To: RFP Respondents
RE: One (1) firm to provide all required professional engineering services for:
Melaleuca Lane and Jog Road Intersection Improvements Department of Engineering Project No. 2019501
and Public Works
P.O. Box21229
West Palm Beach, FL 33416-1229
(561) 684-4000
FAX: (561) 684-4050
www.pbcgov.com
•
Palm Beach County Board of County Commissioners
Dave Kerner, Mayor
Robert S. Weinroth, Vice Mayor
Hal R. Valeche
Gregg K. Weiss
Mary Lou Berger
Melissa McKinlay
Mack Bernard
County Administrator
Verdenia C. Baker
"An Equal Opportunity Affirmative Action Employer•
.PA printed on sustainable W and recycled paper
Dear Consultant:
This letter serves to advise you of the results of the January 14, 2020, Short List Committee meeting for the above project. Constructive Engineering, Inc., Propel Engineering, Inc. and American Consulting Engineers of Florida, LLC were short listed.
Consultants are hereby notified of the "Cone of Silence" requirements pursuant to Palm Beach County Lobbyist Registration Ordinance 2003-055 (Palm Beach County Code 2-351 through 2-358). In addition, it is recommended that all design professionals seeking to provide services to Palm Beach County review Policies and Procedures Manual (PPM) CW-F-067 "Evaluating, Recovering and Recording Errors/Omissions by a Design Professional", which can be found at www.co.palm-beach.fl.us/publicaffairs/ppm/pdf/cw-f-067.pdf
The "Consultant Summary" table and the Short List Committee voting sheets will be posted shortly at: http://discover.pbcgov.org/engineering/roadwayproductions/Paees/RoadwayPulications.aspx.
Thank you for your submittal and we encourage you to respond to future RFP's.
The Short Listed firms will be notified under separate cover of their presentationtime. Should you have any questions or require additional information, please contact me at 561-684-4150 or email me at [email protected]
Sincerely,
H!t(if Contracts Section Manager
pc: Tanya McConnell, P.E., Deputy County Engineer
ec: Patrick Rutter, Assistant County Administrator David L. Ricks, P.E., County Engineer Steve Carrier, P.E., Assistant CoW1ty Engineer Omelio A. Fernandez, P.E., Director, Roadway Production Morton Rose, P.E., Assistant Director, Roadway Production Anthony Montero, Office of the Inspector General Yeliz.aveta B. Herman, Assistant County Attorney Fay Reynolds, Legal Secretary, County Attorney Kathleen 0. Farrell, P.E., Thoroughfare Roads .Section Manager, Roadway Production Fenson Masse, P.E., Project Engineer, Roadway Production Committee Members
F:\ROADWAY\CCNA\2019\2019501 Melaleuca Lane at Jog\Short List Meeling\Short List Results_ Consultants.docx
F:\ROADWAY\CCNA\2019\2019501 Melaleuca Lane at Jog\Short List Meeting\Short List Minutes.doc.docx
MINUTES OF SHORT LIST COMMITTEE MEETING January 14, 2020, Commencing: 2:06 P.M., Ending: 3:04 P.M.
Engineering & Public Works Department, 3rd Floor Conference Room #3W-12
MEMBERS PRESENT:
Steve Carrier, P.E. - Assistant County Engineer Morton Rose, P.E.* - Assistant Director, Roadway Production Joanne Keller, P.E. - Director, Land Development Fenson Masse, P.E.** - Project Engineer, Roadway Production Mark Tomlinson - Director, Construction Coordination Kathleen Farrell, P.E. - Thoroughfare Roads Section Mgr., Roadway Production Angela Smith *** - Sm. Business Development Specialist,
Office of Equal Business Opportunity
* denote any delegated votes here: *Omelio Fernandez, P.E. - Director, Roadway Production **Holly Knight, P.E. - Contracts Manager, Roadway Production ***Tonya Johnson - Director, Office of Equal Business Opportunity
DISCUSSION: Quorum was represented by a minimum of five members. The Short List Committee was called to order by Steve Carrier, P.E., Assistant County Engineer. It was stated that the committee would be discussing the firms for Professional Engineering Consulting Services for:
Melaleuca Lane and Jog Road Intersection Improvements
Project No. 2019501
The meeting was opened up the meeting for Public Comments, public was present but none had questions or comments. The outline of the project was discussed by Kathleen Farrell, P.E., Thoroughfare Roads Section Manager, Roadway Production. The shortlist committee intends to shortlist a minimum of three (3) firms.
