Tidal Analysis (Harmonic Analysis of Tides)

Upload: auly-rakhman

Post on 04-Dec-2015

237 views

Category:

Documents


7 download

DESCRIPTION

Tejnik Kelauatan

TRANSCRIPT

Page 1: Tidal Forecasting

Tidal Analysis

(Harmonic Analysis of Tides)

Page 2: Tidal Forecasting

Method of Tidal Analysis

• Admiralty Method• Least Square (Harmonic Analysis)

Page 3: Tidal Forecasting

Least Square Linear Regression

(Harmonic Analysis of Tides)

Page 4: Tidal Forecasting

Purposes

•Tidal Amplitudes and their phases•Tidal Prediction (e.g. Sea level)

Page 5: Tidal Forecasting

Equation

)cos()(1

k

m

kkk tASotz

tBtASotz sincos)(

Re-expressed:

Page 6: Tidal Forecasting

Least Square Method

tBtASoiz

izizJ t

sincos)(

0)()(

^

2^2

Page 7: Tidal Forecasting

The minimum least square error:

0)(

parameterJ

Page 8: Tidal Forecasting

Thus:

m

it itBitASoizJ

1

2)(sin)(cos)(

m

it itBitASoiz

SoJ

1)(sin)(cos)(20

m

it itBitASoizit

AJ

1)(sin)(cos)()(cos20

m

it itBitASoizit

BJ

1

)(sin)(cos)()(sin20

Where:

Page 9: Tidal Forecasting

Matrix form:

m

it

m

it

m

it

m

i

m

i

m

i

m

i

m

i

m

i

m

i

m

i

itiz

itiz

iz

BASo

itititit

itititit

ititm

1

1

1

1

2

11

11

2

1

11

)(sin)(

)(cos)(

)(

)(sin)(sin)(cos)(sin

)(cos)(sin)(cos)(cos

)(sin)(cos

zBASo

D

Or:

Page 10: Tidal Forecasting

Therefore: zD

BASo

1

22 BAC

ABtan 1

Amplitude:

Phase:

Page 11: Tidal Forecasting

Summary

m

iit

1)(sin

Page 12: Tidal Forecasting

MATLAB Algorithm

Input(data)

Matrix D

Matrix y

Amphase

Prediction

Constituents

Main Program

Output

END

PlotsSpreadsheet

1. M22. 9 Cons3. 21 Cons4. etc

1. Elevation2. Currents3. Formatting4. etc

Page 13: Tidal Forecasting

Example of Invalid Data (1)

Tide Elevation from Measurement and ForecastingPriok 2003, 15 days, 9 Component, Year -16

70

120

170

220

270

320

0 1000 2000 3000 4000 5000 6000 7000 8000

hours

Elev

atio

n (c

m)

Pengukuran Peramalan Linear (Pengukuran)

Page 14: Tidal Forecasting

Example of Invalid Data (2)

Tides Data , Tanjung Priok 1999

50100150200250300350

12/1/19980:00

3/11/19990:00

6/19/19990:00

9/27/19990:00

1/5/20000:00

Time (hrs)

Elev

atio

n (c

m)

Page 15: Tidal Forecasting

Sensitivity Process AnalysisProses Analisis Sensitivitas

220

260

300

340

380

420

12/13/1990 0:00

2/26/19910:00

5/12/19910:00

7/26/19910:00

10/9/19910:00

12/23/1991 0:00

Waktu (Tahun ke-n)

Elev

asi

Thn Ke-1

X1 X2 Xn

Thn Ke-1 + X1

Thn Ke-1 + X1+ X2

Thn Ke-1 + X1

+ X2+…+Xn

Peramalan

Komponen Peramalan Bervariasi:

9, 16, dan 37

Durasi Masukan Bervariasi: 15, 30, 45, 60, 90, 180, 365 hari

X3

Thn Ke-1 + X1+ X2+X3

Sensitivity Process Analysis

Time (n-th year)

Elev

atio

n (c

m)

Page 16: Tidal Forecasting

Model VerificationProses Verifikasi Model

(Dilakukan di Tahun Pertama)

220

260

300

340

380

420

12/31/19900:00

1/30/19910:00

3/1/19910:00

3/31/19910:00

4/30/19910:00

5/30/19910:00

6/29/19910:00

7/29/19910:00

8/28/19910:00

9/27/19910:00

10/27/19910:00

11/26/19910:00

12/26/19910:00

Waktu (Tahun ke-n)

