  • 8/22/2019 Total Quality Management of TATA POWER

    1/105

    TOTAL QUALITY MANAGEMENT

    SUBMITTED BY

    MONIKA SHARMA

    TYBMS

    2006-2007

    SUMMITTED TO

    UNIVERSITY OF MUMBAI

    PROJECT GUIDE : PROF . BHANU KRISHNAN

    GHANSHYAMDAS SARAF GIRLS COLLEGE

    S.V. ROAD MALAD ( WEST )

    MUMBAI - 400064

  • 8/22/2019 Total Quality Management of TATA POWER

    2/105

    ACKNOWLEDGEMENT

    I sincerely thanks my guide PROF BHANU KRISHNAN for providing necessary information

    and valuable guidance which help me in compiling this project in a much better manner .I would like to thank PROF SUBRAMANIUM for being there whenever I need help and

    provided valuable guidance in this project .

    I most thankful to HR Manager THAKKAR Sir and Assistant manager S.V.SHETYE of

    TATA POWER COMPANY Borivali branch for devoting their precious times and shared

    information about TQM and how it is implement in the organization without which this

    project would not have complete .

    I have tried to cover all the aspects of the project and ever care has been taken to

    make the project faultless .

    I will be looking for such type of projects in near future and do my best .

    This project has been complied in simple and lucid language so as to enable every reader

    easy to understand .

    I am eagerly waiting for fruitful comments and constructive suggestions are most welcome

    to improve upon this project .

    Suggestions , if any , are most welcome .

    THANK YOU,

    MONIKA SHARMA .

  • 8/22/2019 Total Quality Management of TATA POWER

    3/105

    INDEX

    SR.NO TOPIC PAGE NO

    1. INTRODUCTION OF TOTAL QUALITY MANAGEMENT 1.

    2. ROLE OF TQM 2.

    3. IMPLEMENTATION OF TQM 3-4.4. TATA POWER COMPANY:-

    i. INTRODUCTION 5-7.

    ii. TATA BUSINESS EXCELLENT MODEL ( TBEM ) 8-9.

    ii i. QUALITY COST REPORT 10-14.

    iv. COSTS ASSOCIATED WITH INSPECTION AND TESTING 15.

    v. BENEFIT THROUGH TQM 16.

    vi. TECHNIQUES USED FOR TOTAL QUALITY CONTROL 17-18.

    vii. TECHNIQUES BASED ON MALCOLM BALDRIGE REPORT

    ASSESSMENT YEAR 2005-2006 :-

    19-66

    a. LEADERSHIP 21-25.b. STRATEGIC PLANNING 26-27.

    c. CUSTOMER AND MARKET FOCUS 28-36.

    d. MEASUREMENT , ANALYSIS AND KNOWLEDGE MANAGEMENT

    AND INFORMATION AND KNOWLEDGE MANAGEMENT

    37-42.

    e. HUMAN RESOURCES FOCUS 43-44.

    f. PROCESS MANAGEMENT 45-47.

    g. BUSINESS RESULT 48-66.

    viii. NEW QUALITY MANAGEMENT SYSTEM ISO 9001: 2000 :- 67-88.

    a. QUALITY MANAGEMENT SYSTEM 68-69.

    b. MANAGEMENT RESPONSIBILTY 70.

    c. RESOURCE MANAGEMENT 71-72.

    d. PRODUCT REALISATION PLANNING OF PRODUCT REALISATION 73.

    e. PRODUCT REALISATION CUSTOMER RELATED PROCESSES 74.

    f. PRODUCT REALISATION DESIGN AND DEVELOPMENT 75-76.

    g. PRODUCT REALISATION PURCHASING 77-78.

    h. PRODUCT REALISATION PRODUCT AND SERVICE PROVISION 79-82.

    i. PRODUCT REALISATION CONTROL OF MONITORING AND

    MEASURING DEVICES

    83.

    J. MEASUREMENT , ANALYSIS AND IMPROVEMENT 84-88.

    5. EVALUATION OF TQM 89-90.

    6. CONCLUSION 91-92.

  • 8/22/2019 Total Quality Management of TATA POWER

    4/105

    EXECUTIVE SUMMARY

    This project contain the information about the topic TOTAL QUALITY MANAGEMENT .

    This project introduces Total Quality Management it mainly focus on Malcolm Baldrige

    Report and ISO 9001:2000 of TATA POWER COMPANY and how it is implement in

    the organization and what are the strategy taken by them .

    Total Quality Management is a continuous process of improvement for individuals , groups

    of people and whole organizations . To improve the process , therefore, people must know

    what to do , how to do it , have the right method to do it , and be able to measure the

    improvement of the process and the current level of achievement .

  • 8/22/2019 Total Quality Management of TATA POWER

    5/105

    When put into practice, appropriate quality methods can rapidly give rise to quality

    improvement . Choosing the right methods for development of a TQM process is one of

    vital roles of management process is complex and the use of some of these methods

    requires careful consideration and clear understanding .

    TQM is blend of technologies focus on four concept i.e. defect prevention , continuous

    improvement , focusing on the customer and a philosophy that quality is not just a

    responsibility of an organization quality assurances department , but rather it is a

    responsibility shared by all TQM reserve our fixation on inspecting to defect and focuses

    on practice that identify potential defects to prevent them from occurring .

    TQM is still a philosophy emphasizing a continuous search for improvement and

    implementing actions to convert improvement opportunities to reality .

    TQM emphasizes knowing our customer both internal and external and focusing on

    satisfying their needs and expectation . The continuity , stability and growth of a business

    depends upon its customers. TQM as an sub serves the institution goals . Returns on

    investments , market expansion , high employee morale and delighted customers are some

    of the benefits of upgrading through TQM .

    INTRODUCTION

    The word total stand for whole or gross . The term quality stands for degree of excellence

    and the word management stand for art of doing a particular work .

    Therefore , TQM is art of doing the whole work in order to achieve a degree of

    excellence .

    TQM in the organization by employee involvement or step to be taken by management to

    implementation TQM :-

    i.) Clarify the goal and objective of organization .

    ii.) Decide the philosophy of management .

  • 8/22/2019 Total Quality Management of TATA POWER

    6/105

    iii.) Follow decentralization and delegation of authorities.

    iv.) Determine the quality standard and make as a rule of the organization .

    v.) Involvement the worker in the system of achieving and maintaining the

    quality concept of kaizen , quality circle are useful in this area .

    vi.) Teach the worker the concept of house keeping .

    vii.) Import training to the worker to enhance their skill to maintain quality.

    Benefits of TQM :-

    i.) Ability to be more competitive .

    ii.) Increased market share .

    iii.) Cost reduction .

    iv.) Increased flexibility and responsiveness .

    v.) Simplified processes.

    vi.) Improved communications .

    vii.) Less frustration and more satisfaction among the workforce .

    THE ROLE OF TQM METHOD

    Total quality management can be implemented by putting into practice suitable TQM

    methods . However , adopting the right kind of method is one of the most important jobs

    of senior management and degree of success obtained will depend on their knowledge

    and understanding of these methods . TQM methods are unlikely to be useful not usedproperly .

    When TQM is implemented in an organization , it invariably starts with a simple procedure:

    the setting up of teams to solve particular problems. However , total quality management

  • 8/22/2019 Total Quality Management of TATA POWER

    7/105

    deals with quality culture , which is all about culture change based on desire to satisfy

    the customer and eliminate existing problems permanently .

    Education and training are key factors in total quality management , including the process

    of learning TQM method . If team start to look at quality management problem without

    proper training they will lose their way and become disheartened . If the quality problem is

    not identified accurately and the TQM method selected for solution based only on data

    analysis , then the problem will not be eliminated forever . In addition , the quality

    improvement process need to be managed by an effective leader to ensure that proper

    implementation is achieved . By applying TQM method properly and not fluctuating from

    one step to another before completion , the quality team will have a much greater chance

    of completing the task successfully .

    The basic role of TQM methods in problem-solving for quality improvement is to help to

    help to meet customer requirements . The methods also help to generate possible root

    causes and potential solutions, and to use data and information to select the best options

    for managing quality . To implement total quality management , it will be necessary to

    apply the method in ever aspect of business life .

    IMPLEMENTATION OF TQM

    Total quality management process and implementation can be divided in three parts as

    follows :-

    1) Total employee involvement ( TEI )2) Just in time ( JIT )

    3) Total quality control ( TQC )

    1.) Total employee involvement :- The basic thinking is the human should not be

    considered as robot or machine . They should be treated with respect and consideration .

  • 8/22/2019 Total Quality Management of TATA POWER

    8/105

    An organization has number of people working for a purpose . Every person has important

    role to play . Organization will be the most effective if all employee work together and

    harmoniously , to achieve common goal .

    TEI is achieved in through following methods :-

    a) House keeping :- Only where by the departmental manager who does not follow

    the principle of housing keeping can be convenience by clicking the photography of

    it department . Which is organized condition and display on the notice of the

    organization and once he improve again the photography will the organization

    department . To show the different which is apparent between the photography .

    The different will through the light on importance of house keeping in the

    organization .

    b) Kaizen :- Kaizen is derived from two word kai & Zen . Kai - mean small , Zen -

    mean improvement i.e. bring small improvement where , when , why how A

    person who bring small improvement in himself is called as Kaizen

    c) Quality circle :- A group people coming together and having a brainstorm over

    issues to come out with good conclusion of problem or issues . Quality circle by

    name itself we can understand where is circle of quality people having a quality

    brainstorm and coming out with a quality conclusion .