Page 1
F:\ROADWAY\CCNA\2019\2019501 Melaleuca Lane at Jog\Short List Meeting\Short List Minutes.doc.docx
January 14, 2020 Short List Meeting for Melaleuca Lane and Jog Road Intersection Improvements Project No. 2019501 RESULTS:
Submitting Firms Shortlisted Firms
American Consulting Engineers of Florida, LLC 1 Constructive Engineering, Inc.
Constructive Engineering, Inc. 2 Propel Engineering, Inc.
Erdman Anthony of Florida, Inc. 3 American Consulting Engineers of Florida, LLC
HBC Engineering Company, Inc.
Pevida Highway Designers, LLC
Propel Engineering, Inc.
R.J. Behar & Company, Inc.
Page 2
SHORT LIST COMMITTEE TALLY SHEET ·-
-- -ONE (1) FIRM FOR: All Engineering Services Required for:
- -Melaleuca Lane and Jog Road Intersection Improvements -
PROJECT NO: 2019501 --- -
-MEETING DATE: Tuesday, January 14, 2020
-- - - - - --MEETING TIME: 2:00P.M. - -
American Constructive Erdman HBC Pevida Propel
Consulting R.J. Behar & Shortlist Committee Engineering, Anthony of Engineering Highway Engineering,
Engineers of Inc. Florida, Inc. Company, Inc. Designers, LLC Inc.
Company
Florida, LLC
Assistant County Engineer Steve Carrier 4 1 7 -L 6 5 2 I 3 -I
-
I I Director Roadway Production * Morton Rose 2 1 5 I 6 3 4 7 Director Traffic Absent Director Land Development Joanne Keller 2 1 5 6 3 4 - ! 7 - -Contracts Manager * Fenson Masse 3 1 7 1 5 4 I 6 ·-Director Construction Coordination Mark Tomlinson 4 2 7 1 6 2 5
User Dept Representative * Kathleen Farrell 2 1 4 7 6 3 I 5 - -
I Director Office of Small Business * Angela Smith 3 2 7 4 6 1 5
Total 20 9 42 31 34 20 38
Rank 2 1 7 4 5 2 6
-- -
I I
v\J---'u--JaeAnn Dean ( - --I Secretary Printed Name \ Secretary Signature
~
SHORT LIST EVALUATION FORM
- ---- _ ONE (1) FIRM FOR: \All Engineering Services Required for: __ ---_ Melaleuca Lane and Jog Road Intersection Improvements
------- -----
Criteria
Ability, knowledge of design criteria and
Max
Score
past performance of firm and the 50
designated project team to satisfy the I 50
requirements of the project. -+-Approach to the project, understanding of
the project and quality of written response, 20
including meeting schedule requirements.
Subtotal 70
Location of the firm's offices where work
will be accomplished. 3
State Certified MBE (2 points for statel
certified MBE primes and/or . I 2
subconsultants)
EBO Program Evaluation preference as
applied by the GSC. APls for this contract
are: 20% Min. Mandatory SBE, & SBE
Evaluation Pref.
Volume of previous work awarded by the
County over the past 4 years. (The firm
with the most work receives the lowest
score.)
Subtotal
15
10
I 3o
Total 100
Rank
PROJECT NO: 2019S01
MEETING DATE: T uesday, January 14, 2020 MEETING TIME: 2:00 P.M.
American Consulting
Engineers of Florida, LLC
3
2
4
9
18
~77
+
Constructive
Engineering, Inc.
