Planning Inspectorate Scheme Ref: TR010035 Application Document Ref: TR010035/APP/1.4 – Rev 8 A585 Windy Harbour to Skippool Improvement Scheme Application Document Tracker APFP Regulation 5(2)(q) Planning Act 2008 Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 Volume 1 October 2019 A585 Windy Harbour to Skippool Improvement Scheme TR010035 1.4 Application Document Tracker

Upload: others

Post on 30-Jan-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TR010035 APP 1.4 - Application Document Tracker · 2019-10-08 · 2.3 Wo rks Plans Su perse ded 1 st November 2018 2.3 (1) Works Plans - Clean Superseded 17 th May 2019 2.3 (1) Wor

Planning Inspectorate Scheme Ref: TR010035 Application Document Ref: TR010035/APP/1.4 – Rev 8

A585 Windy Harbour to Skippool Improvement Scheme Application Document Tracker

APFP Regulation 5(2)(q)

Planning Act 2008

Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009

Volume 1

October 2019

A585 Windy Harbour to Skippool Improvement Scheme

TR010035

1.4 Application Document Tracker

Page 2: TR010035 APP 1.4 - Application Document Tracker · 2019-10-08 · 2.3 Wo rks Plans Su perse ded 1 st November 2018 2.3 (1) Works Plans - Clean Superseded 17 th May 2019 2.3 (1) Wor

Planning Inspectorate Scheme Ref: TR010035 Application Document Ref: TR010035/APP/1.4 – Rev 8

A585 Windy Harbour to Skippool Improvement Scheme Application Document Tracker

Page Left Intentionally Blank

Page 3: TR010035 APP 1.4 - Application Document Tracker · 2019-10-08 · 2.3 Wo rks Plans Su perse ded 1 st November 2018 2.3 (1) Works Plans - Clean Superseded 17 th May 2019 2.3 (1) Wor

Planning Inspectorate Scheme Ref: TR010035 Application Document Ref: TR010035/APP/1.4 – Rev 8

A585 Windy Harbour to Skippool Improvement Scheme Application Document Tracker

Infrastructure Planning

Planning Act 2008

The Infrastructure Planning (Applications: Prescribed Forms and

Procedure) Regulations 2009

A585 Windy Harbour to Skippool

Improvement Scheme Development Consent Order 20[ ]

APPLICATION DOCUMENT TRACKER

Regulation Number: Regulation 5(2)(q) Planning Inspectorate Scheme Reference

TR010035

Application Document Reference TR010035/APP/1.4

Author: A585 Windy Harbour to Skippool Improvement Scheme Project Team, Highways England

Version Date Status of Version

Rev 0 April 2019 Submission at Deadline 1

Rev 1 May 2019 Deadline 2 Submission

Rev 2 May 2019 Deadline 3 Submission

Rev 3 July 2019 Deadline 4 Submission

Rev 4 August 2019 Deadline 5 Submission

Rev 5 August 2019 Deadline 6 Submission

Rev 6 September 2019 Deadline 7 Submission

Rev 7 October 2019 Deadline 8 Submission

Rev 8 October 2019 Deadline 9 Submission

Page 4: TR010035 APP 1.4 - Application Document Tracker · 2019-10-08 · 2.3 Wo rks Plans Su perse ded 1 st November 2018 2.3 (1) Works Plans - Clean Superseded 17 th May 2019 2.3 (1) Wor

Planning Inspectorate Scheme Ref: TR010035 Application Document Ref: TR010035/APP/1.4 – Rev 8

A585 Windy Harbour to Skippool Improvement Scheme Application Document Tracker

Page Left Intentionally Blank

Page 5: TR010035 APP 1.4 - Application Document Tracker · 2019-10-08 · 2.3 Wo rks Plans Su perse ded 1 st November 2018 2.3 (1) Works Plans - Clean Superseded 17 th May 2019 2.3 (1) Wor

Planning Inspectorate Scheme Ref: TR010035 Application Document Ref: TR010035/APP/1.4 – Rev 8

A585 Windy Harbour to Skippool Improvement Scheme Application Document Tracker

CONTENTS

1 INTRODUCTION ....................................................................................................... 1

1.1 Introduction ............................................................................................................... 1

1.2 Master Document List ............................................................................................... 1

2 DOCUMENT TRACKER ........................................................................................... 2

Page 6: TR010035 APP 1.4 - Application Document Tracker · 2019-10-08 · 2.3 Wo rks Plans Su perse ded 1 st November 2018 2.3 (1) Works Plans - Clean Superseded 17 th May 2019 2.3 (1) Wor

Planning Inspectorate Scheme Ref: TR010035 Application Document Ref: TR010035/APP/1.4 – Rev 8

A585 Windy Harbour to Skippool Improvement Scheme Application Document Tracker

Page Left Intentionally Blank

Page 7: TR010035 APP 1.4 - Application Document Tracker · 2019-10-08 · 2.3 Wo rks Plans Su perse ded 1 st November 2018 2.3 (1) Works Plans - Clean Superseded 17 th May 2019 2.3 (1) Wor

A585 Windy Harbour to Skippool Improvement Scheme Application Document Tracker

Page 1 Planning Inspectorate Scheme Ref: TR010035 Application Document Ref: TR010035/APP/1.4 – Rev 8

1 INTRODUCTION 1.1 Introduction 1.1.1 This document provides a guide to Highways England’s A585 Windy Harbour to

Skippool Improvement Scheme (the Scheme) Development Consent Order (DCO) application pursuant to the Planning Act 2008. The original application was submitted to the Planning Inspectorate on the 29 October 2018, and accepted for examination by the Examining Authority on 26 November 2018.

