total quality management of tata power
TRANSCRIPT
-
8/22/2019 Total Quality Management of TATA POWER
1/105
TOTAL QUALITY MANAGEMENT
SUBMITTED BY
MONIKA SHARMA
TYBMS
2006-2007
SUMMITTED TO
UNIVERSITY OF MUMBAI
PROJECT GUIDE : PROF . BHANU KRISHNAN
GHANSHYAMDAS SARAF GIRLS COLLEGE
S.V. ROAD MALAD ( WEST )
MUMBAI - 400064
-
8/22/2019 Total Quality Management of TATA POWER
2/105
ACKNOWLEDGEMENT
I sincerely thanks my guide PROF BHANU KRISHNAN for providing necessary information
and valuable guidance which help me in compiling this project in a much better manner .I would like to thank PROF SUBRAMANIUM for being there whenever I need help and
provided valuable guidance in this project .
I most thankful to HR Manager THAKKAR Sir and Assistant manager S.V.SHETYE of
TATA POWER COMPANY Borivali branch for devoting their precious times and shared
information about TQM and how it is implement in the organization without which this
project would not have complete .
I have tried to cover all the aspects of the project and ever care has been taken to
make the project faultless .
I will be looking for such type of projects in near future and do my best .
This project has been complied in simple and lucid language so as to enable every reader
easy to understand .
I am eagerly waiting for fruitful comments and constructive suggestions are most welcome
to improve upon this project .
Suggestions , if any , are most welcome .
THANK YOU,
MONIKA SHARMA .
-
8/22/2019 Total Quality Management of TATA POWER
3/105
INDEX
SR.NO TOPIC PAGE NO
1. INTRODUCTION OF TOTAL QUALITY MANAGEMENT 1.
2. ROLE OF TQM 2.
3. IMPLEMENTATION OF TQM 3-4.4. TATA POWER COMPANY:-
i. INTRODUCTION 5-7.
ii. TATA BUSINESS EXCELLENT MODEL ( TBEM ) 8-9.
ii i. QUALITY COST REPORT 10-14.
iv. COSTS ASSOCIATED WITH INSPECTION AND TESTING 15.
v. BENEFIT THROUGH TQM 16.
vi. TECHNIQUES USED FOR TOTAL QUALITY CONTROL 17-18.
vii. TECHNIQUES BASED ON MALCOLM BALDRIGE REPORT
ASSESSMENT YEAR 2005-2006 :-
19-66
a. LEADERSHIP 21-25.b. STRATEGIC PLANNING 26-27.
c. CUSTOMER AND MARKET FOCUS 28-36.
d. MEASUREMENT , ANALYSIS AND KNOWLEDGE MANAGEMENT
AND INFORMATION AND KNOWLEDGE MANAGEMENT
37-42.
e. HUMAN RESOURCES FOCUS 43-44.
f. PROCESS MANAGEMENT 45-47.
g. BUSINESS RESULT 48-66.
viii. NEW QUALITY MANAGEMENT SYSTEM ISO 9001: 2000 :- 67-88.
a. QUALITY MANAGEMENT SYSTEM 68-69.
b. MANAGEMENT RESPONSIBILTY 70.
c. RESOURCE MANAGEMENT 71-72.
d. PRODUCT REALISATION PLANNING OF PRODUCT REALISATION 73.
e. PRODUCT REALISATION CUSTOMER RELATED PROCESSES 74.
f. PRODUCT REALISATION DESIGN AND DEVELOPMENT 75-76.
g. PRODUCT REALISATION PURCHASING 77-78.
h. PRODUCT REALISATION PRODUCT AND SERVICE PROVISION 79-82.
i. PRODUCT REALISATION CONTROL OF MONITORING AND
MEASURING DEVICES
83.
J. MEASUREMENT , ANALYSIS AND IMPROVEMENT 84-88.
5. EVALUATION OF TQM 89-90.
6. CONCLUSION 91-92.
-
8/22/2019 Total Quality Management of TATA POWER
4/105
EXECUTIVE SUMMARY
This project contain the information about the topic TOTAL QUALITY MANAGEMENT .
This project introduces Total Quality Management it mainly focus on Malcolm Baldrige
Report and ISO 9001:2000 of TATA POWER COMPANY and how it is implement in
the organization and what are the strategy taken by them .
Total Quality Management is a continuous process of improvement for individuals , groups
of people and whole organizations . To improve the process , therefore, people must know
what to do , how to do it , have the right method to do it , and be able to measure the
improvement of the process and the current level of achievement .
-
8/22/2019 Total Quality Management of TATA POWER
5/105
When put into practice, appropriate quality methods can rapidly give rise to quality
improvement . Choosing the right methods for development of a TQM process is one of
vital roles of management process is complex and the use of some of these methods
requires careful consideration and clear understanding .
TQM is blend of technologies focus on four concept i.e. defect prevention , continuous
improvement , focusing on the customer and a philosophy that quality is not just a
responsibility of an organization quality assurances department , but rather it is a
responsibility shared by all TQM reserve our fixation on inspecting to defect and focuses
on practice that identify potential defects to prevent them from occurring .
TQM is still a philosophy emphasizing a continuous search for improvement and
implementing actions to convert improvement opportunities to reality .
TQM emphasizes knowing our customer both internal and external and focusing on
satisfying their needs and expectation . The continuity , stability and growth of a business
depends upon its customers. TQM as an sub serves the institution goals . Returns on
investments , market expansion , high employee morale and delighted customers are some
of the benefits of upgrading through TQM .
INTRODUCTION
The word total stand for whole or gross . The term quality stands for degree of excellence
and the word management stand for art of doing a particular work .
Therefore , TQM is art of doing the whole work in order to achieve a degree of
excellence .
TQM in the organization by employee involvement or step to be taken by management to
implementation TQM :-
i.) Clarify the goal and objective of organization .
ii.) Decide the philosophy of management .
-
8/22/2019 Total Quality Management of TATA POWER
6/105
iii.) Follow decentralization and delegation of authorities.
iv.) Determine the quality standard and make as a rule of the organization .
v.) Involvement the worker in the system of achieving and maintaining the
quality concept of kaizen , quality circle are useful in this area .
vi.) Teach the worker the concept of house keeping .
vii.) Import training to the worker to enhance their skill to maintain quality.
Benefits of TQM :-
i.) Ability to be more competitive .
ii.) Increased market share .
iii.) Cost reduction .
iv.) Increased flexibility and responsiveness .
v.) Simplified processes.
vi.) Improved communications .
vii.) Less frustration and more satisfaction among the workforce .
THE ROLE OF TQM METHOD
Total quality management can be implemented by putting into practice suitable TQM
methods . However , adopting the right kind of method is one of the most important jobs
of senior management and degree of success obtained will depend on their knowledge
and understanding of these methods . TQM methods are unlikely to be useful not usedproperly .
When TQM is implemented in an organization , it invariably starts with a simple procedure:
the setting up of teams to solve particular problems. However , total quality management
-
8/22/2019 Total Quality Management of TATA POWER
7/105
deals with quality culture , which is all about culture change based on desire to satisfy
the customer and eliminate existing problems permanently .
Education and training are key factors in total quality management , including the process
of learning TQM method . If team start to look at quality management problem without
proper training they will lose their way and become disheartened . If the quality problem is
not identified accurately and the TQM method selected for solution based only on data
analysis , then the problem will not be eliminated forever . In addition , the quality
improvement process need to be managed by an effective leader to ensure that proper
implementation is achieved . By applying TQM method properly and not fluctuating from
one step to another before completion , the quality team will have a much greater chance
of completing the task successfully .
The basic role of TQM methods in problem-solving for quality improvement is to help to
help to meet customer requirements . The methods also help to generate possible root
causes and potential solutions, and to use data and information to select the best options
for managing quality . To implement total quality management , it will be necessary to
apply the method in ever aspect of business life .
IMPLEMENTATION OF TQM
Total quality management process and implementation can be divided in three parts as
follows :-
1) Total employee involvement ( TEI )2) Just in time ( JIT )
3) Total quality control ( TQC )
1.) Total employee involvement :- The basic thinking is the human should not be
considered as robot or machine . They should be treated with respect and consideration .
-
8/22/2019 Total Quality Management of TATA POWER
8/105
An organization has number of people working for a purpose . Every person has important
role to play . Organization will be the most effective if all employee work together and
harmoniously , to achieve common goal .
TEI is achieved in through following methods :-
a) House keeping :- Only where by the departmental manager who does not follow
the principle of housing keeping can be convenience by clicking the photography of
it department . Which is organized condition and display on the notice of the
organization and once he improve again the photography will the organization
department . To show the different which is apparent between the photography .
