TN-URBAN WATER SUPPLY Safeguard Policy Issues / Land Acquisition Plan Prior to appraisal, the Borrower contracted a qualified consultant to prepare an Environmental Assessment of the Project including a review of potential environmental impacts and development of appropriate mitigation measures. The Environmental Assessment Report is available in the SONEDE's Project files and the Bank's Infoshop. Environment The project is expected to bring significant environmental, socio economic and public health benefits through better quality and availability of treated water, and improvements in the sustainability of raw water sources through reductions in losses and wastage. Only limited and temporally negative impacts are expected during construction phase while some adverse impacts may result from the operation of water treatment facilities and potable water wells if they are failures in their design, implementation and operation. Potential impacts during construction and operation phases involve: (a) Impacts were surveyed on air and water quality and noise, resulting from excavation work, machinery operation, and traffic as a result of construction and rehabilitation of transmission and distribution networks, construction of storage reservoirs in urban area and the water treatment plant. These impacts will be localized, temporary and minimal, due to the EMP mitigation measures. (b) Unsustainable use of the groundwater resources: Creation of wells for potable water is among the subprojects requiring environmental screening. For each drinking water well, the Bank will require documentation (from DGRE) that demonstrates the water requirement of the project in relation to the current exploitation and renewable resource status of the aquifer involved. (c) ST4, the planned water treatment plant will remove sediments, iron and minerals, and precipitates from intake waters and might produce sludge contaminated with chemical/hazardous pollutants. The contractor in charge of the design and construction of ST4 will be requested to prepare an EA including the development and implementation of a sludge management plan for the whole water treatment pole in Ghdir-el-Golla. ToRs for this specific EA will be included in ST4 biding documents. (d) The potential water quality and health risks of additional water supply causing overloading of sewerage, treatment and disposal systems were reviewed. It is expected to be minimal since most of the planned subprojects will have limited implications for increased wastewater production. Nevertheless, the EMP includes provisions for a rapid EA screening/appraisal for some urban centres in order to identify appropriate mitigation measures. In general, the project, through the implementation of the developed EMP below, is not expected to have significant negative environmental impacts and will not generate any health damage. Land Acquisition Plan Under the Environmental Assessment, special attention was made for OP 4.12 on involuntary resettlement. It was confirmed that only a small amount of land will be needed for storage tanks and pipelines construction/operation with none involving relocation. SONEDE land acquisition procedures have been reviewed and deemed satisfactory. Detailed surveys for all known land acquisition have been completed and are summarized in the table below. The main land requirement anticipated will be for the construction of << ST4 >> treatment plant and a storage tank in Ghdir El RP351 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 24-Aug-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TN-URBAN WATER SUPPLY Public Disclosure Authorized … · 2005. 9. 15. · SONEDE's Project files and the Bank's Infoshop. Environment The project is expected to bring significant

TN-URBAN WATER SUPPLY

Safeguard Policy Issues / Land Acquisition Plan

Prior to appraisal, the Borrower contracted a qualified consultant to prepare an EnvironmentalAssessment of the Project including a review of potential environmental impacts and development ofappropriate mitigation measures. The Environmental Assessment Report is available in theSONEDE's Project files and the Bank's Infoshop.

EnvironmentThe project is expected to bring significant environmental, socio economic and public health benefitsthrough better quality and availability of treated water, and improvements in the sustainability of rawwater sources through reductions in losses and wastage.

Only limited and temporally negative impacts are expected during construction phase while someadverse impacts may result from the operation of water treatment facilities and potable water wells ifthey are failures in their design, implementation and operation. Potential impacts during constructionand operation phases involve:

(a) Impacts were surveyed on air and water quality and noise, resulting from excavation work,machinery operation, and traffic as a result of construction and rehabilitation of transmission anddistribution networks, construction of storage reservoirs in urban area and the water treatment plant.These impacts will be localized, temporary and minimal, due to the EMP mitigation measures.(b) Unsustainable use of the groundwater resources: Creation of wells for potable water is among thesubprojects requiring environmental screening. For each drinking water well, the Bank will requiredocumentation (from DGRE) that demonstrates the water requirement of the project in relation to thecurrent exploitation and renewable resource status of the aquifer involved.(c) ST4, the planned water treatment plant will remove sediments, iron and minerals, and precipitatesfrom intake waters and might produce sludge contaminated with chemical/hazardous pollutants. Thecontractor in charge of the design and construction of ST4 will be requested to prepare an EAincluding the development and implementation of a sludge management plan for the whole watertreatment pole in Ghdir-el-Golla. ToRs for this specific EA will be included in ST4 biding documents.(d) The potential water quality and health risks of additional water supply causing overloading ofsewerage, treatment and disposal systems were reviewed. It is expected to be minimal since most ofthe planned subprojects will have limited implications for increased wastewater production.Nevertheless, the EMP includes provisions for a rapid EA screening/appraisal for some urban centresin order to identify appropriate mitigation measures.

