28 APRIL 2014 TRAFIK OG BYUDVIKLING I KONGENS LYNGBY 1 Traffic and urban development in Kongens Lyngby Henrik Brade Johansen, seniorconsultant and city councillor

Upload: others

Post on 25-Mar-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Traffic and urban development in Kongens Lyngby · ›The light rail has challenges getting through Lyngby - narrow streets; a viaduct outside space and transfer to trains and buses

28 APRIL 2014

TRAFIK OG BYUDVIKLING I KONGENS LYNGBY 1

Traffic and urban development in Kongens Lyngby

Henrik Brade Johansen, seniorconsultant and city councillor

Page 2: Traffic and urban development in Kongens Lyngby · ›The light rail has challenges getting through Lyngby - narrow streets; a viaduct outside space and transfer to trains and buses

28 APRIL 2014

TRAFIK OG BYUDVIKLING I KONGENS LYNGBY 2

- New lightrail around København - Urban vision and construction in Lyngby - Recreation of old canal to lead away stormwater - Traffic in Lyngby

Henrik Brade Johansen, 28.04.2014

Page 3: Traffic and urban development in Kongens Lyngby · ›The light rail has challenges getting through Lyngby - narrow streets; a viaduct outside space and transfer to trains and buses

Vision of a ringrail around Øresund

28 APRIL 2014

TRAFIK OG BYUDVIKLING I KONGENS LYNGBY 3

Page 4: Traffic and urban development in Kongens Lyngby · ›The light rail has challenges getting through Lyngby - narrow streets; a viaduct outside space and transfer to trains and buses

› Today, trains run several times an hour from Helsingor to Helsingborg via Copenhagen, Kastrup and Malmo

› On the Danish side, the train follows the coast and does not service commercial and residential areas west and south of Copenhagen

› Copenhagen regional development has since the 1940s been guided by "Finger Plan" with development along five axes from central Copenhagen. Commutertrains follow the fingers

› Today, much of the transport goes across the region, currently by bus

› Hence, a new lightrail west of Copenhagen which later can link up to a circle line around the Sound called "Loop City"

› So we just need a fixed link between Elsinore and Helsingborg!

Vision of a lightrail around Øresund

28 APRIL 2014

TRAFIK OG BYUDVIKLING I KONGENS LYNGBY 4

Page 5: Traffic and urban development in Kongens Lyngby · ›The light rail has challenges getting through Lyngby - narrow streets; a viaduct outside space and transfer to trains and buses

Route for lightrail

28 APRIL 2014

TRAFIK OG BYUDVIKLING I KONGENS LYNGBY 5

Page 6: Traffic and urban development in Kongens Lyngby · ›The light rail has challenges getting through Lyngby - narrow streets; a viaduct outside space and transfer to trains and buses

…servicing hundreds of major entreprises

28 APRIL 2014

TRAFIK OG BYUDVIKLING I KONGENS LYNGBY 6

Page 7: Traffic and urban development in Kongens Lyngby · ›The light rail has challenges getting through Lyngby - narrow streets; a viaduct outside space and transfer to trains and buses

and crossing 5 S-train-lines

28 APRIL 2014

TRAFIK OG BYUDVIKLING I KONGENS LYNGBY 7

Page 8: Traffic and urban development in Kongens Lyngby · ›The light rail has challenges getting through Lyngby - narrow streets; a viaduct outside space and transfer to trains and buses

› Kongens Lyngby is the largest commercial center in the Copenhagen region outside Copenhagen City

› With Lyngby Stor Center, Magasin and a vibrant Main street, Lyngby combines the advantages of the city mall and smaller shops in a busy, cosy city street

› The light rail will pass straight through Lyngby on the way to Denmarks Technical University - DTU, with 9,000 students and 5,000 employees

› At the same time there is pressure on traffic, especially during weekends

› Traffic through the main street is deliberately mixed so that cars are forced to respect cyclists and pedestrians.