1.1.2 Since submission, a number of the original application documents have been revised and new documents produced. This guide charts the submission of these documents to the Planning Inspectorate. This is a live document and will be updated throughout the examination period and submitted, when updated, for each deadline.

1.2 Master Document List 1.2.1 The master document list table provides a full list of all the documents submitted to

date, indicating either the latest revision (if applicable) or when a new document was submitted. For ease of navigation these documents are grouped by volumes:

Volume Content

1 Application Form / Information / Background The completed application form and an introduction to the Scheme.

2 Plans, drawings and sections These include plans that illustrate the location of the Scheme, the proposed works, the land that will be acquired or used, and engineering details.

3 Draft Development Consent Order and related documents

This is the document that sets out the legal powers that Highways England is seeking to enable it to build, operate and maintain the Scheme, together with a separate document, the Explanatory Memorandum, explaining the provisions of the Order.

4 Compulsory acquisition information

Documents setting out the land to be acquired or used, and reports justifying the seeking of compulsory acquisition powers over this land.

5 Reports/Statements Reports including the Consultation Report, Habitats Regulations Assessment and other Reports / Statements relevant to this DCO and not dealt with elsewhere in the application.

6 Environmental Impact Assessment (EIA) information

An assessment of the likely significant effects (both positive and negative) of the Scheme on the environment and a description of mitigation measures proposed to reduce any negative impacts.

7 Other Documents (including Examination documents)

Additional documents that support this DCO application including a Planning Statement and a Transport Assessment. This also includes additional documents that are submitted during the Examination process.

8 Statements of Common Ground

Additional documents that support the DCO application and have been produced to confirm to the Examining Authority where agreement has been reached between the Applicant and various interested organisation. The Statements of Common Ground reflect those required as part of the Rule 6 letter.

Highlighted documents are the latest versions and numbers in parentheses refer to the Revision number of the relevant document.

Page 8: TR010035 APP 1.4 - Application Document Tracker · 2019-10-08 · 2.3 Wo rks Plans Su perse ded 1 st November 2018 2.3 (1) Works Plans - Clean Superseded 17 th May 2019 2.3 (1) Wor

A585 Windy Harbour to Skippool Improvement Scheme Application Document Tracker

Page 2 Planning Inspectorate Scheme Ref: TR010035 Application Document Ref: TR010035/APP/1.4 – Rev 8

2 DOCUMENT TRACKER Master Document List – Submissions Made to the Planning Inspectorate Document Reference Document Title Version Submission /

Published Date Volume 1 – Application information

1.1 Application Letter and Schedule of Compliance with the Section 55 Checklist Latest 1st November 2018

1.2 Application Form Latest 1st November 2018 1.3 Introduction to the Application Latest 1st November 2018 1.4 Application Document Tracker Superseded 26th April 2018

1.4 (1) Application Document Tracker Superseded 17th May 2019 1.4 (2) Application Document Tracker Superseded 31st May 2019 1.4 (3) Application Document Tracker Superseded 12th July 2019 1.4 (4) Application Document Tracker Superseded 9th August 2019 1.4 (5) Application Document Tracker Superseded 21st August 2019 1.4 (6) Application Document Tracker Superseded 20th September 2019 1.4 (7) Application Document Tracker Superseded 1st October 2019 1.4 (8) Application Document Tracker Latest 7th October 2019

Volume 2 - Plans, drawings and sections 2.1 Location Plan Latest 1st November 2018 2.2 Land Plans Superseded 1st November 2018

2.2 (1) Land Plans - Clean Superseded 18th December 2018 2.2 (1) Land Plans - Tracked Superseded 18th December 2018 2.2 (2) Land Plans - Clean Superseded 17th May 2019 2.2 (2) Land Plans - Tracked Superseded 17th May 2019 2.2 (3) Land Plans – Clean Latest 9th August 2019 2.2 (3) Land Plans – Tracked Latest 9th August 2019

2.3 Works Plans Superseded 1st November 2018 2.3 (1) Works Plans - Clean Superseded 17th May 2019 2.3 (1) Works Plans - Tracked Superseded 17th May 2019 2.3 (2) Works Plans – Clean Latest 9th August 2019 2.3 (2) Works Plans – Tracked Latest 9th August 2019

2.4 Streets, Rights of Way and Access Plans (all except Sheet 1) Latest 1st November 2018 2.4 (1) Streets, Rights of Way and Access Plans – Sheet 1 Latest 17th May 2019