In general, the project, through the implementation of the developed EMP below, is not expected tohave significant negative environmental impacts and will not generate any health damage.

Land Acquisition PlanUnder the Environmental Assessment, special attention was made for OP 4.12 on involuntaryresettlement. It was confirmed that only a small amount of land will be needed for storage tanks andpipelines construction/operation with none involving relocation. SONEDE land acquisitionprocedures have been reviewed and deemed satisfactory. Detailed surveys for all known landacquisition have been completed and are summarized in the table below. The main land requirementanticipated will be for the construction of << ST4 >> treatment plant and a storage tank in Ghdir El

RP351

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: TN-URBAN WATER SUPPLY Public Disclosure Authorized … · 2005. 9. 15. · SONEDE's Project files and the Bank's Infoshop. Environment The project is expected to bring significant

TUNISIA 2 Land Acquisition PlanUrban Water Supply Project (P064836)

Golla, Greater Tunis which belongs to the SONEDE. The specifics of the project Land AcquisitionPlan and status as submitted on June 15, 2005 is summarized in the following table.

Land requirement (m2) EstimatedProject Sub For For Cost Acquisition process stagecomponent Forpen Forlin Total (106 TND

Equipment Pipeline ___________ H.T)

Station de traitement Land owned by SONEDEST4

R6habi1itation DN 1190 Land owned by GovernmentGEG - Ras Tabia

Reservoir eau traitee Land owned by SONEDEgrand Tunis

Boij Touil 2,500 27,000 29,500 0.040 Pipelines & structures: AOT'issued; purchase begun

La gazelle 2,500 0 2,500 0.013 AOT issued, purchase begunMomag 0 15,000 15,000 0.015 AOT issued

Etage GEG 72 et Bir 10,000 0 10,000 0.050 Land owned by SONEDEKassaa 72

Rouhia-Sbiba-Jedliane 5,000 45,000 50,000 0.070 Pipelines & structure: AOTissued; acquisition initiated

Ghardimaou 3,000 47,000 50,000 0.062 Pipelines : AOT issuedStructures :SONEDE land.

Ain Draham 2,000 0 2,000 0.100 AOT issued, purchase begunOuerdanine 0 10,000 10,000 0.050 AOT issued, purchase begun

Nasrallah 2,500 24,000 26,500 0.037 Pipelines & structures: AOTNasrallah 2,500 24,000 26,500 0.037 ~issued. Acquisition initiated

Kalaa Kbira 0 15,000 15,000 0.075 AOT issued

Jammal 0 50,000 50,000 0.050 AOT issued

Total 27,500 233,000 260,500 0.561

SONEDE's tested land acquisition procedures have applied to previous bank financed projects, andprovided in the appendix below.

Cultural Property

The EA report indicates that project activities would not affect any above ground artifacts witharcheological, paleontological, historical, religious, or unique natural values as defined under OPN11.03. However, most of the construction activities will involve excavation work and thus all

AOT = Avis d 'Occupation Temporaire, or temporary occupation notice.

Page 3: TN-URBAN WATER SUPPLY Public Disclosure Authorized … · 2005. 9. 15. · SONEDE's Project files and the Bank's Infoshop. Environment The project is expected to bring significant

TUNISIA 3 Land Acquisition PlanUrban Water Supply Project (P064836)

contracts will include standard clauses which follow Tunisian law (Law n° 35 of May 9, 1986) andregulations regarding chance finds during construction.

Environmental Mana2ement Plan (EMP)

The objectives of the EMP are to identify feasible, cost effective measures that may be used tomitigate any adverse environmental impacts that might occur during the construction and operation ofthe project. The proposed EMP will consist of three kinds of activities: (i) implementation ofmitigation measures; (ii) monitoring and evaluation of mitigation measures; and (iii) strengthening thecapacities of SONEDE.

