Transform 66 Outside the Beltway Miller Heights Neighborhood Association April 10, 2019

Upload: others

Post on 20-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Transform 66 Outside the Beltway - MHNA · 2019-04-23 · Transform 66 Outside the Beltway: Purpose and Need • Address existing and future transportation needs • Improve multimodal

Transform 66 Outside the Beltway

Miller Heights Neighborhood Association

April 10, 2019

Page 2: Transform 66 Outside the Beltway - MHNA · 2019-04-23 · Transform 66 Outside the Beltway: Purpose and Need • Address existing and future transportation needs • Improve multimodal

Transform 66 Outside the Beltway: Purpose and Need

• Address existing and future transportation needs

• Improve multimodal mobility by providing diverse travel choices in a cost-effective manner

• Enhance transportation safety and travel reliability

2

Page 3: Transform 66 Outside the Beltway - MHNA · 2019-04-23 · Transform 66 Outside the Beltway: Purpose and Need • Address existing and future transportation needs • Improve multimodal

I-66 Outside the Beltway Project

3

Two express lanes

• HOV-3+ and buses travel free

• Non-HOV tolled

• Congestion-based tolls

Three regular lanes

• Open to all traffic

• No tolls

• Ramp-to-ramp connections between interchanges (auxiliary lanes)

• Safety, interchange and operational improvements

New transit service and other multimodal improvements

• High-frequency, fast and reliable bus service during extended peak periods

• Park and ride facilities

• Transportation Demand Management (TDM) strategies

• Bicycle and pedestrian trail and improvements

Page 4: Transform 66 Outside the Beltway - MHNA · 2019-04-23 · Transform 66 Outside the Beltway: Purpose and Need • Address existing and future transportation needs • Improve multimodal

I-66 Outside the BeltwayProject Benefits

• Congestion relief on all lanes

• Faster transit through express lanes

• Move 2,000 to 4,000 more people per hour

• New buses and transit routes

• 4,000 new park and ride spaces

• Improved safety

4

Flexible barrier with buffer, median for potential future transit

(with auxiliary lanes, if needed)

Page 5: Transform 66 Outside the Beltway - MHNA · 2019-04-23 · Transform 66 Outside the Beltway: Purpose and Need • Address existing and future transportation needs • Improve multimodal

Project Roadmap

December 2017

Early Construction Activity

Spring 2018

Construction Ramp Up

2019

Results of Noise, Environmental, and Traffic Analyses

Starting Spring 2018

ROW Acquisition

To

da

y

December 2022

Express Lanes Open

Fall 2019

Park and Ride Milestone(960 Spaces near Gainesville)

November 2020

Route 28 Signalization (Phased Removal

of 4 Traffic Signals from Route 28)

Page 6: Transform 66 Outside the Beltway - MHNA · 2019-04-23 · Transform 66 Outside the Beltway: Purpose and Need • Address existing and future transportation needs • Improve multimodal

Noise, Traffic, and Environmental Analysis Process2019

• Based on design plans & updated traffic studies

- Is the wall feasible?

- Is the wall reasonable?

• Publish final noise study results and noise wall locations in 2019

• Solicit input from benefited property owners & renters (voting process for new walls)

• Include approved noise walls into final plans

Fin

al

No

ise

An

alys

is

• Final Environmental Assessment and Finding of No Significant Impact (FONSI) completed in June 2016 documented the Preferred Alternative design

• Project design changes undergoing environmental re-evaluation

• Results of the traffic and environmental reevaluations and the Final Design Noise Analysis will be posted to Transform66.org Fi

nal

Tra

ffic

an

d

Envi

ron

me

nta

l

Page 7: Transform 66 Outside the Beltway - MHNA · 2019-04-23 · Transform 66 Outside the Beltway: Purpose and Need • Address existing and future transportation needs • Improve multimodal

Construction Activities

Construction has begun along the corridor within VDOT Right of Way:

• Long-term lane shifts

• Tree removal where necessary within existing right of way and at E.C. Lawrence Park

• Installation and maintenance of erosion and sediment controls

• Utility relocation

• Grading and drainage

• Work on new E.C. Lawrence Park Access Road and Braddock Road temporary pavement

• Bridge foundation work at Route 28 and I-495 Interchanges

• Pedestrian box culvert construction at Route 123

• Retaining walls along I-66

Page 8: Transform 66 Outside the Beltway - MHNA · 2019-04-23 · Transform 66 Outside the Beltway: Purpose and Need • Address existing and future transportation needs • Improve multimodal

• Access from US Route 50 East to I-66 East express lanes

• Access from I-66 West express lanes to US Route 50 West

• Safety improvements throughout interchange

• Shared use path through interchange, to connect to other existing or planned trails

Route 50 Interchange Improvements

Page 9: Transform 66 Outside the Beltway - MHNA · 2019-04-23 · Transform 66 Outside the Beltway: Purpose and Need • Address existing and future transportation needs • Improve multimodal

Route 50 Interchange Construction

Upcoming work within next 6 months

• Lane shifting on US Route 50 to create work zones

• Continued tree clearing throughout the interchange

• Grading and drainage inside the interchange

Activities anticipated to begin in Fall 2019

• Bridgework inside interchange

• Construction of temporary pavement detours within interchange

• All current movements will remain available

9

Inside Route 50/I-66 Interchange

Page 10: Transform 66 Outside the Beltway - MHNA · 2019-04-23 · Transform 66 Outside the Beltway: Purpose and Need • Address existing and future transportation needs • Improve multimodal