The different will through the light on importance of house keeping in the
organization .
b) Kaizen :- Kaizen is derived from two word kai & Zen . Kai - mean small , Zen -
mean improvement i.e. bring small improvement where , when , why how A
person who bring small improvement in himself is called as Kaizen
c) Quality circle :- A group people coming together and having a brainstorm over
issues to come out with good conclusion of problem or issues . Quality circle by
name itself we can understand where is circle of quality people having a quality
brainstorm and coming out with a quality conclusion .
2.) Just in time :- It is a concept where time management is exercise for the entire
process right from procuring the raw material from the vendors till the sale of finished
products to the customer .
3.) Total quality control :- Total quality control is applicable to all the functions . Quality
at work , service , information , process , divisional units, people , system and company has
to be maintain at minimum cost . This process consist of evaluate actual quality
performance , compare actual performance to quality goals , act on the differences.
7 QC Tools :-
i.) Statistical data
-
8/22/2019 Total Quality Management of TATA POWER
9/105
ii.) Pareto diagram
iii.) Cause and effect diagram
iv.) Histogram
v.) Scattered diagram
vi.) Check sheet
vii.) Control charts.
TATA POWER COMPANY
INTRODUCTION
Tata power was ranked for its continuous effort to transform the 90 years old power utility
through a combination of cost reduction, steady growth and change in attitude into a moreconsumer-friendly place in a highly regulated environment.
Tata power as been selected among the top 13 best managed companies in India by
business today.
-
8/22/2019 Total Quality Management of TATA POWER
10/105
While tata power fundamental have remained committed to quality and pursue of excellence
now there is a definite thrust on ensuring power supply at competitive tariff to consumer of
all sector
for constant self-evaluation of its plants and performance tata power has adopted the tata
business excellence model[T.B.E.M.] under the J.R.D. Quality values award which the tata
group has instituted in the memory of MR. J.R.D. TATA
incidentally j.b.e.m is modeled on the globally accepted MALCOLM BALDRIDGE national
quality award administered by department of commerce u.s.a.
Tata valuesThe tata has always been a value driven organization these value continue to direct the
groups growth and business. the five core tata value under the way they do their business
are:
1] Integrity: we must conduct our business fairly with honesty and transparency
everything we do must stand the test of public scrutiny.
2] understanding: we must be caring show respect compassion and humanity for
our collogues and customer around the world and always work for the benefit for the
communities we serve.
3] Excellence: we must constantly strive to highest possible standard in our day to
day work in quality of good and services we provide.
4] Unity: we must work cohesively with our collogues across the group and our
customer and partners around the world to build strong relationship based on tolerance
and mutual co-operation.
6] Responsibility: we must continue to be responsible and sensitive to the
countries communities and the environment we work, always ensuring that what comes
from the people goes back to the people many times over.
Quality policy of the tata power transmission and
distribution division
-
8/22/2019 Total Quality Management of TATA POWER
11/105
we at transmission and distribution division of the tata power company limited are
committed to:
1. provide reliable quality power at most competitive price
2. constantly strive for exceeding customer expectation
3. ensure safe and healthy environment for employees equipment and community
4. we shall comply with requirement and continually improve the effectiveness of
quality management system
Quality objectives
1. maintain equipment availably higher than 99.75%
2. improve average restorations time to affect customers[C.A.I.D.I.] from 22 minute to
20 minute
3. reduce average duration of interruption per customer per year reliability index from
47 min to 35 min
4. maintain supply voltage within limits[variation of +/- 6%]
5. reduce T & D operation cost by 10%
6. continually upgrade employee skills to adapt the change
7. have concern [minimize inconvenience] for the community during execution of work
8. continually improve system to become an excellent organization
The above objective shall be received half year the above target are at
all T &D level
Departmental quality objectives operation
Functional quality objectives Measures
-
8/22/2019 Total Quality Management of TATA POWER
12/105
1. Monitoring & controlling of operation
parameters
2. Ensuring heal thinness of equipment
by timely detection of abnormalities
3. Increasing availability of equipment
by normalization during tripping of
equipment lines and outage
4. Preparation and storing of
operational database
5. Ensure reliability and safety correct
and safety operation
6. Continual improvement
Logged value of parameter / logging of
corrective measure taken .
Defect register entries / check list entries
Measure taken during emergencies to
restore normal in minimum possible time of
normalization.
Availability of operational data
Accident free operation no wrong operation
safety practices
Work instruction revisions
TATA BUSINESS EXCELLENCE MODEL [T.B.E.M.]
T.B.E.M. purposes
1.To help improve organizational performance and business excellence practices ,capabilities result .
2.To facilitate communication and sharing of best practices information among tata
organizations of all types .
-
8/22/2019 Total Quality Management of TATA POWER
13/105
3.To serve as working tool for understanding and managing performance and for
providing guidance for planning and identification of opportunities for learning and
improvement .
T.B.E.M. GOALS :
1.Delivery of ever improving value of customers , contributing to market place
success
2. Improvement of overall organizational effectiveness capabilities , resulting in
enhancing to all other stake other
3.Organizational and personal learning
visions of the quality
1. To be an excellent and efficient organization
2. To be a significant player in the national power sector
3. To participate in adjacent infrastructure business that provide opportunity for the
growth
4. To be the best in the tata group
mission of the quality
Improving the quality of life
value
1. Customer driver
2. Result oriented with professional work culture
3. Abide by tata code of conduct
4. Earn trust through fair business practices with all stake holder
5. Growth with environmental protection and enrichment
-
8/22/2019 Total Quality Management of TATA POWER
14/105
6. Corporate citizenship
QUALITY COST REPORT
SR.
NO.
PERFORMANCE
MEASUREMEANT
TARGET
2004-2005
ACTUAL
2004-2005
TARGET
2005-2006
-
8/22/2019 Total Quality Management of TATA POWER
15/105
1.
2.
3.
4.
5.
6.
7.
DIAGNOSTING TESTING OFEQUIPMENTS
DIAGNOSTING TESTING OFPROTECTION
DIAGNOSTING TESTING OFSYSTEM PROTECTION
COMMISION OFEQUIPMENT &PROTECTION SCHEMES
F.D.R. AVILABILITY
TEST INSTRUMENTAVAILABLE
TRIPPING DUE TO HUMANERROR
95%
95%
100%
95%
100%
98%
NIL
70%
76%
79%
95%
99%
97.2%
NIL
95%
95%
95%
95%
100%
98%
NIL
COST OF POOR QUALITY [C.O.P.Q.] REPORT
[C.O.P.Q.] company wide capturing format used for T.R.D.[C.O.P.Q.] to be captured under following two major head
A. cost of non conformance
B. cost of conformance
A. cost of non conformance
1.1] Internal failure cause related cost rework /
repairs cost due to internal causes -
For example -
-
8/22/2019 Total Quality Management of TATA POWER
16/105
a ] E.Q.A.G. relay improper co-ordination / relay maloperation
b ] Non conformance to operating instructions
c ] Non conformance to maintenance work instruction etc .
d ] Non conformance due to inadequate specification in power operation byengineering department
1.2 ] External failure cause related cost - rework
a ] O.E.M. poor quality / inadequate material , fabrication assembly , design
, q.a. / q.c. Causing earlier failure
b ] O.E.M. not informing product modifications incorporated .
1.3 ] Appraisal cost -
Testing / appraisal cost to attend failure / rework - example - O.E.M. engineerservices etc
B. COST OF CONFORMANCE
2.1 ] Preventive cost - cost incurred to prevent recurrence of failure / faultfor that station and other stations for similar equipment .
2.2 ] Appraisal cost - cost incurred to test / appraise for case where failurenot occurred
[ C.O.P.Q. ] cost due to interruption / forced outage
A SR.NO.
Direct cost repair reworkto attend occurrence /forced outage / outagedescription
Man days Man dayCost
TransportCost
Total cost causes
-
8/22/2019 Total Quality Management of TATA POWER
17/105
1.
2.
3.
110 kv bus fault zone-1 on 12/1/06
Tripping of 11 kvvasant utsav f1 feeder
Tripping of 11 kvvasant utsav f6
5
2
2
3000
600
600
Nil
Nil
Nil
15000
1200
1200
External
External
External
B. Srno
OCCURRENCE/FORCED OUTAGEDESCRIPTION
LOAD MW SHUTDOWN
INTERUPTION
Mwh notsupplied
Cost/lossrate rs.2p.u. causes
-
8/22/2019 Total Quality Management of TATA POWER
18/105
1.
2.
3.