Mitigation Measures

Mitigation measures have been identified to ensure that the defined objectives of the project areachieved whilst preventing and reducing any adverse environmental impacts. The mitigation measuresare to be executed by the Construction Contractors with supervision by the SONEDE and involvedgovernmental institutions.

During Construction PhaseConstruction mitigation measures will be required to minimize inconveniences to the public. Suchmitigation measures are standard and widely used in construction practices properly supervised forachievement of international standards of quality. Tables A, B, C et D (construction phase) in the EAreport summarize the major adverse environmental impacts during construction and their mitigationmeasures as well as involved institutions.

Other adverse construction activities will be mitigated through the adoption of Good EnvironmentalPractices given in Annex of the EA report. For instance noisy construction activities can be limited tonormal working hours and providing muffler to minimize noise nuisance. Dust emissions can beavoided by using dust suppression measures such as periodically sprinkling water in certain areas,providing appropriate covers and removal of excess material from the site. Dangerous activities inpublic areas will be controlled to reduce risk to the public, traffic and warning signs will be placed atconstruction sites, trenches will be provided by fences, or railings. The contract with contractors willincorporate all requirements to minimize disturbance from construction activities and will bemonitored by SONEDE (assisted by a Safeguards/Environmentalist Consultant) to ensure compliancewith the contract.

The cost of the mitigation measures during construction will be incorporated in the contract cost ofthe contractor. Moreover, the Bank will review all civil works contracts to ensure that the requiredmitigation measures have been incorporated in the tender documents.

During Operation PhaseThe operation of the water networks and treatment facilities and exploitation of groundwater (wells)can create adverse impacts, which need to be avoided through the implementation of mitigationmeasures. Tables A, B, C and D (operational phase) in the EA report summarizes the potentialimpacts and the proposed mitigation measures. Specific EA will be carried for identified subprojects(see list in the EA report) and will identify more specific safeguards measures.

Page 4: TN-URBAN WATER SUPPLY Public Disclosure Authorized … · 2005. 9. 15. · SONEDE's Project files and the Bank's Infoshop. Environment The project is expected to bring significant

TUNISIA 4 Land Acquisition PlanUrban Water Supply Project (P064836)

Monitoring PlanMonitoring of construction activities will have to ensure that mitigation measures of constructionimpacts are being implemented properly, while monitoring of operation activities is to ensure that nounforeseen negative impacts are arising. During construction, the monitoring program will includedust and noise. Monitoring of the water supply will include biological, physical and chemicalparameters as well as heavy metals and pesticides residues. Table under Section 7.3 of the EA reportgives the proposed monitoring requirements during the construction and operational phases.

Institutional StrengtheningThe institutional arrangement and capacities of the organizations in-charge with the implementationand management of the proposed project were reviewed with the intention of providing technicalassistance and reinforcement. Environmental expertise will be strengthened through:

(i) the provision of an environmental expert to (i) assist the SONEDE in supervising theimplementation of the EMP; (ii) the elaboration of ToRs and review of EIE reports for subprojectsrequiring EA during the project implementation; (iii) the elaboration of EMP monitoring reports.

(ii) the provision of training programs that will be designed and implemented with the assistance of alocal or international expert and will cover the following main topics:

* Environmental Assessment* Effective implementation of mitigation measures* Project supervision, monitoring and evaluation

Implementing safeguard requirements

The borrower will hire a partial time safeguards/environmental consultant to assist the ProjectManagement in overseeing and managing the following environmental activities:

* Overall supervision and monitoring the EMP* Preparation of EIA ToRs for ST4 and supervision of relevant consultants works* Preparation of EIA ToRs of pipeline GEG -Ras Tabia and supervision relevant consultants

works* Preparation of ToRs for rapid EA screening/appraisal and reviewing relevant consultants'

reports

The EMP implementation planning includes contracting out the preparation of EIA and DS studies,implementation of environmental training activities, and EMP supervision and reporting. The projectbudget includes funds for the implementation of all safeguards requirements, including the following:

* Hiring a Safeguards/environmental Consultant* Preparing and implementing Specific EIAs and rapid EA screening/appraisal* Preparing and implementing EMPs* Preparing and implementing an awareness workshop on key environmental issues related to

water supply projects

Page 5: TN-URBAN WATER SUPPLY Public Disclosure Authorized … · 2005. 9. 15. · SONEDE's Project files and the Bank's Infoshop. Environment The project is expected to bring significant

TUNISIA 5 Land Acquisition PlanUrban Water Supply Project (P064836)

* Training SONEDE staff and other involved institutions in fulfilling their responsibilities formanagement of safeguards issues.