    2.) Just in time :- It is a concept where time management is exercise for the entire

    process right from procuring the raw material from the vendors till the sale of finished

    products to the customer .

    3.) Total quality control :- Total quality control is applicable to all the functions . Quality

    at work , service , information , process , divisional units, people , system and company has

    to be maintain at minimum cost . This process consist of evaluate actual quality

    performance , compare actual performance to quality goals , act on the differences.

    7 QC Tools :-

    i.) Statistical data

  • 8/22/2019 Total Quality Management of TATA POWER

    9/105

    ii.) Pareto diagram

    iii.) Cause and effect diagram

    iv.) Histogram

    v.) Scattered diagram

    vi.) Check sheet

    vii.) Control charts.

    TATA POWER COMPANY

    INTRODUCTION

    Tata power was ranked for its continuous effort to transform the 90 years old power utility

    through a combination of cost reduction, steady growth and change in attitude into a moreconsumer-friendly place in a highly regulated environment.

    Tata power as been selected among the top 13 best managed companies in India by

    business today.

  • 8/22/2019 Total Quality Management of TATA POWER

    10/105

    While tata power fundamental have remained committed to quality and pursue of excellence

    now there is a definite thrust on ensuring power supply at competitive tariff to consumer of

    all sector

    for constant self-evaluation of its plants and performance tata power has adopted the tata

    business excellence model[T.B.E.M.] under the J.R.D. Quality values award which the tata

    group has instituted in the memory of MR. J.R.D. TATA

    incidentally j.b.e.m is modeled on the globally accepted MALCOLM BALDRIDGE national

    quality award administered by department of commerce u.s.a.

    Tata valuesThe tata has always been a value driven organization these value continue to direct the

    groups growth and business. the five core tata value under the way they do their business

    are:

    1] Integrity: we must conduct our business fairly with honesty and transparency

    everything we do must stand the test of public scrutiny.

    2] understanding: we must be caring show respect compassion and humanity for

    our collogues and customer around the world and always work for the benefit for the

    communities we serve.

    3] Excellence: we must constantly strive to highest possible standard in our day to

    day work in quality of good and services we provide.

    4] Unity: we must work cohesively with our collogues across the group and our

    customer and partners around the world to build strong relationship based on tolerance

    and mutual co-operation.

    6] Responsibility: we must continue to be responsible and sensitive to the

    countries communities and the environment we work, always ensuring that what comes

    from the people goes back to the people many times over.

    Quality policy of the tata power transmission and

    distribution division

  • 8/22/2019 Total Quality Management of TATA POWER

    11/105

    we at transmission and distribution division of the tata power company limited are

    committed to:

    1. provide reliable quality power at most competitive price

    2. constantly strive for exceeding customer expectation

    3. ensure safe and healthy environment for employees equipment and community

    4. we shall comply with requirement and continually improve the effectiveness of

    quality management system

    Quality objectives

    1. maintain equipment availably higher than 99.75%

    2. improve average restorations time to affect customers[C.A.I.D.I.] from 22 minute to

    20 minute

    3. reduce average duration of interruption per customer per year reliability index from

    47 min to 35 min

    4. maintain supply voltage within limits[variation of +/- 6%]

    5. reduce T & D operation cost by 10%

    6. continually upgrade employee skills to adapt the change

    7. have concern [minimize inconvenience] for the community during execution of work

    8. continually improve system to become an excellent organization

    The above objective shall be received half year the above target are at

    all T &D level

    Departmental quality objectives operation

    Functional quality objectives Measures

  • 8/22/2019 Total Quality Management of TATA POWER

    12/105

    1. Monitoring & controlling of operation

    parameters

    2. Ensuring heal thinness of equipment

    by timely detection of abnormalities

    3. Increasing availability of equipment

    by normalization during tripping of

    equipment lines and outage

    4. Preparation and storing of

    operational database

    5. Ensure reliability and safety correct

    and safety operation

    6. Continual improvement

    Logged value of parameter / logging of

    corrective measure taken .

    Defect register entries / check list entries

    Measure taken during emergencies to

    restore normal in minimum possible time of

    normalization.

    Availability of operational data

    Accident free operation no wrong operation

    safety practices

    Work instruction revisions

    TATA BUSINESS EXCELLENCE MODEL [T.B.E.M.]

    T.B.E.M. purposes

    1.To help improve organizational performance and business excellence practices ,capabilities result .

    2.To facilitate communication and sharing of best practices information among tata

    organizations of all types .

  • 8/22/2019 Total Quality Management of TATA POWER

    13/105

    3.To serve as working tool for understanding and managing performance and for

    providing guidance for planning and identification of opportunities for learning and

    improvement .

    T.B.E.M. GOALS :

    1.Delivery of ever improving value of customers , contributing to market place

    success

    2. Improvement of overall organizational effectiveness capabilities , resulting in

    enhancing to all other stake other

    3.Organizational and personal learning

    visions of the quality

    1. To be an excellent and efficient organization

    2. To be a significant player in the national power sector

    3. To participate in adjacent infrastructure business that provide opportunity for the

    growth

    4. To be the best in the tata group

    mission of the quality

    Improving the quality of life

    value

    1. Customer driver

    2. Result oriented with professional work culture

    3. Abide by tata code of conduct

    4. Earn trust through fair business practices with all stake holder

    5. Growth with environmental protection and enrichment

  • 8/22/2019 Total Quality Management of TATA POWER

    14/105

    6. Corporate citizenship

    QUALITY COST REPORT

    SR.

    NO.

    PERFORMANCE

    MEASUREMEANT

    TARGET

    2004-2005

    ACTUAL

    2004-2005

    TARGET

    2005-2006

  • 8/22/2019 Total Quality Management of TATA POWER

    15/105

    1.

    2.

    3.

    4.

    5.

    6.

    7.

    DIAGNOSTING TESTING OFEQUIPMENTS

    DIAGNOSTING TESTING OFPROTECTION

    DIAGNOSTING TESTING OFSYSTEM PROTECTION

    COMMISION OFEQUIPMENT &PROTECTION SCHEMES

    F.D.R. AVILABILITY

    TEST INSTRUMENTAVAILABLE

    TRIPPING DUE TO HUMANERROR

    95%

    95%

    100%

    95%

    100%

    98%

    NIL

    70%

    76%

    79%

    95%

    99%

    97.2%

    NIL

    95%

    95%

    95%

    95%

    100%

    98%

    NIL

    COST OF POOR QUALITY [C.O.P.Q.] REPORT

    [C.O.P.Q.] company wide capturing format used for T.R.D.[C.O.P.Q.] to be captured under following two major head

    A. cost of non conformance

    B. cost of conformance

    A. cost of non conformance

    1.1] Internal failure cause related cost rework /

    repairs cost due to internal causes -

    For example -

  • 8/22/2019 Total Quality Management of TATA POWER

    16/105

    a ] E.Q.A.G. relay improper co-ordination / relay maloperation

    b ] Non conformance to operating instructions

    c ] Non conformance to maintenance work instruction etc .

    d ] Non conformance due to inadequate specification in power operation byengineering department

    1.2 ] External failure cause related cost - rework

    a ] O.E.M. poor quality / inadequate material , fabrication assembly , design

    , q.a. / q.c. Causing earlier failure

    b ] O.E.M. not informing product modifications incorporated .

    1.3 ] Appraisal cost -

    Testing / appraisal cost to attend failure / rework - example - O.E.M. engineerservices etc

    B. COST OF CONFORMANCE

    2.1 ] Preventive cost - cost incurred to prevent recurrence of failure / faultfor that station and other stations for similar equipment .

    2.2 ] Appraisal cost - cost incurred to test / appraise for case where failurenot occurred

    [ C.O.P.Q. ] cost due to interruption / forced outage

    A SR.NO.

    Direct cost repair reworkto attend occurrence /forced outage / outagedescription

    Man days Man dayCost

    TransportCost

    Total cost causes

  • 8/22/2019 Total Quality Management of TATA POWER

    17/105

    1.

    2.

    3.

    110 kv bus fault zone-1 on 12/1/06

    Tripping of 11 kvvasant utsav f1 feeder

    Tripping of 11 kvvasant utsav f6

    5

    2

    2

    3000

    600

    600

    Nil

    Nil

    Nil

    15000

    1200

    1200

    External

    External

    External

    B. Srno

    OCCURRENCE/FORCED OUTAGEDESCRIPTION

    LOAD MW SHUTDOWN

    INTERUPTION

    Mwh notsupplied

    Cost/lossrate rs.2p.u. causes

  • 8/22/2019 Total Quality Management of TATA POWER

    18/105

    1.

    2.

    3.

    110 kv bus fault zone -1 on 12 / 1 / 06

    Tripping of 11 kvvasant utsav f1 feeder

    Tripping of 11 kvvasant utsav

    40

    0.25

    0.5

    0.11

    3

    16.5

    4.4

    0.75

    8.25

    8800

    1500

    16500

    External

    External

    External

    QUALITY PLANNING AND QUALITY IMPROVEMENT

    QUALITY IMPROVEMENT -

    1. Renew focus on growth in generation capacity

  • 8/22/2019 Total Quality Management of TATA POWER

    19/105

    2. Restructuring of business development & project function to new growth

    opportunities

    3. Setting target in A.B.P. which are more stretch than M.E.R.C. requirements

    QUALITY PLANNING

    1. Centralized control room with remote operation

    2. Distribution automation of customer substations

    3. Diversion of nallahs to increase hydro generation

    4. Broad band on power line

    COSTS ASSOCIATED WITH INSPECTION ANDTESTING

    Vendors / contractor are selected through a well defined selection process with

    emphasis on quality management process at suppliers end . In cases of branded off

    the shelf type of items , vendors certified by O.E.M. [ original equipment manufactures

  • 8/22/2019 Total Quality Management of TATA POWER

    20/105

    ] through their vendor authorization programs , all selected . thus doing away with the

    need to expend resources on certification vendor quality .

