Industry Automation and Drive Technologies - SCE T I A Ausbildungsunterlage Seite 1 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10 Training Document for Integrated Automation Solutions Totally Integrated Automation (TIA) MODULE M1 ‘Startup’ Programming of the SIMATIC S7-1200 with TIA Portal V10

Upload: others

Post on 03-Feb-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 1 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

Training Document for Integrated Automation

Solutions

Totally Integrated Automation (TIA)

MODULE M1

‘Startup’ Programming of the

SIMATIC S7-1200 with TIA Portal V10

Page 2: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 2 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

This document was prepared by the Siemens AG for training purposes for the project: Siemens Automation Cooperates with Education (SCE). Siemens AG does not guarantee the contents. Passing on this document or copying it and using and communicating its content within public training and continued education establishments is permitted. Exceptions require a written authorization by Siemens AG. (Michael Knust [email protected]). Offenders will be held liable. All rights including translation are reserved, particularly if a patent is granted, or a utility model or design is registered. We wish to thank the Michael Dziallas Engineering corporation and the instructors of vocational/professional schools as well as all other persons for their support during the preparation of this document.

Page 3: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 3 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

PAGE

1. Preface .......................................................................................................................................................5

2. Notes on Programming the SIMATIC S7-1200 ..........................................................................................7

2.1 Automation System SIMATIC S7-1200 ......................................................................................................7

2.2 Programming Software STEP 7 Basic V10.5 (TIA Portal V10.5) ...............................................................7

3. Installing the Software STEP 7 Basic V10.5 (TIA Portal V10.5) .................................................................8

4. Connecting to the CPU by means of TCP/IP, and Resetting to Factory Setting ........................................9

5. What is a PLC and What are PLCs Used For? .......................................................................................15

5.1 What does the term PLC mean? ..............................................................................................................15

5.2 How does the PLC Control the Process? .................................................................................................15

5.3 How does the PLC Get the Information about the Process States?.........................................................16

5.4 What is the Difference between Break Contact Elements and Make Contact Elements? .......................16

5.5 How does the SIMATIC S7-1200 Address Individual Input/Output Signals?............................................17

5.6 How is the Program Processed in the PLC? ............................................................................................18

5.7 What do Logic Operations Look Like in the PLC Program?.....................................................................19

5.7.1 AND Operation.................................................................................................................................19

5.7.2 OR Operation...................................................................................................................................21

5.7.3 Negation...........................................................................................................................................22

5.8 How is the PLC Program generated? How does it get to the PLC’s Memory?.........................................23

6. Configuring and Operating the SIMATIC S7-1200 ...................................................................................24

7. Sample Task: Controlling a Press ............................................................................................................28

8. Programming the Press for the SIMATIC S7-1200 ..................................................................................29

8.1. Portal View ...........................................................................................................................................29

8.2. Project View .........................................................................................................................................30

Page 4: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 4 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

The following symbols guide you through this module:

Information

Installation

Programming

Sample Task

Notes

Page 5: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 5 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

1. Preface

Regarding its content, module M01 is part of the training unit 'SIMATIC S7-1200 and TIA Portal’ and

represents a fast entry point for SIMATIC S7 1200 programming.

Training Objective:

In this module M01, the reader learns how to program the programmable logic controller (PLC)

SIMATIC S7-1200, using the programming tool TIA Portal. This module provides the fundamentals

and demonstrates with the steps listed below how this is done, using a detailed example.

• Installing the software and setting the programming interface

• Explanation: What is a PLC and how does it work

• Structure and operation of the SIMATIC S7-1200 PLC

• Generating, loading and testing a sample program

Preconditions:

To successfully work through this module M01, the following knowledge is assumed:

• How to operate Windows

Fundamentals of STEP 7 Programming 2 to 3 days Modules A

Industrial Fieldbus Systems 2 to 3 days Modules D

Additional Functions of STEP 7 Programming 2 to 3 days Modules B

Process Visualization 2 to 3 days Modules F

Programming Languages 2 to 3 days Modules C

IT Communication with SIMATIC S7 2 to 3 days Modules E

System Simulation

with SIMIT SCE

1 to 2 days Modules G

Frequency Converters at SIMATIC S7 2 to 3 days Modules H

SIMATIC S7-1200 and TIA Portal 2 to 3 days Modules M

Page 6: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 6 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

