Three Scoops, Three Flavors
By Primary BenchspirationJerrina Alverio, Andy Eggink, Caleb Fowler, Allison Molleson
The Problem & The Challenge
• Playable• Safe• Comfortable• Aesthetically Pleasing• Use of sustainable materials
Black
Box
Input: The Laurel Tree Charter School primary students without a bench.
Output: The Laurel Tree Charter School primary students with a bench.
The Specifications
• Size must fit a primary school student• Seat a minimum of twenty• Semi-Circular• Playable• Durable enough for adults• Withstand Humboldt climate• Functional after a rain storm
Criteria WeightSafety 10
Durability 10
Playability 8
Level of Educational Value 5
Level of Environmental Justice 5
Comfort 4
Cost Effectiveness 3
The Criteria Defined
The DecisionDesign Score
Three Scoops, Three Flavors 1836
TerraTiers to the Top 1828
Bottles in a Bench 1768
From Stone to Sand 1713
Grassy Day, Let’s Go Play 1552
Cement to the Core 1534
Sittin’ Good on Firewood 1246
Mountains of Mud 1123
Three Scoops, Three Flavors Overview
The Center Bench
Construction• Urbanite• Cement• Lime PlasterFeatures• Rock Wall• Xylophone• Chalkboard• Truth Windows
The Wing Benches
Construction•Mirror Design• Earthbags• EcoladrilloFeatures• Game boards• Pipe-O-Phone
http://ocoaporlanueva.blogspot.com/2012/07/contruyendo-un-mejor-medio-ambiente.html?spref=fb
Three Scoops, Three Flavors Vs. Criteria
• Safe• Durable• Playable• Educational Value• Environmental Justice• Comfort• Cost
MaintenanceSection Being Maintained
Cost ($) Annually
Cost (Hours) Annually
Lime Plaster 10.00 2.00
Rock Wall 0.00 1.00
Xylophone 0.00 1.00
Game Boards 10.00 2.00
Pipe-O-Phone 0.00 0.00
Chalkboard 0.00 1.00
TOTAL: 20.00 7.00
The CostExpenses
Time Spent in Hours
Defining the Problem
Gathering In-formation
Alternative So-lutions
Selecting a So-lution
Implementing the Solution
241
Total Hours: 452
100
68
37
6
Item Source Quantity CostEstimated Value
of DonationFunnels Harbor Freight 2 $3.00 Tarp Harbor Freight $12.00 PVC pipe The Mill Yard $17.00 1/2 yard of sand Eureka Ready Mix 1 $21.00 Cement Ace 4 $48.00 Root barrier fabric Ace $78.00 Sandbags United Rentals $81.00 River sand Wes Green 3 $120.00 Yard of road base Eureka Ready Mix 3 Donated $120.00Wood Miller Farms Donated $200.00Urbanite Miller Farms Donated $200.00Tiles The Tile Center Donated $35.00Stakes Miller Farms Donated $20.00Rebar The Boiler Works Donated $20.00Plexiglass Mollesons Donated $60.00Plastic bottles Eureka Recycling Donated $50.00Lime powder Jungle Mike 3 Donated $30.00Chicken wire The Farm Store Donated $50.00Cement Pierson's/Hensel 10 Donated $120.00Barbed wire Miller Farms Donated $20.00Earth pigment ABC N/A $50.00Aluminum pipe Arcata Scrap N/A $10.00Aluminum molding Arcata Scrap N/A $10.00
Misc. hardware On hand $30.00
$380.00 $1,025.00
Total Cost to Reproduce $1,405.00
Thank You!
•Miller Farms• Eureka Ready Mix • Jungle Mike• Laurel Tree Charter
School• Staff of Laurel Tree• The Tile Center
• Pierson’s• The Farm Store• Hensel Materials• The Boiler Works• The Lungstroms• Eureka Recycling