110 kv bus fault zone -1 on 12 / 1 / 06
Tripping of 11 kvvasant utsav f1 feeder
Tripping of 11 kvvasant utsav
40
0.25
0.5
0.11
3
16.5
4.4
0.75
8.25
8800
1500
16500
External
External
External
QUALITY PLANNING AND QUALITY IMPROVEMENT
QUALITY IMPROVEMENT -
1. Renew focus on growth in generation capacity
-
8/22/2019 Total Quality Management of TATA POWER
19/105
2. Restructuring of business development & project function to new growth
opportunities
3. Setting target in A.B.P. which are more stretch than M.E.R.C. requirements
QUALITY PLANNING
1. Centralized control room with remote operation
2. Distribution automation of customer substations
3. Diversion of nallahs to increase hydro generation
4. Broad band on power line
COSTS ASSOCIATED WITH INSPECTION ANDTESTING
Vendors / contractor are selected through a well defined selection process with
emphasis on quality management process at suppliers end . In cases of branded off
the shelf type of items , vendors certified by O.E.M. [ original equipment manufactures
-
8/22/2019 Total Quality Management of TATA POWER
20/105
] through their vendor authorization programs , all selected . thus doing away with the
need to expend resources on certification vendor quality .
Vendor rating system has been introduced for tracking the performance of the
vendors . cost of poor quality is being tracked analyze rework and defect and to
minimize the cost.
BENEFIT THROUGH TATA QUALITY MANAGEMENT
1. Improvement in C.A.I.D.I.
2. Improvement in reliability and quality of supply at customer end
-
8/22/2019 Total Quality Management of TATA POWER
21/105
3. Reduction in failure , there by improving reliability
4. Reduction in cost of power to customer
5. Improvement in the availability to the customer , meeting customer expectation
6. Reduction in auxiliary power reduction from 12.66% to 10.98%
7. hunting load customers quires can be taken by T.P.C. there by reducing the
dependence on the state grid and making the power withdrawal from K.P.T.C.L. to
zero minimum impact of the outage to the customer
TECHNIQUES USED FOR TOTAL QUALITY CONTROL
FISH BONE DIAGRAM
-
8/22/2019 Total Quality Management of TATA POWER
22/105
ROUTE COST ANALYSIS
MEN
A. Moisture from compressor is not regularly drained
B. Lack of knowledge about overhaul method
MATERIAL
Quality of material should be improved
MACHINES
A. Frequent failures of control circuits of compressor starting and stopping
1. Failure of pressure switches for starting and stopping
2. Failure of contactors and single phasing of switches .
3. Dripping of setting of pressure switches
MEN METHOD
S
MATERIAL MACHINE
COMPRESSOR
EXCESSIVE
RUNNING
-
8/22/2019 Total Quality Management of TATA POWER
23/105
B. Frequent leakages from loose pipes used for air inlets of air blast circuit
breakers and defective non return valves of air blast circuit breakers
methods
A. Existing maint practices not sufficient
B. Conditioning monitoring is not adequate
ADVANTAGE OF FISH BONE DIAGRAM
1. Process is define systematically .
2. Simple to understand .
3. Several time ask the question why till they dont get the
answer
4. Use to find limitation
TECHINQUES BASED ON MALCOLM BALDRIGE
REPORT
-
8/22/2019 Total Quality Management of TATA POWER
24/105
ASSESSMENT YEAR 2005- 2006
REPORT ON MALCOLM BRIDGE FOLLOWED TATA
POWER
SR.
NO.
LINE OF BUSSINESS TURNOVER
FY05 IN
[RS CRORE]
PERCENTAGE
1.
2.
3.
POWER BUSINESS
STRATEGIC ELECTRONICS
DIVISION
POWER SYSTEM DIVISION
3674
62
184.5
93.5%
1.6%
4.7%
The baldrige award examine the quality of an organization
activities in several category
1. Leadership
-
8/22/2019 Total Quality Management of TATA POWER
25/105
2. strategic planning
3. customer and market focus
4. measurement analysis and knowledge management & information &
knowledge management
5. human resources focus
6. process management
7. business result
1. LEADERSHIP
Highlights leaders role in setting and communicating vision , value and focus on customer
and accomplishing organizations objective
-
8/22/2019 Total Quality Management of TATA POWER
26/105
A. SENIOR LEADERSHIP
STAKE
HOLDER
DEVELOPMENT
MECHANISM
RECENT
IMPROVEMENT
RATIONAL
IMPROVEMENT
CUSTOMER
SUPPLIER
1.Customer meets
2.customer focus group
3.Customer opinion
leaders meet
4.Level of customer
contact plans
5.Customer valueimprovement program
Supplier meet
Half yearly supplier survey
together inputs on their
survey together inputs on
Designing and implementation of
customer portal
Visits of customer groups during
major activities at TPC like 500
MW unit overhaul
Inclusion of opinion leader
communication
Participation of senior leader in
the customer meeting cascade
Supplier meet also at divisional
level
Formation of complaints &
grievances cell and vendor portal
as additional mechanism of
To proactively satisfy
queries related to
reliability during customer
meets and building
relations
Communication regarding
TCOC ,TPC future plan
and other area of
common interest
Speedy resolution of
complaints
-
8/22/2019 Total Quality Management of TATA POWER
27/105
Shareholder
INVESTOR
their alias of concern
Half yearly and yearly
report
Investor / forums seminars
/conference
access and information
Half yearly result communication
introduced
Initiated in fy05 , 2/3 meeting
interaction annually
Keeping shareholder
informed about TPCS
future plan
Image building , support
for growth initiative
1. Continued focus on enhancing and improving the equipment , system and network
reliability refuilishment and replace programs leveraging the new technology
-
8/22/2019 Total Quality Management of TATA POWER
28/105
2. Strategic plan for sustenance example generation capacity addition , coal block
etc.
3. Focus on developing technical , managerial and leadership competencies
4. Participation by senior leaders in training program - M.D. as acted as faculty on
tata group level workshop on project management
5. Participation by senior leaders in training program
6. Regular risk assessment and preparation of risk mitigation plans
7. Knowledge management
8. Environment management and C.S.R.
-
8/22/2019 Total Quality Management of TATA POWER
29/105
PERODIC REVIEW OF PROTECTION SCHEMES TO
ENSURE CONTINUED EFFECTIVENESS
ADVERSE IMPACT
PUBLIC CONCERN KEY PRACTISESMEASURES
1. Reliability of power
supply
2. Load shedding
planned and power
interruptions to partial
consumer under low
frequency conditions
A. Forecast demand growth and
address shortage
B. Continues improvement in O&M
practice to ensure high reliability
C. Scheduling of plant / equipment /
outages during low loads
D. Built in redundancies ,T&D
equipmentE. power purchase during shortage
A. Segmentation of on consumers
based impact on business and
public servicesB. Design of graded load shedding
scheme for minimizing power
interruption to critical consumption
Generation plant availability 1%
Indices like CAIFI CAIDI SAIFI
SAIDI
Transmission line availability
Loss of scale due to forces
outages
No. of under frequency load
shedding operation
No. of times critical consumer got
shut down
No. of block outs saved /
-
8/22/2019 Total Quality Management of TATA POWER
30/105
3. Block out [ total
interruption of power
supply to all
consumer ]
A. Islanding scheme to isolate Mumbai
customer from grid disturbances
B. Stand by power arrangement with
M.S.E.B.C. Periodic review of protection scheme
to ensure continued effectiveness
systems block outs
Time taken to restore supply after
a block out .
-
8/22/2019 Total Quality Management of TATA POWER
31/105
2. STRATEGIC PLANNING
Strategy development has been rewritten to clearly address the key aspects of strategy
developing , including ability to execute the strategic planning .[ In contrast , consumer of tata power continue to enjoy uninterrupted supply of quality
power ]
STRATEGIC OBJECTIVE
STAKE
HOLDER
KEY REQUIREMENT
STRATEGIC
OBJECTIVES
1. CUSTOMER
2. INVESTOR
AND
SHAREHOLDER
3. EMPLOYEES
Reliable uninterrupted power supply at competitive rates
Optimum returns
Employee growth and development
1. Low cost generation capacity
2. Peaking power availability
3. Enhancing value to customer
1. Growth to capacity addition ,
entry into adjacent business
2. Organization transformation
Growth through capacity addition
entry into adjacent business
-
8/22/2019 Total Quality Management of TATA POWER
32/105
4. SUPPLIER
AND PATNER
5. community
Challenging work environment
Growth and prosperity
Good corporate citizenship
Organization transformation
1. Growth through capacity additi
entry into adjacent business
1. C.S.R. initiative
3. CUSTOMER AND MARKET KNOWLEDGE / FOCUS
-
8/22/2019 Total Quality Management of TATA POWER
33/105
Focus on customer complaint data and organization process for minimizing customer
dissatisfaction and less of repeat business .
Customer and market knowledge has an enhanced focus on identifying current and
potential customer for both existing and new products and services .
TPCS market development process , is and process in the customer value chain starting
with market identification till developing new initiatives .
The market department has reviewed and refine to take care of new emerging market as
SEBS , traders open access customers and distribution circle .
