This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım Technical Assistance on Institutional Building for the Implementation of RCOP in Turkey Trainer: Aslı Gülgör Procurement of Contract Management Non Key Expert

Upload: hugh-park

Post on 18-Jan-2018

223 views

Category:

Documents


0 download

DESCRIPTION

This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1. The Evaluation Comittee 2. Shortlisting (services over 200,000 euro only) 3. Tender Evaluation Process 4. Contract Award 5. Managing the Contract

TRANSCRIPT

Page 1: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

1

Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım

Technical Assistance on Institutional Building for the Implementation of RCOP in Turkey

Trainer: Aslı GülgörProcurement of Contract Management Non Key Expert

Page 2: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Evaluation of Tenders

2

Page 3: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

1.The Evaluation Comittee2.Shortlisting (services over 200,000 euro

only)3.Tender Evaluation Process 4.Contract Award5.Managing the Contract

Page 4: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Evaluation

Tenders are opened and evaluated by an Evaluation Committee appointed timely and formally by the Contracting Authority comprising a non-voting Chairperson, a non-voting Secretary and an odd number of voting members from ERA’s(minimum of three for all procedures except for works tenders above €5 000 000 which requires a minimum of five).

Page 5: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Availability of the EvC

The evaluators should obtain detailed information of the timetable foreseen and workload involved as evaluator. The Contracting Authority shall make sure that appointed evaluators are available during the scheduled evaluation period. The Contracting Authority will appoint a replacement evaluator for each procedure to prevent delays in case of unpredictable unavailability.

Page 6: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Must have..

Every member must have a reasonable command of the language in which the tenders are submitted.(English)

The voting members (ERA) must possess the technical and administrative capacities necessary to give an informed opinion on the tenders.

There should be no hierachial relationship between the voting members

The identity of the evaluators should be kept confidential.

Page 7: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Attendance

The Evaluation Committee members should attend all meetings. Any absence must be recorded and explained in the Evaluation Report.

Page 8: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Voting Rights

All voting members of the Evaluation Committee have equal voting rights.

Page 9: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Impartiality and Confidentiality

All members of the Evaluation Committee and any observers must sign a Declaration of Impartiality and Confidentiality .

Any Evaluation Committee member or observer who has a potential conflict of interest with any tenderer or applicant must declare it and immediately withdraw from the Evaluation Committee. He/she will be excluded from participating further in any capacity in the evaluation meetings.

Page 10: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

No information about the examination, clarification, evaluation or decisions about the contract award can be disclosed before the signature of the contract(s).

Any attempt by a tenderer or applicant to influence the process in any way (whether by initiating contact with members of the Evaluation Committee or otherwise) may result in the immediate exclusion of its tender or proposal from further consideration.

Page 11: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

In order to maintain the confidentiality of the proceedings, participation in the Evaluation Committee meetings is strictly limited to the members of the Evaluation Committee designated by the Contracting Authority and any authorised observers (including designated assessors in the case of call for proposals).

Page 12: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Responsibilities of the Evaluation Committee

members

Page 13: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

The evaluation committeeComposition, impartiality and confidentiality, responsibilities, timetable and period of validity

minimum 3 for all procedures (for works > € 5 000 000 minimum 5)have equal voting rights

Evaluator

Evaluator

Evaluator

Secretary

Chairperson

must sign a Declaration of Impartiality & Confidentiality (including non-voting members)

should attend all meetings whereby any absence must be recorded and explained in the evaluation report

are appointed and nominated on a personal basis by the Contracting Authority

keeping minutes, registering attendance and drafting the Evaluation Report

to ensure respect for PRAG procedures, impartiality and transparency of the evaluation

Non-voting MembersVoting Members

possess the technical and administrative capacities necessary to give an informed opinion on the tenders

Observerhave collective responsibilities on decisions taken by the committee

Page 14: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Establishment of shortlists

The selection procedure

Establishing a long list Eliminating candidates who are ineligible or fall into one

of the situations under PRAG 2.3.3 and 2.3.5 Applying the selection criteria WITHOUT any

modification

The service providers offering the best guarantees for the satisfactory performance of the contract will be shortlisted

