toolik field station long range facilities plan science support vision workshop august 2012
DESCRIPTION
Toolik Field Station Long Range Facilities Plan Science Support Vision Workshop August 2012. TFS Long Range Facilities Plan. Org Chart. CPS. ARSLS Management (Mike Mc). Alaska Ops (Marin). Facilities Management (Jud). TFS Ops Manager (Mike A). Alaska Science (Naomi). - PowerPoint PPT PresentationTRANSCRIPT
Toolik Field Station
Long Range Facilities Plan
Science Support Vision Workshop
August 2012
TFS Long Range Facilities Plan
2
Facilities Management
(Jud)
Construction Management
(Jay B)
Engineering (Jeff S)
Maintenance Lead
(Thom M)
IT/Comms(SRI)
Toolik Construction
(Jason N)
ARSLS Management
(Mike Mc)
Alaska Ops(Marin)
Alaska Science(Naomi)
TFS Ops Manager(Mike A)
Renewables(Tracy D)
TFS Maintenance(Jeb / Faye)
CPS Org Chart
TFS Long Range Facilities Plan
3
LRFP Timeline and Status• In development since 2009• Draft Final document distributed 2011• Feedback received from stakeholders• Final review/approval underway• A “Living Document”, revised as necessary in
the future
TFS Long Range Facilities Plan
4
Why “Finalize” the LRFP?• Environmental Assessment (EA)required for
new construction• EA must reference a comprehensive
document for site development (eg – LRFP)• Planning and funding for large capital projects
requires long lead times• Demonstrates a strategic vision and plan in the
event new funding comes available
TFS Long Range Facilities Plan
5
Capital Project Categories• Residential• Dorm• Bungalow
• Science• Laboratories• Lecture Hall• Workshop
• Site/Support Infrastructure• Garage • Generator Waste Heat Recovery• Road Lift/Realignment
TFS Long Range Facilities Plan
6
Capital Project Approach• Residential• Dorm New Construction• Bungalow New Construction
• Science• Laboratories New Construction• Lecture Hall• Workshop
• Site/Support Infrastructure• Garage New Construction• Generator Waste Heat Recovery New Construction• Road Lift/Realignment New Construction
TFS Long Range Facilities Plan
7
Capital Project Approach• Residential• Dorm New Construction• Bungalow New Construction
• Science• Laboratories New Construction• Lecture Hall Repurposed Facilities• Workshop Repurposed Facilities
• Site/Support Infrastructure• Garage New Construction• Generator Waste Heat Recovery New Construction• Road Lift/Realignment New Construction
TFS Long Range Facilities Plan
8
Science Wrkshp
Repurposed
New
TFS Long Range Facilities Plan
9
Initial Capital Projects• Dorm A• Two-story. Two wings. 24 rooms per wing. Total of 48
rooms. Two bed spaces per room = 96 potential bed spaces. Year-round capable
• Central common areas (core) on both floors• Garage• 3-bay. 2300 ft2. Year-round.
• Lab• Requirements still to be defined
• Waste Heat Recovery• Generator waste heat used for Garage heating
TFS Long Range Facilities Plan
10
Dorm
TFS Long Range Facilities Plan
11
Garage
TFS Long Range Facilities Plan
12
Bungalow
TFS Long Range Facilities Plan
13
Initial Capital Project TimelineProject 2012 2013 2014 Beyond
Dorm A
Garage
Lab 0
Waste Heat Recovery
DesignSite Prep Construction
Design
Construction
DesignSite Prep Construction
Design Complete
Construction
Bungalow
Lab 8