-
8/22/2019 Total Quality Management of TATA POWER
34/105
Process no Name of
process
improvement
1. MDP2
2. MDP4
3. MDP5
4. MDP7
5.MDP8
Segment market and
customer base
Develop business
plans
New customer
acquisition
Manage customer
a/c
Complaint
management
Criteria for market attractiveness and internal
capabilities are clearly defined , growth potential
of segment also included in the analysis .
Reduce tariff to direct customer of TPC , new
ht residential tariff .
Targets are taken monthly and reviewed
quarterly.
Customer contact plan, monthly customer
coordination meeting, sharing of complaint,
coverage of wider cross section of employees in
customer coordination, focus group/ key a/c
manager meeting (KAM) , customer value
improvement program
Complaint escalation, % of time TPC meets
customer services standards added in bad
measures, complaint analysis shared with other
division , about 30% of sustains covered under
distribution automation to reduce restoration
time, new web based system for complaint
management for call centre.
-
8/22/2019 Total Quality Management of TATA POWER
35/105
SEGEMENT MARKET AND CUSTOMER BASE
i)
-
8/22/2019 Total Quality Management of TATA POWER
36/105
ii)
START
Market
information andindustry trend
from MDP1
1.List segment
2.Segmentcharacteristics
Revised
marketing
segment
Customer
detailfrom
MDP5
Analyses
competitorsmarketsegment tariff
comparison
Analyses
geographicalarea to
understandexisting
distribution
networkcustomer
density
classify
customer
and market
STRATEGIC TACTICAL
MDP1
Develop marketoutlook and
scenarios
MDP3 Formulate
actionable strategies and
propose investment
MDP2
Segmentmarketing and
customer MDP4 Developbusiness plan
-
8/22/2019 Total Quality Management of TATA POWER
37/105
Customer relationship and satisfactionTPC user Manage customer account process to built and strengthen relationship with
customer. TPC interacts customer through many form in order to built relationship and to
understand changing requirement future plans.
TPC use multiple channels to provide access to customer to seeks information, conducts
business and lodge complaints. All customer are well informed about contact central control
room and fault duty / maintenance engineers.
In addition REL and BEST have provide with microwaves communication facilities to
contact any of receiving station LD\ CCR .
Customer contact requirement and gathered through direct customer interaction by the
divisional service staff and feedback received through various post CSS also specifically
check for customer preference on various customer contact mechanisms some example of
improvement in access mechanisms are provision of additional mobile phone to O&M
engineer and web based complaint management system .
Effectiveness of the call centre and all other access mechanisms in assessed through the
happy call survey and CSS .
OPERATIONAL
MDP5 New customeracquisition
MDP7 Managecustomer a/c
MDP6
Implementation and
internal logistics
MDP8 Complaint
management
MDP9 Formulate new
initiatives
-
8/22/2019 Total Quality Management of TATA POWER
38/105
ACCESS MECHANISM
STATION
LICENSES
AREA
AVAILABILITY
TIME
LANDLINE MOBILE FAX E-
MAIL
VSAT WEBSITE
L.D. 24 HRS
M.C.R. OFFICE HRS
ENGINEERING OFFICE HRS
DIVISIONAL
MAINTENCE
24 HRS
CENTRAL
CONTROL
ROOM
24 HRS
CALL
CENTRE
24 HRS
YEL 24 HRS
FAULT DUTY
ENGINEER
24 HRS
CONSUMER
ENGG . DEPT
OFFICE HRS
PLANT LEAD 24 HRS
Complaint management process
TPC user Complaint management process is to ensure prompt and effective resolution
of customer complaint. While the call centre is available round the clock , bulk customer
prefer to contact , respective CCR nodes , divisional control rooms or duty engineer
directly due to long term relationship some customer like railway and licenses lodge written
complaint as well as . All complaint whether received directly or through control room are
collected at call centre for analysis .
In CPP\ IPP all complaint are received by control room . Each control room maintenance a
complaint register and complaint are immediately recorded and to concerned authorities to
takes prompt and suitable action . The existing software at call centre has been replaced
-
8/22/2019 Total Quality Management of TATA POWER
39/105
recent by a web based software which is accessible to all in the customer service
response chain , with restricted access . This will enable on line monitoring of complaint
status . The complaint data is reviewed in monthly meeting with departmental heads and
suitable to avoid recurrence .
customer complaint management process
Attend complaint and inform
complaint attended by CR cell
D\E and informed call centre
If not call centre escalates If not CRR escalates, if not 2nd
complaint, upto 4 level of escalation
escalation .
Complaint attended by D\E Complaint attended
and informed call centre
Customer informed and confirm Inform customerto be satisfied
Call centre updates record and CR cell updates record and generates
generates MIS MIS.
Review report and analyses Review report and analyses complaint
Call centre
phone
inform field
dutyen ineer
CCR nodes\ control room of
receiving station
CR cell (written
interact with
concerneddepartment)
In case of
criticalcomplaint
higher level
alsoinformed
Action byrespective
department
-
8/22/2019 Total Quality Management of TATA POWER
40/105
complaint
Feedback to all concerned to Feedback to all concerned to avoid
avoid recurrence recurrence
Input to HR To EQA for system reliability
studies.
Customer satisfaction determination
Customer satisfaction and dissatisfaction survey are conducted , on various attributes of
product and services quality . Process use for survey is broadly same for different
segment . However questionnaires are designed to reflect difference importance of various
attributes with respect to different segment . Survey is designed to capture information on
customer satisfaction and dissatisfaction . TPC has this year changed the model from
orgs EQ model to Metric model .
This model help to find out the satisfying and delighting attributes separately for each
customer segment .
Customer satisfaction relative to competitorsMumbai Area: CSS cover customer to all major competitors and main utilities i.e; REL,
BEST, and MSEB . TPC also conduct win/loss analysis feedback from opinion leaders
also help to identify area of improvement findings of these surveys are converted in action
plan for implementation benchmarks / comparison of best utilities.
Customer satisfaction survey process
Review in CCM and action plan prepared
Input to engineering for designreview
Qualitative
discover phase
(Customer
requirementsurvey)
Attribute wise
questionnaires
development
Customerinterviews
-
8/22/2019 Total Quality Management of TATA POWER
41/105
Analysis of data
TATA POWER MARKET SEGMENTS
Relativeimportance
of each
factor
Satisfaction/
dissatisfactionlevel of TPC
and competition
an each factor.
Relative rating of TPC V/S Competitor on each factor
A
cti
on pl an pr ep ar ati
on and de pl oy m ent
T
A T A P O WE R M A R K E T S E G M E N T S
-
8/22/2019 Total Quality Management of TATA POWER
42/105
SEBSPublic utilities
REL TPTCCaptives Industry
(TATA STEEL)
BEST TRADERS(NEW
MSEB segment) Lager (Industrycommercial users)
KPTCLDVC Exclusively service
by TPC
Service by TPCand others
Change
over openaccess.
Distributors (75%of power demand)
Short term
buyersLong termbuyers
Consumer
L
I
C
E
NS
EE
High volume (21%of power demand)
Low volume(4% of powe
demand)
Low tensio
industries,commercia
Residential
OPINION MAKERS
ARCHITECTS CONSULTANT BUILDERS
-
8/22/2019 Total Quality Management of TATA POWER
43/105
4. MEASUREMENT , ANALYSIS AND KNOWLEDGE
MANAGEMENT AND INFORMATION AND KNOWLEDGE
MANAGEMENT
It added emphasis on the purpose and use of the result of analyses and review including
strategic decision for organization .
Information and knowledge management : It is a new area to address on data ,
Information and knowledge quality in recognition of challenges all organization face in this
area . This item also now addresses the availability of data and information in the event
of an emergency .
Measurement , analysis and review of organizational performance : Organizationperformance is tracked through OPMS (ORGANISATION PERFORMANCE MEASURE
PROCESS) . The measure for which are derived from strategic objective .
Operation data , information is aggregated and made available to senior management
through Daily operation and statistics report.
ORGANISATIONAL PERFORMANCE MONITORINGSr.no Performance
parameters
area
Sources /MethodsCollection
Organizationperformance KPM
reviewed
Improvementcarried out in
FY 06
Rationale behind theimprovement
1. Finance Departmental /
SAP report
Business area
wise sales
average tariff
operation profit ,
cost of capital.
Business
area wise
drill down for
sales.
To monitor business are
wise performance for
better control and timely
action plans to achieve
competiveness in financia
performance2. Customer Through various
report in sap,
customer surveys,
complaint
management
Customer
satisfaction index
Dissatisfaction
index, Complaint
index.
Customer
dissatisfaction
Andcomplaintindex addedAs KPM.