2.5 General Arrangement Plans Latest 1st November 2018 2.5 (1) General Arrangement Plans – Clean Latest 17th May 2019 2.5 (1) General Arrangement Plans - Tracked Latest 17th May 2019

2.6 Engineering Section Drawings Latest 1st November 2018 2.7 Classification of Roads Plans (all except Sheet 1) Latest 1st November 2018

2.7 (1) Classification of Roads Plans – Sheet 1 Latest 17th May 2019

2.8 Traffic Regulation Measures and De-Trunking Plans (all except Sheet 1)

Latest 1st November 2018

2.8 (1) Traffic Regulation Measures and De-Trunking Plans - Sheet 1 Latest 17th May 2019 2.9 Outline Drainage Works Plans (all except Sheet 1) Latest 1st November 2018

2.9 (1) Outline Drainage Works Plans – Sheet 1 Latest 17th May 2019

2.10 Hedgerow and Protected Trees to be Removed Plans (all except Sheet 1)

Latest 1st November 2018

2.10 (1) Hedgerow and Protected Trees to be Removed Plans – Sheet 1 Latest 17th May 2019 2.11 Crown Land Plan Superseded 1st November 2018

2.11 (1) Crown Land Plan – Clean Superseded 18th December 2018 2.11 (1) Crown Land Plan – Tracked Superseded 18th December 2018 2.11 (2) Crown Land Plan – Clean Latest 17th May 2019 2.11 (2) Crown Land Plan – Tracked Latest 17th May 2019

Volume 3 – Draft Development Consent Order and related documents 3.1 Draft Development Consent Order Superseded 1st November 2018

3.1 (1) Draft Development Consent Order – Clean Superseded 18th December 2018 3.1 (1) Draft Development Consent Order – Tracked Superseded 18th December 2018 3.1 (2) Draft Development Consent Order – Clean Superseded 17th May 2019 3.1 (2) Draft Development Consent Order – Tracked Superseded 17th May 2019

Page 9: TR010035 APP 1.4 - Application Document Tracker · 2019-10-08 · 2.3 Wo rks Plans Su perse ded 1 st November 2018 2.3 (1) Works Plans - Clean Superseded 17 th May 2019 2.3 (1) Wor

A585 Windy Harbour to Skippool Improvement Scheme Application Document Tracker

Page 3 Planning Inspectorate Scheme Ref: TR010035 Application Document Ref: TR010035/APP/1.4 – Rev 8

Master Document List – Submissions Made to the Planning Inspectorate Document Reference Document Title Version Submission /

Published Date 3.1 (3) Draft Development Consent Order – Clean Superseded 9th August 2019 3.1 (3) Draft Development Consent Order – Tracked Superseded 9th August 2019 3.1 (4) Draft Development Consent Order – Clean Superseded 1st October 2019 3.1 (4) Draft Development Consent Order – Tracked Superseded 1st October 2019 3.1 (5) Draft Development Consent Order – Clean Latest 7th October 2019 3.1 (5) Draft Development Consent Order – Tracked Latest 7th October 2019

3.2 Explanatory Memorandum Superseded 1st November 2018 3.2 (1) Explanatory Memorandum – Clean Superseded 17th May 2019 3.2 (1) Explanatory Memorandum - Tracked Superseded 17th May 2019 3.2 (2) Explanatory Memorandum – Clean Latest 1st October 2019 3.2 (2) Explanatory Memorandum - Tracked Latest 1st October 2019

Volume 4 – Compulsory acquisition information 4.1 Statement of Reasons Superseded 1st November 2018

4.1 (1) Statement of Reasons – Clean Superseded 18th December 2018 4.1 (1) Statement of Reasons – Tracked Superseded 18th December 2018 4.1 (2) Statement of Reasons – Clean Superseded 17th May 2019 4.1 (2) Statement of Reasons – Tracked Superseded 17th May 2019 4.1 (3) Statement of Reasons Superseded 31st May 2019 4.1 (4) Statement of Reasons – Clean Superseded 12th July 2019

4.1.4 (4) Statement of Reasons - Tracked Superseded 12th July 2019 4.1 (5) Statement of Reasons – Clean Superseded 9th August 2019 4.1 (5) Statement of Reasons - Tracked Superseded 9th August 2019 4.1 (6) Statement of Reasons – Clean Superseded 21st August 2019 4.1 (6) Statement of Reasons – Tracked Superseded 21st August 2019 4.1 (7) Statement of Reasons – Clean Superseded 20th September 2019 4.1 (7) Statement of Reasons – Tracked Superseded 20th September 2019 4.1 (8) Statement of Reasons – Clean Latest 1st October 2019 4.1 (8) Statement of Reasons – Tracked Latest 1st October 2019