3
28
~ \
Erdman Anthony of Florida, Inc.
3
2
3
16
-~~"-""--~~ <r\ (.;< Member's Signature:! ~ ( )
Member's Name:
I
HBC Engineering
Pevida Highway
Company, Inc. Designers, LLC
30 I \...\D
lO
3 0
2 2
15 T 4
10 10
30 16
"-'70
Propel Engineering,
Inc.
40
l(o
r-:,-9
29
RJ. Behar & Company
3
2
4
7
16
SHORT LIST EVALUATION FORM
ONE (1) FIRM FOR: All Engineering Services Required for: Melaleuca Lane and Jog R~ad Intersection Improvements __ _
PROJECT NO: 2019501
MEETING DATE: Tuesday, January 14, 2020 MEETING TIME: 2:00 P.M.
American Constructive Erdman HBC Pevida Propel
Criteria Max Consulting
Engineering, Anthony of Engineering Highway Engineering, RJ. Behar &
Score Engineers of Inc. Florida, Inc. Company, Inc. Designers, LLC Inc.
Company Florida, LLC
Ability, knowledge of design criteria and
I past performance of firm and the
50 f( 1(p 12- }{) 1:: ~ Lf )_ designated project team to satisfy the
requirements of the project. +-- ---
Approach to the project, understanding of
the project and quality of written response, 20 11 JD /'6 1c;- l'6 /0 /Co including meeting schedule requirements.
Subtotal 70 C, ~(p Location of the firm's offices where work
3 3 3 will be accomplished.
----State Certified MBE (2 points for state
certified MBE primes and/or 2 2 2 2 2 2 2 2
subconsultants)
EBO Program Evaluation preference as T I applied by the GSC. APls for this contract 15 4 13 3 15 4 15 4
are: 20% Min. Mandatory SBE, & SBE
i-Evaluation Pref.
Volume of previous work awarded by the
County over the past 4 years. (The firm 10 9 10
with the most work receives the lowest 8 10 10 9 7
score.)
Subtotal 30
Total 100 '\,
Rank '--..
Member's Name: I M~tJ hse, ---
Member's Signature:
SHORT LIST EVALUATION FORM -- -
- - ---ONE (1) FIRM FOR: All Engineering Services Required for:
--- ----Melaleuca Lane and Jog Road Intersection Improvements
- -- --PROJECT NO: 2019501
- -- - --- --- -- ---
MEETING DATE: Tuesday, January 14, 2020 MEETING TIME: lz:OO P.M.
--- - ---
American Constructive Erdman HBC Pevida Propel
Max Consulting RJ. Behar & Criteria
Score Engineers of Engineering, Anthony of Engineering Highway Engineering,
Company Florida, LLC
Inc. Florida, Inc. Company, Inc. Designers, LLC Inc.
I 14• I
I Ability, knowledge of design criteria and
past performance of firm and the so 50 ~ ~- '2. s So 35 2s designated project team to satisfy the
requirements of the project. I -- I -
Approach to the project, understanding of
the project and quality of written response, 20 ')..O 1.0 I .5" ,o l. 0 15' {O
including meeting schedule requirements.
Subtotal 70 1o 1o ~s 3 > jO so 35'" Location of the firm's offices where work
I
will be accomplished. 3 3 3 3 3 0 3 3
i -
I State Certified M BE (2 points for state
+ certified MBE primes and/or 2 2 2 2 2 2 2
subconsultants) ---+ - - - __ , EBO Program Evaluation preference as
applied by the GSC. APls for this contract
are: 20% Min. Mandatory SBE, & SBE 15 4 13 3 15 4 15 4
Evaluation Pref. -- - -
Volume of previous work awarded by the
County over the past 4 years. (The firm 10 9 10 8 10 10 9 7
with the most work receives the lowest
I score.)