Implementation of EMPs will be monitored by SONEDE regional engineers and/or Safeguardsconsultant as appropriate. The Tunisian EPA will also undertake periodic inspections.

I

Page 6: TN-URBAN WATER SUPPLY Public Disclosure Authorized … · 2005. 9. 15. · SONEDE's Project files and the Bank's Infoshop. Environment The project is expected to bring significant

TUNISIA 6 Land Acquisition PlanUrban Water Supply Project (P064836)

Appendix: SONEDE Land Acquisition Procedures

AcQUxrrxo~flRDW ThRR'IMNS CONSTrrTUTION /UDossR~ COLL 'CTIXF lOALCQMBIT,ONf DE TERaRAIN

_37

tw d._Q

I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~.

Page 7: TN-URBAN WATER SUPPLY Public Disclosure Authorized … · 2005. 9. 15. · SONEDE's Project files and the Bank's Infoshop. Environment The project is expected to bring significant

TUNISIA 7 Land Acquisition PlanUrban Water Supply Project (P064836)

_~~~~~~r In

SowN systNne: Ade mlilstratif: PatriRne fonccr. e i aprieebdMre: 7

Pge Iii D

nN_ MP; Cestion gs ageetfs dere foguilaesaptri a mDNabM _j s . - , - . . ]ZZ ;^X~~~~~~~~ I ii d f~ghjOPfSdk)fl#.JiluI 2003

. _ .r. izVut uk sLLJuvIMI iaZr wiqils he II ,.r* iZt4 e} aj'r:.Contitution du dO 8sler colleetit d'acquis ulitaitd D2 areMAJ

R*/~~~~~~~~Pf* AtmtW 4"h -4' sj* A.3ZI_ bf 6fNomclo ~ Ea ds ~ppsilnsapud e

L r rvenaZnt f op l'op6rat Desarnption de l'oppratlon Doc.ut RGI Nte NT o.r...._ _. _ _ . _ _ _ _ _ _ _ _ _ _ _ R C D_i 5.5 ¢'JAF - - Arie M etre , j srgn turSe liAOldha desengagements do rigularlsation a l'a irable,

{et

1 R* DXfs i sr|cepdUon du couvern'rat du a Rfsulhat g

ElaZt des Zopposilions appuy deZs|r6damnaftlone dosZ oppowits At32.2

- Mettre A jour le RES dZe I'AOT: date de A1.4IrAcepto d^u resulta'. do l'affiGhage.

2 l l |- Contacer les opposants pour foumir2 | 4 les justifhcabfs de propribtk nicessalres

tm | de7pposos I et s'assurer do la validltA des plAcesregues

3 Elablir los plant parcelaires difinitift etI awAhslon AI73.i RG.7.3} Plans un plan deonseinble (en 7 exemplaires) AA.32

| DWclasser le rapport dcexpertlseEtd (lsswnentf - Etablir (au vu 4du Rapport d'expertise,

4 de rEtat d de V'Atat des oppositions at des Plans) Ak3| ctuerrs | un Atat des terrains A acquuitr (2 ~VA

exemiplaires)

La oommuniquer au Directeur rr A7.4I_____ accompagn& des piAces justficatives

Dr.rr | Appatk Examiner Ws documents puis sIgner - - i* LOs Plans! parcellaires d6finifts et AA.3.2

la plan d'snpmble.* L'rtat des terrains b acqu4rir A.7.4L- Os retoumer a lUnOl des affalres

foncl6res

1 SR

I

Page 8: TN-URBAN WATER SUPPLY Public Disclosure Authorized … · 2005. 9. 15. · SONEDE's Project files and the Bank's Infoshop. Environment The project is expected to bring significant

TUNISIA 8 Land Acquisition PlanUrban Water Supply Project (P064836)

SONEDF , -1

[ . C.onsli lpJo 4i d, , miifl._,_tif: _'acqt zi* onieo de la preMAJ_- =_ -.