Elev

asi

Dihitung RPE di 15 hari awal:RPE = (data-model)/data*100%

Feb Apr Mei Jun JulJan Mar NovSepAgt DesOkt

Forecastingdata

Model Verification Process

at the first year

Time (n-th year)

Elev

atio

n (c

m)

Page 17: Tidal Forecasting

9 Components9 ComponentsFrequency Period (degree/hr) (hrs)

M2 28.984 12.42S2 30.000 12.00N2 28.439 12.66K2 30.082 11.97K1 15.041 23.93O1 13.943 25.82P1 14.958 24.07M4 57.968 6.21

MS4 58.984 6.10

Component

Page 18: Tidal Forecasting

16 Components16 ComponentsFrequency Period (degree/hr) (hrs)

M2 28.984 12.42S2 30.000 12.00N2 28.439 12.66K2 30.082 11.97K1 15.041 23.93O1 13.943 25.82P1 14.958 24.07Nu2 28.512 12.63Mu2 27.968 12.872N2 27.895 12.91OO1 16.139 22.31M1 14.496 24.83J1 15.585 23.10Q1 13.398 26.87L2 29.528 12.19T2 29.958 12.02

Component

Page 19: Tidal Forecasting

37 Components37 ComponentsFrequency Period Frequency Period(degree/hr) (hrs) (degree/hr) (hrs)

M2 28.984 12.42 S1 15 24.000S2 30.000 12.00 M1 14.496 24.834N2 28.439 12.66 J1 15.585 23.099K2 30.082 11.97 Mm 0.544 661.765K1 15.041 23.93 Ssa 0.082 4390.244O1 13.943 25.82 Sa 0.041 8780.488P1 14.958 24.07 Msf 1.015 354.680M4 57.968 6.210 Mf 1.098 327.869MS4 58.984 6.103 r1 13.471 26.724M6 86.952 4.140 Q1 13.398 26.870MK3 44.025 8.177 T2 29.958 12.017S4 60.000 6.000 R2 30.041 12.017MN4 57.423 6.269 2Q1 12.854 11.984Nu2 28.512 12.626 2SM 31.015 28.007S6 90.000 4.000 M3 43.476 11.607Mu2 27.968 12.872 L2 29.528 8.2802N2 27.895 12.906 2MK 42.927 12.192OO1 16.139 22.306 M8 115.936 8.386Ld2 29.455 12.222

Component Component

Page 20: Tidal Forecasting

Elevasi Pasang Surut Hasil Pengukuran dan PeramalanSibolga 1991, Input 15 Hari, 9 Komponen, 15 Hari Pertama

240

260

280

300

320

340

360

380

12/31/1990 0:00 1/4/1991 0:00 1/8/1991 0:00 1/12/1991 0:00 1/16/1991 0:00

Jam

Ele

vasi

(cm

)

pengukuran peramalan

Model Verification (9 Components)Model Verification (9 Components)Tide Elevation from Measurement and Forecasting

Sibolga 1991, Input 15 days, 9 Components, first 15 days

hours

Elev

atio

n (c

m)

measurement forecasting

Page 21: Tidal Forecasting

Elevasi Pasang Surut Hasil Pengukuran dan PeramalanSibolga 1991, Input 15 Hari, 16 Komponen, 15 Hari Pertama

220

240

260

280

300

320

340

360

380

400

12/31/1990 0:00 1/4/1991 0:00 1/8/1991 0:00 1/12/1991 0:00 1/16/1991 0:00

Jam

Ele

vasi

(cm

)

pengukuran peramalan

Model Verification (16 Components)Model Verification (16 Components)Tide Elevation from Measurement and Forecasting

Sibolga 1991, Input 15 days, 16 Components, first 15 days

hours

Elev

atio

n (c

m)

measurement forecasting

Page 22: Tidal Forecasting

Elevasi Pasang Surut Hasil Pengukuran dan PeramalanSibolga 1991, Input 15 Hari, 9 Komponen, Tahun ke-1

220

240

260

280

300

320

340

360

380

400

420

12/23/1990 0:00 3/8/1991 0:00 5/22/1991 0:00 8/5/1991 0:00 10/19/1991 0:00 1/2/1992 0:00

Jam

Elev

asi (

cm)

pengukuran peramalan

SibolgaSibolga, 9 Components, 9 ComponentsTide Elevation from Measurement and Forecasting