    Vendor rating system has been introduced for tracking the performance of the

    vendors . cost of poor quality is being tracked analyze rework and defect and to

    minimize the cost.

    BENEFIT THROUGH TATA QUALITY MANAGEMENT

    1. Improvement in C.A.I.D.I.

    2. Improvement in reliability and quality of supply at customer end

  • 8/22/2019 Total Quality Management of TATA POWER

    21/105

    3. Reduction in failure , there by improving reliability

    4. Reduction in cost of power to customer

    5. Improvement in the availability to the customer , meeting customer expectation

    6. Reduction in auxiliary power reduction from 12.66% to 10.98%

    7. hunting load customers quires can be taken by T.P.C. there by reducing the

    dependence on the state grid and making the power withdrawal from K.P.T.C.L. to

    zero minimum impact of the outage to the customer

    TECHNIQUES USED FOR TOTAL QUALITY CONTROL

    FISH BONE DIAGRAM

  • 8/22/2019 Total Quality Management of TATA POWER

    22/105

    ROUTE COST ANALYSIS

    MEN

    A. Moisture from compressor is not regularly drained

    B. Lack of knowledge about overhaul method

    MATERIAL

    Quality of material should be improved

    MACHINES

    A. Frequent failures of control circuits of compressor starting and stopping

    1. Failure of pressure switches for starting and stopping

    2. Failure of contactors and single phasing of switches .

    3. Dripping of setting of pressure switches

    MEN METHOD

    S

    MATERIAL MACHINE

    COMPRESSOR

    EXCESSIVE

    RUNNING

  • 8/22/2019 Total Quality Management of TATA POWER

    23/105

    B. Frequent leakages from loose pipes used for air inlets of air blast circuit

    breakers and defective non return valves of air blast circuit breakers

    methods

    A. Existing maint practices not sufficient

    B. Conditioning monitoring is not adequate

    ADVANTAGE OF FISH BONE DIAGRAM

    1. Process is define systematically .

    2. Simple to understand .

    3. Several time ask the question why till they dont get the

    answer

    4. Use to find limitation

    TECHINQUES BASED ON MALCOLM BALDRIGE

    REPORT

  • 8/22/2019 Total Quality Management of TATA POWER

    24/105

    ASSESSMENT YEAR 2005- 2006

    REPORT ON MALCOLM BRIDGE FOLLOWED TATA

    POWER

    SR.

    NO.

    LINE OF BUSSINESS TURNOVER

    FY05 IN

    [RS CRORE]

    PERCENTAGE

    1.

    2.

    3.

    POWER BUSINESS

    STRATEGIC ELECTRONICS

    DIVISION

    POWER SYSTEM DIVISION

    3674

    62

    184.5

    93.5%

    1.6%

    4.7%

    The baldrige award examine the quality of an organization

    activities in several category

    1. Leadership

  • 8/22/2019 Total Quality Management of TATA POWER

    25/105

    2. strategic planning

    3. customer and market focus

    4. measurement analysis and knowledge management & information &

    knowledge management

    5. human resources focus

    6. process management

    7. business result

    1. LEADERSHIP

    Highlights leaders role in setting and communicating vision , value and focus on customer

    and accomplishing organizations objective

  • 8/22/2019 Total Quality Management of TATA POWER

    26/105

    A. SENIOR LEADERSHIP

    STAKE

    HOLDER

    DEVELOPMENT

    MECHANISM

    RECENT

    IMPROVEMENT

    RATIONAL

    IMPROVEMENT

    CUSTOMER

    SUPPLIER

    1.Customer meets

    2.customer focus group

    3.Customer opinion

    leaders meet

    4.Level of customer

    contact plans

    5.Customer valueimprovement program

    Supplier meet

    Half yearly supplier survey

    together inputs on their

    survey together inputs on

    Designing and implementation of

    customer portal

    Visits of customer groups during

    major activities at TPC like 500

    MW unit overhaul

    Inclusion of opinion leader

    communication

    Participation of senior leader in

    the customer meeting cascade

    Supplier meet also at divisional

    level

    Formation of complaints &

    grievances cell and vendor portal

    as additional mechanism of

    To proactively satisfy

    queries related to

    reliability during customer

    meets and building

    relations

    Communication regarding

    TCOC ,TPC future plan

    and other area of

    common interest

    Speedy resolution of

    complaints

  • 8/22/2019 Total Quality Management of TATA POWER

    27/105

    Shareholder

    INVESTOR

    their alias of concern

    Half yearly and yearly

    report

    Investor / forums seminars

    /conference

    access and information

    Half yearly result communication

    introduced

    Initiated in fy05 , 2/3 meeting

    interaction annually

    Keeping shareholder

    informed about TPCS

    future plan

    Image building , support

    for growth initiative

    1. Continued focus on enhancing and improving the equipment , system and network

    reliability refuilishment and replace programs leveraging the new technology

  • 8/22/2019 Total Quality Management of TATA POWER

    28/105

    2. Strategic plan for sustenance example generation capacity addition , coal block

    etc.

    3. Focus on developing technical , managerial and leadership competencies

    4. Participation by senior leaders in training program - M.D. as acted as faculty on

    tata group level workshop on project management

    5. Participation by senior leaders in training program

    6. Regular risk assessment and preparation of risk mitigation plans

    7. Knowledge management

    8. Environment management and C.S.R.

  • 8/22/2019 Total Quality Management of TATA POWER

    29/105

    PERODIC REVIEW OF PROTECTION SCHEMES TO

    ENSURE CONTINUED EFFECTIVENESS

    ADVERSE IMPACT

    PUBLIC CONCERN KEY PRACTISESMEASURES

    1. Reliability of power

    supply

    2. Load shedding

    planned and power

    interruptions to partial

    consumer under low

    frequency conditions

    A. Forecast demand growth and

    address shortage

    B. Continues improvement in O&M

    practice to ensure high reliability

    C. Scheduling of plant / equipment /

    outages during low loads

    D. Built in redundancies ,T&D

    equipmentE. power purchase during shortage

    A. Segmentation of on consumers

    based impact on business and

    public servicesB. Design of graded load shedding

    scheme for minimizing power

    interruption to critical consumption

    Generation plant availability 1%

    Indices like CAIFI CAIDI SAIFI

    SAIDI

    Transmission line availability

    Loss of scale due to forces

    outages

    No. of under frequency load

    shedding operation

    No. of times critical consumer got

    shut down

    No. of block outs saved /

  • 8/22/2019 Total Quality Management of TATA POWER

    30/105

    3. Block out [ total

    interruption of power

    supply to all

    consumer ]

    A. Islanding scheme to isolate Mumbai

    customer from grid disturbances

    B. Stand by power arrangement with

    M.S.E.B.C. Periodic review of protection scheme

    to ensure continued effectiveness

    systems block outs

    Time taken to restore supply after

    a block out .

  • 8/22/2019 Total Quality Management of TATA POWER

    31/105

    2. STRATEGIC PLANNING

    Strategy development has been rewritten to clearly address the key aspects of strategy

    developing , including ability to execute the strategic planning .[ In contrast , consumer of tata power continue to enjoy uninterrupted supply of quality

    power ]

    STRATEGIC OBJECTIVE

    STAKE

    HOLDER

    KEY REQUIREMENT

    STRATEGIC

    OBJECTIVES

    1. CUSTOMER

    2. INVESTOR

    AND

    SHAREHOLDER

    3. EMPLOYEES

    Reliable uninterrupted power supply at competitive rates

    Optimum returns

    Employee growth and development

    1. Low cost generation capacity

    2. Peaking power availability

    3. Enhancing value to customer

    1. Growth to capacity addition ,

    entry into adjacent business

    2. Organization transformation

    Growth through capacity addition

    entry into adjacent business

  • 8/22/2019 Total Quality Management of TATA POWER

    32/105

    4. SUPPLIER

    AND PATNER

    5. community

    Challenging work environment

    Growth and prosperity

    Good corporate citizenship

    Organization transformation

    1. Growth through capacity additi

    entry into adjacent business

    1. C.S.R. initiative

    3. CUSTOMER AND MARKET KNOWLEDGE / FOCUS

  • 8/22/2019 Total Quality Management of TATA POWER

    33/105

    Focus on customer complaint data and organization process for minimizing customer

    dissatisfaction and less of repeat business .

    Customer and market knowledge has an enhanced focus on identifying current and

    potential customer for both existing and new products and services .

    TPCS market development process , is and process in the customer value chain starting

    with market identification till developing new initiatives .

    The market department has reviewed and refine to take care of new emerging market as

    SEBS , traders open access customers and distribution circle .

  • 8/22/2019 Total Quality Management of TATA POWER

    34/105

    Process no Name of

    process

    improvement

    1. MDP2

    2. MDP4

    3. MDP5

    4. MDP7

    5.MDP8

    Segment market and

    customer base

    Develop business

    plans

    New customer

    acquisition

    Manage customer

    a/c

    Complaint

    management

    Criteria for market attractiveness and internal

    capabilities are clearly defined , growth potential

    of segment also included in the analysis .

    Reduce tariff to direct customer of TPC , new

    ht residential tariff .

    Targets are taken monthly and reviewed

    quarterly.