Subtotal 30 18 28 16 30 16 29 16
Total 100 "' ~s ....... q 8 -..,, ; I ...,, " 5 I'\, 8b I'\. 1 ~ '\, S' I
Rank '" ']... I "' \ 5 l " (o I" 3 "" "i 7
- -- - -Member's Name: I .J"oAtJ tJE. t'\. \L-E. l-1.. E.R..-
-- -- \ JutJ "'f: .J.f. k1.f/ '---
-Member's Signature:
Criteria
SHORT LIST EVALUATION FORM
ONE (1) FIRM FOR: All Engineering Services Required for: Melaleuca Lane and Jog Road Intersection Improvements
PROJECT NO: 2019S01
____ M_E_ETING DATE: Tuesday, January 14_,_2_0_2_0 ____ _ MEETING TIME: ,2:00 P.M.
American Constructive Erdman HBC Pevlda
Max Consulting Engineering, Anthony of Engineering Highway
Score Engineers of Inc. Florida, Inc. Company, Inc. Designers, LLC
Florida, LLC
Propel Engineering,
RJ. Behar&
Inc. Company
Ability, knowledge of design criteria and
past performance of firm and the
designated project team to satisfy the
requirements of the project.
so 41 I 44,I 40 4:> 40 I ¥ 1
4.d-Appmach to the pmject, ""demaod;og of 1
the project and quality of written response, 20
including meeting schedule requirements.
Subtotal
Location of the firm's offices where work
will be accomplished.
State Certified MBE (2 points for state
70
3
certified MBE primes and/or 2
subconsultants)
EBO Program Evaluation preference at applied by the GSC. APls for this contract
15 are: 20% Min. Mandatory SBE, & SBE
Evaluation Pref.
Volume of previous work awarded by the
County over the past 4 years. (The firm
with the most work receives the lowest
score.)
10
Subtotal 30
Total 100
3
2
4 l 9
Member's Name:- Fe/lJ 80 rJ
-}':,
(j 3 3
2 2
13 3
10 8
I
167 } 1
81 h4 3 -
2 2
15 4
-+--10 10
-I?
3
2 2
15 4
9 7
-----
Criteria
Ability, knowledge of design criteria and I past performance offirm and the
designated project team to satisfy the
,eq,l,em,ot, of the project. I
Approach to the project, understanding of
the project and quality of written response,
including meeting schedule requirements.
Subtotal
Location of the firm's offices where work
will be accomplished.
State Certified MBE (2 points for state
certified MBE primes and/or
subconsultants) ci EBO Program Evaluation preference as
applied by the GSC. APls for this contract
are: 20% Min. Mandatory SBE, & SBE
Evaluation Pref.
Volume of previous work awarded by the
County over the past 4 years. (The firm
with the most work receives the lowest
score.)
Subtotal
Total
-- - --M- em- b-er's Name: r Member's Signature:
SHORT LIST EVALUATION FORM
ONE (1) FIRM FOR: !All Engineering Services Required for: __ Melaleuca Lane and Jog Road Intersection Improvements
PROJECT NO: . 2019501
- ------MEETING DATE: Tuesday, January 14, 2020 MEETING TIME: 2:00 P.M.
HBC Engineering
Pevida Highway
Max Score
American
Consulting
Engineers of
Florida, LLC
Constructive
Engineering,
Inc.
Erdman
Anthony of
Florida, Inc. Company, Inc. Designers, LLC
I so
20 \( te ,~ )v li
70 I
3 3 3 3 3 0
--
2 2 2
15 4 4
-
10 9 10
30 18 28 16 30 16
100 8 \ ✓ 7~ ./ J T1 ✓ Rank 4- ;2. I 7 \
\V C.i
I
Propel Engineering,
Inc.
R.J. Behar & Company
r l~ rr ~\
3 3
2 2
15 4
9 7
29 16
/ ~-
Criteria
Ability, knowledge of design criteria and
past performance of firm and the
designated project team to satisfy the
requirements of the project.
Approach to the project, understanding of
the project and quality of written response,
including meeting schedule requirements.