4.2 Funding Statement Latest 1st November 2018 4.3 Book of Reference Superseded 1st November 2018

4.3 (1) Book of Reference - Clean Superseded 18th December 2018 4.3 (1) Book of Reference - Tracked Superseded 18th December 2018 4.3 (2) Book of Reference - Clean Superseded 15th February 2019 4.3 (2) Book of Reference - Tracked Superseded 15th February 2019 4.3 (3) Book of Reference - Clean Superseded 17th May 2019 4.3 (3) Book of Reference - Tracked Superseded 17th May 2019 4.3 (4) Book of Reference Superseded 31st May 2019 4.3 (5) Book of Reference – Clean Superseded 12th July 2019 4.3 (5) Book of Reference – Tracked Superseded 12th July 2019 4.3 (6) Book of Reference – Clean Superseded 9th August 2019 4.3 (6) Book of Reference – Tracked Superseded 9th August 2019 4.3 (7) Book of Reference Superseded 21st August 2019 4.3 (8) Book of Reference – Clean Superseded 20th September 2019 4.3 (8) Book of Reference – Tracked Superseded 20th September 2019 4.3 (9) Book of Reference Latest 1st October 2019

Volume 5 - Consultation Report and related documents 5.1 Consultation Report and Appendices A-E Latest 1st November 2018 5.1 Consultation Report Appendix F Latest 1st November 2018 5.1 Consultation Report Appendices G-N Latest 1st November 2018 5.1 Consultation Report Appendices O-T Latest 1st November 2018 5.2 Flood Risk Assessment Part 1 Superseded 1st November 2018 5.2 Flood Risk Assessment Part 2 Superseded 1st November 2018

5.2 (1) Flood Risk Assessment Part 1 - Clean Latest 17th May 2019 5.2 (1) Flood Risk Assessment Part 2 - Tracked Latest 17th May 2019

5.3 Statement in Respect to Statutory Nuisance Latest 1st November 2018 5.4 Habitats Regulations Assessment Report Superseded 1st November 2018

5.4 (1) Habitats Regulations Assessment Report – Clean Superseded 18th December 2018 5.4 (1) Habitats Regulations Assessment Report – Tracked Superseded 18th December 2018 5.4 (2) Habitats Regulations Assessment Report – Clean Latest 17th May 2019

Page 10: TR010035 APP 1.4 - Application Document Tracker · 2019-10-08 · 2.3 Wo rks Plans Su perse ded 1 st November 2018 2.3 (1) Works Plans - Clean Superseded 17 th May 2019 2.3 (1) Wor

A585 Windy Harbour to Skippool Improvement Scheme Application Document Tracker

Page 4 Planning Inspectorate Scheme Ref: TR010035 Application Document Ref: TR010035/APP/1.4 – Rev 8

Master Document List – Submissions Made to the Planning Inspectorate Document Reference Document Title Version Submission /

Published Date 5.4 (2) Habitats Regulations Assessment Report – Tracked Latest 17th May 2019

5.5 Consents and Agreements Position Statement Superseded 1st November 2018 5.5 (1) Consents and Agreements Position Statement – Clean Latest 17th May 2019 5.5 (1) Consents and Agreements Position Statement - Tracked Latest 17th May 2019

5.6 Water Framework Directive Assessment Latest 1st November 2018 Volume 6 – Environmental Statement and related documents

6.1 Environmental Statement Chapter 1 Introduction Latest 1st November 2018

6.1.1 Environmental Statement Chapter 1 Introduction Appendix 1.1 – Competent Expert Evidence Latest 1st November 2018

6.2 Environmental Statement Chapter 2 Description of the Scheme Latest 1st November 2018

6.2.1 Environmental Statement Chapter 2 Description of the Scheme Appendix 2.1 – Construction Information Latest 1st November 2018

6.3 Environmental Statement Chapter 3 Consultation Latest 1st November 2018 6.4 Environmental Statement Chapter 4 Alternatives Assessment Latest 1st November 2018

6.5 Environmental Statement Chapter 5 Approach to the Environmental Impact Assessment Latest 1st November 2018

6.5.1 Environmental Statement Chapter 5 Approach to the Environmental Impact Assessment Appendix 5.1 – The Inspectorate's Scoping Opinion and Response

Latest 1st November 2018

6.5.2 Environmental Statement Chapter 5 Approach to the Environmental Impact Assessment Appendix 5.2 – Section 42 Comments and Responses

Latest 1st November 2018

6.5.3 Environmental Statement Chapter 5 Approach to the Environmental Impact Assessment Appendix 5.3 – Transboundary Screening

Latest 1st November 2018

6.6 Environmental Statement Chapter 6 Air Quality Latest 1st November 2018

6.6.1 Environmental Statement Chapter 6 Air Quality Appendix 6.1 – Air Quality Model Verification Latest 1st November 2018

6.6.2 Environmental Statement Chapter 6 Air Quality Appendix 6.2 – Air Quality Model Parameters Latest 1st November 2018

6.6.3 Environmental Statement Chapter 6 Air Quality Appendix 6.3 – Air Quality Monitoring Data Latest 1st November 2018

6.7 Environmental Statement Chapter 7 Cultural Heritage Superseded 1st November 2018 6.7 (1) Environmental Statement Chapter 7 Cultural Heritage – Clean Latest 17th May 2019 6.7 (1) Environmental Statement Chapter 7 Cultural Heritage – Tracked Latest 17th May 2019