    Customer contact plan, monthly customer

    coordination meeting, sharing of complaint,

    coverage of wider cross section of employees in

    customer coordination, focus group/ key a/c

    manager meeting (KAM) , customer value

    improvement program

    Complaint escalation, % of time TPC meets

    customer services standards added in bad

    measures, complaint analysis shared with other

    division , about 30% of sustains covered under

    distribution automation to reduce restoration

    time, new web based system for complaint

    management for call centre.

  • 8/22/2019 Total Quality Management of TATA POWER

    35/105

    SEGEMENT MARKET AND CUSTOMER BASE

    i)

  • 8/22/2019 Total Quality Management of TATA POWER

    36/105

    ii)

    START

    Market

    information andindustry trend

    from MDP1

    1.List segment

    2.Segmentcharacteristics

    Revised

    marketing

    segment

    Customer

    detailfrom

    MDP5

    Analyses

    competitorsmarketsegment tariff

    comparison

    Analyses

    geographicalarea to

    understandexisting

    distribution

    networkcustomer

    density

    classify

    customer

    and market

    STRATEGIC TACTICAL

    MDP1

    Develop marketoutlook and

    scenarios

    MDP3 Formulate

    actionable strategies and

    propose investment

    MDP2

    Segmentmarketing and

    customer MDP4 Developbusiness plan

  • 8/22/2019 Total Quality Management of TATA POWER

    37/105

    Customer relationship and satisfactionTPC user Manage customer account process to built and strengthen relationship with

    customer. TPC interacts customer through many form in order to built relationship and to

    understand changing requirement future plans.

    TPC use multiple channels to provide access to customer to seeks information, conducts

    business and lodge complaints. All customer are well informed about contact central control

    room and fault duty / maintenance engineers.

    In addition REL and BEST have provide with microwaves communication facilities to

    contact any of receiving station LD\ CCR .

    Customer contact requirement and gathered through direct customer interaction by the

    divisional service staff and feedback received through various post CSS also specifically

    check for customer preference on various customer contact mechanisms some example of

    improvement in access mechanisms are provision of additional mobile phone to O&M

    engineer and web based complaint management system .

    Effectiveness of the call centre and all other access mechanisms in assessed through the

    happy call survey and CSS .

    OPERATIONAL

    MDP5 New customeracquisition

    MDP7 Managecustomer a/c

    MDP6

    Implementation and

    internal logistics

    MDP8 Complaint

    management

    MDP9 Formulate new

    initiatives

  • 8/22/2019 Total Quality Management of TATA POWER

    38/105

    ACCESS MECHANISM

    STATION

    LICENSES

    AREA

    AVAILABILITY

    TIME

    LANDLINE MOBILE FAX E-

    MAIL

    VSAT WEBSITE

    L.D. 24 HRS

    M.C.R. OFFICE HRS

    ENGINEERING OFFICE HRS

    DIVISIONAL

    MAINTENCE

    24 HRS

    CENTRAL

    CONTROL

    ROOM

    24 HRS

    CALL

    CENTRE

    24 HRS

    YEL 24 HRS

    FAULT DUTY

    ENGINEER

    24 HRS

    CONSUMER

    ENGG . DEPT

    OFFICE HRS

    PLANT LEAD 24 HRS

    Complaint management process

    TPC user Complaint management process is to ensure prompt and effective resolution

    of customer complaint. While the call centre is available round the clock , bulk customer

    prefer to contact , respective CCR nodes , divisional control rooms or duty engineer

    directly due to long term relationship some customer like railway and licenses lodge written

    complaint as well as . All complaint whether received directly or through control room are

    collected at call centre for analysis .

    In CPP\ IPP all complaint are received by control room . Each control room maintenance a

    complaint register and complaint are immediately recorded and to concerned authorities to

    takes prompt and suitable action . The existing software at call centre has been replaced

  • 8/22/2019 Total Quality Management of TATA POWER

    39/105

    recent by a web based software which is accessible to all in the customer service

    response chain , with restricted access . This will enable on line monitoring of complaint

    status . The complaint data is reviewed in monthly meeting with departmental heads and

    suitable to avoid recurrence .

    customer complaint management process

    Attend complaint and inform

    complaint attended by CR cell

    D\E and informed call centre

    If not call centre escalates If not CRR escalates, if not 2nd

    complaint, upto 4 level of escalation

    escalation .

    Complaint attended by D\E Complaint attended

    and informed call centre

    Customer informed and confirm Inform customerto be satisfied

    Call centre updates record and CR cell updates record and generates

    generates MIS MIS.

    Review report and analyses Review report and analyses complaint

    Call centre

    phone

    inform field

    dutyen ineer

    CCR nodes\ control room of

    receiving station

    CR cell (written

    interact with

    concerneddepartment)

    In case of

    criticalcomplaint

    higher level

    alsoinformed

    Action byrespective

    department

  • 8/22/2019 Total Quality Management of TATA POWER

    40/105

    complaint

    Feedback to all concerned to Feedback to all concerned to avoid

    avoid recurrence recurrence

    Input to HR To EQA for system reliability

    studies.

    Customer satisfaction determination

    Customer satisfaction and dissatisfaction survey are conducted , on various attributes of

    product and services quality . Process use for survey is broadly same for different

    segment . However questionnaires are designed to reflect difference importance of various

    attributes with respect to different segment . Survey is designed to capture information on

    customer satisfaction and dissatisfaction . TPC has this year changed the model from

    orgs EQ model to Metric model .

    This model help to find out the satisfying and delighting attributes separately for each

    customer segment .

    Customer satisfaction relative to competitorsMumbai Area: CSS cover customer to all major competitors and main utilities i.e; REL,

    BEST, and MSEB . TPC also conduct win/loss analysis feedback from opinion leaders

    also help to identify area of improvement findings of these surveys are converted in action

    plan for implementation benchmarks / comparison of best utilities.

    Customer satisfaction survey process

    Review in CCM and action plan prepared

    Input to engineering for designreview

    Qualitative

    discover phase

    (Customer

    requirementsurvey)

    Attribute wise

    questionnaires

    development

    Customerinterviews

  • 8/22/2019 Total Quality Management of TATA POWER

    41/105

    Analysis of data

    TATA POWER MARKET SEGMENTS

    Relativeimportance

    of each

    factor

    Satisfaction/

    dissatisfactionlevel of TPC

    and competition

    an each factor.

    Relative rating of TPC V/S Competitor on each factor

    A

    cti

    on pl an pr ep ar ati

    on and de pl oy m ent

    T

    A T A P O WE R M A R K E T S E G M E N T S

  • 8/22/2019 Total Quality Management of TATA POWER

    42/105

    SEBSPublic utilities

    REL TPTCCaptives Industry

    (TATA STEEL)

    BEST TRADERS(NEW

    MSEB segment) Lager (Industrycommercial users)

    KPTCLDVC Exclusively service

    by TPC

    Service by TPCand others

    Change

    over openaccess.

    Distributors (75%of power demand)

    Short term

    buyersLong termbuyers

    Consumer

    L

    I

    C

    E

    NS

    EE

    High volume (21%of power demand)

    Low volume(4% of powe

    demand)

    Low tensio

    industries,commercia

    Residential

    OPINION MAKERS

    ARCHITECTS CONSULTANT BUILDERS

  • 8/22/2019 Total Quality Management of TATA POWER

    43/105

    4. MEASUREMENT , ANALYSIS AND KNOWLEDGE

    MANAGEMENT AND INFORMATION AND KNOWLEDGE

    MANAGEMENT

    It added emphasis on the purpose and use of the result of analyses and review including

    strategic decision for organization .

    Information and knowledge management : It is a new area to address on data ,

    Information and knowledge quality in recognition of challenges all organization face in this

    area . This item also now addresses the availability of data and information in the event

    of an emergency .

    Measurement , analysis and review of organizational performance : Organizationperformance is tracked through OPMS (ORGANISATION PERFORMANCE MEASURE

    PROCESS) . The measure for which are derived from strategic objective .

    Operation data , information is aggregated and made available to senior management

    through Daily operation and statistics report.

    ORGANISATIONAL PERFORMANCE MONITORINGSr.no Performance

    parameters

    area

    Sources /MethodsCollection

    Organizationperformance KPM

    reviewed

    Improvementcarried out in

    FY 06

    Rationale behind theimprovement

    1. Finance Departmental /

    SAP report

    Business area

    wise sales

    average tariff

    operation profit ,

    cost of capital.

    Business

    area wise

    drill down for

    sales.

    To monitor business are

    wise performance for

    better control and timely

    action plans to achieve

    competiveness in financia

    performance2. Customer Through various

    report in sap,

    customer surveys,

    complaint

    management

    Customer

    satisfaction index

    Dissatisfaction

    index, Complaint

    index.

    Customer

    dissatisfaction

    Andcomplaintindex addedAs KPM.

    To identify dissatisfied a

    Reduce complaint

    resolution cycle time and

    no. of complaint

  • 8/22/2019 Total Quality Management of TATA POWER

    44/105

    system

    3. Internal Control room logs,

    SAP report

    departmental

    reviews

    Availability index,

    control

    effectiveness

    index , 3SCR

    targets coal

    consumption ,

    O&M cost , fuel

    cost CRS

    assurances .

    Preserving

    asset base

    capex and

    reduce risk

    control

    effectiveness

    index added

    To accelerates capex jo

    and to strengthen the

    governances system and

    proactive approach for

    statutory comp lances .