Hardware and software needed

1 PC Pentium 4, 1.7 GHz 1 (XP) – 2 (Vista) GB RAM, free disk storage approx. 2 GB;

operating system Windows XP (Home SP3, Professional SP3)/Windows Vista (Home

Premium SP1, Business SP1, Ultimate SP1

2 Software STEP7 Basic V10.5 SP1 (Totally Integrated Automation (TIA) Portal V10.5)

3 Ethernet connection between PC and CPU 1214C

4 PLC SIMATIC S7-1200; for example, CPU 1214C. The inputs have to be brought out to a panel.

1 PC

2 STEP7 Basic (TIA Portal)

4 S7-1200 with CPU 1214C

3 Ethernet connection

Page 7: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 7 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

2. Notes on Programming the SIMATIC S7-1200

2.1 Automation System SIMATIC S7-1200

The automation system SIMATIC S7-1200 is a modular mini-controller system for the lower

performance range.

An extensive module spectrum is available for optimum adaptation to the automation task.

The S7 controller consists of a CPU that is equipped with inputs and outputs for digital and analog

signals.

Additional input and output modules (IO modules) can be installed if the integrated inputs and

outputs are not sufficient for the desired application.

If needed, communication processors for RS232 or RS485 are added.

An integrated TCP/IP interface is obligatory for all CPUs.

With the S7 program, the programmable logic controller (PLC) monitors and controls a machine or a

process, whereby the IO modules are polled in the S7 program by means of the input addresses (%I)

and addressed by means of output addresses (%Q).

The system is programmed with the software STEP 7 Basic V10.5.

2.2 Programming Software STEP 7 Basic V10.5 (TIA Portal V10.5)

The software STEP 7 Basic V10.5 is the programming tool for the automation system

- SIMATIC S7-1200

With STEP 7 Basic V10.5, the following functions can be utilized to automate a plant:

- Configuring and parameterizing the hardware

- Defining the communication

- Programming

- Testing, commissioning and service with the operating/diagnostic functions

- Documentation

- Generating the visual displays for the SIMATIC basic panels

All functions are supported with detailed online help.

Page 8: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 8 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

3. Installing the Software STEP 7 Basic V10.5 (TIA Portal V10.5)

STEP 7 Basic V10.5 is supplied on a DVD.

To install STEP 7 Basic V10.5, do the following:

1. Insert the DVD of STEP 7 Basic V10.5 in the DVD drive.

2. The setup program is started automatically. If not, start it by double clicking on the file '→→→→

START.exe’.

The setup program guides you through the entire installation of STEP 7 Basic V10.5.

To utilize STEP 7 Basic V10.5, no license key or dongle is needed on your computer.

Page 9: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 9 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

4. Connecting to the CPU by means of TCP/IP, and Resetting to Factory Setting

To program the SIMATIC S7-1200 from the PC, the PG or a laptop, you need a TCP/IP connection.

For the PC and the SIMATIC S7-1200 to communicate with each other, it is important also that the IP

addresses of both devices match.

First, we show you how to set the computer’s IP address.

1. From the 'System control’, call the 'Network connections’. Then, select the 'Properties’ of

the LAN connection (→ Start → Settings → System control → Network connections→ Local

Area Connection → Properties)

2. Select the 'Properties’ from the 'Internet Protocol (TCP/IP)’ (→ Internet Protocol (TCP/IP) →

Properties)

3. You can now set the ’IP address’ and the ’Subnet screen form’, and accept with ’OK’ (→ Use

the following IP address → IP address: 192.168.0.99 → Subnet screen form 255.255.255.0 →

OK → Close)

Page 10: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 10 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

Notes on networking on the Ethernet (additional information is provided in Appendix V of the

training document):

MAC address:

The MAC address consists of a permanent and a variable part. The permanent part ("Basic MAC

Address") identifies the manufacturer (Siemens, 3COM, ...). The variable part of the MAC address

differentiates the various Ethernet stations and should be assigned uniquely world-wide. On each

module, a MAC address is imprinted specified by the factory.

Value range for the IP-address:

The IP address consists of 4 decimal numbers from the value range 0 to 255, separated by a period.

