tower a tower c tower b tower b current 110.7...

3
46 Rezoning Report Burrard Gateway Project March 13, 2013 HEIGHT OF BUILDINGS (HEIGHT ENTERING INTO VIEW CONES MEASURED FROM VIEW CONE SITE ELEVATION MAX. HEIGHT imperial metric imperial metric imperial metric imperial metric CURRENT 363.2 110.7 363.6 110.84 162.1 49.4 156.7 47.76 PROPOSED 546.1 166.5 372.4 113.5 188.5 57.4 188.5 57.4 DIFFERENCE 182.9 55.8 8.8 2.7 26.4 8.0 31.8 9.7 Note: All Heights Measured from View Cone Site Elevation (base elevation at: 31m for Tower A & C,34 m for Tower B) to TOP OF APPURTENANCE TOWER C TOWER A TOWER B TOWER B VIEW CONE 3.2.1 QEP VIEW CONE 12.1.2 GB VIEW CONE 12.1.3 GB View Cone Study View Cone Study Tower A & C are within the realm of View Cone: 3.2.1 Queen Elizabeth Park to the Downtown Sklyine and the North Shore Mountains. Higher Building Policy Permits Buildings to go through Queen Elizabeth park View Cone. Tower B is within the realm of View Cone: 12.1.3 Granville Bridge to Crown / Grouse 12.1.2 Granville Bridge to Crown / Grouse * * Policy for Taller Buildings allows consideration of buildings taller than QE view cone at specific downtown locations, including the Burrard Gateway SIte * View Cone Calculation Records – 1290 Burrard and Drake St Map Location View Site Elevation Max Height ID Name A 12.1.3 Granville Bridge to Crown/Grouse 34 47.76m 12.1.2 Granville Bridge to Crown/Grouse 34 49.40m 3.2.1 Queen Elizabeth Park to the Downtown skyline and North Shore mountains 34 107.98m B 12.1.3 Granville Bridge to Crown/Grouse 34 48.66m 12.1.2 Granville Bridge to Crown/Grouse 34 50.26m 3.2.1 Queen Elizabeth Park to the Downtown skyline and North Shore mountains 34 108.00m C 3.2.1 Queen Elizabeth Park to the Downtown skyline and North Shore mountains 33 108.92m D 3.2.1 Queen Elizabeth Park to the Downtown skyline and North Shore mountains 33 108.89m E 3.2.1 Queen Elizabeth Park to the Downtown skyline and North Shore mountains 31 110.78m F 3.2.1 Queen Elizabeth Park to the Downtown skyline and North Shore mountains 31 110.83m G 3.2.1 Queen Elizabeth Park to the Downtown skyline and North Shore mountains 31 110.75m H 3.2.1 Queen Elizabeth Park to the Downtown skyline and North Shore mountains 31 110.70m I 3.2.1 Queen Elizabeth Park to the Downtown skyline and North Shore mountains 32 109.86m J 3.2.1 Queen Elizabeth Park to the Downtown skyline and North Shore mountains 32 109.91m K 3.2.1 Queen Elizabeth Park to the Downtown skyline and North Shore mountains 31 110.84m L 3.2.1 Queen Elizabeth Park to the Downtown skyline and North Shore mountains 31 110.79m

Upload: lamcong

Post on 02-May-2018

216 views

Category:

Documents


1 download

TRANSCRIPT

46Rezoning Report Burrard Gateway ProjectMarch 13, 2013

HEIGHT OF BUILDINGS (HEIGHT ENTERING INTO VIEW CONES MEASURED FROM VIEW CONE SITE ELEVATIONMAX. HEIGHT

imperial metric imperial metric imperial metric imperial metricCURRENT 363.2 110.7 363.6 110.84 162.1 49.4 156.7 47.76

PROPOSED 546.1 166.5 372.4 113.5 188.5 57.4 188.5 57.4 DIFFERENCE 182.9 55.8 8.8 2.7 26.4 8.0 31.8 9.7

Note: All Heights Measured from View Cone Site Elevation (base elevation at: 31m for Tower A & C,34 m for Tower B) to TOP OF APPURTENANCE

TOWER CTOWER A TOWER B TOWER BVIEW CONE 3.2.1 QEP VIEW CONE 12.1.2 GB VIEW CONE 12.1.3 GB

View Cone Study

View Cone Study

Tower A & C are within the realm of View Cone:

3.2.1 Queen Elizabeth Park to the Downtown Sklyine and the North Shore Mountains.• Higher Building Policy Permits Buildings to go

through Queen Elizabeth park View Cone.

Tower B is within the realm of View Cone: • 12.1.3 Granville Bridge to Crown / Grouse• 12.1.2 Granville Bridge to Crown / Grouse

*

* Policy for Taller Buildings allows consideration of buildings taller than QE view cone at specific downtown locations, including the Burrard Gateway SIte

*

View Cone Calculation Records – 1290 Burrard and Drake St

Map Location

View Site Elevation

Max Height ID Name

A

12.1.3 Granville Bridge to Crown/Grouse 34 47.76m

12.1.2 Granville Bridge to Crown/Grouse 34 49.40m

3.2.1 Queen Elizabeth Park to the Downtown skyline and North Shore mountains 34 107.98m

B

12.1.3 Granville Bridge to Crown/Grouse 34 48.66m

12.1.2 Granville Bridge to Crown/Grouse 34 50.26m

3.2.1 Queen Elizabeth Park to the Downtown skyline and North Shore mountains 34 108.00m

C 3.2.1 Queen Elizabeth Park to the Downtown skyline and North Shore mountains 33 108.92m

D 3.2.1 Queen Elizabeth Park to the Downtown skyline and North Shore mountains 33 108.89m

E 3.2.1 Queen Elizabeth Park to the Downtown skyline and North Shore mountains 31 110.78m

F 3.2.1 Queen Elizabeth Park to the Downtown skyline and North Shore mountains 31 110.83m

G 3.2.1 Queen Elizabeth Park to the Downtown skyline and North Shore mountains 31 110.75m

H 3.2.1 Queen Elizabeth Park to the Downtown skyline and North Shore mountains 31 110.70m

I 3.2.1 Queen Elizabeth Park to the Downtown skyline and North Shore mountains 32 109.86m

J 3.2.1 Queen Elizabeth Park to the Downtown skyline and North Shore mountains 32 109.91m

K 3.2.1 Queen Elizabeth Park to the Downtown skyline and North Shore mountains 31 110.84m

L 3.2.1 Queen Elizabeth Park to the Downtown skyline and North Shore mountains 31 110.79m

Urban Design Panel Review SubmissionBurrard GatewayOctober 10th, 2012

View Cone Analysis

47Rezoning Report Burrard Gateway ProjectMarch 13, 2013

Urban Design Panel Review SubmissionBurrard GatewayOctober 10th, 2012

View Cone Analysis View Cone Analysis

48Rezoning Report Burrard Gateway ProjectMarch 13, 2013

View Cone 3.2.1

View Cone | 3.2.1 Queen Elizabeth ParkIn February 2011, City Council approved the Taller Buildings Policy which allows consideration of buildings taller than QE View cone at specific downtown sites, including Burrard Gateway location. Note that Tower A & C’s overage will be for the most part blocked by the existing trees on site.