Page 15: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Establishment of shortlists

Registering the applications Leader (nationality) Other members, if any (nationality) Time of receipt (within the deadline) Use of standard application form and verification of only one

application submitted per candidate

Eliminating the candidates who are ineligible Eligibility of nationality Declaration(s) – PRAG 2.3.3 (as per Article 7 of the application

form)

Page 16: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Establishment of shortlists

Applying the selection criteria WITHOUT any modification

Economic and financial capacity Professional capacity Technical capacity

Comments Status after re-examination: (E)liminated/(R)etained

Shortlisted: (Y/N)

ALWAYS justify/explain the basis of your selection/rejection in order to avoid rejections from the EU Delegation

Page 17: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Establishment of shortlists

The service providers offering the best guarantees for the satisfactory performance of the contract are shortlisted

Shortlist contains between 4 and 8 candidates No. of candidates > 8, apply the additional

criteria published in the PN No. of candidates < 4, the CA may only invite

those satisfying the criteria to submit a tender

Page 18: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Tender evaluation process

Receipt and registration of tenders Tender Opening session (public for Supplies

and Works) Part 1. Preparatory Phase Part 2. Compliance with formal submission requirements

Evaluation of offers Part 1. Administrative Compliance Part 2. Technical compliance

Evaluation of financial offers Conclusions of the evaluation committee

Page 19: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Tender evaluation process

all proceedings are conducted in cameraevaluation proceedings are

COMPLETELY confidential and must under no circumstances be discussed with outsiders

only committee members should have access to the evaluation room

tender bids should not leave the evaluation room and should be kept in a safe place when not in use

Page 20: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Evaluation of tenders

Individual assessment by each voting member scores out of a max.100 points in accordance with the evaluation

grid tenders be scored for a given criterion one after another experts be scored in comparison to the requirements in the ToR

(only diplomas and experience with documented proofs) establishing a general appreciation of strengths and weaknesses

of the individual technical offers Wrap up session

Comparison of points awarded by each committee member Besides the numerical score, a member must explain the reasons

for his/her choice and defend his/her scores before the committee

Page 21: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Evaluation of tenders

Standard practice whenever the expert proposed has no relevant experience on EU projects in the same language area, as evidenced by the CV.

The preferred method of conducting the interviews shall be by telephone (or equivalent).

Exceptionally and only if duly justified, the method may be an interview in person

Interviews for Service Contracts

Page 22: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Evaluation of tenders

Services quality based evaluationOnce the Committee has established each technical offer’s average score, any tender falling short of the 80-point threshold is automatically rejected. Out of the tenders reaching the 80-point threshold, the best technical offer is awarded 100 points.

Technical score = (final score of the technical offer in question / final score of the best technical offer) x 100

Page 23: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Evaluation of tenders

For Service Contract EvaluationsUpon completion of the technical evaluation, the envelopes containing the financial offers (for the tenderers scored above 80) are opened. • Financial offers are checked for arithmetical

errors.• When evaluating financial offers, the evaluation

committee compares only the fees between the different financial offers. The tender with the lowest total fees receives 100 points. The financial score of the others = (lowest total fees / total fees of the tender being considered) x 100

Page 24: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Evaluation of tenders

ServicesConclusion of the Evaluation Committee:

The best value for money (for services)Weighing technical quality against price on a 80/20 basis:

The scores awarded to the technical offers x 0,80 The scores awarded to the financial offers x 0,20

The resulting, weighted technical and financial scores are then added together and the contract is awarded to the tender achieving the highest overall score

Page 25: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

25

Evaluation of tenders

Supplies and WorksConclusion of the Evaluation Committee:

PriceCheapest Price complying the technical specifications

Page 26: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Tender Evaluations

• Evaluations are held in phases:• Receipt and registration of tenders• Prepatory meeting• Tender Opening Session• Administrative Compliance• Technical Evaluation• Financial Evaluation• Conclusion

Page 27: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Tender Evaluations

Evaluation Committee– 5 members for contract < 5,000,000

Euro 3 voting members from ERA

– 7 members for contract > 5,000,000 Euro

5 voting members from ERA– Reasonable command of English +

technical & administrative capacity– Impartiality and confidentiality (conflict

of interest)