For example, 141.80.0.16

Value range for the subnet screen form:

This screen form is used to recognize whether a station or its IP address belongs to the local subnetwork, or can be accessed only by means of a router. The subnet screen form consists of four decimal numbers from the value range 0 to 255, separated

by a period. For example, 255.255.0.0

In their binary representation, the 4 decimal numbers of the subnet screen form have to contain

-from the left- a series of gapless values "1" and from the right a series of gapless values "0".

The values "1" specify the area of the IP address for the network number. The values "0" specify the

area of the IP address for the station address.

Example:

Correct values: 255.255.0.0 Decimal = 1111 1111.1111 1111.0000 0000.0000 0000 binary

255.255.128.0 Decimal = 1111 1111.1111 1111.1000 0000.0000 0000 binary

255.254.0.0 Decimal = 1111 1111.1111 1110.0000 0000.0000.0000 binary

Wrong value: 255.255.1.0 Decimal = 1111 1111.1111 1111.0000 0001.0000 0000 binary

Value range for the address of the gateway (Router):

The address consists of 4 decimal numbers from the value range 0 to 255, separated by a period. For

example, 141.80.0.1.

Relationship of IP addresses, router address, and subnet screen form:

The IP address and the gateway address are to differ only at positions where an "0" is located in the

subnet screen form.

Example:

You entered the following: for the subnet screen form 255.255.255.0, for the IP address 141.30.0.5

and for the router address 141.30.128.1.

The IP address and the gateway address must have a different value only in the 4th decimal number.

However, in the example, the 3rd position already differs.

That means, in the example you have to change alternatively:

- the subnet screen form to: 255.255.0.0 or

- the IP address to: 141.30.128.5 or

- the gateway address to: 141.30.0.1

Page 11: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 11 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

The SIMATIC S7-1200 IP address is set as follows:

4. Select the ’Totally Integrated Automation Portal’; it is called here with a double click (→

Totally Integrated Automation Portal V10)

5. Then, select the ’Project View’. (→ Project view)

Page 12: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 12 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

6. Next, in project navigation, select under ’Online accesses’ the network card that was already

set beforehand. If you click here on ’Update accessible stations’ <<Erreichbare Teilnehmer

aktualisieren>>, you will see the the MAC address of the connected SIMATIC S7-1200. Select

’Online & Diagnosis’. (→ Online accesses → … Network Connection → Update accessible

stations → MAC= ….. → Online & Diagnosis)

Note: If an IP address was set previously at the CPU, you will see this address instead of the

MAC address.

Page 13: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 13 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

7. Under ’Functions’ you will see the item ’Assign IP address’. Here, enter ’IP address’ and

’Subnet screen form’. Then, click on ’Assign IP address’, and your SIMATIC S7-1200 will be

assigned this new address (→ Functions → Assign IP address → IP address: 192.168.0.1 →

Subnet screen form: 255.255.255.0 → Assign IP address)

Page 14: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 14 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

8. Under ’Functions’, select ’Reset to factory settings’. Keep this setting on ’Retain IP address’

and click on ’Reset’. (→ Functions → Reset to factory settings → Retain IP address → Reset)

9. Confirm the query whether you want to go through with a reset to the factory setting with ’OK’

(→ OK)

Page 15: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 15 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

5. What is a PLC and What are PLCs Used For?

5.1 What does the term PLC mean?

PLC is the abbreviation for Programmable Logic Controller. It describes a device that controls a

process (for example, a printing press for printing newspapers, a filling plant for filling cement in

bags, a press for forming plastic shapes, etc....). This is performed according to the instructions of a

program that is located in the memory of the device.

.

5.2 How does the PLC Control the Process?

The PLC controls the process as follows: through the PLC connections called outputs, so-called

actuators are wired with a control voltage of 24V for example. This allows for switching motors on

and off, opening and closing valves, turning lamps on and off.

M

M

0V

24V

The outputs of the PLC control the actuators by switching the control voltage!

PLC

Machine

Program with instructions

Memory

Program is loaded in the PLC’s memory......

.... controls the machine

PLC

Outputs

Lamp is lit

Lamp is off

Page 16: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 16 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

5.3 How does the PLC Get the Information about the Process States?

The PLC receives information about the process from the so-called signal transmitters that are

wired to the inputs of the PLC. These signal transmitters can be, for example, sensors that

recognize whether a work piece is in a certain position, or they can be simple switches and

pushbuttons that may be open or closed. Here, we differentiate between break contact elements

that are closed if not operated, and make contact elements that are open if not activated.