6.7.1 Environmental Statement Chapter 7 Cultural Heritage Appendix 7.1 – Desk-Based Assessment Superseded 1st November 2018

6.7.1 (1) Environmental Statement Chapter 7 Cultural Heritage Appendix 7.1 – Desk-Based Assessment - Clean Latest 17th May 2019

6.7.1 (1) Environmental Statement Chapter 7 Cultural Heritage Appendix 7.1 – Desk-Based Assessment - Tracked Latest 17th May 2019

6.7.2 Environmental Statement Chapter 7 Cultural Heritage Appendix 7.2 – Archaeological Geophysical Survey Latest 1st November 2018

6.7.3 Environmental Statement Chapter 7 Cultural Heritage Appendix 7.3 – Geoarchaeological Assessment Latest 1st November 2018

6.8 Environmental Statement Chapter 8 Biodiversity Latest 1st November 2018

6.8.1 Environmental Statement Chapter 8 Biodiversity Appendix 8.1 – Extended Phase 1 Habitat Technical Appendix Latest 1st November 2018

6.8.2 Environmental Statement Chapter 8 Biodiversity Appendix 8.2 – Great Crested Newt Technical Appendix Latest 1st November 2018

6.8.3 Environmental Statement Chapter 8 Biodiversity Appendix 8.3 – Reptile Technical Appendix Latest 1st November 2018

6.8.4 Environmental Statement Chapter 8 Biodiversity Appendix 8.4 – Bird Technical Appendix Latest 1st November 2018

6.8.5 Environmental Statement Chapter 8 Biodiversity Appendix 8.5 – Bat Technical Appendix Latest 1st November 2018

6.8.6 Environmental Statement Chapter 8 Biodiversity Appendix 8.6 – Confidential Badger Technical Appendix Latest 1st November 2018

6.8.7 Environmental Statement Chapter 8 Biodiversity Appendix 8.7 – Otter Technical Appendix Latest 1st November 2018

Page 11: TR010035 APP 1.4 - Application Document Tracker · 2019-10-08 · 2.3 Wo rks Plans Su perse ded 1 st November 2018 2.3 (1) Works Plans - Clean Superseded 17 th May 2019 2.3 (1) Wor

A585 Windy Harbour to Skippool Improvement Scheme Application Document Tracker

Page 5 Planning Inspectorate Scheme Ref: TR010035 Application Document Ref: TR010035/APP/1.4 – Rev 8

Master Document List – Submissions Made to the Planning Inspectorate Document Reference Document Title Version Submission /

Published Date 6.8.8 Environmental Statement Chapter 8 Biodiversity

Appendix 8.8 – Water Vole Technical Appendix Latest 1st November 2018

6.8.9 Environmental Statement Chapter 8 Biodiversity Appendix 8.9 – Biodiversity Metric Calculations Latest 1st November 2018

6.9 Environmental Statement Chapter 9 Landscape Latest 1st November 2018

6.9.1 Environmental Statement Chapter 9 Landscape Appendix 9.1 – National Character Area 32 Latest 1st November 2018

6.9.2 Environmental Statement Chapter 9 Landscape Appendix 9.2 – Extracts from “A Landscape Strategy for Lancashire” Latest 1st November 2018

6.9.3 Environmental Statement Chapter 9 Landscape Appendix 9.3 – Visual Effects Schedule Latest 1st November 2018

6.10 Environmental Statement Chapter 10 People and Communities Latest 1st November 2018

6.10.1 Environmental Statement Chapter 10 People and Communities Appendix 10.1 – Baseline NMU Surveys Latest 1st November 2018

6.10.2 Environmental Statement Chapter 10 People and Communities Appendix 10.2 – Driver Stress Calculations Latest 1st November 2018

6.11 Environmental Statement Chapter 11 Noise and Vibration Latest 1st November 2018

6.11.1 Environmental Statement Chapter 11 Noise and Vibration Appendix 11.1 – Noise Survey Data Latest 1st November 2018

6.11.2 Environmental Statement Chapter 11 Noise and Vibration Appendix 11.2 – Construction Noise Assessment Latest 1st November 2018

6.11.3 Environmental Statement Chapter 11 Noise and Vibration Appendix 11.3 – Noise Insulation Regulations Assessment Latest 1st November 2018

6.12 Environmental Statement Chapter 12 Road Drainage and the Water Environment Latest 1st November 2018

6.13 Environmental Statement Chapter 13 Geology and Contaminated Land Latest 1st November 2018

6.14 Environmental Statement Chapter 14 Materials Latest 1st November 2018 6.15 Environmental Statement Chapter 15 Climate Latest 1st November 2018 6.16 Environmental Statement Chapter 16 Cumulative Effects Latest 1st November 2018

6.16.1 Environmental Statement Chapter 16 Cumulative Effects Appendix 16.1 – Other Development Longlist Latest 1st November 2018

6.17 Environmental Statement Chapter 17 Summary Latest 1st November 2018 6.18 Environmental Statement Chapter 18 Non-Technical Summary Superseded 1st November 2018