Page 28: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Tender Evaluations

• Tender opening session

– To check tenders are complete and tender guarantee is submitted

– Restricted to the tenderers– EU representatives should be informed (ex-ante)– Opening checklist should be filled– Chairperson has to check the conflict of interest of the

Evaluation Committee – Tender opening checklist & report has to be completed

Page 29: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Tender Evaluations

• Administrative Compliance Grid:• Documentation complete as required• Nationality of the Tenderer• Language Correct

• Committee may request clarifications within reasonable time

• Only compliant tenders go on to next phase

Page 30: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Tender Evaluations

Tenders falling in the following situations should not be rejected (2.8.3 PRAG)

•Fewer number of copies•Correct templates and the requested information is provided, but in an incorrect section•Tenders not signed or scanned signatures, request subsequently if not obtain then reject•Candidates demonstrating a required document is not present but an alternative is provided

Page 31: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Tender Evaluations

Technical Evaluation:•Done Lot by Lot; - Be careful about criteria for tenderers tendering for multiple Lots•Evaluation Grid in the tender dossier•Rules of origin•Eligibility of Contractor and sub-contractor•Required Capacity (economic, financial, professional and technical)•Only technically compliant offers go on to the next phase

Page 32: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Tender Evaluations

Financial Evaluation:

•Check arithmetical errors•Calculate discounts for multiple Lots•Contract is awarded to the lowest compliant offer; within the available budget•Evaluation of variant solution – only those submitted by the lowest compliant offer•Problem of abnormally low offers

Page 33: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Contract Award

Evaluation Committee recommends to:

•Award the contract to the tenderer which complies with administrative and technical

requirements is the lowest offer within the maximum

budget available •Cancel the procedure

Page 34: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

This project is co-financed by the European Union and the Republic of Turkey

Contract Award

• Contracting Authority & EUD must approve the evaluation report (Ex-ante)

• Inform the successful tenderer and ask for «Proof documents» - 15 days

• Prepare contract• Sign and send 3 copies of contract

2 copies to be returned in 30 days with the financial guarantees

effective from the date of the last signature• Publish Contract Award Notice• Inform unsuccessful tenderers in max 15 days with

standard letter Return the tender guarantees

Page 35: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Contract award

CA notifies the successful tenderer and proceeds with the contract signature.

Once the contract is signed the CA informs the unsuccesful tenderers.

Thanks them for their interest and for submitting a tender

Page 36: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Cancellation of procurement procedures

the tender procedure has been unsuccessful, the economic or technical data of the project have been

fundamentally changed exceptional circumstances or force majeure render

normal performance of the contract impossible all technically compliant tenders exceed the financial

resources available there have been irregularities in the procedure, in

particular where these have prevented fair competition the award is not in compliance with sound financial

management (principles of economy, efficiency and effectiveness)

Page 37: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Cancellation of procurement procedures

After cancellation the CA;to launch a new tender procedureto open negotiations with one or more tenderers who participated in the tender procedure and comply with the selection criteria, provided that the original terms of the contract have not been substantially altered not to award the contract

Page 38: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Manage the contract

Introduction of the project personnel and responsibilities

Re-introduction of the project team Overview of project and immediate priorities Agreement on Inception Report and allocation

of the Non-key experts (for services) Administrative issues – office set-up, labour

permit, VAT, reporting formats, visibility, etc.

Page 39: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Manage the contract

Key documents Terms of Reference Technical Specifications Designs, BoQs, TSs

Presents all the strategic decisions taken with consensus by all the related parties

Details indicators updated work plan and strategy

Page 40: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Manage the contract

Monthly managers’ meetings Delivery and assessment of outputs Progress reports and requests for payments Use of incidentals (services) Addenda to contracts

EXTENSION OF THE CONTRACT PERIOD , VARIATIONS REPLACEMENT OF EXPERTS !!

Provisional Acceptances /taking Over certificates

Final Acceptances /Performance Certificates

Page 41: This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel

This project is co-financed by the European Union and the Republic of Turkey

REPUBLIC OF TURKEYMINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY

Questions and answers

41