town hall presentation
DESCRIPTION
rene Keil and Tiffany Lin, Design Consultants to Dean Ken Schwartz, present select schemes for the relocation of the computer lab to studio levels, for a new faculty office corridor on ground level, and for the reorganization of the 4th floor core area in Richardson Memorial HallTRANSCRIPT
“Town Hall Meeting”ROOM 201
KEILLINpartnership
Renovation proposals for Richardson Memorial Hall will be presented. All Students, Faculty and Staff are welcome to attend and fill out comment sheets!! Monday, 1/25, 12-12:45pm, Rm 201.
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 2000 2010 2020
1908-1963 MEDICAL SCHOOL OCCUPIES RMH
ARCH
1908 Richardson Memorial Hall built for Medical School
BUILDING TIME LINE
The building is named for Dr. Tobias G. Richardson, Dean of the Medical Department from 1865-1885.
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 2000 2010 2020
1908-1963 MEDICAL SCHOOL OCCUPIES RMH
ARCH
ARTS & SCIENCES
1964 Architecture School shares RMH
BUILDING TIME LINE
Freshmen studios occupy room 401, while the remainder of the architecture school stays next door at Stanley Thomas Hall. RMH is shared with various other departments during this transition period.
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 2000 2010 2020
1908-1963 MEDICAL SCHOOL OCCUPIES RMH
1972 - PRESENT ARCHITECTURE SCHOOL OCCUPIES RMH
ARCH
1972 Architecture School officially moves in to RMH
BUILDING TIME LINE
ARTS & SCIENCES
Louis Kahn gives inaugural lecture to architecture students in former anatomical theater.
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 2000 2010 2020
1908-1963 MEDICAL SCHOOL OCCUPIES RMH
1972 - PRESENT ARCHITECTURE SCHOOL OCCUPIES RMH
ARCH
BUILDING TIME LINE
ARTS & SCIENCES
1986 RENOVATION following fire in Amphitheater
Attic space renovated for fifth floor studios.Fourth and fifth levels connected with skylight.Third floor administration entrance created.
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 2000 2010 2020
1908-1963 MEDICAL SCHOOL OCCUPIES RMH
1972 - PRESENT ARCHITECTURE SCHOOL OCCUPIES RMH
ARCH
1999 RENOVATION
1995 RENOVATION
BUILDING TIME LINE
ARTS & SCIENCES
Slide library Special Projects room
Fire safety improvementsUpgrade of room 204
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 2000 2010 2020
1908-1963 MEDICAL SCHOOL OCCUPIES RMH
1972 - PRESENT ARCHITECTURE SCHOOL OCCUPIES RMH
ARCH
2001 RENOVATION
BUILDING TIME LINE
ARTS & SCIENCES
Central HVAC on fourth and fifth floors.New studio furnishings
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 2000 2010 2020
1908-1963 MEDICAL SCHOOL OCCUPIES RMH
1972 - PRESENT ARCHITECTURE SCHOOL OCCUPIES RMH
ARCH
BUILDING TIME LINE
ARTS & SCIENCES
2010 RENOVATION
Dean Schwartz commissions current design of new computer labs, teaching spaces and faculty corridor.