To identify dissatisfied a
Reduce complaint
resolution cycle time and
no. of complaint
-
8/22/2019 Total Quality Management of TATA POWER
44/105
system
3. Internal Control room logs,
SAP report
departmental
reviews
Availability index,
control
effectiveness
index , 3SCR
targets coal
consumption ,
O&M cost , fuel
cost CRS
assurances .
Preserving
asset base
capex and
reduce risk
control
effectiveness
index added
To accelerates capex jo
and to strengthen the
governances system and
proactive approach for
statutory comp lances .
4. Growth ,
globalization
And
regulator
management
Review at
leadership level ,
fibers regulators
order and
communication
Status /milestone
achieves for
generation and
transmission
capacity addition
captive coal .
New
performance
parameters
added.
To focus organization
efforts on substances an
Expansion activities .
5. Learning
and growth
Employee
engagement
survey ,TBEM
assessment MBEsurvey .
Employees
engagement index
talent
management PPMFor future leader
MBE assurances
TBEM score
Taken
management
PPM for
future leader.
For leadership
development.
Analysis to support performance review and validationof conclusion
-
8/22/2019 Total Quality Management of TATA POWER
45/105
Analysis data and information based on KPMS , is carried out using different methods like
variance analysis cause effect , waterfall diagram , cost benefits.
These analysis are presented during organizational performance review to senior leaders ,
departmental head as mention in next page table.
The developed action plans with result analysis and communicated to relevant division ,
department , working groups through leadership to enable decision making result of
analysis , regulatory charges , new opportunity action plans etc are shared to suppliers
and partners during customer / vendor meets and regular interaction for effective
performance from them in future transaction .
Analysis to support performance review and validationof conclusion
KPMS Method
used for
obtaining
information
Strategic
objectives
Analysis
method
Action
plan
supporting
objective
Example of improvement
made based on review
finding
Result
related to
achieveme
nt of
strategic
plans
Result related
achievement
1. fuel
cost
[belga
m]
Report from
fuel dept.
supplier
interaction
Reinforce
current
business
low cost
generation
Variance
and
cause
effect
monthlyreview
Sourcing
cheaper
reliable
fuel
With continuous rise in
fuel cost in international
market search of
alternative reliable fuel
suppliers reducedtransportation cost
Reliable
and reduce
cost of
fuel
Able to source
alternate
supplier who
reliable and
cheapercompared to
international
market
2. fuel
cost
Report from
fuel dept.
Reinforce
current
Variance
, trend
Sourcing
reliable
In view of falling trends
from local refinery
Availability
of fuel for
Fuel made
available
-
8/22/2019 Total Quality Management of TATA POWER
46/105
[tromb
ay]
supplier
interaction
business
low cost
generatio
n
analysis
/
monthly
divs.
O&M
and
strategy
review
fuel imports initiated generation through
alternate
source
Cost
of fuel
[for
trombay]
Report
from fuel
dept.
Reinforce
current
business
low costgeneratio
n
Cause
effect
monthly
review
Ensure
reliability
and
reducedfuel cost
Work on new coal berth
started at trombay
Will reduce
dependenc
e on other
contractorin coal
supply
Reduce cost
of fuel
Consu
mer
interru
ption
duratio
n and
reliabil
ity
Monthly
marketing
information
system
[MIS]
report
Reinforce
current
business
enhance
value to
customer
Variance
/ causes
effect
analysis
monthly
review
Reduction
of
consumer
interruptio
n
frequency
and
improve
reliability
Network modification on Improve in
CAIDI from
28.50 min
in FY05 to
25.95 min
in FY06
and
reliability
index from
42.47 in
FY06 to
42.99 min
in FY04
Minimum
duration of
interruption to
consumers
Information and knowledge managementData and information is made available and accessible on need to know basis to various
stakeholder .
-
8/22/2019 Total Quality Management of TATA POWER
47/105
Data and information availability for stakeholders.Stakeholder Process of
Gathering
requirement
Data and information
Needed
Types Available through
Customer Customer co-
ordination
meeting
Complaints, billing ,
Payment quires
Transactional Customer portal,
call, seminar ,
customer visit
Meets, SAP.
Supplier Supplier meets
And interaction
Order information ,
Forecast
Transactional/
Strategic
E-MAIL,
telephone , fax
Communication,
Vendor , portal,Personal visits,
Supplier meets.
Employees Open dialogues
Focus groups,
Committee
meeting.
Functional and
administrative
Functional
Transaction
strategic
SAP, people
Power, new
letters,
transmission line.
Investor Investors
meets, AGM,
Investors visit.
Financial result, growth
plans , queries
Operational
and strategic.
Quarterly result ,
Annual report,
websites
feedbacks.
Partner Interaction Function Transactional/
Strategic
Web-sites , call
centre ,
meetings/reviews,
Interaction SAP.
Improvements carried out this are pay slips are now available in electronic format with
intimation through E-MAIL.
TRANSCATION
TRANSCA
TION
TRANSCATION
TRANSCATION
TRANSCA
TION
TRANSCAT
ION
TRANSCAT
ION
TRANSCATIO
N
TRA
N
SCATION
TRANSCATION
-
8/22/2019 Total Quality Management of TATA POWER
48/105
5.HUMAN RESOURCE FOCUS
The item in this category have an added focus on how work system and employee
learning reinforce accomplishment of organization action plans and retention of critical
organization knowledge.
TPC has undertaken several initiative to promote high performance work culture .
Some of include :-
-
8/22/2019 Total Quality Management of TATA POWER
49/105
a. Setting goal and expectation .
b. Introduce PPM process to identify and groom talent .
c. Introduction of scientific tools to assess potential and aptitude at entry level
and aptitude at entry level and ascertain job fit.
d. Restructured performance reward policy .
e. To promote improvement through team activity.
f. Reward and recognition.
WORK SYSTEM:-TPC has adopted following initiative in its work system to promote co-operative ,
empowerment agility and innovation are :-
Migration towards a team based cultures - Cross functional team are formed at two level
i.e. Corporate level to address organizational level problems . These teams are empowered
to suggest and drive change in work processes. Innovation is primarily driven through the
3SCR Initiative . Suggestion schemes and small group activities quality circle are other are
mean to encourage innovation and team work.
Job Rotation- Job Rotation addresses objectives such as leadership development, meeting
organizational needs an opportunity to individual to manage their own careers. In meeting
these their own careers . In meeting these objectives , job Rotation is linked with the
PPM process and an online job posting mechanism has been introduce to encourage
people from within to manage their career paths.
Work systems to capitalize on diverse ideas:- TPC is an equal opportunity employer and
as such the recruitment polices are directed in which organization operates . Suggestion
scheme ,CFTS, SGAS, Quality circle , Knowledge sharing session etc. Issues impacting
work system are identified during structured meets, feedbacks and focus group discussion .
Various training delivery options
Delivery Method Training program
Lecture All training programme with class room set-up.
Case studies Finances for senior manager , basic of finance.
-
8/22/2019 Total Quality Management of TATA POWER
50/105
Role plays Presentation skills, Develop your own potential.
Hands on training Techniques, Breaker maintenance workshops , OEM training , welding
Technique.
Simulation Business simulation games , Simulator training , PS awareness,
MS offices.
On the job Control room training , Deputation to outage job.
Project based
learning
Project management , CFT/SGA on specific project.
Distance learning K HUB, Knowledge portal.
Seminars and
conference
Nominations to vital seminars and conferences conducted by reputed
Organizations and institutes .
Outbound training Outbound team building
Video session Industrial safety, Base level awareness session.
Mentoring Induction / system for new entrants (Guide for every individual)Group Discussion Team Building ,Develop Management potential.
6.PROCESS MANAGEMENT
It has new area to address on operational planning . This area focus on financial planning,
resources , as well as process for continuity of operation in case of an emergency.
Design of value creation processes
Design of value creation processes translates into expansion , refurbishments ,
modernization and improvement and to O&M process and meeting customer requirement in
these areas while designing the value creation processes efficiency and effectiveness factor
such as cost cycle times, consideration for new technology.
-
8/22/2019 Total Quality Management of TATA POWER
51/105
Cycle time , Productivity and cost control
O&M processes are constantly Monitoring cycle time of various sub processes such as
overhaul time, quantity of coal receipt etc. To identity opportunity for improvement. Process/
performance improvement have been achieved through benchmarking . Due to this capital
overhaul and startup periods have been steadily reduced and luster capital overhaul period
22 days for 500MW coal fired. This was facilitated by various improvements in outage
management and safety compliance.
Example Improved productivity use in average coal receipt by critically reviewing and
modifying system by the O&M team .
Adoptions of condition based maintenance approach as compared to periodic , preventive
maintenances work has resulted in optimum resource utilisation and reduced equipment
down time .