Balls Ford Park and Ride Lot

▪ 230 spaces expected to open December 2018

▪ Full project completion expected

▪ Access from Heathcote Blvd

▪ Features:

▪ Two Bus Bays and Two Bus Shelters

▪ Bicycle Racks and Lockers

▪ Kiss-and-Ride (Drop-off) Area

▪ Parking Management System

▪ OmniRide working through its process to add direct service to Rosslyn-Ballston corridor

Page 11: Transform 66 Outside the Beltway - MHNA · 2019-04-23 · Transform 66 Outside the Beltway: Purpose and Need • Address existing and future transportation needs • Improve multimodal

Waples Mill Road Improvements

Waples Mill Road Improvements• Shared use path on West side of bridge; sidewalk

on East side

Upcoming work within next two months• Mass excavation

• Utility relocation

Activities anticipated to begin in next 6 months• Reduction of Waples Mill Road bridge over I-66 to one

lane, movement controlled by a traffic signal –approximately 6 months in duration

• Bridge work

Page 12: Transform 66 Outside the Beltway - MHNA · 2019-04-23 · Transform 66 Outside the Beltway: Purpose and Need • Address existing and future transportation needs • Improve multimodal

Jermantown Road Improvements

Jermantown Road Improvements

• New bridge will be striped for four lanes

• Shared use path on both sides of bridge

Upcoming work within next two months

• Traffic pattern shift on Jermantown Road from two lanes to one lane- Approximately two month duration

• Waterline relocation

Activities anticipated to begin in Fall 2019

• Bridge work for new Jermantown Road Bridge

• No anticipated long term traffic interruptions

• Communities will be notified of any traffic changes

Page 13: Transform 66 Outside the Beltway - MHNA · 2019-04-23 · Transform 66 Outside the Beltway: Purpose and Need • Address existing and future transportation needs • Improve multimodal

• Access to/from express lanes in both directions

• Safety improvements throughout interchange

• Shared use path through interchange, to connect to planned George Snyder Trail in City of Fairfax

Route 123 Interchange Improvements

Page 14: Transform 66 Outside the Beltway - MHNA · 2019-04-23 · Transform 66 Outside the Beltway: Purpose and Need • Address existing and future transportation needs • Improve multimodal

Route 123 InterchangeCurrent and Upcoming Construction Activities

Current Work • Excavating and building of retaining walls

along I-66 between Jermantown Road and Route 123

• Continued clearing and grubbing, erosion and sediment control, drainage, utility work

• Paving for traffic shifts of ramp from I-66W to Route 123

• Striping and installation of traffic signal for upcoming traffic pattern change

Upcoming Work• Long-term traffic pattern shift from Route

123 North to I-66 West (on/about April 19, 2019)

• Demolition of loop ramp from Route 123 North to I-66 West

Page 15: Transform 66 Outside the Beltway - MHNA · 2019-04-23 · Transform 66 Outside the Beltway: Purpose and Need • Address existing and future transportation needs • Improve multimodal

Balls Ford Park and Ride Lot

▪ 230 spaces expected to open December 2018

▪ Full project completion expected

▪ Access from Heathcote Blvd

▪ Features:

▪ Two Bus Bays and Two Bus Shelters

▪ Bicycle Racks and Lockers

▪ Kiss-and-Ride (Drop-off) Area

▪ Parking Management System

▪ OmniRide working through its process to add direct service to Rosslyn-Ballston corridor

Page 16: Transform 66 Outside the Beltway - MHNA · 2019-04-23 · Transform 66 Outside the Beltway: Purpose and Need • Address existing and future transportation needs • Improve multimodal

16

Corridor Revegetation Plan

A plan to revegetate the corridor will be produced once final design is complete

The plan will include:

• Indigenous and non-competitive species

• Plants adept to roadside environment

• Replanting of trees within VDOT right of way where able

Page 17: Transform 66 Outside the Beltway - MHNA · 2019-04-23 · Transform 66 Outside the Beltway: Purpose and Need • Address existing and future transportation needs • Improve multimodal

Project website featuring easy-to-access information:

• Construction activities

• Lane closures and traffic changes

• Weekly lane closure look-ahead report

• Direct link to Virginia 511 for real-time traffic conditions and work zones

• Alternative commute information and new commute options

• Project interactive map showing ultimate improvements

• Opportunity to sign-up for regular project updates and news

17

Project Website: Transform66.org

Page 18: Transform 66 Outside the Beltway - MHNA · 2019-04-23 · Transform 66 Outside the Beltway: Purpose and Need • Address existing and future transportation needs • Improve multimodal

Transportation Management Plan During Construction

• Programs to keep commuters moving, reduce number of single-occupant drivers, and promote use of transit and alternative travel strategies during construction

• Additional state police and safety service patrols throughout corridor

• I-66 Outside the Beltway TMP:

• $1 fares on many Connector routes to Vienna Metro

• Half-price OmniRide routes to Tysons, Arlington, and Washington, DC

• New bus service from Front Royal to Washington, DC

• $100 incentives for new HOV-3+ carpoolers

• $200-per-seat subsidy for new vanpools; $350 gas card incentives for 10+ passenger vans; $100 for smaller vans

• Up to $10,000 for new telework programs

Page 19: Transform 66 Outside the Beltway - MHNA · 2019-04-23 · Transform 66 Outside the Beltway: Purpose and Need • Address existing and future transportation needs • Improve multimodal

THANK YOU!STAY INFORMED – Sign Up for Alerts @