Rif N. Nom de WmI. OfVint,M.nant F op Voprat* Doscriptic de pa In DIG o T OP

UAF 6 rocndu -Cconisituonduer Dossier coJOtf:Dossiercowh d'acquisition dps terrains compos6:

dacquilsna a Plan d'ensrmbIe (3 exemp) AA.32M Etades tirrains A acqumrir A.7.4a Cople du otppdxte d 'eexpertise A.3.3* L'astatidn d'aflchage et I'Et A322:des oppos ions

Extraltde rle

- ctabir uns nke de prAsentation du7 Trasnmisson Dosder Collecif on 2 exemnplires

Cu e - Communiquarl la Dossler ColletlfCOtgztf auOTT acoompagnO de la Note de

prLsentaton ai DOcteur 1

Dr.lT 8 - Examiner4e D4ssfer Collectif at sgner

I aNote de pr donsi*atume - Les retournerd a l'unltA des afaires

UAF 8 Trmission - Transmettre lei Dossier Collectif avec ladu Dossier oedon ab note & la DJF,pour approbton par la

DJF Direction gAnerale

Mis our - Mettte & jour RS des acquLsItlons des10 dter rainsA Sup rfce acquArir, N" des

de Wii titres et Montat dacquisition- Mettre a jour 1 RS de I'AOT: date de AAA

transmission du Dossier CollecUit & IaDJF I

- Ctassement deS plans parcellaires 4 Enattents de ia *eplon des actes depropiieti '

- Classer la 2 cope du DossierColleotf (accotinpagnMe de la note depr6sentation) a En atfento de Ia'racepion des vctes de popriAtb et deIascard de 'a: direction g6n6rale suri'acquislton det terrains n: Ct P.=

|I39z~~~~~~~~~~~~~~~~~~~~~m I A J -Nnr-gi Nnw

Page 9: TN-URBAN WATER SUPPLY Public Disclosure Authorized … · 2005. 9. 15. · SONEDE's Project files and the Bank's Infoshop. Environment The project is expected to bring significant

C~ -1

00t'I

o ~ ~ ~ ~ ~ ~ ~ ~ ~ J4~~~f

0~~~~~~~~~~~~~~~~~~~~0

SD

2~~i''-

Page 10: TN-URBAN WATER SUPPLY Public Disclosure Authorized … · 2005. 9. 15. · SONEDE's Project files and the Bank's Infoshop. Environment The project is expected to bring significant

TUNISIA 13 Land Acquisition PlanUrban Water Supply Project (P064836)

. I

'.- :|P-OPAMtXON

Ii0e1 CO:JJ CR-Infl-91 'AU

Page 11: TN-URBAN WATER SUPPLY Public Disclosure Authorized … · 2005. 9. 15. · SONEDE's Project files and the Bank's Infoshop. Environment The project is expected to bring significant

TUNISIA 14 Land Acquisition PlanUrban Water Supply Project (P064836)

SONEDE - s.. dh4, t , |

- ?ade la procedidre. ~ ~ ~ &Susystenwe . dministratxf: Paitinmo~ie foncier Page ,2 3z

.MPi Gestion des itffires fonci4res par ti DtN TDI 'dte d'iIabomrialoJilflet 2(113. ,.I djour:

Proceduro'Exe ropriaItion .. O'rnidreilJ

Rif N Nomn de Doc.ut R. Ri: Ril2 Fr d o D F op Vop6rat Description de I'opkration RO I Note NYT P

LP _ _ . ............... _ RC1D _ _x_520 VAF - Proc6er A la demandt de la DJF A

I Enquut - ue anqu nte de profondlt pourDoassuer de la propdrJ n

2 AfsE moute,Etablir b plans paigCela SdinO A.7.3.t

despltrns (PPD)

- tabir au vu du ftort les PPD iet de._ _ 3 _d aiEude rit de __t_, rEtd des terans b A.93

3 tmWnis & expmprier(en 6exempWes

- 0rI - xamineffuer I dossier d'ExpropriWon4 d omgmum du

Rs ultatndee1enqunteLa Iw.ma.io La solaireLo Rappoftd'experOset

ost - ....... Loes PPDret luEntb de carte (4 s 7-L1'exemploires| L!Et3t des terreh«iAexroprber A.9.3

| T . 1- Eablir une note de pr6sentallon du5| d,DiStS au Mossior d'expropdaon anl 2