    4. Growth ,

    globalization

    And

    regulator

    management

    Review at

    leadership level ,

    fibers regulators

    order and

    communication

    Status /milestone

    achieves for

    generation and

    transmission

    capacity addition

    captive coal .

    New

    performance

    parameters

    added.

    To focus organization

    efforts on substances an

    Expansion activities .

    5. Learning

    and growth

    Employee

    engagement

    survey ,TBEM

    assessment MBEsurvey .

    Employees

    engagement index

    talent

    management PPMFor future leader

    MBE assurances

    TBEM score

    Taken

    management

    PPM for

    future leader.

    For leadership

    development.

    Analysis to support performance review and validationof conclusion

  • 8/22/2019 Total Quality Management of TATA POWER

    45/105

    Analysis data and information based on KPMS , is carried out using different methods like

    variance analysis cause effect , waterfall diagram , cost benefits.

    These analysis are presented during organizational performance review to senior leaders ,

    departmental head as mention in next page table.

    The developed action plans with result analysis and communicated to relevant division ,

    department , working groups through leadership to enable decision making result of

    analysis , regulatory charges , new opportunity action plans etc are shared to suppliers

    and partners during customer / vendor meets and regular interaction for effective

    performance from them in future transaction .

    Analysis to support performance review and validationof conclusion

    KPMS Method

    used for

    obtaining

    information

    Strategic

    objectives

    Analysis

    method

    Action

    plan

    supporting

    objective

    Example of improvement

    made based on review

    finding

    Result

    related to

    achieveme

    nt of

    strategic

    plans

    Result related

    achievement

    1. fuel

    cost

    [belga

    m]

    Report from

    fuel dept.

    supplier

    interaction

    Reinforce

    current

    business

    low cost

    generation

    Variance

    and

    cause

    effect

    monthlyreview

    Sourcing

    cheaper

    reliable

    fuel

    With continuous rise in

    fuel cost in international

    market search of

    alternative reliable fuel

    suppliers reducedtransportation cost

    Reliable

    and reduce

    cost of

    fuel

    Able to source

    alternate

    supplier who

    reliable and

    cheapercompared to

    international

    market

    2. fuel

    cost

    Report from

    fuel dept.

    Reinforce

    current

    Variance

    , trend

    Sourcing

    reliable

    In view of falling trends

    from local refinery

    Availability

    of fuel for

    Fuel made

    available

  • 8/22/2019 Total Quality Management of TATA POWER

    46/105

    [tromb

    ay]

    supplier

    interaction

    business

    low cost

    generatio

    n

    analysis

    /

    monthly

    divs.

    O&M

    and

    strategy

    review

    fuel imports initiated generation through

    alternate

    source

    Cost

    of fuel

    [for

    trombay]

    Report

    from fuel

    dept.

    Reinforce

    current

    business

    low costgeneratio

    n

    Cause

    effect

    monthly

    review

    Ensure

    reliability

    and

    reducedfuel cost

    Work on new coal berth

    started at trombay

    Will reduce

    dependenc

    e on other

    contractorin coal

    supply

    Reduce cost

    of fuel

    Consu

    mer

    interru

    ption

    duratio

    n and

    reliabil

    ity

    Monthly

    marketing

    information

    system

    [MIS]

    report

    Reinforce

    current

    business

    enhance

    value to

    customer

    Variance

    / causes

    effect

    analysis

    monthly

    review

    Reduction

    of

    consumer

    interruptio

    n

    frequency

    and

    improve

    reliability

    Network modification on Improve in

    CAIDI from

    28.50 min

    in FY05 to

    25.95 min

    in FY06

    and

    reliability

    index from

    42.47 in

    FY06 to

    42.99 min

    in FY04

    Minimum

    duration of

    interruption to

    consumers

    Information and knowledge managementData and information is made available and accessible on need to know basis to various

    stakeholder .

  • 8/22/2019 Total Quality Management of TATA POWER

    47/105

    Data and information availability for stakeholders.Stakeholder Process of

    Gathering

    requirement

    Data and information

    Needed

    Types Available through

    Customer Customer co-

    ordination

    meeting

    Complaints, billing ,

    Payment quires

    Transactional Customer portal,

    call, seminar ,

    customer visit

    Meets, SAP.

    Supplier Supplier meets

    And interaction

    Order information ,

    Forecast

    Transactional/

    Strategic

    E-MAIL,

    telephone , fax

    Communication,

    Vendor , portal,Personal visits,

    Supplier meets.

    Employees Open dialogues

    Focus groups,

    Committee

    meeting.

    Functional and

    administrative

    Functional

    Transaction

    strategic

    SAP, people

    Power, new

    letters,

    transmission line.

    Investor Investors

    meets, AGM,

    Investors visit.

    Financial result, growth

    plans , queries

    Operational

    and strategic.

    Quarterly result ,

    Annual report,

    websites

    feedbacks.

    Partner Interaction Function Transactional/

    Strategic

    Web-sites , call

    centre ,

    meetings/reviews,

    Interaction SAP.

    Improvements carried out this are pay slips are now available in electronic format with

    intimation through E-MAIL.

    TRANSCATION

    TRANSCA

    TION

    TRANSCATION

    TRANSCATION

    TRANSCA

    TION

    TRANSCAT

    ION

    TRANSCAT

    ION

    TRANSCATIO

    N

    TRA

    N

    SCATION

    TRANSCATION

  • 8/22/2019 Total Quality Management of TATA POWER

    48/105

    5.HUMAN RESOURCE FOCUS

    The item in this category have an added focus on how work system and employee

    learning reinforce accomplishment of organization action plans and retention of critical

    organization knowledge.

    TPC has undertaken several initiative to promote high performance work culture .

    Some of include :-

  • 8/22/2019 Total Quality Management of TATA POWER

    49/105

    a. Setting goal and expectation .

    b. Introduce PPM process to identify and groom talent .

    c. Introduction of scientific tools to assess potential and aptitude at entry level

    and aptitude at entry level and ascertain job fit.

    d. Restructured performance reward policy .

    e. To promote improvement through team activity.

    f. Reward and recognition.

    WORK SYSTEM:-TPC has adopted following initiative in its work system to promote co-operative ,

    empowerment agility and innovation are :-

    Migration towards a team based cultures - Cross functional team are formed at two level

    i.e. Corporate level to address organizational level problems . These teams are empowered

    to suggest and drive change in work processes. Innovation is primarily driven through the

    3SCR Initiative . Suggestion schemes and small group activities quality circle are other are

    mean to encourage innovation and team work.

    Job Rotation- Job Rotation addresses objectives such as leadership development, meeting

    organizational needs an opportunity to individual to manage their own careers. In meeting

    these their own careers . In meeting these objectives , job Rotation is linked with the

    PPM process and an online job posting mechanism has been introduce to encourage

    people from within to manage their career paths.

    Work systems to capitalize on diverse ideas:- TPC is an equal opportunity employer and

    as such the recruitment polices are directed in which organization operates . Suggestion

    scheme ,CFTS, SGAS, Quality circle , Knowledge sharing session etc. Issues impacting

    work system are identified during structured meets, feedbacks and focus group discussion .

    Various training delivery options

    Delivery Method Training program

    Lecture All training programme with class room set-up.

    Case studies Finances for senior manager , basic of finance.

  • 8/22/2019 Total Quality Management of TATA POWER

    50/105

    Role plays Presentation skills, Develop your own potential.

    Hands on training Techniques, Breaker maintenance workshops , OEM training , welding

    Technique.

    Simulation Business simulation games , Simulator training , PS awareness,

    MS offices.

    On the job Control room training , Deputation to outage job.

    Project based

    learning

    Project management , CFT/SGA on specific project.

    Distance learning K HUB, Knowledge portal.

    Seminars and

    conference

    Nominations to vital seminars and conferences conducted by reputed

    Organizations and institutes .

    Outbound training Outbound team building

    Video session Industrial safety, Base level awareness session.

    Mentoring Induction / system for new entrants (Guide for every individual)Group Discussion Team Building ,Develop Management potential.

    6.PROCESS MANAGEMENT

    It has new area to address on operational planning . This area focus on financial planning,

    resources , as well as process for continuity of operation in case of an emergency.

    Design of value creation processes

    Design of value creation processes translates into expansion , refurbishments ,

    modernization and improvement and to O&M process and meeting customer requirement in

    these areas while designing the value creation processes efficiency and effectiveness factor

    such as cost cycle times, consideration for new technology.

  • 8/22/2019 Total Quality Management of TATA POWER

    51/105

    Cycle time , Productivity and cost control

    O&M processes are constantly Monitoring cycle time of various sub processes such as

    overhaul time, quantity of coal receipt etc. To identity opportunity for improvement. Process/

    performance improvement have been achieved through benchmarking . Due to this capital

    overhaul and startup periods have been steadily reduced and luster capital overhaul period

    22 days for 500MW coal fired. This was facilitated by various improvements in outage

    management and safety compliance.

    Example Improved productivity use in average coal receipt by critically reviewing and

    modifying system by the O&M team .

    Adoptions of condition based maintenance approach as compared to periodic , preventive

    maintenances work has resulted in optimum resource utilisation and reduced equipment

    down time .

    T&D :-

    i) Process of preventive maintain of 22kv

    Action plan identified

    Improved preparation before breaker is to taken out for maintenanceReduction in inspection and general cleaning time

    Considering the system of safety taken

    Benefits

    Cycle time reduction from 150 minutes to 120 minutes

    Inputs from markets,customer, statutory,

    strategy planning

    ABP

    Translating deliverablesin location plans and

    review then feedback

    mechanism

    Performance measuresviz. cycle time , cost

    v/s target.