,

5.4 What is the Difference between Break Contact Elements and Make Contact Elements?

As to the signal transmitters, we differentiate between break contacts and make contacts.

The switch shown below is a make contact; i.e., it is closed exactly when it was operated

The switch shown below is a break contact; i.e, it is closed exactly when it was not operated.

24V

24V

0V

The inputs of the PLC record the information about the states in the process

PLC

Inputs

Switch closed

Switch open

24V

Make contact not operated

Make contact open

Make contact operated

Make contact closed

Break contact not operated

Break contact closed

Break contact operated

Break contact open

Page 17: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 17 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

5.5 How does the SIMATIC S7-1200 Address Individual Input/Output Signals?

Specifying a certain input or output within the program is called addressing.

The PLC inputs and outputs are usually combined into groups of 8 on digital input modules and

digital output modules. This unit of 8 is called a byte. Each such group receives a number as the so-

called byte address.

In order to address a single input or output within a byte, each byte is broken down into bits. These

are numbered Bit 0 to Bit 7. This is how we arrive at the bit address.

The PLC shown here has the input bytes 0 and 1 as well as the output bytes 4 and 5.

To address the fifth digital input, for example, we specify the following address:

%E 0 . 4

%E here indicates the address type as input, 0 the byte address, and 4 the bit address.

Byte address and bit address are always separated by a period.

Note: For the bit address, a 4 is shown for the fifth input, because we start counting with 0.

To address the 10th output, for example, we specify the following address:

%A 1 . 1

%A here indicates the address type as output, 1 the byte address, and 1 the bit address.

Byte address and bit address are always separated by a period.

Note: For the bit address, a 1 is shown at the 10th output, because we start counting with 0..

14 integrated digital inputs Byte 0 Bit 0 to 7 and Byte 1 Bit 0 to 7

10 integrated digital outputs Byte 0 Bit 0 to 7 and Byte 1 Bit 0 to 1

Page 18: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 18 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

5.6 How is the Program Processed in the PLC?

The program is processed in the PLC cyclically, in the following sequence:

1. First, the status is transferred from the process image of the outputs (PIQ) to the outputs, and

switched on or off.

2. Then the processor -which is practically the PLC’s brain- inquires whether the individual inputs

are carrying voltage. This status of the inputs is stored in the process image of the inputs (PII).

For the inputs that carry voltage, the information 1 or "High“ is stored, for those that don’t the

information 0 or "Low“.

3. This processor then processes the program stored in the program memory. The program

consists of a list of logic operations and instructions that are processed one after the other. For

the required input information, the processor accesses the PII that was entered previously, and

the result of the logic operation (RLO) is written into a process image of the outputs (PIQ). If

necessary, the processor also accesses other memory areas during program processing; for

example, for local data of sub-programs, data blocks and flags.

4. Then, internal operating system tasks such as self tests and communication are performed

Then we continue with Item 1.

Note: The time the processor needs for this sequence is called cycle time. In turn, the cycle time

depends on the number and type of instructions and the processor capacity.

PLC’s program in the program memory 1st instruction 2nd instruction 3rd instruction 4th instruction ... Last instruction

1. Transfer the status from the PIQ to the outputs. 2. Store the status of the inputs in the PII.

3. Processing the program instruction by instruction with access to PII and PIQ

4. Perform internal operating system tasks (communication, selftest, etc…)

PII

Local data

Flags

Data blocks

PIQ

Page 19: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 19 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

5.7 What do Logic Operations Look Like in the PLC Program?

Logic operations are used to specify conditions for switching an output.

In the PLC program, these can be programmed in the programming languages Ladder Diagram

(LAD) or Function Block Diagram (FBD).

We will use FBD for illustration.

There is a large number of logic operations that can be used in PLC programs.

However, AND as well as OR operations and the NEGATION of an input are used most frequently

and are explained briefly below, using examples.

Note: Clearly arranged Information about additional logic operations can be obtained quickly in online

help.

5.7.1 AND Operation

Example of an AND operation:

A lamp is to light up when two switches are operated simultaneously as make contacts.

Diagram:

Explanation:

The lamp lights up exactly when both switches are operated.

That is, when switches S1 and S2 are operated, lamp P1 is lit.