T&D :-
i) Process of preventive maintain of 22kv
Action plan identified
Improved preparation before breaker is to taken out for maintenanceReduction in inspection and general cleaning time
Considering the system of safety taken
Benefits
Cycle time reduction from 150 minutes to 120 minutes
Inputs from markets,customer, statutory,
strategy planning
ABP
Translating deliverablesin location plans and
review then feedback
mechanism
Performance measuresviz. cycle time , cost
v/s target.
Track measures and changing requirementsreview and feedback mechanisms
-
8/22/2019 Total Quality Management of TATA POWER
52/105
ii) Process of replacing and transformer to reduce down time
Action plan identified
Storage of spare and transformers of these more location in tested communication of
status to all.
Round the clock accessibility of spares and review of test to minimized time .
Standard of transformer and relay setting
Benefits
Cycle times reduction to 16hrs from 36hrs.
iii.) Cycle times to attend HT (high tension/ cable to fault to increase reliability)
Action plan identified
Increased working hrs
Resident cable ENGG at receiving station and material storage at 3 more receiving station.
Benefits
Target reduction in cycle times from 7 days presently to 3 days.
HYDRO
i.) Process of daily performances review
Action plan identified
Improvement in aggregation and reporting mechanism for daily performance
Benefits
Better performance on key parameters due to renewed focus and internal competition.
ii.) Forced outage
Action plan identified
Semi annual technical audit of division
Benefits
Improved availability of the units.
-
8/22/2019 Total Quality Management of TATA POWER
53/105
iii.) Unit start up
Action plan identified
Unit start up time reduced from 330 sec to 125 sec.
Benefits
Improved response to real time load requirement.
7.BUISNESS RESULT
i.) Product and service outcome
It has been given a value of 100% to indicate the importance of product and service
performance result to customer satisfaction , loyalty , and long term business success.
ii.) Leadership and social responsibility resultIt addresses all governance, senior leadership and social responsibility results. The item
places in one location the evidence of accomplishing organization strategy , ethical
behavior , fiscal accountability , legal compliance and organization citizenship.
1. Product and service outcome
-
8/22/2019 Total Quality Management of TATA POWER
54/105
a.) Commercial Complaint Index Survey and customer interaction have
highlighted billing and bill payment as concern for customer in Mumbai area.
3
1.92
2.28
1.83
0.48
0
0.5
1
1.5
2
2.5
3
3.5
1
year
percentage
(%
)
2002 2003 2004 2005 2006
d.) SAIDI INDEX MINUTES. System average interruption frequency in frequency
index in average interruption in minutes for customer served during the year has been
shown improvement in SAIDI trend. This is achieved through installation of line fault
locators, automation of critical networks etc.
-
8/22/2019 Total Quality Management of TATA POWER
55/105
54.29
41.76 40.99 39.63
0
10
20
30
40
50
60
1
year
MINUT
ES
2003 2004 2005 2006
2. Customer focused results
TPC has been conducting annual customer satisfaction survey since the year 2001 through
an external agency . TPC has an external agency . TPC has further refined its method by
including customer requirement inputs as a part of the CSS . TPC from ORGS EQ model
to metrics moster model . Results are presented as per the customer segmentation
revised in 2005-2006.a.) CSI ( Customer satisfaction index ) Overall based on ORGS model.
b.) CSI- LT
Industrial
86
89
86
84.5
85
85.5
86
86.5
87
87.5
88
88.5
89
89.5
1
year
percentage(%)
20 04 2 00 5 20 06
-
8/22/2019 Total Quality Management of TATA POWER
56/105
89 89
88
87.5
88
88.5
89
89.5
1
year
percentage(%)
2003--2004 2004-2005 2005-2006
c.) CSI- Residential
88
86
90
84
86
88
90
92
1
year
percentage(%)
2003-2004 2004-2005 2005-2006
d.) CSI- LT Commercial
9088
80
7476
7880
82
84
86
88
9092
1
year
percentage(%)
2003-2004 2004-2005 2005-2006
-
8/22/2019 Total Quality Management of TATA POWER
57/105
It is seen that CSI has improved for the residential , but has reduced for the LT
commercial segment . This is also seen by the increase in dissatisfaction for this segment
.
CUSTOMER SATISFACTION INDEX
OPINION
LEADER
YEAR TPC REL BEST03-04 89 71 87
04-05 84 75 76
05-06 89 NA NA
CUSTOMER DISSATISFACTION INDEX
TPC REL BEST
03-
04
04-
05
05-06 03-04 04-05 05-06 03-04 04-05 05-06
Larger
ind/Commercial
14 9 5 41 20 19 22 27 9
Public utility 12 6 9 10 34 34 13 9 9
Long term
Buyer
16 10 0 NAPP NAPP NAPP NAPP NAPP NAPP
LT Industrial 6 6 4 9 11 44 5 10 17
LT Commercial 6 6 10 10 10 38 7 7 15
Residential 9 6 5 10 10 19 8 8 2
(Note:- NA is not available and NAPP is not applicable.)
3.) Human resource result
a.) Team engaged in improvement
( CFTS + SGA + QC ) CFTS ( Cross functional team )
-
8/22/2019 Total Quality Management of TATA POWER
58/105
96
61
237
179
0
50
100
150
200
250
1
year
Numb
er
2003 2004 2005 2006
b.) Number of knowledge sharing section
30
183213
359
0
50
100
150
200
250
300
350
400
1
year
Number
2003 2004 2005 2006
c.) Employee productivity
-
8/22/2019 Total Quality Management of TATA POWER
59/105
4.2
7.1
0
1
2
3
4
5
6
7
8
1
year
No's
pere
mployee
2005 2006
d.) Training coverage percentage employees receiving training.
81.9
90
81
76
78
80
82
84
86
88
90
92
1
year
perce
ntage(%)
2004 2005 2006
e.) Training effectiveness
-
8/22/2019 Total Quality Management of TATA POWER
60/105
77
81
78
75
76
77
78
79
80
81
82
1
year
percentag
e
(%)
2004 2005 2006
f.) Absenteeism rate
0.24
0.28
0.08
0.02
0.11
0
0.05
0.1
0.15
0.2
0.25
0.3
1
year
percentage(%)
2002 2003 2004 2005 2006
g.) Training effectiveness segmented
-
8/22/2019 Total Quality Management of TATA POWER
61/105
h.) ETD Intervention in strategic area
501
87
591
26
931
121100
1581
59107
492
200
0
200
400
600
800
10001200
1400
1600
1800
1
Intervation in strategic area
Manday's
Fin
Value engg
QTY CIRCLE
7QC TOOLOEM
Project management
EMBA
TBEM
Power trading
DRUM
Team bldg
PMS
4.) Organizational Effectiveness Result
79
76
80
83
75
85
76
70
72
74
76
78
80
82
84
86
1
Segment
percentage
(%)
Customer
Finance
Leadership
MDP
3SGA
Team building
Technical
-
8/22/2019 Total Quality Management of TATA POWER
62/105
a.) Thermal plant availability (%)
93
91
96.8 96.9
94.4 94.05
88
89
90
91
92
93
94
95
96
97
98
1
year
percentage(%)
2002 2003 2004 2005 2006 Target
b.) Hydro plant availability (%)
83.58
89.7788.5
92.72
96.44
93.43
75
80
85
90
95
100
1
year
percentage(%)
2002 2003 2004 2005 2006 Target
-
8/22/2019 Total Quality Management of TATA POWER
63/105
c.) Generation Due to improved availability , TPC has been able to generate and meet
the increasing demand of city of Mumbai and total generation increase by 2.4% over the
production .
9779
10391 10374
10965
11208
9000
9500
10000
10500
11000
11500
1
year
ACTUAL
2002 2003 2004 2005 2006
9740
10437 10442
10708
11206
9000
9500
10000
10500
11000
11500
1YEAR
TARGET
2002 2003 2004 2005 2006
-
8/22/2019 Total Quality Management of TATA POWER
64/105
5.) Marketing result
i) Market share (Generation) TPC has maintained its leadership position in generation
TPC has continue to be leader in the generation in licenses area contributes in volume
from power business outsides MA (Mumbai area)
ii) Market share (Distribution) Despite down trend in the HT industrial segment, TPC has
maintain increasing trend in the business volume through growth in HT and LT
Commercial segment business and sales to SEB directly .
iii.) Sales to SEB In order to increase volume of business in licensed area and
maximum utilization of assets , TPC continued to peruse sales to other SEBS directly.