    Track measures and changing requirementsreview and feedback mechanisms

  • 8/22/2019 Total Quality Management of TATA POWER

    52/105

    ii) Process of replacing and transformer to reduce down time

    Action plan identified

    Storage of spare and transformers of these more location in tested communication of

    status to all.

    Round the clock accessibility of spares and review of test to minimized time .

    Standard of transformer and relay setting

    Benefits

    Cycle times reduction to 16hrs from 36hrs.

    iii.) Cycle times to attend HT (high tension/ cable to fault to increase reliability)

    Action plan identified

    Increased working hrs

    Resident cable ENGG at receiving station and material storage at 3 more receiving station.

    Benefits

    Target reduction in cycle times from 7 days presently to 3 days.

    HYDRO

    i.) Process of daily performances review

    Action plan identified

    Improvement in aggregation and reporting mechanism for daily performance

    Benefits

    Better performance on key parameters due to renewed focus and internal competition.

    ii.) Forced outage

    Action plan identified

    Semi annual technical audit of division

    Benefits

    Improved availability of the units.

  • 8/22/2019 Total Quality Management of TATA POWER

    53/105

    iii.) Unit start up

    Action plan identified

    Unit start up time reduced from 330 sec to 125 sec.

    Benefits

    Improved response to real time load requirement.

    7.BUISNESS RESULT

    i.) Product and service outcome

    It has been given a value of 100% to indicate the importance of product and service

    performance result to customer satisfaction , loyalty , and long term business success.

    ii.) Leadership and social responsibility resultIt addresses all governance, senior leadership and social responsibility results. The item

    places in one location the evidence of accomplishing organization strategy , ethical

    behavior , fiscal accountability , legal compliance and organization citizenship.

    1. Product and service outcome

  • 8/22/2019 Total Quality Management of TATA POWER

    54/105

    a.) Commercial Complaint Index Survey and customer interaction have

    highlighted billing and bill payment as concern for customer in Mumbai area.

    3

    1.92

    2.28

    1.83

    0.48

    0

    0.5

    1

    1.5

    2

    2.5

    3

    3.5

    1

    year

    percentage

    (%

    )

    2002 2003 2004 2005 2006

    d.) SAIDI INDEX MINUTES. System average interruption frequency in frequency

    index in average interruption in minutes for customer served during the year has been

    shown improvement in SAIDI trend. This is achieved through installation of line fault

    locators, automation of critical networks etc.

  • 8/22/2019 Total Quality Management of TATA POWER

    55/105

    54.29

    41.76 40.99 39.63

    0

    10

    20

    30

    40

    50

    60

    1

    year

    MINUT

    ES

    2003 2004 2005 2006

    2. Customer focused results

    TPC has been conducting annual customer satisfaction survey since the year 2001 through

    an external agency . TPC has an external agency . TPC has further refined its method by

    including customer requirement inputs as a part of the CSS . TPC from ORGS EQ model

    to metrics moster model . Results are presented as per the customer segmentation

    revised in 2005-2006.a.) CSI ( Customer satisfaction index ) Overall based on ORGS model.

    b.) CSI- LT

    Industrial

    86

    89

    86

    84.5

    85

    85.5

    86

    86.5

    87

    87.5

    88

    88.5

    89

    89.5

    1

    year

    percentage(%)

    20 04 2 00 5 20 06

  • 8/22/2019 Total Quality Management of TATA POWER

    56/105

    89 89

    88

    87.5

    88

    88.5

    89

    89.5

    1

    year

    percentage(%)

    2003--2004 2004-2005 2005-2006

    c.) CSI- Residential

    88

    86

    90

    84

    86

    88

    90

    92

    1

    year

    percentage(%)

    2003-2004 2004-2005 2005-2006

    d.) CSI- LT Commercial

    9088

    80

    7476

    7880

    82

    84

    86

    88

    9092

    1

    year

    percentage(%)

    2003-2004 2004-2005 2005-2006

  • 8/22/2019 Total Quality Management of TATA POWER

    57/105

    It is seen that CSI has improved for the residential , but has reduced for the LT

    commercial segment . This is also seen by the increase in dissatisfaction for this segment

    .

    CUSTOMER SATISFACTION INDEX

    OPINION

    LEADER

    YEAR TPC REL BEST03-04 89 71 87

    04-05 84 75 76

    05-06 89 NA NA

    CUSTOMER DISSATISFACTION INDEX

    TPC REL BEST

    03-

    04

    04-

    05

    05-06 03-04 04-05 05-06 03-04 04-05 05-06

    Larger

    ind/Commercial

    14 9 5 41 20 19 22 27 9

    Public utility 12 6 9 10 34 34 13 9 9

    Long term

    Buyer

    16 10 0 NAPP NAPP NAPP NAPP NAPP NAPP

    LT Industrial 6 6 4 9 11 44 5 10 17

    LT Commercial 6 6 10 10 10 38 7 7 15

    Residential 9 6 5 10 10 19 8 8 2

    (Note:- NA is not available and NAPP is not applicable.)

    3.) Human resource result

    a.) Team engaged in improvement

    ( CFTS + SGA + QC ) CFTS ( Cross functional team )

  • 8/22/2019 Total Quality Management of TATA POWER

    58/105

    96

    61

    237

    179

    0

    50

    100

    150

    200

    250

    1

    year

    Numb

    er

    2003 2004 2005 2006

    b.) Number of knowledge sharing section

    30

    183213

    359

    0

    50

    100

    150

    200

    250

    300

    350

    400

    1

    year

    Number

    2003 2004 2005 2006

    c.) Employee productivity

  • 8/22/2019 Total Quality Management of TATA POWER

    59/105

    4.2

    7.1

    0

    1

    2

    3

    4

    5

    6

    7

    8

    1

    year

    No's

    pere

    mployee

    2005 2006

    d.) Training coverage percentage employees receiving training.

    81.9

    90

    81

    76

    78

    80

    82

    84

    86

    88

    90

    92

    1

    year

    perce

    ntage(%)

    2004 2005 2006

    e.) Training effectiveness

  • 8/22/2019 Total Quality Management of TATA POWER

    60/105

    77

    81

    78

    75

    76

    77

    78

    79

    80

    81

    82

    1

    year

    percentag

    e

    (%)

    2004 2005 2006

    f.) Absenteeism rate

    0.24

    0.28

    0.08

    0.02

    0.11

    0

    0.05

    0.1

    0.15

    0.2

    0.25

    0.3

    1

    year

    percentage(%)

    2002 2003 2004 2005 2006

    g.) Training effectiveness segmented

  • 8/22/2019 Total Quality Management of TATA POWER

    61/105

    h.) ETD Intervention in strategic area

    501

    87

    591

    26

    931

    121100

    1581

    59107

    492

    200

    0

    200

    400

    600

    800

    10001200

    1400

    1600

    1800

    1

    Intervation in strategic area

    Manday's

    Fin

    Value engg

    QTY CIRCLE

    7QC TOOLOEM

    Project management

    EMBA

    TBEM

    Power trading

    DRUM

    Team bldg

    PMS

    4.) Organizational Effectiveness Result

    79

    76

    80

    83

    75

    85

    76

    70

    72

    74

    76

    78

    80

    82

    84

    86

    1

    Segment

    percentage

    (%)

    Customer

    Finance

    Leadership

    MDP

    3SGA

    Team building

    Technical

  • 8/22/2019 Total Quality Management of TATA POWER

    62/105

    a.) Thermal plant availability (%)

    93

    91

    96.8 96.9

    94.4 94.05

    88

    89

    90

    91

    92

    93

    94

    95

    96

    97

    98

    1

    year

    percentage(%)

    2002 2003 2004 2005 2006 Target

    b.) Hydro plant availability (%)

    83.58

    89.7788.5

    92.72

    96.44

    93.43

    75

    80

    85

    90

    95

    100

    1

    year

    percentage(%)

    2002 2003 2004 2005 2006 Target

  • 8/22/2019 Total Quality Management of TATA POWER

    63/105

    c.) Generation Due to improved availability , TPC has been able to generate and meet

    the increasing demand of city of Mumbai and total generation increase by 2.4% over the

    production .

