBO Engineering Peer Review 48 UCB, Oct. 17, 2003
THEMIS CANADA WEB
![Page 49: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/49.jpg)
THEMIS/GBO Engineering Peer Review 49 UCB, Oct. 17, 2003
THEMIS CANADA WEB
![Page 50: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/50.jpg)
THEMIS/GBO Engineering Peer Review 50 UCB, Oct. 17, 2003
THEMIS CANADA WEB
![Page 51: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/51.jpg)
THEMIS/GBO Engineering Peer Review 51 UCB, Oct. 17, 2003
THEMIS CANADA WEB
![Page 52: THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 THEMIS Preliminary Design Review November 13, 2003 THEMIS ASI Array Eric Donovan on behalf of the](https://reader030.vdocument.in/reader030/viewer/2022032612/56649ed15503460f94be0341/html5/thumbnails/52.jpg)
THEMIS/GBO Engineering Peer Review 52 UCB, Oct. 17, 2003
• Real-time Merged Webpage 2004• Archive structure 2004• Summary database 2005• Relational database 2006
• Eric Donovan• Trond Trondsen• Mikko Syrjäsuo• Brian Jackel
Canadian Personnel Involved in ASI Data Management
Development Milestones for Data Management