I Onn I SaeXeMplairer,

F 1- I~~~Coimmuniqwar le iDosslerl | .dt~Exproptleon iamtmrpagn6 de le note

Dr.lTT 6|| Exarriner le idos*3i d'exproprTabon et .Exaen t 1 signer la rote

i J |- tLas retoumer A I'uniHb des alfalres

:1.45Ipifl Cil:J1 QO-Nnr-PI nw

Page 12: TN-URBAN WATER SUPPLY Public Disclosure Authorized … · 2005. 9. 15. · SONEDE's Project files and the Bank's Infoshop. Environment The project is expected to bring significant

TUNISIA 15 Land Acquisition PlanUrban Water Supply Project (P064836)

SQbJWEC -r . L

_ ! , . . - --- -- ,e o. 'oer

. . . . .. :etiwds ,5:f .. ; .,rV N.do&l d'&&Ov&ndf1tf 2* P e fE ~ ~ ~ ~ ~ ~~~~d apoddv

. .Sous sst&mle: bdrnifhtra,tf; Pair zauir f;oncder .Pag ¢

@ .: G.sdoo .des affaire fonici4rs par ia DTlN . 'S date d 'Ifahora,,;,lw/R 240S3

.;Proedue F~xprOQrIa*oi0.n - .. ; i r2nMA)

= -__ = I

R6& NO Nom d* Doc.ut RW. RV RUlnbw* F op I'op6rat Description de lop6ratlon RG I Note NT o0F

__ _ __ _ _ _ _ _ _ _ _ _ _ _ RCD 0 s UA;F 7 Tmirxrai - i Tfnmmatm bI doser d'expropratlon

l DJF I avem b la e A la DJF pour suite .t ~~~~~~~~~I tonner ,I

- Met e& jour:le RS des acquisionsdate do tnsmssion du dossie A.5A.2I dsWpmpdaflo h In DJF

- Classwr une cople du dossierd'oxproptiaton a Fn attete de bT cGptIon do Is OJF du dcWretCExpropEaIon

Putenont du rA de Ba fadi' de laexoert -r squat A - Proc6der au pahment de Jexpert durewt * L Cf. 1 1.2 11.2,2

9 p*wtbn (fu eDs -16=ti di la DJF du Rdetd6ew 'xIOfaw I~.~

- Metra jour le RS des acquiorns:data de r6cepibon du d&mret AR2:d'.xpiopraionI

- Classer le decret d'exprpriaZon a Enatnte de ba rption de la d6isionde B misean possession .

1 p ralede n rAcu!c de to DJFdo tact, de mis enracta8 de miss BaenpcPson - Metre jour le RS ds aquisitions:

.date de reception de l'ateo de mise on on .4.2possession

. bIstSflh - Asster b Is miss en poesion:12 n coMcrnansbe par un PV dont cople estpoession remiss A Is DTT.

. - __ = - = _ - = X -- L t 11

- I ~~~~T.46

I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Page 13: TN-URBAN WATER SUPPLY Public Disclosure Authorized … · 2005. 9. 15. · SONEDE's Project files and the Bank's Infoshop. Environment The project is expected to bring significant

TUNISIA 16 Land Acquisition PlanUrban Water Supply Project (Po64836)

SOCMENA70MLE DEXLQ MAII0&ET DE DIST.RiBUTON DES EALIX

Tunis, 1e.10 Octobre 1978

Jr&JTel Occupation temparaire Acquisition de Terrvains.

YGENERALIIES:l'obpet dle la prcsent note est de r6glementet ei proCAdure d'occupation temporaire,

d'expropriation at le acqujsltorin de toile fan quo lea 1'expropriation dcintervienneplus u la fin des travaux oe que ie paiement des propri6taires so fosse dans leamelilleurs d6lais possiblos.Pour cela lpon no sourient joip insister co cue lea Divisions Travaux fassontrespecter To tracA d'ex6cution 6tabli par ie service topographie ore de VAtudeparcellaire - ce trac6 doit tre d6finitif at doit pouvair donner cle Is moni6re lI pluspr6cise possible, la superficie A occupabir temporairement et au soin do ceil.i lasuporficie & acqu6rer ( ou lo cmi &ohoant a exproprieri).

if - OCCUPATION TEMPORA1E ACQUISITION4 DE TERRAINS:

deux oprrations se rejoignent dens teurs phase pr6paratoire qul ost du ressor.B avice Topographique - cet phase comprond:

L-Mude parcellalre

La dSlimitation do la zone qoicupation temporaire qui ontraTno le constitution dudossier d'occupation temporair(.