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
EXISTING GROUND FLOOR
EXISTING 4TH FLOOR
EXISTING COMPUTER LAB WITH NON-COMPLIANT BUILDING EGRESS TO BE RELOCATED
EXISTING OFFICES, TEACHING SPACE AND CITY CENTER TO BE RELOCATED
STUDIOSTUDIO
SHOP
MECH
MECH
MECH
MECH KITCH
CL
ROOM 404
RM 405
RM 101
OFFICE OO
CAFETERIACOMPUTER LAB
TCC RM 405 OFFICE OOTCC
objectives1 RELOCATE COMPUTER LAB TO STUDIO LEVEL
objectives1 RELOCATE COMPUTER LAB TO STUDIO LEVEL
...integrate computer lab into studios
...foster studio culture and stimulate learning environment
...provide a more secure computer lab
...improve quality of lab space
objectives1 RELOCATE COMPUTER LAB TO STUDIO LEVEL
...integrate computer lab into studios
...foster studio culture and stimulate learning environment
...provide a more secure computer lab
...improve quality of lab space
2 RELOCATE 4TH FLOOR OFFICES TO GROUND LEVEL
objectives
2 RELOCATE 4TH FLOOR OFFICES TO GROUND LEVEL...create a centralized faculty corridor...encourage discourse between faculty and student visitors...connect new faculty corridor with building circulation
1 RELOCATE COMPUTER LAB TO STUDIO LEVEL...integrate computer lab into studios...foster studio culture and stimulate learning environment...provide a more secure computer lab...improve quality of lab space
objectives
2 RELOCATE 4TH FLOOR OFFICES TO GROUND LEVEL...create a centralized faculty corridor...encourage discourse between faculty and student visitors...connect new faculty corridor with building circulation
3 PROVIDE NEW TEACHING SPACES ON 4TH FLOOR
1 RELOCATE COMPUTER LAB TO STUDIO LEVEL...integrate computer lab into studios...foster studio culture and stimulate learning environment...provide a more secure computer lab...improve quality of lab space
objectives
3 PROVIDE NEW TEACHING SPACES ON 4TH FLOOR...create flexible classrooms...enhance central hallway as teaching space...reclaim building core as public zone
2 RELOCATE 4TH FLOOR OFFICES TO GROUND LEVEL...create a centralized faculty corridor...encourage discourse between faculty and student visitors...connect new faculty corridor with building circulation
1 RELOCATE COMPUTER LAB TO STUDIO LEVEL...integrate computer lab into studios...foster studio culture and stimulate learning environment...provide a more secure computer lab...improve quality of lab space
16 JANUARY 2010RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership EXISTING GROUND FLOOR
SHOP
MECH
MECH
MECH
MECH KITCH
RM 101 CAFETERIACOMPUTER LAB
16 JANUARY 2010RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership PROPOSED GROUND FLOOR EXTENSION
1 2 3 4 5
6
NEW EXIT DOORSIX NEW OFFICES
NEW FLOOR AND WALL SURFACE TO CONNECT
FACULTY HALL / DISPLAY
WIDENED CORRIDOR TOCELEBRATE NATURAL
LIGHT AND VIEW
LOUNGE AREA
SHOP
MECH
MECH
MECH
MECH KITCH
RM 101 CAFETERIA
SHOP
MECH
MECH
MECH
MECH KITCH
RM 101 CAFETERIA
16 JANUARY 2010RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
NEW EXIT DOORSIX NEW OFFICES
NEW FLOOR AND WALL SURFACE TO CONNECT
FACULTY HALL / DISPLAY
WIDENED CORRIDOR TOCELEBRATE NATURAL
LIGHT AND VIEW
FACULTY LOUNGE AREA
1 2 3 4 5
6
CODE COMPLIANT EGRESSSIX NEW FACULTY OFFICESCONTINUOUS GALLERY WALL ALONG OFFICESLIGHT AND VIEW AT CORRIDOR’S ENDFACULTY LOUNGE AREAREUSE EXISTING OPENING FOR NEW DOORFOCUS ON NEW LAYER, AWAY FROM CEILING DUCTSNEW SURFACE ALLOWS FOR CONDUITS FOR LIGHTING AND INTEGRATED SIGNAGE
PROPOSED GROUND FLOOR EXTENSION
IN INITIAL PLANNING STUDIES, 6 SCHEMES FOR LABS AND CLASSROOMS WERE EXPLORED ...
RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership EXISTING FOURTH FLOOR
STUDIOSTUDIO
ROOM 404
RM 405 OFFICE OOTCC
16 JANUARY 2010RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
PROSLABS INTEGRATED WITH STUDIOSBI-SYMMETRICAL VOLUMES IN SPIRIT OF RMHMAXIMUM GAINED CRIT SPACES
CONSSTUDIO ACCESS ONLY THROUGH LABS, NO SECURITYDOUBLE WIRING FOR TWO LABSCIRCULATION DIVIDES LABS INTO PODS30 STUDIO DESKS LOST
SCHEME 1 : CLOSE TWINS
SCHEME 1 UNIT PROGRAM SF NEW SF EXISTG SF GAIN/LOSS
311 gsfCOMPUTER LABS 303 nsf 1,212 sf 776 sf + 436 sf 303 nsf x 4 pods 32 work stations 26 work stations + 6 work stations
732 gsf per lab including center aisle
1,025 gsfCRIT SPACES 993 nsf 993 sf 315 sf RM 405 + 678 sf
STUDIO SPACE 2,372 sf per studio 4,744 sf 6,210 sf - 1,466 sf - 30 studio desks
COMPUTER LAB 1 606 nsf, 16 work stationscirculation btwn two pods
COMPUTER LAB 2 606 nsf, 16 work stationscirculation btwn two pods
CLASSRMS/ CRIT SPACE993 nsf
16 JANUARY 2010RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership SCHEME 2 : DISTANT TWINS
COMPUTER LAB 1 496 nsf, 24 work stations
COMPUTER LAB 2 496 nsf, 24 work stations
CLASSRMS/ CRIT SPACE993 nsf
PROSLABS INTEGRATED WITH STUDIOSBI-SYMMETRICAL VOLUMES IN SPIRIT OF RMHMAXIMUM GAINED WORK STATIONS AND CRIT SPACESSECURE LOCATION OF LABS WITHIN STUDIOS
CONSMINIMAL PRESENCE OF LAB DESIGNDOUBLE WIRING FOR TWO LABS30 STUDIO DESKS LOST
SCHEME 2 UNIT PROGRAM SF NEW SF EXISTG SF GAIN/LOSS
523 gsfCOMPUTER LABS 496 nsf 992 sf 776 sf + 216 sf 48 work stations 26 work stations + 22 work stations
1,025 gsfCRIT SPACES 993 nsf 993 sf 315 sf RM 405 + 678 sf
STUDIO SPACE 2,581 sf per studio 5,162 sf 6,210 sf - 1,048 sf - 30 studio desks
16 JANUARY 2010RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership SCHEME 3 : SINGLE LOADED
COMPUTER LAB 1 1,131 nsf, 40 work stations
CLASSRMS/ CRIT SPACE993 nsf
PROSLABS INTEGRATED WITH STUDIOSSINGLE WING OF WIRINGMAXIMUM GAINED CRIT SPACESMAXIMUM INTEGRATION OF LAB TO STUDIO
CONSWINDOW WALL OBSTRUCTEDDISRUPTED STUDIO CONFIGURATION39 STUDIO DESKS LOST
SCHEME 3 UNIT PROGRAM SF NEW SF EXISTG SF GAIN/LOSS
1,179 gsfCOMPUTER LABS 1,131 nsf 1,131 sf 776 sf + 355 sf 40 work stations 26 work stations + 14 work stations
1,025 gsfCRIT SPACES 993 nsf 993 sf 315 sf RM 405 + 678 sf
STUDIO SPACE 1,926 sf + 3,105 5,162 sf 6,210 sf - 1,179 sf - 39 studio desks
16 JANUARY 2010RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership SCHEME 4 : SPLIT SIBLINGS
COMPUTER LAB 1 463 nsf, 16 work stations
COMPUTER LAB 2 463 nsf, 16 work stations
CLASSRMS/ CRIT SPACE993 nsf
PROSLABS INTEGRATED WITHIN STUDIOSAXIAL VOLUMES DIAGONALLY LINKED BY CORRIDORMAXIMUM GAINED CRIT SPACESSECURE LOCATION OF LABS WITHIN STUDIOS