24V

M

S1 S2

P1

Page 20: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 20 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

Wiring the PLC:

To apply this logic to a PLC program, both switches have to be connected to inputs of the PLC. Here,

S1 is wired to input I 0.0 and S2 to input I 0.1.

In addition, lamp P1 has to be connected to an output; for example Q 0.0.

AND logic in the FBD:

In the function block diagram FBD, the AND operation is programmed using a graphic representation,

and looks like this:

& =

M

24V

PLC

Inputs

Switch S1

Switch S2

I 0.0

A 0.0

Outputs Lamp P1 is to light up when switches S1 and S2 are operated.

24V

I 0.1

%Q 0.0

%I 0.1

%I 0.0

Inputs of AND operation. More than 2 inputs can be located here!

Output to which the assignment is allocated!

Graphic representation of the AND operation!

Assignment of the result of the logic operation!

Page 21: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 21 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

5.7.2 OR Operation

Example of an OR operation:

A lamp is to light up when one or both <<?>> of two switches are operated as make contacts.

Diagram:

Explanation:

The lamp lights up exactly when one or both switches are operated.

That is, if switch S1 or S2 is operated, lamp P1 is lit.

Wiring the PLC:

To apply this logic to a PLC program, both switches have to be connected to inputs at the PLC, of

course. Here, S1 is connected to input I 0.0 and S2 to input I 0.1.

In addition, lamp P1 has to be connected to an output; for example, Q 0.0.

M

24V

M

S1

S2

P1

24V

PLC

Inputs

Switch S1

Switch S2

I 0.0

Q 0.0

Outputs Lamp P1 is to be lit when switch S1 or S2 is operated.

24V

I 0.1

24V

Page 22: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 22 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

OR operation in the FBD:

In the function plan FBD, the OR operation is programmed using a graphic representation, and looks

like this:

5.7.3 Negation

In logic operations, it is often necessary to inquire whether a make contact was NOT operated or

whether a break contact was operated and thus no voltage is applied to the corresponding input.

This happens when we program a Negation at the input of the AND or OR operation.

In the function block diagram FBD, the negation of an input at an AND operation is programmed with

the following graphic representation:

That means, voltage is applied to the output %Q 0.0 exactly when %I 0.0 is not connected

and %I 0.1 is connected.

= %Q 0.0

%I 0.1

%I 0.0

Inputs of the OR operation. More than 2 inputs can be located here!

Output to which the assignment is allocated!

Graphic representation of the logic OR operation!

Assignment of the result of the logic operation!

>

& =

%Q 0.0

%I 0.1

%I 0.0

Input of the AND operation that is to be negated!

Graphic representation of the negation!

Page 23: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 23 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

5.8 How is the PLC Program generated? How does it get to the PLC’s Memory?

The PLC program is generated on a PC using the software STEP 7, and temporarily stored there.

After the PC is connected with the TCP/IP interface of the PLC, the program can be transferred with a

load function to the PLC’s memory.

The PC is no longer needed for further program processing in the PLC.

Note: The exact sequence is described step by step in the chapters below.

PC with STEP 7

PLC S7-1200

1. Generate PLC programm with STEP 7 on the PC

2. Connect PC with TCP/IP PLC interface

3. Load program from the PC to the PLC memory.

Page 24: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 24 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

6. Configuring and Operating the SIMATIC S7-1200

Module Spectrum:

The SIMATIC S7-1200 is a modular automation system and offers the following module spectrum:

- Central modules CPU with different capacity, integrated inputs/outputs and

PROFINET interface (for example, CPU1214C)

- Power supply PM with input AC 120/230V, 50Hz/60Hz, 1.2A/0.7A, and output DC 24V/2.5A

- Signal boards SB for adding analog or digital inputs/outputs; whereby the size of the CPU does

not change

.

(signal boards can be used with the CPUs 1211C/1212C and 1214C)

Page 25: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 25 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

- Signal modules SM for digital and analog inputs and outputs

(for CPUs 1212C a maximum of 2 SMs can be used, for 1214C a maximum of. 8)

- Communication modules CM for serial communication RS 232/RS 485

(for CPUs 1211C/1212C and 1214C, up to 3 CMs can be used)

- Compact Switch Module CSM with 4x RJ45 socket connectors 10/100 MBit/s

SIMATIC memory cards 2MB or 24MB for storing program data and simple CPU replacement

for maintenance

Note: For this module M01, any CPU with integrated digital inputs and digital outputs is sufficient.