Sibolga 1991, Input 15 days, 9 Components, first year

hours

Elev

atio

n (c

m)

measurement forecasting

Page 23: Tidal Forecasting

Elevasi Pasang Surut Hasil Pengukuran dan PeramalanSibolga 1991, Input 15 Hari, 16 Komponen, Tahun ke-1

220

240

260

280

300

320

340

360

380

400

420

12/23/1990 0:00 3/8/1991 0:00 5/22/1991 0:00 8/5/1991 0:00 10/19/1991 0:00 1/2/1992 0:00

Jam

Ele

vasi

(cm

)

pengukuran peramalan

SibolgaSibolga, 16 Components, 16 ComponentsTide Elevation from Measurement and Forecasting

Sibolga 1991, Input 15 days, 16 Components, first year

hours

Elev

atio

n (c

m)

measurement forecasting

Page 24: Tidal Forecasting

Admiralty Method

• Admiralty Method

Page 25: Tidal Forecasting

Tidal Component

Komponen Simbol Periode (jam)

Keterangan

Utama bulan M2 12.4106Utama matahari S2 12.0000Bulan akibat variasi bulanan jarak bumi-bulan N2 12.6592Matahari-bulan akibat perubahan sudut deklinasi matahari-bulan K2 11.9673

Matahari-bulan K1 23.9346Utama bulan O1 25.8194Utama matahari P1 24.0658

Utama bulan M4 6.2103Matahari-bulan MS4 6.1033

Pasang Surut Semi Diurnal

Pasang Surut Diurnal

Perairan Dangkal

Page 26: Tidal Forecasting

1st Scheme

• Scheme I• Contain Tidal data that has been

corrected by the hour as many as 15 or 29 days (tidal elevation units used are cm). On this scheme determine the mid-observation.

Page 27: Tidal Forecasting

2nd Scheme

• Scheme II• Contains the functions X1, Y1, X2, Y2,

X4, and Y4 are each grouped by the positive sign (+) and negative (-). The magnitude of the positive (+) and negative (-) constants obtained by multiplying the observational data at a given time (Scheme I) with a constant magnitude constituent II Scheme.

Page 28: Tidal Forecasting

2nd Scheme

• Constant Number that Used In Scheme IIJam

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23X1 -1 -1 -1 -1 -1 -1 1 1 1 1 1 1 1 1 1 1 1 1 -1 -1 -1 -1 -1 -1Y1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 1 1 1 1 1 1 1 1 1 1 1 1X2 1 1 1 -1 -1 -1 -1 -1 -1 1 1 1 1 1 1 -1 -1 -1 -1 -1 -1 1 1 1Y2 1 1 1 1 1 1 -1 -1 -1 -1 -1 -1 1 1 1 1 1 1 -1 -1 -1 -1 -1 -1X4 1 0 -1 -1 0 1 1 0 -1 -1 0 1 1 0 -1 -1 0 1 1 0 -1 -1 0 1Y4 1 1 1 -1 -1 -1 1 1 1 -1 -1 -1 1 1 1 -1 -1 -1 1 1 1 -1 -1 -1

Koefisien

Page 29: Tidal Forecasting

3rd Scheme

• Is the sum of the component (+) and (-) of Scheme II.