CONSDOUBLE WIRING FOR TWO LABSDISRUPTIVE STUDIO CONFIGURATION36 STUDIO DESKS LOST
SCHEME 4 UNIT PROGRAM SF NEW SF EXISTG SF GAIN/LOSS
486 gsfCOMPUTER LABS 463 nsf x 2 926 sf 776 sf + 150 sf 32 work stations 26 work stations + 6 work stations
1,025 gsfCRIT SPACES 993 nsf 993 sf 315 sf RM 405 + 678 sf
STUDIO SPACE 2,618 sf per studio 5,236 sf 6,210 sf - 974 sf - 36 studio desks
888888 888
888
SCHEME 5A : FIRST COUSINS
COMPUTER LAB 2 463 nsf, 24 work stations
CLASSRMS/ CRIT SPACE493 nsf
PROS2 TYPES OF LABS - CENTRAL AND STUDIO LABSHARED WIRING FOR LABS w/ADJACENCY TO ROUTERVISIBILITY OF COMPUTER LABGAINED CRIT SPACEACTIVATION OF CENTRAL SPACE
CONSDISRUPTIVE STUDIO CONFIGURATION18 STUDIO DESKS LOST
SCHEME 5A UNIT PROGRAM SF NEW SF EXISTG SF GAIN/LOSS
511 gsf + 486 gsfCOMPUTER LABS 491 nsf + 463 nsf 954 sf 776 sf + 178 sf 48 work stations 26 work stations + 22 work stations
513 gsfCRIT SPACES 493 nsf 493 sf 315 sf RM 405 + 178 sf
STUDIO SPACE 2,618 sf + 3,105 sf 5,723 sf 6,210 sf - 387 sf - 18 studio desks
COMPUTER LAB 1491 nsf, 24 work stations
16 JANUARY 2010RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
888
8 8 8
888
8 8 8
SCHEME 5B : SECOND COUSINS
COMPUTER LAB 2 463 nsf, 24 work stations
CLASSRM/ CRIT SPACE 1214 nsf
PROS2 TYPES OF LABS - CENTRAL AND STUDIO LABVISIBILITY OF COMPUTER LABGAINED CRIT SPACEACTIVATION OF CENTRAL SPACE
CONSDISRUPTIVE STUDIO CONFIGURATION18 STUDIO DESKS LOSTSMALL CRIT SPACES
SCHEME 5B UNIT PROGRAM SF NEW SF EXISTG SF GAIN/LOSS
570 gsf + 486 gsfCOMPUTER LABS 552 nsf + 463 nsf 1,015 sf 776 sf + 239 sf 48 work stations 26 work stations + 22 work stations
229 gsf x 2CRIT SPACES 214 nsf x 2 428 sf 315 sf RM 405 + 113 sf
STUDIO SPACE 2,618 sf + 3,105 sf 5,723 sf 6,210 sf - 387 sf - 18 studio desks
COMPUTER LAB 1552 nsf, 24 work stations
CLASSRM/ CRIT SPACE 2214 nsf
16 JANUARY 2010RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
204
4
4
4
SCHEME 6 : CENTER SINGLE
FLEXIBLE CRIT SPACE +/- 650 nsf
PROSCENTRAL COMPUTER LABACTIVATION OF CENTRAL SPACEVISIBILITY OF COMPUTER LAB with DONOR POTENTIAL NO DISRUPTION OF STUDIOSMINIMUM AMOUNT OF CONSTRUCTIONFLEXIBLE CRIT SPACESPOTENTIAL GALLERY / EXHIBITION HALL
CONSENCLOSED CLASSROOM SPACE LOSTNO DIRECT INTEGRATION WITH STUDIOS
SCHEME 6 UNIT PROGRAM SF NEW SF EXISTG SF GAIN/LOSS
804 gsfCOMPUTER LAB 767 nsf 767 sf 776 sf - 9 sf 36 work stations 26 work stations + 10 work stations
CRIT SPACES flexible flexible 315 sf RM 405 N/A
STUDIO SPACE 3,105 sf x 2 6,210 sf 6,210 sf NO CHANGE
COMPUTER LAB 767 nsf, 36 work stations
4
4
204
4
16 JANUARY 2010RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
AFTER A CLIENT MEETING WITH DEAN SCHWARTZ, 3 LAB + 3 CORE CONFIGURATIONS WERE IDENTIFIED...