Page 26: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 26 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

Important CPU elements:

With an integrated voltage supply (24V connection) and integrated inputs and outputs, the S7-1200

CPU is ready, without additional components.

To communicate with a programming device, the CPU is equipped with an integrated TCP/IP port. By means of an ETHERNET network, the CPU is able to communicate with HMI operator devices or other CPUs.

� Connection 24V � Insertable terminal block for user wiring (behind the cover plates) � Status LEDs for the integrated I/O and the CPU’s operating mode � TCP/IP connection (on the lower side of the CPU)

The SIMATIC Memory Card (MC) stores the program, data, system data, files and projects. It can

be used for the following:

- Transferring a program to several CPUs

- Firmware update of CPUs, signal modules SM and communication modules CM

Page 27: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 27 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

Operating Modes of the CPU

The CPU has the following operating modes:

● In the operating mode STOP, the CPU does not execute the program, and you can load a project

● In the operating mode STARTUP, the CPU performs a startup.

● In the operating mode RUN, the program is executed cyclically. Projects can not be loaded in the

CPU’s RUN mode.

The CPU does not have a physical switch for changing the operating mode. The operating mode

(STOP or RUN) is changed by using the button on the operator panel of the software STEP7 Basic. In

addition, the operator panel is provided with the button MRES to perform a general memory reset and

displays the status LEDs of the CPU.

The color of the status LED RUN/STOP on the front of the CPU indicates its current operating mode.

In addition, there are the LEDs ERROR to indicate errors and MAINT to indicate that maintenance is

required.

● Yellow light indicates the STOP mode. ● Green light indicates the RUN mode. ● Blinking light indicates the STARTUP mode.

Page 28: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 28 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

7. Sample Task: Controlling a Press

Our first program consists of programming a press control.

A press with a protective guard is to be activated with a START button S3 only if the protective

screen is closed. This state is monitored with a sensor Protective Screen Closed B1.

If this is the case, a 5/2 way valve M0 for the press cylinder is set so that a plastic shape can be

pressed.

The press is to retract again when the EMERGENCY OFF button (break contact) EMERGENCY OFF

is activated, or the sensor Protective Screen B1 no longer responds, or the sensor Cylinder B2

Extended responds.

Assignment list:

Address Symbol Comment

%I 0.1 EMERGENCY OFF EMERGENCY OFF button (break contact)

%I 0.3 S3 Start button S3 (make contact)

%I 0.4 B1 Sensor protective screen closed (make contact)

%I 0.5 B2 Sensor Cylinder extended (make contact)

%Q 0.0 M0 Extend Cylinder A

Page 29: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 29 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

8. Programming the Press for the SIMATIC S7-1200

The software 'Totally Integrated Automation Portal’ manages the project and does the

programming.

Here, under a uniform interface, the components such as the controller, visualization and networking

the automation solution are set up, parameterized and programmed.

Online tools are provided for error diagnosis.

The software 'Totally Integrated Automation Portal’ has two different views: the portal view and the

project view.

8.1. Portal View

The portal view provides a task oriented view of the tools for processing the project. Here, you can

quickly decide what you want to do, and call the tool for the respective task. If necessary, a change

to the project view takes place automatically for the selected task. Primarily, getting started and the

first steps are to be facilitated here.

Note: On the lower left, you can jump from the portal view to the project view!

Page 30: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 30 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

8.2. Project View

The project view is a structured view to all constituent parts of the project. As a matter of standard,

the menu bar with the function bars is located on top, project navigation with all the parts of a project

on the left, and the task cards (with instructions and libraries, for example) on the right.

If an element (here, for example, program block FC1) is selected in project navigation, it is displayed

in the center and can be processed there.

Note: On the lower left, you can jump from the project view to the portal view!