Xo X1 Y1 X2 Y2 X4 Y4+ - + - + - + - + - + - 2000 2000 2000 2000 2000 2000

1,613.00 2,014.00 2,221.00 1,406.00 1,648.00 1,979.00 1,731.00 1,896.00 1,189.00 1,225.00 1,780.00 1,847.00 3,627.00 1,599.00 2,815.00 1,669.00 1,835.00 1,964.00 1,933.001,642.00 2,183.00 2,232.00 1,593.00 1,760.00 2,066.00 1,799.00 2,026.00 1,274.00 1,287.00 1,870.00 1,955.00 3,825.00 1,459.00 2,639.00 1,694.00 1,773.00 1,987.00 1,915.001,671.00 2,271.00 2,275.00 1,667.00 1,854.00 2,090.00 1,810.00 2,132.00 1,317.00 1,310.00 1,944.00 1,998.00 3,942.00 1,400.00 2,608.00 1,764.00 1,678.00 2,007.00 1,946.001,766.00 2,289.00 2,199.00 1,856.00 1,954.00 2,104.00 1,910.00 2,145.00 1,361.00 1,347.00 2,031.00 2,024.00 4,055.00 1,477.00 2,343.00 1,850.00 1,765.00 2,014.00 2,007.001,792.00 2,277.00 2,137.00 1,932.00 2,045.00 2,028.00 1,930.00 2,139.00 1,347.00 1,370.00 2,034.00 2,035.00 4,069.00 1,515.00 2,205.00 2,017.00 1,791.00 1,977.00 1,999.001,904.00 2,170.00 2,123.00 1,951.00 2,097.00 1,982.00 1,961.00 2,113.00 1,373.00 1,336.00 2,036.00 2,038.00 4,074.00 1,734.00 2,172.00 2,115.00 1,848.00 2,037.00 1,998.001,978.00 2,115.00 2,122.00 1,971.00 2,121.00 1,978.00 2,003.00 2,090.00 1,392.00 1,350.00 2,049.00 2,044.00 4,093.00 1,863.00 2,151.00 2,143.00 1,913.00 2,042.00 2,005.002,037.00 2,025.00 2,097.00 1,965.00 2,120.00 1,949.00 2,050.00 2,012.00 1,364.00 1,339.00 2,044.00 2,018.00 4,062.00 2,012.00 2,132.00 2,171.00 2,038.00 2,025.00 2,026.002,094.00 2,000.00 2,206.00 1,888.00 2,113.00 1,989.00 2,106.00 1,988.00 1,373.00 1,365.00 2,037.00 2,057.00 4,094.00 2,094.00 2,318.00 2,124.00 2,118.00 2,008.00 1,980.002,300.00 2,089.00 2,411.00 1,978.00 2,235.00 2,163.00 2,314.00 2,075.00 1,465.00 1,458.00 2,192.00 2,197.00 4,389.00 2,211.00 2,433.00 2,072.00 2,239.00 2,007.00 1,995.002,228.00 1,948.00 2,281.00 1,895.00 2,088.00 2,098.00 2,241.00 1,935.00 1,418.00 1,368.00 2,103.00 2,073.00 4,176.00 2,280.00 2,386.00 1,990.00 2,306.00 2,050.00 2,030.002,146.00 1,942.00 2,435.00 1,653.00 2,009.00 2,090.00 2,187.00 1,901.00 1,382.00 1,355.00 2,046.00 2,042.00 4,088.00 2,204.00 2,782.00 1,919.00 2,286.00 2,027.00 2,004.002,226.00 2,058.00 2,606.00 1,678.00 2,042.00 2,254.00 2,304.00 1,980.00 1,433.00 1,416.00 2,162.00 2,122.00 4,284.00 2,168.00 2,928.00 1,788.00 2,324.00 2,017.00 2,040.001,986.00 2,051.00 2,476.00 1,561.00 1,874.00 2,176.00 2,123.00 1,914.00 1,340.00 1,346.00 2,050.00 1,987.00 4,037.00 1,935.00 2,915.00 1,698.00 2,209.00 1,994.00 2,063.001,998.00 2,180.00 2,540.00 1,638.00 1,899.00 2,293.00 2,140.00 2,038.00 1,375.00 1,417.00 2,097.00 2,081.00 4,178.00 1,818.00 2,902.00 1,606.00 2,102.00 1,958.00 2,016.00

Y1 X2 Y2 X4 Y4X1

Page 30: Tidal Forecasting

4th Scheme

• Contains the value of the components of Scheme II and Scheme III the second suffix is added either 0, 2, b, and c 3 aides to draw up a table based on Scheme IV

Page 31: Tidal Forecasting

4th SchemeIndeks Kedua 0 2 b 3 c 4 dPengali untuk B (29 piantan) -29 -1 0 -1 0 -1 0Pengali untuk B (15 piantan) -15 1 0 5 0 1 0

1 1 0 -1 1 1 01 1 -1 -1 1 1 -11 1 -1 1 1 -1 -11 1 -1 1 1 -1 -11 -1 -1 1 1 -1 11 -1 -1 1 -1 1 11 -1 -1 1 -1 1 11 -1 0 -1 -1 1 01 -1 1 -1 -1 1 -11 -1 1 -1 -1 -1 -11 -1 1 -1 1 -1 -11 1 1 -1 1 -1 11 1 1 1 1 -1 11 1 1 1 1 1 1