Subtotal
Location of the firm's offices where work
will be accomplished.
State Certified MBE (2 points for state
certified MBE primes and/or
subconsultants)
EBO Program Evaluation preference as
applied by the GSC. APls for this contract
are: 20% Min. Mandatory SBE, & SBE
Evaluation Pref.
Volume of previous work awarded by the
County over the past 4 years. (The firm
with the most work receives the lowest
score.)
Subtotal
Total
SHORT LIST EVALUATION FORM
ONE (1) FIRM FOR: All Engineering Services Required for:
Max Score
50
Melaleuca Lane and Jog Road Intersection Improvements
PROJECT NO: 2019501
MEETING DATE: Tuesday, January 14, 2_0_2_0 ____ _
MEETING TIME: 2:00 P.M.
American Constructive Erdman HBC Pevida
Consulting Engineers of
Engineering, Anthony of Engineering Highway
Florida, LLC Inc. Florida, Inc. Company, Inc. Designers, LLC
J~ :JO 37
Propel
Engineering, Inc.
I li f J l q!__ -L-
I 20 1i ·15 t7 5 15 15 70 C, ./ s~ / 3 / 3 3 3 3 0 3
t 2 2 2 2 2 2
15 4 13 3 15 4 15
10 9 10 8 10 10 9 I I
I 30 18 28 16 30 16 29.
100 .I I J1 ✓ 7 ✓ 5.5 / I (, '{ ~J... Rank ol I I I 4 7 (o 3
Member's Na~ at h ( ~ Fa Yrt r I Member's Signature:
RJ. Behar& Company
LID i 13
• 5
3
2
4
7
SHORT LIST EVALUATION FORM -- - ---
ONE (1) FIRM FOR: All Engineering Services Required for: -
, Melaleuca Lane and Jog Road Intersection Improvements PROJECT NO: 2019501
- --- --
MEETING DATE: Tuesday, January 14, 2020 --- -- --
MEETING TIME: 2:00 P.M. -- - --
American Constructive Erdman HBC Pevida
Consulting Propel
Criteria Max
Engineering, Anthony of Engineering Highway Engineering, R.J. Behar&
Score Engineers of Company 1,
Florida, LLC Inc. Florida, Inc. Company, Inc. Designers, LLC Inc.
Ability, knowledge of design criteria and j I
I past performance of firm and the
I so
designated project team to satisfy the
requirements of the project. ~ L\1 L.f')" ~ 4(p 2.-{g l '-l7
- _J____
Approach to the project, understanding of
the project and quality of written response, 20
including meeting schedule requirements. tC\ ,g 1'< tt.J l1 lq ,q
Subtotal 70 lt1 .I (D€ .I u1- I 5'-{ Ii w3 ✓r t.a1 ./ v lJ ti,
.,,,
Location of the firm's offices where work I
will be accomplished. 3 3 3 3 3 0 + 3 3
I
State Certified MBE (2 points for state I certified MBE primes and/or
I 2 2 2 2 2 2 2 2
subconsultants) • -
T-EBO Program Evaluation preference as
applied by the GSC. APls for this contract 15 4 13 3 15 4 4