Page 31: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 31 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

With the following steps, we are setting up a project for the SIMATIC S7-1200 and we are

programming the solution of the task:

1. The central tool is the 'Totally Integrated Automation Portal’ which is called here with a

double click (→ Totally Integrated Automation Portal V10)

2. Programs for the SIMATIC S7-1200 are managed in projects. Such a project is now set up in the

portal view (→ Generate new project → startup → Generate)

Page 32: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 32 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

3. Now 'First Steps’ are suggested for the configuration. First, we want to ’Configure a device’

(→ First steps → Configuring a device)

Page 33: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 33 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

4. Then, we ’Insert a new device’ with the ’Device name Controller Press’. To this end, we

select from the catalog the 'CPU1214C’ with the matching order number (→ Insert new device →

Controller press → CPU1214C → 6ES7 ……. → Insert)

Page 34: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 34 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

5. Now, the software automatically changes to the project view with the opened hardware

configuration. Here, additional modules can be inserted from the hardware catalog (to the right!), and

in the ’Device overview’, the input/output addresses can be set. Here, the integrated inputs of the

CPU have the addresses %I0.0 to %I1.5 and the integrated outputs the addresses %Q0.0 to %Q1.1 (

→ Device overview → DI14/DO10 → 0…1)

Page 35: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 35 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

6. So that the software later accesses the correct CPU, its IP address and the subnet screen form

have to be set (→ Properties → General → PROFINET interface → IP address: 192.189.0.1 →

Subnet screen form: 255.255.255.0)

(refer also to Chapter 3 for setting the programming interface)

Page 36: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 36 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

7. Since for modern programming, we don’t program with absolute addresses but with variables,

we have to specify the global PLC variables here.

These global PLC variables are descriptive names with comments for those inputs and outputs that

are used in the program. Later, during programming, the global PLC variables can be accessed by

means of this name.

These global variables can be used in the entire program in all blocks.

To this end, first select in project navigation the 'Controller Press[CPU1214C DC/DC/DC]’ and then

’PLC variables’. With a double click, open the table ’PLC variables’ and as shown below, enter the

names for the inputs and outputs (→ Controller Press[CPU1214C DC/DC/DC]’ → PLC Variables→

PLC Variables)

Page 37: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 37 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

8. The program sequence is written in so-called blocks. As a matter of standard, organization block

OB1 already exists.

It represents the interface to the CPU’s operating system, is called by it automatically, and

processed cyclically.

From this organization block, additional blocks can be called in turn for structured programming,

such as the function FC1.

The purpose is to break down an overall task into partial tasks. These can be solved more

easily and tested in their functionality.

Program structure of the example:

Organizaton block OB1 Block called cycically by the operating system. Here, Function FC1 is used.

Function FC1 In this example, contains the actual program for the press control. Is called by OB1..

Page 38: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 38 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

9. To generate the function FC1, in Project Navigation first select 'Controller Press[CPU1214C

DC/DC/DC]’ and then ’Program blocks’. Next, double click on ’Insert new block’ (→ Controller

Press[CPU1214C DC/DC/DC]’ → Program blocks → Insert new block)

Page 39: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 39 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

10. In the selection, select ’Function (FC)’ and assign the name ’Program press’. As programming

language, 'FBD’ is entered. Enumeration is automatic. Since this FC1 is called later with the symbolic

name anyhow, the number is no longer that important. Accept your input with ’OK’. (→ Function (FC)

→ Program Press → FBD → OK)

Page 40: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 40 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

11. The block ’Program Press[FC1]’ will be opened automatically. However, before the program

can be written, the block’s interface has to be declared.

When the interface is declared, the local variables known only in this block are specified.

The variables consist of two groups

• Block parameters that generate the interface of the block for the call in the program.

Type Name Function Available in

Input parameters Input Parameters whose values the block reads

Functions, function blocks and some types of organization blocks

Output parameters Output Parameters whose values the block writes

Functions and function blocks

InOut parameters InOut

Parameters whose value the block reads when it is called and after processing, writes again to the same parameter

Functions and function blocks

• Local data that is used for storing intermediate results.

Type Name Function Available in

Temporary local data Temp

Variables that are used for storing temporary intermediate results. Temporary data is retained for one cycle only.

Functions, function blocks and organization blocks

Static local data Static

Variables that are used for storing static intermediate results in the instance data block. Static data is retained also over several cycles, until it is written anew.

Function blocks

Page 41: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 41 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

12. When declaring the local variables, in our example the following variables are needed.

Input:

EMERGENCY_OFF Here, EMERGENCY OFF monitoring is entered

Start Here, the start button is entered

B_Screen Here, the status of the protection screen is entered

B_Cylinder Here, the status of the sensor Cylinder Extended is entered

Output:

M_Press Here, a status for the output Press Cylinder is written

Temp:

HM01 Auxiliary flag 01 for the SR FlipFlop

All variables in this case are of the type 'Bool’; which means variables that only can have the status '0’

(false) or '1’ (true).