    9779

    10391 10374

    10965

    11208

    9000

    9500

    10000

    10500

    11000

    11500

    1

    year

    ACTUAL

    2002 2003 2004 2005 2006

    9740

    10437 10442

    10708

    11206

    9000

    9500

    10000

    10500

    11000

    11500

    1YEAR

    TARGET

    2002 2003 2004 2005 2006

  • 8/22/2019 Total Quality Management of TATA POWER

    64/105

    5.) Marketing result

    i) Market share (Generation) TPC has maintained its leadership position in generation

    TPC has continue to be leader in the generation in licenses area contributes in volume

    from power business outsides MA (Mumbai area)

    ii) Market share (Distribution) Despite down trend in the HT industrial segment, TPC has

    maintain increasing trend in the business volume through growth in HT and LT

    Commercial segment business and sales to SEB directly .

    iii.) Sales to SEB In order to increase volume of business in licensed area and

    maximum utilization of assets , TPC continued to peruse sales to other SEBS directly.

    a.) Number of customers

    1886

    5181

    9110

    17028

    214422206723488

    0

    5000

    10000

    15000

    20000

    25000

    1

    year

    Numberofcustomer 1999-2000

    2000-2001

    2001-2002

    2002-2003

    2003-2004

    2004-2005

    2005-2006

    b.) Sales and Revenue (New consumer)

  • 8/22/2019 Total Quality Management of TATA POWER

    65/105

    SALES

    100156

    237

    360

    483

    607

    0

    100

    200

    300

    400

    500

    600

    700

    1

    year

    SALES

    MILLION

    UNITS(MUS)

    2000-2001

    2001-2002

    2002- 2003

    2003-2004

    2004-2005

    2005-2006

    REVENUE

    4060

    98.5

    143

    201

    230

    0

    50

    100

    150

    200

    250

    1

    YEAR

    REVENUEIN

    RS.CRORE

    2000-2001

    2001-2002

    2002-2003

    2003-2004

    2004-2005

    2005-2006

    C.) Market share generation in MUS

  • 8/22/2019 Total Quality Management of TATA POWER

    66/105

    TPC -POWER BUISNESS

    9000

    12996 12912 1328313746

    0

    2000

    4000

    6000

    8000

    10000

    1200014000

    16000

    1

    YEAR

    MILLION

    UNITS

    2001 2002 2003 2004 2005

    TPC-MUMBAI AREA (MA)

    900010032 10469 10374

    11086 11246

    0

    2000

    4000

    6000

    8000

    10000

    12000

    1

    YEAR

    MILLION

    UN

    ITS

    (MUS)

    2000 2001 2002 2003 2004 2005

    d.) MARKET SHARE (MUS SOLD)

  • 8/22/2019 Total Quality Management of TATA POWER

    67/105

    TPC-power business

    9500 950011000

    12194 12500 1266313574

    0

    2000

    4000

    6000

    8000

    10000

    1200014000

    16000

    1

    year

    MILLION

    UNITS

    (MUS)

    2000 2001 2002 2003 2004 2005 2006

    TPC-MUMBAI AREA

    8000 8000 85009500 10000

    1047411066

    0

    2000

    4000

    6000

    8000

    10000

    12000

    1

    YEAR

    MILLION

    UNIT

    (MUS)

    2000 2001 2002 2003 2004 2005 2006

    6.) Financial result TPC has a track record of consistent improving financial performance.

  • 8/22/2019 Total Quality Management of TATA POWER

    68/105

    a.) Profit before tax

    700

    500

    700650

    700759

    659

    0

    100

    200

    300

    400

    500

    600

    700

    800

    1

    year

    RS

    IN

    CRORES

    1999 2000 2001 2002 2003 2004 2005

    b.) Profit after tax It has shown consistent rise from RS 330 in 1998- 99 RS 551

    crores in 2004-2005 CAGR 8.92% ( Compounded Annual Growth )

    330

    469

    390

    508 520 509551

    0

    100

    200

    300

    400

    500

    600

    1

    YEAR

    RS

    IN

    CRORES

    1999 2000 2001 2002 2003 2004 2005 (DEC)

    c.) Earning per share TPC has shown a consistent/ steady rise in EPS

  • 8/22/2019 Total Quality Management of TATA POWER

    69/105

    18.78 19.66

    25.68 26.27 25.6928.11

    0

    5

    10

    15

    20

    25

    30

    1

    YEAR

    RS

    PER

    SHARE

    1999 2000 2001 2002 2004 2005 DEC

    d.) Fixed asset There is an increase in gross fixed asset in power business from RS

    4938 Crores in FY 2002 to RS 5426 in FY05 ( CAGR of 3.19 )

    49365000

    53055426

    5842

    4400

    4600

    4800

    5000

    5200

    5400

    5600

    5800

    6000

    1

    YEAR

    RSIN

    CRORES

    2001 2002 2003 2004 2005 DEC

  • 8/22/2019 Total Quality Management of TATA POWER

    70/105

    e.) Income from Power Business This is mainly due to reduction in average realized

    revenue caused by MERC ( Maharastra electricity regulatory commission) order revising the

    tariff downward by 9.2% and a lower FAC (Fuel adjustment chares ) resulting due to better

    fuel mix.

    42304043

    3683

    3216

    0

    500

    1000

    1500

    2000

    2500

    3000

    3500

    4000

    4500

    1

    year

    RS

    IN

    CRORES

    2002-2003 2003-2004 2004-2005 2004-2005 (dec)

    7.) Governance and social responsibility result

    TPC participate in MBE ( Management of Business ethic ) assurances survey conducted byTQMS for obtaining feedback on the company s status on implementation of various

    ethics policies survey for this year is being carried out.

    a.) Leadership effectiveness survey

    LEADERSHIP EFFECTIVENESS SURVEY RESULT

    LEADERSHIP

    EFFECTIVENESS

    INDEX HIGHER THE

    BETTER

    2004 2005 2006

    73.3% 73.5% 75%

    b.) Results of Investor Survey

  • 8/22/2019 Total Quality Management of TATA POWER

    71/105

    PARAMETERS PERCENTAGE (%) FAVOURABLE RESPONSE

    2003 2004 2005 2006

    Dissemination of

    INFO :-a.) Through

    news item in

    paper /journal

    b.) Through

    annual report

    c.) Through

    cross web sites

    NA

    98%

    NA

    NA

    98%

    95%

    93%

    98%

    94%

    94%

    98%

    95%

    Arrangement

    and presentation

    Last AGM

    (Annual general

    Meeting)

    97% 96% 95% 98%

    Timeliness ,

    accuracy and

    Quality

    89% 97% 94% 96%

    C.) CRS SURVEY RESULT 2004 ( Corporate social responsibility )

    Perspective 2004 score

    Leadership commitment 84.2%

    Manage structure 69.8%

    CRS strategy 75.6%

    Review mechanism 71.5%

    Communication and awareness 64.1%

    Training and development 76.7%

    d.) CRS survey result 2005

    CRS SURVEY REPORT TATA POWER TATA AVG

    GROUP

    BEST IN

    GROUP

    Awareness 99% 90% 100

  • 8/22/2019 Total Quality Management of TATA POWER

    72/105

    CRS environment index 44% 37% 59%

    Leadership committee 57% 49% 75%

    Communication 37% 43% 71%

    Relevance 38% 36% 59%

    System process and support 44% 38% 66%

    Personal committee 91% 86% 98%

    e.) TPC is pioneer in breeding and distributing medicine show result provided to

    village.

    TPC 2002 2003 2004 2005 2006

    Medicine to

    village in

    lakh (RS)

    3.79 9.40 7.54 8.17 27

    f.) Tree plantation is a major activity in hydro catchments area It may be that TPC

    has cumulative planted more than 10 MILLION Trees.

    No. of tree

    planted.

    2002 2003 2004 2005 2006

    Hydro 615000 654000 72000 924000 990000

    Jojobera 19000 5200 1850 1600 1550

    Belgaum _ 3000 4000 3500 2000

    ISO - REPORT 9001:2000 (New Quality Management

    system)

    The Quality manual is the essence of the quality management system and it provides

    organizational directions in meeting the ISO 9001:2000 requirements , which are utilized to

    improve overall performance of the organization . The quality manual is approved by the

    management representation and it is mandatory for all to follow , as applicable .

  • 8/22/2019 Total Quality Management of TATA POWER

    73/105

    The quality policy and broad based quality objectives are established and communication to

    all employees . All efforts are made to see that these are understood and implemented by

    all.

    As customer driven organization , it is necessary that the consumer requirement are

    determined and met with to enhance the consumer satisfaction.

    We ensured that the applicable statutory and are met with and all efforts are made to go

    beyond these on our own as a special responsibility.

    We are confident that all our employees will adopt this standard ISO 9001: 2000 of the

    quality management system in letter and in sprit for sustainable development.

    ISO 9001: 2000 IS IMPLEMENT IN THE AREA ARE AS FOLLOW:-

    1.) Quality management system

    2.) Management Responsibility

    3.) Resource Management

    4.) Product realization planning of product realization

    5.) Product realization customer related processes

    6.) Product realization design and development

    7.) Product realization purchasing

    8.) Product realization product and service provision

    9.) Product realization control of monitoring and measuring devices.

    1.) QUALITY MANAGEMENT SYSTEM

    The Organization has:-

    1.) Identified the processes needed for quality management system and their application

    throughout T,D&S division.

  • 8/22/2019 Total Quality Management of TATA POWER

    74/105

    2.) Determined the sequence and interaction of these processes .( Activity flow charts and

    given in quality management system procedures ).

    3.) Developed effective methods for operation and control of these processes .

    4.) Ensured the availability of resources and information required to support and monitor

    these processes . Necessary manpower, infrastructure, transmission and distribution network

    have been provided . Technical literature to run the processes is available .

    5.) Ensured monitoring measuring and analysis of these processes.

    6.) Implemented actions necessary to achieve planned results and continual improvement of

    these processes.

    Quality management system ISO 9001: 2000

    ISO 9001:2000

    Quality policy

    ( Intention of organization )

    Quality manual ( what is being done )

    Quality procedures manual ( Why , how it is being done)

    Work instruction ( How in detail )

    Format, records

    ( proof of work

    done)

    Control of documents

    The organization has established and maintained procedures to control all documents and

    data that affect the quality of product . It is ensures that all documents are prepared,

    reviewed and modified for their adequacy, approved and distributed to the persons

    concerned.

  • 8/22/2019 Total Quality Management of TATA POWER

    75/105

    All the software used in organization are controlled with password at appropriate level

    depending on requirement of the control

    EXAMPLE :- SAP systems are operated with unique identify for each division with a

    specific password ; e-mail are operated with individual profile and password ; SCADA

    system is operated with individual login name and password. Regular updating of revised

    software packages and anti-virus protection is being carried out by it department (support

    service)

    Control record

    The organization has identified and maintained the records required for effective

    implementation of the quality management system.