are: 20% Min. Mandatory SBE, & SBE
Evaluation Pref. --
Vol,me of p,e,lo"' =rl< awa,ded by fl County over the past 4 years. (The firm
10 9 10 8 10 10 9 7 with the most work receives the lowest
I I I
I I I score.) I Subtotal 30 18 28 16 30 16 29 16
Total 100 ~6' ./ q3 .I '1~ / ~l.-\: ✓ ,1 ./ q1, / ~i ../ Rank 3 i- '1 ~ ll l '{"
-- --- -
-Member's Name: -An~ LB<- -Yh~
--- --
Member's Signature: 0 J.---~ I) -
F:\ROADWAY\CCNA\2019\2019501 Melaleuca Lane at Jog\Short List Meeting\Summary Spreadsheet of Teams Page 1 of 3 1/16/2020 8:17 AM
One Firm to Provide:
Project No:EBO API's:
Meeting Date: Meeting Time:
PBC M/WBE
FL M/WBE
American Consulting Engineers of Florida, LLC 3.02 74% 74% - - - $171,575 $126,966Betsy Lindsay, Inc. 5.02 9% 9% 9.0 9.0 9.0 $35,186 $3,167Constructive Engineering, Inc. 3.02 5% 1 5% 5.0 5.0 - $0 $0GCME 6.01 3% 3% 3.0 3.0 3.0 $71,681 $2,150Simmons & White, Inc. 3.06 9% 9% 9.0 - - $152,022 $13,682
26.0% 17.0% 12.0%4 2
Constructive Engineering, Inc. 3.02 65% 1 65% 65.0 65.0 - $0 $0Scalar Consulting Group, Inc. 3.02, 3.06 20% 20% - - 20.0 $364,590 $72,918GCME, Inc. 6.01 5% 5% 5.0 5.0 5.0 $71,681 $3,584Biscayne Engineering Company, Inc. 5.02 10% 10% 10.0 - - $0 $0
80.0% 70.0% 25.0%13 2
Erdman Anthony of Florida, Inc. 3.02, 3.06 60% 60% - - - $349,074 $209,444Scalar Consulting Group, Inc. 3.02 20% 20% - - 20.0 $364,590 $72,918Propel Engineering, Inc. 3.02 5% 1, 7 5% 5.0 5.0 5.0 $98,727 $4,936Ritzel-Mason, Inc. 5.02 10% 7 10% 10.0 - - $0 $0GCME, Inc. 6.01 5% 7 5% 5.0 5.0 5.0 $71,681 $3,584
20.0% 10.0% 30.0%3 2
2019501
Tuesday, January 14, 20202:00 P.M.
9
% Work on Project Notes % Work in
PBCPoints
(3 max)
10
100% 100%
$290,883
SHORTLIST CONSULTANT SUMMARY
Professional Engineering Consulting Services forMelaleuca Lane and Jog RoadIntersection Improvements
Minimum Mandatory 20% SBE & SBE Evaluation Preference (sliding scale)
3 15
$76,502
Team Members
LOCATIONTEAM EBO VOLUME OF PREVIOUS WORK ($)
Points (17 max)
Fee Considered
Pro-Rated Fee*
Points (10 max)Services Provided SBE
$145,965100%100%
3 6
3 5 8
* - questionnaires filled out wrong for Ritzel-Mason and GCME 100% 100%
F:\ROADWAY\CCNA\2019\2019501 Melaleuca Lane at Jog\Short List Meeting\Summary Spreadsheet of Teams Page 2 of 3 1/16/2020 8:17 AM
One Firm to Provide:
Project No:EBO API's:
Meeting Date: Meeting Time:
PBC M/WBE
FL M/WBE
2019501
Tuesday, January 14, 20202:00 P.M.