a.) Number of customers
1886
5181
9110
17028
214422206723488
0
5000
10000
15000
20000
25000
1
year
Numberofcustomer 1999-2000
2000-2001
2001-2002
2002-2003
2003-2004
2004-2005
2005-2006
b.) Sales and Revenue (New consumer)
-
8/22/2019 Total Quality Management of TATA POWER
65/105
SALES
100156
237
360
483
607
0
100
200
300
400
500
600
700
1
year
SALES
MILLION
UNITS(MUS)
2000-2001
2001-2002
2002- 2003
2003-2004
2004-2005
2005-2006
REVENUE
4060
98.5
143
201
230
0
50
100
150
200
250
1
YEAR
REVENUEIN
RS.CRORE
2000-2001
2001-2002
2002-2003
2003-2004
2004-2005
2005-2006
C.) Market share generation in MUS
-
8/22/2019 Total Quality Management of TATA POWER
66/105
TPC -POWER BUISNESS
9000
12996 12912 1328313746
0
2000
4000
6000
8000
10000
1200014000
16000
1
YEAR
MILLION
UNITS
2001 2002 2003 2004 2005
TPC-MUMBAI AREA (MA)
900010032 10469 10374
11086 11246
0
2000
4000
6000
8000
10000
12000
1
YEAR
MILLION
UN
ITS
(MUS)
2000 2001 2002 2003 2004 2005
d.) MARKET SHARE (MUS SOLD)
-
8/22/2019 Total Quality Management of TATA POWER
67/105
TPC-power business
9500 950011000
12194 12500 1266313574
0
2000
4000
6000
8000
10000
1200014000
16000
1
year
MILLION
UNITS
(MUS)
2000 2001 2002 2003 2004 2005 2006
TPC-MUMBAI AREA
8000 8000 85009500 10000
1047411066
0
2000
4000
6000
8000
10000
12000
1
YEAR
MILLION
UNIT
(MUS)
2000 2001 2002 2003 2004 2005 2006
6.) Financial result TPC has a track record of consistent improving financial performance.
-
8/22/2019 Total Quality Management of TATA POWER
68/105
a.) Profit before tax
700
500
700650
700759
659
0
100
200
300
400
500
600
700
800
1
year
RS
IN
CRORES
1999 2000 2001 2002 2003 2004 2005
b.) Profit after tax It has shown consistent rise from RS 330 in 1998- 99 RS 551
crores in 2004-2005 CAGR 8.92% ( Compounded Annual Growth )
330
469
390
508 520 509551
0
100
200
300
400
500
600
1
YEAR
RS
IN
CRORES
1999 2000 2001 2002 2003 2004 2005 (DEC)
c.) Earning per share TPC has shown a consistent/ steady rise in EPS
-
8/22/2019 Total Quality Management of TATA POWER
69/105
18.78 19.66
25.68 26.27 25.6928.11
0
5
10
15
20
25
30
1
YEAR
RS
PER
SHARE
1999 2000 2001 2002 2004 2005 DEC
d.) Fixed asset There is an increase in gross fixed asset in power business from RS
4938 Crores in FY 2002 to RS 5426 in FY05 ( CAGR of 3.19 )
49365000
53055426
5842
4400
4600
4800
5000
5200
5400
5600
5800
6000
1
YEAR
RSIN
CRORES
2001 2002 2003 2004 2005 DEC
-
8/22/2019 Total Quality Management of TATA POWER
70/105
e.) Income from Power Business This is mainly due to reduction in average realized
revenue caused by MERC ( Maharastra electricity regulatory commission) order revising the
tariff downward by 9.2% and a lower FAC (Fuel adjustment chares ) resulting due to better
fuel mix.
42304043
3683
3216
0
500
1000
1500
2000
2500
3000
3500
4000
4500
1
year
RS
IN
CRORES
2002-2003 2003-2004 2004-2005 2004-2005 (dec)
7.) Governance and social responsibility result
TPC participate in MBE ( Management of Business ethic ) assurances survey conducted byTQMS for obtaining feedback on the company s status on implementation of various
ethics policies survey for this year is being carried out.
a.) Leadership effectiveness survey
LEADERSHIP EFFECTIVENESS SURVEY RESULT
LEADERSHIP
EFFECTIVENESS
INDEX HIGHER THE
BETTER
2004 2005 2006
73.3% 73.5% 75%
b.) Results of Investor Survey
-
8/22/2019 Total Quality Management of TATA POWER
71/105
PARAMETERS PERCENTAGE (%) FAVOURABLE RESPONSE
2003 2004 2005 2006
Dissemination of
INFO :-a.) Through
news item in
paper /journal
b.) Through
annual report
c.) Through
cross web sites
NA
98%
NA
NA
98%
95%
93%
98%
94%
94%
98%
95%
Arrangement
and presentation
Last AGM
(Annual general
Meeting)
97% 96% 95% 98%
Timeliness ,
accuracy and
Quality
89% 97% 94% 96%
C.) CRS SURVEY RESULT 2004 ( Corporate social responsibility )
Perspective 2004 score
Leadership commitment 84.2%
Manage structure 69.8%
CRS strategy 75.6%
Review mechanism 71.5%
Communication and awareness 64.1%
Training and development 76.7%
d.) CRS survey result 2005
CRS SURVEY REPORT TATA POWER TATA AVG
GROUP
BEST IN
GROUP
Awareness 99% 90% 100
-
8/22/2019 Total Quality Management of TATA POWER
72/105
CRS environment index 44% 37% 59%
Leadership committee 57% 49% 75%
Communication 37% 43% 71%
Relevance 38% 36% 59%
System process and support 44% 38% 66%
Personal committee 91% 86% 98%
e.) TPC is pioneer in breeding and distributing medicine show result provided to
village.
TPC 2002 2003 2004 2005 2006
Medicine to
village in
lakh (RS)
3.79 9.40 7.54 8.17 27
f.) Tree plantation is a major activity in hydro catchments area It may be that TPC
has cumulative planted more than 10 MILLION Trees.
No. of tree
planted.
2002 2003 2004 2005 2006
Hydro 615000 654000 72000 924000 990000
Jojobera 19000 5200 1850 1600 1550
Belgaum _ 3000 4000 3500 2000
ISO - REPORT 9001:2000 (New Quality Management
system)
The Quality manual is the essence of the quality management system and it provides
organizational directions in meeting the ISO 9001:2000 requirements , which are utilized to
improve overall performance of the organization . The quality manual is approved by the
management representation and it is mandatory for all to follow , as applicable .
-
8/22/2019 Total Quality Management of TATA POWER
73/105
The quality policy and broad based quality objectives are established and communication to
all employees . All efforts are made to see that these are understood and implemented by
all.
As customer driven organization , it is necessary that the consumer requirement are
determined and met with to enhance the consumer satisfaction.
We ensured that the applicable statutory and are met with and all efforts are made to go
beyond these on our own as a special responsibility.
We are confident that all our employees will adopt this standard ISO 9001: 2000 of the
quality management system in letter and in sprit for sustainable development.
ISO 9001: 2000 IS IMPLEMENT IN THE AREA ARE AS FOLLOW:-
1.) Quality management system
2.) Management Responsibility
3.) Resource Management
4.) Product realization planning of product realization
5.) Product realization customer related processes
6.) Product realization design and development
7.) Product realization purchasing
8.) Product realization product and service provision
9.) Product realization control of monitoring and measuring devices.
1.) QUALITY MANAGEMENT SYSTEM
The Organization has:-
1.) Identified the processes needed for quality management system and their application
throughout T,D&S division.
-
8/22/2019 Total Quality Management of TATA POWER
74/105
2.) Determined the sequence and interaction of these processes .( Activity flow charts and
given in quality management system procedures ).
3.) Developed effective methods for operation and control of these processes .
4.) Ensured the availability of resources and information required to support and monitor
these processes . Necessary manpower, infrastructure, transmission and distribution network
have been provided . Technical literature to run the processes is available .
5.) Ensured monitoring measuring and analysis of these processes.
6.) Implemented actions necessary to achieve planned results and continual improvement of
these processes.
Quality management system ISO 9001: 2000
ISO 9001:2000
Quality policy
( Intention of organization )
Quality manual ( what is being done )
Quality procedures manual ( Why , how it is being done)
Work instruction ( How in detail )
Format, records
( proof of work
done)
Control of documents
The organization has established and maintained procedures to control all documents and
data that affect the quality of product . It is ensures that all documents are prepared,
reviewed and modified for their adequacy, approved and distributed to the persons
concerned.
-
8/22/2019 Total Quality Management of TATA POWER
75/105
All the software used in organization are controlled with password at appropriate level
depending on requirement of the control
EXAMPLE :- SAP systems are operated with unique identify for each division with a
specific password ; e-mail are operated with individual profile and password ; SCADA
system is operated with individual login name and password. Regular updating of revised
software packages and anti-virus protection is being carried out by it department (support
service)
Control record
The organization has identified and maintained the records required for effective
implementation of the quality management system.
Details of procedure required for storage , protection , retrieval, retention and disposal of
quality records are given in quality procedure manual.
2. MANAGEMENT RESPONBILITYThe top management quality objective are smart ( specific , measurable , achievable,
realistic and time bound ) .
a.) Maintain leadership position in customer satisfaction .
b.) Maintain power supply reliability index higher than 99.50%.