- La d6limitation de la zone A acqudrir ou h exproprier, support du dossierd'exproprlation dont se chergilie servioe juridique.N.B. La superricie nAcessaire pour i'5dlflcatbon dun ouvrage autrequ'une conduitedolt Atro d6iimit6e avec la plusigrande pr6cision.

Darns unis deuxibm~ie phase, II y aura an paraleOlo9

I 'AiL~ J tR . CM-iunr-Pr tIdnu

Page 14: TN-URBAN WATER SUPPLY Public Disclosure Authorized … · 2005. 9. 15. · SONEDE's Project files and the Bank's Infoshop. Environment The project is expected to bring significant

TUNISIA 17 Land Acquisition PlanUrban Water Supply Project (P064836)

-Zxecution de l'ouvrage avec Ivaluatlon des d6gats et dedommagements au fur et ArMf,;sure de l'avancement des tiavaLx

_ltablissement de dossier d'expropriation par le Service Juridique suite b un rapportd expertise de terrain 6tabli per le Service Topographique.

ill - I ERE PHASE - VAUX PROPARATOR9S:

1/ Etude Parcellaire:

Cette etude consiste, suite A un levb topographique, ia btablir un plan parcallairefaisant ressortir le trac6 de ji'ouvrage et au dela de ce trac6 la zone d'occupationtbmporaire.

21 - D4Ito de h zone dLOa aualion Tnnoraire:

Los Agents du Service Topographique, aides par un agent du Service Chantler&ucluel ce dAplacement servira de reconnaissanoe, dresseront un etat cornportanteavo l'ordre des lots & traVerser, les noms des propridtaire et la superficie desprr-elles a occuper temporairement.

,3/ - Demton de I. n Acaur .

C'ette bande doit, lors de son Atablissement, faire l'objet d'une Atude minutieuse attenir cornpte de tous leas lmp4oidrables (oppqsitipn d'une minutieuse et tenir comptede tous les impond6rablos (i opposition d'une autorit6 locale pour sos propreebesoins, par exemple ), afln' qu'elle nr souffre d'aucune modification lors de lardalisatlon de f'ouvrag.:La Division Travaux doit 6t8blir pour chaque parcelle de terrain A acqu6rir un planparcellaire 6tabli sur une 6challe aussi grande que possible( Ex, 11500 ) faisantressortir les limites de la propnit§ A traverser:

- S'il s'agit d'une parcelle faisant partle d'un terrain immatricul4 il sera fait mentiondu num4ro du titre foncier et da Is transposition de l'emprise de l'ouvrago sur uneoopie du plan objet du titre foncier en question d6livr6 par l'office de la topographieet de la cartographie.

2; i s'agit d'un terrain non immatriculb il sera indique les limites de l'emprlse de Iapow.&ulle A acqu6rir per rapport A Ilensemble du terraln appartenant aux tiersainai

It noms des riverains.

OcCuDatsopn Temnoralr

41. Etablisseome-t d Dossir d'cccuDafioA tmoaeire:

A l'aide du plan parcellaire et de 1'6tat des paroelles d6limitant la zone d'occupationtemporaire, le service Topographique 4tablit:

- Un projet d 'arrt6 d'occupation temporaire

7t -J onV I I rrJ I nT rTf 'nnit I

Page 15: TN-URBAN WATER SUPPLY Public Disclosure Authorized … · 2005. 9. 15. · SONEDE's Project files and the Bank's Infoshop. Environment The project is expected to bring significant

TUNISIA 18 Land Acquisition PlanUrban Water Supply Project (P064836)

- Un avis d'occupation teniporaire destin4 aux propri6talres- Un projet de note au Gouverneur.

C(o- documents ajoutbs au plan parcellaire constituent le dossier d'occupationfcm,4,rairc qui ect d6poe4 en six oxemplairer pour approbation au Minist6re doLAtloulture.