% Work on Project Notes % Work in
PBCPoints
(3 max)
SHORTLIST CONSULTANT SUMMARY
Professional Engineering Consulting Services forMelaleuca Lane and Jog RoadIntersection Improvements
Minimum Mandatory 20% SBE & SBE Evaluation Preference (sliding scale)
Team Members
LOCATIONTEAM EBO VOLUME OF PREVIOUS WORK ($)
Points (17 max)
Fee Considered
Pro-Rated Fee*
Points (10 max)Services Provided SBE
HBC Engineering Company, Inc. (3.01) , 3.02 80% 2 80% 80.0 80.0 - $0 $0Manuel G. Vera & Associates, Inc. (5.01) , 5.02 10% 2 10% - - - $19,703 $1,970RADISE International, LC 6.01, (6.06) 10% 2 5% 10.0 10.0 10.0 $268,992 $26,899
90.0% 90.0% 10.0%15 2
Pevida Highway Designers, LLC 3.02 75% 0% - - - $0 $0Simmons & White, Inc. 3.06 8% 7 8.0 - - $152,022 $12,162Ritzel-Mason, Inc. 5.02 10% 7 0% 10.0 - - $0 $0GCME, Inc. 6.01 7% 7% 7.0 7.0 7.0 $71,681 $5,018
25.0% 7.0% 7.0%4 2
Propel Engineering, Inc. 3.02, 3.06 88% 1, 7 88% 88.0 88.0 88.0 $98,727 $86,880DRMP, Inc. 5.02 7% 7 6% - - - $0 $0Tierra South Florida, Inc. 6.01 5% 7 5% - - 5.0 $740,260 $37,013
88.0% 88.0% 93.0%15 2
R.J. Behar & Company, Inc. 3.02, (9.05) 75% 2 75% - - 75.0 $255,597 $191,698Brown & Phillips 5.02 15% 15% 15.0 15.0 15.0 $553,902 $83,085RADISE International, LC 6.01 10% 10% 10.0 10.0 10.0 $268,992 $26,899
25.0% 25.0% 100.0%4 2
3 6 7* - no team member listed for 3.06, but RJB has certification 100% 100% $301,682
3 17 9100% 99% $123,893
17 10* - no team member listed for 3.06, but HBC has certification 100% 95% $28,870
0 6 10
* - no location data for S&W on questionnaire 100% 7% $17,179
3
F:\ROADWAY\CCNA\2019\2019501 Melaleuca Lane at Jog\Short List Meeting\Summary Spreadsheet of Teams Page 3 of 3 1/16/2020 8:17 AM
One Firm to Provide:
Project No:EBO API's:
Meeting Date: Meeting Time:
PBC M/WBE
FL M/WBE
2019501
Tuesday, January 14, 20202:00 P.M.
% Work on Project Notes % Work in
PBCPoints
(3 max)
SHORTLIST CONSULTANT SUMMARY
Professional Engineering Consulting Services forMelaleuca Lane and Jog RoadIntersection Improvements
Minimum Mandatory 20% SBE & SBE Evaluation Preference (sliding scale)
Team Members
LOCATIONTEAM EBO VOLUME OF PREVIOUS WORK ($)
Points (17 max)
Fee Considered
Pro-Rated Fee*
Points (10 max)Services Provided SBE
3.02 (General Hwy. Design w/Curb & Gutter, Access & Drainage)
Notes
* - Pro Rated Fee = Previous Work Amount multiplied by the % of work on the project1 - Prime and Sub on different teams
Prime Categories
6 - Prime does not have at least one prime category
3 - Incomplete Team4 - Did not meet mandatory EBO requirement5 - Prime is doing less than 50% of the work
2 - Unrequested Service
7 - Error on Questionnaire
3.06 (Traffic Operation Design)5.02 (Engineering Surveying)6.01 (Gelogical & Geographic Studies)
Subcategories
COMMITTEE MEMBERS
SHORT LIST COMMITTEE MEETING
Palm Beach County Engineering Department
One (I) Firm - to provide all engineering services required for the preparation of plans and specifications complete for formal advertising and receipt of bids for:
Tuesday, January 14, 2020
Name
Melaleuca Lane and Jog Road Intersection Improvements
Project No. 2019501
Organization Phone
r • I •
{t) (
F: \ ROADWAY\ CCNA\201 9 \2019501 Melaleuca Lane at Jog\Short List Meeting\ShortListMeetingSigninSheeet_Committee.docx
PUBLIC
SHORT LIST COMMITTEE MEETING
Palm Beach County Engineering Department
One (1) Firm - to provide all engineering services required for the preparation of plans and specifications complete for formal advertising and receipt of bids for:
Melaleuca Lane and Jog Road Intersection Improvements
Project No. 2019501
Tuesday, January 14, 2020
Name Phone Email
F:\ROADWAY\CCNA\2019\2019501 Melaleuca Lane at Jog\Short List Meeting\ShortListMeetingSigninSheeet_Public . docx
-~