6.18 (1) Environmental Statement Chapter 18 Non-Technical Summary – Clean Latest 18th December 2018

6.18 (1) Environmental Statement Chapter 18 Non-Technical Summary – Tracked Latest 18th December 2018

6.19 Environmental Statement Chapter 19 Environmental Masterplan Superseded 1st November 2018 6.19 (1) Environmental Statement Chapter 19 Environmental Masterplan Superseded 17th May 2019 6.19 (2) Environmental Statement Chapter 19 Environmental Masterplan Latest 12th July 2019 6.19 (3) Environmental Statement Chapter 19 Environmental Masterplan Latest 21st August 2019

6.20 Environmental Statement Chapter 20 The Planning Inspectorate's Scoping Opinion Latest 1st November 2018

Volume 7 – Other documents 7.1 Planning Statement and National Policy Statement Accordance Latest 1st November 2018 7.2 Outline Construction Environmental Management Plan Superseded 1st November 2018

7.2 (1) Outline Construction Environmental Management Plan - Clean Superseded 17th May 2019 7.2 (1) Outline Construction Environmental Management Plan - Tracked Superseded 17th May 2019 7.2 (2) Outline Construction Environmental Management Plan – Clean Superseded 12th July 2019 7.2 (2) Outline Construction Environmental Management Plan - Tracked Superseded 12th July 2019 7.2 (3) Outline Construction Environmental Management Plan – Clean Superseded 21st August 2019 7.2 (3) Outline Construction Environmental Management Plan - Tracked Superseded 21st August 2019 7.2 (4) Outline Construction Environmental Management Plan – Clean Latest 20th September 2019 7.2 (4) Outline Construction Environmental Management Plan - Tracked Latest 20th September 2019

7.3 Record of Environmental Actions and Commitments Superseded 1st November 2018 7.3 (1) Record of Environmental Actions and Commitments - Clean Superseded 17th May 2019 7.3 (1) Record of Environmental Actions and Commitments - Tracked Superseded 17th May 2019 7.3 (2) Record of Environmental Actions and Commitments – Clean Superseded 12th July 2019

Page 12: TR010035 APP 1.4 - Application Document Tracker · 2019-10-08 · 2.3 Wo rks Plans Su perse ded 1 st November 2018 2.3 (1) Works Plans - Clean Superseded 17 th May 2019 2.3 (1) Wor

A585 Windy Harbour to Skippool Improvement Scheme Application Document Tracker

Page 6 Planning Inspectorate Scheme Ref: TR010035 Application Document Ref: TR010035/APP/1.4 – Rev 8

Master Document List – Submissions Made to the Planning Inspectorate Document Reference Document Title Version Submission /

Published Date 7.3 (2) Record of Environmental Actions and Commitments – Tracked Superseded 12th July 2019 7.3 (3) Record of Environmental Actions and Commitments – Clean Superseded 9th August 2019 7.3 (3) Record of Environmental Actions and Commitments – Tracked Superseded 9th August 2019 7.3 (4) Record of Environmental Actions and Commitments – Clean Superseded 21st August 2019 7.3 (4) Record of Environmental Actions and Commitments – Tracked Superseded 21st August 2019 7.3 (5) Record of Environmental Actions and Commitments – Clean Latest 20th September 2019 7.3 (5) Record of Environmental Actions and Commitments – Tracked Latest 20th September 2019

7.4 Transport Assessment Latest 1st November 2018 7.5 Traffic Management Plan Latest 1st November 2018 7.6 Ground Investigation Report Latest 1st November 2018 7.7 Progress with Statements of Common Ground Superseded 1st November 2018

7.7(1) Progress with Statements of Common Ground Superseded 26th April 2019 7.7 (2) Progress with Statements of Common Ground – Clean Superseded 17th May 2019 7.7 (2) Progress with Statements of Common Ground – Tracked Superseded 17th May 2019 7.7 (3) Progress with Statements of Common Ground – Clean Superseded 31st May 2019 7.7 (3) Progress with Statements of Common Ground – Tracked Superseded 31st May 2019 7.7 (4) Progress with Statements of Common Ground – Clean Superseded 12th July 2019 7.7 (4) Progress with Statements of Common Ground – Tracked Superseded 12th July 2019 7.7 (5) Progress with Statements of Common Ground – Clean Superseded 9th August 2019 7.7 (5) Progress with Statements of Common Ground – Tracked Superseded 9th August 2019 7.7 (6) Progress with Statements of Common Ground – Clean Superseded 21st August 2019 7.7 (6) Progress with Statements of Common Ground – Tracked Superseded 21st August 2019 7.7 (7) Progress with Statements of Common Ground – Clean Superseded 20th September 2019 7.7 (7) Progress with Statements of Common Ground – Tracked Superseded 20th September 2019 7.7 (8) Progress with Statements of Common Ground – Clean Superseded 1st October 2019 7.7 (8) Progress with Statements of Common Ground – Tracked Superseded 1st October 2019 7.7 (9) Progress with Statements of Common Ground – Clean Latest 7th October 2019 7.7 (9) Progress with Statements of Common Ground – Tracked Latest 7th October 2019