204
4
4
4
SCHEME 3
204
4
4
4
20 JANUARY 2010 RESOURCES MEETINGRICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
COMPUTER LAB 767 nsf, 36 work stations
204
4
4
4
PROSACTIVATION OF CENTRAL CORE WITH LABSINGLE LAB WITH DONOR POTENTIALVISIBILITY OF NEW LAB FROM EXTERIOR NO DISRUPTION OF STUDIOSMINIMUM CONSTRUCTION WITH FOCUSED DESIGNDEFINED REVIEW SPACE IN HALLWAYPOTENTIAL GALLERY / EXHIBITION SPACE
CONSENCLOSED CLASSROOM SPACE LOSTNO DIRECT INTEGRATION WITH STUDIOS
SCHEME 6 UNIT PROGRAM SF NEW SF EXISTG SF GAIN/LOSS
804 gsfCOMPUTER LAB 767 nsf 767 sf 776 sf - 9 sf 36 work stations 26 work stations +10 work stations CRIT SPACE flexible flexible 315 sf RM 405 N/A
SCHEME 3
204
4
4
4
20 JANUARY 2010 RESOURCES MEETINGRICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
COMPUTER LAB 767 nsf, 36 work stations
FLEXIBLE REVIEW SPACE +/- 650 nsf
20 JANUARY 2010 RESOURCES MEETINGRICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
COMPUTER LAB 1 24 work stations (496 nsf)
COMPUTER LAB 2 24 work stations (496 nsf)
LAB SCHEME 2
SCHEME 2 UNIT PROGRAM SF NEW SF EXISTG SF GAIN/LOSS
523 gsfCOMPUTER LABS 496 nsf 992 sf 776 sf + 216 sf 48 work stations 26 work stations + 22 work stations
STUDIO SPACE 2,581 sf per studio 5,162 sf 6,210 sf - 1,048 sf - 30 studio desks
20 JANUARY 2010 RESOURCES MEETINGRICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
PROSSECURE LABS INTEGRATED WITHIN STUDIOSMAXIMUM TEACHING SPACES GAINED IN CORE
CONSDOUBLE WIRING FOR TWO LABSDISRUPTIVE STUDIO CONFIGURATION30 STUDIO DESKS LOST
LAB SCHEME 2
COMPUTER LAB 1 24 work stations (496 nsf)
COMPUTER LAB 2 24 work stations (496 nsf)
20 JANUARY 2010 RESOURCES MEETINGRICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership LAB SCHEME 1
COMPUTER LAB 1 16 work stations (413 nsf)
COMPUTER LAB 216 work stations (413 nsf)
SCHEME 1 UNIT PROGRAM SF NEW SF EXISTG SF GAIN/LOSS
486 gsfCOMPUTER LABS 413 nsf x 2 826 sf 776 sf + 50 sf 32 work stations 26 work stations + 6 work stations
STUDIO SPACE 2,671 sf per studio 5,342 sf 6,210 sf - 868 sf - 30 studio desks
PROSSECURE LABS INTEGRATED WITHIN STUDIOSMAXIMUM TEACHING SPACES GAINED IN CORE
CONSDOUBLE WIRING FOR TWO LABSDISRUPTIVE STUDIO CONFIGURATION30 STUDIO DESKS LOST
20 JANUARY 2010 RESOURCES MEETINGRICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership LAB SCHEME 1
COMPUTER LAB 1 16 work stations (413 nsf)
COMPUTER LAB 216 work stations (413 nsf)
20 JANUARY 2010 RESOURCES MEETINGRICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership CORE SCHEME a
20-SEAT CLASSRM (271 nsf)
35-SEAT CLASSRM (553 nsf)
14-SEAT SEMINAR (271 nsf)
20 JANUARY 2010 RESOURCES MEETINGRICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
REVIEW / EXHIBITIONflexible (324 nsf)
CORE SCHEME a
20 JANUARY 2010 RESOURCES MEETINGRICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
REVIEW / EXHIBITIONflexible (324 nsf)
20-SEAT CLASSRM (271 nsf)
35-SEAT CLASSRM (553 nsf)
14-SEAT SEMINAR (271 nsf)
SCHEME a UNIT PROGRAM SF NEW SF EXISTG SF GAIN/LOSS
CLASSROOM 1 284 gsf x 2 271 nsf x 2 542 sf 315 sf RM 405 + 780 sfCLASSROOM 2 578 gsf 553 nsf 553 sf
