Page 1: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman

Toshiba IR Test Apparatus Project

Ahmad Nazri Fadzal

Zamir Izam

Nurfazlina Kamaruddin

Wan Othman

Page 2: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman

Project Goal Create a test program that can verify the

TV is outputting the correct IR signals to VCR and DVD that are connected through IR blaster cable

4 different VCR and DVD brands will be tested

Page 3: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman

Requirements Two modes: Database mode and Test

mode Database mode

Receive signal from TV, analyze, and store its characteristic

Allow operator to designate a “name” Signal begins on the first signal

transition and ends after 1s of no transitions

Page 4: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman

Requirements (continued) Test mode

Allow operator to select a sequence of signals from the database mode

START and STOP capabilities Handle no more than a 1s “silent”

transition between each new test signal Log pass/fail results to User Interface

and text file output

Page 5: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman

Test model

Page 6: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman

GLINK Use to connect cable

box and VCR

Page 7: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman

Block diagram for capturing signal from VCR player

Page 8: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman

TheaterNet Use to connect DVD

player

Page 9: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman

Block diagram for capturing signal from DVD player

Page 10: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman

Software

Programming

Database Mode Test Mode

Page 11: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman

Database Mode

Database Mode

Sampling

• Start and stop trigger

• Edit signal feature

Storage Analyzing

Save

Name file

• Library

Graphical display

• Time length

• Bit length

Page 12: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman

Test mode

Test Mode

Retrieve Signal

• Start and stop trigger

• Edit signal feature

Test output signal

Statistic GraphicalDisplay

• Compare

• Result-pass/fail

•Pulse width

•Bit length

Normal plot

Expected & Actual signal plot on same plot

Load signal

Select signal from library

Page 13: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman

Operational concept Sample 4 different DVD and VCR brands:

Toshiba Panasonic JVC Sony

Theaternet Sample 8 functions for each DVD brand (Power, Play, Stop, FF, REW, Pause, Skip, Search) Each test function will be sampled 3 times (3 rep/test)

Page 14: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman

GLINK Sample 3 functions for each VCR brand (Power, Stop, and Record) Each test function will be sampled 3 times (3

rep/test)

Page 15: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman

Block Diagram for Database Mode

Page 16: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman

Database Mode Front Panel

Page 17: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman
Page 18: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman

Library file of Toshiba DVD PLAY Signal

Page 19: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman

Block Diagram for Test Mode

Page 20: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman

Test Mode Front Panel

Page 21: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman
Page 22: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman
Page 23: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman
Page 24: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman
Page 25: Toshiba IR Test Apparatus Project Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman

Next week plan Start and Stop Trigger

Signal analysis