Waktu menengah 1 1 0 1 0 1 01 1 -1 1 -1 1 -11 1 -1 1 -1 -1 -11 1 -1 -1 -1 -1 -11 -1 -1 -1 -1 -1 11 -1 -1 -1 1 -1 11 -1 -1 -1 1 1 11 -1 0 -1 1 1 01 -1 1 1 1 1 -11 -1 1 1 1 1 -11 -1 1 1 -1 -1 -11 1 1 1 -1 -1 11 1 1 1 -1 -1 11 1 1 -1 -1 1 11 1 1 1 -1 -1 11 1 0 -1 -1 1 0

Kon

stan

ta u

ntuk

15

pian

tan

Kon

stan

ta u

ntuk

29

pian

tan

Page 32: Tidal Forecasting

5th And 6th Scheme

• Scheme V and Scheme VI is the result of matrix multiplication between the first column of these schemes with a helper table to compile Scheme V and Scheme VI Admiralty, where the price of the first column is obtained from the difference algebra by a certain rule of the components in Scheme IV.

Page 33: Tidal Forecasting

5th And 6th SchemeSo M2 S2 N2 K1 O1 M4 MS4

X 00 = 60993 60993.00 X 10 = -2231 -22.31 22.310 -22.31 -66.93 -2231.000 156.170 -22.310

(29) : Daftar 3a X 12 - Y 1b = 3,293.00 -65.86 296.370 -32.93 -296.37 -296.370 3293.000 -65.860 65.860 (15) : Daftar 3b X 13 - Y 1c = 2,059.93 82.40 -144.195 20.60 267.79 411.986 -1215.359 61.798

X 20 = -1,380.00 13.80 207.000 -1380.00 -400.20 -13.800 27.600X 22 - Y 2b = 5,358.00 53.58 5358.000 -750.12 -3268.38 -107.160 -160.740 160.740 -160.740X 23 - Y 2c = 2,913.00 -58.26 -1893.450 728.25 2913.00 87.390 -145.650 -29.130X 42 - Y 4b = 420.00 4.200 4.20 42.000 420.000

V X 44 - Y 4d = -394.00 3.940 -3.94 -7.88 -397.940 19.700Y 10 = 7,729.00 -77.29 154.58 7806.290 -618.320 77.290 77.290Y 12 + X 1b = -4,157.70 -207.885 -41.58 207.89 498.924 -4365.585 124.731 -41.577Y 13 + X 1c = -5,324.49 106.490 106.49 -479.20 -1277.878 3460.919 -212.980 -106.490Y 20 = 225.00 -36.000 225.00 67.50 -2.250 4.500 -6.750 -2.250Y 22 + X 2b = 273.00 283.920 -40.95 -174.72 5.460 -27.300 10.920 -5.460Y 23 + X 2c = 72.00 -50.400 18.72 74.16 -2.160 6.480 -5.040 -2.160Y 42 + X 4b = 70.00 1.400 7.700 70.000

VI Y 44 + X 4d = -60.00 1.800 -0.60 -3.00 -60.000 3.600

Page 34: Tidal Forecasting

7th And 8th Scheme

• Is the final stage of the process of looking for the tidal component according to the method of Admiralty. Charging rules of each column follows the formula contained in the first column of each of these schemes.

Page 35: Tidal Forecasting

Go to FTP site 167.205.37.3 Find Folder KL 2206 Pengumpulan dan Analisa data Lapangan

User name : KL22062Password : padl2

• Pick a tidal data on Folder Assignment 6• Do Tidal analysis with Least Square Method with program ERG (this

program create by Edi Rahmat Gandanegara KL 96)• Do Tidal analysis with Admiralty Method using step that provide on

same folder• Do Tidal Analysis with NAOTide Program that Also provided on that

folder• Compare the results of Analysis using that different method• Write Report in English• Due date : at Midterm Exam

Project Assignment

Page 36: Tidal Forecasting

Tidal DataHasil Pengamatan Lapangan

0

50

100

150

200

250

300

18 J

UN

I 201

1

19 J

UN

I 201

1

20 J

UN

I 201

1

21 J

UN

I 201

1

22 J

UN

I 201

1

23 J

UN

I 201

1

24 J

UN

I 201

1

25 J

UN

I 201

1

26 J

UN

I 201

1

27 J

UN

I 201

1

28 J

UN

I 201

1

29 J

UN

I 201

1

30 J

UN

I 201

1

1 JU

LI 2

011

2 JU

LI 2

011

Elevasi (m)