REVIEW / EXHIBIT 324 nsf 324 sf 162 sf + 162 sf
CORE SCHEME a
PROSMAXIMUM TEACHING SPACES GAINEDDEFINED REVIEW / EXHIBITION SPACE IN HALL
CONSCOMPUTER LABS IN STUDIO SPACESTUDIO DESKS LOST
20 JANUARY 2010 RESOURCES MEETINGRICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
49-SEAT CLASSRM (687 nsf)
CORE SCHEME b
20 JANUARY 2010 RESOURCES MEETINGRICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
REVIEW / EXHIBIT SPACE(279 nsf)
REVIEW / EXHIBIT SPACE(279 nsf)
CORE SCHEME b
20 JANUARY 2010 RESOURCES MEETINGRICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
REVIEW / EXHIBIT SPACE(279 nsf)
REVIEW / EXHIBIT SPACE(279 nsf)
49-SEAT CLASSRM (687 nsf)
CORE SCHEME b
SCHEME a UNIT PROGRAM SF NEW SF EXISTG SF GAIN/LOSS
LARGE CLASSROOM 725 gsf 687 nsf 687 sf 315 sf RM 405 + 372 sf
REVIEW / EXHIBIT 279 nsf x 2 558 sf 162 sf + 396 sf
PROSMAXIMUM TEACHING SPACES GAINEDOPEN REVIEW / EXHIBIT SPACES AT STAIR AXIS
CONSCOMPUTER LABS IN STUDIO SPACESTUDIO DESKS LOST
20 JANUARY 2010 RESOURCES MEETINGRICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
35-SEAT CLASSRM(492 nsf)
35-SEAT CLASSRM(492 nsf)
CORE SCHEME c
20 JANUARY 2010 RESOURCES MEETINGRICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
EXHIBITION HALLflexible (418 nsf)
CORE SCHEME c
20 JANUARY 2010 RESOURCES MEETINGRICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
EXHIBITION HALLflexible (418 nsf)
CORE SCHEME c
35-SEAT CLASSRM(492 nsf)
35-SEAT CLASSRM(492 nsf)
SCHEME C UNIT PROGRAM SF NEW SF EXISTG SF GAIN/LOSS
CLASSROOMS 512 gsf x 2 492 nsf x 2 984 sf 315 sf RM 405 + 669 sf
EXHIBIT HALL 418 nsf 418 sf 162 sf + 256 sf
PROSMAXIMUM TEACHING SPACES GAINEDCENTRAL EXHIBITION SPACE
CONSCOMPUTER LABS IN STUDIO SPACESTUDIO DESKS LOST
POTENTIAL CORE + LAB COMBINATIONS ...
COMPUTER LAB 1 16 work stations (413 nsf)
COMPUTER LAB 216 work stations (413 nsf)
20 JANUARY 2010 RESOURCES MEETINGRICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership COMBINATION : 1-a
REVIEW / EXHIBITIONflexible (324 nsf)
COMPUTER LAB 1 16 work stations (413 nsf)
COMPUTER LAB 216 work stations (413 nsf)
20 JANUARY 2010 RESOURCES MEETINGRICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
EXHIBITION HALLflexible (418 nsf)
COMBINATION : 1-c
35-SEAT CLASSRM(492 nsf)
35-SEAT CLASSRM(492 nsf)
20 JANUARY 2010 RESOURCES MEETINGRICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership COMBINATION : 2-b
COMPUTER LAB 1 24 work stations (496 nsf)
COMPUTER LAB 2 24 work stations (496 nsf)
REVIEW / EXHIBIT SPACE(279 nsf)
REVIEW / EXHIBIT SPACE(279 nsf)
49-SEAT CLASSRM (687 nsf)
COMBINATION : 3
204
4
4
4
20 JANUARY 2010 RESOURCES MEETINGRICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDYKEILLINpartnership
COMPUTER LAB 767 nsf, 36 work stations
FLEXIBLE REVIEW SPACE +/- 650 nsf
COMMENT SHEET
S C H E M E S
YESNO
LAB 1
LAB 2
LAB 3
CORE A
CORE B
CORE C
YESNO
YESNO
YESNO
YESNO
YESNO
TOWN HALL MEETING 125 JANUARY 2010
KEILLINpartnership RICHARDSON MEMORIAL HALL PRELIMINARY PROGRAM STUDY
C O M M E N T S + S U G G E S T I O N S
name: faculty staff student