42 piofusn du DossIer d'Occuotion Temnoreir:

Une fois approuv6 et retOurr du Minist6re de I'Agriculture le dossier d'occupationtamporaire devient executoire. 11 est alors trar*MriU:

- Au Gouvemour de la r4gion en doux exemplaires. Ce dernier se charged'acheminer les avis d'occupation temporaire aux pr6sum6s proprintaires pourinformation.

- Au service Chantier en un exemplaire pour ex6cution des Travaux.

- A la Division Travaux en un exemplaire pour lnformntion.

- Au Service Juridique en un exemplaire pour suivi et paiement des dagAts.

j; ~caulsftion de Teain:

51t. rE4 DrtlSE d e " fot at ir;Cp

* .s I'etablissement du dossier d'occupation temporaire, le Service Topographiqueit proc6der 6 Iexpertise des terrains nus a acqu&rir, par un expert agrei aupres

ties Tribunaux onginaires de la region.L'expertise dolt etre faite I/'hectare poor les ibrrains a vocation agricole et au metrecarr6 pour les terrains destinas b la construction at situes dans une zonemunicipale.I'expertise qui recevra l'agr6ment des deux parties donnera naissance a un 6tat desexpertises des terrains nus.

62. Offre des Pnx et Traactionscaer le Service :

D6s r6ception de 1'6tat des expertises, le S.J doit notifier apr6s accord de laDirection GAnkrale les offres de prix aux proprietaires. Dans le cas ou le propriAtairen'accepterait pas I'affre qui luija ett faite, il sera invit6 d produire une expertise,Ce bIle par un expert agr66 requis a ses frais.At.4 Vt. des deux rapports d'expert1ses 6tablis l'un A l'initiativa de Ila SONEDE, I'autre

tp nhtafive du proprietaire, le S.J peut:

Soit soumettra A la Dlrection G6n6rale une proposition de transaction entre IsSONEDE et le propri6taire int6ressA.

- Soit proc6der a une expertise d'arbitrage ( pRr u i expert arbitre choisi par les deuxexperts des deux partles en litige )

L RL: ). .'-IlP4I 'Anlo

Page 16: TN-URBAN WATER SUPPLY Public Disclosure Authorized … · 2005. 9. 15. · SONEDE's Project files and the Bank's Infoshop. Environment The project is expected to bring significant

TUNISIA 19 Land Acquisition PlanUrban Water Supply Project (P064836)

Pt 'd 1V3IO1

III - 2 PHA8E - OCCUPATION TEMPORAIRE - ACQUISTION DE TERRAINS

11. Evaluatgon des DeaAts:

Ella a lieu au fur et a mesure de l'avancement des Travaux. Cotte 6valuationcom.orte outre la doterminiatlon des .d6gbts, mat6riaiis6e par un oonstatconr,Vidictoire, leurs &valuations propremont dite. Celi-ci peut sefaire A I'amiable* L .au cas de contestation, Atre soumise & la proc4dure d'expertise groupanteA3amble des expertises das i6gats afftrents au tragon ex6cut6.

12. EtablJisement du Dossfer dgldnmnisation:

Le service Chantier appelle les propriAtaires O produire les documents attestant leuridentit6 et leurs qualites de proprietaires. 11 adresse uns cople du rapport d'expertiseau Service Marche qui lburs envote en retour une demande de marchk simple quimvtir:n :1 i AarwinA p(hAnfler d'itablir un constat d'avancement des Travaux ( CAT)at de cr6er une fiche lmmobilisatlon en cours ( FIC).

Leas constats contradictoires des d6ghts, le rapport d'exprtiseo los titres deproprlAt6s, les dermandes de marche simple et to CAT constituent ls dossierdTindemnisation que le Service Chantier achemine au Service Juridique.

13. )ndemnisation

t4- Service Juridique s'assureide l'exactitude des lnformations du dossier et proc&deau Vtirient par chbque.

2,,-A uismioN DES TERRAINS=

£6s r6ception de Is copie du dossier, d'occupation temporaire et de l4tat detexpertise des terrains nus, le service Juridique entame la procAdure d'equisitionqul comprend les operations sulvantes

- Aflfchage au slAge du gouvernorat et de D66lgation pour les terrains nonimmetricul6s.

- Offre de prix par le Service juridique

- autorination de Vente du Gouverneur aprbs accord des dcux parties.

^ Etablissement du contrat de paiement

Le Pr6sident Directeur G6n6raj

A.FRJIH

Vl:).l C-Mrnr-PI 'mnu

I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~