› The light rail has challenges getting through Lyngby - narrow streets; a viaduct outside space and transfer to trains and buses v. Lyngby station

Plan og traffic in Kongens Lyngby

28 APRIL 2014

TRAFIK OG BYUDVIKLING I KONGENS LYNGBY 8

Page 9: Traffic and urban development in Kongens Lyngby · ›The light rail has challenges getting through Lyngby - narrow streets; a viaduct outside space and transfer to trains and buses

Lightrail – route through Lyngby

28 APRIL 2014

TRAFIK OG BYUDVIKLING I KONGENS LYNGBY 9

Page 10: Traffic and urban development in Kongens Lyngby · ›The light rail has challenges getting through Lyngby - narrow streets; a viaduct outside space and transfer to trains and buses

Lightrail – alternative route through DTU

28 APRIL 2014

TRAFIK OG BYUDVIKLING I KONGENS LYNGBY 10

Page 11: Traffic and urban development in Kongens Lyngby · ›The light rail has challenges getting through Lyngby - narrow streets; a viaduct outside space and transfer to trains and buses

› DTU's expansion plans; Light rail plans and Lyngby's proximity to Copenhagen and green surrounding scenery make the city very attractive as headquarters for major, mainly technical companies

› The municipality conducts a hearing on the future use of the last remaining agricultural area which lies between DTU and Dyrehaven

› Presently, Microsoft is constructing its new headquarters on Kanalvej just behind Lyngby Stor Center just as Mærsk drilling is constructing a new HQ in central Lyngby

› Later, the addition of several hundred student residence on Kanalvej and more than a thousand new about DTU and the center also

Urban vision and development

28 APRIL 2014

TRAFIK OG BYUDVIKLING I KONGENS LYNGBY 11

Page 12: Traffic and urban development in Kongens Lyngby · ›The light rail has challenges getting through Lyngby - narrow streets; a viaduct outside space and transfer to trains and buses

Urban vision – DTU og Dyrehavegård

28 APRIL 2014

TRAFIK OG BYUDVIKLING I KONGENS LYNGBY 12

Page 13: Traffic and urban development in Kongens Lyngby · ›The light rail has challenges getting through Lyngby - narrow streets; a viaduct outside space and transfer to trains and buses

› In 1880-1890 extensive fortifications were built around Copenhagen with the aim to deter an enemy from attacking the capital of a country greatly reduced after the loss of Schleswig-Holstein in 1864.

› The facility included a large rampart and a moat on the west and a number of forts on land and in Øresund and the possibility of flooding large areas to keep the enemy at bay.

› At this northern end, canals were dug to carry water from the extensive Furesø to enable flooding of large areas from east of Lyngby to the sea

› The dredged channel - Fæstningskanalen - ran through Lyngby and was filled up by the city's development in the 1930s - but the actual position got protected and is undeveloped today.

› As part of the derivation of the increased rainfall is envisaged to re- dig the canal while creating a beautiful river through the city.

› This will cost 300 M DKK – half of a traditional extension of sewers and waterbassins.

Recreation of old canal as stormwater reservoir

28 APRIL 2014

TRAFIK OG BYUDVIKLING I KONGENS LYNGBY 13

Page 14: Traffic and urban development in Kongens Lyngby · ›The light rail has challenges getting through Lyngby - narrow streets; a viaduct outside space and transfer to trains and buses

Københavns fortification 1890

28 APRIL 2014

TRAFIK OG BYUDVIKLING I KONGENS LYNGBY 14

Page 16: Traffic and urban development in Kongens Lyngby · ›The light rail has challenges getting through Lyngby - narrow streets; a viaduct outside space and transfer to trains and buses

Fæstningskanalen recreated as a stormwater reservoir

Page 17: Traffic and urban development in Kongens Lyngby · ›The light rail has challenges getting through Lyngby - narrow streets; a viaduct outside space and transfer to trains and buses

Stormwater catchment to Fæstningskanalen

28 APRIL 2014

TRAFIK OG BYUDVIKLING I KONGENS LYNGBY 17

Page 18: Traffic and urban development in Kongens Lyngby · ›The light rail has challenges getting through Lyngby - narrow streets; a viaduct outside space and transfer to trains and buses

Kanalvej construction including Fæstningskanalen

28 APRIL 2014

TRAFIK OG BYUDVIKLING I KONGENS LYNGBY 18

Page 19: Traffic and urban development in Kongens Lyngby · ›The light rail has challenges getting through Lyngby - narrow streets; a viaduct outside space and transfer to trains and buses

Overview of central Kongens Lyngby

28 APRIL 2014