Tang

gal

Hasil Pengamatan Lapangan

Page 37: Tidal Forecasting

Least Square ResultsNilai Elevasi-elevasi Penting (cm) Elevasi (cm) Highest Water Spring (HWS ) 290.52Mean High Water Spring (MHWS) 269.53Mean High Water Level (MHWL) 210.89Mean Sea Level (MSL ) 169.39Mean Low Water Level (MLWL) 127.24Mean Low Water Spring (MLWS) 91.01Lowest Water Spring (LWS ) 68.16 Nilai Elevasi-elevasi Penting di ikatkan pada LWS (cm)

Elevasi (cm)

Highest Water Spring (HWS ) 222.36Mean High Water Spring (MHWS) 201.37Mean High Water Level (MHWL) 142.73Mean Sea Level (MSL ) 101.23Mean Low Water Level (MLWL) 59.08Mean Low Water Spring (MLWS) 22.85Lowest Water Spring (LWS ) 0Tunggang pasang : 222.36 cm

KONSTITUEN AMPLITUDO BEDA FASAM2 18.92 10.74S2 9.66 ‐40.39N2 2.74 71.27K2 15.08 ‐2.02K1 47.39 29.84O1 23.73 24.02P1 13.79 112.7M4 1.47 200.92MS4 1.31 ‐10.17SO 169.39

Page 38: Tidal Forecasting

Comparison Between Data and Result of Least Square Method

0

50

100

150

200

250

300

18 J

UN

I 201

1

19 J

UN

I 201

1

20 J

UN

I 201

1

21 J

UN

I 201

1

22 J

UN

I 201

1

23 J

UN

I 201

1

24 J

UN

I 201

1

25 J

UN

I 201

1

26 J

UN

I 201

1

27 J

UN

I 201

1

28 J

UN

I 201

1

29 J

UN

I 201

1

30 J

UN

I 201

1

1 JU

LI 2

011

2 JU

LI 2

011

Elevasi (m)