To make it easier to follow them, all local variables should also be provided with a sufficient

comment.

Page 42: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 42 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

13. After having declared the local variables, we can now start programming. To provide a better

overview, we program in networks. A new network can be inserted by clicking on the symbol

’Insert network’. Like the block itself, each network should be documented in the title line. If a longer

text is needed for the description, the ’Comment’ field can be used (→ )

To generate our solution, we need an ’SR Flipflop’. It is located under ’Instructions’ in the folder

’Bit combinations’. If you point with the mouse to an object such as the SR flipflop, detail

information about this object will be displayed (→ Instructions → Bit combination → SR)

Page 43: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 43 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

14. If you highlight an object and then press ’F1’ on your PC, you will be provided with online help

about this object in a window to the right (→ F1)

Note: Here, extensive information is provided in online help regarding the function and the wiring of

the SR flipflop.

Page 44: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 44 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

15. Now, drag the SR flipflop with the mouse below the comment in Network 1. (→ SR)

Page 45: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 45 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

16. Next, highlight the Set input of the SR flipflop and click on AND in the favorites (→ S →

Favorites → AND)

Page 46: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 46 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

17. Exactly in the same way we place the OR at the R1 input and the assignment at the

Q output of the SR flipflop (→ R1 → OR → Q → assignment)

Page 47: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 47 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

18. Now, we enter the local variables. It suffices to enter the first letter of the local variables in the

fields at the commands. Then we can select the desired variable from a list. Local variables are

always identified with the symbol '#’ preceding the name (→ #M_Press).

Page 48: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 48 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

19. Likewise, add the other local variables. At the OR, another input is to be inserted. To this end,

highlight the lowest input with the right mouse key and select ’Insert input’ (→ Insert input)

Page 49: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 49 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

20. Assign the local variable shown here to this input also. If an input is to be inverted, simply drag

the symbol Negation from the ’Favorites’ to the input. (→ Favorites → )

Page 50: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 50 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

21. Next, the ’Properties’ of the cyclically processed block ’Main[OB1]’ are selected. Block

properties can be modified (→ Properties → Main[OB1])

Page 51: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 51 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

22. In the properties, select the programming-’Language’ function block diagram ’FBD’. (→ FBD →

OK)

Page 52: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 52 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

23. As mentioned previously, the block "Program Press“ has to be called from the program block

Main[OB1]. Otherwise, the block would not be processed al all. Open this block by double clicking on

’Main[OB1]’ (→ Main[OB1])

Page 53: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 53 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

24. The block "Program Press“ can then simply be dragged with Drag&Drop to Network 1 of the

block Main[OB1]. Don’t forget to document the networks also in block Main[OB1] (→ Program Press)

Page 54: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 54 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

25. Next, the interface parameters of the block "Program Press“ have to be connected to global PLC

variables. It is sufficient to enter the first letter of the global variable in the field before the local

variable of the block. Then, the desired operand can be selected from a list (→ "EMERGENCY OFF“

)

Page 55: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 55 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

26. Likewise, connect the input variables ’Start’, ’B_Screen’ and ’B_Cylinder’ as well as the output

variable ’M_Press’ to the PLC variables shown here. With a mouse click on Store project

the project will be stored. (→“S3“ → "B1“ → "B2“ → "M0“ → )

Page 56: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 56 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

27. To load your entire program into the CPU, first highlight the folder ’Controller Press’ and then

click on the symbol Load to device (→ Controller Press → )

Page 57: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 57 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

28. During loading, the status is displayed in a window.

29. If loading was successful, it is displayed in a window. Now click on ’Complete’ (→ Complete)

Page 58: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 58 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

30. Now, start the CPU by clicking on the symbol (→ )

31. With ’OK’, confirm the question whether you actually want to start the CPU (→ OK)

Page 59: Training Document for Integrated Automation Solutions Totally

Industry Automation and Drive Technologies - SCE

T I A Ausbildungsunterlage Seite 59 von 59 Modul M1 Ausgabestand: 05/2010 ‚Startup’ Programmierung der SIMATIC S7-1200 mit TIA- Portal V10

32. By clicking on the symbol Monitoring on/off, you can monitor the status of the input and

output variables during program testing at the block "Program Press“ (→ )