-
8/22/2019 Total Quality Management of TATA POWER
76/105
c.) Achieve average restoration time of 20 minutes to affected customers.
d.) Maintain supply voltage within limits ( variation of + - 6% )
e.) Adhere to standard of performance for power supply connections.
f.) Control ATC loss below 12% .
g.) Reduce average cost per unit ( T,D& S) by 5%.
h.) Ensure accident free working by adhering to safety policy.
i.) Continually upgrade employee skills to adapt to change.
j.) Minimize inconvenience to the community during exestuations of work .
Review input
i.) Confirmation / follow up of previous management review.
ii.) Result of quality management system audit report.
iii.) Feedback on customer satisfaction survey customer meet and customer
complaints.
iv.) Status of corrective actions and preventive actions takes.
v.) Recommendations for improvements from all divisions.
vi.) Review of quality objectives.
Review output
Discussions and decision are recorded in MOM (Minutes of meeting ) which includes
some of the following point :-
i.) Improvement of the effectiveness of quality management system and its
processes .
ii.) Improvement in service to consumer.
iii.) Resources required.
iv.) Action plan and agenda for next meeting.
3. RESOURCE MANAGEMENTResources required for implementing and maintaining effective quality management
system and enchaining customer satisfaction are identified and provided.
EXAMPLE:- Manpower , Material, services , Infrastructure, work environment,
information system , finance etc.
-
8/22/2019 Total Quality Management of TATA POWER
77/105
a.) Infrastructure
The infrastructure required to achieve conformity to product / service requirement , has
been determined , provided and maintained.
b.) Preventive maintenance
This is planned as per the maintenance schedule carried out and records maintained .
Spare are maintenance , annual maintenances contracts are entered in to for support
equipment.
c.) Breakdown maintenance
Information regarding is given to the concerned maintenance department. The repair
work is carried and records are maintained . Details of the equipment regarding
manufactures data of purchase and installation , Specification , drawing and major
repairs done , are maintained . Breakdown van is available for emergency round the
clock.
d.) Work space / office
Suitable workspace and officers furniture are provided for officers and staff . Adequate
computer with necessary software and peripherals have been provided .
e.) Computer maintenance ( Hardware and software )
Computer have been provided in departments for data storage , communication , data
processing and to speed up work functions. Official software package viz. windows ,
SAP, Outlook , Novell etc have been load in the computer for various applications.
Anti-virus protection have been provided . All the software used in organization
controlled with passwords and login names at appropriates levels. Backup facility is
provided as centre serve.
f.) Transportation
Bus transport is provided to employees . Vehicles are provided for various sites
activities maintenances and repairs vehicles are carried out regularly.
g.) Communication Telephone to individual and department having intercom and
direct dial facilities are provided . Microwaves, carries, fiber optic telephone
communication system have been provided for operation staff and senior officers .
Mobile phones have been provide to senior officers and O &M Engineers. Fax
machine, Internal memos are used for written communication.
-
8/22/2019 Total Quality Management of TATA POWER
78/105
h.) Work environment
Management has determined and ensured that adequate provision are available for
health and safe working environment . Clean rooms, proper lighting , ventilation and air
conditioners are provided to control temperature and humidity . Fire extinguisher and
first aids boxes are provided as a safety measures. In order to maintain the
temperature, air quality , air conditioners, ventilation have been provided . Proper lighting
arrangement at work places have been made .
I.) House keeping
Cleaning of the station premises is carried out . Material in stores are stocked neatly
on the racks. Space provided for them . Files are kept in filing cabinets. drawings are
kept in drawings are kept in drawing cabinets . Regular pest control is carried out in
the premises.
j.) Food
Canteen facility has been provided at certain locations given breakfast lunch , snacks ,
tea , coffee to the employees at subsidized rates.
k.) Recreation
Rest room is provided to the work force. Games rooms having gymnasium , carom
and table tennis facilities are provide . Library facilities are available with technical
books and periodicals so as to keep the employee in touch with the latest
development. Various sports meets are arranged by TPC for spotting of talent and
exceptional sportspersons are encourage to participate in tournament at various level.
4.) PRODUCT REALIZATION PLANNING OFPRODUCT REALISATION
-
8/22/2019 Total Quality Management of TATA POWER
79/105
The network infrastructures is planned base on the long term network expansion plans
and load . Application forms from the customers according to schemes for providing
the schemes for providing power supply to the customer one finalized . The
implementation schedule is discussed in the respective divisional co-ordination meeting .
The time frame for each schedule is proportioned as per the ISLA ( Internal service
level agreement ) with the respective support processes . Job quality in confirmed
through third party inspection .
i.) These process are documented and provided to meet the requirement of
product realization .
ii.) The required verification , validation , monitoring , inspection and testing
activities specific to the equipment have been determined and the criteria for
acceptance is established by the organization .
iii.) The records are maintained to determined to demonstrate that the product
meets the requirement.
5. PRODUCT REALISATION CUSTOMER RELATESPROCESSES
Review of requirement related to the product :-
-
8/22/2019 Total Quality Management of TATA POWER
80/105
Review of the customer requirement is carried out jointly by engineering department T&D
division CDD (Consumer development department ) . T&D division takes appropriate action
for the implementation .
EXAMPLE:- Requirement of the customer for reduction in interruption of supply and
voltage fluctuation to them by providing under ground cables in place of overhead line,
increase in the capacity of power supply requirement etc. The requirement are
communicated to the concerned and contract review records are maintained .
Customer communication :-
CCR , O&M engineers and the call centre are contacted by customer for and any help
required . These centre receive complaints and immediately intimate working agencies who
are available on telephones and monitor restoration of supply and resolving of complaint.
The complaint data is complied and reviewed by concerned division for improvements.
Customer feedback is obtained through customer meets , focus group , and customer
satisfaction survey . T,D&S division participates in the customer meets , where customer
related issues are discussed and feedback is received. Also T,D&S division receives the
report on customer satisfaction surveys for necessary action .
EXAMPLE:-
A customer contact plan is prepared, which indicates the frequency of meeting customer
by various level of personnel .
6.) PRODUCT REALISATION DESIGN ANDDEVELOPMENT
a.) Design and development planning
-
8/22/2019 Total Quality Management of TATA POWER
81/105
Planning and control of design and development of product / services are done to
determines .
i.) Design and development stages .
ii.) Review , verification and validation as appropriates to design and development .
iii.) Responsibility and authorities for design and development .
iv.) The various division have interfaces to ensures clarity of responsibility and effective
communication.
b.) Design and development inputs
i.) Input from customer standard design and engineering guidelines .
ii.) The India electricity acts , 2003.
iii.) Relevant India standards .
iv.) Review of standard design schemes based on new technology , vendor input , site
inspection and comments on similar design .
v.) Inputs from user departments.
vi.) Inputs from other organization and distribution licenses .
vii.) Input from customer guidance .
c.) Design and development output
The outputs of design and development are verified against the corresponding inputs and
checked prior to release , to meet requirement of the customer , organizational needs ,
site constraints, material procurement activity and cost estimate. The outputs of design are
in the form of schemes , drawings , material specifications , product acceptances criteria ,
safety and it s proper application.
d.) Design development review
At suitable stage, systematic design and development review are carried out to :-
i.) Evaluate the design outputs meet the requirements as defined in the design input
stage.
ii.) Identified any problems / deviation and proposed corresponding necessary action.
The participants of design process are from CED ( consumer engineering department ) ,
civil , cable , customer division , EQAS and other as required . The records of the review
and require action are maintained by CED.
e.) Design and development verification
-
8/22/2019 Total Quality Management of TATA POWER
82/105
The design and development verification is carried out by inspection team at the
manufacture work to ensures that the output meet the requirements given in defined at the
planning stages.
Sample approval , inspection and testing are carried out at manufacture premises to
ensure that the output as per the design requirements . The test report copies are
maintained by CED.
f.) Design and development validation
To ensure that the result product is capable of meeting required applications ; design and
development validation are out by CED , user division and EQAG as specified in planning
stages for schemes, drawings and material specifications, validation is carried out in any of
the following ways as applicable:-
i.) Comparing with manufactures test certificates for the equipment .
ii.) Conformance with performance with latest amendments under IE ACT rules ( Indian
electricity act ) .
iii.) Comparing with manufactures test certificates for the equipment .
iv.) Comparing with performance / feedback / occurrences report for similar equipment from
user department .
g.) Control of design and development change
Request for changes in design and development , whenever receive from customer
development implementing agencies are incorporates after review . The changes made are
reviewed , verified and validated . These are approved by CED before implementation.
7. PRODUCT REALISATION PURCHASINGa.) Purchase process
i.) The requirement of the material is determined by concerned division and the
s