Tang

gal

Hasil Pengamatan Lapangan Hasil Peramalan Dengan Leastsquare

Page 39: Tidal Forecasting

Admiralty Methodskema 3

Xo X1 Y1 X2 Y2 X4 Y4+ - + - + - + - + - + - 2000 2000 2000 2000 2000 2000

1,613.00 2,014.00 2,221.00 1,406.00 1,648.00 1,979.00 1,731.00 1,896.00 1,189.00 1,225.00 1,780.00 1,847.00 3,627.00 1,599.00 2,815.00 1,669.00 1,835.00 1,964.00 1,933.001,642.00 2,183.00 2,232.00 1,593.00 1,760.00 2,066.00 1,799.00 2,026.00 1,274.00 1,287.00 1,870.00 1,955.00 3,825.00 1,459.00 2,639.00 1,694.00 1,773.00 1,987.00 1,915.001,671.00 2,271.00 2,275.00 1,667.00 1,854.00 2,090.00 1,810.00 2,132.00 1,317.00 1,310.00 1,944.00 1,998.00 3,942.00 1,400.00 2,608.00 1,764.00 1,678.00 2,007.00 1,946.001,766.00 2,289.00 2,199.00 1,856.00 1,954.00 2,104.00 1,910.00 2,145.00 1,361.00 1,347.00 2,031.00 2,024.00 4,055.00 1,477.00 2,343.00 1,850.00 1,765.00 2,014.00 2,007.001,792.00 2,277.00 2,137.00 1,932.00 2,045.00 2,028.00 1,930.00 2,139.00 1,347.00 1,370.00 2,034.00 2,035.00 4,069.00 1,515.00 2,205.00 2,017.00 1,791.00 1,977.00 1,999.001,904.00 2,170.00 2,123.00 1,951.00 2,097.00 1,982.00 1,961.00 2,113.00 1,373.00 1,336.00 2,036.00 2,038.00 4,074.00 1,734.00 2,172.00 2,115.00 1,848.00 2,037.00 1,998.001,978.00 2,115.00 2,122.00 1,971.00 2,121.00 1,978.00 2,003.00 2,090.00 1,392.00 1,350.00 2,049.00 2,044.00 4,093.00 1,863.00 2,151.00 2,143.00 1,913.00 2,042.00 2,005.002,037.00 2,025.00 2,097.00 1,965.00 2,120.00 1,949.00 2,050.00 2,012.00 1,364.00 1,339.00 2,044.00 2,018.00 4,062.00 2,012.00 2,132.00 2,171.00 2,038.00 2,025.00 2,026.002,094.00 2,000.00 2,206.00 1,888.00 2,113.00 1,989.00 2,106.00 1,988.00 1,373.00 1,365.00 2,037.00 2,057.00 4,094.00 2,094.00 2,318.00 2,124.00 2,118.00 2,008.00 1,980.002,300.00 2,089.00 2,411.00 1,978.00 2,235.00 2,163.00 2,314.00 2,075.00 1,465.00 1,458.00 2,192.00 2,197.00 4,389.00 2,211.00 2,433.00 2,072.00 2,239.00 2,007.00 1,995.002,228.00 1,948.00 2,281.00 1,895.00 2,088.00 2,098.00 2,241.00 1,935.00 1,418.00 1,368.00 2,103.00 2,073.00 4,176.00 2,280.00 2,386.00 1,990.00 2,306.00 2,050.00 2,030.002,146.00 1,942.00 2,435.00 1,653.00 2,009.00 2,090.00 2,187.00 1,901.00 1,382.00 1,355.00 2,046.00 2,042.00 4,088.00 2,204.00 2,782.00 1,919.00 2,286.00 2,027.00 2,004.002,226.00 2,058.00 2,606.00 1,678.00 2,042.00 2,254.00 2,304.00 1,980.00 1,433.00 1,416.00 2,162.00 2,122.00 4,284.00 2,168.00 2,928.00 1,788.00 2,324.00 2,017.00 2,040.001,986.00 2,051.00 2,476.00 1,561.00 1,874.00 2,176.00 2,123.00 1,914.00 1,340.00 1,346.00 2,050.00 1,987.00 4,037.00 1,935.00 2,915.00 1,698.00 2,209.00 1,994.00 2,063.001,998.00 2,180.00 2,540.00 1,638.00 1,899.00 2,293.00 2,140.00 2,038.00 1,375.00 1,417.00 2,097.00 2,081.00 4,178.00 1,818.00 2,902.00 1,606.00 2,102.00 1,958.00 2,016.00

X1 Y1 X2 Y2 X4 Y4

KONSTITUEN AMPLITUDOBEDA FASA

M2 296.068S2 59.722 ‐1602.451N2 16.208 71.456K2 7.107 ‐2687.582K1 3.728 71.456O1 20.972 80.429P1 1.498 ‐1600.866M4 6.921 80.429MS4 1.498 ‐4046.107SO 0.872 ‐1665.76

Elevasi (cm)Highest Water Spring (HWS ) 394.468Lowest Water Spring (LWS ) 196.799

Elevasi (m)

Highest Water Spring (HWS ) 197.7Lowest Water Spring (LWS ) 0

Nilai Elevasi-elevasi Penting (m)

Nilai Elevasi-elevasi Penting di ikatkan pada LWS (m)

Tunggang pasang : 197 cm

Page 40: Tidal Forecasting

Comparison Between Admiralty Result and Data

0

50

100

150

200

250

300

18 J

UN

I 201

1

19 J

UN

I 201

1

20 J

UN

I 201

1

21 J

UN

I 201

1

22 J

UN

I 201

1

23 J

UN

I 201

1

24 J

UN

I 201

1

25 J

UN

I 201

1

26 J

UN

I 201

1

27 J

UN

I 201

1

28 J

UN

I 201

1

29 J

UN

I 201

1

30 J

UN

I 201

1

1 JU

LI 2

011

2 JU

LI 2

011

Data Pengamatan Lapangan Ramal Admiralty

Page 41: Tidal Forecasting

Comparison Between Naotide and Data

0

0.5

1

1.5

2

2.5

3

18 J

UN

I 201

1

19 J

UN

I 201

1

20 J

UN

I 201

1

21 J

UN

I 201

1

22 J

UN

I 201

1

23 J

UN

I 201

1

24 J

UN

I 201

1

25 J

UN

I 201

1

26 J

UN

I 201

1

27 J

UN

I 201

1

28 J

UN

I 201

1

29 J

UN

I 201

1

30 J

UN

I 201

1

1 JU

LI 2

011

2 JU

LI 2

011

Survey NAOTIDE

Page 42: Tidal Forecasting

Tides