7.8 Applicant’s Draft Itinerary for Accompanied Site Inspection Latest 26th April 2019 7.9 Comments on Relevant Representations Latest 26th April 2019

7.10 Responses to the Examining Authority’s Written Questions Latest 17th May 2019 7.11 Environmental Statement Changes and Corrections Document Superseded 17th May 2019

7.11 (1) Environmental Statement Changes and Corrections Document – Clean Superseded 12th July 2019

7.11 (1) Environmental Statement Changes and Corrections Document – Tracked Superseded 12th July 2019

7.11 (2) Environmental Statement Changes and Corrections Document – Clean Latest 21st August 2019

7.11 (2) Environmental Statement Changes and Corrections Document – Tracked Latest 21st August 2019

7.12 Combined Modelling and Appraisal Report Latest 26th April 2019 7.13 ExQ1.1.8 Schedule of CA and TP Objections Superseded 17th May 2019

7.13 (1) ExQ1.1.8 Schedule of CA and TP Objections Superseded 31st May 2019 7.13 (2) ExQ1.1.8 Schedule of CA and TP Objections – Clean Superseded 12th July 2019 7.13 (2) ExQ1.1.8 Schedule of CA and TP Objections – Tracked Superseded 12th July 2019 7.13 (3) ExQ1.1.8 Schedule of CA and TP Objections – Clean Superseded 9th August 2019 7.13 (3) ExQ1.1.8 Schedule of CA and TP Objections – Tracked Superseded 9th August 2019 7.13 (4) ExQ1.1.8 Schedule of CA and TP Objections Superseded 21st August 2019 7.13 (5) ExQ1.1.8 Schedule of CA and TP Objections – Clean Superseded 20th September 2019 7.13 (5) ExQ1.1.8 Schedule of CA and TP Objections – Tracked Superseded 20th September 2019 7.13 (6) ExQ1.1.8 Schedule of CA and TP Objections – Clean Latest 1st October 2019 7.13 (6) ExQ1.1.8 Schedule of CA and TP Objections – Tracked Latest 1st October 2019

7.14 ExQ1.1.9 PA2008 s127 Statutory Undertakers Land / Rights Superseded 17th May 2019 7.14 (1) ExQ1.1.9 PA2008 s127 Statutory Undertakers Land / Rights Superseded 31st May 2019 7.14 (2) ExQ1.1.9 PA2008 s127 Statutory Undertakers Land / Rights Superseded 12th July 2019 7.14 (3) ExQ1.1.9 PA2008 s127 Statutory Undertakers Land / Rights Superseded 9th August 2019 7.14 (4) ExQ1.1.9 PA2008 s127 Statutory Undertakers Land / Rights Superseded 21st August 2019 7.14 (5) ExQ1.1.9 PA2008 s127 Statutory Undertakers Land / Rights - Clean Superseded 20th September 2019

7.14 (5) ExQ1.1.9 PA2008 s127 Statutory Undertakers Land / Rights - Tracked Superseded 20th September 2019

Page 13: TR010035 APP 1.4 - Application Document Tracker · 2019-10-08 · 2.3 Wo rks Plans Su perse ded 1 st November 2018 2.3 (1) Works Plans - Clean Superseded 17 th May 2019 2.3 (1) Wor

A585 Windy Harbour to Skippool Improvement Scheme Application Document Tracker

Page 7 Planning Inspectorate Scheme Ref: TR010035 Application Document Ref: TR010035/APP/1.4 – Rev 8

Master Document List – Submissions Made to the Planning Inspectorate Document Reference Document Title Version Submission /

Published Date 7.14 (6) ExQ1.1.9 PA2008 s127 Statutory Undertakers Land / Rights –

Clean Latest 1st October 2019

7.14 (6) ExQ1.1.9 PA2008 s127 Statutory Undertakers Land / Rights - Tracked Latest 1st October 2019

7.15 ExQ1.1.10 PA2008 s138 Statutory Undertakers Apparatus Etc Superseded 17th May 2019 7.15 (1) ExQ1.1.10 PA2008 s138 Statutory Undertakers Apparatus Etc Superseded 31st May 2019 7.15 (2) ExQ1.1.10 PA2008 s138 Statutory Undertakers Apparatus Etc Superseded 12th July 2019 7.15 (3) ExQ1.1.10 PA2008 s138 Statutory Undertakers Apparatus Etc Superseded 9th August 2019 7.15 (4) ExQ1.1.10 PA2008 s138 Statutory Undertakers Apparatus Etc Superseded 21st August 2019 7.15 (5) ExQ1.1.10 PA2008 s138 Statutory Undertakers Apparatus Etc Superseded 20th September 2019

7.15 (6) ExQ1.1.10 PA2008 s138 Statutory Undertakers Apparatus Etc – Clean Latest 1st October 2019

7.15 (6) ExQ1.1.10 PA2008 s138 Statutory Undertakers Apparatus Etc - Tracked Latest 1st October 2019