    Details of procedure required for storage , protection , retrieval, retention and disposal of

    quality records are given in quality procedure manual.

    2. MANAGEMENT RESPONBILITYThe top management quality objective are smart ( specific , measurable , achievable,

    realistic and time bound ) .

    a.) Maintain leadership position in customer satisfaction .

    b.) Maintain power supply reliability index higher than 99.50%.

  • 8/22/2019 Total Quality Management of TATA POWER

    76/105

    c.) Achieve average restoration time of 20 minutes to affected customers.

    d.) Maintain supply voltage within limits ( variation of + - 6% )

    e.) Adhere to standard of performance for power supply connections.

    f.) Control ATC loss below 12% .

    g.) Reduce average cost per unit ( T,D& S) by 5%.

    h.) Ensure accident free working by adhering to safety policy.

    i.) Continually upgrade employee skills to adapt to change.

    j.) Minimize inconvenience to the community during exestuations of work .

    Review input

    i.) Confirmation / follow up of previous management review.

    ii.) Result of quality management system audit report.

    iii.) Feedback on customer satisfaction survey customer meet and customer

    complaints.

    iv.) Status of corrective actions and preventive actions takes.

    v.) Recommendations for improvements from all divisions.

    vi.) Review of quality objectives.

    Review output

    Discussions and decision are recorded in MOM (Minutes of meeting ) which includes

    some of the following point :-

    i.) Improvement of the effectiveness of quality management system and its

    processes .

    ii.) Improvement in service to consumer.

    iii.) Resources required.

    iv.) Action plan and agenda for next meeting.

    3. RESOURCE MANAGEMENTResources required for implementing and maintaining effective quality management

    system and enchaining customer satisfaction are identified and provided.

    EXAMPLE:- Manpower , Material, services , Infrastructure, work environment,

    information system , finance etc.

  • 8/22/2019 Total Quality Management of TATA POWER

    77/105

    a.) Infrastructure

    The infrastructure required to achieve conformity to product / service requirement , has

    been determined , provided and maintained.

    b.) Preventive maintenance

    This is planned as per the maintenance schedule carried out and records maintained .

    Spare are maintenance , annual maintenances contracts are entered in to for support

    equipment.

    c.) Breakdown maintenance

    Information regarding is given to the concerned maintenance department. The repair

    work is carried and records are maintained . Details of the equipment regarding

    manufactures data of purchase and installation , Specification , drawing and major

    repairs done , are maintained . Breakdown van is available for emergency round the

    clock.

    d.) Work space / office

    Suitable workspace and officers furniture are provided for officers and staff . Adequate

    computer with necessary software and peripherals have been provided .

    e.) Computer maintenance ( Hardware and software )

    Computer have been provided in departments for data storage , communication , data

    processing and to speed up work functions. Official software package viz. windows ,

    SAP, Outlook , Novell etc have been load in the computer for various applications.

    Anti-virus protection have been provided . All the software used in organization

    controlled with passwords and login names at appropriates levels. Backup facility is

    provided as centre serve.

    f.) Transportation

    Bus transport is provided to employees . Vehicles are provided for various sites

    activities maintenances and repairs vehicles are carried out regularly.

    g.) Communication Telephone to individual and department having intercom and

    direct dial facilities are provided . Microwaves, carries, fiber optic telephone

    communication system have been provided for operation staff and senior officers .

    Mobile phones have been provide to senior officers and O &M Engineers. Fax

    machine, Internal memos are used for written communication.

  • 8/22/2019 Total Quality Management of TATA POWER

    78/105

    h.) Work environment

    Management has determined and ensured that adequate provision are available for

    health and safe working environment . Clean rooms, proper lighting , ventilation and air

    conditioners are provided to control temperature and humidity . Fire extinguisher and

    first aids boxes are provided as a safety measures. In order to maintain the

    temperature, air quality , air conditioners, ventilation have been provided . Proper lighting

    arrangement at work places have been made .

    I.) House keeping

    Cleaning of the station premises is carried out . Material in stores are stocked neatly

    on the racks. Space provided for them . Files are kept in filing cabinets. drawings are

    kept in drawings are kept in drawing cabinets . Regular pest control is carried out in

    the premises.

    j.) Food

    Canteen facility has been provided at certain locations given breakfast lunch , snacks ,

    tea , coffee to the employees at subsidized rates.

    k.) Recreation

    Rest room is provided to the work force. Games rooms having gymnasium , carom

    and table tennis facilities are provide . Library facilities are available with technical

    books and periodicals so as to keep the employee in touch with the latest

    development. Various sports meets are arranged by TPC for spotting of talent and

    exceptional sportspersons are encourage to participate in tournament at various level.

    4.) PRODUCT REALIZATION PLANNING OFPRODUCT REALISATION

  • 8/22/2019 Total Quality Management of TATA POWER

    79/105

    The network infrastructures is planned base on the long term network expansion plans

    and load . Application forms from the customers according to schemes for providing

    the schemes for providing power supply to the customer one finalized . The

    implementation schedule is discussed in the respective divisional co-ordination meeting .

    The time frame for each schedule is proportioned as per the ISLA ( Internal service

    level agreement ) with the respective support processes . Job quality in confirmed

    through third party inspection .

    i.) These process are documented and provided to meet the requirement of

    product realization .

    ii.) The required verification , validation , monitoring , inspection and testing

    activities specific to the equipment have been determined and the criteria for

    acceptance is established by the organization .

    iii.) The records are maintained to determined to demonstrate that the product

    meets the requirement.

    5. PRODUCT REALISATION CUSTOMER RELATESPROCESSES

    Review of requirement related to the product :-

  • 8/22/2019 Total Quality Management of TATA POWER

    80/105

    Review of the customer requirement is carried out jointly by engineering department T&D

    division CDD (Consumer development department ) . T&D division takes appropriate action

    for the implementation .

    EXAMPLE:- Requirement of the customer for reduction in interruption of supply and

    voltage fluctuation to them by providing under ground cables in place of overhead line,

    increase in the capacity of power supply requirement etc. The requirement are

    communicated to the concerned and contract review records are maintained .

    Customer communication :-

    CCR , O&M engineers and the call centre are contacted by customer for and any help

    required . These centre receive complaints and immediately intimate working agencies who

    are available on telephones and monitor restoration of supply and resolving of complaint.

    The complaint data is complied and reviewed by concerned division for improvements.

    Customer feedback is obtained through customer meets , focus group , and customer

    satisfaction survey . T,D&S division participates in the customer meets , where customer

    related issues are discussed and feedback is received. Also T,D&S division receives the

    report on customer satisfaction surveys for necessary action .

    EXAMPLE:-

    A customer contact plan is prepared, which indicates the frequency of meeting customer

    by various level of personnel .

    6.) PRODUCT REALISATION DESIGN ANDDEVELOPMENT

    a.) Design and development planning

  • 8/22/2019 Total Quality Management of TATA POWER

    81/105

    Planning and control of design and development of product / services are done to

    determines .

    i.) Design and development stages .

    ii.) Review , verification and validation as appropriates to design and development .

    iii.) Responsibility and authorities for design and development .

    iv.) The various division have interfaces to ensures clarity of responsibility and effective

    communication.

    b.) Design and development inputs

    i.) Input from customer standard design and engineering guidelines .

    ii.) The India electricity acts , 2003.

    iii.) Relevant India standards .

    iv.) Review of standard design schemes based on new technology , vendor input , site

    inspection and comments on similar design .

    v.) Inputs from user departments.

    vi.) Inputs from other organization and distribution licenses .

    vii.) Input from customer guidance .

    c.) Design and development output

    The outputs of design and development are verified against the corresponding inputs and

    checked prior to release , to meet requirement of the customer , organizational needs ,

    site constraints, material procurement activity and cost estimate. The outputs of design are

    in the form of schemes , drawings , material specifications , product acceptances criteria ,

    safety and it s proper application.

    d.) Design development review

    At suitable stage, systematic design and development review are carried out to :-

    i.) Evaluate the design outputs meet the requirements as defined in the design input

    stage.

    ii.) Identified any problems / deviation and proposed corresponding necessary action.

    The participants of design process are from CED ( consumer engineering department ) ,

    civil , cable , customer division , EQAS and other as required . The records of the review

    and require action are maintained by CED.

    e.) Design and development verification

  • 8/22/2019 Total Quality Management of TATA POWER

    82/105

    The design and development verification is carried out by inspection team at the

    manufacture work to ensures that the output meet the requirements given in defined at the

    planning stages.

    Sample approval , inspection and testing are carried out at manufacture premises to

    ensure that the output as per the design requirements . The test report copies are

    maintained by CED.

    f.) Design and development validation

    To ensure that the result product is capable of meeting required applications ; design and

    development validation are out by CED , user division and EQAG as specified in planning

    stages for schemes, drawings and material specifications, validation is carried out in any of

    the following ways as applicable:-

    i.) Comparing with manufactures test certificates for the equipment .

    ii.) Conformance with performance with latest amendments under IE ACT rules ( Indian

    electricity act ) .

    iii.) Comparing with manufactures test certificates for the equipment .

    iv.) Comparing with performance / feedback / occurrences report for similar equipment from

    user department .

    g.) Control of design and development change

    Request for changes in design and development , whenever receive from customer

    development implementing agencies are incorporates after review . The changes made are

    reviewed , verified and validated . These are approved by CED before implementation.

    7. PRODUCT REALISATION PURCHASINGa.) Purchase process

    i.) The requirement of the material is determined by concerned division and the

    s