train loading system
TRANSCRIPT
-
8/13/2019 Train loading system
1/2
Schenck Process Australia Pty Ltd
Ground Floor, 65 Epping Road
North Ryde NSW 2113 Australia
Tel +61 (0) 2 9886 6800
Fax +61 (0) 2 9878 4400
www.schenckprocess.com.au
Subheadline
Subheadline
bySchenckProcessAustralia,2011
weighing
feeding
screening
automation
Schenck Process is the global market leader of solutions in measuring and process technologies in industrial weighing, feeding,
screening and automation.
Schenck Process develops, manufactures and markets a full range of solutions, products and turnkey systems on the basis of
combining process engineering expertise, reliable components and field-proven technology.
BV-P8001GB1132
B
Schenck Process has been
involved in 80% of train
load outs constructed inAustralia for the past 14
years. This gives Schenck
an extensive knowledge and
development base.
Stockpile Volumetric Silo Volumetric Silo Gravemetric
Proven technology in coal and iron ore
Loading rates up to 20,000 tph
Single, double or triple chute systems
Silos can be selected in standard range or custom
designed to suit your application
Train manifests can be fully integrated
for wagon identification
Full automatic remote operation possible
Tare and gross wagon weights to 0.5%
accuracy with our MULTIRAILsystem
Train loading system design
2011.0
8.1
2Allinformationisgivenwithoutobligation.
Allspecificationsaresubjecttochange.
-
8/13/2019 Train loading system
2/2
Features
Multirail In motion rail weighing
for Tare and Gross wagon loads
measured to 0.5%
Helps to eliminate wagon over/
under loading
Increased payload by average per car
Automation
Intergration into site ERP system
Intergration for full system
remote operation
Control system features
Schenck Process is the OEM for
all train load out technology
Increased payload by average
per car
Design and project management
Full inhouse design and R&D team
develop projects to suit to all applications
Project management from tender
to delivery
Our experience
We have supplied 57 train loaders worldwide
Over 30 years experience in train loaders
Supplied TLO systems to the major miners
throughout the world
Supplier of more than 90% of the iron ore TLO
systems around Australia since 1993
Using our vast weighing experience and expertise, and by
incorporating Schenck weighing components
our train loaders provide accurate high speed loading
of rail wagons.
We have been involved in up to 80% of all train load outs
for the past 14 years. This gives Schenck an extensive
knowledge and development base.