7.16 Comments on Further Representations Received at Deadline 1 Latest 17th May 2019 7.17 ExQ1.1.7 Crown Land and Consent Superseded 17th May 2019

7.17 (1) ExQ1.1.7 Crown Land and Consent Superseded 31st May 2019 7.17 (2) ExQ1.1.7 Crown Land and Consent – Clean Superseded 12th July 2019 7.17 (2) ExQ1.1.7 Crown Land and Consent – Tracked Superseded 12th July 2019 7.17 (3) ExQ1.1.7 Crown Land and Consent Superseded 9th August 2019 7.17 (4) ExQ1.1.7 Crown Land and Consent Superseded 21st August 2019 7.17 (5) ExQ1.1.7 Crown Land and Consent Superseded 20th September 2019 7.17 (6) ExQ1.1.7 Crown Land and Consent Latest 1st October 2019

7.18 Comments on Written Representations Latest 31st May 2019 7.19 Comments on Local Impact Reports Latest 31st May 2019 7.20 Comments on responses to the ExA’s Written Questions Latest 31st May 2019 7.21 Comments on Written Representations Received at Deadline 3 Latest 12th July 2019 7.22 Responses to ExA’s Further Written Questions Latest 9th August 2019 7.23 Responses to Representations Received at Deadline 4 Latest 9th August 2019 7.24 Responses to Oral Representations Latest 9th August 2019 7.25 Responses to Representations Received at Deadline 5 Latest 21st August 2019

7.26 Responses to the ExA’s Additional Written Questions and requests for information – ExQ3 Latest 02nd September 2019

7.27 Responses to Comments on the Applicant’s Revised Draft DCO Latest 20th September 2019 7.28 Responses to Representations Received at Deadline 6 & 6a Latest 20th September 2019

7.29 Comments on the Report on the Implications for European Sites (RIES) Latest 20th September 2019

7.30 Draft Archaeological Mitigation Strategy Superseded 20th September 2019 7.30 (1) Draft Archaeological Mitigation Strategy - Clean Latest 7th October 2019 7.30 (1) Draft Archaeological Mitigation Strategy - Tracked Latest 7th October 2019

7.31 Responses to the ExA’s proposed schedule of changes to the dDCO Latest 20th September 2019

7.32 Responses to Representation Received at Deadline 7 Latest 1st October 2019

7.33 Submission in respect of Part 3 of Schedule 10 to the Development Consent Order Latest 1st October 2019

7.34 Responses to the ExA’s Request for Further Information Latest 7th October 2019 7.35 Responses to Representations Received at Deadline 8 Latest 7th October 2019

Volume 8 – Statements of Common Ground (SoCG) 8.1 Draft SoCG with Natural England Superseded 17th May 2019

8.1 (1) SoCG with Natural England Withdrawn 12th July 2019 8.1 (2) SoCG with Natural England Latest 1st October 2019

8.2 Draft SoCG with Lancashire County Council Superseded 17th May 2019 8.2 (1) SoCG with Lancashire County Council Latest 1st October 2019

8.3 Draft SoCG with Environment Agency Superseded 17th May 2019 8.3 (1) SoCG with Environment Agency Latest 12th July 2019

8.4 Draft SoCG with Wyre Borough Council Superseded 17th May 2019 8.4 (1) SoCG with Wyre Borough Council Latest 12th July 2019

8.5 Draft SoCG with Fylde Borough Council Superseded 17th May 2019

8.5 (1) SoCG with Fylde Borough Council Latest 20th September 2019

Page 14: TR010035 APP 1.4 - Application Document Tracker · 2019-10-08 · 2.3 Wo rks Plans Su perse ded 1 st November 2018 2.3 (1) Works Plans - Clean Superseded 17 th May 2019 2.3 (1) Wor

A585 Windy Harbour to Skippool Improvement Scheme Application Document Tracker

Page 8 Planning Inspectorate Scheme Ref: TR010035 Application Document Ref: TR010035/APP/1.4 – Rev 8

Master Document List – Submissions Made to the Planning Inspectorate Document Reference Document Title Version Submission /

Published Date 8.6 SoCG Historic England Latest 26th April 2019

8.10 Draft SoCG with United Utilities Latest 17th May 2019 8.11 SoCG Electricity North West Latest 26th April 2019 8.12 Draft SoCG with Cadent Latest 17th May 2019 8.13 SoCG British Telecom (Openreach) Latest 26th April 2019 8.15 SoCG with GTC Latest 26th April 2019 8.16 Draft SoCG with MMO Superseded 17th May 2019

8.16 (1) SoCG with MMO Latest 7th October 2019

Page 15: TR010035 APP 1.4 - Application Document Tracker · 2019-10-08 · 2.3 Wo rks Plans Su perse ded 1 st November 2018 2.3 (1) Works Plans - Clean Superseded 17 th May 2019 2.3 (1) Wor

A585 Windy Harbour to Skippool Improvement Scheme Application Document Tracker

Page 9 Planning Inspectorate Scheme Ref: TR010035 Application Document Ref: TR010035/APP/1.4 – Rev 8

Page left intentionally blank